Loading...
HomeMy WebLinkAboutItem 13 - Construction Contract to Legion Contractors, Inc. for the Memory Lane & Flower Street Improvements Project Public Works Agency www.santa-ana.gov/pwa Item # 13 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report September 15, 2026 TOPIC: Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and Flower Street Improvements Project AGENDA TITLE Award of a Construction Contract to Legion Contractors, Inc. for the Memory Lane and Flower Street Improvements Project (No. 23-6037) (General Fund & Non-General Fund) RECOMMENDED ACTION 1. Approve an appropriation adjustment recognizing $4,550,000 in the Active Transportation Program, State Grant-Direct (14817002-52025) revenue account and appropriate the same amount into the Active Transportation Program, Improvements Other than Building (14817613-66220) expenditure account. (Requires five affirmative votes) 2. Approve an amendment to the Fiscal Year 2026-2027 Capital Improvement Program to include an additional $4,550,000 in construction funds for the Memory Lane and Flower Street Improvements Project (No. 23-6037). 3. Approve the Project Cost Analysis for a total estimated construction delivery cost of$6,008,510, which includes $4,806,808 for the construction contract, $721,021 for contract administration, inspection, and testing, and $480,681 for unanticipated or unforeseen work. 4. Award a construction contract to Legion Contractors, Inc., the lowest responsible bidder, in accordance with the base bid in the amount of$4,806,808, subject to change orders, for construction of the Memory Lane and Flower Street Improvements Project (No. 23-6037), for a term beginning September 15, 2026 and authorize the City Manager to execute the contract. 5. Determine that, pursuant to the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. 2023-118 will be filed for Project No. 23-6037. GOVERNMENT CODE 484308 APPLIES: No Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and Flower Street Improvements Project September 15, 2026 Page 2 DISCUSSION The Public Works Agency (PWA) is responsible for managing the City's roads and transportation network which include arterial, residential, alley, and industrial streets. The planning and improvements of this network are guided by the City's General Plan Mobility Element, Active Transportation Plan, and Pavement Management Program. Together, these plans and programs establish priorities for improving mobility and safety, expanding pedestrian and bicycle connectivity, and maintaining roadway infrastructure through data-driven pavement management. Consistent with these priorities, PWA identified and recommends street and multimodal improvements along Memory Lane and Flower Street (Exhibit 1). The Memory Lane and Flower Street project limits include roadway segments in poor to fair condition. The Pavement Condition Index (PCI), which evaluates pavement conditions on a scale from 0-100, identifies PCI values of 56 along Flower Street from Memory Lane to Santiago Creek and 62 along Memory Lane from the Santa Ana River to Flower Street. No major rehabilitation has occurred within the project limits since the year 2000. Existing deficiencies include deteriorated pavement, curbs, gutters, sidewalks, driveways, and curb ramps. Additionally, the project area has been the subject of community safety concerns related to speeding, pedestrian crossings, bicycle related collisions, and unlawful driver behaviors. Since 2017, PWA staff have actively engaged with the Morrison Park and Fisher Park Neighborhood Associations through 15 community meetings to discuss traffic safety concerns, evaluate potential improvements along the project corridor, and to provide updates on the project's design and development. Community feedback received through these meetings helped inform the proposed safety and mobility improvements included in the final project design. One of the primary safety concerns identified by residents involves the intersection of Memory Lane and Flower Street, where unsafe turning movements and vehicle spinouts, commonly referred to as "donuts," have been reported. In response, staff developed design features that modify the intersection geometry and reduce the available roadway area to physically constrain and discourage these unsafe vehicle movements. Because the proposed design incorporates unique geometric features, staff worked closely with residents from both neighborhoods throughout the design process. Although initial opinions regarding the proposed improvements varied, staff developed and presented multiple design concepts based on community feedback, ultimately reaching consensus on the design incorporated into the Project. The Memory Lane and Flower Street Improvements Project (Project No. 23-6037) will improve street pavement through the reconstruction and rehabilitation of roadway pavement (both asphalt and Portland Cement Concrete), repair of concrete infrastructure, landscaping, and irrigation. It will also enhance pedestrian and bicycle Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and Flower Street Improvements Project September 15, 2026 Page 3 safety through the installation of bulb-outs and protected bike lanes in both directions of travel. Pedestrian facility improvements will comply with the Americans with Disabilities Act (ADA) standards. The project incorporates traffic safety improvements, including modifications to the existing traffic signal at the intersection of Bristol Street and Memory Lane, the installation of rectangular rapid flashing beacons (RRFBs) paired with raised crosswalks at the intersections of Memory Lane and Westwood Avenue and at Flower Street and Sharon Road, and upgraded traffic striping and pavement markings to improve roadway visibility and guide all users safely through the corridor. Additionally, the project will install drought-tolerant landscaping and irrigation at island buffers within the corridor. Once completed, these improvements will enhance overall safety, ride quality, and the visual appearance of the street corridor. Grant Funding Given the cost and scale of the proposed improvements, PWA pursued funding through multiple competitive grant programs. Following unsuccessful applications to the Active Transportation Program (ATP) and Bicycle Corridor Improvement Program (BCIP) in 2018, staff submitted a subsequent ATP application on July 14, 2022. On June 28, 2023, the California Department of Transportation (Caltrans) notified the City that the Project had been selected for funding. The ATP award provides funding for environmental, design, and construction activities, including traffic signal modifications, enhanced and raised crosswalks, reduced curb-return radii, ADA-compliant curb ramps, and Class II and Class IV bicycle facilities. Funding for the design phase was previously approved by the City Council as part of the Fiscal Year 2023-24 Capital Improvement Program. Through this staff report, staff recommends recognizing $4,550,000 in ATP construction funding and amending the Fiscal Year 2026-27 Capital Improvement Program accordingly. The grant requires the Project to be completed by January 31, 2028. Project Advertisement and Contractor Procurement To provide an opportunity for local vendors to submit bids, the City notified a total of 3,137 regional vendors via PlanetBids, many of which are Santa Ana based. Furthermore, staff specifically reached out to Santa Ana vendors to encourage their participation in bids. A total of seven (7) bids were received. Zero (0) bids were received from Santa Ana contractors. As legally required, a Notice Inviting Bids was advertised in the Orange County Register newspaper on June 12, 2026. The project was also advertised in PlanetBids from June 9, 2026 to June 30, 2026. Bids were received electronically via PlanetBids on June 30, 2026. No bid protest was submitted by any of the bidders during the bid protest period. Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and Flower Street Improvements Project September 15, 2026 Page 4 Copies of construction plans, contracts, specifications, and all related reference materials (such as The Greenbook) are available for public review at the Public Works Agency Central Files office located in City Hall. Bid Results Summary RANK BIDDER'S NAME LOCATION BID 1 Legion Contractors, Inc. Los Angeles, CA $4,806,808.00 2 U.S. Builders & Consultants Irvine, CA $5,044,800.00 3 Aster Construction Services, Los Angeles, CA $5,101,201.06 1 nc. 4 Hardy & Harper, Inc. Lake Forest, CA $5,150,000.00 5 Westcoast Public Works, Inc. Woodland Hills, CA $5,601,421.00 6 Vido Samarzich, Inc. Santa Ana, CA $5,675,000.00 7 Excel Paving Co. Long Beach, CA $6,148,565.00 A total of seven (7) bids were received and deemed responsive. Legion Contractors, Inc. submitted the lowest responsive bid in the amount of$4,806,808.00 (Exhibit 2). Following review of the bid and contractor references, staff recommends awarding the construction contract to Legion Contractors, Inc. (Exhibit 3). Legion Contractors, Inc. has successfully completed projects as a prime contractor in the City of Santa Ana within the past two years, including Outdoor Library at Jerome Park and Bristol-Tolliver Street Urban Greening Project. Based on the contractor's satisfactory performance on these projects, staff recommends awarding the construction contract to Legion Contractors, Inc. for the construction of the project. Project Delivery In addition to the construction contract, the total project delivery cost includes a budget allocation for construction administration, inspection, and testing. Construction administration and inspection may be performed by either staff or consultants and includes construction management, inspection of the contractor's work for compliance with contract requirements and quality standards, materials testing, and administration of applicable labor compliance requirements. As indicated in the Cost Analysis and as summarized in the table below, the estimated total construction delivery cost of the project is $6,008,510. Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and Flower Street Improvements Project September 15, 2026 Page 5 Project Item Total Construction Contract Bid Amount $4,806,808 Construction Administration $384,545 Ins ection $240,340 Testing $96,136 Unanticipated or Unforeseen Work $480,681 TOTAL ESTIMATED CONSTRUCTION DELIVERY COST $6,008,510 Project Schedule and Contract Time The project completion date is June 2027, barring unforeseeable conditions such as rain, natural disasters, or other delays beyond the control of the City and of the Contractor. The contract time for this project is 120 working days, as specified in the bid documents. Working days are counted in accordance with the City's Standard Specifications, which exclude weekends, City-observed holidays, and inclement weather days that prevent work. The projected completion dates based on the schedule is June 2027, which is within the allotted 120 working days. If the contractor fails to deliver on time, they will be assessed a penalty of$5,200 per calendar day as specified in the bid documents. The actual completion date will depend on the contractor's construction schedule, material procurement lead times, field conditions, and unforeseen delays. The anticipated project schedule is summarized below; Project Milestones Milestone Estimated Notes Completion Date Administrative Startup September 2026 Contract execution, bonds, insurance Material Procurement December 2026 Procurement may take place concurrently with construction. Contractor Mobilization November 2026 Start of construction activities Project Completion June 2027 Based on 120 working days Project Phasing The Project will be constructed in a single phase in accordance with the scope of work established in the contract documents. The contractor will be responsible for scheduling and sequencing construction activities based on their proposed means and methods and within the contract time specified in the bid documents. Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and Flower Street Improvements Project September 15, 2026 Page 6 Public Outreach During the Project's planning and design phases, City staff met with the Morrison Park and Fisher Park Neighborhood Associations to present proposed improvements, provide project updates, and collect community input, as described above. Upon Council approval of recommended actions and prior to start of construction, Staff will notify area residents and businesses of upcoming construction activities and distribute informational materials and mail post cards identifying project information and resources for questions and concerns. Staff will also attend future Neighborhood Association meetings to provide an update on the project. The contractor is required to issue construction notices to adjacent residents and businesses at least two weeks before construction begins. The contractor will also install signage at the project site indicating project details and appropriate contact information. ENVIRONMENTAL IMPACT Pursuant to the California Environmental Quality Act (CEQA), the recommended actions are exempt from further review pursuant to Section 15301(b) and 15301(c) of the CEQA Guidelines for projects consisting of repair and maintenance of existing public facilities and existing highways, streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities. The proposed project continues to meet these parameters of the CEQA Guidelines, and Categorical Exemption Environmental Review No. ER-2023-118 will be filed for Project 23-6037 (Exhibit 4). FISCAL IMPACT As indicated in the Cost Analysis, the estimated total construction delivery cost of the project is $6,008,510. With the approval of the requested appropriation adjustments, all funds are available for expenditure in Fiscal Year 2026-27. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers into Fiscal Year 2027-2028. The proposed contract authorizes staff a maximum of 10% in construction contract change orders for unanticipated or unforeseen work. Staff will return to City Council for authorization and appropriation of additional funding if necessary. With the approval of the requested appropriation adjustment, $4,550,000 in Active Transportation Program grant funds will be recognized in the Traffic System Management Grant, State Grant-Direct revenue account (No. 14817002-52025) and appropriated for spending into the Active Transportation Program, Improvements Other than Building, Account (No. 14817613-66220). Approval of the requests to reallocate funds will provide a total of $683,037 in unspent funds from Project 26-6716. Award a Contract to Legion Contractors, Inc. for the Construction of Memory Lane and Flower Street Improvements Project September 15, 2026 Page 7 Funds were budgeted and available in the following account(s) for use in Fiscal Year 2026-2027 and will be carried forward for use in Fiscal Year 2027-2028, subject to City Council approval of the carryover. Accounting Fiscal Unit—Account Fund Accounting Unit, Amount Year No. Description Account Description Project No. CURRENT BUDGET PW-Traffic/Trans 2025-26 01117620-66220 General Fund Service Enhancement, $775,473 (23-6037) Improvements Other Than Building APPROPRIATION ADJUSTMENT Traffic System Active Transportation 2026-27 14817613-66220 Management Program, $4,550,000 (23-6037) Grant Improvements Other Than Building REALLOCATION 05917665-66220 Select Street HUTA Gas Tax- 2025-26 (From 26-6716 RMRA, Improvements $683,037 to 23-6037 Construction Other Than Building FTOTAL $6,008,510 EXHIBIT(S) 1. Location Map 2. Bid Proposal 3. Construction Contract 4. Environmental Determination 5. Capital Improvement Project Worksheet Submitted By: Rodolfo Rosas, P.E., Executive Director of Public Works Approved By: Alvaro Nunez, City Manager i I -------- ------- LEGEND: ` _ .,tv y• n,ift' :` " I 0 - PROJECTLIMITS Exhibit 1 O RAry SANTAANA Project No. 23-6037.PWA 2 Memory Lane and Flower Street Bikeway and rUBLICWOPKS Traffic Calming I AGENCY Exhibit 2 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6037 MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: Legion Contractors Inc. REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Amount Price 1 Unclassified Excavation* 1,008 CY $ $ 165 166,320 2 Asphalt Concrete * 588 TN $ $ 240 141,120 3 Asphalt Rubber Hot Mix(ARHM) 2,730 TN $ $ 195 532,350 4 Cold Mill(2") 205,000 SF $ $ 0.65 133,250 5 Rubberized Emulsion Aggregate Slurry 60 TN $ $ (REAS)Type 11* 1,500 90,000 6 PCC Street Removal 210 CY $ $ 300 63,000 7 Construct 7"PCC with(3-day)Cure 210 CY $ $ Including Dowels 720 151,200 8 PCC Sidewalk(T=4") 9,240 SF $ $ 18 166,320 9 PCC Curb Ramp 3,990 SF $ $ 28 111,720 10 PCC Curb and Gutter(Type A-2-8) 840 LF $ $ 120 100,800 11 PCC Curb and Gutter(Type A-2-6) 525 LF $ $ 110 57,750 12 PCC Driveway(T=8") 1,155 SF $ $ 25 28,875 13 Cross Gutter(T=8") 3,885 SF $ $ 35 135,975 14 Monolithic PCC Bike Lane(T=6") 4,960 LF $ $ (Including Raised Buffer) 140 694,400 P-1 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6037 MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING Item Description Qty Unit Unit Amount Price 15 PCC Bike Lane(T=8") 120 LF $ $ 145 17,400 16 PCC Bike Lane(T=6") 239 LF $ $ (Adjacent to Bioretention Basin) 135 32,265 17 Concrete Rolled Curb 320 LF $ $ 110 35,200 18 PCC Type B-1 Curb 1,360 LF $ $ 80 108,800 19 Colored Concrete(Red Brick)-Topcast 830 SF $ $ Exposed Aggregate Finish 25 20,750 20 PCC Raised Crosswalk 2 EA $ $ 50,000 100,000 21 Steel Plate(Slip Resistant) 8 EA $ $ 15,000 120,000 22 Tree Removal 3 EA $ $ 1,500 4,500 23 Neighborhood Entry Monument Removal 2 EA $ $ 5,000 10,000 24 Adjust Water Valve Frame and Cover 24 EA $ $ 2,000 48,000 25 Adjust Manhole Frame and Cover 24 EA $ $ 2,000 48,000 26 Adjust 46 Pullbox to Finished Grade 4 EA $ $ 1,500 6,000 27 Local Depression. C.S.A STD. 305 1 EA $ $ 7,000 7,000 28 Reconstruct Catch Basin Top Slab 2 EA $ $ (Including Local Depression) 10,000 20,000 29 Parkway Culvert(Type A)per CSA Std. 2 EA $ $ 318 15,000 30,000 30 Crushed Miscellaneous Base(CMB) * 250 TN $ $ 110 27,500 31 Irrigation 1 LS $ $ 115,000 115,000 32 Landscape 1 LS $ $ 135,000 135,000 33 Irrigation&Landscape Local 1 LS $ $ Repairs/Modifications(Curb Extension Areas) * 40,000 40,000 34 Landscape Maintenance Period(90-Days) 1 LS $ $ 10,000 10,000 P-2 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6037 MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING Item Description Qty Unit Unit Amount Price 35 Signing and Striping 1 LS $ $ 185,000 185,000 36 Green Methyl Methacrylate (MMA) 10,000 SF $ $ 11 110,000 37 Project Advertisement Sign 3 EA $ $ 5,000 15,000 38 Adjust Survey Monument 11 EA $ $ 2,500 27,500 39 Bioretention Basin 1 LS $ $ 60,000 60,000 40 Storinwater Pollution Prevention Plan 1 LS $ $ (SWPPP)-Risk Level 1 60,000 60,000 41 Remove Existing and Install New Water 2 EA $ $ Meter Frame and Cover 2,000 4,000 42 New Fire Hydrant Assembly 3 EA $ $ 20,000 60,000 43 Furnish and Install New Water Valve 10 EA $ $ Frame and Cover 4,500 45,000 44 Furnish and Install New Neighborhood 1 LS $ $ Entry Monument(Including(1)Water 40,000 40,000 Proof Solar Powered Light Fixtures and(1) Remote Solar Panel 45 Adjust Manhole Frame and Cover(per 8 EA $ $ O.C.S.D Std. S-050A, S-055 and S-055A) 3,500 28,000 46 Furnish and Install New Manhole Frame 2 EA $ $ and Cover 5,000 10,000 47 Construction Permit 1 LS $17,813 $ 17,813 48 Remove Existing Fire Hydrant Assembly 4 EA $ $ 6,500 26,000 49 Remove Existing Gate Valve Frame and 3 EA $ $ Cover 10,000 30,000 50 Construct 6"Resilient Gate Valve 3 EA $ $ 40,000 120,000 51 Traffic Signal Modification at Bristol 1 LS $ $ Street and Memory Lane 310,000 310,000 52 Install 2"PVC Conduit 30 LF $ $ 100 3,000 53 Install 3"PVC Conduit 100 LF $ $ 100 3,000 54 Install No. 6 Pull Box 8 EA $ $ 2,000 16,000 P-3 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6037 MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING Item Description Qty Unit Unit Amount Price 55 Install Type E Traffic Signal Loop 2 EA $ $ Detector 2,500 5,000 56 Pothole Traffic Signal Pole Location 8 EA $ $ for Utility Conflicts 2,000 16,000 57 Temporary Overhead Wiring at Traffic 1 LS $ $ Signal 25,000 25,000 58 Rectangular Rapid Flashing Beacon 1 LS $ $ Modification at Flower Street and Sharon Road 30,000 30,000 59 Rectangular Rapid Flashing Beacon 1 LS $ $ Installation at Memory Lane and Westwood Avenue 40,000 40,000 60 As-Builts 1 LS $ $ 5,000 5,000 TOTAL BASE BID $ 4,806,808 The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within one hundred and twenty (120) working days after the commencement date stated in the Notice to Proceed.Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $5,200 per calendar day. P-4 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6037 MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING Name of Firm Legion Contractors Inc. Signature of BIDDER Saba Khoubanshargh Title Secretary (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Legion Contractors, Inc. - CA Corporation Amir Movafegh - President, Treasurer and Manager 4VV- Saba Khoubanshargh - Secretary 4---- P-5 of P-21 Exhibit 3 CITY OF SANTA ANA CONSTRUCTION CONTRACT PROJECT 23-6037 MEMORY LANE &FLOWER STREET BIKEWAY AND TRAFFIC CALMING This CONSTRUCTION CONTRACT is made and entered into this 15th day of September, 2026 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Legion Contractors, Inc. (hereinafter"CONTRACTOR"). WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, Memory Lane & Flower Street Bikeway and Traffic Calming (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the"Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed Four Million Eight Hundred Six Thousand Eight Hundred Eight and No Cents ($4,806,808.00), as set forth and identified in the itemized BID PROPOSAL uploaded by the Contractor to PlanetBids, which is attached hereto and incorporated herein as Exhibit"A". The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. rev.09/01/2017 Pagel of 3 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements and Liquidated Damages section of the BID PROPOSAL (Exhibit `B") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement (CWA), a pre-hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: hqp://www.santa-ana.ora/pwa/documents/CWA.pdf 7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work(Performance Bond), and one in the amount of One Hundred Percent(100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. 8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars($500,000),the Warranty Bond amount shall be the greater of Ten Thousand Dollars($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000),the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent(10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. 10. INDEMNIFICATION. To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend, indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"), through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs, damages or losses, including reasonable costs and attorney's fees, for injury, including death to any person or damage to any property, arising directly or indirectly from, or in any manner relating to, any of the following: (i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its Subcontractors of any lower tier; (ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of any of the obligations under the Contract Documents; Page 2 of 3 (iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either on the project site or on other properties; (iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work of Improvement performed on or off the project site; and (v) Any personal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of the Work of Improvement. (vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subcontract documents issued by CONTRACTOR. Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of CONTRACTOR against CITY or any other Indemnitee. IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: CITY OF SANTA ANA JENNIFER L. HALL ALVARO NUNEZ City Clerk City Manager APPROVED AS TO FORM: SONIA R. CARVALHO CONTRACTOR: City Attorney Legion Contractors, Inc. By: E NELLESEN BY: Amir Movafegh Assistant City Attorney TITLE: President RECOMMENDED FOR APPROVAL: Fhbdolfo Rosas(Aug 31,2026 15:45:38 CDT) RODOLFO ROSAS, P.E. Acting Executive Director Public Works Agency Page 3 of 3 City of Santa Ana Page 1 cf 5 Memory Lane and Flower Street Bikeway and Traffic Calming(Project#23-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0,3110l2026 EXHIBIT A Submission Bidder Details Vendor Name Legion Contractors Inc Address 445 S.Figueroa St.Suite 2580 Los Angeles,California 90071 United States Respondee Saba Khouban Respondee Title Secretary Phone 310-740-6640 Email Info@legioncontraCtors.com Vendor Type SBE,CADIR License# 1061257 Submission Detail Submission Format Electronic Submitted 06/30/2026 1:59 PM(PDT) Delivery Method Responsive Submission Status Submitted Confirmation# 494643 Respondee Comment Buyer Comment Attachments File Title File Name File Type Legion Bid Package.pdf Legion Bid Package.pdf General Forms Ownership Affidavit.pdf Ownership Affidavit.pdf Ownership Affidavit(Notary Public)-REQ Original Hard Copy Submittal in Addition Bid Bond Guaranty.pdf Bid Bond Guaranty.pdf Bid Bond Guaranty(Notary Public)-REQ Original Hard Copy Submittal in Addition Non-Collusion Affidavit.pdf Non-Collusion Affidavit.pdf Non-Collusion Affidavit(Notary Public)-REQ Original Hard Copy Submittal in Addition PlanetBids City of Santa Ana Page 2 of 5 Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026 Line Items Discount Terms No Discount PlanetBids City of Santa Ana Page 3 of 5 Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026 Item Item# Code Type Item Description UOM QTY Unit Price Line Total Response Comment Bid Line Items $4,806,808.00 1 Unclassified Excavation CY 1008 $165.00 $166,320.00 Yes 2 Asphalt Concrete* TN 588 $240.00 $141,120.00 Yes 3 Asphalt Rubber Hot Mix(ARHM) TN 2730 $195.00 $532,350.00 Yes 4 Cold Mill(2") SF 205000 $0.65 $133,250.00 Yes 5 Rubberized Emulsion Aggregate Slurry(REAS)Type II' TN 60 $1,500.00 $90,000.00 Yes 6 PCC Street Removal CY 210 $300.00 $63,000.00 Yes 7 Construct 7"PCC with(3-day)Cure Including Dowels CY 210 $720.00 $151,200.00 Yes 8 PCC Sidewalk(T=4") SF 9240 $18.00 $166,320.00 Yes 9 PCC Curb Ramp SF 3990 $28.00 $111,720.00 Yes 10 PCC Curb and Gutter(Type A-2-8) LF 840 $120.00 $100.800.00 Yes 11 PCC Curb and Gutter(Type A-2-6) LF 525 $110.00 $57,750.00 Yes 12 PCC Driveway(T=8") SF 1155 $25.00 $28,875.00 Yes 13 Cross Gutter(T=8") SF 3885 $35.00 $135,975.00 Yes 14 Monolithic PCC Bike Lane(T=6")(Including Raised Buffer) LF 4960 $140.00 $694,400.00 Yes 15 PCC Bike Lane(T=8") LF 120 $145.00 $17,400.00 Yes 16 PCC Bike Lane(T=6")(Adjacent to Bioretention Basin) LF 239 $135.00 $32,265.00 Yes 17 Concrete Rolled Curb LF 320 $110.00 $35,200.00 Yes 18 PCC Type 9-1 Curb LF 1360 $80.00 $108,800.00 Yes 19 Colored Concrete(Red Brick)-Topcast Exposed Aggregate Finish SF 830 $25.00 $20,750.00 Yes 20 PCC Raised Crosswalk EA 2 $50,000.00 $100,000.00 Yes 21 Steel Plate(Slip Resistant) EA 8 $15,000.00 $120,000.00 Yes 22 Tree Removal EA 3 $1,500.00 $4,500.00 Yes 23 Neighborhood Entry Monument Removal EA 2 $5,000.00 $10,000.00 Yes 24 Adjust Water Valve Frame and Cover EA 24 $2,000.00 $48,000.00 Yes 25 Adjust Manhole Frame and Cover EA 24 $2,000.00 $48,000.00 Yes 26 Adjust#6 Pullbox to Finished Grade EA 4 $1,500.00 $6,000.00 Yes 27 Local Depression.C.S.A STD.305 EA 1 $7,000.00 $7,000.00 Yes 28 Reconstruct Catch Basin Top Slab(Including Local Depression) EA 2 $10,000.00 $20,000.00 Yes 29 Parkway Culvert(Type A)per CSA Std.318 EA 2 $15,000.00 $30,000.00 Yes 30 Crushed Miscellaneous Base(CMB)• TN 250 $110.00 $27,500.00 Yes 31 Irrigation LS 1 $115,000.00 $115,000.00 Yes 32 Landscape LS 1 $135,000.00 $135,000.00 Yes 33 Irrigation&Landscape Local Repairs/Modifications(Curb Extension Areas)' LS 1 $40,000.00 $40,000.00 Yes 34 Landscape Maintenance Period(90-Days) LS 1 $10,000.00 $10,000.00 Yes 35 Signing and Striping LS 1 $185,000.00 $185,000.00 Yes 36 Green Methyl Methacrylate(MMA)(Approx.250 Kits) SF 10000 $11.00 $110,000.00 Yes 37 Project Advertisement Sign EA 3 $5,000.00 $15,000.00 Yes 38 Adjust Survey Monument EA 11 $2,500.00 $27,500.00 Yes 39 Bioretention Basin LS 1 $60,000.00 $60,000.00 Yes 40 Stormwater Pollution Prevention Plan(SWPPP)-Risk Level I LS 1 $60,000.00 $60,000.00 Yes 41 Remove Existing and Install New Water Meter Frame and Cover EA 2 $2,000.00 $4,000.00 Yes 42 New Fire Hydrant Assembly EA 3 $20,000.00 $60,000.00 Yes 43 Furnish and Install New Water Valve Frame and Cover EA 10 $4,500.00 $45,000.00 Yes 44 Furnish and Install New Neighborhood Entry Monument(Including(1)Water Proof Solar Powered Light Fixtures and(1) LS 1 $40,000.00 $40,000.00 Yes Remote Solar Panel) 45 Adjust Manhole Frame and Cover(per O.C.S.D Std.5.050A,5.055 and 5.055A) EA 8 $3,500.00 $28,000.00 Yes 46 Furnish and Install New Manhole Frame and Cover EA 2 $5,000.00 $10,000.00 Yes 47 Construction Permit LS 1 $17,813.00 $17,813.00 Yes 48 Remove Existing Fire Hydrant Assembly EA 4 $6,500.00 $26,000.00 Yes 49 Remove Existing Gate Valve Frame and Cover EA 3 $10,000.00 $30,000.00 Yes City of Santa Ana Page 4 of 5 Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026 Item Item# Code Type Item Description UOM QTY Unit Price Line Total Response Comment 50 Construct 6"Resilient Gate Valve EA 3 $40,000.00 $120,000.00 Yes 51 Traffic Signal Modification at Bristol Street and Memory Lane LS 1 $310,000.00 $310,000.00 Yes 52 Install 2"PVC Conduit LF 30 $100.00 $3,000.00 Yes 53 Install 3"PVC Conduit LF 100 $100.00 $10,000.00 Yes 54 Install No.6 Pull Box EA 8 $2,000.00 $16,000.00 Yes 55 Install Type E Traffic Signal Loop Detector EA 2 $2,500.00 $5,000.00 Yes 56 Pothole Traffic Signal Pole Location For Utility Conflicts EA 8 $2,000.00 $16,000.00 Yes 57 Temporary Overhead Wiring at Traffic Signal LS 1 $25,000.00 $25,000.00 Yes 58 Rectangular Rapid Flashing Beacon Modification at Flower Street and Sharon Road LS 1 $30,000.00 $30,000.00 Yes 59 Rectangular Rapid Flashing Beacon Installation at Memory Lane and Westwood Avenue LS 1 $40,000.00 $40,000.00 Yes 60 As-Buitts LS 1 $5,000.00 $5,000.00 Yes Non-Bid Line Items $0.00 61 Asterisk Notes per P-4 of Specifications N/A 0 $75,000.00 $0.00 Yes .The quantity for this bid item is shown for bid comparison only.This bid item shall not be subject to the"25%"limit as stated in 62 Section 7-3.5 of the Standard Specifications.The actual amount for this item will be dictated by the actual quantity used,and the N/A 0 $75,000.00 $0.00 Yes Agency reserves the right to increase or decrease the quantity of this item accordingly. City of Santa Ana Page 5 of 5 Memory Lane and Flower Street Bikeway and Traffic Calming(Project 423-6037),bidding on 06/30/2026 2:00 PM(PDT) Printed 0811012026 Line Item Subtotals Section Title Line Total Bid Line Items $4,806,808.00 Non-Bid Line Items $0.00 Grand Total $4,806,808.00 PlanetBids CITY OF SANTA ANA PROPOSAL EXHIBIT B PROJECT NO.: 23-6037 MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING TOTAL BASE BID $ 4,806,808 The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within one hundred and twenty (120) working days after the commencement date stated in the Notice to Proceed.Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $5,200 per calendar day. P-4 of P-21 CITY OF SANTA ANA PROPOSAL PROJECT NO.: 23-6037 MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING Name of Firm Legion Contractors Inc. Signature of BIDDER Saba Khoubanshargh Title Secretary (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Legion Contractors, Inc. - CA Corporation Amir Movafegh - President, Treasurer and Manager 4VV- Saba Khoubanshargh - Secretary 4---- P-5 of P-21 09 15 26 PWA 05 Exh 3 Construction Contract Final Audit Report 2026-08-31 Created: 2026-08-31 By: Skylar Wilk(swilk@santa-ana.org) Status: Signed Transaction ID: CBJCHBCAABAAGHHmUIIs_fCeVt5DuJodcPjwG-XzwJEw "09 15 26 PWA 05_Exh 3 Construction Contract" History Document created by Skylar Wilk (swilk@santa-ana.org) 2026-08-31 -6:42:30 PM GMT Document emailed to Rudy Rosas (rrosas@santa-ana.org) for signature 2026-08-31 -6:42:38 PM GMT Email viewed by Rudy Rosas (rrosas@santa-ana.org) 2026-08-31 -6:46:33 PM GMT Signer Rudy Rosas (rrosas@santa-ana.org) entered name at signing as Rodolfo Rosas 2026-08-31 -8:45:36 PM GMT Document e-signed by Rodolfo Rosas (rrosas@santa-ana.org) Signature Date:2026-08-31 -8:45:38 PM GMT-Time Source:server-Signature Appearance Selected:MOBILE—DRAW Agreement completed. 2026-08-31 -8:45:38 PM GMT Adobe Acrobat Sign Exhibit 4 MAYOR ACTING CITY MANADER ValerieAmezeua Steven Mendoza MAYOR PRO TEM ;� ' CITYATTORNEY Jessie Lopez Sonia R,Carvalho COUNCILMEMBERS CITY CLERK Phil Bacerra -a,.� Jennifer L.Hall Johnathan Ryan Hemandez David Penatoza Thal Viet Phan Benjamin Vazquez PUBLIC WORKS AGENCY 20 Civic Center Plaza(M•36) P.D.BOX 1988.Santa Ana,California 92742 (714)647-5886-FaK(714)647-5823 vmw,sr;ntaane.arg NOTICE OF EXEMPTION From the Requirements of the California Environmental Quality Act(CEQA) Fee Exemption per California Government Code Section 6103 To: COUNTY CLERK From: City of Santa Ana County of Orange Public Works Agency P.O. Box 238 20 Civic Center Plaza(M-36) Santa Ana,CA 92702 Santa Ana,CA 92702 Project Title; Memory Lane and Flower Street Bikeway Project Number(s): CIPA 23-6037 Project location: Memory lane from The City Drive to Flower Street and Flower Street from Mem City: Santa Ana County: Orange ER Number: ER-2023-118 Orate of Approval: 12/19/2023 Project Description: Construction of bikeway, ADA compliant sidewalks and curb ramps, bulb-outs (curb extensions), raised medians/crosswalks,traffic signal modification and channelization on Memory Lane and Flower Street. Applicant Name: City of Santa Ana,Public Works Agency Applicant Address; 20 Civic Center Plaza M-36 Santa Ana,CA 92702 Name of Public Agency Approving Project: City Council TO BE FILED Name of Agency Carrying Out Project: Public Works Agency Exempt Status: ❑ Ministerial(Sec. 15268) ❑ Declared Emergency(Sec. 16269(a)) ❑ Emergency Project(Sec. 16269(b through e)) 13 General Rule(Sec. 15061(b)(3)/(5)) ❑ Statutory Exemption: ® Categorical Exemption: 15301(b) Reason(s)Why Project Is Exempt From CEQA: 16301(b)consists of repair/maintenance of existing public facilitles. City Contact: ilbert Castillo Title: Senlor Engineer Telephone: l (714)647-5647 Signature: Date: 3ANTAANA CITY COUNCIL Valerie 4m a d seals I apnz Thal Viol Phan Benjamin Vazquoz Phil Bacerra Johnathan Ryan Hemandoz David Penalcra Mayor Mayor Pro Tom,Ward 3 Ward 1 Ward 2 Ward 4 Ward 5 Ward 6 vamezwardssnta-ana.ora s o a a-a ;tohamftant"na.arq hvazairer ante-egaorg abacarca_lrDsantaann:arn : IrvanhemandexlAsanla•arsa.ara sera .an m � x w « \ � j Cl) 2 / \ LL � o 7 §a � , , , . � &/ } / y/ LL LL � j \ w ` § w \2 LL L ) cc 0- cz , , , . Lu - - a$ m m .\ 0 C) » » E LU # LU § , , , . ) , , , . Cl) m m m Q / IL z \ � ya»E) S§ . . . . § . . . . a R �>. w \\\ N / LL � \k\ « ] o / o / p w o « z � ` ® | d = \ § G § o 't g W R � ¥ \ \ ®a " /¥ / \ ®\ » � co �t G m w = a z/ 0 \ C, No (Db & a \ ! t F- F- L � \\/ Ocn O o � Lu {/} m 2 w ice ® F- a a a� /\\ cn � e g � V}3 LL } z \ w a®\ w / 0 2 a 0 # o LU w j / \ Q ® s u \\\ / \ \ % 0- k > % a d >w o 0 3 O \ § � 6 IL Cl) % , / w \ w § 2 | C E k § Q \ � / gn O E \ O 2 L / a 2 3 CL 2 i � . . .