CLERK OF COUNCIL SECOND AMENDMENT TO CONSULTANT
DATE: 12- Iq - 07 AGREEMENT WITH PARSONS BRINKERHOF
a~
S~ , cQ7rx(-~;c E~.
0 : T (2~ dba PB AMERICAS, INC.
J
Q
VQV,t,~ BYDr~~li ll0 rd
THIS SECOND AMENDMENT, ~s made and entered mto this 3 day of
December, 2007, by and between Parsons Brinkerhof, doing business as "PB Americas,
Inc.", a New York corporation (hereinafer "Consultant"), and the City of Santa Ana, a
charter city and municipal corporation organized and existing under the Constitution and
laws of the State of California (hereinafter "City").
RECITALS
A. The City entered into an Agreement with Consultant on January 17, 2006, ("the
Agreement") to provide support services to complete the Santa Ana Transit
Master Plan.
B. City needs further support services to conduct the Metrolink extension studies
that will meet the various Federal transit agencies' guidelines in order to
complete Step One of the "Go Local Program" with the Orange County
Transportation Authority.
C. The parties hereto now desire to amend the Agreement in order for Consultant
to perform additional services for the City, add additional funding and extend
the term.
NOW THEREFORE, in consideration of the mutual and respective promises, and
subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. The "Scope of Services" term of the Agreement will be expanded and updated to
allow Consultant Yo conduct the City-Initiated Transit Extensions to the Metrolink
Studies as further set forth in Exhibit A-1 attached hereto and incorporated herein.
2. The "Compensation" term of the Agreement will be increased with additional funding
not to exceed Three Hundred Fifty Thousand Dollars ($350,000.00).
3. The "Term" of the Agreement shall be extended through March 31, 2009
4. The above changes are the only changes to the Agreement, and all other terms and
conditions of the Agreement remain unchanged.
IN WITNESS WHEREOF, the parties hereto have executed this Second Amendment to
Agreement the date and year first above written.
ATTEST:
PATRICIA E. HEALY
Clerk of the Council
CITY OF SANTA ANA:
lx
DAVID N. RE
City Manager
APPROVETI AS TO FORM:
JOSEPH W.FLETCHER
City Attorney
Lisa E. Storck
Assistant City Attorney
FOR APPROVAL
G. Ross
ive Director
CONSULTANT
/~
~-R-E: ~~ ~,, . T.so
5r.-~ssE:Vice President JZ-~J~~o'7
ager
Public Works Agency
City of Santa Ana
Tax ID #: 11-1531569
Parsons 407 8 Street
BAnckerhor/ Suite 1450
-_ San Diego, CA 92107
_ 679-338-9376
-f00
YERflS
November 8, 2007
Mr. Dave Biondolillo
City of Santa Ana
Transportation & Traffic Engineering
Public Works Agency M-931
20 Civic Center Plaza
Santa Ana, CA 92702
Dear Dave:
RE: Proposed Amendment No. 2 to Contract No. A-2007-035
Phase B -Santa Ana Transit Vision and Go Local Project Concept Study
I have enclosed the revised work scope and cost proposal for Phase B Amendment
No. 2 of the Santa Ana Transit Vision and Go Local Project Concept Study. If you
concur with the enclosures, this study title and work scope would supersede the OCTA
Go Local Program -Step 1 study title and work scope and, along with the cost proposal,
would constitute Amendment No. 2 to the agreement executed between the City of
Santa Ana and PB on January 17, 2006 (Amendment No. 1 was executed on February
5, 2007).
The $279,189 proposed contract amendment generally breaks down as follows:
27% =Preparation of the OCTA Go Local Final Concept Report and OCTA Go Local
Step 2 Application and initiation of the Final Study Report
51 % = Photosimulations and Aerial Tour Video
22% =Completion of the Final Study Report and Project Activities/Project Management
during the additional four months of the contract (March -June 2008)
We have been undertaking work in accordance with the amended work scope per your
direction at our August 1, 2007 Progress Meeting and subsequent meetings since
August 1, 2007. This out-of-scope work has been billed to the existing contract budget
pending formal execution of a contract amendment that incorporates the amended work
Over a Century o/
Engineering Excellence
The total contract budget amendment requested is $279,189 and would extend the
project contract schedule four months through June 30, 2008. The overall contract
budget summary is:
---- 100
YEARS m
scope and cost proposal. It is imperative that a contract amendment be executed for
proposed Phase B Amendment No. 2 by early December 2007 to provide sufficient
funding for us to complete the original contract work scope and the amendment project
work currently underway. It is my understanding that you plan to request the Santa Ana
City Council to amend the contract on December 3, 2007. Upon City Council action,
please forward a contract amendment to me for signature.
Thanks, Dave, and if you have any questions about the amended work scope or revised
cost proposal, please let me know.
Sincerely,
P~''
Toni Bates
Project Manager
Cc: Brian Pearson, Project Director
Over a Century of
Englneerrng ExeelMnce
_... _...
City of Santa Ana
Transit Vision and Go Local Project Concept Definition
Study
Phase B
Amendment No. 2
Scope of Work
(November 2007)
Study Purpose
This study will refine and complete the Transit Vision for the City of Santa Ana that
recognizes the importance of the City's regional civic, employment and cultural role as
"Orange County's Downtown°. The Transit Vision focuses on transforming the Santa
Ana Regional Transportation Center (SARTC) into a regional intermodal transportation
hub that will accommodate the vision over the short and long terms. The study will also
define a Project Concept from the Transit Vision for advancement through OCTA's Go
Local program.
NOTE: This study title and work scope supersede the OCTA Go Local Program -
Step (study title and work scope and, along with the revised cost
proposal, constitute Amendment No. 2 to the agreement executed
between the City of Santa Ana and PB on January 17, 2006 (Amendment
No. 1 was executed on February 5, 2007).
Task 1. Project Management and Administration
1.1 PB will provide overall consultant management for the study, including all tasks
necessary to execute the work as defined in this scope, within the schedule and
budget.
1.2 The PB Project Manager will be the primary point of contact for the City of Santa
Ana.
1.3 Project management and administration will include monthly Progress Meetings
with City of Santa Ana staff, the PB Project Manager and other technical and
advisory staff, as necessary.
1.4 PB will prepare and submit regular Progress Reports and Invoices to the City of
Santa Ana. The Progress Reports will document specific accomplishments for
each task, identify any issues and challenges encountered, and describe any
adjustments that may be needed to the project work tasks, schedule and budget.
The Progress Reports and Invoices will identify the percent of work complete and
budget expended for each task and the overall study to ensure the study is
progressing within schedule and budget.
Deliverables:
• Regular Progress Reports and Invoices
• Attendance at monthly Progress Meetings
Task 2. Data Collection
2.1 PB will incorporate the Data List and data analyses conducted to date into this
amendment.
2.2 PB will research, compile and present general operating, cost and performance
data for Modern Streetcars and ground power supply rail systems, including an
identification and discussion of Streetcar and ground power supply rail systems
currently in operation, as possible applications for the Civic Center Fixed
Guideway Project Concept.
2.3 PB will document street and public rights-of-way to assess the opportunities and
constraints related to implementing various transit technologies within the City of
Santa Ana.
2.4 PB will collect, review and evaluate other data and background materials
necessary to successfully develop the Transit Vision and Go Local Project
Concepts Definition.
Deliverables:
• Updated Data List to include data sources on Streetcars and ground power
supply rail systems, street and public right-of-way information, and other new
data sources gathered to complete this work scope.
Task 3. Background Analysis
3.1 PB will summarize and use the results from the draft Travel Patterns and
Demand Analysis Technical Memorandum to support the Transit Vision and Go
Local Project Concept Definition.
3.2 PB will summarize the Alternatives Analysis work completed to date, which
included an initial assessment of possible transit connections between the Santa
Ana Regional Transportation Center and the Civic Center/Downtown, Main
Place/City Place, South Coast Metro/MacArthur Place, Metro East, and along the
Pacific Electric (PE) Right-of-Way, to support the Transit Vision and Go Local
Project Concept Definition by documenting the advantages of the selected
project concept.
3.3 PB will prepare a Background Chapter for the Final Study Report.
Deliverables:
• Background Chapter 2 in Final Study Report
Task 4. Transit Vision
4.1 PB will refine and complete a Transit Vision for the City of Santa Ana and
prepare a Transit Vision Chapter for the Final Study Report. The Transit Vision
will:
• Incorporate regional long-term and local short-term transit project concepts,
specifically:
o a fixed guideway/streetcar transit system between the SARTC and the
Civic Center with an extension option onto the PE Right-of-Way and
identification of possible future extensions to Main Place/City Place
and the Metro East area
o along term concept for use of the PE Right-of-Way
o expansion of the SARTC to accommodate the short term project
concept and the long term vision.
• Relate directly to regional and local transit and land use plans, specifically
the:
o OCTA Metrolink Expansion Plan
o OCTA BRT Plan
o HOV, High Speed Rail and maglev plans
o Santa Ana General Plan
o Santa Ana Renaissance Specific Plan
o Santa Ana Metro East Overlay Zone
• Identify the Go Local components of the vision for short range planning and
further definition of the Go Local Concept.
4.2 PB will prepare up to three (3) maps and graphics, and one (1) Power Point
presentation to support the Transit Vision.
Deliverables:
• Transit Vision Chapter 3 in Final Study Report
• Up to three (3) maps and graphics
• One (1) Power Point presentation
Task 5. Go Local Project Concept Definition
5.1 PB will define the concept for a fixed guideway/streetcar transit system
connecting the SARTC with the Civic Center/PE Right-of-Way. The concept
definition will include:
• Routing options
• Potential station locations
• Potential transit technologies
• Possible Right-of-way issues and requirements
• Operating plan scenarios
• Ridership potential
• Land use integration
• Conceptual-level capital and operating costs
• Possible concept extensions
5.2 PB will define the concept for the SARTC Expansion. The concept definition will
include:
• Identification of short and long term capital facilities necessary to
accommodate the components of the Transit Vision as developed in Task 4.
• Proposals for expanding the SARTC to the east and south
• Site plan concept for the expanded SARTC
• Integration of Transit Oriented Development on and adjacent to the SARTC,
consistent with the City of Santa Ana's land use plans and policies.
5.3 PB will evaluate the fxed guideway/streetcar and SARTC expansion project
concept relative to the OCTA Go Local criteria and identify the degree to which
the project concepts address the OCTA Go Local program criteria, goals and
objectives.
5.4 PB will prepare a Project Concept Definition Chapter for the Final Study Report
5.5 PB will prepare one (1) site plan and one (1) architect's rendering of the SARTC
expansion. PB will enhance the Power Point presentation prepared as part of
Task 4 to include the Project Concept renderings and visual simulations.
Deliverables:
Project Concept Definition Chapter 4 in Final Study Report
Prepare one (1) Site Plan and one (1) Architect's Rendering of the SARTC
expansion
Task 6. Outreach and Communications
6.1 PB will support the City of Santa Ana staff with outreach and communication
related to the Transit Vision and Go Local Project Concept Definition Study. PB
support will include preparation of meeting materials, and attending and
presenting study information at the following meetings:
• Up to five (5) Strategy Meetings with City staff and OCTA
• One (1) Environmental and Transportation Advisory Committee (ETAC)
meetings
• Up to three (3) Santa Ana City Council Transportation Committee meetings
• Up to two (2) business/property owner meetings
• One (1) City of Santa Ana Planning Commission meeting
Deliverables:
• Meeting materials, attendance and presentations
Task 7. Final Study Report, OCTA Go Local Final Concept Report, and Step 2
Application
7.1 PB will prepare a Final Study Report to include the following:
Executive Summary
Chapter 1: Introduction
Chapter 2: Background
Chapter 3: Transit Vision
Chapter 4: Go Local Project Concept Definition
Chapter 5: Future Activities
Technical Appendices
7.2 PB will prepare the Final Project Concept Report as defined in the OCTA Go
Local Program guidelines (August 10, 2006) for the City to submit to OCTA by
the February 2008 due date. PB will prepare an initial draft of the Final Project
Concept Report for review by the City of Santa Ana approximately three weeks
before the OCTA submittal deadline. Based on comments received from the
City, the report will be revised, as needed, prior to submission to OCTA.
7.3 PB will prepare the OCTA Go Local Step 2 application package for the Project
Concept identified in Task 5. PB will prepare an initial draft of the application
package for review by the City of Santa Ana approximately three weeks before
the OCTA submittal date and will incorporate City comments into the final Step 2
application package.
Deliverables:
• Final Study Report
• OCTA Go Local Final Report
• OCTA Go Local Step 2 Application Package
Task 8. Photosimulations
8.1 PB will prepare seven computer generated photosimulations as follows:
8.1.1 Santa Ana Blvd/Ross St. View at the intersection of Santa Ana Boulevard and
Ross Street using two photo views and incorporating the streetcar, station(s) and
the new Court building. The photosimulation will include animation.
8.1.2 SARTC Expansion. View of the SARTC looking south from atop the Santiago
Lofts incorporating the streetcar, station, transit-oriented development and other
expansion features. This photosimulation will include animation.
8.1.3 PE Right-of-Way. View along the PE Right-of-Way at Willowick Golf Course
looking northwest from ground level incorporating the streetcar, arterial roadway,
bikepath, pedestrian sidewalk and landscaping. This photosimulation will include
animation.
8.1.4 Santa Ana Blvd Looking East. Ground level view looking east along Santa Ana
Boulevard near Flower Street incorporating the streetcar. This photosimulation
will include animation.
8.1.5 Santa Ana Blvd/Bristol St. View of the intersection of Santa Ana Boulevard and
Bristol Street incorporating the Bristol Street widening concept, the streetcar,
Bristol Street BRT, and an intermodal transfer facility. This photosimulation will
NOT include animation.
8.1.6 SR22 Off-Ramp to PE Right-of-Way. View of the PE Right-of-Way in the location
where it intersects with SR22 incorporating a vehicular off-ramp from the freeway
to the right-of-way and an arterial street along the right-of-way. This
photosimulation will NOT include the streetcar and will NOT include animation.
8.1.7 Civic Center Drive. Ground level view along Civic Center Drive in a location
similar to where photosimulations were created for the Centerline LRT project.
This photosimulation will include the streetcar and animation.
Deliverables:
• Seven (7) photosimulations as described in Sections 8.1.1 through 8.1.7
Task 9. Aerial Tour Video
9.1 PB will develop an aerial flyover video of one (1) streetcar route, using available
aerial photography from either on-line sources or provided by the City of Santa
Ana. The aerial tour will travel over the aerial mapping and include a moving line
to replicate the streetcar route. The aerial tour will incorporate the seven
photosimulations defined and produced in Task 8 which will pop-up at the
appropriate locations on the aerial map. The aerial tour will also incorporate up
to five (5) additional still photos that will pop-up at key landmarks along the route.
9.2 PB will develop a schematic overview graphic of the Santa Ana area in relation to
regional transportation corridors that defines landmarks and transportation
access into the city. The schematic overview will be incorporated into the aerial
tour as an orientation for the tour.
Deliverables:
• One (1) three to five minute aerial tour video.
• Schematic overview graphic
File: P:/Santa AnaMlork Scope/Amendment No. 2 Work Scope.Santa Ana -Revised 11.07
-~
d
N
:i
C
N
..
O
7
7
D °'
3 ~
0
~ r ~ O
a o ~ y
g m o ~
~ ~ ~
m N` ~ O
' ~ d 0
m n~ D
~ o °7 r
00 ~
m
T
0
M
M
Q
N
..
c
a
r
z
0
0
V
~ N A ~ o A N a o 0
c e e o a a
COST PROPOSAL for
Santa Ana Transit Vision and Go Local Project Concept Definition Study
Amendment 2 - Phase B
_,_ gffl,~ _.. ,Y5. :It~~~
1 52
.04
8
9
Activi
Pro'ect Administration and Mana ament
Data Collection
Back round Stud
Transit Vision
Go Local Pro"ect Conce t Definition
Outreach and Communication
Go Local Concept Reports &
Ste 2 A [katian
Photosimulations
Visualsimulation
Jm;;<>
Hours per month (for 8 months)
2
2
Rates: 1
Full Hourly
Rates r
SP Brian Pearson 215.17
TS Toni Bates 213.95
TO Theresa Daw 125.29
ME Melissa Estrada 74.17
MG Mitali Gupta 91.82
SS Brian Balderrama 128.46
Tdl Theresa Dickerson 109.77
AH Alan HOOoes 178.00
ss Shivaprasad Shivananiappa 80.25
OS David Shelton 112.09
RM Rodrigo Mavorga 101.23
KL Kathrvn Urn 214.44
TT Todd Teuscher 98.70
LL Lee Lamn 75.26
CR Chris Revnolds 112.32
RS Rvan Sander 93.75
KS Kelly Barnes 72.52
VL Victoria Lona 78.65
8~Nov-07
48
escalated
aw rate
75.429
75.000
43.921
26.000
32.188
45.032
38.480
62.400
28.133
39.294
35.488
75.172
34.601
26.384
39.374
32.864
25.424
27.572
Page 2
November 2007 - June 2008
20
60
8
16
24
64
20
20 60 20 40
60 56 28
40 20 188
25 25
:t&f~~tO,j < :~~ O;~", ,,'11.$ ,._~bJ ~ !l'jjilii ~tlI' sr>:" ;lmi0i:'it'113~
2 3 23 10 9 3 3 142
40 40
o
.,,'~oa,.,. .iiii'l2ll::.
26 15
current
raw rate lM
72.528 2.85264
72.115
42.232
25.000
30.950
43.300
37.000
60000
27.051
37.783
34.123
72.281
33.270
25.369
37.860
31.600
24.446
26.512
Pro"ect Mgmt
Santa Ana/Ross
w/Animation
PE ROW
wfAnimation
SARTC
$11,177
$2,704
$10424
$1,900
$9 670
$1,900
$10000
$2.000
$10,000
$0
$10.000
$0
$10,000
$2.000
SANTA ANA TRANSIT VISION & GO LOCAL PROJECT CONCEPT DEFINITION STUDY
Phase- " . Amendmenl2 Work Scope
November 8 2007
2007 2008
Products Task > > 15 u u u u <:: <:: <:: .0 .0 .0 0 ~ 0 ~ ~
15 0 0 u (I) (I) (I) (I) <:: 0 0 0 .0 (I) (I) (I) 0 0 0 0. 0-
Z Z Z (I) 0 0 0 0 0 ..., ..., ..., (I) u.. u.. u.. ::;; ::;; ::;; ::;; ~
z .,:, , , ~ , , , , ..., , , , u.. , cb , ::;; , , ;:!; , <(
, <>- ~ 0 "- .... ;;; , .... ~ , - "' .J.. 0 "- :;; ,
"' - - - N "- - N .... - - N - - "- -
Project Management & Administration 1
Manage Project & Contract 1.1
provide Point of Contact 1.2
Conduct Progress Meetings 1.3
Prepare Prooress Renorts 1.4 I I I I I 1
Data Collection 2
Update Data List 2.1
Conduct Technologv Research 2.2
Identify Street/Public Rioht-of-Way 2.3
Review Backaround Materials 2.4
Background study 3 ",..'
Summarize the Travel Patterns & Demand Data 3.1 I I
Summarize the Alternatives Analysis 3.2
Preoare Backaround Chapter of Final Renort 3.3
Transit Vision 4 ~"..... .--.
Develop & Refine Transit Vision/Preoare Chapter 4.1 I T I T I 1 I I T
Prepare Maps, Graphics, Presentation 4.2 1 I 1 I I T 1 I I T
Go Local Project Cqnceptoefinition 5 ~ .,.,-
Define Fixed Guideway Concept 5.1
Define SARTC Expansion Concept 5.2
Evaluate Project Concept (aCTA Criteria) 5.3
Prepare Project Concept Definition Chapter 5.4
Prepare SARTC Site Plan and Rendering 5.5
Outreat;h anc:fCommunication 6 r -~.-,-" ,
.
Attend Meetinos 6.1 I I I I I I I
OCTA Go Local Concept Re~rt$/Step 2 Application 7
Prepare Final Study Report 7.1
Prepare aCTA Go Local Concept Report 7.2
Prepare Step 2 Application 7.31 I I I I I I I
Photosimulatiomi 8 .-."
First Set of Three (8.1.1,8.1.2, 8.1.3) 8.1 I I
Second Set of Four (8.1.4, 8.1.5, 8.1.6, 8.1.7) 8.1 I I I
Aerial Tour Video 9
Video Product 9.1 I I I I I I I 1 I
Schematic Overview Graphic Y."/. I I I I I I I T
IProduct
. Progress Report I Invoice
Iprogress Meeting
Other Meetings
Aon RiSk Services, Inc. 01 New York
199 Water Street
New York. NY 10038
PHONE: 866-266-7475
FAX: 866-467-7847
CERTIFICATE '-1: LIABILITY INSURANCf , DA;~i;1~:O~';")
\"".- Senal # 506062 THIS CERTIFICATE IS ISSI[~ AS A MATTER OF INFORMATION
ONLY ANO CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND. EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
COMPANIES AFFORDING COVERAGE
COMPANY
A AMERICAN CASUALTY CO. OF REAOING PA (NAlC #20427)
ACORD,.
PR0DUCER
PB AMERICAS. INC.
ONE PENN PLAZA
NEW YORK, NY 10119
COMPANY
B
COM~ANY TRANSPORTATION INSURANCE COMPANY (NAIC #20494)
INSURED
,
; C9VEIlAOES '. .....
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERMOR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED B YTHE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
I COM~ANY
co
LTR
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE POLICY EXPIRATION
DATE (MMlDDlYY) DATE (MWDDlYY)
LIMITS
A GENERAL LIABILITY
-
X COMMERCIAL GENERAL LIABILITY
C ri CLA!MS MADE IX] OCCUR
OWNER'S & CONTRACTOR'S PROT
f-
h
GL2095788109
GENERAL LIABILITY (A/S)
,GL 2095788093
GENERAL LIABILITY-STOP GAP
11/01/2007 ! 11/01/2008
GENERAL AGGREGATE
PRODUCTS - COMPIOP AGG
PERSONAL & ADV INJURY
EACH OCCURRENCE
FIRE DAMAGE (Anyone fire)
MED EXP (Anyone parson)
A AUTOMOBILE LIABILITY
7 ANY AUTO
~
ALL OWNED AUTOS
f--
SCHEDULED AUTOS
f--
HIRED AUTOS
f--
NON-OWNED AUTOS
-
1---
BUA 2095788112
COMMERCIAL AUTO
BUA 2095788126 PO
AUTO PHYSICAL DAMAGE
11/01/2007
11/01/2008
COMBINED SINGLE LIMIT
BODILY INJURY
(Per person)
$500 OED COMP
,$1.000 OED COLL
__t"\ . 10 :'O?:,II
p:i~1 7.H
!C/. 'c. S10~\I..
,:\51\ 1'1 ~ ,..~ne'
,..,... 0. (;/5)
BODILY INJURY
(Paraccidanl)
GARAGE LIABILITY
- ANY AUTO
-
-
. .
PROPERTY DAMAGE $
AUTO ONLY. EA ACCIDENT ,
--
OTHER THAN AVTO ONLY: I,
-
EACH ACCIDENT
AGGREGATE "
EACH OCCURRENCE ,
AGGREGATE ,
.-------------
,
i EXCESS LIABILITY
n- UMBRELLA FORM
H OTHER THAN UMBRELLA FORM
A WORKER'S COMPENSATION AND
A EMPLOYERS' LIABILITY
C THE PROPRIETOR'
PARTNERS/EXECUTIVE
a'FlCER$ARE-
'wc 2095788059 AOS
IWC 2095788062 CA ONLY
fi': wc 2095788076 RETRO (OR.VA,WI)
,INCL
i EXCL
11/01/2007 11/01/2008 X ! ib~~~J~s T lD~~' ..
11/01/2007 11/01/2008 EL EACH ACCIDENT $ 1,000.000
11/01/2007 11/01/2008 EL DISEASE - POLICY LIMIT $ 1,000,000
EL DISEASE - EA EMPLOYEE $ 1.000,000
OTHER
i
DESCRIPTION OF OPERATIONSlLOCATIONS/YEHICLESJSPECIAL ITEMS
(PB ~11972) SARTC METROllNK EXTENSION STUDY
EXCEPT FOR WORKERS COMPESATION, CITY OF SANTA ANA, ITS OFFICERS AND EMPLOYEES ARE INCLUDED AS AODITIONAL INSURED: 1) FOR
LIABILITY TO WHICH THEY MAY BE SUBJECT TO AS A RESULT OF PB'S NEGLIGENCE & 2)UP TO COVERAGE AMOUNTS HEREON.
..~
':.'
-
'-r"
CITY OF SANTA ANA, M - 30
20 CIVIC CENTER PLAZA
SANTA ANA, CA 92702
,.,., <.
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL E~~ MAIL
~ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
. ":,!:."- ',,'
,.",
~~1il1AJII1Om'
~~~~I5's.
AUTHORlZ~:~:~EN;~.T~/IV,: 1 mA.{)
7 ifl/'-'A.. (.( - -/9 or 10242936
, "'" ',,,,,~" ~.,,,.ri~J,' ~":tj : ,OACORD'" 1'"
Page 1
PARSON 2000 2fi'S.FP:"iPARSONS LIABILITY Ofi-0fi.FPfi
I",..
-'
POLICY NUMBER: GL 2095788109 A/S COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY
ADDITIONAL INSURED - OWNERS, LESSEES OR
CONTRACTORS (FORM B)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Name of Person or Organization:
CITY OF SANTA ANA, ITS OFFICERS AND EMPLOYEES
(if no entry appears above, information required to complete this
endorsement will be shown in the Declarations as applicable to this
endorsement. )
WHO IS AN INSURED (Section II) is amended to include as an insured
the person or organization shown in the Schedule, but only with
respect to liability arising out of "your work" for that insured by
or for you.
PB #11972
o~
.~~
~~
~
~'(,.~ ~f. ~'l
(j~~O f} (. .:; Cl (..~,~~
'" O';o."~0('.1
o '.~\. ^)
.~'(.tj '/
~ 0~
CG 20 10 11 85 Copyright, Insurance Services Office, Inc., 1984
Serial #: 506062
Page 2
MARSH ~ CERTIFICATE OF IltsURANCE CERTlFICA.TE NUMBER
NYC-002788729-01
PRODUCER THIS CERTifiCATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
MARSH USA, INC. NO RIGHTS UPON THE CERTIFICATE HOL.DER OTHER THAN THOSE PROVIDED IN THE
FIN PRO POLICY. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE
1166 AVENUE OF THE AMERICAS AFFORDED BY THE POLICIES DESCRIBED HEREIN.
38TH FLOOR COMPANIES AFFOROING COVERAGE
NEW YORK, NY 10036
COMPANY
36157-Amer-PL-06-07 A ZURICH AMERICAN INSURANCE COMPANY
INSURED COMPANY
PB Americas, Inc. a
One Penn Plaza
New York, NY 10119 COMPANY
C
COMPANY
0
COVERAGES This certificate supersedes and replaces any previously issued certificate for the policy period noted below. 2
THIS IS TO CERT1FY THAT POLICIES Of INSURANCE DESCRIBED HEREIN HAVE BEEN IssueD TO THE INSURED NAMED HEREIN FOR TI-lE POLICY PERIOD INDICATED.
NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THE CERTIFICATE MAY BE ISSUED OR MAY
PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, CONDITlONS AND EXCLUSIONS OF SUCH POLICIES. AGGREGATE
LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
CO TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS
LT" DATE (MMIDDIYY) DATE {MMIDDIYYI
GENERAL LIABILITY GENERAL AGGREGATE $
-
COMMERCIAL GENERAL LIABILITY PRODUCTS - COMP/OP AGG $
- ~ CLAIMS MADE D OCCUR
- PERSONAL & ADV INJURY $
- OW NER'S & CONTRACTOR'S PROT EACH OCCURRENCE $
FIRE DAMAGE (A~'y one fire) $
MED EXP IAn one person' $
AUTOMOBILE LIABILITY $
- COMBINED SINGLE LIMIT
- ANY AUTO
- ALL OWNED AUTOS BODIL YINJURY $
(Per person)
- SCHEDULED AUTOS
- HIRED AUTOS BODilY INJURY $
IPeraccldenl)
- NON-OWNED AUTOS
- PROPERTY DAMAGE $
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
- ~S 'to }'0\1
- ANY AUTO OTHER THAN AUTO ONLY:
- Ii 'l)'E''a0'J''E'O EACH ACCIDENT $
~ ~1 AGGREGATE $
EXCESS LIABILITY J:;[' EACH OCCURRENCE $
SiORCI(
==i ~MBRElLA FORM \.\S{>. ~ AGGREGATE $
OTHER THAN UMBRELLA FORM - , .~. Ci'rJ ",ttOf\'\e~ $
WORKERS COMPENSATION AND "" ~I ~;,F '1) I T"6~~~fJ~s I I OTH-
EMPLOYERS' LIABILITY ER
EL EACH ACCIDENT $
THE PROPRIETOR/ R'NGl t"- EL DISEASE-POLICY LIMIT $
PARTNERS/EXECUTIVE
OFFICERS ARE. EXCL EL DISEASE-EACH EMPLOYEE $
OTHER
A PROFESSIONAL LIABILITY EOC 587103605 11/01/07 11101/08 $1,000,000 Per Claim
$1,000,000 Aggregate
DESCRIPTION OF OPERATlONSILOCATlONSIVEHICL.ESISPECIAL ITEMS
PB#11972 NAIC #16535
Project Name: SARTC Metrolink Extension Study
CERTIFICATE HOLOER CANCELLATION
SHOULD ANY OF THE POLICIES DESCRIBED HEREIN BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF
THE INSURER AFFORDING COVERAGE WILL ENDEAVOR TO MAIL ---3..Q DAYS WRITTEN NOTICE TO THE
City of Santa Ana, M-30 CERTIFICATE HOLDER NAMED HEREIN, BUT FAILURE TO MAil SUCH NOTICE SHALL IMPOSE NO OBLlGATIUN OR
20 Civic Center Plaza
Santa Ana, CA 92792 LIABILITY OF Il,NYKIND UPON THE INSURER AFFORDING COVERAGE. ITS AGENTS OR REPRESENTATIVES. OR ~E
ISSUER OF THIS CERTIFICATE
MARSH USA INC. \..b"~h'~. a~
BY: Dennis M. Baez
MM1(3/02) VALID AS OF: 12/07/07