OCTOBER 5, 2009
TITLE:
CONTRACT AWARD FOR FLOWER
STREET BIKE TRAIL EXTENSION,
PHASE 1, FROM UNION PACIFIC
RAILROAD TO MACARTHUR BOULEVARD
(PROJECT N0.08-6029-C)
,1
CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
^ As Recommended
^ As Amended
^ Ordinance on 15` Reading
^ Ordinance on 2"d Reading
^ Implementing Resolution
^ Set Public Hearing For_
CONTINUED TO
FILE NUMBER
1. Award a contract to I.C.E. Engineering, Inc., the lowest responsible
bidder, in accordance with unit bid prices for the base bid in the
estimated amount of $726,208 for construction of Flower Street Bike
Trail Extension, Phase 1, from Union Pacific Railroad to MacArthur
Boulevard.
2. Approve a Funding Analysis with a total estimated construction cost
of $931,900.
DISCUSSION
The Flower Street Bike Trail Extension project has the potential to
increase bicycle commuting. The first phase of this project will make
strides towards providing a connection between the Alton Bike Trail and
the Sunflower Avenue Bike Trail, providing bicycle access to the South
Coast Metro business park and connection to Santa Ana's Golden Loop trail
system (Exhibit 1).
The project consists of asphalt paving, installing guard cable and
wrought iron fences along the channel, installing a drainage system,
signing and striping, landscaping, and irrigation using reclaimed water.
Once completed, the bike trail will provide safety and security to
pedestrians and bicyclists.
The Notice Inviting Bids was advertised on August 12 and 14, 2009, and
bids were opened on September 4, 2009. A summary of the bid invitations
mailed, the bids received, and the bid results follows.
Santa Ana Contractors receiving notices: 16
Contractors requesting bidding documents: 19
Bids received: 9
Bids received from Santa Ana Co~t~s: 0
Contract Award For Flower
Street Bike Trail Extension
October 5, 2009
Page 2
NAME OF RESPONSIVE BIDDER
1. I.C.E. Engineering, Inc.
2. Hillcrest Contracting
3. Elite Bobcat Service, Inc
4. NPG, Inc.
5. All American Asphalt
6. Excel Paving Company
7. Mega Way Enterprises
8. Autobahn Construction, Inc.
9. Sequel Contractors, Inc.
CITY BID AMOUNT
Rowland Heights $726,208.00
Corona $731,814.80
Corona $741,036.75
Perris $753,213.26
Moreno Valley $810,999.00
Long Beach $842,625.35
Pomona $853,455.00
Orange $888,636.00
Santa Fe Springs $955,533.00
A total of nine bids were received and all were responsive. The lowest
bid was submitted by I.C.E. Engineering, Inc., for $726,208, which is
below the Engineer's estimate of $900,000.
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the project
is exempt from future review. Categorical Exemption Environmental Review
No. 2006-197 will be filed for the project.
FISCAL IMPACT
The funding analysis shows a total estimated construction cost of
$931,900 for the project (Exhibit 2). Funds are available in the Bicycle
Transportation Act Fund (accounting unit 16113261-66220) and the
Acquisition and Development Fund (accounting unit 31313260-66220).
APPROVED AS TO FUNDS AND ACCOUNTS:
C.=/~ ,~~~ C~
livi-~-~-Cc~w !Ip~ l~-L.s-c.
George Alvarez ~cvFrancisco Gutierrez _, 1/
Acting Executive Director Executive Director ~'"~
'Public Works Agency Finance & Mgmt. Services Agency
~.m~
~w Gera do Mouet
Exec tive Director
Park Recreation, and
Community Services Agency
K:\Construction\RFCA-draft\10-5-09 FlowerSt 08-6029 ICE 40 WD ET.docx
23D-2
i
EXHIBIT 1
P~ ,..
~O -"
P~ ,,.
~. '
Q Q` -,",
v ,--
,;.~
,,.
.~~~ ~~ .i
II ~ l
I.
I ~
L__ ~
ALTON AVE
0
v_
'~ ~
---~ ~
--- U
~ __- u.
~ - U
ac --- O
~ ---
O ___
~ ---
' ~~ MAC ARTHUR BLVD
SANTA ANA FLOWER STREET BIKE TRAIL EXTENSION
~~' crnr courvci~ PHASE I -UNION PACIFIC RAIL ROAD
P W A AGENDA DATE' TO MAC ARTHUR BOULEVARD
PUBLIC nBRKS AGENCY OCTOBER .~ 2009
(PROJECT NO. 08-6029-C)
23D-3
FUNDING ANALYSIS
PROJECT NO. 08-6029-C
FLOWER STREET BIKE TRAIL EXTENSION, PHASE 1,
FROM UNION PACIFIC RAILROAD TO MACARTHUR BOULEVARD
Construction Contract $726,208
Contract Administration
$33,200
Inspection and Testing
$54,471
Survey Staking
$21,200
Contingencies $96,821
TOTAL ESTIMATED CONSTRUCTION COSTS $931,900