MREEMENT FOR REHABILITATION OFHARBOR BOULEVARD
FROM SUNFLOWER AVENUE TO MACARTHUR BOULEVARD
THIS AGREEMENT is made and entered into this day of 1996 by the CITY
OF SANTA AA (hereinafter "Santa Ana") and the CITY OF COSTA MESA (hereinafter
"Costa Mesa"). I
WITNESSETH
WHEREAS, Costa Mesa desires to resurface the pavement, and reconstruct existing damaged
concrete street improvements on sections of Harbor Boulevard from Wilson Street to MacArthur
Boulevard, construct storm drain improvements from Sunflower Avenue to Greenville Banning
Channel (South Coast Drive), and intersection improvements at Sunflower Avenue ' and Harbor
Boulevard (hereinafter, "THE PROJECT") in accordance with engineering studies indicating the
need for such improvements; and
WHEREAS, a portion of Harbor Boulevard needing new storm drain facilities, resurfacing, and
reconstruction located between Sunflower Avenue and MacArthur Boulevard lies partly within
the corporate limits of Santa Ana; and
WHEREAS, Costa Mesa and C.J. Segerstrom & Sons have entered into a contract with
CH2N4HILL and Norris-Repke, Inc., (hereinafter, "CONSULTANTS") to provide design
engineering and prepare plans and specifications for THE PROJECT, and
WHEREAS, the parties hereto desire to provide for the concurrent design engineering,
construction engineering, survey, and construction of that portion of Harbor Boulevard within
the corporate boundaries of both cities and desire to provide for the proportionate sharing of the
costs thereof.
NOW, THEREFORE, the parties hereto agree as follows:
1. Costa Mesa shall prepare the plans and specifications for THE PROJECT in
accordance with standard engineering practices. Santa Ana shall have a right of
approval of said plans and specifications as they relate to the portion of THE
PROJECT located within Santa Ana.
Costa Mesa shall advertise and award the construction contract for THE PROJECT in
accordance with state and local law.
3. Costa Mesa shall administer the constniction contract and shall supervise all work
performed.
Harbor Rehab Agreement I of 3
4. Mutual Indemnity Provision:
a.) Santa Ana shall hold harmless, indemnify and defend Costa Mesa and its
officers, agents, and employees from and against all claims and liabilities for
injury to person or property arising out of any negligent or wrongful act, error
or omission of Santa Ana or its officers, agents, or employees in the
performance of this Agreement.
b.) Costa Mesa shall hold harmless , indemnify and defend Santa Ana and its
officers, agents and employees from and against all claims and liabilities for
injury to person or property arising out of any negligent or wrongful act, error,
or omission of Costa Mesa or its officers, agents, or employees in the
performance of this Agreement.
S. Each City's share of the cost of THE PROJECT, including design engineering, survey
and construction engineering shall be borne and paid for by the parties hereto in
proportion to the amount of resurfacing and reconstruction actually performed in each
City. The proportionate shares have been preliminarily apportioned as follow: A -
Harbor Rehabilitation: to Costa Mesa in the amount of ninety-nine percent (99%) and
to Santa Ana in the amount of one percent (1%); and B- Harbor Storm Drain
Improvements and Intersection Improvements at Harbor Blvd. And Sunflower Ave.:
to Costa Mesa in the amount of twenty-nine percent (29%) and to Santa Ana in the
amount of seventy-one (71%). Such preliminary proportionate shares may be
adjusted, as necessary, with the mutual approval of the City Engineers of Costa Mesa
and Santa Ana and shall reflect the actual quantity of work performed in each city.
b. Upon award of a construction contract to the successful bidder, Costa Mesa will
forward a copy of the bid abstract to Santa Ana together with an invoice for Santa
Ana's, estimated proportionate share of construction, construction engineering,
survey, and design engineering costs.
7. Any change orders deemed necessary or advisable by Costa Mesa may be executed by
Costa Mesa, except that any change orders which may affect the construction within
Santa Ana shall first be approved, in writing, by Santa Ana. Any changes requested
by Santa Ana may likewise be processed and included. Santa Ana shall be
responsible for payment of Santa Ana's share of all change orders affecting Santa
Ana's portion of THE PROJECT.
9. Upon completion of THE PROJECT, Costa Mesa will forward to Santa Ana an
itemized invoice setting forth the final contract costs for construction within Santa
Ana. Said costs shall include the total amount paid to the contractor together with
design engineering, survey, construction engineeering costs and change orders (if any)
based upon actual charges. Santa Ana shall pay its share of funds to Costa Mesa
within thirty (30) days of invoice.
Harbor Rehab Agreement 2 of 3
9. Upon recordation of the Notice of Completion, each party shall rnaintain those
improvements located within its corporate limits.
10. Santa Ana and Costa Mesa do hereby waive all claims and demands against each
other for any loss, damage or iijjury of any kind or character to any person or
property, arising out of design or construction of THE PROJECT or arising from any
act or omission of either City's respective officers, agents, or employees, except to the
extent occasioned by the sole negligence or willful misconduct of the parties or their
officers, agents, or employees.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year
first above written.
CITY OF SANTA ANA
By:
Mayor
By:
Clerk of the Council
APPROVED AS TO FORM
c--z-
City Attorney
APPROVED AS TO CONCEPT
M-
City Manager
RECOM7 �,LADED FOR :OVAL
James G. Ross, Executive
Public Works Agency
CITY OF COSTA MESA
By:
Mayor
By: T.
City Clerk
APPROVED AS TO FORM
By:
City Attorney
APPROVED AS TO CONCEPT
00
By: il-15-11ro
Project 1\44ater
CRY Council Approved On: / L -2 - �L
Harbor Rehab Agreement 3 of 3
CITY COUNCIL MEETING DATE:
JANUARY 6, 1997
TITLE:
APPROVED
13
As Recommended
ITY
0
As Amended
RARBOR
0
Ordinance on 1st Reading
ENTS
LJ
Ordinance on 2nd Reading
LJ
Implementing Resolution
0
Set Public Hearing For
CONTINUED TO
FILE NUMBER
CITY MANAGER
H1141 W"ItIff"
Direct the City Attorney to
of the Council. to execute an
Harbor Boulevard improvements
prepare and. authorize the Mayor and Clerk
agreement with the City of Costa Mesa for
in the amount of $534,540.
The City of Costa Mesa is planning to rehabilitate the pavement and
construct a. storm drain on Harbor Boulevard between MacArthur Boulevard
and Wilson Street (Exhibit 1). Since a portion of Harbor Boulevard lies
within -the City of Santa Ana, the City of Costa Mesa has requested
Santa Ana's participation in the project. The Public Works Agency has
reviewed the design concept for this project and recommends
participation in. the pavement rehabilitation and storm drain
construction of Harbor Boulevard.
As the predominant portion of the project lies within Costa Mesa, the
City of Costa Mesa will serve as the lead agency. The agreement sets
forth the terms and conditions for design and construction of the
pro? e c t .
Although construction is scheduled to commence in January 1997 and be
completed by September 1.997, the City of Santa Ana share wiii not be
available until FY 1997-98 budget. The City of Costa Mesa has accepted
this funding arrangement.
mm
M
Agreement With the
January 6, 1997
Page 2
City of Costa Mesa
The total cost for the Harbor Boulevard project is estimated at
$5,560,000. The City's share is estimated at $534,540. Funds for the
project will be budgeted in the Fiscal Year 1.997-98 Capital Improvement
Program.
James G. Ross
Executive Director
Public Works Agency
Blvd (-'cnsL/r4d
D AS,40 FUNDS AND ACCOUNTS:
--l. --
Executive
Finance &
irector
anagement Services
25C )- 048
EXHIBIT 1
SAWA ANA City Council Title: AGREEMENT WITH THE CITY OF
p�� Agenda Date COSTA MESA FOR HARBOR BLVD.
PNi 1ANUARY 6, 1997 IMPROVEMENTS
PUBLIC RM, MERCY
CT
ION
ARR