HomeMy WebLinkAboutItem 24 - Agreements for Backup Power Generator Maintenance & Repair Services Public Works Agency
www.santa-ana.gov/pw
Item # 24
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
August 4, 2026
TOPIC: Award of Aggregate Agreements for Backup Power Generator Maintenance and
Repair Services
AGENDA TITLE
Award of Aggregate Agreements with Global Power Group, Inc., Odyssey Power
Corporation, Quinn Company dba Quinn Power Systems, and West Coast Energy
Systems, LLC for On-Call Generator Maintenance and Repair Services (Specification
No. 26-075) (General & Non-General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute aggregate agreements with Global Power
Group, Inc., Odyssey Power Corporation, Quinn Power Systems, and West Coast
Energy Systems, LLC to provide on-call generator maintenance and repair services
beginning August 4, 2026 and expiring August 3, 2027, with an estimated annual
budget of$115,000, with provisions for four, one-year extensions, in a total aggregate
amount not to exceed $575,000 (Core Agreement No. A-2026-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The Public Works Agency (PWA) is responsible for maintaining and ensuring the
operational reliability of emergency and standby power systems that serve critical City
facilities, including water and wastewater facilities, Santa Ana City Hall, the Corporate
Yard, and the Santa Ana Regional Transportation Center. To support the continuous
operation of these facilities, PWA requires professional on-call generator maintenance
and repair services to ensure emergency power systems remain reliable and
operational during planned and unplanned power outages.
The City's diesel and natural gas-powered generators, automatic transfer switches,
control systems, fuel systems, batteries, and associated equipment are subject to
routine wear, aging, and unexpected mechanical or electrical failures. Regular
preventive maintenance, testing, troubleshooting, and repair services are essential to
maintain operational readiness, maximize equipment reliability, minimize downtime, and
extend the service life of these critical assets.
Backup Power Generator Maintenance and Repair Services
August 4, 2026
Page 2
The City has an ongoing need for specialized maintenance and support services for its
backup power systems. These services require technical expertise, manufacturer-
specific knowledge, specialized testing equipment, and diagnostic capabilities that are
not available in-house. Utilizing qualified specialized contractors helps ensure
dependable backup power, protects critical infrastructure, and supports the
uninterrupted delivery of essential public services during power disruptions.
Request for Proposals (RFP) No. 26-075 was issued on June 2, 2026, on the City's
online bid management and publication system. A summary of vendor participation and
results is as follows:
320 Vendors notified
6 Santa Ana vendors notified
17 Vendors downloaded the bid packet
4 Responsive proposals received
0 Responsive proposals received from Santa Ana vendors
Proposals were opened on June 23, 2026, and evaluated. Four proposals were
submitted by the RFP deadline and were determined to be responsive to the
specifications and met the City's requirements. An evaluation committee reviewed and
rated the proposals according to the criteria listed in the RFP.
Staff recommends awarding agreements to Global Power Group, Inc. (Exhibit 1),
Odyssey Power Corporation (Exhibit 2), Quinn Power Systems (Exhibit 3), and West
Coast Energy Systems, LLC (Exhibits 4). The recommended firms demonstrated the
qualifications, technical expertise, and experience necessary to provide comprehensive
generator maintenance and repair services for the City's emergency and standby power
systems. Global Power Group, Inc. and Quinn Power Systems each bring over five
years of experience working with, and are current vendors of, the City of Santa Ana,
providing valuable familiarity with the City's standards, procedures, and operational
requirements. Additionally, all four recommended vendors have successfully performed
comparable emergency generator maintenance and repair services, demonstrating their
capability to deliver reliable, high quality services in support of critical infrastructure.
Their extensive experience and strong performance history reduce project risk and
provide confidence that the work will be completed efficiently, professionally, and in
accordance with the City's expectations.
Given the critical nature of the City's emergency power systems and the need for timely
response during planned and unplanned outages, staff recommends establishing
agreements with multiple qualified contractors. Access to multiple vendors will provide
the City with greater flexibility to schedule preventative maintenance, obtain specialized
technical expertise, respond to emergency repair needs, and ensure continuity of
service when contractor availability is limited. This approach will help maintain the
Backup Power Generator Maintenance and Repair Services
August 4, 2026
Page 3
reliability of the City's backup power infrastructure and support the uninterrupted
delivery of essential public services.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Funds are budgeted and available in the following accounts for Fiscal Year 2026-27.
Subsequent fiscal year funding for renewal options, if exercised, will be included in the
proposed budgets for City Council consideration. The following is an estimate of
expenditures by fiscal year. Actual expenditures may vary by fiscal year based on
operational needs, provided total expenditures do not exceed the total aggregate
contract amount authorized by City Council.
Accounting Accounting Unit,
Fiscal Unit —Account Fund Account Amount
Year No. Description
Pro'ect No. Description
CONTRACT (ONE-YEAR TERM)
Water Utility
06017640- Water Fund Production & Supply, $45,343
62300 Contract Services-
Professional
Building
Maintenance,
(Aug 4 7 62320 09- General Fund Maintenance & $45,343
(Aug 4 — 62320 Repair Buildings &
Jun 30) Ground
PWA-SARTC
06717650- Regional Operations,
62320 Transportation Maintenance & $13,603
Center Repair Buildings &
Ground
Water Utility
06017640- Water Fund Production & Supply, $4,657
62300 Contract Services-
2027-28 Professional
(Jul 1 — Building
Aug 3) 01117609- Maintenance,
62320 General Fund Maintenance & $4,657
Repair Buildings &
Ground
Backup Power Generator Maintenance and Repair Services
August 4, 2026
Page 4
PWA-SARTC
06717650- Regional Operations,
62320 Transportation Maintenance & $1,397
Center Repair Buildings &
Ground
CONTRACT (ONE-YEAR) TOTAL $115,000
OPTIONAL FOUR ONE-YEAR EXTENSIONS
Water Utility
06017640- Water Fund Production & Supply, $45,343
62300 Contract Services-
Professional
Building
Maintenance,
(Aug 4 8 62320 09- General Fund Maintenance & $45,343
(Aug 4 — 62320 Repair Buildings &
Jun 30) Ground
PWA-SARTC
06717650- Regional Operations,
62320 Transportation Maintenance & $13,603
Center Repair Buildings &
Ground
Water Utility
06017640- Water Fund Production & Supply, $50,000
62300 Contract Services-
Professional
Building
01117609- Maintenance,
2028-29 62320 General Fund Maintenance & $50,000
Repair Buildings &
Ground
PWA-SARTC
06717650- Regional Operations,
62320 Transportation Maintenance & $15,000
Center Repair Buildings &
Ground
Water Utility
06017640- Water Fund Production & Supply, $50,000
2029-30 62300 Contract Services-
Professional
01117609- General Fund Building $50,000
62320 Maintenance,
Backup Power Generator Maintenance and Repair Services
August 4, 2026
Page 5
Maintenance &
Repair Buildings &
Ground
PWA-SARTC
06717650- Regional Operations,
62320 Transportation Maintenance & $15,000
Center Repair Buildings &
Ground
Water Utility
06017640- Water Fund Production & Supply, $50,000
62300 Contract Services-
Professional
Building
01117609- Maintenance,
2030-31 62320 General Fund Maintenance & $50,000
Repair Buildings &
Ground
PWA-SARTC
06717650- Regional Operations,
62320 Transportation Maintenance & $15,000
Center Repair Buildings &
Ground
Water Utility
06017640- Water Fund Production & Supply, $4,657
62300 Contract Services-
Professional
Building
2031-32 01117609- Maintenance,
(Jul 1 — 62320 General Fund Maintenance & $4,657
Aug 3) Repair Buildings &
Ground
PWA-SARTC
06717650- Regional Operations,
62320 Transportation Maintenance & $1,397
Center Repair Buildings &
Ground
OPTIONAL FOUR ONE-YEAR EXTENSION TOTAL $4601000
TOTAL FIVE-YEAR CONTRACT): $575,000
Backup Power Generator Maintenance and Repair Services
August 4, 2026
Page 6
EXHIBIT(S)
1. Agreement with Global Power Group, Inc.
2. Agreement with Odyssey Power Corporation
3. Agreement with Quinn Power Systems
4. Agreement with West Coast Energy Systems, LLC
Submitted By: Rodolfo Rosas, P.E., Acting Executive Director of Public Works Agency
Approved By: Alvaro Nunez, City Manager
Exhibit 1
AGREEMENT WITH GLOBAL POWER GROUP, INC TO PROVIDE ON-CALL
GENERATOR MAINTENANCE AND REPAIR SERVICES FOR THE CITY OF SANTA
ANA
THIS AGREEMENT is made and entered into on this 4ch day of August, 2026 by and
between Global Power Group, Inc. ("Contractor"), and the City of Santa Ana, a charter city and
municipal corporation organized and existing under the Constitution and laws of the State of
California("City").
RECITALS
A. On June 2, 2026 the City issued Request for Proposals No. 26-075, by which it sought
Contractors to provide on-call generator maintenance and repair services on behalf of the
City of Santa Ana's Public Works Agency.
B. Contractor submitted a responsive proposal that was among those selected by the City.
Contractor represents that it is able and willing to provide the services described in the
scope of work that was included in RFP No. 26-075.
C. Contractor was selected as one of four (4) vendors which qualified for this engagement.
Only those Contractors approved by the City Council on August 4, 2026 shall be eligible
to be engaged by the City for these services.
D. In undertaking the performance of this Agreement, Contractor represents that it is
knowledgeable in its field and that any services performed by Contractor under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Contractor shall perform during the term of this Agreement, the tasks and obligations
including all labor, materials, tools, equipment, and incidental customary work required to fully
and adequately complete the services described and set forth in Exhibit A, attached hereto and
incorporated by reference.
2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to
Contractor shall be paid only for actual services performed under this Agreement at the
rates and charges identified in Exhibit B. Contractor is one of four (4) Contractors
selected under RFP 26-075. The total aggregate compensation amount shall not
exceed Five Hundred and Seventy-Five Thousand($575,000) during the term of the
Agreement, including any extension periods.
Page 1 of 8
b. Payment by City shall be made within forty-five(45)days following receipt of proposer
invoice evidencing work performed, subject to City accounting procedures. Payment
need not to be made for work which fails to meet the standards of performance set forth
in the Recitals and Scope of Work, which may reasonably be expected by City.
3. TERM
This Agreement shall commence on August 4, 2026 for a one-year term with the option for
the City to grant up to four(4), one-year extensions, exercisable by a writing by the City Manager
and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an
independent Contractor and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer-employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Contractor
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Contractor shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Contractor shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or
caused to be prepared by Contractor under this Agreement ("Documents & Data"). Contractor
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Contractor represents and warrants that Contractor has the legal right to license any and all
Documents & Data. Contractor makes no such representation and warranty in regard to
Documents & Data which were provided to Contractor by the City. City shall not be limited in
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
6. INSURANCE
Insurance requirements are attached hereto as Exhibit C and incorporated by reference.
Page 2 of 8
7. INDEMNIFICATION
Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers,
agents, employees, contractors, special counsel, and representatives from liability: (1)for personal
injury, damages,just compensation,restitution,judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
negligent operations of the Contractor, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section 1 of this Agreement; and (2)
from any claim that personal injury, damages,just compensation, restitution,judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages,just compensation,restitution,judicial
or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in
this Section or by reason of the terms of, or effects, arising from this Agreement. The Contractor
further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including
fees and costs for special counsel to be selected by the City, regarding any action by a third party
challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution,judicial or equitable relief due to personal or property rights arises by
reason of the terms of, or effects arising from this Agreement. City may make all reasonable
decisions with respect to its representation in any legal proceeding.Notwithstanding the foregoing,
to the extent Contractor's services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of,
pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Contractor shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
letters patent,trademark, or copyright infringement,including costs,contained in the work product
or documents provided by Contractor to the City pursuant to this Agreement.
9. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed
under this Agreement. Contractor shall maintain complete and accurate records with respect to the
costs incurred under this Agreement and any services, expenditures, and disbursements charged to
the City for a minimum period of three (3) years, or for any longer period required by law, from
the date of final payment to Contractor under this Agreement. All such records and invoices shall
be clearly identifiable. Contractor shall allow a representative of the City to examine, audit, and
make transcripts or copies of such records and any other documents created pursuant to this
Agreement during regular business hours. Contractor shall allow inspection of all work, data,
documents, proceedings, and activities related to this Agreement for a period of three (3) years
from the date of final payment to Contractor under this Agreement.
Page 3 of 8
10. CONFIDENTIALITY
If Contractor receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Contractor agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the same degree of care it uses to protect its own information of like
importance,but in no event less than reasonable care. "Confidential Information"shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that(a) has been disclosed in publicly available sources; (b)is, through no fault of the
Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Contractor without reference to information disclosed by the
City.
11. CONFLICT OF INTEREST CLAUSE
a. Contractor covenants that it presently has no interests and shall not have interests,direct
or indirect,which would conflict in any manner with performance of services specified
under this Agreement.
b. No immediate family members of either the Mayor, City Council Member, or any
appointed City Official, including appointed board and commission members, as
defined under the City's Municipal Code, whose position with the City shall award or
influence the award of this Agreement, or any competing contract or amendment
thereof, shall be employed in any capacity by the Contractor or have any other direct
or indirect financial benefit or interest in this Agreement.
c. The section also prohibits the awarding of any agreement, contract, grant, or any
amendment to those awards, to any former full-time employee for one-year from date
of employee separation except for any CaIPERS retiree as authorized by City Council
resolution
d. The Contractor must comply with all conflict of interest laws, ordinances, and
regulations now in effect or hereafter to be enacted during the term of this Agreement.
The Contractor warrants that it is not now aware of any facts which conflict with the
prohibitions defined above. If the Contractor hereafter becomes aware of any facts that
might reasonably be expected to create a conflict of interest, it must immediately make
full written disclosure of such facts to the City. Full written disclosure must include,
but is not limited to, identification of all persons implicated and a complete description
of all relevant circumstances. Failure to comply with the provisions of this paragraph
will be a material breach of this Agreement.
Page 4 of 8
e. Contractor covenants that none of its directors, officers, employees, or agents shall
participate in selecting or administrating any subcontract supported(in whole or in part)
by City funds stemming from the Agreement where the awarding of the subcontract
has any direct or indirect financial benefit or interest to any individual, as defined in
subsections (b) and(c) above.
12. NON-DISCRIMINATION
Contractor shall not discriminate because of race, color, creed, religion, sex, marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization,
promotion, termination or other employment related activities or any services provided under this
Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Contractor, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto, the terms
of this Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Contractor. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to,the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other Contractor retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor
compensation for all services performed by Contractor prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Contractor to
deliver to the City all work product(s) completed as of such date, and in such case
Page 5 of 8
such work product shall be the property of the City unless prohibited by law, and
Contractor consents to the City's use thereof for such purposes as the City deems
appropriate.
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION-VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail,postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza(M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
Page 6 of 8
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza(M-21)
P.O. Box 1988
Santa Ana, California 92702
To Contractor:
Global Power Group, Inc.
Attn: Salvatore Martorana
12060 Woodside Ave.
Lakeside, CA 92040
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24)hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this Agreement.
[signature page to follow]
Page 7 of 8
SIGNATURE PAGE TO AGREEMENT WITH GLOBAL POWER GROUP, INC TO
PROVIDE ON-CALL GENERATOR MAINTENANCE AND REPAIR SERVICES FOR
THE CITY OF SANTA ANA
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nunez
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO GLOBAL POWER GROUP, INC.
City Attorney
By:
Kyle ellesen Salvatore Martorana
Assistant City Attorney President
RECOMMENDED FOR APPROVAL:
Digitally signed by Rodolfo Rosa,
Rodolfo Rosas DN rn=Rodolfo Rosas,email=rrosasCsanta-
ana.org,r—US
Date:2026.07.20 14:18:10-07,00'
Rodolfo Rosas, P.E.
Acting Executive Director
Public Works Agency
Page 8 of 8
EXHIBIT A
CITY OF SANTA ANA
EXHIBIT 1 -
SCOPE OF SERVICES
1. Description of Work:
The City of Santa Ana is requesting proposals for the purpose of providing preventative
maintenance service visits, on-call diagnostic and repair services, and emergency repair
services to various generators within the City. The manufacturers of the City's existing
generators include Caterpillar, Cummins, and Perkins. Proposers shall be fully experienced,
licensed, and equipped to perform the work specified and required herein.
All work performed shall be in compliance with the National Fire Protection Association (NFPA)
70 National Electrical Code, NFPA 110 Standard for Emergency, Standby Power Systems, and
CaIOSHA safety requirements as well as other applicable federal, state, and local codes. The
Contractor(s) shall provide all necessary labor, materials, tools, supervision, transportation and
equipment to perform services specified herein.
2. Normal Operating Hours
Monday through Friday, 7:00 AM to 5:00 PM
Operating hours are subject to change and the City will communicate all changes in advance
with the Contractor(s).
3. Emergency Service Request
The Contractor(s) must be available to receive the City's emergency service request twenty-
four (24) hours a day, seven (7) days a week.
In the event of a generator failure or malfunction, the Contractor must respond within four (4)
hours of receiving emergency service request from the City.
The Contractor's service technician is required to be on-site to commence work within eight (8)
hours of initial contact, if the event has been deemed by the City to be an emergency. The
response time may be waived by the City if service can wait to be performed during the City's
normal business hours.
4. Parts. Materials. and Warranties
All parts, repairs, and/or fluid changing must be done with parts and fluids that meet or exceed
the manufacturer's recommendations. All replacement parts shall be new and of the same
quality and brand name as those being replaced; OEM parts are preferred. Substitutions will
be permitted only with prior authorization from the City.
Upon contract execution, the City will finalize the list and quantity of parts that the Contractors
must have available on-hand at all times to avoid potential delays in performing the work
required during the term of the contract. If the Contractor is unable to stock certain items at all
times and must special order them on a project basis, they will submit the lead time for
procurement to the City for review and approval. All material markup must not exceed 10%
percent above Contractor's cost when charged back to the City.
(9)
CITY OF SANTA ANA
All work performed will carry a minimum one-year warranty on parts
and labor. The Contractors shall properly dispose of used oil, fluids, and filters generated by its
services off-site, leaving the job site environmentally clean.
5. Price, Schedule, and Invoice
Awarded Contractor(s) shall provide quotes and project schedules with pricing in accordance
with their submitted rates upon request by the City. The quote will include, but is not limited to
summary of anticipated tasks, anticipated project time of completion, hourly rate, rates for
materials, and oversized equipment rates on a project by project basis for the City's review and
approval. Any special materials as required for the work to be purchased by the Contractor may
only occur after formal discussion and approved in writing by the City.
Contractor(s) shall coordinate all scheduled services at least five (5) business days in advance
with the City's Water Services Superintendent. Contractors shall invoice the City on a monthly
basis for all work performed during the period or provide a one-time invoice at the completion of
work issued. Each invoice shall include as information as required on the quote and be
accompanied by a summary of tasks performed, results and progress on long-term tasks if any,
and agreement number.
6. Preventative Maintenance
All testing and maintenance services will be scheduled in advance with the City.
Upon request from the City, the Contractor shall perform preventative maintenance as specified
below. The Contractor shall maintain service reports on all maintenance and repairs, and shall
provide a copy of the service report to the City upon request. In addition to Contractor's self-
generated service reports, the Contractor is required to complete the City's own form and submit
back to the City after work is completed.
Contractor shall stop work and immediately notify City personnel of conditions that do not
conform to applicable codes and/or pose a safety hazard should they encounter them while
performing preventative maintenance. Contractor shall ensure all work performed on electrical
power generation and transfer equipment shall be accomplished under the technical
management of a qualified electrical licensed contractor.
A. Tier I: Preventative Maintenance Services (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier I Preventative Maintenance Services and shall at a
minimum include checking the following:
i. Fuel (Check main and day tank fuel supply levels; day tank float switch; piping,
hoses and connectors; operating fuel pressure; and for any obstructions to tank
vents and overflow piping)
ii. Lubrication system (Check for proper oil level and oil operating pressure; Tube
oil heater)
iii. Cooling system (Check coolant level, water pump(s), jacket water heater,
belts, hoses, fan)
iv. Exhaust system (Check drain condensate trap and for possible leakage)
CITY OF SANTA ANA
V. Battery System (Look for possible corrosion; check specific gravity, electrolyte
level and battery charger — maintenance-free batteries require routine visual
inspection and maintenance in accordance with manufacturer's instructions)
vi. Electrical system (Conduct a general inspection of wiring and connections;
check circuit breakers/fuses)
vii. Prime Mover/Generator (Check for debris, foreign objects, loose or broken
fittings; check guards and components; look for any unusual condition of
vibration, leakage, noise, temperature or deterioration)
viii. Thirty (30) Minute Load Test (Contractor shall carry out 30-minute generator
load tests and run the generator at 30% for a minimum of 30 minutes. If a
generator does not"pass" the load test consistently then Contractor will ask the
City of Santa Ana if a resistive load bank test should be performed.)
Within five (5) business days of completing a load test on a generator and maintenance
inspection services, Contractor shall provide a completed Tier 1: Generator 30-Minute
Load Test Form, the approved form is provided as Exhibit 6 to the City. The Contractor
shall state all findings, along with a proposed scope of work and complete cost
estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
B. Tier II: Preventative Maintenance Service (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier II Preventative Maintenance Services and shall at a
minimum include checking the items listed below. In addition to the items listed below
and in Exhibit 7 Tier II Generator Inspection and Preventative Maintenance Checklist,
the Tier II visit shall include a full change of engine oil and filter, along with a battery and
coolant replacement if necessary, and an optional two (2) hours load bank test or a four
(4) hours load bank test. When applicable, the Contractor shall perform automatic
transfer switch (ATS) testing in accordance with current NFPA 110 standards.
L COOLING SYSTEM
1. Inspect radiator exchanger
2. Check coolant level
3. Glycol check of coolant (freezing point) (Results must be turned in)
4. Inspect all hoses and connections
5. Inspect fan drive pulley and fan
6. Inspect fan belts
7. Check jacket water heater
8. Inspect water pump
9. Inspect thermostats
ii. FUEL SYSTEM
1. Inspect fuel tank
2. Change fuel/water separator strainers
3. Inspect all fuel lines and connections
4. Inspect governor and controls
5. Change all fuel filters
6. Check fuel pressure
7. Test fuel in tanks for water(results must be turned in)
CITY OF SANTA ANA
iii. AIR INTAKE & EXHAUST SYSTEM
1. Change air filters as needed (At the discretion of the City)
2. Check air filter service indicator
3. Inspect air inlet system
4. Inspect turbocharger
5. Check exhaust manifold
6. Inspect exhaust system
iv. ENGINE MONITORS & SAFETY CONTROLS
1. Check all gauges
2. Check all safety controls
3. Check remote enunciators & alarms
v. LUBE OIL SYSTEM
1. Check oil level
2. Change all oil filters
3. Check oil pressure
4. Inspect crankcase breather
5. Check for any leaks
6. Take sample of existing oil (results must be turned in)
7. Change oil
vi. STARTING SYSTEM
1. Inspect batteries, terminals & connections
2. Check specific gravity of batteries (results must be turned in)
3. Perform load test on batteries (results must be turned in)
4. Inspect battery charger
5. Inspect starting motor
6. Inspect alternator
vii. GENERATOR
1. Inspect bearings
2. Check vibration isolators
3. Inspect control panel
4. Check start controls
5. Check voltmeter
6. Check ammeter
7. Check frequency meter
8. Check circuit breaker
viii. TRANSFER SWITCH
1. Inspect all connections (retighten if necessary)
2. Inspect wiring for brittle or burn marks
3. Inspect all switches
ix. LOAD BANK TEST
1. Option for a 2-Hour Load Test
2. Or an option for a 4-Hour Load Test
CITY OF SANTA ANA
x. PROVIDE WRITTEN DOCUMENTATION OF ALL WORK PERFORMED
1. Oil Test Results (results must be turned in)
2. Diagnostic Procedures and Results
Within five (5) business days of completing the Tier II Preventative Maintenance Service,
the Contractor shall provide a completed Tier II: Generator Inspection and Preventative
Maintenance Checklist Form, the approved form is provided as Exhibit 7 to the City. The
Contractor shall state all findings, along with a proposed scope of work and complete
cost estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
7. Automatic Transfer Switch (ATS)
Contractor shall perform a visual inspection only of the Automatic Transfer Switch (ATS)
associated with each City generator during scheduled maintenance visits. Contractor shall inspect
the exterior and readily accessible portions of the ATS for visible signs of damage, corrosion,
moisture intrusion, overheating, loose or missing hardware, abnormal indicator lights or alarms,
and other observable deficiencies that may affect reliable operation. Contractor shall document
all findings and notify the City of any conditions requiring further evaluation or corrective action.
Contractor shall not perform ATS maintenance, repairs, installation, operational testing,
exercising, switching, calibration, adjustments, or any work requiring manipulation of the ATS
unless specifically authorized in writing by the City.
8. Fueling
The City may, at its sole discretion, require the Contractor to provide fueling services for City
generators as part of maintenance and repair activities or during emergency response situations.
Contractor shall furnish and deliver fuel as directed by the City and shall provide documentation
supporting the cost of fuel upon request. Fueling markup shall not exceed ten percent (10%)
above the Contractor's actual cost when invoiced to the City.
9. On-Call Services
Contractor shall provide on-call generator repair services for all City generators at an hourly rate
that aligns with their submitted fee schedule(s). All repair services will require an estimate being
submitted to the City for approval prior to any work being performed by the Contractor.
A service report is to be completed by the Contractor's technician and the report is to be provided
to City personnel upon completion of the request.
Any on-call work carried out by the Contractor that requires taking a generator offline for testing
or repairs requires prior approval from the City. Should a generator need to be taken offline
temporarily, it may not be left unattended by the Contractor's personnel. The Contractor must
remain on-site until the generator is successfully returned online to normal operation.
Contractors must provide technical and engineering support upon request from the City for
generators manufactured by but not limited to Caterpillar, Cummins, and Perkins.
(9)
CITY OF SANTA ANA
10. VALUE ADDED RELATED SERVICES
Contractors may propose additional related services that the City has not specifically identified
in this RFP to accomplish the stated goals of this RFP. Value added related services will be
considered by the City and may or may not be incorporated in the agreement.
EXHIBIT B
CITY OF SANTA ANA
ATTACHMENT A-1 -
FEE SCHEDULE
Contractors shall complete Attachment A-1: Fee Schedule and provide pricing on a per visit basis
in accordance with Tier 1 and Tier 11 Preventative Maintenance Services as specified in this RFP.
Furthermore, Contractors shall submit their own fee schedule for additional labor, material and
equipment rates as a separate form. This additional flee schedule shall list rates for all labor
designations, equipment and materials.
Cost for preventative maintenance services (Tiers 1 and 11) must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Item Location uOM QTY Tier I Tier II Subtotal Tier Tier II(add-on') Subtotal Tier I,
I\o. I&II II,&Add-On
1 Segerstrom Station EA 1 $ �C�� $ $ �� $ f�00
2 West Station EA 1 $ ��1 $ 735, $ 3`I b $_V $ 17 jz
3 East Station EA 1 $ 7 $ $ $ $
�;���, 3Tj5,
4 John Garthe EA 1 $ [} b $ �' $ $ l�C.c $ J_
Station �� � � ', � ' U �a C.��4�i J
5 Walnut Station EA 1 $�C� ( ( $3 b_ )) $ 31 $lr� �a[[
6 Maxine Station EA 1 $�L $ �4�,D,^ $ �(✓ !�� $ y l h $ s, �,t —
JJUU �1 �C li; ✓ C U
7 Well40 EA 1 $ $ $
TOTAL
`Add-On Services are a full change of engine oil and filter, battery and coolant replacement, and a two
(2) hours load bank test and a four(4) hours load bank test. Cost must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Please also provide unit pricin for each add-on service for Tier II based on generator by location.
Item Segerstrom West East John walnut Maxine
No Description Station Station Station Garthe Station Station Well40
Station
E Engine oil and filter S $ $ u(��.' S t•. S 'S L�1 $ 1� $ ��1 thane
9 Battery and coolant
replacement
10 Two 12) hours load bank test
Four 14)hours load /
11 bank test i��'r
THIS FORM MUST BE COMPLETED AND MCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSWEE,
�R. CITY OF SANTA ANA
o rt-C all Repair Services
i 2 Hourly Rate HR 1 $
13 CT Hourly Rate HR �
i4 Weekends/Holidays Hourly Rate HR 1 $
'5 OT Weekends/Holidays Hourly Rate HR 1 $5DDi
i le Trip FeelTruck Charge EA 1 $
160,
'THIS fcl I,1 ! L i GL CI6 l Q'L•G AND INCLUDED WITH TKE PROPOSAL.
- PR POS/�l TH/.kl DC N-10T CONTAIN TH!S (-QRhfl lYIL BE CONSIDERED NOKMESPoCkPSfVE<
cD
c c C D A N y
a m m z3 m
> V m (n A co N N
_ _ cl c
� rn m c
�p O
d
cn
7
N N !D O (CD
N m m oc 3
m cn (n `Z m m � m
(n m tfr in x °' G) w m r
GH to 69 io '-c Oq
m N N m A O N m m (� K m0 N
SR { Cn O o p p A D7 K
N A W 11 O O O O cD Cn o q-• ^ C/ O cno
7
N NLT, c c O ^
U1 0 o O O O
7 = O
r r,
cn N A
O
N N O co to E9
O O r+ W ff} 69 F-+ ffl m
N N Z W O I--+ .-r .O
W p p A O W. N N f-+ FA F, F- N
to to Z t!f Cn Cn
rA V fA J O Op c)cD O pp `y
co A N o O
m m
p
r F
cT T ?
N o
N
NO O F-+ W 69 ffl Hi N {f3 ffl ffl fA b9 EA fA
N p m (D V tD o N N N N N N N
(A N c) �'' F� w Ln (n Cn m (n Ul Ln
W O O A O O O o O O O O
in
in
{ii fA Z d CJl O CDCn O , cD cDO O CD CD CD �--'
N W A N m o O cD C, cD 0 O O O O o O O
m m N c O
07 Cn
m O z
n
nmi
A C O
A (D ?
37 � Z 7
N O ~ 0 v fu3 fA {fl fA +� ff3 fA fA {A fA ifl fA
NA O c N C m O v m o V A m co V V m
O Oo
U1 to to fA (WD O O (n A m N p !D N (D p pp
ffl N O O O O N
Ul W ul cD cD cD (D cDW cD O cD p cD cD cDcp �I U1 m p O � O O O O O O O
co 0 U1 m O
7
— N N C
-
C m cDfA fA v Ed9 EA (e ffi
-tl J m W F-� A W N W W W W N
W
c:, C m D� p I--� p Ln l co CO m 07 F-+ (D CD CD p
fq W O O A J Oo OD 'I W Am Oo PI)ffl {y 69 N m W N (.n O IV (D m (n (n nD
W A (n ? O 0 0 0 0 6 m O o o cD o O
V m W W O O O O O Cl O O O p
Ln
N J V 7
p N cn cn
rQ N
cn m Ln 3 i
v
cc a, ff3 b9 4A rA to ff3 fA Q'3 (p A W N W N W W N
A
p N E9 69 E9 fA X.
N
Lr N O W W Ln m A O fJ V Am co J V m N
C CC N NO C C C C m (WIl C N CO U Ul (n R,EnN
LC N Q;jq
c:, C C cD c-_ Ei
0 c, O O C O O O
(« p cD O
o m Or
r
Imo: C C W EA fA i e fi9 ffl 69 f5 EH H3
co ��., � I--� .9 A V cn -.l m V V Ln
N Z W J co o �-` r m A V CDU� C) V V m
W O p A p N (D �--� A N PI) O
b9 i s Z ffl Ut (n A N o o A W o o O m
a O 0 0 0 O o 0 0 0 0 0 0 0 0
m
x cn o
cc
EXHIBIT C
Contractor shall procure and maintain for the duration of the agreement, the following insurance
coverages:
MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts and shall
be at least as broad as:
• Commercial General Liability(CGL): Insurance Services Office Form CG 00 01 covering
CGL on an "occurrence" basis, including products and completed operations, property
damage, bodily injury and personal &advertising injury with limits no less than $1,000,000
per occurrence and $2,000,000 aggregate.
• Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1
(any auto), with combined single limits of $1,000,000. In the event Contractor does not
maintain commercial automobile liability insurance, City will accept evidence of personal
automobile insurance, provided that such policy is endorsed for business use and provides
coverage with a minimum limit of $1,000,000. Required policy limits can be met with
primary and umbrella/excess insurance policies.
• Workers' Compensation (WC): as required by the State of California, with statutory
limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per
accident, per employee, per policy for bodily injury or disease. This requirement can be
waived if Contractor has no employees. Contractor attests that its workers' compensation
coverage extends to all persons who will be working with the City under the agreed scope
of services.
If Contractor maintains broader coverage and/or higher limits than the minimums shown
above, City requires and shall be entitled to the broader coverage and/or the higher limits
maintained by Contractor. Any available insurance proceeds in excess of the specified
minimum limits of insurance and coverage shall be available to City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, its City Council, its officers, officials,
employees, agents, and volunteers are to be covered as additional insureds with
respect to liability arising out of work or operations performed by or on behalf of the
Contractor including materials, parts, equipment, and personnel furnished in
connection with such work or operations.
2. CGL, AL, and WC policies: Insurance company(ies) agrees to waive all rights of
subrogation against City, its City Council, its officers, officials, employees, agents,
and volunteers for losses paid under the terms of any policy which arise from work
performed by Contractor for City.
3. All required insurance policies: For any claims related to this contract, Contractor's
insurance coverage shall be primary and any insurance maintained by City, its City
Council, its officers, officials, employees, agents, or volunteers shall not contribute
with it.
4. All required insurance policies: A severability of interest provision must apply for all
the additional insureds, ensuring that Contractor's insurance shall apply separately to
each insured against whom a claim is made or suit is brought, except with respect to
the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be
canceled, suspended, voided, reduced in coverage or in limits, non-renewed by the
carrier, or materially changed except after thirty (30) days prior written notice has
been given to City. Ten (10) days prior written notice shall be provided to City for
policy cancellation or non-renewal due to non-payment.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa
Ana, Attention: Jaime Arias, 215 S. Center St., M-85, Santa Ana, CA 92703. The
name and location of the event should be included in the Description of Operations
section of each certificate.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. City may require
Contractor to purchase coverage with a lower retention or provide proof of ability to pay
losses and related investigations, claim administration, and defense expenses within the
retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of
California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable
to City.
Verification of Coverage
Contractor shall furnish City with original Certificates of Insurance including all required
amendatory endorsements (or copies of the applicable policy language effecting coverage
required by this clause) and a copy of the Declarations and Endorsement Page of the CGL
policy listing all policy endorsements to Entity before work begins. However, failure to obtain
the required documents prior to the work beginning shall not waive Contractor's obligation to
provide them. City reserves the right to require complete, certified copies of all required
insurance policies, including endorsements required by these specifications, at any time.
Claims Made Policies
If any of the required policies provide coverage on a claims-made basis:
1. The retroactive date must be shown and must be before the date of the contract or the
beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at least
three (3) years after completion of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made
policy form with a retroactive date prior to the contract effective date, Contractor must
purchase "extended reporting" coverage for a minimum of three (3) years after completion of
work.
Subcontractors
Contractor shall require and verify that all sub-contractors maintain insurance
meeting all the requirements stated herein, and Contractor shall ensure that City
is an additional insured on insurance required from sub-contractors.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of
the risk, prior experience, insurer, coverage, or other special circumstances.
AGREEMENT WITH ODYSSEY POWER CORPORATION TO PROVIDE ON-CALL
GENERATOR MAINTENANCE AND REPAIR SERVICES
FOR THE CITY OF SANTA ANA
THIS AGREEMENT is made and entered into on this 4ch day of August, 2026 by and
between Odyssey Power Corporation("Contractor"), and the City of Santa Ana, a charter city and
municipal corporation organized and existing under the Constitution and laws of the State of
California("City").
RECITALS
A. On June 2, 2026 the City issued Request for Proposals No. 26-075, by which it sought
Contractors to provide on-call generator maintenance and repair services on behalf of the
City of Santa Ana's Public Works Agency.
B. Contractor submitted a responsive proposal that was among those selected by the City.
Contractor represents that it is able and willing to provide the services described in the
scope of work that was included in RFP No. 26-075.
C. Contractor was selected as one of four (4) vendors which qualified for this engagement.
Only those Contractors approved by the City Council on August 4, 2026 shall be eligible
to be engaged by the City for these services.
C. In undertaking the performance of this Agreement, Contractor represents that it is
knowledgeable in its field and that any services performed by Contractor under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Contractor shall perform during the term of this Agreement, the tasks and obligations
including all labor, materials, tools, equipment, and incidental customary work required to fully
and adequately complete the services described and set forth in Exhibit A, attached hereto and
incorporated by reference.
2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to
Contractor shall be paid only for actual services performed under this Agreement at the
rates and charges identified in Exhibit B. Contractor is one of four (4) Contractors
selected under RFP 26-075. The total aggregate compensation amount shall not
exceed Five Hundred and Seventy-Five Thousand($575,000) during the term of the
Agreement, including any extension periods.
Page 1 of 8
b. Payment by City shall be made within forty-five(45)days following receipt of proposer
invoice evidencing work performed, subject to City accounting procedures. Payment
need not to be made for work which fails to meet the standards of performance set forth
in the Recitals and Scope of Work, which may reasonably be expected by City.
3. TERM
This Agreement shall commence on August 4, 2026 for a one-year term with the option for
the City to grant up to four(4), one-year extensions, exercisable by a writing by the City Manager
and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an
independent Contractor and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer-employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Contractor
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Contractor shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Contractor shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or
caused to be prepared by Contractor under this Agreement ("Documents & Data"). Contractor
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Contractor represents and warrants that Contractor has the legal right to license any and all
Documents & Data. Contractor makes no such representation and warranty in regard to
Documents & Data which were provided to Contractor by the City. City shall not be limited in
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
6. INSURANCE
Insurance requirements are attached hereto as Exhibit C and incorporated by reference.
Page 2 of 8
7. INDEMNIFICATION
Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers,
agents, employees, contractors, special counsel, and representatives from liability: (1)for personal
injury, damages,just compensation,restitution,judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
negligent operations of the Contractor, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section 1 of this Agreement; and (2)
from any claim that personal injury, damages,just compensation, restitution,judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages,just compensation,restitution,judicial
or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in
this Section or by reason of the terms of, or effects, arising from this Agreement. The Contractor
further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including
fees and costs for special counsel to be selected by the City, regarding any action by a third party
challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution,judicial or equitable relief due to personal or property rights arises by
reason of the terms of, or effects arising from this Agreement. City may make all reasonable
decisions with respect to its representation in any legal proceeding.Notwithstanding the foregoing,
to the extent Contractor's services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of,
pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Contractor shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
letters patent,trademark, or copyright infringement,including costs,contained in the work product
or documents provided by Contractor to the City pursuant to this Agreement.
9. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed
under this Agreement. Contractor shall maintain complete and accurate records with respect to the
costs incurred under this Agreement and any services, expenditures, and disbursements charged to
the City for a minimum period of three (3) years, or for any longer period required by law, from
the date of final payment to Contractor under this Agreement. All such records and invoices shall
be clearly identifiable. Contractor shall allow a representative of the City to examine, audit, and
make transcripts or copies of such records and any other documents created pursuant to this
Agreement during regular business hours. Contractor shall allow inspection of all work, data,
documents, proceedings, and activities related to this Agreement for a period of three (3) years
from the date of final payment to Contractor under this Agreement.
10. CONFIDENTIALITY
Page 3 of 8
If Contractor receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Contractor agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the same degree of care it uses to protect its own information of like
importance,but in no event less than reasonable care. "Confidential Information"shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that(a) has been disclosed in publicly available sources; (b)is, through no fault of the
Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Contractor without reference to information disclosed by the
City.
11. CONFLICT OF INTEREST CLAUSE
a. Contractor covenants that it presently has no interests and shall not have interests,direct
or indirect,which would conflict in any manner with performance of services specified
under this Agreement.
b. No immediate family members of either the Mayor, City Council Member, or any
appointed City Official, including appointed board and commission members, as
defined under the City's Municipal Code, whose position with the City shall award or
influence the award of this Agreement, or any competing contract or amendment
thereof, shall be employed in any capacity by the Contractor or have any other direct
or indirect financial benefit or interest in this Agreement.
c. The section also prohibits the awarding of any agreement, contract, grant, or any
amendment to those awards, to any former full-time employee for one-year from date
of employee separation except for any Ca1PERS retiree as authorized by City Council
resolution
d. The Contractor must comply with all conflict of interest laws, ordinances, and
regulations now in effect or hereafter to be enacted during the term of this Agreement.
The Contractor warrants that it is not now aware of any facts which conflict with the
prohibitions defined above. If the Contractor hereafter becomes aware of any facts that
might reasonably be expected to create a conflict of interest, it must immediately make
full written disclosure of such facts to the City. Full written disclosure must include,
but is not limited to, identification of all persons implicated and a complete description
of all relevant circumstances. Failure to comply with the provisions of this paragraph
will be a material breach of this Agreement.
e. Contractor covenants that none of its directors, officers, employees, or agents shall
participate in selecting or administrating any subcontract supported(in whole or in part)
by City funds stemming from the Agreement where the awarding of the subcontract
Page 4 of 8
has any direct or indirect financial benefit or interest to any individual, as defined in
subsections (b) and(c) above.
12. NON-DISCRIMINATION
Contractor shall not discriminate because of race, color, creed,religion, sex, marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization,
promotion, termination or other employment related activities or any services provided under this
Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Contractor, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto, the terms
of this Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Contractor. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to,the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other Contractor retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor
compensation for all services performed by Contractor prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Contractor to
deliver to the City all work product(s) completed as of such date, and in such case
such work product shall be the property of the City unless prohibited by law, and
Contractor consents to the City's use thereof for such purposes as the City deems
appropriate.
Page 5 of 8
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure,right or remedy. No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar,nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION-VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza(M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
Page 6 of 8
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza(M-21)
P.O. Box 1988
Santa Ana, California 92702
To Contractor:
Odyssey Power Corporation
Attn: Jennifer Garnant
2100 W. Orangewood Ave.
Orange, CA 92868
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24) hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this Agreement.
[Signature Page to Follow]
Page 7 of 8
SIGNATURE PAGE TO AGREEMENT WITH ODYSSEY POWER CORPORATION TO
PROVIDE ON-CALL GENERATOR MAINTENANCE AND REPAIR SERVICES
FOR THE CITY OF SANTA ANA
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nunez
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO ODYSSEY POWER CORPORATION
City Attorney
By:
Kyle ellesen David Newman
Assistant City Attorney CFO
RECOMMENDED FOR APPROVAL:
Digitally signed by Rodolfo Rosas
s D ainrRodolfo Rosas
Rodolfo Rosa ,
email=rosas@santa-ana.org,c=US
Date:2026.07.20 14:18:55-07'00'
Rodolfo Rosas, P.E.
Acting Executive Director
Public Works Agency
Page 8 of 8
EXHIBIT A
CITY OF SANTA ANA
EXHIBIT 1 -
SCOPE OF SERVICES
1. Description of Work:
The City of Santa Ana is requesting proposals for the purpose of providing preventative
maintenance service visits, on-call diagnostic and repair services, and emergency repair
services to various generators within the City. The manufacturers of the City's existing
generators include Caterpillar, Cummins, and Perkins. Proposers shall be fully experienced,
licensed, and equipped to perform the work specified and required herein.
All work performed shall be in compliance with the National Fire Protection Association (NFPA)
70 National Electrical Code, NFPA 110 Standard for Emergency, Standby Power Systems, and
CaIOSHA safety requirements as well as other applicable federal, state, and local codes. The
Contractor(s) shall provide all necessary labor, materials, tools, supervision, transportation and
equipment to perform services specified herein.
2. Normal Operating Hours
Monday through Friday, 7:00 AM to 5:00 PM
Operating hours are subject to change and the City will communicate all changes in advance
with the Contractor(s).
3. Emergency Service Request
The Contractor(s) must be available to receive the City's emergency service request twenty-
four (24) hours a day, seven (7) days a week.
In the event of a generator failure or malfunction, the Contractor must respond within four (4)
hours of receiving emergency service request from the City.
The Contractor's service technician is required to be on-site to commence work within eight (8)
hours of initial contact, if the event has been deemed by the City to be an emergency. The
response time may be waived by the City if service can wait to be performed during the City's
normal business hours.
4. Parts. Materials. and Warranties
All parts, repairs, and/or fluid changing must be done with parts and fluids that meet or exceed
the manufacturer's recommendations. All replacement parts shall be new and of the same
quality and brand name as those being replaced; OEM parts are preferred. Substitutions will
be permitted only with prior authorization from the City.
Upon contract execution, the City will finalize the list and quantity of parts that the Contractors
must have available on-hand at all times to avoid potential delays in performing the work
required during the term of the contract. If the Contractor is unable to stock certain items at all
times and must special order them on a project basis, they will submit the lead time for
procurement to the City for review and approval. All material markup must not exceed 10%
percent above Contractor's cost when charged back to the City.
(9)
CITY OF SANTA ANA
All work performed will carry a minimum one-year warranty on parts
and labor. The Contractors shall properly dispose of used oil, fluids, and filters generated by its
services off-site, leaving the job site environmentally clean.
5. Price, Schedule, and Invoice
Awarded Contractor(s) shall provide quotes and project schedules with pricing in accordance
with their submitted rates upon request by the City. The quote will include, but is not limited to
summary of anticipated tasks, anticipated project time of completion, hourly rate, rates for
materials, and oversized equipment rates on a project by project basis for the City's review and
approval. Any special materials as required for the work to be purchased by the Contractor may
only occur after formal discussion and approved in writing by the City.
Contractor(s) shall coordinate all scheduled services at least five (5) business days in advance
with the City's Water Services Superintendent. Contractors shall invoice the City on a monthly
basis for all work performed during the period or provide a one-time invoice at the completion of
work issued. Each invoice shall include as information as required on the quote and be
accompanied by a summary of tasks performed, results and progress on long-term tasks if any,
and agreement number.
6. Preventative Maintenance
All testing and maintenance services will be scheduled in advance with the City.
Upon request from the City, the Contractor shall perform preventative maintenance as specified
below. The Contractor shall maintain service reports on all maintenance and repairs, and shall
provide a copy of the service report to the City upon request. In addition to Contractor's self-
generated service reports, the Contractor is required to complete the City's own form and submit
back to the City after work is completed.
Contractor shall stop work and immediately notify City personnel of conditions that do not
conform to applicable codes and/or pose a safety hazard should they encounter them while
performing preventative maintenance. Contractor shall ensure all work performed on electrical
power generation and transfer equipment shall be accomplished under the technical
management of a qualified electrical licensed contractor.
A. Tier I: Preventative Maintenance Services (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier I Preventative Maintenance Services and shall at a
minimum include checking the following:
i. Fuel (Check main and day tank fuel supply levels; day tank float switch; piping,
hoses and connectors; operating fuel pressure; and for any obstructions to tank
vents and overflow piping)
ii. Lubrication system (Check for proper oil level and oil operating pressure; Tube
oil heater)
iii. Cooling system (Check coolant level, water pump(s), jacket water heater,
belts, hoses, fan)
iv. Exhaust system (Check drain condensate trap and for possible leakage)
CITY OF SANTA ANA
V. Battery System (Look for possible corrosion; check specific gravity, electrolyte
level and battery charger — maintenance-free batteries require routine visual
inspection and maintenance in accordance with manufacturer's instructions)
vi. Electrical system (Conduct a general inspection of wiring and connections;
check circuit breakers/fuses)
vii. Prime Mover/Generator (Check for debris, foreign objects, loose or broken
fittings; check guards and components; look for any unusual condition of
vibration, leakage, noise, temperature or deterioration)
viii. Thirty (30) Minute Load Test (Contractor shall carry out 30-minute generator
load tests and run the generator at 30% for a minimum of 30 minutes. If a
generator does not"pass" the load test consistently then Contractor will ask the
City of Santa Ana if a resistive load bank test should be performed.)
Within five (5) business days of completing a load test on a generator and maintenance
inspection services, Contractor shall provide a completed Tier 1: Generator 30-Minute
Load Test Form, the approved form is provided as Exhibit 6 to the City. The Contractor
shall state all findings, along with a proposed scope of work and complete cost
estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
B. Tier II: Preventative Maintenance Service (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier II Preventative Maintenance Services and shall at a
minimum include checking the items listed below. In addition to the items listed below
and in Exhibit 7 Tier II Generator Inspection and Preventative Maintenance Checklist,
the Tier II visit shall include a full change of engine oil and filter, along with a battery and
coolant replacement if necessary, and an optional two (2) hours load bank test or a four
(4) hours load bank test. When applicable, the Contractor shall perform automatic
transfer switch (ATS) testing in accordance with current NFPA 110 standards.
L COOLING SYSTEM
1. Inspect radiator exchanger
2. Check coolant level
3. Glycol check of coolant (freezing point) (Results must be turned in)
4. Inspect all hoses and connections
5. Inspect fan drive pulley and fan
6. Inspect fan belts
7. Check jacket water heater
8. Inspect water pump
9. Inspect thermostats
ii. FUEL SYSTEM
1. Inspect fuel tank
2. Change fuel/water separator strainers
3. Inspect all fuel lines and connections
4. Inspect governor and controls
5. Change all fuel filters
6. Check fuel pressure
7. Test fuel in tanks for water(results must be turned in)
CITY OF SANTA ANA
iii. AIR INTAKE & EXHAUST SYSTEM
1. Change air filters as needed (At the discretion of the City)
2. Check air filter service indicator
3. Inspect air inlet system
4. Inspect turbocharger
5. Check exhaust manifold
6. Inspect exhaust system
iv. ENGINE MONITORS & SAFETY CONTROLS
1. Check all gauges
2. Check all safety controls
3. Check remote enunciators & alarms
v. LUBE OIL SYSTEM
1. Check oil level
2. Change all oil filters
3. Check oil pressure
4. Inspect crankcase breather
5. Check for any leaks
6. Take sample of existing oil (results must be turned in)
7. Change oil
vi. STARTING SYSTEM
1. Inspect batteries, terminals & connections
2. Check specific gravity of batteries (results must be turned in)
3. Perform load test on batteries (results must be turned in)
4. Inspect battery charger
5. Inspect starting motor
6. Inspect alternator
vii. GENERATOR
1. Inspect bearings
2. Check vibration isolators
3. Inspect control panel
4. Check start controls
5. Check voltmeter
6. Check ammeter
7. Check frequency meter
8. Check circuit breaker
viii. TRANSFER SWITCH
1. Inspect all connections (retighten if necessary)
2. Inspect wiring for brittle or burn marks
3. Inspect all switches
ix. LOAD BANK TEST
1. Option for a 2-Hour Load Test
2. Or an option for a 4-Hour Load Test
,wZ`R
CITY OF SANTA ANA
x. PROVIDE WRITTEN DOCUMENTATION OF ALL WORK PERFORMED
1. Oil Test Results (results must be turned in)
2. Diagnostic Procedures and Results
Within five (5) business days of completing the Tier II Preventative Maintenance Service,
the Contractor shall provide a completed Tier II: Generator Inspection and Preventative
Maintenance Checklist Form, the approved form is provided as Exhibit 7 to the City. The
Contractor shall state all findings, along with a proposed scope of work and complete
cost estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
7. Automatic Transfer Switch (ATS)
Contractor shall perform a visual inspection only of the Automatic Transfer Switch (ATS)
associated with each City generator during scheduled maintenance visits. Contractor shall inspect
the exterior and readily accessible portions of the ATS for visible signs of damage, corrosion,
moisture intrusion, overheating, loose or missing hardware, abnormal indicator lights or alarms,
and other observable deficiencies that may affect reliable operation. Contractor shall document
all findings and notify the City of any conditions requiring further evaluation or corrective action.
Contractor shall not perform ATS maintenance, repairs, installation, operational testing,
exercising, switching, calibration, adjustments, or any work requiring manipulation of the ATS
unless specifically authorized in writing by the City.
8. Fueling
The City may, at its sole discretion, require the Contractor to provide fueling services for City
generators as part of maintenance and repair activities or during emergency response situations.
Contractor shall furnish and deliver fuel as directed by the City and shall provide documentation
supporting the cost of fuel upon request. Fueling markup shall not exceed ten percent (10%)
above the Contractor's actual cost when invoiced to the City.
9. On-Call Services
Contractor shall provide on-call generator repair services for all City generators at an hourly rate
that aligns with their submitted fee schedule(s). All repair services will require an estimate being
submitted to the City for approval prior to any work being performed by the Contractor.
A service report is to be completed by the Contractor's technician and the report is to be provided
to City personnel upon completion of the request.
Any on-call work carried out by the Contractor that requires taking a generator offline for testing
or repairs requires prior approval from the City. Should a generator need to be taken offline
temporarily, it may not be left unattended by the Contractor's personnel. The Contractor must
remain on-site until the generator is successfully returned online to normal operation.
Contractors must provide technical and engineering support upon request from the City for
generators manufactured by but not limited to Caterpillar, Cummins, and Perkins.
(9) CITY OF SANTA ANA
10. VALUE ADDED RELATED SERVICES
Contractors may propose additional related services that the City has not specifically identified
in this RFP to accomplish the stated goals of this RFP. Value added related services will be
considered by the City and may or may not be incorporated in the agreement.
EXHIBIT B
��RIw
CITY OF SANTA ANA
ATTACHMENT A-1 -
FEE SCHEDULE
Contractors shall complete Attachment A-1: Fee Schedule and provide pricing on a per visit basis
in accordance with Tier I and Tier II Preventative Maintenance Services as specified in this RFP.
Furthermore, Contractors shall submit their own fee schedule for additional labor, material and
equipment rates as a separate form. This additional fee schedule shall list rates for all labor
designations, equipment and materials.
Cost for preventative maintenance services (Tiers I and II) must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Item Subtotal Tier Subtotal Tier I,
No. Location UOM QTY Tier I Tier II I&II Tier II (add-on') II,&Add-On
1 Segerstrom Station EA 1 $580.00 $1065.00 $1645.00 $ 5450.00 $ 7095.00
2 West Station EA 1 $ $ $ $ $
580.00 2034.00 2614.00 9448.00 12,062.00
3 East Station EA 1 $580.00 $2034.00 $2614.00 $ 9448.00 $12,062.00
4 John Garthe EA 1 $ $ $ $ $
Station 580.00 1305.00 1885.00 6052.00 7,937.00
5 Walnut Station EA 1 $870.00 $2720.00 $3590.00 $11838.00 $15,428.00
6 Maxine Station EA 1 $ $ $ $ $
520.00 825.00 1345.00 3752.00 5,097.00
7 Well 40 EA 1 $580.00 $ 2034.00 $2614.00 $ 9448.00 $12,062.00
TOTAL $16,307.00 $55,436.0, $71,743.00
*Add-On Services are a full change of engine oil and filter, battery and coolant replacement, and a two
(2) hours load bank test and a four (4) hours load bank test. Cost must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Please also provide unit pricing for each add-on service for Tier II based on generator by location.
Item Segerstrom West East John Walnut Maxine
No. Description Station Station Station Garthe Station Station Well 40
Station
8 Engine oil and filter $ $ $ $
chap a Includ din Tier II ervice$ $er co e in bid acket
9 Battery and coolant $3200.00 $5900.00 $5900.00 $3600.00 $6900.00 $1800.00 $5900.00
replacement
10 Two(2)hours load bank $1000.00 $1588.00 $1588.00 -'1050.00 $2188.00 $800.00 $1588.00
test
11 Four(4)hours load $1250.00 $1960.00 $1960.00 1402.00 $2750.00 $1152.00 $1960.00
bank test
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
(9) CITY OF SANTA ANA
On-Call Repair Services
12 Hourly Rate HR 1 $210.00
13 OT Hourly Rate HR 1 $315.00
14 Weekends/Holidays Hourly Rate HR 1 $315.00
15 OT Weekends/Holidays Hourly Rate HR 1 $420.00
16 Trip Fee/Truck Charge EA 1 $210.00
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
EXHIBIT C
Contractor shall procure and maintain for the duration of the agreement, the following insurance
coverages:
MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts and shall
be at least as broad as:
• Commercial General Liability(CGL): Insurance Services Office Form CG 00 01 covering
CGL on an "occurrence" basis, including products and completed operations, property
damage, bodily injury and personal &advertising injury with limits no less than $1,000,000
per occurrence and $2,000,000 aggregate.
• Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1
(any auto), with combined single limits of $1,000,000. In the event Contractor does not
maintain commercial automobile liability insurance, City will accept evidence of personal
automobile insurance, provided that such policy is endorsed for business use and provides
coverage with a minimum limit of $1,000,000. Required policy limits can be met with
primary and umbrella/excess insurance policies.
• Workers' Compensation (WC): as required by the State of California, with statutory
limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per
accident, per employee, per policy for bodily injury or disease. This requirement can be
waived if Contractor has no employees. Contractor attests that its workers' compensation
coverage extends to all persons who will be working with the City under the agreed scope
of services.
If Contractor maintains broader coverage and/or higher limits than the minimums shown
above, City requires and shall be entitled to the broader coverage and/or the higher limits
maintained by Contractor. Any available insurance proceeds in excess of the specified
minimum limits of insurance and coverage shall be available to City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, its City Council, its officers, officials,
employees, agents, and volunteers are to be covered as additional insureds with
respect to liability arising out of work or operations performed by or on behalf of the
Contractor including materials, parts, equipment, and personnel furnished in
connection with such work or operations.
2. CGL, AL, and WC policies: Insurance company(ies) agrees to waive all rights of
subrogation against City, its City Council, its officers, officials, employees, agents,
and volunteers for losses paid under the terms of any policy which arise from work
performed by Contractor for City.
3. All required insurance policies: For any claims related to this contract, Contractor's
insurance coverage shall be primary and any insurance maintained by City, its City
Council, its officers, officials, employees, agents, or volunteers shall not contribute
with it.
4. All required insurance policies: A severability of interest provision must apply for all
the additional insureds, ensuring that Contractor's insurance shall apply separately to
each insured against whom a claim is made or suit is brought, except with respect to
the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be
canceled, suspended, voided, reduced in coverage or in limits, non-renewed by the
carrier, or materially changed except after thirty (30) days prior written notice has
been given to City. Ten (10) days prior written notice shall be provided to City for
policy cancellation or non-renewal due to non-payment.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa
Ana, Attention: Jaime Arias, 215 S. Center St., M-85, Santa Ana, CA 92703. The
name and location of the event should be included in the Description of Operations
section of each certificate.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. City may require
Contractor to purchase coverage with a lower retention or provide proof of ability to pay
losses and related investigations, claim administration, and defense expenses within the
retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of
California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable
to City.
Verification of Coverage
Contractor shall furnish City with original Certificates of Insurance including all required
amendatory endorsements (or copies of the applicable policy language effecting coverage
required by this clause) and a copy of the Declarations and Endorsement Page of the CGL
policy listing all policy endorsements to Entity before work begins. However, failure to obtain
the required documents prior to the work beginning shall not waive Contractor's obligation to
provide them. City reserves the right to require complete, certified copies of all required
insurance policies, including endorsements required by these specifications, at any time.
Claims Made Policies
If any of the required policies provide coverage on a claims-made basis:
1. The retroactive date must be shown and must be before the date of the contract or the
beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at least
three (3) years after completion of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made
policy form with a retroactive date prior to the contract effective date, Contractor must
purchase "extended reporting" coverage for a minimum of three (3) years after completion of
work.
Subcontractors
Contractor shall require and verify that all sub-contractors maintain insurance
meeting all the requirements stated herein, and Contractor shall ensure that City
is an additional insured on insurance required from sub-contractors.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of
the risk, prior experience, insurer, coverage, or other special circumstances.
Exhibit 3
AGREEMENT WITH QUINN POWER SYSTEMS TO PROVIDE ON-CALL WATER
GENERATOR MAINTENANCE AND REPAIR SERVICES
FOR THE CITY OF SANTA ANA
THIS AGREEMENT is made and entered into on this 4ch day of August, 2026 by and
between Quinn Company dba Quinn Power Systems ("Contractor"), and the City of Santa Ana, a
charter city and municipal corporation organized and existing under the Constitution and laws of
the State of California("City").
RECITALS
A. On June 2, 2026 the City issued Request for Proposals No. 26-075, by which it sought
Contractors to provide on-call generator maintenance and repair services on behalf of the
City of Santa Ana's Public Works Agency.
B. Contractor submitted a responsive proposal that was among those selected by the City.
Contractor represents that it is able and willing to provide the services described in the
scope of work that was included in RFP No. 26-075.
C. Contractor was selected as one of four (4) vendors which qualified for this engagement.
Only those Contractors approved by the City Council on August 4, 2026 shall be eligible
to be engaged by the City for these services
D. In undertaking the performance of this Agreement, Contractor represents that it is
knowledgeable in its field and that any services performed by Contractor under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Contractor shall perform during the term of this Agreement, the tasks and obligations
including all labor, materials, tools, equipment, and incidental customary work required to fully
and adequately complete the services described and set forth in Exhibit A, attached hereto and
incorporated by reference.
2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to
Contractor shall be paid only for actual services performed under this Agreement at the
rates and charges identified in Exhibit B. Contractor is one of four (4) Contractors
selected under RFP 26-075. The total aggregate compensation amount shall not
exceed Five Hundred and Seventy-Five Thousand($575,000) during the term of the
Agreement, including any extension periods.
Page 1 of 8
b. Payment by City shall be made within forty-five(45)days following receipt of proposer
invoice evidencing work performed, subject to City accounting procedures. Payment
need not to be made for work which fails to meet the standards of performance set forth
in the Recitals and Scope of Work, which may reasonably be expected by City.
3. TERM
This Agreement shall commence on August 4, 2026 for a one-year term with the option for
the City to grant up to four(4), one-year extensions, exercisable by a writing by the City Manager
and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an
independent Contractor and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer-employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Contractor
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Contractor shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Contractor shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or
caused to be prepared by Contractor under this Agreement ("Documents & Data"). Contractor
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Contractor represents and warrants that Contractor has the legal right to license any and all
Documents & Data. Contractor makes no such representation and warranty in regard to
Documents & Data which were provided to Contractor by the City. City shall not be limited in
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
6. INSURANCE
Insurance requirements are attached hereto as Exhibit C and incorporated by reference.
Page 2 of 8
7. INDEMNIFICATION
Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers,
agents, employees, contractors, special counsel, and representatives from liability: (1)for personal
injury, damages,just compensation, restitution,judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
negligent operations of the Contractor, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section 1 of this Agreement,
provided, however, that such indemnity shall not apply to the extent such claims arise from the
active negligence or willful misconduct of the City, its officers, agents, employees, contractors, or
representatives; and (2) from any claim that personal injury, damages, just compensation,
restitution,judicial or equitable relief is due by reason of the terms of or effects arising from this
Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just
compensation, restitution,judicial or equitable relief suffered, or alleged to have been suffered, by
reason of the events referred to in this Section or by reason of the terms of, or effects, arising from
this Agreement. The Contractor further agrees to indemnify, hold harmless, and pay all costs for
the defense of the City, including fees and costs for special counsel to be selected by the City,
regarding any action by a third party challenging the validity of this Agreement, or asserting
that personal injury, damages, just compensation, restitution, judicial or equitable relief due to
personal or property rights arises by reason of the terms of, or effects arising from this
Agreement. City may make all reasonable decisions with respect to its representation in any
legal proceeding. Notwithstanding the foregoing, to the extent Contractor's services are subject to
Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil
Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence,
recklessness, or willful misconduct of the Contractor.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Contractor shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
letters patent,trademark, or copyright infringement,including costs, contained in the work product
or documents provided by Contractor to the City pursuant to this Agreement.
9. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed
under this Agreement. Contractor shall maintain complete and accurate records with respect to the
costs incurred under this Agreement and any services, expenditures, and disbursements charged to
the City for a minimum period of three (3) years, or for any longer period required by law, from
the date of final payment to Contractor under this Agreement. All such records and invoices shall
be clearly identifiable. Contractor shall allow a representative of the City to examine, audit, and
make transcripts or copies of such records and any other documents created pursuant to this
Agreement during regular business hours. Contractor shall allow inspection of all work, data,
documents, proceedings, and activities related to this Agreement for a period of three (3) years
from the date of final payment to Contractor under this Agreement.
Page 3 of 8
10. CONFIDENTIALITY
If Contractor receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Contractor agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the salve degree of care it uses to protect its own information of like
importance,but in no event less than reasonable care. "Confidential Information"shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that(a)has been disclosed in publicly available sources; (b)is, through no fault of the
Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Contractor without reference to information disclosed by the
City.
11. CONFLICT OF INTEREST CLAUSE
a. Contractor covenants that it presently has no interests and shall not have interests,direct
or indirect,which would conflict in any manner with performance of services specified
under this Agreement.
b. No immediate family members of either the Mayor, City Council Member, or any
appointed City Official, including appointed board and commission members, as
defined under the City's Municipal Code, whose position with the City shall award or
influence the award of this Agreement, or any competing contract or amendment
thereof, shall be employed in any capacity by the Contractor or have any other direct
or indirect financial benefit or interest in this Agreement.
c. The section also prohibits the awarding of any agreement, contract, grant, or any
amendment to those awards, to any former full-time employee for one-year from date
of employee separation except for any Ca1PERS retiree as authorized by City Council
resolution
d. The Contractor must comply with all conflict of interest laws, ordinances, and
regulations now in effect or hereafter to be enacted during the term of this Agreement.
The Contractor warrants that it is not now aware of any facts which conflict with the
prohibitions defined above. If the Contractor hereafter becomes aware of any facts that
might reasonably be expected to create a conflict of interest, it must immediately make
full written disclosure of such facts to the City. Full written disclosure must include,
but is not limited to, identification of all persons implicated and a complete description
of all relevant circumstances. Failure to comply with the provisions of this paragraph
will be a material breach of this Agreement.
e. Contractor covenants that none of its directors, officers, employees, or agents shall
Page 4 of 8
participate in selecting or administrating any subcontract supported(in whole or in part)
by City funds stemming from the Agreement where the awarding of the subcontract
has any direct or indirect financial benefit or interest to any individual, as defined in
subsections (b) and(c) above.
12. NON-DISCRIMINATION
Contractor shall not discriminate because of race, color, creed, religion, sex, marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable taw, in the recruitment, selection, teaching, training, utilization,
promotion, termination or other employment related activities or any services provided under this
Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Contractor, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto, the terms
of this Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Contractor. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other Contractor retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor
compensation for all services performed by Contractor prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Contractor to
deliver to the City all work product(s) completed as of such date, and in such case
such work product shall be the property of the City unless prohibited by law, and
Page 5 of 8
Contractor consents to the City's use thereof for such purposes as the City deems
appropriate.
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure,right or remedy. No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar,nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION-VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza(M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
Page 6 of 8
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza(M-21)
P.O. Box 1988
Santa Ana, California 92702
To Contractor:
Quinn Company dba Quinn Power Systems
Attn: Rayden King
3500 Shepherd St.
City of Industry, CA 90601
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24)hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this Agreement.
[Signature Page to Follow]
Page 7 of 8
SIGNATURE PAGE TO AGREEMENT WITH QUINN POWER SYSTEMS TO
PROVIDE ON-CALL WATER GENERATOR MAINTENANCE AND REPAIR
SERVICES FOR THE CITY OF SANTA ANA
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nunez
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO QUINN COMPANY DBA QUINN
City Attorney POWER SYSTEMS
By: /' 'i' / 11(44mIlam
Kyle ellesen Kris Paluzzi
Assistant City Attorney VP & CFO
RECOMMENDED FOR APPROVAL:
t Digitally signed by Rodolfo Rosas
RO�OI I O RO��� —N Rodolfo Rosas,email=rrosas@sana-
org,I us
Date:2026.07.20 14:20:02-07'00'
Rodolfo Rosas, P.E.
Acting Executive Director
Public Works Agency
Page 8 of 8
EXHIBIT A
CITY OF SANTA ANA
EXHIBIT 1 -
SCOPE OF SERVICES
1. Description of Work:
The City of Santa Ana is requesting proposals for the purpose of providing preventative
maintenance service visits, on-call diagnostic and repair services, and emergency repair
services to various generators within the City. The manufacturers of the City's existing
generators include Caterpillar, Cummins, and Perkins. Proposers shall be fully experienced,
licensed, and equipped to perform the work specified and required herein.
All work performed shall be in compliance with the National Fire Protection Association (NFPA)
70 National Electrical Code, NFPA 110 Standard for Emergency, Standby Power Systems, and
CaIOSHA safety requirements as well as other applicable federal, state, and local codes. The
Contractor(s) shall provide all necessary labor, materials, tools, supervision, transportation and
equipment to perform services specified herein.
2. Normal Operating Hours
Monday through Friday, 7:00 AM to 5:00 PM
Operating hours are subject to change and the City will communicate all changes in advance
with the Contractor(s).
3. Emergency Service Request
The Contractor(s) must be available to receive the City's emergency service request twenty-
four (24) hours a day, seven (7) days a week.
In the event of a generator failure or malfunction, the Contractor must respond within four (4)
hours of receiving emergency service request from the City.
The Contractor's service technician is required to be on-site to commence work within eight (8)
hours of initial contact, if the event has been deemed by the City to be an emergency. The
response time may be waived by the City if service can wait to be performed during the City's
normal business hours.
4. Parts. Materials. and Warranties
All parts, repairs, and/or fluid changing must be done with parts and fluids that meet or exceed
the manufacturer's recommendations. All replacement parts shall be new and of the same
quality and brand name as those being replaced; OEM parts are preferred. Substitutions will
be permitted only with prior authorization from the City.
Upon contract execution, the City will finalize the list and quantity of parts that the Contractors
must have available on-hand at all times to avoid potential delays in performing the work
required during the term of the contract. If the Contractor is unable to stock certain items at all
times and must special order them on a project basis, they will submit the lead time for
procurement to the City for review and approval. All material markup must not exceed 10%
percent above Contractor's cost when charged back to the City.
(9)
CITY OF SANTA ANA
All work performed will carry a minimum one-year warranty on parts
and labor. The Contractors shall properly dispose of used oil, fluids, and filters generated by its
services off-site, leaving the job site environmentally clean.
5. Price, Schedule, and Invoice
Awarded Contractor(s) shall provide quotes and project schedules with pricing in accordance
with their submitted rates upon request by the City. The quote will include, but is not limited to
summary of anticipated tasks, anticipated project time of completion, hourly rate, rates for
materials, and oversized equipment rates on a project by project basis for the City's review and
approval. Any special materials as required for the work to be purchased by the Contractor may
only occur after formal discussion and approved in writing by the City.
Contractor(s) shall coordinate all scheduled services at least five (5) business days in advance
with the City's Water Services Superintendent. Contractors shall invoice the City on a monthly
basis for all work performed during the period or provide a one-time invoice at the completion of
work issued. Each invoice shall include as information as required on the quote and be
accompanied by a summary of tasks performed, results and progress on long-term tasks if any,
and agreement number.
6. Preventative Maintenance
All testing and maintenance services will be scheduled in advance with the City.
Upon request from the City, the Contractor shall perform preventative maintenance as specified
below. The Contractor shall maintain service reports on all maintenance and repairs, and shall
provide a copy of the service report to the City upon request. In addition to Contractor's self-
generated service reports, the Contractor is required to complete the City's own form and submit
back to the City after work is completed.
Contractor shall stop work and immediately notify City personnel of conditions that do not
conform to applicable codes and/or pose a safety hazard should they encounter them while
performing preventative maintenance. Contractor shall ensure all work performed on electrical
power generation and transfer equipment shall be accomplished under the technical
management of a qualified electrical licensed contractor.
A. Tier I: Preventative Maintenance Services (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier I Preventative Maintenance Services and shall at a
minimum include checking the following:
i. Fuel (Check main and day tank fuel supply levels; day tank float switch; piping,
hoses and connectors; operating fuel pressure; and for any obstructions to tank
vents and overflow piping)
ii. Lubrication system (Check for proper oil level and oil operating pressure; Tube
oil heater)
iii. Cooling system (Check coolant level, water pump(s), jacket water heater,
belts, hoses, fan)
iv. Exhaust system (Check drain condensate trap and for possible leakage)
CITY OF SANTA ANA
V. Battery System (Look for possible corrosion; check specific gravity, electrolyte
level and battery charger — maintenance-free batteries require routine visual
inspection and maintenance in accordance with manufacturer's instructions)
vi. Electrical system (Conduct a general inspection of wiring and connections;
check circuit breakers/fuses)
vii. Prime Mover/Generator (Check for debris, foreign objects, loose or broken
fittings; check guards and components; look for any unusual condition of
vibration, leakage, noise, temperature or deterioration)
viii. Thirty (30) Minute Load Test (Contractor shall carry out 30-minute generator
load tests and run the generator at 30% for a minimum of 30 minutes. If a
generator does not"pass" the load test consistently then Contractor will ask the
City of Santa Ana if a resistive load bank test should be performed.)
Within five (5) business days of completing a load test on a generator and maintenance
inspection services, Contractor shall provide a completed Tier 1: Generator 30-Minute
Load Test Form, the approved form is provided as Exhibit 6 to the City. The Contractor
shall state all findings, along with a proposed scope of work and complete cost
estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
B. Tier II: Preventative Maintenance Service (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier II Preventative Maintenance Services and shall at a
minimum include checking the items listed below. In addition to the items listed below
and in Exhibit 7 Tier II Generator Inspection and Preventative Maintenance Checklist,
the Tier II visit shall include a full change of engine oil and filter, along with a battery and
coolant replacement if necessary, and an optional two (2) hours load bank test or a four
(4) hours load bank test. When applicable, the Contractor shall perform automatic
transfer switch (ATS) testing in accordance with current NFPA 110 standards.
L COOLING SYSTEM
1. Inspect radiator exchanger
2. Check coolant level
3. Glycol check of coolant (freezing point) (Results must be turned in)
4. Inspect all hoses and connections
5. Inspect fan drive pulley and fan
6. Inspect fan belts
7. Check jacket water heater
8. Inspect water pump
9. Inspect thermostats
ii. FUEL SYSTEM
1. Inspect fuel tank
2. Change fuel/water separator strainers
3. Inspect all fuel lines and connections
4. Inspect governor and controls
5. Change all fuel filters
6. Check fuel pressure
7. Test fuel in tanks for water(results must be turned in)
CITY OF SANTA ANA
iii. AIR INTAKE & EXHAUST SYSTEM
1. Change air filters as needed (At the discretion of the City)
2. Check air filter service indicator
3. Inspect air inlet system
4. Inspect turbocharger
5. Check exhaust manifold
6. Inspect exhaust system
iv. ENGINE MONITORS & SAFETY CONTROLS
1. Check all gauges
2. Check all safety controls
3. Check remote enunciators & alarms
v. LUBE OIL SYSTEM
1. Check oil level
2. Change all oil filters
3. Check oil pressure
4. Inspect crankcase breather
5. Check for any leaks
6. Take sample of existing oil (results must be turned in)
7. Change oil
vi. STARTING SYSTEM
1. Inspect batteries, terminals & connections
2. Check specific gravity of batteries (results must be turned in)
3. Perform load test on batteries (results must be turned in)
4. Inspect battery charger
5. Inspect starting motor
6. Inspect alternator
vii. GENERATOR
1. Inspect bearings
2. Check vibration isolators
3. Inspect control panel
4. Check start controls
5. Check voltmeter
6. Check ammeter
7. Check frequency meter
8. Check circuit breaker
viii. TRANSFER SWITCH
1. Inspect all connections (retighten if necessary)
2. Inspect wiring for brittle or burn marks
3. Inspect all switches
ix. LOAD BANK TEST
1. Option for a 2-Hour Load Test
2. Or an option for a 4-Hour Load Test
CITY OF SANTA ANA
x. PROVIDE WRITTEN DOCUMENTATION OF ALL WORK PERFORMED
1. Oil Test Results (results must be turned in)
2. Diagnostic Procedures and Results
Within five (5) business days of completing the Tier II Preventative Maintenance Service,
the Contractor shall provide a completed Tier II: Generator Inspection and Preventative
Maintenance Checklist Form, the approved form is provided as Exhibit 7 to the City. The
Contractor shall state all findings, along with a proposed scope of work and complete
cost estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
7. Automatic Transfer Switch (ATS)
Contractor shall perform a visual inspection only of the Automatic Transfer Switch (ATS)
associated with each City generator during scheduled maintenance visits. Contractor shall inspect
the exterior and readily accessible portions of the ATS for visible signs of damage, corrosion,
moisture intrusion, overheating, loose or missing hardware, abnormal indicator lights or alarms,
and other observable deficiencies that may affect reliable operation. Contractor shall document
all findings and notify the City of any conditions requiring further evaluation or corrective action.
Contractor shall not perform ATS maintenance, repairs, installation, operational testing,
exercising, switching, calibration, adjustments, or any work requiring manipulation of the ATS
unless specifically authorized in writing by the City.
8. Fueling
The City may, at its sole discretion, require the Contractor to provide fueling services for City
generators as part of maintenance and repair activities or during emergency response situations.
Contractor shall furnish and deliver fuel as directed by the City and shall provide documentation
supporting the cost of fuel upon request. Fueling markup shall not exceed ten percent (10%)
above the Contractor's actual cost when invoiced to the City.
9. On-Call Services
Contractor shall provide on-call generator repair services for all City generators at an hourly rate
that aligns with their submitted fee schedule(s). All repair services will require an estimate being
submitted to the City for approval prior to any work being performed by the Contractor.
A service report is to be completed by the Contractor's technician and the report is to be provided
to City personnel upon completion of the request.
Any on-call work carried out by the Contractor that requires taking a generator offline for testing
or repairs requires prior approval from the City. Should a generator need to be taken offline
temporarily, it may not be left unattended by the Contractor's personnel. The Contractor must
remain on-site until the generator is successfully returned online to normal operation.
Contractors must provide technical and engineering support upon request from the City for
generators manufactured by but not limited to Caterpillar, Cummins, and Perkins.
(9)
CITY OF SANTA ANA
10. VALUE ADDED RELATED SERVICES
Contractors may propose additional related services that the City has not specifically identified
in this RFP to accomplish the stated goals of this RFP. Value added related services will be
considered by the City and may or may not be incorporated in the agreement.
EXHIBIT B
w'4
CITY OF SANTA ANA
ATTACHMENT A-1 -
FEE SCHEDULE
Contractors shall complete Attachment A-1: Fee Schedule and provide pricing on a per visit basis
in accordance with Tier I and Tier II Preventative Maintenance Services as specified in this RFP.
Furthermore, Contractors shall submit their own fee schedule for additional labor, material and
equipment rates as a separate form. This additional fee schedule shall list rates for all labor
designations, equipment and materials.
Cost for preventative maintenance services (Tiers I and II) must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Item Subtotal Tier Subtotal Tier I,
No. Location UOM OTY Tier I Tier II 1&II Tier II(add-on') 11, &Add-On
1 Segerstrom Station EA 1 $525 $2,700 $3,225 $11,000 $14,225
2 West Station EA 1 $525 $4,042 $4,567 $18,842 $23,409
3 East Station EA 1 $525 $4,042 $4,567 18,842 $23,409
4 John Garthe EA 1 $ $ $ $
Station 525 3,970 4,495 16,820 21,315
5 Walnut Station EA 1 $525 $4,760 $5,285 19,210 $24,495
6 Maxine Station EA 1 $525 $2,500 $3,025 9,250 $12,275
7 Well 40 EA 1 $525 $5,220 $5,745 20,020 $25,765
TOTAL $30,909 113,984 $ 144,893
*Add-On Services are a full change of engine oil and filter, battery and coolant replacement, and a two
(2) hours load bank test and a four (4) hours load bank test. Cost must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Please also provide unit pricing for each add-on service for Tier II based on generator by location.
Item Segerstrom West East John Walnut Maxine
No. Description Station Station Station Garthe Station Station Well40
Station
8 Engine oil and filter $1,450 $2,792 $2,792 $3,970 $3,510 $1,250 $3,970
change
9 Battery and coolant $4,000 $8,900 $8,900 $5,700 $6,500 $3,500 $8,900
replacement
10 Two(2)hours load bank $2,500 $3,300 $3,300 $3,300 $4,250 $2,000 $3,300
test
11 Four(4)hours load $3,050 $3,850 $3,850 $3,850 $4,950 $2,500 $3,850
bank test
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
(2)
CITY OF SANTA ANA
On-Call Repair Services
12 Hourly Rate HR 1 $275
13 OT Hourly Rate HR 1 $412.50
14 Weekends/Holidays Hourly Rate HR 1 $412.50 / 525
15 OT Weekends/Holidays Hourly Rate HR 1 $525
16 Trip Fee/Truck Charge EA 1 $N/A
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
EXHIBIT C
Contractor shall procure and maintain for the duration of the agreement, the following insurance
coverages:
MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts and shall
be at least as broad as:
• Commercial General Liability(CGL): Insurance Services Office Form CG 00 01 covering
CGL on an "occurrence" basis, including products and completed operations, property
damage, bodily injury and personal &advertising injury with limits no less than $1,000,000
per occurrence and $2,000,000 aggregate.
• Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1
(any auto), with combined single limits of $1,000,000. In the event Contractor does not
maintain commercial automobile liability insurance, City will accept evidence of personal
automobile insurance, provided that such policy is endorsed for business use and provides
coverage with a minimum limit of $1,000,000. Required policy limits can be met with
primary and umbrella/excess insurance policies.
• Workers' Compensation (WC): as required by the State of California, with statutory
limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per
accident, per employee, per policy for bodily injury or disease. This requirement can be
waived if Contractor has no employees. Contractor attests that its workers' compensation
coverage extends to all persons who will be working with the City under the agreed scope
of services.
If Contractor maintains broader coverage and/or higher limits than the minimums shown
above, City requires and shall be entitled to the broader coverage and/or the higher limits
maintained by Contractor. Any available insurance proceeds in excess of the specified
minimum limits of insurance and coverage shall be available to City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, its City Council, its officers, officials,
employees, agents, and volunteers are to be covered as additional insureds with
respect to liability arising out of work or operations performed by or on behalf of the
Contractor including materials, parts, equipment, and personnel furnished in
connection with such work or operations.
2. CGL, AL, and WC policies: Insurance company(ies) agrees to waive all rights of
subrogation against City, its City Council, its officers, officials, employees, agents,
and volunteers for losses paid under the terms of any policy which arise from work
performed by Contractor for City.
3. All required insurance policies: For any claims related to this contract, Contractor's
insurance coverage shall be primary and any insurance maintained by City, its City
Council, its officers, officials, employees, agents, or volunteers shall not contribute
with it.
4. All required insurance policies: A severability of interest provision must apply for all
the additional insureds, ensuring that Contractor's insurance shall apply separately to
each insured against whom a claim is made or suit is brought, except with respect to
the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be
canceled, suspended, voided, reduced in coverage or in limits, non-renewed by the
carrier, or materially changed except after thirty (30) days prior written notice has
been given to City. Ten (10) days prior written notice shall be provided to City for
policy cancellation or non-renewal due to non-payment.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa
Ana, Attention: Jaime Arias, 215 S. Center St., M-85, Santa Ana, CA 92703. The
name and location of the event should be included in the Description of Operations
section of each certificate.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. City may require
Contractor to purchase coverage with a lower retention or provide proof of ability to pay
losses and related investigations, claim administration, and defense expenses within the
retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of
California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable
to City.
Verification of Coverage
Contractor shall furnish City with original Certificates of Insurance including all required
amendatory endorsements (or copies of the applicable policy language effecting coverage
required by this clause) and a copy of the Declarations and Endorsement Page of the CGL
policy listing all policy endorsements to Entity before work begins. However, failure to obtain
the required documents prior to the work beginning shall not waive Contractor's obligation to
provide them. City reserves the right to require complete, certified copies of all required
insurance policies, including endorsements required by these specifications, at any time.
Claims Made Policies
If any of the required policies provide coverage on a claims-made basis:
1. The retroactive date must be shown and must be before the date of the contract or the
beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at least
three (3) years after completion of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made
policy form with a retroactive date prior to the contract effective date, Contractor must
purchase "extended reporting" coverage for a minimum of three (3) years after completion of
work.
Subcontractors
Contractor shall require and verify that all sub-contractors maintain insurance
meeting all the requirements stated herein, and Contractor shall ensure that City
is an additional insured on insurance required from sub-contractors.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of
the risk, prior experience, insurer, coverage, or other special circumstances.
Exhibit 4
AGREEMENT WITH WEST COAST ENERGY SYSTEMS, LLC TO PROVIDE ON
CALL GENERATOR MAINTENANCE AND REPAIR SERVICES FOR THE CITY OF
SANTA ANA
THIS AGREEMENT is made and entered into on this 4ch day of August, 2026 by and
between West Coast Energy Systems, LLC ("Contractor"), and the City of Santa Ana, a charter
city and municipal corporation organized and existing under the Constitution and laws of the State
of California("City").
RECITALS
A. On June 2, 2026 the City issued Request for Proposals No. 26-075, by which it sought
Contractors to provide on-call generator maintenance and repair services on behalf of the
City of Santa Ana's Public Works Agency.
B. Contractor submitted a responsive proposal that was among those selected by the City.
Contractor represents that it is able and willing to provide the services described in the
scope of work that was included in RFP No. 26-075.
C. Contractor was selected as one of four (4) vendors which qualified for this engagement.
Only those Contractors approved by the City Council on August 4, 2026 shall be eligible
to be engaged by the City for these services.
C. In undertaking the performance of this Agreement, Contractor represents that it is
knowledgeable in its field and that any services performed by Contractor under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Contractor shall perform during the term of this Agreement, the tasks and obligations
including all labor, materials, tools, equipment, and incidental customary work required to fully
and adequately complete the services described and set forth in Exhibit A, attached hereto and
incorporated by reference.
2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to
Contractor shall be paid only for actual services performed under this Agreement at the
rates and charges identified in Exhibit B. Contractor is one of four (4) Contractors
selected under RFP 26-075. The total aggregate compensation amount shall not
exceed Five Hundred and Seventy-Five Thousand($575,000) during the term of the
Agreement, including any extension periods.
Page 1 of 8
b. Payment by City shall be made within forty-five (45) days following receipt of proper
invoice evidencing work performed, subject to City accounting procedures. City and
Contractor agree that all payments due and owing under this Agreement shall be made
through Automated Clearing House (ACH)transfers. Contractor agrees to execute the
City's standard ACH Vendor Payment Authorization and provide required
documentation. Upon verification of the data provided, the City will be authorized to
deposit payments directly into Contractor's account(s) with financial institutions.
Payment need not be made for work which fails to meet the standards of performance
set forth in the Recitals which may reasonably be expected by City.
3. TERM
This Agreement shall commence on August 4, 2026 for a one-year term with the option for
the City to grant up to four(4), one-year extensions, exercisable by a writing by the City Manager
and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an
independent Contractor and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer-employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Contractor
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Contractor shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Contractor shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or
caused to be prepared by Contractor under this Agreement ("Documents & Data"). Contractor
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Contractor represents and warrants that Contractor has the legal right to license any and all
Documents & Data. Contractor makes no such representation and warranty in regard to
Documents & Data which were provided to Contractor by the City. City shall not be limited in
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
Page 2 of 8
6. INSURANCE
Insurance requirements are attached hereto as Exhibit C and incorporated by reference.
7. INDEMNIFICATION
Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers,
agents, employees, contractors, special counsel, and representatives from liability: (1)for personal
injury, damages,just compensation,restitution,judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
negligent operations of the Contractor, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section 1 of this Agreement; and(2)
from any claim that personal injury, damages,just compensation, restitution,judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages,just compensation,restitution,judicial
or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in
this Section or by reason of the terms of, or effects, arising from this Agreement. The Contractor
further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including
fees and costs for special counsel to be selected by the City, regarding any action by a third party
challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution,judicial or equitable relief due to personal or property rights arises by
reason of the terms of, or effects arising from this Agreement. City may make all reasonable
decisions with respect to its representation in any legal proceeding.Notwithstanding the foregoing,
to the extent Contractor's services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of,
pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Contractor shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
letters patent,trademark, or copyright infringement,including costs,contained in the work product
or documents provided by Contractor to the City pursuant to this Agreement.
9. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed
under this Agreement. Contractor shall maintain complete and accurate records with respect to the
costs incurred under this Agreement and any services, expenditures, and disbursements charged to
the City for a minimum period of three (3) years, or for any longer period required by law, from
the date of final payment to Contractor under this Agreement. All such records and invoices shall
be clearly identifiable. Contractor shall allow a representative of the City to examine, audit, and
make transcripts or copies of such records and any other documents created pursuant to this
Agreement during regular business hours. Contractor shall allow inspection of all work, data,
documents, proceedings, and activities related to this Agreement for a period of three (3) years
Page 3 of 8
from the date of final payment to Contractor under this Agreement.
10. CONFIDENTIALITY
If Contractor receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Contractor agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the same degree of care it uses to protect its own information of like
importance,but in no event less than reasonable care. "Confidential Information"shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that(a)has been disclosed in publicly available sources; (b)is, through no fault of the
Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Contractor without reference to information disclosed by the
City.
11. CONFLICT OF INTEREST CLAUSE
a. Contractor covenants that it presently has no interests and shall not have interests,direct
or indirect,which would conflict in any manner with performance of services specified
under this Agreement.
b. No immediate family members of either the Mayor, City Council Member, or any
appointed City Official, including appointed board and commission members, as
defined under the City's Municipal Code, whose position with the City shall award or
influence the award of this Agreement, or any competing contract or amendment
thereof, shall be employed in any capacity by the Contractor or have any other direct
or indirect financial benefit or interest in this Agreement.
c. The section also prohibits the awarding of any agreement, contract, grant, or any
amendment to those awards, to any former full-time employee for one-year from date
of employee separation except for any CalPERS retiree as authorized by City Council
resolution
d. The Contractor must comply with all conflict of interest laws, ordinances, and
regulations now in effect or hereafter to be enacted during the term of this Agreement.
The Contractor warrants that it is not now aware of any facts which conflict with the
prohibitions defined above. If the Contractor hereafter becomes aware of any facts that
might reasonably be expected to create a conflict of interest, it must immediately make
full written disclosure of such facts to the City. Full written disclosure must include,
but is not limited to, identification of all persons implicated and a complete description
of all relevant circumstances. Failure to comply with the provisions of this paragraph
will be a material breach of this Agreement.
Page 4 of 8
e. Contractor covenants that none of its directors, officers, employees, or agents shall
participate in selecting or administrating any subcontract supported(in whole or in part)
by City funds stemming from the Agreement where the awarding of the subcontract
has any direct or indirect financial benefit or interest to any individual, as defined in
subsections (b) and(c) above.
12. NON-DISCRIMINATION
Contractor shall not discriminate because of race, color, creed, religion, sex, marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization,
promotion, termination or other employment related activities or any services provided under this
Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Contractor, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto, the terms
of this Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Contractor. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other Contractor retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor
compensation for all services performed by Contractor prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Contractor to
Page 5 of 8
deliver to the City all work product(s) completed as of such date, and in such case
such work product shall be the property of the City unless prohibited by law, and
Contractor consents to the City's use thereof for such purposes as the City deems
appropriate.
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure,right or remedy. No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION-VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza(M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Page 6 of 8
Fax: 714- 647-6956
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza(M-21)
P.O. Box 1988
Santa Ana, California 92702
To Contractor:
West Coast Energy Systems, LLC
Attn: Andrew Barth
Director of Aftermarket Sales &Rentals
7 Latitude Way
Corona, CA 92881
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24) hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this Agreement.
[Signature Page to Follow]
Page 7 of 8
SIGNATURE PAGE TO AGREEMENT WITH WEST COAST ENERGY SYSTEMS,LLC
TO PROVIDE ON CALL GENERATOR MAINTENANCE AND REPAIR SERVICES
FOR THE CITY OF SANTA ANA
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nunez
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO WEST COAST ENERGY SYSTEMS,
City Attorney LLC
By: 6
Kyle llesen Andrew Barth
Assistant City Attorney Director of Aftermarket Sales & Rentals
RECOMMENDED FOR APPROVAL:
DN en Digitally signed by Rod olfo Rosas
Rodolfo Rosas""i""odolfoRosas."mall.... =�=anta-
a.org,—U5
Date:2026,07.20 14:22:14-07'00'
Rodolfo Rosas, P.E.
Acting Executive Director
Public Works Agency
Page 8 of 8
EXHIBIT A
CITY OF SANTA ANA
EXHIBIT 1 -
SCOPE OF SERVICES
1. Description of Work:
The City of Santa Ana is requesting proposals for the purpose of providing preventative
maintenance service visits, on-call diagnostic and repair services, and emergency repair
services to various generators within the City. The manufacturers of the City's existing
generators include Caterpillar, Cummins, and Perkins. Proposers shall be fully experienced,
licensed, and equipped to perform the work specified and required herein.
All work performed shall be in compliance with the National Fire Protection Association (NFPA)
70 National Electrical Code, NFPA 110 Standard for Emergency, Standby Power Systems, and
CaIOSHA safety requirements as well as other applicable federal, state, and local codes. The
Contractor(s) shall provide all necessary labor, materials, tools, supervision, transportation and
equipment to perform services specified herein.
2. Normal Operating Hours
Monday through Friday, 7:00 AM to 5:00 PM
Operating hours are subject to change and the City will communicate all changes in advance
with the Contractor(s).
3. Emergency Service Request
The Contractor(s) must be available to receive the City's emergency service request twenty-
four (24) hours a day, seven (7) days a week.
In the event of a generator failure or malfunction, the Contractor must respond within four (4)
hours of receiving emergency service request from the City.
The Contractor's service technician is required to be on-site to commence work within eight (8)
hours of initial contact, if the event has been deemed by the City to be an emergency. The
response time may be waived by the City if service can wait to be performed during the City's
normal business hours.
4. Parts. Materials. and Warranties
All parts, repairs, and/or fluid changing must be done with parts and fluids that meet or exceed
the manufacturer's recommendations. All replacement parts shall be new and of the same
quality and brand name as those being replaced; OEM parts are preferred. Substitutions will
be permitted only with prior authorization from the City.
Upon contract execution, the City will finalize the list and quantity of parts that the Contractors
must have available on-hand at all times to avoid potential delays in performing the work
required during the term of the contract. If the Contractor is unable to stock certain items at all
times and must special order them on a project basis, they will submit the lead time for
procurement to the City for review and approval. All material markup must not exceed 10%
percent above Contractor's cost when charged back to the City.
(9)
CITY OF SANTA ANA
All work performed will carry a minimum one-year warranty on parts
and labor. The Contractors shall properly dispose of used oil, fluids, and filters generated by its
services off-site, leaving the job site environmentally clean.
5. Price, Schedule, and Invoice
Awarded Contractor(s) shall provide quotes and project schedules with pricing in accordance
with their submitted rates upon request by the City. The quote will include, but is not limited to
summary of anticipated tasks, anticipated project time of completion, hourly rate, rates for
materials, and oversized equipment rates on a project by project basis for the City's review and
approval. Any special materials as required for the work to be purchased by the Contractor may
only occur after formal discussion and approved in writing by the City.
Contractor(s) shall coordinate all scheduled services at least five (5) business days in advance
with the City's Water Services Superintendent. Contractors shall invoice the City on a monthly
basis for all work performed during the period or provide a one-time invoice at the completion of
work issued. Each invoice shall include as information as required on the quote and be
accompanied by a summary of tasks performed, results and progress on long-term tasks if any,
and agreement number.
6. Preventative Maintenance
All testing and maintenance services will be scheduled in advance with the City.
Upon request from the City, the Contractor shall perform preventative maintenance as specified
below. The Contractor shall maintain service reports on all maintenance and repairs, and shall
provide a copy of the service report to the City upon request. In addition to Contractor's self-
generated service reports, the Contractor is required to complete the City's own form and submit
back to the City after work is completed.
Contractor shall stop work and immediately notify City personnel of conditions that do not
conform to applicable codes and/or pose a safety hazard should they encounter them while
performing preventative maintenance. Contractor shall ensure all work performed on electrical
power generation and transfer equipment shall be accomplished under the technical
management of a qualified electrical licensed contractor.
A. Tier I: Preventative Maintenance Services (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier I Preventative Maintenance Services and shall at a
minimum include checking the following:
i. Fuel (Check main and day tank fuel supply levels; day tank float switch; piping,
hoses and connectors; operating fuel pressure; and for any obstructions to tank
vents and overflow piping)
ii. Lubrication system (Check for proper oil level and oil operating pressure; Tube
oil heater)
iii. Cooling system (Check coolant level, water pump(s), jacket water heater,
belts, hoses, fan)
iv. Exhaust system (Check drain condensate trap and for possible leakage)
CITY OF SANTA ANA
V. Battery System (Look for possible corrosion; check specific gravity, electrolyte
level and battery charger — maintenance-free batteries require routine visual
inspection and maintenance in accordance with manufacturer's instructions)
vi. Electrical system (Conduct a general inspection of wiring and connections;
check circuit breakers/fuses)
vii. Prime Mover/Generator (Check for debris, foreign objects, loose or broken
fittings; check guards and components; look for any unusual condition of
vibration, leakage, noise, temperature or deterioration)
viii. Thirty (30) Minute Load Test (Contractor shall carry out 30-minute generator
load tests and run the generator at 30% for a minimum of 30 minutes. If a
generator does not"pass" the load test consistently then Contractor will ask the
City of Santa Ana if a resistive load bank test should be performed.)
Within five (5) business days of completing a load test on a generator and maintenance
inspection services, Contractor shall provide a completed Tier 1: Generator 30-Minute
Load Test Form, the approved form is provided as Exhibit 6 to the City. The Contractor
shall state all findings, along with a proposed scope of work and complete cost
estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
B. Tier II: Preventative Maintenance Service (refer to Attachment A-1: Fee Schedule)
Contractor shall perform Tier II Preventative Maintenance Services and shall at a
minimum include checking the items listed below. In addition to the items listed below
and in Exhibit 7 Tier II Generator Inspection and Preventative Maintenance Checklist,
the Tier II visit shall include a full change of engine oil and filter, along with a battery and
coolant replacement if necessary, and an optional two (2) hours load bank test or a four
(4) hours load bank test. When applicable, the Contractor shall perform automatic
transfer switch (ATS) testing in accordance with current NFPA 110 standards.
L COOLING SYSTEM
1. Inspect radiator exchanger
2. Check coolant level
3. Glycol check of coolant (freezing point) (Results must be turned in)
4. Inspect all hoses and connections
5. Inspect fan drive pulley and fan
6. Inspect fan belts
7. Check jacket water heater
8. Inspect water pump
9. Inspect thermostats
ii. FUEL SYSTEM
1. Inspect fuel tank
2. Change fuel/water separator strainers
3. Inspect all fuel lines and connections
4. Inspect governor and controls
5. Change all fuel filters
6. Check fuel pressure
7. Test fuel in tanks for water(results must be turned in)
CITY OF SANTA ANA
iii. AIR INTAKE & EXHAUST SYSTEM
1. Change air filters as needed (At the discretion of the City)
2. Check air filter service indicator
3. Inspect air inlet system
4. Inspect turbocharger
5. Check exhaust manifold
6. Inspect exhaust system
iv. ENGINE MONITORS & SAFETY CONTROLS
1. Check all gauges
2. Check all safety controls
3. Check remote enunciators & alarms
v. LUBE OIL SYSTEM
1. Check oil level
2. Change all oil filters
3. Check oil pressure
4. Inspect crankcase breather
5. Check for any leaks
6. Take sample of existing oil (results must be turned in)
7. Change oil
vi. STARTING SYSTEM
1. Inspect batteries, terminals & connections
2. Check specific gravity of batteries (results must be turned in)
3. Perform load test on batteries (results must be turned in)
4. Inspect battery charger
5. Inspect starting motor
6. Inspect alternator
vii. GENERATOR
1. Inspect bearings
2. Check vibration isolators
3. Inspect control panel
4. Check start controls
5. Check voltmeter
6. Check ammeter
7. Check frequency meter
8. Check circuit breaker
viii. TRANSFER SWITCH
1. Inspect all connections (retighten if necessary)
2. Inspect wiring for brittle or burn marks
3. Inspect all switches
ix. LOAD BANK TEST
1. Option for a 2-Hour Load Test
2. Or an option for a 4-Hour Load Test
CITY OF SANTA ANA
x. PROVIDE WRITTEN DOCUMENTATION OF ALL WORK PERFORMED
1. Oil Test Results (results must be turned in)
2. Diagnostic Procedures and Results
Within five (5) business days of completing the Tier II Preventative Maintenance Service,
the Contractor shall provide a completed Tier II: Generator Inspection and Preventative
Maintenance Checklist Form, the approved form is provided as Exhibit 7 to the City. The
Contractor shall state all findings, along with a proposed scope of work and complete
cost estimate for any recommended equipment repairs and/or replacement if necessary.
Alternative reporting forms may be used if approved by the City.
7. Automatic Transfer Switch (ATS)
Contractor shall perform a visual inspection only of the Automatic Transfer Switch (ATS)
associated with each City generator during scheduled maintenance visits. Contractor shall inspect
the exterior and readily accessible portions of the ATS for visible signs of damage, corrosion,
moisture intrusion, overheating, loose or missing hardware, abnormal indicator lights or alarms,
and other observable deficiencies that may affect reliable operation. Contractor shall document
all findings and notify the City of any conditions requiring further evaluation or corrective action.
Contractor shall not perform ATS maintenance, repairs, installation, operational testing,
exercising, switching, calibration, adjustments, or any work requiring manipulation of the ATS
unless specifically authorized in writing by the City.
8. Fueling
The City may, at its sole discretion, require the Contractor to provide fueling services for City
generators as part of maintenance and repair activities or during emergency response situations.
Contractor shall furnish and deliver fuel as directed by the City and shall provide documentation
supporting the cost of fuel upon request. Fueling markup shall not exceed ten percent (10%)
above the Contractor's actual cost when invoiced to the City.
9. On-Call Services
Contractor shall provide on-call generator repair services for all City generators at an hourly rate
that aligns with their submitted fee schedule(s). All repair services will require an estimate being
submitted to the City for approval prior to any work being performed by the Contractor.
A service report is to be completed by the Contractor's technician and the report is to be provided
to City personnel upon completion of the request.
Any on-call work carried out by the Contractor that requires taking a generator offline for testing
or repairs requires prior approval from the City. Should a generator need to be taken offline
temporarily, it may not be left unattended by the Contractor's personnel. The Contractor must
remain on-site until the generator is successfully returned online to normal operation.
Contractors must provide technical and engineering support upon request from the City for
generators manufactured by but not limited to Caterpillar, Cummins, and Perkins.
(9)
CITY OF SANTA ANA
10. VALUE ADDED RELATED SERVICES
Contractors may propose additional related services that the City has not specifically identified
in this RFP to accomplish the stated goals of this RFP. Value added related services will be
considered by the City and may or may not be incorporated in the agreement.
EXHIBIT B
CITY OF SANTA ANA
ATTACHMENT A-1 -
FEE SCHEDULE
Contractors shall complete Attachment A-1: Fee Schedule and provide pricing on a per visit basis
in accordance with Tier I and Tier II Preventative Maintenance Services as specified in this RFP.
Furthermore, Contractors shall submit their own fee schedule for additional labor, material and
equipment rates as a separate form. This additional fee schedule shall list rates for all labor
designations, equipment and materials.
Cost for preventative maintenance services (Tiers I and II) must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Item Subtotal Tier Subtotal Tier I,
No. Location UOM QTY Tier I Tier II I&II Tier II (add on') II,&Add-On
1 Segerstrom Station EA 1 $470 $1830 $ 2300 $ 1000 $ 3300
2 West Station EA 1 $560 $3760 $ 4320 $ 1000 $ 5320
3 East Station EA 1 $560 $3760 $ 4320 $ 1000 $ 5320
4 John EA 1
Station ion $510 $2210 $2720 $ 1000 $ 3720
5 Walnut Station EA 1 $560 $2900 $ 3460 $ 1000 $ 4460
6 Maxine Station EA 1 $470 $1320 $ 1790 $ 1000 $ 2790
7 Well 40 EA 1 $560 $2900 $ 3460 $ 1000 $ 4460
TOTAL $ 22370 $7000 $ 29370
*Add-On Services are a full change of engine oil and filter, battery and coolant replacement, and a two
(2) hours load bank test and a four (4) hours load bank test. Cost must be inclusive of all labor, materials,
tools, supervision, transportation, and equipment.
Please also provide unit priicin for each add-on service for Tier II based on qenerator by location.
Item Segerstrom West East John Walnut Maxine
No. Description Station Station Station Garthe Station Station Well40
Station
8 Engine oil and filter $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0
change
Battery and coolant
s re lacement $ 700 $700 $ 700 $ 700 $700 $700 $700
Two(2)hours load bank
1 o test $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0
Four(4)hours load
11 bank test $300 $300 $ 300 $ 300 $300 $300 $ 300
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
(9) CITY OF SANTA ANA
On-Call Repair Services
12 Hourly Rate HR 1 $200
13 OT Hourly Rate HR 1 $300
14 Weekends/Holidays Hourly Rate HR 1 $400
15 OT Weekends/Holidays Hourly Rate HR 1 $400
16 Trip Fee/Truck Charge EA 1 $3.40/mi
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
EXHIBIT C
Contractor shall procure and maintain for the duration of the agreement, the following insurance
coverages:
MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts and shall
be at least as broad as:
• Commercial General Liability(CGL): Insurance Services Office Form CG 00 01 covering
CGL on an "occurrence" basis, including products and completed operations, property
damage, bodily injury and personal &advertising injury with limits no less than $1,000,000
per occurrence and $2,000,000 aggregate.
• Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1
(any auto), with combined single limits of $1,000,000. In the event Contractor does not
maintain commercial automobile liability insurance, City will accept evidence of personal
automobile insurance, provided that such policy is endorsed for business use and provides
coverage with a minimum limit of $1,000,000. Required policy limits can be met with
primary and umbrella/excess insurance policies.
• Workers' Compensation (WC): as required by the State of California, with statutory
limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per
accident, per employee, per policy for bodily injury or disease. This requirement can be
waived if Contractor has no employees. Contractor attests that its workers' compensation
coverage extends to all persons who will be working with the City under the agreed scope
of services.
If Contractor maintains broader coverage and/or higher limits than the minimums shown
above, City requires and shall be entitled to the broader coverage and/or the higher limits
maintained by Contractor. Any available insurance proceeds in excess of the specified
minimum limits of insurance and coverage shall be available to City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, its City Council, its officers, officials,
employees, agents, and volunteers are to be covered as additional insureds with
respect to liability arising out of work or operations performed by or on behalf of the
Contractor including materials, parts, equipment, and personnel furnished in
connection with such work or operations.
2. CGL, AL, and WC policies: Insurance company(ies) agrees to waive all rights of
subrogation against City, its City Council, its officers, officials, employees, agents,
and volunteers for losses paid under the terms of any policy which arise from work
performed by Contractor for City.
3. All required insurance policies: For any claims related to this contract, Contractor's
insurance coverage shall be primary and any insurance maintained by City, its City
Council, its officers, officials, employees, agents, or volunteers shall not contribute
with it.
4. All required insurance policies: A severability of interest provision must apply for all
the additional insureds, ensuring that Contractor's insurance shall apply separately to
each insured against whom a claim is made or suit is brought, except with respect to
the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be
canceled, suspended, voided, reduced in coverage or in limits, non-renewed by the
carrier, or materially changed except after thirty (30) days prior written notice has
been given to City. Ten (10) days prior written notice shall be provided to City for
policy cancellation or non-renewal due to non-payment.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa
Ana, Attention: Jaime Arias, 215 S. Center St., M-85, Santa Ana, CA 92703. The
name and location of the event should be included in the Description of Operations
section of each certificate.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. City may require
Contractor to purchase coverage with a lower retention or provide proof of ability to pay
losses and related investigations, claim administration, and defense expenses within the
retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of
California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable
to City.
Verification of Coverage
Contractor shall furnish City with original Certificates of Insurance including all required
amendatory endorsements (or copies of the applicable policy language effecting coverage
required by this clause) and a copy of the Declarations and Endorsement Page of the CGL
policy listing all policy endorsements to Entity before work begins. However, failure to obtain
the required documents prior to the work beginning shall not waive Contractor's obligation to
provide them. City reserves the right to require complete, certified copies of all required
insurance policies, including endorsements required by these specifications, at any time.
Claims Made Policies
If any of the required policies provide coverage on a claims-made basis:
1. The retroactive date must be shown and must be before the date of the contract or the
beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at least
three (3) years after completion of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made
policy form with a retroactive date prior to the contract effective date, Contractor must
purchase "extended reporting" coverage for a minimum of three (3) years after completion of
work.
Subcontractors
Contractor shall require and verify that all sub-contractors maintain insurance
meeting all the requirements stated herein, and Contractor shall ensure that City
is an additional insured on insurance required from sub-contractors.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of
the risk, prior experience, insurer, coverage, or other special circumstances.