City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
September 15, 2026
TOPIC: Award a Contract to Legion Contractors, Inc. for the Construction of Memory
Lane and Flower Street Improvements Project
AGENDA TITLE
Award of a Construction Contract to Legion Contractors, Inc. for the Memory Lane and
Flower Street Improvements Project (No. 23-6037) (General Fund & Non-General Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment recognizing $4,550,000 in the Active
Transportation Program, State Grant-Direct (14817002-52025) revenue account
and appropriate the same amount into the Active Transportation Program,
Improvements Other than Building (14817613-66220) expenditure account.
(Requires five affirmative votes)
2. Approve an amendment to the Fiscal Year 2026-2027 Capital Improvement
Program to include an additional $4,550,000 in construction funds for the
Memory Lane and Flower Street Improvements Project (No. 23-6037).
3. Approve the Project Cost Analysis for a total estimated construction delivery cost
of$6,008,510, which includes $4,806,808 for the construction contract, $721,021
for contract administration, inspection, and testing, and $480,681 for
unanticipated or unforeseen work.
4. Award a construction contract to Legion Contractors, Inc., the lowest responsible
bidder, in accordance with the base bid in the amount of$4,806,808, subject to
change orders, for construction of the Memory Lane and Flower Street
Improvements Project (No. 23-6037), for a term beginning September 15, 2026
and authorize the City Manager to execute the contract.
5. Determine that, pursuant to the California Environmental Quality Act, the
recommended actions are exempt from further review. Categorical Exemption
Environmental Review No. 2023-118 will be filed for Project No. 23-6037.
GOVERNMENT CODE 484308 APPLIES: No
Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and
Flower Street Improvements Project
September 15, 2026
Page 2
DISCUSSION
The Public Works Agency (PWA) is responsible for managing the City's roads and
transportation network which include arterial, residential, alley, and industrial streets.
The planning and improvements of this network are guided by the City's General Plan
Mobility Element, Active Transportation Plan, and Pavement Management Program.
Together, these plans and programs establish priorities for improving mobility and
safety, expanding pedestrian and bicycle connectivity, and maintaining roadway
infrastructure through data-driven pavement management. Consistent with these
priorities, PWA identified and recommends street and multimodal improvements along
Memory Lane and Flower Street (Exhibit 1).
The Memory Lane and Flower Street project limits include roadway segments in poor to
fair condition. The Pavement Condition Index (PCI), which evaluates pavement
conditions on a scale from 0-100, identifies PCI values of 56 along Flower Street from
Memory Lane to Santiago Creek and 62 along Memory Lane from the Santa Ana River
to Flower Street. No major rehabilitation has occurred within the project limits since the
year 2000. Existing deficiencies include deteriorated pavement, curbs, gutters,
sidewalks, driveways, and curb ramps. Additionally, the project area has been the
subject of community safety concerns related to speeding, pedestrian crossings, bicycle
related collisions, and unlawful driver behaviors.
Since 2017, PWA staff have actively engaged with the Morrison Park and Fisher Park
Neighborhood Associations through 15 community meetings to discuss traffic safety
concerns, evaluate potential improvements along the project corridor, and to provide
updates on the project's design and development. Community feedback received
through these meetings helped inform the proposed safety and mobility improvements
included in the final project design.
One of the primary safety concerns identified by residents involves the intersection of
Memory Lane and Flower Street, where unsafe turning movements and vehicle
spinouts, commonly referred to as "donuts," have been reported. In response, staff
developed design features that modify the intersection geometry and reduce the
available roadway area to physically constrain and discourage these unsafe vehicle
movements. Because the proposed design incorporates unique geometric features,
staff worked closely with residents from both neighborhoods throughout the design
process. Although initial opinions regarding the proposed improvements varied, staff
developed and presented multiple design concepts based on community feedback,
ultimately reaching consensus on the design incorporated into the Project.
The Memory Lane and Flower Street Improvements Project (Project No. 23-6037) will
improve street pavement through the reconstruction and rehabilitation of roadway
pavement (both asphalt and Portland Cement Concrete), repair of concrete
infrastructure, landscaping, and irrigation. It will also enhance pedestrian and bicycle
Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and
Flower Street Improvements Project
September 15, 2026
Page 3
safety through the installation of bulb-outs and protected bike lanes in both directions of
travel. Pedestrian facility improvements will comply with the Americans with Disabilities
Act (ADA) standards.
The project incorporates traffic safety improvements, including modifications to the
existing traffic signal at the intersection of Bristol Street and Memory Lane, the
installation of rectangular rapid flashing beacons (RRFBs) paired with raised crosswalks
at the intersections of Memory Lane and Westwood Avenue and at Flower Street and
Sharon Road, and upgraded traffic striping and pavement markings to improve roadway
visibility and guide all users safely through the corridor. Additionally, the project will
install drought-tolerant landscaping and irrigation at island buffers within the corridor.
Once completed, these improvements will enhance overall safety, ride quality, and the
visual appearance of the street corridor.
Grant Funding
Given the cost and scale of the proposed improvements, PWA pursued funding through
multiple competitive grant programs. Following unsuccessful applications to the Active
Transportation Program (ATP) and Bicycle Corridor Improvement Program (BCIP) in
2018, staff submitted a subsequent ATP application on July 14, 2022. On June 28,
2023, the California Department of Transportation (Caltrans) notified the City that the
Project had been selected for funding. The ATP award provides funding for
environmental, design, and construction activities, including traffic signal modifications,
enhanced and raised crosswalks, reduced curb-return radii, ADA-compliant curb ramps,
and Class II and Class IV bicycle facilities. Funding for the design phase was previously
approved by the City Council as part of the Fiscal Year 2023-24 Capital Improvement
Program. Through this staff report, staff recommends recognizing $4,550,000 in ATP
construction funding and amending the Fiscal Year 2026-27 Capital Improvement
Program accordingly. The grant requires the Project to be completed by January 31,
2028.
Project Advertisement and Contractor Procurement
To provide an opportunity for local vendors to submit bids, the City notified a total of
3,137 regional vendors via PlanetBids, many of which are Santa Ana based.
Furthermore, staff specifically reached out to Santa Ana vendors to encourage their
participation in bids. A total of seven (7) bids were received. Zero (0) bids were
received from Santa Ana contractors.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on June 12, 2026. The project was also advertised in PlanetBids from June
9, 2026 to June 30, 2026. Bids were received electronically via PlanetBids on June 30,
2026. No bid protest was submitted by any of the bidders during the bid protest period.
Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and
Flower Street Improvements Project
September 15, 2026
Page 4
Copies of construction plans, contracts, specifications, and all related reference
materials (such as The Greenbook) are available for public review at the Public Works
Agency Central Files office located in City Hall.
Bid Results Summary
RANK BIDDER'S NAME LOCATION BID
1 Legion Contractors, Inc. Los Angeles, CA $4,806,808.00
2 U.S. Builders & Consultants Irvine, CA $5,044,800.00
3 Aster Construction Services, Los Angeles, CA $5,101,201.06
1 nc.
4 Hardy & Harper, Inc. Lake Forest, CA $5,150,000.00
5 Westcoast Public Works, Inc. Woodland Hills, CA $5,601,421.00
6 Vido Samarzich, Inc. Santa Ana, CA $5,675,000.00
7 Excel Paving Co. Long Beach, CA $6,148,565.00
A total of seven (7) bids were received and deemed responsive. Legion Contractors,
Inc. submitted the lowest responsive bid in the amount of$4,806,808.00 (Exhibit
2). Following review of the bid and contractor references, staff recommends awarding
the construction contract to Legion Contractors, Inc. (Exhibit 3).
Legion Contractors, Inc. has successfully completed projects as a prime contractor in
the City of Santa Ana within the past two years, including Outdoor Library at Jerome
Park and Bristol-Tolliver Street Urban Greening Project. Based on the contractor's
satisfactory performance on these projects, staff recommends awarding the
construction contract to Legion Contractors, Inc. for the construction of the project.
Project Delivery
In addition to the construction contract, the total project delivery cost includes a budget
allocation for construction administration, inspection, and testing. Construction
administration and inspection may be performed by either staff or consultants and
includes construction management, inspection of the contractor's work for compliance
with contract requirements and quality standards, materials testing, and administration
of applicable labor compliance requirements.
As indicated in the Cost Analysis and as summarized in the table below, the estimated
total construction delivery cost of the project is $6,008,510.
Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and
Flower Street Improvements Project
September 15, 2026
Page 5
Project Item Total
Construction Contract Bid Amount $4,806,808
Construction Administration $384,545
Ins ection $240,340
Testing $96,136
Unanticipated or Unforeseen Work $480,681
TOTAL ESTIMATED CONSTRUCTION DELIVERY
COST $6,008,510
Project Schedule and Contract Time
The project completion date is June 2027, barring unforeseeable conditions such as
rain, natural disasters, or other delays beyond the control of the City and of the
Contractor. The contract time for this project is 120 working days, as specified in the bid
documents. Working days are counted in accordance with the City's Standard
Specifications, which exclude weekends, City-observed holidays, and inclement
weather days that prevent work.
The projected completion dates based on the schedule is June 2027, which is within the
allotted 120 working days. If the contractor fails to deliver on time, they will be assessed
a penalty of$5,200 per calendar day as specified in the bid documents.
The actual completion date will depend on the contractor's construction schedule,
material procurement lead times, field conditions, and unforeseen delays. The
anticipated project schedule is summarized below;
Project Milestones
Milestone Estimated Notes
Completion Date
Administrative Startup September 2026 Contract execution, bonds,
insurance
Material Procurement December 2026 Procurement may take place
concurrently with construction.
Contractor Mobilization November 2026 Start of construction activities
Project Completion June 2027 Based on 120 working days
Project Phasing
The Project will be constructed in a single phase in accordance with the scope of work
established in the contract documents. The contractor will be responsible for scheduling
and sequencing construction activities based on their proposed means and methods
and within the contract time specified in the bid documents.
Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and
Flower Street Improvements Project
September 15, 2026
Page 6
Public Outreach
During the Project's planning and design phases, City staff met with the Morrison Park
and Fisher Park Neighborhood Associations to present proposed improvements,
provide project updates, and collect community input, as described above. Upon
Council approval of recommended actions and prior to start of construction, Staff will
notify area residents and businesses of upcoming construction activities and distribute
informational materials and mail post cards identifying project information and resources
for questions and concerns. Staff will also attend future Neighborhood Association
meetings to provide an update on the project.
The contractor is required to issue construction notices to adjacent residents and
businesses at least two weeks before construction begins. The contractor will also
install signage at the project site indicating project details and appropriate contact
information.
ENVIRONMENTAL IMPACT
Pursuant to the California Environmental Quality Act (CEQA), the recommended actions
are exempt from further review pursuant to Section 15301(b) and 15301(c) of the CEQA
Guidelines for projects consisting of repair and maintenance of existing public facilities
and existing highways, streets, sidewalks, gutters, bicycle and pedestrian trails, and
similar facilities. The proposed project continues to meet these parameters of the CEQA
Guidelines, and Categorical Exemption Environmental Review No. ER-2023-118 will be
filed for Project 23-6037 (Exhibit 4).
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $6,008,510. With the approval of the requested appropriation adjustments, all
funds are available for expenditure in Fiscal Year 2026-27. Any remaining balances not
expended at the end of the fiscal year will be presented to City Council for approval of
carryovers into Fiscal Year 2027-2028.
The proposed contract authorizes staff a maximum of 10% in construction contract
change orders for unanticipated or unforeseen work. Staff will return to City Council for
authorization and appropriation of additional funding if necessary.
With the approval of the requested appropriation adjustment, $4,550,000 in Active
Transportation Program grant funds will be recognized in the Traffic System
Management Grant, State Grant-Direct revenue account (No. 14817002-52025) and
appropriated for spending into the Active Transportation Program, Improvements Other
than Building, Account (No. 14817613-66220).
Approval of the requests to reallocate funds will provide a total of $683,037 in unspent
funds from Project 26-6716.
Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and
Flower Street Improvements Project
September 15, 2026
Page 7
Funds were budgeted and available in the following account(s) for use in Fiscal Year
2026-2027 and will be carried forward for use in Fiscal Year 2027-2028, subject to City
Council approval of the carryover.
Accounting
Fiscal Unit—Account Fund Accounting Unit, Amount
Year No. Description Account Description
Project No.
CURRENT BUDGET
PW-Traffic/Trans
2025-26 01117620-66220 General Fund Service Enhancement, $775,473
(23-6037) Improvements Other
Than Building
APPROPRIATION ADJUSTMENT
Traffic System Active Transportation
2026-27 14817613-66220 Management Program, $4,550,000
(23-6037) Grant Improvements Other
Than Building
REALLOCATION
05917665-66220 Select Street HUTA Gas Tax-
2025-26 (From 26-6716 RMRA, Improvements $683,037
to 23-6037 Construction Other Than Building FTOTAL $6,008,510
EXHIBIT(S)
1. Location Map
2. Bid Proposal
3. Construction Contract
4. Environmental Determination
5. Capital Improvement Project Worksheet
Submitted By: Rodolfo Rosas, P.E., Executive Director of Public Works
Approved By: Alvaro Nunez, City Manager
i
I -------- -------
LEGEND: ` _ .,tv y• n,ift' :` " I
0 -
PROJECTLIMITS Exhibit 1
O RAry
SANTAANA Project No. 23-6037.PWA
2
Memory Lane and Flower Street Bikeway and
rUBLICWOPKS Traffic Calming I
AGENCY
Exhibit 2
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6037
MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Legion Contractors Inc.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Item Description Qty Unit Unit Amount
Price
1 Unclassified Excavation* 1,008 CY $ $
165 166,320
2 Asphalt Concrete * 588 TN $ $
240 141,120
3 Asphalt Rubber Hot Mix(ARHM) 2,730 TN $ $
195 532,350
4 Cold Mill(2") 205,000 SF $ $
0.65 133,250
5 Rubberized Emulsion Aggregate Slurry 60 TN $ $
(REAS)Type 11* 1,500 90,000
6 PCC Street Removal 210 CY $ $
300 63,000
7 Construct 7"PCC with(3-day)Cure 210 CY $ $
Including Dowels 720 151,200
8 PCC Sidewalk(T=4") 9,240 SF $ $
18 166,320
9 PCC Curb Ramp 3,990 SF $ $
28 111,720
10 PCC Curb and Gutter(Type A-2-8) 840 LF $ $
120 100,800
11 PCC Curb and Gutter(Type A-2-6) 525 LF $ $
110 57,750
12 PCC Driveway(T=8") 1,155 SF $ $
25 28,875
13 Cross Gutter(T=8") 3,885 SF $ $
35 135,975
14 Monolithic PCC Bike Lane(T=6") 4,960 LF $ $
(Including Raised Buffer) 140 694,400
P-1 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6037
MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING
Item Description Qty Unit Unit Amount
Price
15 PCC Bike Lane(T=8") 120 LF $ $
145 17,400
16 PCC Bike Lane(T=6") 239 LF $ $
(Adjacent to Bioretention Basin) 135 32,265
17 Concrete Rolled Curb 320 LF $ $
110 35,200
18 PCC Type B-1 Curb 1,360 LF $ $
80 108,800
19 Colored Concrete(Red Brick)-Topcast 830 SF $ $
Exposed Aggregate Finish 25 20,750
20 PCC Raised Crosswalk 2 EA $ $
50,000 100,000
21 Steel Plate(Slip Resistant) 8 EA $ $
15,000 120,000
22 Tree Removal 3 EA $ $
1,500 4,500
23 Neighborhood Entry Monument Removal 2 EA $ $
5,000 10,000
24 Adjust Water Valve Frame and Cover 24 EA $ $
2,000 48,000
25 Adjust Manhole Frame and Cover 24 EA $ $
2,000 48,000
26 Adjust 46 Pullbox to Finished Grade 4 EA $ $
1,500 6,000
27 Local Depression. C.S.A STD. 305 1 EA $ $
7,000 7,000
28 Reconstruct Catch Basin Top Slab 2 EA $ $
(Including Local Depression) 10,000 20,000
29 Parkway Culvert(Type A)per CSA Std. 2 EA $ $
318 15,000 30,000
30 Crushed Miscellaneous Base(CMB) * 250 TN $ $
110 27,500
31 Irrigation 1 LS $ $
115,000 115,000
32 Landscape 1 LS $ $
135,000 135,000
33 Irrigation&Landscape Local 1 LS $ $
Repairs/Modifications(Curb Extension
Areas) * 40,000 40,000
34 Landscape Maintenance Period(90-Days) 1 LS $ $
10,000 10,000
P-2 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6037
MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING
Item Description Qty Unit Unit Amount
Price
35 Signing and Striping 1 LS $ $
185,000 185,000
36 Green Methyl Methacrylate (MMA) 10,000 SF $ $
11 110,000
37 Project Advertisement Sign 3 EA $ $
5,000 15,000
38 Adjust Survey Monument 11 EA $ $
2,500 27,500
39 Bioretention Basin 1 LS $ $
60,000 60,000
40 Storinwater Pollution Prevention Plan 1 LS $ $
(SWPPP)-Risk Level 1 60,000 60,000
41 Remove Existing and Install New Water 2 EA $ $
Meter Frame and Cover 2,000 4,000
42 New Fire Hydrant Assembly 3 EA $ $
20,000 60,000
43 Furnish and Install New Water Valve 10 EA $ $
Frame and Cover 4,500 45,000
44 Furnish and Install New Neighborhood 1 LS $ $
Entry Monument(Including(1)Water 40,000 40,000
Proof Solar Powered Light Fixtures and(1)
Remote Solar Panel
45 Adjust Manhole Frame and Cover(per 8 EA $ $
O.C.S.D Std. S-050A, S-055 and S-055A) 3,500 28,000
46 Furnish and Install New Manhole Frame 2 EA $ $
and Cover 5,000 10,000
47 Construction Permit 1 LS $17,813 $ 17,813
48 Remove Existing Fire Hydrant Assembly 4 EA $ $
6,500 26,000
49 Remove Existing Gate Valve Frame and 3 EA $ $
Cover 10,000 30,000
50 Construct 6"Resilient Gate Valve 3 EA $ $
40,000 120,000
51 Traffic Signal Modification at Bristol 1 LS $ $
Street and Memory Lane 310,000 310,000
52 Install 2"PVC Conduit 30 LF $ $
100 3,000
53 Install 3"PVC Conduit 100 LF $ $
100 3,000
54 Install No. 6 Pull Box 8 EA $ $
2,000 16,000
P-3 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6037
MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING
Item Description Qty Unit Unit Amount
Price
55 Install Type E Traffic Signal Loop 2 EA $ $
Detector 2,500 5,000
56 Pothole Traffic Signal Pole Location 8 EA $ $
for Utility Conflicts 2,000 16,000
57 Temporary Overhead Wiring at Traffic 1 LS $ $
Signal 25,000 25,000
58 Rectangular Rapid Flashing Beacon 1 LS $ $
Modification at Flower Street and
Sharon Road 30,000 30,000
59 Rectangular Rapid Flashing Beacon 1 LS $ $
Installation at Memory Lane and
Westwood Avenue 40,000 40,000
60 As-Builts 1 LS $ $
5,000 5,000
TOTAL BASE BID $ 4,806,808
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within one hundred and twenty (120) working days after the commencement date stated in
the Notice to Proceed.Upon issuance of the Notice to Proceed, Contractor shall immediately place
order for long-lead time items.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $5,200 per calendar day.
P-4 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6037
MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING
Name of Firm Legion Contractors Inc.
Signature of BIDDER Saba Khoubanshargh
Title Secretary
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Legion Contractors, Inc. - CA Corporation
Amir Movafegh - President, Treasurer and Manager
4VV-
Saba Khoubanshargh - Secretary
4----
P-5 of P-21
Exhibit 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT 23-6037
MEMORY LANE &FLOWER STREET BIKEWAY AND TRAFFIC CALMING
This CONSTRUCTION CONTRACT is made and entered into this 15th day of September, 2026 by
and between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Legion
Contractors, Inc. (hereinafter"CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, Memory Lane & Flower Street Bikeway and Traffic Calming
(hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with
the Contract Documents prepared by the City's Public Works Agency and approved by the City
Council.
2. The complete Construction Contract consists of the"Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Four Million Eight Hundred Six Thousand Eight
Hundred Eight and No Cents ($4,806,808.00), as set forth and identified in the itemized BID
PROPOSAL uploaded by the Contractor to PlanetBids, which is attached hereto and incorporated
herein as Exhibit"A".
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
rev.09/01/2017 Pagel of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements and Liquidated Damages section of the BID PROPOSAL
(Exhibit `B") including commencing construction within the timeframe therein specified after
issuance of a Notice to Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre-hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: hqp://www.santa-ana.ora/pwa/documents/CWA.pdf
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work(Performance Bond), and one in the amount of One Hundred Percent(100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars($500,000),the Warranty Bond amount shall be the greater of Ten Thousand Dollars($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000),the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent(10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 3
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST: CITY OF SANTA ANA
JENNIFER L. HALL ALVARO NUNEZ
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO CONTRACTOR:
City Attorney Legion Contractors, Inc.
By:
E NELLESEN BY: Amir Movafegh
Assistant City Attorney TITLE: President
RECOMMENDED FOR APPROVAL:
Fhbdolfo Rosas(Aug 31,2026 15:45:38 CDT)
RODOLFO ROSAS, P.E.
Acting Executive Director
Public Works Agency
Page 3 of 3
City of Santa Ana Page 1 cf 5
Memory Lane and Flower Street Bikeway and Traffic Calming(Project#23-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0,3110l2026
EXHIBIT A
Submission
Bidder Details
Vendor Name Legion Contractors Inc
Address 445 S.Figueroa St.Suite 2580
Los Angeles,California 90071
United States
Respondee Saba Khouban
Respondee Title Secretary
Phone 310-740-6640
Email Info@legioncontraCtors.com
Vendor Type SBE,CADIR
License# 1061257
Submission Detail
Submission Format Electronic
Submitted 06/30/2026 1:59 PM(PDT)
Delivery Method
Responsive
Submission Status Submitted
Confirmation# 494643
Respondee Comment
Buyer Comment
Attachments
File Title File Name File Type
Legion Bid Package.pdf Legion Bid Package.pdf General Forms
Ownership Affidavit.pdf Ownership Affidavit.pdf Ownership Affidavit(Notary Public)-REQ Original Hard Copy Submittal in Addition
Bid Bond Guaranty.pdf Bid Bond Guaranty.pdf Bid Bond Guaranty(Notary Public)-REQ Original Hard Copy Submittal in Addition
Non-Collusion Affidavit.pdf Non-Collusion Affidavit.pdf Non-Collusion Affidavit(Notary Public)-REQ Original Hard Copy Submittal in Addition
PlanetBids
City of Santa Ana Page 2 of 5
Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026
Line Items
Discount Terms No Discount
PlanetBids
City of Santa Ana Page 3 of 5
Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026
Item Item# Code Type Item Description UOM QTY Unit Price Line Total Response Comment
Bid Line Items $4,806,808.00
1 Unclassified Excavation CY 1008 $165.00 $166,320.00 Yes
2 Asphalt Concrete* TN 588 $240.00 $141,120.00 Yes
3 Asphalt Rubber Hot Mix(ARHM) TN 2730 $195.00 $532,350.00 Yes
4 Cold Mill(2") SF 205000 $0.65 $133,250.00 Yes
5 Rubberized Emulsion Aggregate Slurry(REAS)Type II' TN 60 $1,500.00 $90,000.00 Yes
6 PCC Street Removal CY 210 $300.00 $63,000.00 Yes
7 Construct 7"PCC with(3-day)Cure Including Dowels CY 210 $720.00 $151,200.00 Yes
8 PCC Sidewalk(T=4") SF 9240 $18.00 $166,320.00 Yes
9 PCC Curb Ramp SF 3990 $28.00 $111,720.00 Yes
10 PCC Curb and Gutter(Type A-2-8) LF 840 $120.00 $100.800.00 Yes
11 PCC Curb and Gutter(Type A-2-6) LF 525 $110.00 $57,750.00 Yes
12 PCC Driveway(T=8") SF 1155 $25.00 $28,875.00 Yes
13 Cross Gutter(T=8") SF 3885 $35.00 $135,975.00 Yes
14 Monolithic PCC Bike Lane(T=6")(Including Raised Buffer) LF 4960 $140.00 $694,400.00 Yes
15 PCC Bike Lane(T=8") LF 120 $145.00 $17,400.00 Yes
16 PCC Bike Lane(T=6")(Adjacent to Bioretention Basin) LF 239 $135.00 $32,265.00 Yes
17 Concrete Rolled Curb LF 320 $110.00 $35,200.00 Yes
18 PCC Type 9-1 Curb LF 1360 $80.00 $108,800.00 Yes
19 Colored Concrete(Red Brick)-Topcast Exposed Aggregate Finish SF 830 $25.00 $20,750.00 Yes
20 PCC Raised Crosswalk EA 2 $50,000.00 $100,000.00 Yes
21 Steel Plate(Slip Resistant) EA 8 $15,000.00 $120,000.00 Yes
22 Tree Removal EA 3 $1,500.00 $4,500.00 Yes
23 Neighborhood Entry Monument Removal EA 2 $5,000.00 $10,000.00 Yes
24 Adjust Water Valve Frame and Cover EA 24 $2,000.00 $48,000.00 Yes
25 Adjust Manhole Frame and Cover EA 24 $2,000.00 $48,000.00 Yes
26 Adjust#6 Pullbox to Finished Grade EA 4 $1,500.00 $6,000.00 Yes
27 Local Depression.C.S.A STD.305 EA 1 $7,000.00 $7,000.00 Yes
28 Reconstruct Catch Basin Top Slab(Including Local Depression) EA 2 $10,000.00 $20,000.00 Yes
29 Parkway Culvert(Type A)per CSA Std.318 EA 2 $15,000.00 $30,000.00 Yes
30 Crushed Miscellaneous Base(CMB)• TN 250 $110.00 $27,500.00 Yes
31 Irrigation LS 1 $115,000.00 $115,000.00 Yes
32 Landscape LS 1 $135,000.00 $135,000.00 Yes
33 Irrigation&Landscape Local Repairs/Modifications(Curb Extension Areas)' LS 1 $40,000.00 $40,000.00 Yes
34 Landscape Maintenance Period(90-Days) LS 1 $10,000.00 $10,000.00 Yes
35 Signing and Striping LS 1 $185,000.00 $185,000.00 Yes
36 Green Methyl Methacrylate(MMA)(Approx.250 Kits) SF 10000 $11.00 $110,000.00 Yes
37 Project Advertisement Sign EA 3 $5,000.00 $15,000.00 Yes
38 Adjust Survey Monument EA 11 $2,500.00 $27,500.00 Yes
39 Bioretention Basin LS 1 $60,000.00 $60,000.00 Yes
40 Stormwater Pollution Prevention Plan(SWPPP)-Risk Level I LS 1 $60,000.00 $60,000.00 Yes
41 Remove Existing and Install New Water Meter Frame and Cover EA 2 $2,000.00 $4,000.00 Yes
42 New Fire Hydrant Assembly EA 3 $20,000.00 $60,000.00 Yes
43 Furnish and Install New Water Valve Frame and Cover EA 10 $4,500.00 $45,000.00 Yes
44 Furnish and Install New Neighborhood Entry Monument(Including(1)Water Proof Solar Powered Light Fixtures and(1) LS 1 $40,000.00 $40,000.00 Yes
Remote Solar Panel)
45 Adjust Manhole Frame and Cover(per O.C.S.D Std.5.050A,5.055 and 5.055A) EA 8 $3,500.00 $28,000.00 Yes
46 Furnish and Install New Manhole Frame and Cover EA 2 $5,000.00 $10,000.00 Yes
47 Construction Permit LS 1 $17,813.00 $17,813.00 Yes
48 Remove Existing Fire Hydrant Assembly EA 4 $6,500.00 $26,000.00 Yes
49 Remove Existing Gate Valve Frame and Cover EA 3 $10,000.00 $30,000.00 Yes
City of Santa Ana Page 4 of 5
Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026
Item Item# Code Type Item Description UOM QTY Unit Price Line Total Response Comment
50 Construct 6"Resilient Gate Valve EA 3 $40,000.00 $120,000.00 Yes
51 Traffic Signal Modification at Bristol Street and Memory Lane LS 1 $310,000.00 $310,000.00 Yes
52 Install 2"PVC Conduit LF 30 $100.00 $3,000.00 Yes
53 Install 3"PVC Conduit LF 100 $100.00 $10,000.00 Yes
54 Install No.6 Pull Box EA 8 $2,000.00 $16,000.00 Yes
55 Install Type E Traffic Signal Loop Detector EA 2 $2,500.00 $5,000.00 Yes
56 Pothole Traffic Signal Pole Location For Utility Conflicts EA 8 $2,000.00 $16,000.00 Yes
57 Temporary Overhead Wiring at Traffic Signal LS 1 $25,000.00 $25,000.00 Yes
58 Rectangular Rapid Flashing Beacon Modification at Flower Street and Sharon Road LS 1 $30,000.00 $30,000.00 Yes
59 Rectangular Rapid Flashing Beacon Installation at Memory Lane and Westwood Avenue LS 1 $40,000.00 $40,000.00 Yes
60 As-Buitts LS 1 $5,000.00 $5,000.00 Yes
Non-Bid Line Items $0.00
61 Asterisk Notes per P-4 of Specifications N/A 0 $75,000.00 $0.00 Yes
.The quantity for this bid item is shown for bid comparison only.This bid item shall not be subject to the"25%"limit as stated in
62 Section 7-3.5 of the Standard Specifications.The actual amount for this item will be dictated by the actual quantity used,and the N/A 0 $75,000.00 $0.00 Yes
Agency reserves the right to increase or decrease the quantity of this item accordingly.
City of Santa Ana Page 5 of 5
Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026
Line Item Subtotals
Section Title Line Total
Bid Line Items $4,806,808.00
Non-Bid Line Items $0.00
Grand Total $4,806,808.00
PlanetBids
CITY OF SANTA ANA
PROPOSAL EXHIBIT B
PROJECT NO.: 23-6037
MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING
TOTAL BASE BID $ 4,806,808
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any).
The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within one hundred and twenty (120) working days after the commencement date stated in
the Notice to Proceed.Upon issuance of the Notice to Proceed, Contractor shall immediately place
order for long-lead time items.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $5,200 per calendar day.
P-4 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6037
MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING
Name of Firm Legion Contractors Inc.
Signature of BIDDER Saba Khoubanshargh
Title Secretary
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Legion Contractors, Inc. - CA Corporation
Amir Movafegh - President, Treasurer and Manager
4VV-
Saba Khoubanshargh - Secretary
4----
P-5 of P-21
09 15 26 PWA 05 Exh 3 Construction Contract
Final Audit Report 2026-08-31
Created: 2026-08-31
By: Skylar Wilk(swilk@santa-ana.org)
Status: Signed
Transaction ID: CBJCHBCAABAAGHHmUIIs_fCeVt5DuJodcPjwG-XzwJEw
"09 15 26 PWA 05_Exh 3 Construction Contract" History
Document created by Skylar Wilk (swilk@santa-ana.org)
2026-08-31 -6:42:30 PM GMT
Document emailed to Rudy Rosas (rrosas@santa-ana.org) for signature
2026-08-31 -6:42:38 PM GMT
Email viewed by Rudy Rosas (rrosas@santa-ana.org)
2026-08-31 -6:46:33 PM GMT
Signer Rudy Rosas (rrosas@santa-ana.org) entered name at signing as Rodolfo Rosas
2026-08-31 -8:45:36 PM GMT
Document e-signed by Rodolfo Rosas (rrosas@santa-ana.org)
Signature Date:2026-08-31 -8:45:38 PM GMT-Time Source:server-Signature Appearance Selected:MOBILE—DRAW
Agreement completed.
2026-08-31 -8:45:38 PM GMT
Adobe Acrobat Sign
Exhibit 4
MAYOR ACTING CITY MANADER
ValerieAmezeua
Steven Mendoza
MAYOR PRO TEM ;� ' CITYATTORNEY
Jessie Lopez Sonia R,Carvalho
COUNCILMEMBERS CITY CLERK
Phil Bacerra -a,.� Jennifer L.Hall
Johnathan Ryan Hemandez
David Penatoza
Thal Viet Phan
Benjamin Vazquez PUBLIC WORKS AGENCY
20 Civic Center Plaza(M•36)
P.D.BOX 1988.Santa Ana,California 92742
(714)647-5886-FaK(714)647-5823
vmw,sr;ntaane.arg
NOTICE OF EXEMPTION
From the Requirements of the California Environmental Quality Act(CEQA)
Fee Exemption per California Government Code Section 6103
To: COUNTY CLERK From: City of Santa Ana
County of Orange Public Works Agency
P.O. Box 238 20 Civic Center Plaza(M-36)
Santa Ana,CA 92702 Santa Ana,CA 92702
Project Title; Memory Lane and Flower Street Bikeway
Project Number(s): CIPA 23-6037
Project location: Memory lane from The City Drive to Flower Street and Flower Street from Mem
City: Santa Ana County: Orange ER Number: ER-2023-118 Orate of Approval: 12/19/2023
Project Description:
Construction of bikeway, ADA compliant sidewalks and curb ramps, bulb-outs (curb extensions), raised
medians/crosswalks,traffic signal modification and channelization on Memory Lane and Flower Street.
Applicant Name: City of Santa Ana,Public Works Agency
Applicant Address; 20 Civic Center Plaza M-36
Santa Ana,CA 92702
Name of Public Agency Approving Project: City Council TO BE FILED
Name of Agency Carrying Out Project: Public Works Agency
Exempt Status:
❑ Ministerial(Sec. 15268)
❑ Declared Emergency(Sec. 16269(a))
❑ Emergency Project(Sec. 16269(b through e))
13 General Rule(Sec. 15061(b)(3)/(5))
❑ Statutory Exemption:
® Categorical Exemption: 15301(b)
Reason(s)Why Project Is Exempt From CEQA:
16301(b)consists of repair/maintenance of existing public facilitles.
City Contact: ilbert Castillo Title: Senlor Engineer Telephone: l (714)647-5647
Signature: Date:
3ANTAANA CITY COUNCIL
Valerie 4m a d seals I apnz Thal Viol Phan Benjamin Vazquoz Phil Bacerra Johnathan Ryan Hemandoz David Penalcra
Mayor Mayor Pro Tom,Ward 3 Ward 1 Ward 2 Ward 4 Ward 5 Ward 6
vamezwardssnta-ana.ora s o a a-a ;tohamftant"na.arq hvazairer ante-egaorg abacarca_lrDsantaann:arn : IrvanhemandexlAsanla•arsa.ara sera .an
m
�
x
w «
\
�
j Cl) 2 /
\ LL � o
7
§a � , , , . �
&/
} /
y/ LL LL
� j \
w ` §
w \2 LL L )
cc 0- cz
, , , .
Lu - -
a$ m m .\
0 C) » » E
LU #
LU
§ , , , . ) , , , . Cl)
m m m Q /
IL z \
� ya»E)
S§ . . . . § . . . .
a R �>. w \\\ N /
LL
� \k\
« ] o / o / p w o
« z � ` ® | d = \ § G § o 't g W
R
� ¥ \ \ ®a " /¥ / \ ®\ »
� co �t G m w = a
z/ 0 \
C, No (Db &
a \ ! t F- F-
L � \\/ Ocn O
o � Lu {/} m 2
w ice ® F-
a a
a� /\\ cn � e g
� V}3 LL } z \
w a®\ w / 0 2 a 0 #
o LU
w j / \ Q ® s u
\\\ / \ \ % 0- k > %
a d >w o 0 3 O \ § � 6
IL Cl)
% ,
/
w \ w § 2 | C
E
k §
Q
\ � / gn
O E \ O 2
L /
a 2 3 CL 2 i
� . . .