Loading...
HomeMy WebLinkAbout23B - PROJECT - HARBOR FAIRVIEW INTERCONNECT AND INTERTIEREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JUNE 1, 2009 TITLE: CONTRACT AWARD FOR HARBOR/ FAIRVIEW INTERCONNECT AND INTERTIE AND WARNER AVENUE INTERCONNECT (PROJECT NOS. 09- 5024-M AND 09-5026-M) ~~-~ f CLERK OF COUNCIL USE ONLY: APPROVED ^ As Recommended ^ As Amended ^ Ordinance on 1 S` Reading ^ Ordinance on 2nd Reading ^ Implementing Resolution ^ Set Public Hearing For_ CONTINUED TO FILE NUMBER CITY MANAGER RECOMMENDED ACTION ~',~e~~ 1. Award a contract to Moore Electrical responsible bidder, in accordance with unit the base bid plus add-on alternate one in $383,921, for construction of the Harbor Interconnect and Intertie with the City of Warner Avenue Interconnect. Contracting, the lowest bid lump sum prices for the estimated amount of Boulevard/Fairview Street Fountain Valley; and the 2. Approve a Funding Analysis with a total estimated construction cost of $479,900. DISCUSSION This project will replace traffic signal controller cabinets on Harbor Boulevard, and install conduit, interconnect and fiber optic cable to traffic signals on Harbor Boulevard, Fairview Street and Warner Avenue (Exhibit 1). The project also provides interconnect to the City of Fountain Valley's traffic signals and Closed Circuit TV on Harbor Boulevard. The new improvements will allow staff to communicate with traffic signals, monitor traffic volume and speed, and make traffic signal timing adjustments as necessary based on real time traffic conditions. The Notice Inviting Bids was advertised on April 24 and 27, 2009, and bids were opened on May 11, 2009. A summary of the bid invitations mailed, the bids received, and the bid results follows. 23B-1 Contract award For Harbor/Fairview Interconnect and Intertie and Warner Ave. Interconnect June 1, 2009 Page 2 Santa Ana Contractors receiving notices: 25 Contractors requesting bidding documents: 12 Bids received: 4 Bids received from Santa Ana Contractors: 0 TOTAL BASE BID TOTAL PLUS ADD-ON NAME OF RESPONSIVE BIDDER CITY BASE BID ALTERNATE ONE 1. Moore Electrical Corona Contracting 2. High-Light Electric 3. Lincoln Pacific Builders $349,621 $383,921 Riverside $354,157 Baldwin Park $355,340 $390,657 $387,440 A total of four bids were received and three were responsive. Protech Engineering did not comply with the licensing requirement and therefore, their bid is considered non-responsive. The lowest bid plus add-on alternate one was submitted by Moore Electrical Contracting for $383,921, which is above the Engineer's Estimate of $365,875. The bid documents stipulate that the lowest responsible bidder be selected based on the lowest total base bid. ENVIRONMENTAL IMPACT After completion of Environmental Review Nos. 2008-155 and 2008-157, a Categorical Exemption will be filed for the projects pursuant to the California Environmental Quality Act. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $479,900 for the project (Exhibit 2). Funds are available in the Measure M Competitive Fund (account no. 32-551-6631) and the Proposition 1B Infrastructure Bond Fund (account no. 30-551-6631). APPROVED AS TO FUNDS AND ACCOUNTS: James G Ross Francisco Gutierrez Executive Director Executive Director Public Works Agency Finance & Mgmt. Services Agency K:\Construction\RFCA-draft\06-01-09 09-5024-26 Intertie WA 100 WD.docx 23B-2 EXHIBIT 1 SANTA ANA ~~1~1 City Council CONTRACT AWARD P^ YYM Agenda Date: HARBOR / FAIRVIEW INTERCONNECT AND INTERTIE v AND PUBLIC WORKS AGENCY WARNER AVENUE INTERCONNECT June 1, 2009 (PROJECTS 09-5024-M AND 09-5026-M) JGA'(~ON F~~ ~0.~ s~ t' ~ , ,.1 ;~` ~~~ 23B-3 FUNDING ANALYSIS PROJECT NOS. 09-5024-M and 09-5026-M HARBOR/FAIRVIEW INTERCONNECT AND INTERTIE AND WARNER AVENUE INTERCONNECT Construction Contract $383,921 Contract Administration $17,587 Inspection and Testing $40,000 Contingencies $38,392 TOTAL ESTIMATED CONSTRUCTION COSTS $479,900 Exhibit 2 23B-4