City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
July 21, 2026
TOPIC: Sodium Hypochlorite Generation, Maintenance, and Equipment
AGENDA TITLE
Agreement with PSI Water Technologies, Inc. for Sodium Hypochlorite Generation,
Maintenance, and Equipment (Specification No. 26-049) (Non-General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute an agreement with PSI Water Technologies, Inc.
to provide sodium hypochlorite generation, maintenance, and equipment in an amount
beginning July 21, 2026, and expiring July 20, 2027, with an estimated annual budget of
$500,000 with provisions for four, one-year extensions, in a total amount not to exceed
$2,500,000 (Agreement No. A-2026-XXX).
GOVERNMENT CODE §84308 APPLIES: No
DISCUSSION
The Public Works Agency (PWA) is responsible for the daily operations of the City's
drinking water system. The water system comprises of approximately 480 miles of water
main, 21 groundwater wells, seven pump stations, 10 reservoirs with a storage capacity
of 45 million gallons, four pressure-regulating stations, and seven connection points to
the Metropolitan Water District (MWD). The system has an average daily demand of 43
million gallons from its roughly 45,000 service connections.
To maintain compliance with federal and state drinking water regulations, the City uses
sodium hypochlorite generation (SHG) units to produce chlorine for potable water
treatment. The SHG units utilized by the City meet the water quality requirements
established under the City's Domestic Water Supply permit and are essential for
maintaining regulatory compliance; therefore, their ongoing maintenance and reliability
are critical to water distribution operations. In addition, this form of sodium hypochlorite
generation is recognized as one of the safest methods for introducing chlorine into a
potable water system, providing safe and reliable drinking water to residents. These
systems require specialized preventive maintenance, system calibration, replacement of
proprietary components, and emergency repair services to ensure uninterrupted
operation.
Sodium Hypochlorite Generation, Maintenance, and Equipment
July 21, 2026
Page 2
Invitation for Bids (IFB) No. 26-049 was advertised on April 9, 2026 on the City's online
bid management and publication system, PlanetBids. A summary of vendor participation
and results is as follows:
365 Vendors notified
2 Santa Ana vendors notified
9 Vendors downloaded the bid packet
1 Responsive bid received
0 Responsive bids received from Santa Ana vendor
Bids were solicited, opened on May 5, 2026, and evaluated (Exhibit 1). One bid was
submitted by the IFB deadline and was determined to be responsive to the
specifications and met the City's requirements. The bid submitted by PSI Water
Technologies, Inc. was determined to be the lowest, responsible bid, was responsive to
the specifications, and meets the City's requirements.
Staff recommends awarding an agreement to PSI Water Technologies, Inc. (Exhibit 2)
to provide SHG maintenance and equipment. The firm has demonstrated strong
technical qualifications and experience in maintaining SHG systems and, as the current
provider for the City of Santa Ana, has successfully provided similar services for other
municipalities. In addition to serving the City of Santa Ana, the firm currently provides
similar maintenance and support services to Rancho California Water District, Los
Angeles Department of Water and Power, and Irvine Ranch Water District. Award of the
agreement ensures the continued reliability and operational performance of the City's
SHG systems, including routine maintenance, emergency repairs, and system
upgrades, and has the capability to provide prompt maintenance services, emergency
repairs, and system upgrades.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Funds are budgeted and available in the following accounts for Fiscal Year 2026-27.
Subsequent fiscal year funding for renewal options, if exercised, will be included in the
proposed budgets for City Council consideration. The following is an estimate of
expenditures by fiscal year:
Accounting
Fiscal Fund Accounting Unit,
Year Unit—Account Description Account Description Amount
CONTRACT (ONE-YEAR TERM)
Sodium Hypochlorite Generation, Maintenance, and Equipment
July 21, 2026
Page 3
2026-27 06017640- Water Utility Production
(Jul 21- 62300 Water Fund & Supply, Contract $472,603
Jun 30) Services-Professional
2027-28 06017640- Water Utility Production
(Jul 1 — 62300 Water Fund & Supply, Contract $27,397
Jul 20) 1 Services-Professional
Contract (One-Year) Total $500,000
OPTIONAL FOUR ONE-YEAR EXTENSIONS
2027-28 06017640- Water Utility Production
(Jul 21 — 62300 Water Fund & Supply, Contract $472,603
Jun 30) Services-Professional
06017640- Water Utility Production
2028-29 62300 Water Fund & Supply, Contract $500,000
Services-Professional
06017640- Water Utility Production
2029-30 62300 Water Fund & Supply, Contract $500,000
Services-Professional
06017640- Water Utility Production
2030-31 62300 Water Fund & Supply, Contract $500,000
Services-Professional
2031-32 06017640- Water Utility Production
(Jul 1 — 62300 Water Fund & Supply, Contract $27,397
Jun 30) Services-Professional
Optional Four One-Year Extension Total $2,000,000
TOTAL (Five Year Contract): $2,500,000
EXHIBIT(S)
1. Abstract of Bids (No. 26-049)
2. Agreement with PSI Water Technologies, Inc.
Submitted By: Rodolfo Rosas, P.E., Acting Executive Director of Public Works Agency
Approved By: Alvaro Nunez, City Manager
r-I
H
00
2 aE) o
X
n X 0A Y
W VT) °
c a)
o
> nz v o
N p Z O fl
> Q1 O
u
U
Y a i x U N O
E O
E a
° c
0 O E
E � c c c E
O C a)
O_ fl_ C) c -
ro E (d `1
p -6 N
6 L2 -0 VO
Y Ql N Q �- y ice+
Q O c p c a) �O O
— n O
.� Q vCL Oi N O u c c a
u t0 Y x p EU
> vOi H u
CD N c 0 10 0 Q1 Y
N c Ln o U Q
u u N 'j N O N N -c
L O c -C3 Ql 0
co M i0 m N C O LD � �O O O O N -4 a) O O 0 0 � O O O O
Ln Ln V) 00 an � O? m O O O O n n N O V1 O O M O O O O
+-' M rn m al O Ln 00 I, O O O CD a) Ln I- O m O Ln N O O O CDO � 00 m Ln 00 LD n Dl M V} O O O I, 00 1-1 O 00 Ln I, W V?
H M m Ln N N LD -1 • N lD LD -;t N N O n N M LD
W 06 LD I-� O0 M O N N al M Di O c-I M LD V) N M an
O M N It It c-I c-I c-I M V) N 00 LD w O V) V)
J Ln cq 1-1 N M V} VT V} V} -Zt VT N M
V'l V} V} V} V} 14
00 M lD a)
•d7= LD N Ln V 00 O O O O LD -4 Ol O O O O
O O O
VLn ) Ln 00aCY) I ll� O 00 , f rl� O ) rq O O O
Cn m V CT) V O I-I O1 V O O O a) Ln I, O O1 V) M O O O
V 00 D) V) V M M � O VT O O O M 00 ci O ci N D V). V). VT
Dl DlVV) - lDmO • cl cl O0 I� NfVVI- fV
ao �D r; v v rl o m rn v v v 11 m v m V-1
O V m N I, n n Ln m V). VT l 00 o VT cl Ln
Ln It LD V)- V4 V} Vr v V� m
-4 -1 -1 N N N V 001 -1 V I, N N V) O OI V 1-1 cil
Y
M V 3..y
W
d
L N
Od
F
V °
Q a a a a a a a a a� a a a a a a a1 a a s J,01 a 'a 'a a
w w w w w w w ww w w w w w w w w J w 0 0 w
r
A lD
aj
O C VI
Z OcO v O
\c
_Op YaV°ELO+
u
o_ d a- w v w
o a) w ubo D_ u vOa,t
u ar
v c v v v c D -i � 0 p a E
U U c U c U LL LD LL U U -O N a) O O
}a O O O V) LL V) x c 0 9 L
00 '�+ - '�+ - '�+ tm z V) z ` n3 C h0 c
0 0 0 00 OD 0 o z u d 0 N a) v 0 00 N .O
O O ❑ 0 c -0
O o ^ Ln o o D o = v E E E o Y a °
0 O O LD V Q i i i LL LL N ° N 7 " E 3 a) - O
a+ V U V U � � � o O U u i= LL N ° N E -O O i
i _ O n n n o � � n v o c pp c c o0 w o a
y ❑ o u N u N u � u ? > > — — — p °° a v — c w v 3
c. V) )n )n vT E E E u u u v u o v v y
'£ X a E x E a a v =
O) d N in �' in �' in �' in }' in in 'N 0 0 0 a) O a) c i
++ O ❑ c �i c �i i a a a E o s m v " O c — v ro n3
a) .- a) a) n u N Y N -O 0
O O -O c -O c c _0 c a a a a `o `o 0 0 `� L v E
t N c C7 c U' c C7 Qj c o O O Ln c u L m O Y v v > "
co co co co m Ln o O E O E O E y N 2� �, ac v = v V
O N Y N Y to N to N c- c-I c-I u a) u a) u Ql (0 x T Y c @ cu
N W O
N @! @1Cl o o E aY ° ° 'v u o OL
= N w o w : w :Ew :Ex x x m ^ ^ E Ln t s z ,af) s V CL 9 0 'E
u u u u D_ aL a o 0 0 0 0 0 �, o 'E — m m o E
❑ o o o o l7 C7 C7 Z ar v a) c
O O a a . cl a Ln Ln ° v v o v w a = 0 v —
c ? c ? c ? c ? n N 0� I� U V V u O_ U O O O 0 '6 9 Z -O
++ 0 2 0 2 0 2 0 2 \ c a) c al c aJ J 0 c V) N x x U c -O c
f0 ma 't M C M 0 M 0 C (6 a) E
CLOs0+ s0.+ s0+ sV+ Q Q Q •0 clic a) c a) c a) u Q aJ p c to E - C fl_ , > 0 a1 O
v l7 . o v D D_ x v v c a ° v E z v n E
•- in c in c in c in c 0 0 0 E p .c 0) ,c ap-• •c aO+ N �• N c6 ,c .N ? � � E O w p Y T m
O O x O 'x O 'x O 'x O LL D_ D_ n3 n o — — o — ? _ a x V) c c a c
ca H ai v a) v a, w as w ` n p O O v a w °° Li u x ° y E u a3
QO a a a a C C C p d 0 N V 6 V 6 V a d a N - N 0 a a) m E C
aF ❑ o w o w O w O `c a) 0) v D- v mu 0 O 0 0 0 O L Lof o y ~ cu~ :t O u 'p
aJ a) aJ a) al a) a) J (6 V c a c ? c ? f0 N X n1 x c a) N N '^ �-^ c ° O O
C C c c c O a a O co O O O N
O O cc u cc u c u � u c c D_ V) J a x a x a x x V) 0_ x D_ a 0C V) LL LL V) LL -O 0 u V) z J N
m - cy N Cn V V) LD 1- 00 D O c-I N M Ln D n c0 0) O -4 N m Ln
.- •� 3 ci c-I c-I c-I c-I c-I c-I c-I c-I c-I N N N N N N
O z
3 3 w
AGREEMENT WITH PSI WATER TECHNOLOGIES,INC. TO PROVIDE SODIUM
HYPOCHLORITE GENERATION UNITS FOR THE
CITY OF SANTA ANA
THIS AGREEMENT is made and entered into on this 21s' day of July, 2026 by and between PSI Water
Technologies, Inc., ("Contractor"), and the City of Santa Ana, a charter city and municipal corporation
organized and existing under the Constitution and laws of the State of California ("City").
RECITALS
A. On April 9,2026,the City issued Invitation for Bid(IFB)No. 26-049,by which it sought qualified
contractors to provide preventative annual maintenance services and repairs for the City's sodium
hypochlorite generation units, as well as procurement of replacement parts and new installations.
B. Contractor submitted a responsive proposal that was selected by the City. Contractor represents
that it is able and willing to provide such the services described in the scope of work that was
included in IFB No. 26-049.
C. In undertaking the performance of this Agreement, Contractor represents that it is knowledgeable
in its field and that any services performed by Contractor under this Agreement will be performed
in compliance with such standards as may reasonably be expected from a professional consulting
firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms
and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Contractor shall perform during the term of this Agreement,the tasks and obligations including all
labor, materials, tools, equipment, and incidental customary work required to fully and adequately
complete the services described and set forth in the Scope of Work that was included in IFB No. 26-049,
which is attached hereto as Exhibit A and incorporated by reference.
2. COMPENSATION
a. City agrees to pay, and Contractor agrees to accept as total payment for its services for City,
the rates and charges identified in Exhibit B. The Parties estimate an annual budget of
$500,000 for the initial term and each extension period, if exercised. Accordingly, the total
amount to be expended during the term of this Agreement, including any extension periods,
shall not exceed $2,500,000.
b. Payment by City shall be made within forty-five(45)days following receipt of proper invoice
evidencing work performed, subject to City accounting procedures. City and Contractor agree
that all payments due and owing under this Agreement shall be made through Automated
Clearing House (ACH) transfers. Contractor agrees to execute the City's standard ACH
Vendor Payment Authorization and provide required documentation. Upon verification of the
data provided, the City will be authorized to deposit payments directly into Contractor's
1
account(s) with financial institutions. Payment need not be made for work which fails to
meet the standards of performance set forth in the Recitals which may reasonably be expected
by City.
3. TERM
This Agreement shall commence on July 21, 2026 for a one (1) N ear term with the option for the
City to grant up to four (4), one-year extensions, exercisable by a writing by the City Manager and the
City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an independent
Contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to
create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise
discretion or control over the professional manner in which Contractor performs the services which are
the subject matter of this Agreement;however,the services to be provided by Contractor shall be provided
in a manner consistent with all applicable standards and regulations governing such services. Contractor
shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar
taxes relating to employees and shall be responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,modify,reuse,
or sublicense any and all copyrights, designs, and other intellectual property embodied in plans,
specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any
tangible medium of expression, including but not limited to, physical drawings or data magnetically or
otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Contractor
under this Agreement ("Documents & Data"). Contractor shall require all subcontractors to agree in
writing that City is granted a non-exclusive and perpetual license for any Documents & Data the
subcontractor prepares under this Agreement. Contractor represents and warrants that Contractor has the
legal right to license any and all Documents & Data. Contractor makes no such representation and
warranty in regard to Documents & Data which were provided to Contractor by the City. City shall not
be limited in any way in its use of the Documents and Data at any time, provided that any such use not
within the purposes intended by this Agreement shall be at City's sole risk.
6. INSURANCE
Insurance requirements are attached hereto as Exhibit C.
7. INDEMNIFICATION
Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers, agents,
employees, contractors, special counsel, and representatives from liability: (1) for personal injury,
damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal
injury, including death, and claims for property damage, which may arise from the negligent operations
2
of the Contractor, its subcontractors,agents,employees,or other persons acting on its behalf which relates
to the services described in section 1 of this Agreement; and (2) from any claim that personal injury,
damages, just compensation, restitution,judicial or equitable relief is due by reason of the terms of or
effects arising from this Agreement.This indemnity and hold harmless agreement applies to all claims for
damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been
suffered,by reason of the events referred to in this Section or by reason of the terms of,or effects, arising
from this Agreement. The Contractor further agrees to indemnify, hold harmless, and pay all costs for the
defense of the City, including fees and costs for special counsel to be selected by the City, regarding any
action by a third party challenging the validity of this Agreement, or asserting that personal injury,
damages,just compensation,restitution,judicial or equitable relief due to personal or property rights arises
by reason of the terms of,or effects arising from this Agreement. City may make all reasonable decisions
with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent
Contractor's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to
the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the
negligence,recklessness, or willful misconduct of the Contractor.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Contractor shall defend and indemnify the City,its officers,agents,representatives,and employees
against any and all liability, including costs, for infringement of any United States' letters patent,
trademark, or copyright infringement, including costs, contained in the work product or documents
provided by Contractor to the City pursuant to this Agreement.
9. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed under this
Agreement. Contractor shall maintain complete and accurate records with respect to the costs incurred
under this Agreement and any services, expenditures, and disbursements charged to the City for a
minimum period of three(3)years,or for any longer period required by law,from the date of final payment
to Contractor under this Agreement. All such records and invoices shall be clearly identifiable. Contractor
shall allow a representative of the City to examine, audit, and make transcripts or copies of such records
and any other documents created pursuant to this Agreement during regular business hours. Contractor
shall allow inspection of all work, data, documents,proceedings, and activities related to this Agreement
for a period of three (3) years from the date of final payment to Contractor under this Agreement.
10. CONFIDENTIALITY
If Contractor receives from the City information which due to the nature of such information is
reasonably understood to be confidential and/or proprietary, Contractor agrees that it shall not use or
disclose such information except in the performance of this Agreement, and further agrees to exercise the
same degree of care it uses to protect its own information of like importance, but in no event less than
reasonable care. "Confidential Information" shall include all nonpublic information. Confidential
information includes not only written information, but also information transferred orally, visually,
electronically, or by other means. Confidential information disclosed to either party by any subsidiary
and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and
nondisclosure shall not apply to any information that(a)has been disclosed in publicly available sources;
3
(b) is, through no fault of the Contractor disclosed in a publicly available source; (c) is in rightful
possession of the Contractor without an obligation of confidentiality; (d) is required to be disclosed by
operation of law; or (e) is independently developed by the Contractor without reference to information
disclosed by the City.
11. CONFLICT OF INTEREST CLAUSE
a. Contractor covenants that it presently has no interests and shall not have interests, direct or
indirect,which would conflict in any manner with performance of services specified under this
Agreement.
b. No immediate family members of either the Mayor, City Council Member, or any appointed
City Official, including appointed board and commission members,as defined under the City's
Municipal Code, whose position with the City shall award or influence the award of this
Agreement, or any competing contract or amendment thereof, shall be employed in any
capacity by the Contractor or have any other direct or indirect financial benefit or interest in
this Agreement.
c. The section also prohibits the awarding of any agreement, contract, grant, or any amendment
to those awards, to any former full-time employee for one-year from date of employee
separation except for any CalPERS retiree as authorized by City Council resolution
d. The Contractor must comply with all conflict of interest laws,ordinances, and regulations now
in effect or hereafter to be enacted during the term of this Agreement. The Contractor warrants
that it is not now aware of any facts which conflict with the prohibitions defined above. If the
Contractor hereafter becomes aware of any facts that might reasonably be expected to create a
conflict of interest, it must immediately make full written disclosure of such facts to the City.
Full written disclosure must include, but is not limited to, identification of all persons
implicated and a complete description of all relevant circumstances. Failure to comply with
the provisions of this paragraph will be a material breach of this Agreement.
e. Contractor covenants that none of its directors, officers, employees, or agents shall participate
in selecting or administrating any subcontract supported (in whole or in part) by City funds
stemming from the Agreement where the awarding of the subcontract has any direct or indirect
financial benefit or interest to any individual, as defined in subsections (b)and(c) above.
12. NON-DISCRIMINATION
Contractor shall not discriminate because of race, color, creed,religion, sex, marital status, sexual
orientation, gender identity, gender expression, gender, medical conditions, genetic information, or
military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by
applicable law,in the recruitment,selection,teaching,training,utilization,promotion,termination or other
employment related activities or any services provided under this Agreement. Contractor affirms that it is
an equal opportunity employer and shall comply with all applicable federal, state and local laws and
regulations.
4
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Contractor,
and supersedes any and all other agreements,oral or written,between the parties. In the event of a conflict
between the terms of this Agreement and any attachments hereto,the terms of this Agreement shall prevail.
This Agreement may not be modified except by written instrument signed by the City and by an authorized
representative of Contractor. The parties agree that any terms or conditions of any purchase order or other
instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or
obligate Contractor or the City. Each party to this Agreement acknowledges that no representations,
inducements,promises or agreements,orally or otherwise,have been made by any party,or anyone acting
on behalf of any party,which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Contractor may not assign,transfer, delegate, or subcontract any interest herein without the prior written
consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior
written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit
the City's ability to have any of the services which are the subject to this Agreement performed by City
personnel or by other Contractors retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty(30)days written notice of termination.
In such event, Contractor shall be entitled to receive and the City shall pay Contractor compensation for
all services performed by Contractor prior to receipt of such notice of termination,subject to the following
conditions:
a. As a condition of such payment,the Executive Director may require Contractor to deliver
to the City all work product(s) completed as of such date, and in such case such work
product shall be the property of the City unless prohibited by law,and Contractor consents
to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance
specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by
the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving
the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed
a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver
constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION-VENUE
This Agreement has been executed and delivered in the State of California and the validity,
5
interpretation,performance, and enforcement of any of the clauses of this Agreement shall be determined
and governed by the laws of the State of California. Both parties further agree that Orange County,
California, shall be the venue for any action or proceeding that may be brought or arise out of, in
connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses, permits,
approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by
the laws and regulations of the United States, the State of California, the City of Santa Ana and all other
governmental agencies. Contractor shall notify the City immediately and in writing of its inability to
obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be
cause for termination of this Agreement.
19. NOTICE
Any notice,tender,demand, delivery, or other communication pursuant to this Agreement shall be
in writing and shall be deemed to be properly given if delivered in person or mailed by first class or
certified mail,postage prepaid, or sent by fax or other telegraphic communication in the manner provided
in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza(M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
With courtesy copies to:
Executive Director,Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
To Contractor:
Guy Chadwell
Vice President& COO
PSI Water Technologies, Inc.
550 Sycamore Dr.
Milpitas, CA, 95035
A party may change its address by giving notice in writing to the other party. Thereafter, any
6
communication shall be addressed and transmitted to the new address. If sent by mail, communication
shall be effective or deemed to have been given three (3) days after it has been deposited in the United
States mail,duly registered or certified,with postage prepaid, and addressed as set forth above. If sent by
fax, communication shall be effective or deemed to have been given twenty-four(24)hours after the time
set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth
above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays
shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power,
authority and right to bind their respective parties to each of the terms of this Agreement,
and shall indemnify City fully, including reasonable costs and attorney's fees, for any
injuries or damages to City in the event that such authority or power is not, in fact,held by
the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth
in the body of this Agreement.
IN WITNESS WHEREOF,the parties hereto have executed this Agreement the date and year first above
written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nunez -
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO PSI WATER TECHNOLOGIES,INC.:
City Attorney
r
KyIVXellesen Guy Chadwell
Assistant City Attorney Vice President& COO
RECOMMENDED FOR APPROVAL:
�OG(OG�O 'Osaf
Rodolfo Rosas(Jul 6,2026 14:02:18 PDT)
Rodolfo Rosas, P.E.
Acting Executive Director
Public Works Agency
7
CITY OF SANTA ANA
EXHIBIT A -
SCOPE OF SERVICES
Contractor shall perform services as set forth below.
I. BACKGROUND
The City of Santa Ana Public Works Agency — Water Resources Division oversees and maintains the daily
operations of the Water System and Sanitary Sewer System.The City of Santa Ana's water system has an average
day demand of about 43 million gallons (MG)with 45,000 services. It is comprised of approximately 478 miles
of water main,50 MG of storage at 8 sites,7 Metropolitan Water District(MWD)connections,21 groundwater
wells, 7 pump stations, 4 pressure regulating stations and utilizes 2 pressure zones. The City treats all
groundwater water with chlorine in the form of sodium hypochlorite solution prior to entering the distribution
system utilizing thirteen (13)sodium hypochlorite generation units throughout Santa Ana.
II. GENERAL DESCRIPTION
The City of Santa Ana (City), is seeking proposals from qualified firms and organizations(proposers)to provide
preventative annual maintenance services and repairs for the City's existing thirteen (13) sodium hypochlorite
generation units, in addition to procurement of replacement parts and new installations as specified herein at
the SCOPE OF SERVICES. The existing onsite sodium hypochlorite units are MicrOclor Multi-Cells as
manufactured by Process Solutions,Incorporated(a UGSI solutions company)and are sized for 60, 100 and 400
pound per day(PPD)capacity.The system also includes seventeen(17)PAX Mixers and Nine(9)residual control
systems that shall be included as part of the maintenance and service scope. New installations and replacement
parts shall be procured from and manufactured by Process Solutions, Incorporate. Substitutions shall not be
permitted.
The City of Santa Ana has the following thirteen (13)sodium hypochlorite generation units on-site:
TABLE A: EXISTING MICROCLOR UNITS IN THE CITY OF SANTA ANA
I Chlorine Unit
Units Reservoir Well Sites Address Model
Well 33,29, 16,
1 Walnut 41 723 E Walnut St,Santa Ana 92701 MC-400,77.2 GPH
2007 W McFadden,Santa Ana CA
2 Well 37 92704 MC-60, 26 GPH
3 Well 35 1718 N Sydney St,Santa Ana CA 92706 MC-60, 26 GPH
Well 18,24,32,
4 Garthe 36,39 2401 N Bristol St,Santa Ana,CA 92706 MC-400, 50 GPH
5 Crooke Well 27,28 730 E Memory Ln,Santa Ana,CA 92706 MC-100,26 GPH
6 Well 40 1789 E Fruit St, Santa Ana CA MC-60,50 GPH
1815 E Chestnut St,Santa Ana CA
7 Well 31 92701 MC-60,26 GPH
209 S Mountain View,Santa Ana, CA
8 West Well 20, 21,30 I. 92703 MC-100, 77.2 GPH
9 PSI Trailer 215 S. Center St. Santa Ana,CA 92703 MC-60,26 GPH
City of Santa Ana IFB No.26-049 Page 14 of 57
CITY OF SANTA ANA
627 E.Washington Ave.Santa Ana,CA
10 Well 42 92701 MC-100,GPH(TBD)
11 East Well 26 1730 S Santa Fe,Santa Ana CA 92705 MC-100,26 GPH
12 South Well 34 1727 W Alton Ave,Santa Ana,CA 92705 MC-60, 26 GPH
C 2736 N Cambridge St,Santa Ana, CA
13 Cambridge LWell 38 90701 MC-60,26 GPH
Additionally, the Contractor shall design, furnish and install submersible tank mixing systems with chemical
injection systems for continuous use in the City's nine (9) potable water storage tanks specified in TABLE B:
EXISTING POTABLE RESERVOIR TANKS IN THE CITY OF SANTA ANA. The Contractor shall furnish a PWM400V3
PAX Water Mixer or a PWM500 V3 PAX Water Mixer(depending upon the application and at the request of the
City) with a PCC405V3 PAX Control Center. The Contractor shall install the submersible mixing system with
controls and accessories necessary for a complete and operable system. Each mixer shall have the ability to
function continuously on a year-round basis, regardless of drain and fill cycles. Each mixer shall consist of a
water-filled submersible motor, an impeller and a non-submersible control center that houses all control
electronics. Upon completion of installation,the Contractor shall provide the City with training services.
For more intensive mixing applications in City owned reservoirs, the Contractor shall design, furnish and
install a Residual Control System (RCS). The RCS shall include but is not limited to the tank mixer, piping,
valves, ancillary equipment as specified herein, installation, related testing, start-up, and training services.
The RCS shall be the Tank Shark Mixing System as manufactured and supplied by Process Solutions, Inc.,
Campbell,California. Substitutions shall not be permitted.
The City of Santa Ana has the following nine(9) reservoir tanks on-site:
TABLE B:EXISTING POTABLE RESERVOIR TANKS IN THE CITY OF SANTA ANA
Capacity(Million � Mixer(s) RCS
Units Reservoir Address Gallons) Quantity Quantity
723 E Walnut St,Santa Ana,
1 Walnut Reservoir 1 CA 92701 7 MG 2 1
2401 N Bristol St,Santa Ana,
2 Garthe Reservoir 1 CA 92706 6 MG 2 1
2401 N Bristol St,Santa Ana,
3 Garthe Reservoir 2 CA 92706 5 MG 2 L-1
2401 N Bristol St,Santa Ana,
4 Garthe Reservoir 3 CA 92706 5 MG 2 1
y
730 E Memory Ln,Santa
5 Crooke Ana, CA 92706 6 MG 2 1
209 S Mountain View,Santa
6 West Ana,CA 92703 6 MG _ 2_ 1
1730 S Santa Fe,Santa Ana,
7 East CA 92705 6 MG 2 1
1727 W Alton Ave,Santa
8 South Ana, CA 92705 6 MG 1 2 1
2736 N Cambridge St,Santa
9 Cambridge Ana,CA 90701 1.3 MG 1 1
City of Santa Ana IFB No.26-049 Page 15 of 57
CITY OF SANTA ANA
III. SCOPE OF SERVICES
A.ANNUAL MAINTENANCE
The Contractor shall carry out annual maintenance services for all listed sodium hypochlorite generation
units as requested by the City at the hourly rated specified in the Fee Schedule.The Contractor shall charge
labor at the established rates for normal hours, after hours, weekend hours and holiday hours. Regular
business hours are considered from 7:00 A.M. to 5:00 P.M. (Monday through Friday). Anytime outside of
business hours of operation may be considered after hours/weekends.
The Contractor shall inspect the equipment listed in accordance with the specifications set forth by the
manufacturer's operation and maintenance manual and shall provide recommended additional parameters.
The Contractor shall provide trained personnel who are qualified to work on MicrOclor Multi-Cell units with
no less than three (3)years of experience.
The annual maintenance will consist of components specified in APPENDIX A and are not limited to
addressing following:
• HYDROGEN DILUTION VENTING SYSTEM
o Check airflow switches
o Check/clean/replace vent screens
• RECTIFIER
o Clean dust debris and fan using vacuum/air hose
o Inspection thermal grease on Silicon Controlled Rectifiers (SCRs) and clean and replace
thermal grease compound
o Inspect and tighten all electrical connections
o Replace starter contactors, if necessary
• STORAGE TANKS
o Inspect,drain,and clean the interior
• BRINE TANKS
o Inspect, drain,and clean the interior
o Remove and clean all deposits on brine tank level switch
• HYDROGEN ROOM SENSOR
o Inspect, clean, and calibrate with test gas
• BRINE FEED PUMP
o Rebuild brine pump by changing out gear and bearing assemblies
• ULTRASONIC TRANSMITTER
o Calibrate the transmitter within the day tank
o Diagnostic check on all PLC Modules
o Verify the alarms
• INJECTION QUILLS
o Inspect, drain, and clean the interior
The Contractor shall immediately notify the City of conditions that do not conform to applicable codes and/or
pose a safety hazard.
Within five (5) business days of completing preventative maintenance on a sodium hypochlorite generation
unit,the Contractor shall provide a detailed report to the City stating all findings,if any,along with a proposed
scope of work and complete cost estimates for any recommended equipment repairs and/or replacement.
The Contractor is required to develop and/or utilize reporting forms acceptable to the City that address all
City of Santa Ana IFB No.26-049 Page 16 of 57
(9) CITY OF SANTA ANA
components in APPENDIX A. Furthermore, the Contractor shall recommend any additional parameters that
have not been included in APPENDIX A.
B. ON-CALL REPAIR SERVICES
Any repair service above and beyond preventative maintenance will require an estimate being submitted to
the City. The Contractor requires City approval prior to any work being performed. The Contractor shall
provide a copy of original invoices for materials purchased at a maximum cap of 10% markup on parts. Part
replacements and repairs will be performed on an"as needed" basis and must be approved in writing by the
City personnel responsible for overseeing these sodium hypochlorite generation units.
In the event of a sodium hypochlorite generation unit failure or malfunction, the Contractor shall provide-
on-call repair services within five (5) days of receiving the call from the City and shall respond to initial
requests within twenty-four(24) hours of receiving calls.
C. REPLACEMENT PARTS
The Contractor shall provide chlorine generation unit parts,supplies and equipment for all listed City sodium
hypochlorite generation units as requested by the City at a cost not to exceed the markup percentage
specified in Fee Schedule. Upon request of the City,the Contractor must provide the City with its actual paid
supplier invoices and statements for parts,supplies and equipment.
All parts, supplies, materials, and equipment provided to the City are to be new, and from acceptable
manufacturers with acceptable warranty periods to the City.
D. FURNISH AND INSTALL NEW MICROCLOR SODIUM HYPOCHLORITE GENERATION UNITS
The Contractor shall remove existing units, procure and install new sodium hypochlorite units. The new
onsite sodium hypochlorite units shall be MicrOclor Multi-Cells as manufactured by Cleanwaterl,a UGSI
solutions company sized for 60-400 pound per day(PPD) capacity, and no alternatives will be allowed.
1. REMOVAL OF EXISTING UNITS
The Contractor shall be responsible for removal of existing sodium hypochlorite units prior to installation.
The Contractor shall utilize adequate equipment to properly dispose of the equipment and waste, and
restore the site in the same condition as when the Contractor arrived. Refuse shall be disposed of
sufficiently and in frequent intervals so that at no time there is unsightly accumulation of debris and/or
rubbish.Final cleanup shall include the removal of all equipment,surplus material,debris,and rubbish from
the work site leaving it in a neat and clean condition.
2. PRE-INSTALLATION
Prior to commencement of work, unit diagrams and drawings of the installation layouts shall be
submitted to and approved by the City. The Contractor shall submit Shop Drawings required for the
fabrication and installation of the Generation System equipment.
Shop Drawings shall include, but not be limited to,the following:
a. Supplier's literature, illustrations, Specifications and bill of materials for each component of the
City of Santa Ana IFB No.26-049 Page 17 of 57
.. CITY OF SANTA ANA
system. Date shall include a complete description in sufficient detail to permit comparison with the
scope of work.
b. Dimensions, materials,size,weight and performance data.
c. Drawings showing fabrication, assembly, installation and wiring diagrams. Wiring diagrams shall
consist of, at a minimum, control schematics; including coordination with other electrical control
devices operating in conjunction with the sodium hypochlorite generator feed system. (Per site)
d. Affidavits of compliance with all standards and codes including NSF 61 certification for equipment in
contact with potable water.
e. Supplier's standards for sodium hypochlorite generator and feed system equipment.
f. Process Control and Instrumentation:
i. Hardware Submittal
• Bill of Materials
• Data sheets for all instruments provided.
• Catalog cuts for all process control and instrumentation equipment.
• Detailed control panel drawings including assembly/layout drawings and heating/cooling
calculations.
• Instrument installation, mounting and anchoring details.
ii. Detailed schematic drawings for all control equipment(Per Site).
iii. Detailed process and instrumentation diagrams(P&ID)for all control equipment (Per Site).
iv. Detailed loop drawings. Submittal of generic diagrams will not be acceptable. Loop
drawings shall contain all content as specified within this specification at a minimum (Per
Site).
v. Point-to-point interconnection wiring diagrams(Per site).
vi. Panel wiring and piping diagrams(Per Site).
vii. Instrument index with ranges and set points (Per Site).
viii. A fully documented diagram PLC program listing including the 1/0 list and housing
configuration for each PLC(Per Site).
ix. Each PLC program must be associated with a complete English language narrative describing
the function and operation of said rung(Per Site).
x. Color copies of all proposed operator interface screens.
xi. Detailed Factory Testing procedure.
xii. Training plan submittal
xiii. Operations and Maintenance Manual as described below.
3. INSTALLATION
The Bidder shall be responsible for connecting all conduits, wires, pipes, etc. for the onsite generation
unit equipment to City's existing equipment.This includes piping from the feed pumps to the injection
points to provide a complete and fully operational onsite generation unit.
City of Santa Ana IFB No.26-049 Page 18 of 57
CITY OF SANTA ANA
Installation shall be considered"Turnkey'for all sites and includes:
• Disposal/recycling of existing onsite generation units
• Schedule 80 PVC Plumbing Components
• Carlon Non-metallic PVC Electrical Conduit&Connectors Stainless Steel Fasteners Throughout
• FRP Strut &Clamps
• All Mechanical, Electrical and Instrumentation Labor
• Integration of sodium hypochlorite generation unit PLC with City's existing site PLC and SCADA
system.
• Salt Storage Tank
• Brine Storage Tank
• Magelis HMI
• Modicon PLC
• Sodium Hypochlorite Injection lines
• Relocation of the brine feed pump from outside of the generator skid to inside of the generator
skid
• Water Chiller
• Heat Exchanger
• Acid cleaning system
• Hydrogen detector
• Hypochlorite dilution panel with mechanically driven pump rotameters,flow control valves, and
century educator
• Water hardness monitor
• Chlorine analyzer
Instrumentation, controls,computer logic, programming, interlocks and system valving shall be provided
by the Contractor as required for the system to fully operate.
4. CHLORINE GENERATOR OPERATION SHUTDOWN SEQUENCE
The chlorine generation unit shall shut down and alarm for the following conditions:
• Low electrolyte level in any one cell compartment
• Hypochlorite temperature exceeds 1302F(552C)
• Inlet flow falls below a preset value
• Rectifier high or low amperage
• Rectifier high temperature
• Hydrogen dilution blower failure and or low air flow
City of Santa Ana IFB No.26-049 Page 19 of 57
0 CITY OF SANTA ANA
• Sodium hypochlorite tank level high and low level
The generator shall automatically start and stop based on the low and high levels in the
sodium hypochlorite solution tank.
The generator shall be built and configured to allow for one of the electrolytic cells to be removed
(replaced with a pipe spool) and still run at 80 percent production capacity with only minor
adjustments to the required generator controls.
5. LEVEL INDICATORS FOR HYPOCHLORITE SOLUTION TANK(S)
The Contractor shall provide internal ultrasonic level transmitters on each hypochlorite storage
tank for operation of the generation equipment and alarm initiation.
6. OPERATION AND MAINTENANCE REQUIREMENTS
The Contractor shall submit four(4) copies of preliminary operation and maintenance manuals and four
(4)copies of the final manuals for each generation system as described below:
Operation Data
• Complete,detailed operating instructions for each piece of equipment
• Explanations for all safety considerations relating to operations
• Recommended spare parts lists
Maintenance Data
• Master equipment list with the make,model, ranges and calibration information.
• Maintenance data shall include all information and instructions required by plant personnel to
keep equipment properly cleaned, lubricated and adjusted so that it functions effectively.
• Explanation with illustrations as necessary for each maintenance task
• Recommended schedule of maintenance tasks
• Lubrications charts and tables of alternate lubricants
• Troubleshooting instructions
• List of maintenance tools and equipment
• Name, address, and phone number of manufacturer and manufacturer's local service
representative.
The Contractor's equipment must have a troubleshooting section of the 0&M manual downloaded
into the Magelis HMI for operator quick access to O&M.
7. DELIVERY,STORAGE AND HANDLING
The Contractor shall be responsible for the delivery,storage and handling of products in accordance
with the manufacturer's recommendations.
City of Santa Ana IFB No.26-049 Page 20 of 67
CITY OF SANTA ANA
8. SYSTEM START-UP AND TESTING
The Contractor shall furnish the services of qualified personnel to check installation, start-up and
instruct City's operating personnel in the proper operation and maintenance of the equipment per
the schedules. Provide all documentation as described under the operation and maintenance
requirements.
The System supplier and Contractor shall verify that structures, equipment, pumps and motors are
compatible for an efficient system.
The Contractor shall test the sodium hypochlorite feed system for proper operation in the presence of
the City per requirements of this section. Testing is to include, but not be limited to, validation of
the following performance criteria:
a. Sodium hypochlorite concentration produced.
b. Electrical efficiency(kWH/Ib equivalent chlorine produced)
c. Salt consumption
d. Water Consumption
e. SCADA Operation and Communication. The City SCADA vendor shall be onsite to ensure
full functionality of the sodium hypochlorite feed system integration with the SCADA
network. It is the Contractor's responsibility to contact the City of Santa Ana and the City's
Engineering Consultant and secure their services to support the sodium hypochlorite
generation installations.
f. Local HMI operation
The Contractor shall furnish all necessary testing equipment and devices. If the sodium hypochlorite
feed system fails to meet any of the specified performance requirements, the Contractor shall modify
and/or replace defective equipment until it meets specified requirements. The systems shall be re-tested
to verify satisfactory operation.
The successful Contractor shall retain, for a period of not less than three (3) days onsite, factory
trained representatives of the manufacturer of each component with demonstrated ability and
experience in the installation and operation of the equipment to perform the following:
• Service/Inspection during installation.
• Inspection reports at completion.
• Testing,calibration and adjusting of all components for optimum performance.
• Supervise the correction of any defective or faulty work before and after acceptance
by the City.
The equipment shall not be considered ready for testing until the following conditions are
satisfied:
• Operations and Maintenance Manual and final shop.drawings have been reviewed,
City of Santa Ana IFB No.26-049 Page 21 of 57
CITY OF SANTA ANA
approved and accepted by the City.
• All required electrical tests and electrical adjustments have been completed to the
satisfaction of the City.
• All safety devices, instrumentation and equipment are installed,fully functional,adjusted
and tested.
9. SAFETY&SERVICE RELATED REQUIREMENTS
The cells must be vertical design with high volume, re-circulating flows to provide a shearing action for
cleaner cells, and the ability to operate on lower quality salt. The location of hydrogen safety's greatest
concern is at the cell, not the tank. The cells must operate at atmospheric pressure and discharge the
hydrogen at each cell compartment. Under no circumstances can water/liquids handling and/or cells be
located immediately above the power supplies.
All electrical equipment and enclosures will be built and certified to UL 508 standards and will possess
the appropriate label. Amperage control in the cells must be done by conductivity control utilizing a
positive displacement brine pump with speed control. The systems must use multiple cells and be able
to easily and quickly remove one cell from service, replace it with a pipe spool, and still be able to
operate the system at reduced capacity. All spare parts and replacement parts(except cells), must be
available locally at supply houses.
Contractor's installation personnel shall coordinate all work with City staff, wear all required
personal protective equipment(PPE)and comply with all safety standards and laws.
10. CITY OF SANTA ANA RESPONSIBILITY
The City of Santa Ana will be responsible for providing the following:
• Potable Water Supply 1"at 50 PSI Minimum
• Underground or Structural Work
• Concrete Work
• Permitting or regulatory approvals
11. POWER
The City will provide 480 VAC as required to a J-Box within 5-feet of where the new unit will be
installed. Circuits that will be provided:
• For 60 PPD units:480 VAC,three phase, 15 FLA
• For 100 PPD units:480 VAC,three phase,20 FLA
• For 400 PPD units:480 VAC,three phase,80 FLA
12. WATER
City of Santa Ana IFB No.26-049 Page 22 of 57
CITY OF SANTA ANA
Water will be available in the brine maker enclosure. The Contractor will be responsible to connect
to the softener as required by the City.
13. CONTROL AND SIGNAL WIRING
The Contractor will be responsible to run all required control and signal wiring for the operation
of the generation systems. Numbering assignment of registers shall be coordinated with the City's
Engineering Consultant for integration with the City site PLC and SCADA system.
14. CONTROL SYSTEM
The Contractor shall be responsible for programming the generation system package control
software, including the PLC and HMI,as well as integrating the sodium hypochlorite generation unit PLC
with City's existing site PLC and existing SCADA system. The Contractor will furnish the PLCs for use in
the onsite generation unit (Modicon M340 PLC). The Contractor shall contract, as necessary, with the
City's SCADA vendor to ensure that full integration and programming of all units with the City's home
SCADA network. Any changes, programming or otherwise, necessitated by the new sodium
hypochlorite units to the existing SCADA panels shall be done by the Contractor.
The Contractor shall perform functional, performance and start-up testing of the generation system.
The Contractor shall notify the City at least fourteen (14) calendar days before performing these tests.
The Contractor shall coordinate with the City prior to performing these tests.
The generator PLC and local Human Machine Interface (HMI) will control and monitor all functions and
operational parameter including, but not limited,to the following when feasible:
• Redundant cell level switches
• Process temperature control
• Rectifier control
• DC amperage and voltage
• Hypochlorite tank levels
• Blower controls
• Chlorine residual
• Metering pump flow pacing and dosing(when applicable)
• Alarm history
• Security protection
• The hydrogen gas room monitor shall send signals with alarms to the PLC. All levels and
alarms shall be displayed locally at the hydrogen gas monitor, but be sent and stored into
the local PLC and SCADA historian. The system shall send an alarm when preset limits are
exceeded for gas concentration.
• HMI display shall include a full O&M Manual so that maintaining a hard copy is not
necessary
• Brine feed pump speed and clamp controls
City of Santa Ana IFB No.26-049 Page 23 of 57
CITY OF SANTA ANA
The control cabinet logic will function at the PLC level where operating parameters will be measured,
corrected,scaled,reported and controlled. The HMI will serve as the operator interface,data input screen
and alarm log.
15. AS-BUILTS
Site specific as-built drawings will be required at the completion of the project.The Contractor shall deliver
to the City all PLC and HMI programming and codes for future reference prior to final acceptance.
Final payment will not be made until these requirements are met.
The Contractor shall submit an operation and maintenance manual and maintenance summary forms for
the generation system.The O&M manual and forms shall be reviewed by the Contractor and issued to
the City for review and approval.
16. TRAINING
Training shall be provided to the City by the Contractor over the period of two(2)days and shall be eight
(8) hours per day. Contractor shall provide four(4)copies of training manuals per site.
The Contractor shall train City's personnel and provide detailed instructions in the operation of the
generation equipment and provide certification authorizing City personnel to work on MicrOclor units.
Training shall be considered included in the costs of each site bid item.
17. LOCAL SUPPORT
The Contractor shall have 24/7 support/service center with a maximum response time of 24-hours.
The location of the customer service center must be included in the proposal documents and will
be used to determine compliance with these requirements. The service center must be within 100
miles from the center of the City of Santa Ana.
18. INSTALLATION OF PAX MIXERS AND RESIDUAL CONTROL SYSTEMS(RCS)
The Contractor shall provide all labor,materials,equipment,and supervision necessary for the installation
of PAX Mixers and Residual Control Systems.Work shall include the installation,mounting,and alignment
of mixers within the designated mixing basins to ensure rapid and uniform dispersion of sodium
hypochlorite during the treatment process. The Contractor shall also install and integrate the residual
control system, including associated sensors, control panels, instrumentation, and communication
interfaces, to enable continuous monitoring and automated adjustment of sodium hypochlorite dosing.
All mechanical, electrical, and control components shall be installed in accordance with manufacturer
recommendations, applicable codes and standards, and the project plans and specifications. The
Contractor shall perform testing, calibration, and commissioning to verify proper operation and ensure
the system functions reliably as part of the overall treatment process.
E. ANNUAL MAINTENANCE FOR PAX WATER TECHNOLOGY CIRCULATORS
City of Santa Ana IFB No.26-049 Page 24 of 57
' CITY OF SANTA ANA
Annual maintenance shall include maintenance of the circulators a year after installation. Preventative
maintenance shall consist of the following and the Contractor shall recommend any additional
parameters:
a. CHECK THE FOLLOWING ON THE PAX CONTROL CENTER
i. The condition and tightness of connections
ii. Ensure that the temperature around the PAX Control Centers remain between -4 °F to
129°F (-20°C to 54°C)or less and that ventilation is effective
iii. Remove any dust from inside the PAX Control Center and around the VFD
iv. Ensure proper operation of the VFD fan and PAX Control Center fan (if installed)
v. Physical damage to the PAX Control Center
b. SIDE AIR FILTER ON THE PAX CONTROL CENTER
L Remove and clean the filter with mild detergent and water
ii. Reinstall the filters or replace
c. BOTTOM AIR FILTER ON THE PAX CONTROL CENTER
i. Remove and clean the filter with mild detergent and water
ii. Reinstall the filters or replace
d. CHECK THE FOLLOWING ON THE PAX WATER MIXER
i. Operation of the motor
ii. Chemical feed attachment is properly functioning for intended purpose
iii. General wear and tear on the unit
e. HACH TOTAL CHLORINE ANALYZER
i. Clean the controller cover exterior with mild detergent and water
ii. Confirm general operation is intact;flow adjustment, pH adjustment,cleaning
iii. Calibration and verification of analyzers
iv. Ensure controller cover is securely closed and in working condition
Within five(5)business days of completing preventative maintenance on a PAX Water Technology
Circulator, the Contractor shall provide a detailed report to the City stating all findings, if any,
along with a proposed scope of work and complete cost estimates for any recommended
equipment repairs and/or replacement. The Contractor is required to develop and/or utilize
reporting forms acceptable to the City. The Contractor shall follow the manufacturer's
specification in regards to preventative maintenance.
F. ANNUAL MAINTENANCE FOR THE RESIDUAL CONTROL SYSTEM RCS)
Annual maintenance shall include maintenance of the RCS a year after installation.Within five(5)business
days of completing preventative maintenance on a RCS,the Contractor shall provide a detailed report to
the City stating all findings, if any,along with a proposed scope of work and complete cost estimates for
any recommended equipment repairs and/or replacement. The Contractor is required to develop
reporting forms acceptable to the City that detail the annual maintenance work entailed.The Contractor
shall follow the manufacturer's specification in regards to preventative maintenance.
G. DESIGN, FURNISH AND INSTALL NEW KINETICO SOFTENING SYSTEMS
City of Santa Ana IFB No.26-049 Page 25 of 57
CITY OF SANTA ANA
The Contractor shall procure and install Kinetico Water Softening systems manufactured by Kinetico Water
Systems Incorporated at the City's existing sodium hypochlorite generation sites listed in TABLE A:EXISTING
MICROCLOR UNITS IN THE CITY OF SANTA ANA.The Contractor shall properly size and install the Kinetico
softening systems based on the specific needs of the City's facilities for industrial use. The Kinetico Water
Softening units shall be installed in accordance with the manufacturer's recommendations and
specifications.Substitutions shall not be permitted.
1. PRE-INSTALLATION
Prior to commencement of work,the Kinetico softener systems shall be properly sized and recommended
by the Contractor based off the City's needs and specifications at each site location. Drawings of the
installation layouts shall be submitted to and approved by the City. The Contractor shall submit Shop
Drawings required for the installation of the Kinetico softening systems.
Shop Drawings shall include, but not be limited to,the following:
a. Supplier's literature, illustrations, specifications and bill of materials for each component of the
system.
b. Dimensions, materials, size,weight and performance data.
c. Drawings showing fabrication, assembly, installation and wiring diagrams. Wiring diagrams shall
consist of, at minimum, control schematics. (Per site)
d. Affidavits of compliance with all standards and codes including NSF/ANSI Standard 44 certification;
industry-accepted efficiency rating measuring the amount of hardness removed per pound of salt
used.
e. Submittal
i. Bill of Materials
ii. Data sheets for all instruments provided
iii. Instrument installation, mounting and anchoring details
iv. Detailed schematic drawings for all equipment(Per Site)
V. Training plan submittal
vi. Operations and Maintenance Manual as described below
2. REMOVAL OF EXISTING SOFTENING SYSTEM
The Contractor shall remove the existing softening system and return all softening equipment to the City.
All accumulation of debris not integral to the operation of the removed softening system shall be properly
disposed.
3. INSTALLATION
The Contractor shall be responsible for mounting and installing the Kinetico softener systems at each of
the City's requested sites.The Contractor shall provide all equipment, materials, and resources required
for complete installation of the Kinetico softening systems.All water softening equipment provided shall
possess a ten(10)year warranty.
4. SUBMITTALS AND TRAINING
City of Santa Ana IFB No.26-049 Page 26 of 57
CITY OF SANTA ANA
Upon completion of the installation,the Contractor shall supply training to the City consisting of no less
than four (4) hours, and shall provide as-built specifications regarding the location of the Kinetico
softening systems.The Proposer shall submit an operation and maintenance manual and
maintenance summary forms for the Kinetico softening systems. The 0&M manual and forms shall be
reviewed by the Proposer and issued to the City for review and approval.
S. START—UP
Each unit shall operate maintenance free for a full thirty(30)day test period prior to final acceptance by
the City. Final payment shall not be made until the successful completion of the start—up test period.
H. WARRANTY
Prior to acceptance of the sodium hypochlorite generation system, the Contractor shall provide written
warranty from the system manufacturer that includes the following statements:
a. The System Supplier shall inspect the installation during and after completion and provide
written certification that the sodium hypochlorite generation system is free from faults and
defects and is in conformance with the specifications.
b. The System Supplier must provide the following after sales services and installation:
• 24-hour 365 day toll free service hot line.
• Same day or overnight parts availability.
• Must provide evidence of spare parts availability on this system such as
electrolytic cells, rectifiers,control cabinets and metering pumps.
• Technician availability within 48 hours.
c. The Supplier shall guarantee the minimum performance of the system for electrical
consumption, salt usage and water usage for a minimum of three (3) years following final
acceptance of installation.
Contractor shall warrant all the equipment supplied to be free from defects in materials and workmanship
for a period of three (3) years from the date of start-up. This warranty shall not apply to products that
require repair or replacement due to accident,misuser or improper maintenance. Any product or parts of
the product repaired or replaced by the Contractor under this warranty are warranted only for the
remaining unexpired part of its three (3) year original warranty period. All ancillary equipment provided
by Contractor, including tanks and pumps,will be included in the three(3)year warranty.
Contractor shall warrant the electrolytic cells and cell bodies on a prorated basis for years four through
seven.
I. DESCRIPTION OF BID ITEMS
The onsite hypochlorite generation system shall include, but is not limited to: annual maintenance, the
removal of existing units, furnishing and installation of sodium hypochlorite generator skid, piping,valves,
system control cabinet with programmable logic controller(PLC), ancillary equipment, installation, related
testing,start-up,training services,and furnishing and installation of PAX Water Technology Circulators and
Kinetico Softening Systems as specified in the Scope of Work and herein.
a. Remove existing units,furnish and install MicrOclor Multi-Cell 100 PPD, NSF-61 Certified, Onsite
City.of Santa Ana IFB No.26-049 Page 27 of 57
. .~. ` CITY OF SANTA ANA
Hypochlorite Generator System consisting of the following:
• One PLC Control Panel,skid mounted including:
• Modicon M340 PLC
• 7.5" Magelis color touch screen
• Ethernet communication interface
• Hoffman 304 stainless steel panel, 24"x 24"x 8"
• Cabinet mounted electrical disconnect
• U.L. 508 Approval NEMA 4X Rating
• Dedicated 24 VDC Power Supply for PLC,display and brine pump
• Emergency stop pushbutton
• One Transformer Rectifier,skid mounted including:
• 304 stainless steel enclosure
• 12 KVA step down transformer, 480 three phase VAC Primary, 300 VDC @
40 amps DC secondary
• D.C. Bridge rectifier utilizing 3 diode assemblies,aluminum heat sink with 120
VAC cooling fan
• Panel mount disconnect
• 4-20 mA D.C.current transducer and NEMA 4X digital display of amperage
• One Electrolytic Cell Skid Assembly including:
• 304 stainless steel frame
• Five(5) 20 PPD Cells, 14 Pass, 2"x12"Active Surface, 1.2 ASI
• One(1) Micropump,stainless steel brine gear pump with integral speed control,
Part Number L24795(Serial Number 1010809004, Model Number GJSN21-
DG.F61J)
• Polycarbonate water and brine rotameters
• GF-Signet Magnetic flow meter
• Five(5)Optical level switches
• Four(4)Temperature switches
• One(1)Temperature sensor
• Teflon& Kynar interconnecting tubing
• PVC 80&Acrylic Cell body construction
• %z"Water and brine solenoid valves
• Two Cartridge Filters for brine and potable water to generator
• One Hydrogen Dilution Blower
• 110 CFM
• Blower current sensor
• Differential pressure switch
• Software controlled safety interlocks to detect control system sequence failure
• One Manual Fill Brine Tank
• High Density Linear Polyethylene(HDLPE) construction
• 2,750-lb salt capacity(275 gallons)
• Manual salt fill
• Under drain
• Drain valve
• Level control assembly
• Dimension:42"D x 48"H
• One Hypochlorite Storage Tank
• HDLPE construction
• 1,000 Gallons
• Top Manway
City of Santa Ana IFB No.26-049 Page 28 of 57
CITY OF SANTA ANA
• Dimension: 7'-0" D x 4'-4" H
• Ultrasonic level control
• One Hydrogen Detector
• ConspecCN06
• Documentation
• Submittals
• As-built drawing
• O&M Manual
• Field Service
• Startup
• Training
• Freight to job site
b. Remove existing units,furnish and install MicrOclor Multi-Cell 60 PPD, NSF-61 Certified, Onsite
Hypochlorite Generator System consisting of the following:
• One PLC Control Panel,skid mounted including:
• Modicon M340 PLC
• 7.5" Magelis color touch screen
• Ethernet communication interface
• Hoffman 304 stainless steel panel,24"x 24"x 8"
• Cabinet mounted electrical disconnect
• U.L. 508 Approval NEMA 4X Rating
• Dedicated 24 VDC Power Supply for PLC,display and brine pump
• Emergency stop pushbutton
• One Transformer Rectifier,skid mounted including:
• 304 stainless steel enclosure
• 7.2 KVA step down transformer, 208/240 single phase VAC Primary, 180 VDC @ 40
amps DC secondary
• D.C.Bridge rectifier utilizing 3 diode assemblies,aluminum heat sink with 120 VAC
cooling fan
• Panel mount disconnect
• 4-20 mA D.C. current transducer
• One Electrolytic Cell Skid Assembly including:
• 304 stainless steel frame
• Three(3)20 PPD Cells, 14 Pass,2"x12"Active Surface, 1.2 ASI
• Micropump,stainless steel brine gear pump with integral speed control, Part
Number L24795(Serial Number 1010809004, Model Number GJSN21-DG.F61J)
• GF-Signet Magnetic flow meter
• Three (3)Optical level switches
• Two (2)Temperature switches
• One(1)Temperature sensor
• Teflon& Kynar interconnecting tubing
• PVC 80&Acrylic Cell body construction
• Yz"Water and brine solenoid valves
• Two Cartridge Filters for brine and potable water to generator
• Two Hydrogen Dilution Blower
• 75 CFM
• Current sensor
• Differential pressure switch
• One Manual Fill Brine Tank
City of Santa Ana IFB No.26-049 Page 29 of 57
CITY OF SANTA ANA
• HDLPE construction
• 1,500-lb salt capacity(150 gallons)
• Manual salt fill
• Under drain
• Drain valve
• Level control assembly
• Dimension: 31"D x 48"H
• One Hypochlorite Storage Tank
• HDLPE construction
• 685 Gallons
• Top Manway
• Dimension: 5'-0" D x 5'-0" H
• Ultrasonic level control
• One Hydrogen Detector
• Conspec CN06
• Documentation
• Submittals
• As-built drawing
• O&M Manual
• Field Service
• Startup
• Training
• Freight to job site
c. Remove existing units,furnish and install MicrOclor Multi-Cell 60 PPD, NSF-61 Certified, Onsite
Hypochlorite Generator System consisting of the following:
• One PLC Control Panel,skid mounted including:
• Modicon M340 PLC
• 7.5"Magelis color touch screen
• Ethernet communication interface
• Hoffman 304 stainless steel panel, 24"x 24" x 8"
• Cabinet mounted electrical disconnect
• U.L. 508 Approval NEMA 4X Rating
• Dedicated 24 VDC Power Supply for PLC,display and brine pump
• Emergency stop pushbutton
• One Transformer Rectifier,skid mounted including:
• 304 stainless steel enclosure
• 7.2 KVA step down transformer, 208/240 single phase VAC Primary, 180 VDC @ 40
amps DC secondary
• D.C.Bridge rectifier utilizing 3 diode assemblies,aluminum heat sink with 120 VAC
cooling fan
• Panel mount disconnect
• 4-20 mA D.C. current transducer
• One Electrolytic Cell Skid Assembly including:
• 304 stainless steel frame
• Three(3)20 PPD Cells, 14 Pass,2"x12"Active Surface, 1.2 ASI
• Micropump,stainless steel brine gear pump with integral speed control, Part Number
L24795 (Serial Number 1010809004, Model Number GJSN21-DG.F61J)
• GF-Signet Magnetic flow meter
• Three(3)Optical level switches
City of Santa Ana IFB No.26-049 Page 30 of 57
CITY OF SANTA ANA
• Two(2)Temperature switches
• One(1)Temperature sensor
• Teflon& Kynar interconnecting tubing
• PVC 80&Acrylic Cell body construction
• %"Water and brine solenoid valves
• Two Cartridge Filters for brine and potable water to generator
• One Hydrogen Dilution Blower
• 75 CFM
• Current sensor
• Differential pressure switch
• One Manual Fill Brine Tank
• HDLPE construction
• 1,500-lb salt capacity(150 gallons)
• Manual salt fill
• Under drain
• Drain valve
• Level control assembly
• Dimension: 31"D x 48"H
• One Hypochlorite Storage Tank
• HDLPE construction
• 475 Gallons
• Top Manway
• Dimension:4'-0" D x 6'-0" H
• Ultrasonic level control
• One Hydrogen Detector
• ConspecCN06
• Documentation
• Submittals
• As-built drawing
• O&M Manual
• Field Service
• Startup
• Training
• Freight to job site
d. Remove existing units,furnish and install MicrOclor Multi-Cell 4 00 PPD, NSF-61 Certified, Onsite
Hypochlorite Generator System consisting of the following:
• One PLC Control Panel,skid mounted including:
• Modicon M340 PLC
• 7.5"Magelis color touch screen
• Ethernet communication interface
• Hoffman 304 stainless steel panel, 24" x 24"x 8"
• Cabinet mounted electrical disconnect
• U.L. 508 Approval NEMA 4X Rating
• Dedicated 24 VDC Power Supply for PLC,display and brine pump
• Emergency stop push button
• One Transformer Rectifier,skid mounted including:
• 304 stainless steel enclosure
• 48 KVA step down transformer, 480 three phase VAC Primary, 300 VDC @
160 amps DC secondary
City of Santa Ana IFB No.26-049 Page 31 of 57
CITY OF SANTA ANA
• D.C.Bridge rectifier utilizing 3 diode assemblies,aluminum heat sink with 120
VAC cooling fan
• Panel mount disconnect switch
• 4-20 mA D.C.current transducer and NEMA 4X digital display of amperage
• One Electrolytic Cell Skid Assembly including:
• 304 stainless steel frame
• Five(5)80 PPD Cells, 14 Pass,2"x12"Active Surface, 1.2 ASI
• One (1) Micropump,stainless steel brine gear pump with integral speed control,
Part Number L24795(Serial Number 1010809004, Model Number GJSN21-
DG.F61J)
• Polycarbonate water and brine rotameters
• GF-Signet Magnetic flow meter
• Five(5)Optical level switches
• Four(4)Temperature switches
• One(1)Temperature sensor
• Teflon& Kynar interconnecting tubing
• PVC 80&Acrylic Cell body construction
• %Z"Water and brine solenoid valves
• Three Cartridge Filters for brine and potable water to generator
• Polypropylene Housing
• 50 Micron Filter
• Two Hydrogen Dilution Blower(For Generator and Tank)
• Plastec 15 Direct Drive Polyporpylene
• P15,0.5HP,3370 RPM, 115/208-230V, 1 Phase
• TEFC Motor
• 110 CFM
• Blower current sensor
• Differential pressure switch
• Software controlled safety interlocks to detect control system sequence failure
• One Manual Fill Brine Tank
• High Density Linear Polyethylene(HDLPE) Construction
• 5,000-lb salt capacity(500 gallons)
• Manual salt fill
• Under drain with valve
• Quartz rock filter bed
• Level control assembly
• Dimension: 60"D x 46"H
• One Hypochlorite Storage Tank
• HDLPE Construction
• 1,500 Gallons
• Top Manway
• Tank Fittings
• Dimension:7'-2" D x 6'-2" H
• VEGA Radar Level Sensor
• One Hydrogen Detector
• Conspec CN06
• Documentation
• Submittals
• As-built drawing
• O&M Manual
City of Santa Ana IFB No.26-049 Page 32 of 57
CITY OF SANTA ANA
• Field Service
• Startup
• Training
• Installation Inspection
• Freight to job site
e. Furnish and Install Metering Pumps, 77 GPH @ 130 PSI Assembly
• Two(2)Metering Pumps(Duty/Standby), Encore 700
• Two(2)Allen Bradley Variable frequency drives, PowerFlex 520-Series AC Drive with NEMA
4X Enclosure
• Two(2)PVC stands
• One(1)Calibration Column
• One(1)Pressure Relief
• One(1)Pulsation Dampener
• One(1) Y-Strainer
• One(1)Pressure Gauge
f. Furnish and Install Metering Pumps,45 GPH @ 150 PSI Assembly
• Two(2)Metering Pumps(Duty/Standby), Encore 700
• Two(2)Allen Bradley Variable frequency drives, PowerFlex 520-Series AC Drive with NEMA
4X Enclosure
• Two(2)PVC stands
• One(1)Calibration Column
• One(1)Pressure Relief
• One(1)Pulsation Dampener
• One(1) Y-Strainer
• One(1)Pressure Gauge
g. Furnish and Install Metering Pumps, 77.2 GPH @ 130 PSI Assembly
• Two(2) Metering Pumps(Duty/Standby), Encore 700
• Two(2)Allen Bradley Variable frequency drives, PowerFlex 520-Series AC Drive with NEMA
U Enclosure
• Two(2) PVC stands
• One(1) Calibration Column
• One(1) Pressure Relief
• One(1) Pulsation Dampener
• One(1)Y-Strainer
• One(1) Pressure Gauge
h. PLC and HMI Programming and Integration
• Programming the generation system control software
• Integration of the sodium hypochlorite generation unit PLC with City's existing site PLC
and SCADA system.
• Furnish the PLCs for use in the onsite generation unit.
• Provide copies of programming code for future reference,troubleshooting and back-up.
• Programming of local human machine interfaces.
i. Spare Parts Kit
• Individual 20 PPD Cells, 14 Pass,2"x12"Active Surface, 1.2 ASI (6 Cells)
City of Santa Ana IFB No.26-049 Page 33 of 57
40�
CITY OF SANTA ANA
• Five(5) electrolytic cell temperature sensors
• Spare Modicon M340 PLC
• Spare Magelis HMI Panel PC Perform, Part Number HMIPPH7D0701
Spare parts shall be packed in sturdy containers with clear indelible identification markings and
shall be stored in a dry,warm location until transferred to the City at the completion of the contract.
j. Local Support
• 24/7 support/service center with a maximum response time of 24-hours.
• Unlimited phone support and trouble-shooting diagnostics for a period of 7 years
j. Annual Maintenance of MicrOclor Multi-Cell 100 PPD, NSF-61 Certified, Onsite Hypochlorite
Generator System
k. Annual Maintenance of MicrOclor Multi-Cell 60 PPD, NSF-61 Certified, Onsite Hypochlorite
Generator System
I. Annual Maintenance of MicrOclor Multi-Cell 400 PPD, NSF-61 Certified, Onsite Hypochlorite
Generator System
m. Hach Total Chlorine Analyzer Kit, Product Number 2981700
i. One(1)CLT10 sc Total Chlorine Sensor
ii. One(1) SC200 Controller
iii. One(1) Mounting hardware kit
iv. One(1) im Digital Extension Cable
V. One(1)Stainless Steel CL10sc Panel
vi. One(1) Micropump,stainless steel brine gear pump with integral speed control, Part
Number L24795 (Serial Number 1010809004, Model Number GJSN21-DG.F61J)
n. Furnish PAX Water Mixer(PWM500)with Chemical Injection and Dry Installation into Reservoirs
L Tripod
• One(1) Bearing housing/Motor mount
• Three(3) Leg,Tripod,
• Three(3),Tripod,Gecko
• One(1) Impeller
• Three(3) Knurled knob and lanyards
• Three (3)Clevis Pin with cotter pins
• One(1) Bail lifting handle,wireform
• One(1) Power Cable
• Two(2) Hose clamps
ii. Bracket
• One(1) Breaking housing/Motor mount
• One(1) Bracket mounting kit
• Three(3)Clevis Pin with cotter pin
• One(1) Bail lifting handle,wireform
• One(1) Isolation pad
• One(1) Power cable
City of Santa Ana IFB No.26-049 Page 34 of 57
CITY OF SANTA ANA
• One(1) Impeller
• One (1) Hardware kit
iii. PAX Control Center(PCC405)
• One (1)PCC Enclosure, 311
• One (1)PCC Door
• One(1) PCC Back Plate
• One(1) Electronics cover panel
• One(1) Cooling Fan
• One(1)Wireless SCADA
iv. Hach Total Chlorine Analyzer, Product Number 2981700
• One(1)CLT10 sc Total Chlorine Sensor
• One(1) SC200 Controller
• One(1)Mounting hardware kit
• One(1) 1m Digital Extension Cable
• One(1)Stainless Steel CL10sc Panel
• One(1) Micropump,stainless steel brine gear pump with integral speed control, Part
Number L24795 (Serial Number 1010809004, Model Number GJSN21-DG.F61J)
o. Annual Maintenance on PAX Water Technology Mixers and Reservoir Control Systems
p. Remove Existing Softening Systems and Design, Furnish and Install New Kinetico
Softening Systems
*All items not described by the bid items, but identified within the scope of work, shall be
considered included within the cost of other bid items.
J. VALUE ADDED RELATED SERVICES
The Contractor may propose additional related services that the City has not specifically identified in this
RFP to accomplish the stated goals of this RFP.Value added related services will be considered by the City
and may or may not be incorporated in the agreement.All parts and materials must be supplied new and
factory approved.
Additional work/locations may be added during the contract period. Upon request by the Project Manager,
the Contractor shall provide a written quotation for any additional work/location(s), based on the rates
submitted.The Contractor shall be paid for additional work/location(s)in accordance with the rates
submitted. Upon Contract Manager's negotiations and acceptance of the Contractor's written quotation,
the additional work/location(s) may be added to the contract by amendment or change order.
K. SAFETY
The Contractor shall perform all work activities in a safe manner respecting and following all
applicable safety standards, rules, regulations, laws and codes.
The Contractor shall observe all applicable State of California Occupational Safety and Health
Administration(Cal/OSHA)and Public Works' safety requirements while at City job sites.
City of Santa Ana IFB No.26-049 Page 35 of 57
CITY OF SANTA ANA
It is the Contractor's responsibility to wear all applicable personal protective equipment applicable to the
tasks assigned.
L. CONFINED SPACE ENTRY
Tanks must be treated as a confined space.Confined space entry by personnel is potentially a life-threatening
task. Confined space entry is governed by OSHA, State regulations, and usually by municipal or corporate
policies.When the contractor's work involves confined space entry,the Contractor/Consultant must review
and sign the Contractor/Consultant Requirements for Confined Space Work prior to commencing work.The
consultant will provide training documentation that certifies their employees have gone through extensive
training that complies with all CAL-OSHA requirements(including but not limited to Cal/OSHA§5157.Permit-
Required Confined Space).
M. LOCKOUT-TAGOUT REQUIREMENTS
The Contractor agrees to fulfill all of its obligations and responsibilities pertaining to Lockout /ragout
regulations as stated within appropriate Cal-OSHA regulations. The Contractor/Consultant has instructed
and trained all of its employees in its own Lockout/Tagout program.The Contractor shall provide locks and
tags in the event Lockout/Tagout is required.At its Sole discretion,the Public Works Agency can immediately
suspend or terminate a contract and/or suspend or discontinue work of a Contractor/Subcontractor due to
poor or non-compliant safety performance and/or failure to adhere to the Public Works Agency's governing
policies and procedures,and to applicable regulations:
• CAL/OSHA§3314.The Control of Hazardous Energy for the Cleaning,Repairing,Servicing,Setting Up,and
Adjusting Operations of Prime Movers, Machinery and Equipment, Including Lockout/Tagout.
N. FALL PROTECTION REQUIREMENTS
When required the Contractor will utilize their own safety equipment and fall protection devices according
to:
• Article 2. Standard Specifications(Cal/OSHA General Industry Safety Orders,3209—3239)
• Article 16.Standard Railings(Cal/OSHA Construction Safety Orders 1620-1621)
• Article 19. Floor, Roof and Wall Openings(Cal/OSHA Construction Safety Orders 1632- 1633)
• Article 21.Scaffolds-General Requirements (Cal/OSHA Construction Safety Orders 1635.1 1637)
• Article 22.Scaffolds-Various Types (Cal/OSHA Construction Safety Orders 1640-1655)
• Article 24. Fall Protection (Cal/OSHA Construction Safety Orders 1669-1672)
O. WORK STANDARDS
All work performed by Contractor shall be to a professional standard, complying with the requirements
of the applicable editions of the Standard Specification for Public Works Constructions, and State and
Local building codes.
P. KgWRM E NT
City of Santa Ana IFB No.26-049 Page 36 of 57
CITY OF SANTA ANA
Contractor shall own and have in good repair all equipment necessary to perform the described services
and the equipment necessary to complete related tasks.
Q. CLEAN UP
The Contractor shall be responsible for removing all debris from the site and cleaning affected areas daily
after preforming work. The Contractor shall keep the premises free of debris and unusable materials
resulting from their work at all times, and upon completion, leave all affected areas as they were prior to
beginning work.
R. STORAGE FACILITIES
The Public Works Agency will not provide storage facilities for the Contractor. The Public Works Agency
will not be liable or responsible for any damage, by whatever means, or for theft of materials or
equipment on the jobsite.
S. PROTECTION OF PROPERTY
The Contractor shall perform work in such a manner that does not damage property. In the event damage
occurs to property by reason of any repairs or installations performed under this contract, the contractor
shall replace,or repair the same at no cost to the City. If damage caused by the Contractor must be repaired
or replaced by the City, the cost of such work shall be deducted from any outstanding balance due the
contractor.
T. UNSATISFACTORY WORK
In the event the work performance of the contractor is unsatisfactory, the contractor shall be notified
and shall have seven (7)calendar days to correct the work at no charge to the City.
City of Santa Ana IFB No.26-049 Page 37 of 57
E w
j x C a
N E •N c 3
a U U
O. p L
> ° Z CL
ar M
v u
a1 N
U_
a+ w aJ '> x u y O
d LC N Q N
E V u C tw O O C E
U n Q m E E Ln �e
p O a U
m L'' w O CL
Q O r al ,0
` p
N cl
Q N A w U C N w C U
U H RO Y i X 3 O H
>- a' '^
H N a N a a u ,a
V V N >_ N 0 N N —
i w C I.E 7 a 01 .--I ei .4 w
00 to LD 0) N O LD O O O O N M O O O O V O O O O
Ln Ln Ln 00 a1 In C1 O O O O n n N O Ln O O M O O O O
co M V 0) 0) O Ln 00 n CD O CD Ln n O M O Ln N O O O O
v 00 LT Ln Lb �D n D, M V> o O 0 n 00 .-1 0 00 Ln n Lo v} in Ur V}
H 01 0) cr In N N LA -4 O N LD LD N N O n N M w
N 00 LD n 00 M O N N M M 01 a -Z ff LD V1 N M O1
C O � V c 7 M N f ci 'i ri M to N 00 LD LD O VT VT Ln
Ln --t LD ei 11 14 N M VT VT in Vb -* V? N co
Vt V! Aft Vt• V). te�VT V! Vt V} V} Vt•
r/ 00 M LD M LD N Ln , , O O O O o CD v CD O O
W 4, Ln Ln Ln o0 01 N M n LD O O O O o0 n N O M O Ln n1 O O O O
.- M m d' Qi 4 O n 01 V O O O O Di Ln n O rn Vi n N O O O O
a 't 00 (1 LA V M co � 0 in O O O M 00 '•1 O ri N M LD UT VT to V!
QM C ct Ln '•1 LD M C C 00 00 00 n N N n N M LD
Cc0 LD n V V -4 O M M V � .••I M V M � � 0)
0 cY M N n n n Ln M V) V} VT .•i 00 LD in ci Ln
n r iaj} D to Sh VT to VF N th �t iR
zr c-1 '-1 e-I rl N N N -�r 00 r•I d• n N N .•i '-1 LO chi O O ei ei r-1 e-I a-i
C
16
r
a �
z �
W
a �
¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ o ¢ a T¢ ¢
� W W W W W W W W W W W W W W W W W W W W J W W
O �
V � a
�i Y Y
LL LL N
.N 7
Z O O
C C Y \ O O O
m Z z Z O v a` £ c 0 c
a ctl0a a v a w a m ai 4�-__ a v ra Io E
> z a
o o d d o o .« co u Ln _ w a c
c u v c _ u Q c £
u 0 u c W c v ° `° Lin Lo ° u o v °' ' o
- 0 ° -:tf ° - LL LL i a £ m o u
' V) LL V) x:tf C Y 3 L L
NJ g o g °na °Ago o Z o uo d �_ a, v o
o w n Ln d o d o g (V c E E E 3 Y o
O O O a O v i d d d O
N
u E u E u E " E a a c. 0 0 o LUiL m °c LL Ou y o £ -°'a o
O v - c c v LC O
cO NO N � N � N > > T' i Ln _ o c @ on � Z ar c aQi 3
a Ln in Ln In E E E V U V Li ^ ai @ `�-' E O aui a�
X £ x £ E
V O ♦+ +' H O N O N N L 3 7 7 LV O •al C C M a •u
G c@ c `>° c S° c `� ¢ ¢ ¢ 5 no
a c a c a c 'CC cw a a `"d a o o `o o `i L v E ern w v e y ai o M
C D C a1 C al aJ L 00 N l0 a1 LL.+ >
@ m Lon Ln o O E O E O E u N 3 N v > = �° a
S a0+ L a0+ - +0+ a0+ e-1 'i ei m aJ a1 �0 _ >. ++ C CO Ln o p
E _ 'c _ 'E _ 'c _ C7 @1 U % L' ^ ^ L' Q) 0 9 o E x¢ Ln a� a '� > u o H n
O O O O O0 N N O yd,, d 00 i0 i0 y +_' -O y
w L w L w L w L 2 2 S Y u E Ln v1 •C K cc H L V Q .F L O a
d d d 7 >• O E > > N H O '� 3
Y O y 0 Y 0 0 U' l7 U' C w O w o w O O Z 4r aJ 7 D W N O E N
Q._ Q Q Q n In In 4! fL al m N I`O r-I O `' d IC L"'
C T C _> n V N 02S n u V U F iJ d u p O p p a Q Z •p4,5
7 7 3 7 N vi vi to a C a C a C J U C c � � _ = C •al y E Ln O 3
ate+ bD ate+ M aad to ate+ Q Q Q N C aJ C a1 C aJ u p a1 O C £ C C O.a > O p
c c c c E a l7 w C1 a C7 x u a) ,a' a m p 0 Z E c £
c C C C 7 > > ; C N = �' c C = > .� .� £ o a� o :: > >3
x O 'x O 'x O 'x O d d d ^ fl ca - o - R - > > > co x c c ¢ c
a a a d � v Y a_ w L L O w E Y m
d d v a m m oa Q g `o `o g o m c m °° u u x a� c
a a W v c c c 3 c Lo a c v c
m CU m (U O d L c L N > - N m O E C G O p O
> > > > Ln io u is u is u ¢ d ¢ io C , H �- a> > D v
E U E r OE � E C " a d ` `O c' a c a c a u a x u x c E 2 ° 7O ai Ou Y' f6 0
QJ a) a1 a1 a1 a/ a) a) 0cJ Cd 6C1 J Q O C > C > C > f0 O ¢ fa ¢ C O1 p aJ aJ f0 O Ll O O O O a1
K u K u K u cc u G C L d Ln J ¢ S ¢ S ¢ 2 2 N d S d ¢ OG Ln LL lL Ln LL a 0 u V'1 Z J N
rl N en Ln LD n 00 C) O rl N cn Ln LD n 00 Cl O .•i N fn a Ln
ei '-I ei ei c-1 'i 1-i e-I '-I rl N N N N N N
Z
Y
EXHIBIT C -
INSURANCE REQUIREMENTS
Contractor shall procure and maintain for the duration of the agreement, the following insurance coverages:
MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts and shall be at least as
broad as:
• Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an
"occurrence" basis, including products and completed operations, property damage, bodily injury and
personal&advertising injury with limits no less than$2,000,000 per occurrence and$4,000,000 aggregate.
• Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1 (any auto), with
combined single limits of$1,000,000. In the event Contractor does not maintain commercial automobile
liability insurance, City will accept evidence of personal automobile insurance, provided that such policy is
endorsed for business use and provides coverage with a minimum limit of $1,000,000. Required policy
limits can be met with primary and umbrella/excess insurance policies.
• Workers'Compensation(WC):as required by the State of California,with statutory limits,and Employer's
Liability Insurance with limit of no less than $1,000,000 per accident, per employee, per policy for bodily
injury or disease. This requirement can be waived if Contractor has no employees.
If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires
and shall be entitled to the broader coverage and/or the higher limits maintained by Contractor.Any available
insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to
City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, its City Council, its officers, officials, employees, agents,
and volunteers are to be covered as additional insureds with respect to liability arising out of work or
operations performed by or on behalf of the Contractor including materials, parts, equipment, and
personnel furnished in connection with such work or operations.
2. CGL,AL, and WC policies: Insurance company(ies) agrees to waive all rights of subrogation against
City, its City Council, its officers, officials, employees, agents, and volunteers for losses paid under
the terms of any policy which arise from work performed by Contractor for City.
3. All required insurance policies: For any claims related to this contract, Contractor's insurance
coverage shall be primary and any insurance maintained by City, its City Council, its officers, officials,
employees, agents, or volunteers shall not contribute with it.
4. All required insurance policies:A severability of interest provision must apply for all the additional
insureds, ensuring that Contractor's insurance shall apply separately to each insured against whom a
claim is made or suit is brought, except with respect to the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be canceled, suspended,
voided, reduced in coverage or in limits, non-renewed by the carrier, or materially changed except
after thirty(30)days prior written notice has been given to City. Ten (10) days prior written notice
shall be provided to City for policy cancellation or non-renewal due to non-payment.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, Attention:
Jaime Arias, Public Works Agency,Water Resources, 220 S. Daisy Ave., M-85, Santa Ana, CA
92703. The name and location of event should be included in the Description of Operations section of
each certificate.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. City may require Contractor to
purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations,
claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of California with a current
A.M. Best rating of no less than A:VII, unless otherwise acceptable to City.
Verification of Coverage
Contractor shall furnish City with original Certificates of Insurance including all required amendatory
endorsements(or copies of the applicable policy language effecting coverage required by this clause)and a
copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to Entity
before work begins. However,failure to obtain the required documents prior to the work beginning shall not
waive Contractor's obligation to provide them. City reserves the right to require complete, certified copies of
all required insurance policies, including endorsements required by these specifications, at any time.
Claims Made Policies
If any of the required policies provide coverage on a claims-made basis:
1. The retroactive date must be shown and must be before the date of the contract or the beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at least three(3) years after
completion of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a
retroactive date prior to the contract effective date, Contractor must purchase"extended reporting"coverage
for a minimum of three(3)years after completion of work.
Subcontractors
Contractor shall require and verify that all sub-contractors maintain insurance meeting all the
requirements stated herein, and Contractor shall ensure that City is an additional insured on
insurance required from sub-contractors.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior
experience, insurer, coverage, or other special circumstances.