HomeMy WebLinkAboutItem 17 - Construction Contract to BNS Construction for the Fire Station 70Public Works Agency
www.santa-ana.org/pw
Item # 17
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 1, 2025
TOPIC: Fire Station 70 Restroom Remodel and Generator Replacement
AGENDA TITLE
Construction Contract to BNS Construction for the Fire Station 70, 2301 Old Grand
Street, Remodel, ADA Restroom and Generator Upgrade (Project No. 24-6626)
(General Fund)
RECOMMENDED ACTION
1. Approve an amendment to the FY 2024-25 Capital Improvement Program to
include $716,250 in construction funds for the Fire Station 70 Remodel, ADA
Restroom and Generator Project.
2. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$716,250 which includes $573,000 for the construction contract, $85,950 for
contract administration, inspection, and testing, and a $57,300 project contingency
for unanticipated or unforeseen work.
3. Award a construction contract to BNS Construction, the lowest responsible bidder,
in accordance with the base bid in the amount of $573,000, subject to change
orders, for the remodel of Fire Station 70 ADA Restroom and Generator
Replacement for a term beginning upon April 1, 2025, and authorize the City
Manager to execute the contract.
4. Determine that, pursuant to the California Environmental Quality Act, the
recommended actions are exempt from further review. Categorical Exemption
Environmental Review No. ER-2025-11 was filed for project 24-6626.
GOVERNMENT CODE §84308 APPLIES: No
DISCUSSION
The Public Works Agency's (PWA) Parks, Fleet, and Facilities team maintains most City
facilities, including ten fire stations occupied by the Orange County Fire Authority
(OCFA). Together with OCFA, staff assessed all Santa Ana fire stations and prioritized
repairs and improvements. It was identified that the restrooms at Fire Station 70,
located at 2301 Old Grand Street (Exhibit 1), currently do not meet the accessibility
standards set by the Americans with Disabilities Act (ADA) and require remodeling. Built
Fire Station 70 ADA Restroom Remodel and Generator Replacement
April 1, 2025
Page 2
in 1971, this fire station's restroom is original to the structure. Additionally, the
emergency generator, which powers the facility during power outages, is 54 years old
and has become outdated and in need of replacement.
Improvements to the facility include updating lighting, plumbing fixtures, finishes,
demolition and installation of non-loadbearing interior partitions and ceiling finishes, and
replacing the outdated generator on a level, flat, and hardened concrete pad. The pad
will offer a level base for the generator, protect it from damage, and enhance safety and
efficiency. Once completed, these improvements will ensure the facility remains in
compliance with the latest building codes and ADA standards.
A copy of construction plans, contracts, specifications, and all related reference
materials (such as The Greenbook) are available for public review at the City's Public
Works Agency, Central Files office located in City Hall.
Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of
2,620 regional vendors via PlanetBids, several of which are Santa Ana based. A total of
23 bids were received. No bids were received from Santa Ana contractors.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on December 2, 2024 and December 9, 2024. This project was also
advertised in PlanetBids on November 26, 2024. Bids were received electronically via
Planet Bids on January 13, 2025. No bid protest was submitted by any of the bidders
during the bid protest period.
Bid Results Summ
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
BNS Construction
Tarzana, CA
$573,000
2
Estate Design and Construction
Los Angeles, CA
$610,557
3
Rhome Profile Construction
Bellflower, CA
$632,643
4
Triangle DeCon Services, Inc.
Mission Viejo, CA
$696,500
5
American Construction Company
Anaheim, CA
$704,513
6
Global Builders Inc.
Laguna Hills, CA
$749,888
7
R Dependable Const Inc.
San Bernardino, CA
$749,997
8
Fidelity Builders, Inc.
Glendale, CA
$787,700
9
Ambit Construction & Design, Inc.
Los Angeles, CA
$799,200
10
Far West Contractors
Placentia, CA
$860,022
11
KAH Construction LLC
Canyon Country, CA
$992,321
12
Loen reen, Inc.
Los Angeles, CA
$1,076,005
13
JRH Construction Company, Inc.
Tustin, CA
$1,077,261
14
AVA Builders, Inc.
North Hollywood, CA
$1,087,022
15
Metro Builders & Engineers Group, Ltd
Newport Beach, CA
$1,102,005
Fire Station 70 ADA Restroom Remodel and Generator Replacement
April 1, 2025
Page 2
RANK
BIDDER'S NAME
LOCATION
BASE BID
16
U.S Builders & Consultants
Irvine, CA
$1,138,700
17
Marjani Builders, Inc.
Rancho Mission Viejo,
CA
$1,144,022
18
Urban Professional Builders, Inc.
Pasadena, CA
$1,264,022
19
The Nazerian Group
Encino, CA
$1,294,123
20
BBS Construction, Inc.
West Covina, CA
$1,332,022
21
Accurate Construction Company Inc.
Covina, CA
$1,336,092
22
MLC Constructors Inc.
Corona, CA
$1,344,181
A total of 23 bids were received and one was deemed unresponsive. BNS Construction
submitted the lowest responsive base bid in the amount of $573,000 (Exhibit 2). As
specified in the bid documents, the lowest bid shall be determined on the basis of the
base bid.
This will be the first project BNS Construction will build in Santa Ana. BNS Construction
has done similar projects in the past for other agencies. Most recently, they completed a
similar ADA restroom renovation project for the U.S. Department of Veterans Affairs
Contracting Office in Yorba Linda, CA. Based on the bid analysis and a contractor's
reference check, staff recommends awarding the construction contract to BNS
Construction (Exhibit 3).
Protect Delivery
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen
conditions. Construction administration and inspection includes construction
management and implementation of the labor requirements.
Any of the allocated construction administration funds not spent are considered project
savings and are returned to the respective fund balance upon close out of the project.
As indicated in the Cost Analysis and as summarized in the table below, the estimated
total construction delivery cost of the project is $716,250.
Project Item
Total
Construction Contract Bid Amount
$ 573,000
Construction Administration
42,975
Inspection
25,785
Testing
17,190
Project Contingencies
57,300
TOTAL ESTIMATED CONSTRUCTION DELIVERY COST
$ 716,250
Fire Station 70 ADA Restroom Remodel and Generator Replacement
April 1, 2025
Page 2
Proiect Schedule and Contract Time
The project completion date is March 2026, barring unforeseeable conditions such as
rain, natural disasters, or other delays beyond the control of the City and of the
Contractor. The contract for this project is 150 working days, as specified in the bid
documents. Working days are counted in accordance with the City's Standard
Specifications, which exclude weekends, City -observed holidays, and inclement
weather days that prevent work. The projected project schedule is provided below:
Project Milestones
Milestone
Estimated
Notes
Completion Date
Administrative Startup
April 2025
Contract execution, bonds,
insurance
Material Procurement
April -August 2025
Procurement for long lead items
(panel, generator, automatic
transfer switch, electrical fixtures
Contractor Mobilization
August 2025
Start of construction activities
Project Completion
March 2026
Based on 150 working days
Project Phasing
The contractor will be constructing this project in one singular phase, fulfilling the scope
of work as outlined in the contract documents. Due to the long lead times in securing
project materials, on -site work will not commence until materials have been secured
(approx. August 2025). The contractor is responsible for determining the scheduling and
sequencing of activities based on their proposed means and methods.
Public Outreach
Construction will be confined to the fire station, ensuring that the community and
neighborhoods remain unaffected. Staff has continuously met with OCFA to discuss the
impact on their fire station. The contractor and staff will coordinate with OCFA
throughout the project construction and will install signage at the project site indicating
project details and contact information.
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Review No. ER-2025-11 was
filed for the project 24-6626 (Exhibit 4).
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $716,250. All funds are available for expenditure in Fiscal Year 2024-2025.
Any remaining balances not expended at the end of the fiscal year will be presented to
City Council for approval to carry forward to Fiscal Year 2025-2026 (Exhibit 5).
Fire Station 70 ADA Restroom Remodel and Generator Replacement
April 1, 2025
Page 2
The proposed contract enables staff to authorize a construction cost increase of up to
10%, if necessary for contingencies. Staff expects to utilize other available Public Works
appropriations if a contingency becomes necessary to complete the project. If there are
no other available appropriations, staff will return to City Council with a project update
and recommendations.
The funds are budgeted and available in the following accounts for this project.
Fiscal
Accounting Unit
Fund
Accounting Unit,
Year
_ Account No.
Description
Account Description
Amount
project No.
Current Budget
01115017-62300
General
Fire — Service
2024-25
(24-6626)
Fund
Enhancement, Contract
635,861
Services - Professional
01115330-62300
General
Fire Suppression/EMS,
2024-25
(24-6626)
Fund
Contract Services -
80,389
Professional
TOTAL
$716,250
EXHIBIT(S)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Environmental Determination
5. Capital Improvement Project Worksheet
Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency
Approved By: Alvaro Nunez, City Manager
EXHIBIT 1
SANTAANA Project Nos. 24-6626.
Phi OCFA Fire Station #70 Remodel, ADA Restroom
% J and Generator Upgrade
PUBLICWORKS AGENCY 1 2301 Old Grand St, Santa Ana, CA 92705
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: BNS Construction
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Fire Station 70 Tenant Improvements
I
LS
$ 557,978.00
$ 557,978.00
2
Project Advertisement Sign
I
EA
$2,000
$ 2,000.00
3
As-builts
I
LS
$5,000
$ 5,000.00
4
Construction Permit
1
LS
$8,022
$ 8,022.00
TOTAL BASE BID $ 573,000.00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within number (150) working days after the commencement date stated in the Notice to
P-1 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for
long -lead time items.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $3,600 per calendar day.
Name of Firm BNS Construction
Signature of BIDDER l j.
Title Owner
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-2 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm BNS Construction
Signature of BIDDER,
Title Owner
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-3 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and
all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: BNS Construction
Business Address: 18440 Hatteras St. #33, Tarzana, CA 91356
Business E-Mail Address: sales@bnsconstruct.com
Telephone:
818-535-1006
State Contractor's License No. and Class
License Expiration Date:
State Dept. of Industrial Relations (DIR)
Registration No.:
State Dept. of Industrial Relations (DIR)
Registration Expiration Date:
Signed:
Title: Owner
California, 758726, class: B, C-21, ASB
02/28/2027
2000006915
06/30/2025
P-4 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as
California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which
require the payment of prevailing wage rates and the performance of other requirements on "public
works" and "maintenance" projects. Since the services are being performed as part of an applicable
"public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the
total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing
Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the
commencement of this Agreement. Contractor shall make copies of the prevailing rates of per
diem wages for each craft, classification or type of worker needed to execute the services available
to interested parties upon request, and shall post copies at the Contractor's principal place of
business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and
agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm BNS Construction
Signature of BIDDER is;;
Title Owner
(if an individual, so state)
P-5 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION 470 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS:
CITY OF SANTA ANA )
Ron Shashua , being duly sworn, deposes and says:
®INDIVIDUAL That he/she is the party making the foregoing proposal: $ 573,000
❑ PARTNERSHIP That he/she is a member of the co -partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments
for the co -partnership by:
who constitute the other members of the co -partnership.
❑ CORPORATION That he is of:
a corporation which is malting the foregoing proposal:
❑ JOINT VENTURE That he is of
one of the parties making the foregoing proposal as a joint venture, and the he/she has been
and is duly vested with the authority to execute instruments for an on behalf of the parties
making said bid whe are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion
to secure any advantage against the City of Santa Ana or any person interested in the proposed
contract, for himself or any other person.
Signature of Bidder
Subscrib swo efore me this 9th day of January 20 25
ALn�� �-
Signature of officer dministering Oath (Notary Public)
1GM STBL
Notary Public - California
_ Ventura County
° Commission # 2387741
My Comm. Expires Dec 21, 2025
P-6 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
BID BOND
KNOW ALL PRESENT that,
,.,DNS Construction , as BIDDER, and
Merchants National Bonding Inc , as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of _
Fifty -Seven Thousand Three Hundred Dollars ($ 57 300.00 _), which is ten percent (10%)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is
accepted and a contract is awarded and entered into by BIDDER in the manner and time specified,
then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor
of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
9th day of January , 20 25
BIDDER*
BNS Construction 18440 Hatteras St. #33, Tarzana, CA 91 356
Ron Shashua
SURETY*
Merchants National
Subscribed and sworn to before me
January 9 20 25.
14498, Des Moines, IA 50306 800-678-8171
Kim Steil
Philips, Attorney -In -Fact
this 9th day of
Notary Public in and for the County of Los Angeles _ , State of California
* Provide BIDDER/ SURETY name, address, and telephone number and the nacre, title, address,
and telephone number of authorized representative.
P-7 of P-18
CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies onlythe identity of the individual who signed the document
to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California j
County of c,:
On 2�before me, 1 �1 -�3 S 1- ] dTv pvlb
D to Here Insert Name and Title of th Officer
personally appeared
Name(s)
who proved to me on the basis of satisfactory evidence to be the person(`) whose name(j) is/ate subscribed
to the within instrument and acknowledged to me that VsheAey executed the same in his/her/their
authorized capacity(i-ks), and that by hlc./her/thileir signature(s) on the instrument the personk), or the entity
upon behalf of which the person(V) acted, executed the instrument.
KIM STUL
j Notary Public - California
Ventura County
cammission 11 2387741
My Comm. Expires Dec 21, 20Z5
Place Notary Seal and/or Stamp Above
I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
c
Signature
Signature of Notary Public
yr l 1W]Wae_
Completing this information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document,
Description of Attached Document
Title or Type of Document:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer— Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee
❑ Other:
Signer is Representing
❑ Guardian or Conservator
02019 National Notary Association
Number of Pages:
Signer's Name:
❑ Corporate Officer —
❑ Partner— ❑ Limite
❑ Individual
❑ Trustee?
❑ Other:
Signer is Representing
d
Title(s):
❑ General
❑ Attorney in Fact
❑ Guardian or Conservator
CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document
to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California 1
County o Los Angeles J}
On of oz before me, Kim Steil, Notary Public
Date (--) / Herp Insert Ngme and Title of the Officer
personally appeared
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed
to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their
authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity
upon behalf of which the person(s) acted, executed the instrument.
KIM STEIL
Notary Public California
Y
Ventura County
Commission A 2387741
My comet. Expires I)ec 21, 2D25
Place Notary Sea! andlor Stomp Above
I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature _�& a
Signature of ctor Public
OPTIONAL
Completing this information con deter alteration of the document or
fraudulent reattachment of this form to on unintended document.
Description of Attached Document
Titie or Type of Document:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — ❑ Limited 0 General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
o Other:
Signer is Representing:
Cc2019 National Notary Association
Number of Pages:
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner ❑ Limited ❑ General
❑ Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
❑ Other:
Signer is Representing:
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: 1/2% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: 1/2% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name
I builders 4 u
License #/Exp.
988185
DIR Reg. #/Exp.
06/30/2025
Location 18375 Ventura Blvd, unit 148. Tarzana, 91356
Phone
818-383-3353
Type Of Work
Concrete, Finishes
Amount $
56,868
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Signature of Bidder
Name
License #/Exp.
DIR Reg. #/Exp.
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
'�
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
1. VA contracting office, 18801 Haven Lane, Yorba Linda, CA 92886
Name and Address of Owner.
Ginny Bolle (714) 803-5387 leave a message and she will call you back
Name and Telephone Number of person familiar with project.
$88,000 ADA Bathroom Remodeling VA 1 /29/2023
Contract Amount Type of Work Date Completed
2. Topham LLC, 18627 Topham St. Tarzana, CA 91356
Name and Address of owner.
foram Kesten 818-398-5125
Name and Telephone Number of person familiar with project.
$440,000 8 units ADA Bathroom Remodeling 10/20/2022
Contract Amount Type of Work Date Completed
VA federal Project, Acton
Name and Address of owner.
Lawrence Mcmahan, 216-258-4707
Name and Telephone Number of person familiar with project.
$99,480.00 VA Adaptable Bathroom Acton
Contract Amount Type of Work
02/04/2021
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Shay Philips
S Philips Surety & Insurance Services Inc
22647 Ventura BI #349
Woodland i s,
818-715-7133
P-9 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
1. Federal Aviation , Lihue Airport, HI
2.
Name and Address of Owner.
Ira Farnoush, (310) 880-0462
Name and Telephone Number of person familiar with project.
$R8"000.00 Lihue Vortac Refurbishment, 1 /20/2020
Contract Amount Type of Work Date Completed
Name and Address of owner.
Name and Telephone Number of person familiar with�ro�ect.
Remove, Refurbish the Upolu OR Teepee &
Tacan) and Reinstall 1 0/?900i--�
Contract Amount Type of Work Date Completed
3. Subcontractor project: 4M Investment, 12300 Wilshire Blvd, Los Angeles, CA 90025
Name and Address of owner.
David Marzini, 818-339-3653
Name and Telephone Number of person familiar with project.
$734,000
Contract Amount
12300 Whilsire TI
Type of Work
10/12/2022
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Shav Philips
S Philips Surety & Insurance Services Inc
22647 Ventura BI #349
VVoodland Hills, CA 91364
818-715-7133
shay@spbonds.com
P-10 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine and
not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other
BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are cautioned
that making a false certification may subject the certifier to criminal prosecution.
Signed BNS Construction
State of California
County of Los Angeles
Subscribed and sworn to (or affirmed) before me on this 9th day of Janes, 20J by
Ron Shashua proved to me on the basis of satisfactory evidence to be the person(s)
who appeared before me
i -
Notary Public >.gn re Notary Public Seal
90my
KIM STEIL
Notary Public - California
Ventura County
Commission # 2387741
Comm. Expires Dec 21, 2D25
P-11 of P-1 S
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering
agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with
such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government contracts or federally assisted construction contracts in accordance with
procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise
provided by law.
P-12 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless
exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding
upon each subcontract or purchase order as the administering agency may direct as means of
enforcing such provisions, including sanctions for noncompliance; provided, however, that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency, the
Contractor may request that the United States enter into such litigation to protect the interests
of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Chapter.
Signed:
Title: Owner
Firm: BNS Construction
Date: 1 /13/2025
P-13 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor
under the apprenticeship standards for the employment and training of apprentices in the area
or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other contractors, except contractors not signatory to the trust agreement shall
pay a like amount to the California Apprenticeship Council.
Signed:
Title: Owner
Firm: BNS Construction
Date: 1 /13/2025
P-14 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is otherwise entitled.
Signed: m
� ,_ 1 +
�
Title: Owner
Firm: BNS Construction
P-15 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board's
policies, rules and regulations and are familiar with the requirements of Title 13, California Code
of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder
hereby certifies, subject to penalty for perjury, that the option checked below relating to the
Bidder's fleet, and/or that of their subcontractor(s) ("Fleet") is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of
Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449. 1 (f)(2), and a signed description of
the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as
defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records
describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof
that shows they were not able to procure renewable diesel (i.e. third party correspondence or
vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because
this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall
only operate the exempted vehicles in the emergency situation and records of the exempted
vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning
is attached hereto.
Name of Bidder: BNS Construction
Signature:
Name: Ron Shashua
Title: Owner
Date: 1 /13/2025
P-16 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of
law or a safety regulation?
Yes No
If the answer is yes, explain the circumstances in the following space.
P-17 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the
CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties
Building and Construction Trades Council, and the signatory Craft Councils and Local Unions,
effective as of June 6, 2023.
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA,
and is capable of completing construction of the project continuously, and without interruptions or
delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the
Letter of Assent that appears as Attachment A to the CWA.
The undersigned BIDDER has reviewed the Public Works Construction Permit and required
deposit described in Section 2-2a and the Notice of Inviting Bids.
Signed:
Title: Owner
Firm: BNS Construction
Date: 1 /13/2025
P-18 of P-18
EXHIBIT 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT AGREEMENT
PROJECT NO.: 24-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
This CONSTRUCTION CONTRACT is made and entered into this 1st day of April, 2025 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and BNS
Construction (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the OCFA Fire Station #70 Remodel, ADA Restroom and Generator
Upgrade Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in
accordance with the Contract Documents prepared by the City's Public Works Agency and approved
by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Five Hundred Seventy -Three Thousand Dollars
and No Cents ($573,000.00), as set forth and identified in the BID PROPOSAL, which is attached
hereto and incorporated herein as Exhibit "A," and in accordance with Section 2-7.1 of the Greenbook:
Standard Specifications for Public Works Construction.
rev. 09/01/2017 Page 1 of 4
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: https://www.santa-ana.org/documents/community-workforce-agreement/
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
Page 2 of 4
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
[signature page to follow]
Page 3 of 4
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
JENNIFER L. HALL
City Clerk
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: I&Lxll�
K E NELLESEN
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
Digitally signed by
Nabil Saba
N a b i I S a ^�h a Date: 2025.03.17
11:40:23-07'00'
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
ALVARO NUNEZ
City Manager
CONTRACTOR:
BNS Construction
70'MNa. #Nml
NAME: Ron Shashua
TITLE: Owner
Page 4 of 4
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: BNS Construction
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Fire Station 70 Tenant Improvements
I
LS
$ 557,978.00
$ 557,978.00
2
Project Advertisement Sign
I
EA
$2,000
$ 2,000.00
3
As-builts
I
LS
$5,000
$ 5,000.00
4
Construction Permit
1
LS
$8,022
$ 8,022.00
TOTAL BASE BID $ 573,000.00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within number (150) working days after the commencement date stated in the Notice to
P-1 of P-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6626
OCFA FIRE STATION #70 REMODEL, ADA RESTROOM AND GENERATOR UPGRADE
Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for
long -lead time items.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $3,600 per calendar day.
Name of Firm BNS Construction
Signature of BIDDER l j.
Title Owner
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-2 of P-18
ORANGE COUNTY
CLERK -RECORDER
CEQA FILING COVER SHEET
-50- 011 SO 0V S(i
Recorded in Official Records, Orange County
Hugh Nguyen, Clerk -Recorder ll IIII
1111 NO F E E
*$ R 0 it 1 5 3 8 9 2 5 3$
202585000057 2:33 pm 01/30/25
428 Vitlndx Z01
0.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00
Complete and attach this form to each CEQA Notice filed with the County Clerk -Recorder
TYPE OR PRINT CLEARLY
Project Title
FIRE STATION 70 REMODEL
Check Document being Filed:
0 Environmental Impact Report (EIR)
Mitigated Negative Declaration (MIND) or Negative Declaration (ND)
Notice of Exemption (NOE)
0 Other (Please fill in type):
FILE®
JAN 3 0 2025
HUGH NGUYEN, CL! RK RECORDER
BY: —1��_ DEPUTY
FILED IN THE OFFICE OF THE ORANGE
COUNTY CLERK -RECORDER ON Janunry 30, 2025
Posted for 30 days
DEPUTY KALCIDO
Filing fees are due at the time a Notice of Determination/Exemption is filed with our offlce,For more information
on filing fees and No Effect Determinations, please refer to California Code of Regulations, Title'14, section 753.5.
MAYOR
Valerie Amezcua
MAYOR PRO TFM
Thai Viet Phan
COUNCILMEMBERS
Phil Bacerra
Johnathan Ryan Hernandez
Jessie Lopez
David Penaloza
Benjamin Vazquez
PUBLIC WORKS AGENCY
20 Civic Center Plaza (M-36)
P.O. BOX 1988 - Santa Ana, California 92702
j714) 647-5690 • Fax (714) 647-5823
www.santa-ana.org
CITY MANAGER
Alvaro Nunez
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Jennifer L. Hall
NOTICE OF EXEMPTION
From the Requirements of the California Environmental Quality Act (CEQA)
Fee Exemption per California Government Code Section 6103
To: COUNTY CLERK From: City of Santa Ana
County of Orange Public Works Agency
P.O. Box 238 20 Civic Center Plaza (M-36)
Santa Ana, CA 92702 Santa Ana, CA 92702
Project Title: Fire Station 70 Remodel
Project Number(s): 24-6626
Project Location: 2301 Old Grand St, Santa Ana, CA 92705
City: Santa Ana County: Orange ER Number. ER-2025-11 Date of Approval:
Project Description: The construction will include selective demolition and installation of existing
electrical, finish ceiling, millwork, generator and pad, and plumbing fixtures.
Applicant Name: City of Santa Ana, Public Works Agency
Applicant Address: 20 Civic Center Plaza M-36
Santa Ana, CA 92702
Name of Public Agency Approving Project: City Council
Name of Agency Carrying Out Project: Public Works Agency
Exempt Status:
❑ Ministerial (Sec. 15268)
❑ Declared Emergency (Sec. 15269 (a))
❑ Emergency Project (Sec. 15269 (b through e))
❑ General Rule (Sec. 15061(b)(3)1(5))
❑ Statutory Exemption:
0 Categorical Exemption: 15301 (b)
Reason(s) Why Project is Exempt From CEQA:
15031(b) consists of repair/maintenance of existing public facilities.
City Contact: Suzi Furjanic
Signature:
01/29/2025
non -bearing interior partitions,
FILED
JAN 3 0 2025
HUGH NGUYEN, CLERK -RECORDER
BY: 1l� DEPUTY
Title: Associate Park and Landscape Planner Telephone: (714) 571-4241
Date:
(,-1j0. 2-02.-�—
SANTA ANA CITY COUNCIL
Va€erie Amezcua Thai Viet Phan Jessie Lopez Benjamin Vazquez Phii Bacerra Johnathan Ryan Hernandez David Penaloza
Mayor Mayor Pro Tom, Ward 1 Ward 3 Ward 2 Ward 4 Ward 5 Ward 6
vamezcuacD,Santa-ana_orrl tphan(d),santa-ana.orq iessielaoez(Osanta-ana,oro bvazguezo),sanla-ana.oM pbacerra(dsants-ana.orq Iryanhernandez(o.santa-ana.orq deenaloza Santa-ana.oru
State of California - Department of Fish and Wildlife
_ 2025 ENVIRONMENTAL DOCUMENT FILING FEE
CASH RECEIPT
DFW 753.5a (REV. 01101125) Previously DFG 753.5a
� � L Save
RECEIPT NUMBER:
30 — 01/30/2025 — 0054
STATE CLEARINGHOUSE NUMBER (!(applicable)
SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARLY.
LEADAGENCY LEADAGENCY EMAIL DATE
CITY OF SANTA ANA 1 01/30/2025
COUNTYISTATE AGENCY OF FILING DOCUMENT NUMBER
orange 1202585000057
PROJECT TITLE
FIRE STATION 70 REMODEL
PROJECT APPLICANT NAME PROJECT APPLICANT EMAIL PHONE NUMBER
CITY OF SANTA ANA (714)571-4241
PROJECT APPLICANT ADDRESS
CITY
STATE
ZIP CODE
20 CIVIC CENTER PLAZA (M-36)
SANTA ANA
CA
92702
PROJECT APPLICANT (Check appropriate box)
�✓ Local Public Agency I] School District [] Other Special District
State Agency
Private Entity
CHECK APPLICABLE FEES:
❑ Environmental Impact Report (EIR)
$4,123.50
$
0.00
❑ Mitigated/Negative Declaration (MND)(ND)
$2,968.75
$
0.00
❑ Certified Regulatory Program (CRP) document - payment due directly to CDFW
$1,401.75
$
0.00
El Exempt from fee
E) Notice of Exemption (attach)
❑ CDFW No Effect Determination (attach)
❑ Fee previously paid (attach previously issued cash receipt copy)
❑ Water Right Application or Petition Fee (State Water Resources Control Board only)
$850.00
$
0.00
❑ County documentary handling fee
$
50.00
❑ Other
$
PAYMENT METHOD:
❑ Cash ❑ Credit ❑ Check ❑ Other TOTAL
RECEIVED
$
50.00
SIGNATURE AGENCY OF FILING PRINTED NAME AND TITLE
X KALCI DO, DEPUTY
ORI G INA4 -PROJECT APPLICANT COPY - CDFWIASB COPY - LEAD AGENCY COPY - COUNTY CLERK DFW 753.5a (Rev. 01IM2025)
EXHIBIT 5
PROJECT TITLE:
Fire Station 70 ADA Restroom
Remodel and Generator
Replacement
PROJECT CATEGORY:
City & Park Facility Improvements
Facility
LOCATION MAP A
N
CITY OF SANTA ANA FY 24/25CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Fire Station 70 ADA Restroom Remodel and Generator
Replacement
PF I
PROJECT NEED:
The restrooms at Fire Station 70 currently do not meet the accessibility
standards set by the Americans with Disabilities Act (ADA) and requires
remodeling. Additionally, the emergency generator, which powers the
facility during power outages, is 54 years old and has become outdated
and in need of replacement.
PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27128 FY 28/29 FY 29/30 FY 30131
Construction 716,250 - - - - - -
TOTAL 716,250 - - - - - -
SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30131
635,862 - - - - - -
GENERAL FUND 80,388
TOTAL 716,250 - - -
AGENCY: DIVISION: CONTACT: DATE:
Public Works Parks, Fleet & Facilities Mike Ortiz, Parks, Fleet, and Facilities Manager 13-Mar-2025