Loading...
HomeMy WebLinkAbout23D - FLOWER ST CONTRACT AWARD PROJ 60-29-CREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: OCTOBER 5, 2009 TITLE: CONTRACT AWARD FOR FLOWER STREET BIKE TRAIL EXTENSION, PHASE 1, FROM UNION PACIFIC RAILROAD TO MACARTHUR BOULEVARD (PROJECT N0.08-6029-C) ,1 CITY MANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ^ As Recommended ^ As Amended ^ Ordinance on 15` Reading ^ Ordinance on 2"d Reading ^ Implementing Resolution ^ Set Public Hearing For_ CONTINUED TO FILE NUMBER 1. Award a contract to I.C.E. Engineering, Inc., the lowest responsible bidder, in accordance with unit bid prices for the base bid in the estimated amount of $726,208 for construction of Flower Street Bike Trail Extension, Phase 1, from Union Pacific Railroad to MacArthur Boulevard. 2. Approve a Funding Analysis with a total estimated construction cost of $931,900. DISCUSSION The Flower Street Bike Trail Extension project has the potential to increase bicycle commuting. The first phase of this project will make strides towards providing a connection between the Alton Bike Trail and the Sunflower Avenue Bike Trail, providing bicycle access to the South Coast Metro business park and connection to Santa Ana's Golden Loop trail system (Exhibit 1). The project consists of asphalt paving, installing guard cable and wrought iron fences along the channel, installing a drainage system, signing and striping, landscaping, and irrigation using reclaimed water. Once completed, the bike trail will provide safety and security to pedestrians and bicyclists. The Notice Inviting Bids was advertised on August 12 and 14, 2009, and bids were opened on September 4, 2009. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 16 Contractors requesting bidding documents: 19 Bids received: 9 Bids received from Santa Ana Co~t~s: 0 Contract Award For Flower Street Bike Trail Extension October 5, 2009 Page 2 NAME OF RESPONSIVE BIDDER 1. I.C.E. Engineering, Inc. 2. Hillcrest Contracting 3. Elite Bobcat Service, Inc 4. NPG, Inc. 5. All American Asphalt 6. Excel Paving Company 7. Mega Way Enterprises 8. Autobahn Construction, Inc. 9. Sequel Contractors, Inc. CITY BID AMOUNT Rowland Heights $726,208.00 Corona $731,814.80 Corona $741,036.75 Perris $753,213.26 Moreno Valley $810,999.00 Long Beach $842,625.35 Pomona $853,455.00 Orange $888,636.00 Santa Fe Springs $955,533.00 A total of nine bids were received and all were responsive. The lowest bid was submitted by I.C.E. Engineering, Inc., for $726,208, which is below the Engineer's estimate of $900,000. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the project is exempt from future review. Categorical Exemption Environmental Review No. 2006-197 will be filed for the project. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $931,900 for the project (Exhibit 2). Funds are available in the Bicycle Transportation Act Fund (accounting unit 16113261-66220) and the Acquisition and Development Fund (accounting unit 31313260-66220). APPROVED AS TO FUNDS AND ACCOUNTS: C.=/~ ,~~~ C~ livi-~-~-Cc~w !Ip~ l~-L.s-c. George Alvarez ~cvFrancisco Gutierrez _, 1/ Acting Executive Director Executive Director ~'"~ 'Public Works Agency Finance & Mgmt. Services Agency ~.m~ ~w Gera do Mouet Exec tive Director Park Recreation, and Community Services Agency K:\Construction\RFCA-draft\10-5-09 FlowerSt 08-6029 ICE 40 WD ET.docx 23D-2 i EXHIBIT 1 P~ ,.. ~O -" P~ ,,. ~. ' Q Q` -,", v ,-- ,;.~ ,,. .~~~ ~~ .i II ~ l I. I ~ L__ ~ ALTON AVE 0 v_ '~ ~ ---~ ~ --- U ~ __- u. ~ - U ac --- O ~ --- O ___ ~ --- ' ~~ MAC ARTHUR BLVD SANTA ANA FLOWER STREET BIKE TRAIL EXTENSION ~~' crnr courvci~ PHASE I -UNION PACIFIC RAIL ROAD P W A AGENDA DATE' TO MAC ARTHUR BOULEVARD PUBLIC nBRKS AGENCY OCTOBER .~ 2009 (PROJECT NO. 08-6029-C) 23D-3 FUNDING ANALYSIS PROJECT NO. 08-6029-C FLOWER STREET BIKE TRAIL EXTENSION, PHASE 1, FROM UNION PACIFIC RAILROAD TO MACARTHUR BOULEVARD Construction Contract $726,208 Contract Administration $33,200 Inspection and Testing $54,471 Survey Staking $21,200 Contingencies $96,821 TOTAL ESTIMATED CONSTRUCTION COSTS $931,900 Exhibit 2 23D-4