Loading...
HomeMy WebLinkAboutORANGE, CITY OF (MAIN STREET IMPROVEMENRTS) - 2007 r -....~:f SINOV 8 2007 i 0'. f>WA(A\'o.n S\afl\e~ (2) e e /Ir.l. f/td'- J ~.J A-2007 -230 AGREEMENT BETWEEN THE CITY OF SANTA ANA AND THE CITY OF ORANGE FOR THE ARTERIAL HIGHWAYS REHABILITATION PROJECT ON MAIN STREET FROM WALKIE WAY TO NORTH CITY LIMITS /F ...L- This Agreement ("Agreement"), made and entered into this...1fl,l day of uc I q~~..L ,2007, by and between the CITY OF ORANGE, a municipal corporation ("ORANGE"), and the CITY OF SANTA ANA, a charter city and municipal corporation ("SANTA ANA"). RECITALS: A. ORANGE and SANTA ANA desire to enter into an agreement for street rehabilitation work per the plans and specifications prepared by the City of Santa Ana ("the PROJECT"). The PROJECT consists of street rehabilitation work on Main Street from Walkie Way to the north Santa Ana city limits. B. The PROJECT lies partly within the corporate and jurisdictional limits of SANTA ANA and partly within the corporate and jurisdictional limits of ORANGE. C. The parties hereto desire to each provide for the PROJECT, induding the preparation of plans, specifications, and related cost estimates for construction (collectively "the Construction Documents"); materials testing; site survey; construction engineering; construction management; construction and maintenance. D. The parties desire for SANTA ANA to be responsible for preparing the Construction Documents and materials testing, site construction survey, construction engineering, construction management, and construction for the entire PROJECT. E. The PROJECT has received the funding in the amount of$565,6ll from Arterial Highways Rehabilitation Project (AHRP), while the total PROJECT cost is estimated at $1,131,221. F. Final cost will be per unit price bid for the quantity of all items as listed in Exhibit "A". NOW, THEREFORE, the parties agree as follows: 1. SANTA ANA Rights and Duties: a. SANTA ANA shall be the lead agency for prepanng the Construction Documents. b. SANT A ANA shall notify ORANGE in writing of any changes, increased costs, and meetings associated with SANTA ANA's lead agency responsibilities for the PROJECT. c. SANTA ANA shall be the lead agency for materials testing, site construction survey, construction engineering, construction management, and construction 1 for the PROJECT; and is authorized to hire and confer with all consulting engineers and contractors relative to the materials testing, site construction survey, construction engineering, construction management, and construction for the total PROJECT in accordance with standard construction practices. d. SANTA ANA shall have the exclusive right of approval of all plans, specifications and cost estimates prepared by consultants for the portion of the PROJECT within the jurisdictional boundaries of SANTA ANA. e. All progress payments for the PROJECT shall be reviewed by SANTA ANA. All work within SANTA ANA shall be per Santa Ana standard plans. f. SANTA ANA shall cause all hired consultants on the PROJECT to obtain general liability and motor vehicle liability insurance in amounts satisfactory to ORANGE. For any consultant contract on the PROJECT entered into for this "Agreement", SANTA ANA shall also cause ORANGE to be named as additionally insured on insurance certificates and separate endorsements for all consultant contracts related to the PROJECT. Copies of such certificates and endorsements shall be provided to ORANGE prior to consultants proceeding with work on the PROJECT. g. SANTA ANA shall advertise and award all contracts for the PROJECT in accordance with federal, state and local laws. h. SANTA ANA shall, in advance, notify ORANGE as to the official advertising dates, bid opening date, and construction start date, and request ORANGE to attend all pertinent meetings, i.e. pre-bid, pre-construction, site, and final walk through. 1. SANTA ANA shall provide ORANGE final Record Drawings for the PROJECT within 120 days of the completion and acceptance of construction. 2. ORANGE Rights and Duties: a. Change orders for work within ORANGE must receive the written approval of the Executive Director of the Public Works Agency of ORANGE prior to implementation, which approval shall not be umeasonably withheld. ORANGE shall have oversight inspection review within ORANGE jurisdictional boundaries and shall be notified of the progress of the PROJECT for such purposes. ORANGE shall also have the right to enter and inspect within SANTA ANA boundaries at all times for the purposes of overseeing SANTA ANA lead agency functions. b. ORANGE shall have the exclusive right of approval of all plans, specifications and cost estimates prepared by consultants for the portion of the PROJECT within the jurisdictional boundaries of ORANGE. 2 3. Joint Rights and Duties: a. In the event that expended costs for the PROJECT exceed funds listed in Exhibit "A", SANTA ANA shall be solely responsible for obtaining the additional funding for the increased costs occurring within the jurisdictional boundary of SANTA ANA and ORANGE shall be solely responsible for obtaining the additional funding for the increased costs occurring within the jurisdictional boundary of ORANGE. ORANGE shall be responsible for 50% of the cost for eligible items under the AHRP program and 100% of the cost for non-eligible items as listed in Exhibit "A". b. ORANGE and SANTA ANA shall be responsible for maintenance and operations within their jurisdictional boundaries for the work done under this PROJECT. c. Mutual Indemnity Provision: 1. Upon completion of the PROJECT, SANTA ANA shall accept maintenance responsibility for the PROJECT within SANTA ANA jurisdictional limits, and ORANGE within ORANGE jurisdictional limits. 11. Pursuant to Section 8546.7 of the California Government Code, in the event that this Agreement involves expenditures of State funds aggregating in excess of Ten Thousand Dollars ($10,000), both parties shall be subject to the examination and audit of the Auditor General of the State of California for a period of three (3) years after final payment under this Agreement. 111. That neither SANTA ANA nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by ORANGE under or in connection with any work, authority, or duties delegated to ORANGE under this Agreement. It is also understood and agreed that, pursuant to Government Code Section 895.4, ORANGE shall fully indemnify, defend, and hold SANTA ANA harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by ORANGE under or in connection with any work, authority, or duties delegated to ORANGE under this Agreement. IV. That neither ORANGE nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by SANTA ANA under or in connection with any work, authority, or duties delegated to SANTA ANA under this Agreement. It is also understood and agreed that pursuant to Government Code Section 895.4, SANTA 3 T ANA shall fully indemnify, defend and hold ORANGE harmless form any liability imposed for injury (as defined by Government Code Section 810.8) occurring by reason of anything done or omitted to be done by SANTA ANA in connection with any work, authority, or duties delegated to SANTA ANA under this Agreement. 4. Notice: Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by telefacsimile or other telegraphic communication in the manner provided in this Section, to the following persons: To City: Executive Director Public Works Agency City of Santa Ana 20 Civic Center Plaza (M-21) P.O. Box 1988 Santa Ana, California 92702-1988 Telefacsimile (714) 647-5622 and, City Attorney City of Santa Ana 20 Civic Center Plaza (M-29) P.O. Box 1988 Santa Ana, California 92702 Telefacsimi1e (714) 647-6515 and, City of Orange - Public Works Agency 300 E. Chapman Avenue Orange, CA 92866 Attn: Gail Farber Telefacsimile (714) 744-5573 and, City Attorney, David DeBerry City of Orange 300 E Chapman Avenue Orange, CA 92866 Telefacsimile (714) 538-7157 A party may change its address by giving notice in writing to the other party. Thereafter, any notice, tender, demand, delivery, or other communication shall be addressed and 4 transmitted to the new address. If sent by mail, any notice, tender, demand, delivery, or other communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by telefacsimile, any notice, tender, demand, delivery, or other communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. Remainder of page intentionally blank Signatures on following page 5 IN WITNESS WHEREOF, ORANGE has caused this Agreement to be executed by its Mayor and attested by its Clerk, and SANTA ANA caused this Agreement to be executed by its City Manager and attested by its Clerk, as duly authorized by the ORANGE City Council and the SANTA ANA City Council, respectively. CITY OF SANTA ANA, a municipal corporation of the State of California ~ By: ~ David N. Re City Manager CITY OF ORANGE, a municipal corporation of the State of Car ia ATTEST: ATTEST: '-~ ~v Patricia E. Heal~ Clerk of the Co cil APPROVED AS TO FORM: II I -. . .Oh<- a~ Joseph W. Fletcher City Attorney APPROVED AS TO CONTENT: i /\ ~ t"- i ....~- ~ - . - r~1 ~ohn W. Sibley 'City Manager RECOMMENDED FOR APPROVAL: RECOMMENDED FOR APPROVAL: Xfa~./d~' Gail Farber Director of Public Works/City Engineer 6 , " ' , I,,'" ,.,,~ 8 ''-''''':' . ,~',:: ~' IW1: , , . :':~i::~,~ :' .~'t~~ J";'0:~ ~ ,,'. ,";;, .. . . ~, . .. $.0 ~ , ..= ~;I, 00 <( ~ " 0() .. +-' = J' ..c ~ .:\ . ;i $.0 ; ..c 0 ;,;, >< r,.,';,: ,;: w ~ , . 1'< Q ~/l~:"i '~::~ ~ ...... :"">~?~~ .. U I'~, :,~ ':1 ' ',;; ':~:"": : ' , ..; ',g /" '. Ii "~ 'S ..~ = .. .e} i l!)l!)<O "IC\J"'" T""","l!) ~~~ Ol!)O ","C')O l!)C\Jl!) "':<OC\J ~~~ l!)l!)","Ol!)O "I "IT"" T""OOO "'" "'" ~ T"" ~ l!) ~~ ~ "I ~ . ::: ~ l!)T""~","o;T"" l!)T""T"" <(<(LL>-ZCJ) WWCJ)OI-....J l!) . ,... C\J "I C\J" , C') T"""","l!) ~~~ Ol!)O ","C')O l!)C\Jl!) "':<OC\J ~~~ l!)l!)","Ol!)O "I "IT"" T""OOO ","","~T""~l!) ~~ ~ C\J ~ l!)T""~","o;T"" l!)T""T"" <(<(LL>-ZCJ) WWCJ)OI-....J Q) Q) '0'0 CO CO C: C: '0'0 Q) Q) ..c ..c C/J "~ "~ 9- E E E o 0 CO -_0: >I.D :s: ~ :; enCi)Ci)O E:J:JO Q)'O'OO .:::<(<(0... ~ X :g. W-CCi) -gQ)'O ;;::: E @ "w Q) C/J 10 g ~ 0... c cOg ::J<(CJ) ~NMV~ ""<OI'--o::t' .....l!)C')CD M~ l!) 0 at O"'"C')..... ~~~~ ....."'"<0..... ~l!)C')d'; ~l!)0 ~ O"'"C')..... ~~~~ CD I g ";:: Q) Q) en c E "g Q) c en .:::W E ~5~Q) J:2+:;C'::: :~ () Q) Q) ::2Q:ji UJ Ci) "~ 'r; - C C .~' asOOUJen OOO_E 1i~~S$ ~ l!) 0 0 cnT""T""I-Q) ji :~ (j) c - I-- . ,,,"', 000> 001 o 0 0') 0> 0> 00, 0> 0 0') T"" 0> 0') , ;i O>I'--r-:T""I'--a)'tt ~~0~~0(1. 0 0 " , T""" T"" T"" ~ ,', ~ - 0 0> 0 I'-- " f-- >- LL 0 CJ) - , X Q) '0 Q) ;;:::~ "w CO ~ :s: ()~ c "_ ::JCJ) 000> g ";:: en Q) E ~ Q) "g en .::: C E Q)W Q) jic~.:::...I :~"Q g Q) < _UQ)ji..... ~ .s g. :~O - C/J +:; .- ..... 1U 5 5 ~ 's 000 - 0 0 1U J:2Q<::Q<::-a: ~~~~~ '~ .... : 1:l is 0) u ";:: a. +-' c ::J ..... 0) a. 0) .n "~ (f) 0) ::J co > <( U5 0 u +-' co 0) .n "~ (f) E .~ 0) ;Q .Q> (jj C: 0 z E co ..... 0> 0 ..... a. a... a: I <( 0) -S ..... 0) 1:l C +-' ::J C (f) 0) E E 0) .~ u CO 0) C. 15 0) 0> ..... ..... (jj .2 0) 1:l -S c CO '0 0> ;(2 C 0 E 0 ..... L!'l .2 c ..... ..... 0 .2 0:;::::; 0) _u .n 0 0) (f) CO <( Q) (f) ..c 0) ~ (f) 1:l ...... C ::J (f) 0) (30 E .~ C') 0) OX (f) ..... <(0 ::J .n jB~ E 0_ 'Qi Z 0 a: , CITY OF ORANGE CITY CLERK (714) 744-5500 FAX: (714) 744-5515 www.cityoforange.org October 29, 2007 Alan Stanley Engineering Tech II Public Works Agency City of Santa Ana 20 Civic Center Plaza (M-21) P.O. Box 1988 Santa Ana, CA 92702-1988 Dear Mr. Stanley: Enclosed please find (3) three executed copies of the agreement for the rehabilitation of Main St. between your agency and the City of Orange. They are now ready for signatures by your agency. Once these documents have been signed, please return one fully executed copy to me at the City Clerk's Office at the address below. If! can be of any further assistance to you, please contact me at the City Clerk's office Very truly yours, ~l-f. ~ LMary E. Murphy ! . City Clerk cc: Public Works Department C:\Documents and Settings\mday\My Documents\agrsig.doc 81,':\~M~CY~LIYe.lh CENTER 300 E. CHAPMAN A VENUE ORANGE, CALIFORNIA 92866-1591