Loading...
HomeMy WebLinkAbout23A - FLOWER ST REHABREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JIILY 2, 2007 TITLE: CONTRACT AWARD FOR FLOWER STREET REHABILITATION (PROJECT NOS. 06- 1710 AND 06-1006) CLERK OF COUNCIL USE ONLY: APPROVED ^ As Recommended ^ As Amended ^ Ordinance onlsaReading ^ Ordinance on 2 Reading ^ Implementing Resolution ^ Set Public Hearing For CONTINUED TO FILE NUMBER 1. Award a contract to R.J. Noble Company, the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $2,566,914.90, for construction of the Flower Street Rehabilitation project from Edinger Avenue to First Street and Civic Center Drive to Seventeenth Street. 2. Approve a Funding Analysis with a total estimated construction cost of $3,168,900. The segments of Flower Street from Edinger Avenue to First Street and Civic Center Drive to Seventeenth Street have been identified as a high priority on the City's Pavement Management System (Exhibit 1). The pavement is deteriorating due to weather, age, and heavy usage. Some of the adjacent curbs, gutters, sidewalks, and driveway approaches are also in various state of disrepair. The project provides for construction of new street pavement and replacement of damaged concrete curbs, gutters, sidewalks, driveway approaches, and installation of wheelchair ramps. Once completed, these improvements will enhance the ride quality, surface drainage and visual appearance of the street. Additionally, the existing In-Roadway Flashing Crosswalk (IRFC) at the intersection of Flower and Walnut Streets will be removed and replaced with the latest IRFC model. Once completed, the IRFC installation will enhance the visibility and safety of the existing marked crosswalk. 23A-1 Flower Street Rehabilitation July 2, 2007 Page 2 The Notice Inviting Bids was advertised on May 21 and 23, 2007, and bids were opened on June 7, 2007. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 36 Contractors requesting bidding documents: 16 Bids received: 5 Bids received from Santa Ana Contractors: 0 NAME OF BIDDER CITY BID AMOUNT 1. R.J. Noble Company Orange $2,566,914.90 2. Excel Paving Company Long Beach $2,685,670.80 3. Shawman Downey $2,685.705.80 4. Sequel Contractors, Inc. Santa Fe Springs $2,703.162.55 5. All American Asphalt Corona $2,882,882.00 A total of five bids were received and all were responsive. The lowest bid was submitted by R.J. Noble Company, for $2,566,914.90, which is below the Engineer's estimate of $2,874,000. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemption ER 2006-1 and ER 2005-97 were filed for the project. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $3,168,900 for the project (Exhibit 2). Funds are available in the Select Street Construction Fund (account no. 59-551-6631) and in the Measure M Construction Fund (account no. 32-551-6631). APPROVED AS TO FUNDS AND ACCOUNTS: James G. oss Francisco Gutierrez Executive Director Executive Director Public Works Agency Finance & Mgmt. Services Agency K:\COnstruction\RFCA-draft\2007\06-1710 2007-07-02 120 WD.doc 23A-2 FUNDING ANALYSIS PROJECT NOS. 06-1710 and 06-1006 FLOWER STREET REHABILITATION Construction Contract $2,566,914 Contract Administration Inspection and Testing Survey Staking Contingencies TOTAL ESTIMATED CONSTRUCTION COSTS Exhibit 2 $64,570 $147,990 $132,735 $256,691 53,168,900 23A-3 J MCF ADDEN AV 1ST ST ISEE IOrER LEFTI MAL NUT CHESTNUT CAYILE NE ST ST LE ST 17TH ST. V AV r z 5T. NG70N AVE. AV RI CHLAND HIGHLAND ST $T CUDDON ST~A CUBRDN ST NCFADDEN AV ISEE UPPER RICNT) SANf1 ANA F ~.~..~. EXHIBIT 1 FLOWER BTFIEET REFIA~JiA110N p'ROJEC7 NOB. OB-1710 MD OB-1009) 23A-4 ST. EDINGER AV CIVIL CENTER DR.