Loading...
HomeMy WebLinkAboutItem 16 - Agreement with KTU&A for Safe Routes to Parks & Wheelchair Assessment Plan Public Works Agency www.santa-ana.gov/public-works Item # 16 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report September 15, 2026 TOPIC: Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan AGENDA TITLE Agreement with KTU&A for Safe Routes to Parks and Wheelchair Assessment Plan (Project No. 26-6100) (Specification No. 26-028A) (Non-General Fund) RECOMMENDED ACTION 1. Approve an appropriation adjustment to recognize $83,486 of prior-year fund balance in the Measure M-Street Construction, Prior Year Carryforward revenue account and appropriate the same amount to the Measure M2 Local Fairshare St, Improvements Other Than Buildings expenditure account. (Requires five affirmative votes) 2. Approve an amendment to the Fiscal Year 2026-2027 Capital Improvement Program to include an additional $83,486 in Measure M2 Local Fair Share funds for the Safe Routes to Parks and Wheelchair Assessment Plan (No. 26-6100). 3. Authorize the City Manager to execute an agreement with KTU&A to provide Safe Routes to Parks and Wheelchair Assessment Plan in an amount of $813,854, for a term beginning September 15, 2026 and expiring March 14, 2028, with provisions for one (1) six-month extension for a total not to exceed $813,854 (Agreement No. A-2026-XXX). GOVERNMENT CODE §84308 APPLIES: Yes DISCUSSION The Public Works Agency (PWA) is responsible for planning and implementing infrastructure improvements to its roadway network to prioritize safety and accessibility for all users and abilities. These efforts are guided by the approved General Plan Mobility Element, which calls for a safe, balanced, and integrated network of travel ways for nonmotorized modes of transportation that connects people to activity centers and inspires healthy, active lifestyles. The City's Safe Routes to Schools and Parks policy calls for developing and implementing safe routes to schools and parks by partnering with school districts, residents, property owners, and community stakeholders. Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026 Page 2 The City has advanced these goals through several transportation safety planning efforts, including the Safe Mobility Santa Ana (SMSA) Plan adopted in 2016 and Active Transportation Plan adopted in 2019. In 2020, the City adopted the Santa Ana Safe Routes to School (SRTS) Plan, developed through a multi-agency partnership to promote walking and bicycling as safe and healthy transportation options for students traveling to and from school. In 2024, the City adopted its Vision Zero Action Plan, which updated the SMSA Plan and identified strategies to address serious collisions and improve safety for the City's most vulnerable roadway users. The City owns, operates, and maintains 50 parks and recreational facilities, consisting of: • City Parks (6) • Community Parks (17) • Neighborhood Parks (12) • Pocket Parks (8) • Urban Plazas (3) • Special Use Facilities (4) While roadways adjacent to certain parks and schools have been evaluated through the Vision Zero Action Plan and Safe Routes to School Plan, the majority of routes providing access to the City's 50 parks and recreational facilities have not been comprehensively studied. This planning gap identified the need for a Safe Routes to Parks and Wheelchair Assessment Plan to evaluate existing conditions, identify accessibility and safety deficiencies, and develop recommended improvements that build upon the City's previous transportation planning efforts. The wheelchair assessment will further evaluate pedestrian accessibility along routes serving City parks, including sidewalks, curb ramps, crossings, and other potential barriers to mobility. The proposed Safe Routes to Parks and Wheelchair Assessment Plan will complement, rather than duplicate, these existing planning efforts by focusing specifically on safe and accessible routes to City parks and identifying mobility barriers for persons with disabilities. The project will evaluate pedestrian and bicycle access to the City's 50 parks and recreational facilities, with a focus on routes within one-quarter mile of each park. Based on the City's existing pedestrian network, the combined park study areas encompass an estimated 250 miles of sidewalk before accounting for overlapping study areas. The wheelchair assessment will build upon the City's existing citywide inventory of approximately 7,400 curb-ramp locations and will update curb-ramp conditions, with park-area ramps receiving focused field review and other locations evaluated through a combination of desktop review and targeted field verification. The City applied for and was awarded a Planning and Demonstration grant through the U.S. Department of Transportation (DOT) Federal Highway Administration (FHWA) Fiscal Year 2023 Safe Streets and Roads for All (SS4A) Grant program. The SS4A Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026 Page 3 Program supports the planning, infrastructure, behavioral, and operational initiatives to prevent roadway deaths and serious injuries among all roadway users, including pedestrians, bicyclists, transit and micromobility users, and commercial vehicle operators. Due to federal staffing constraints and a high volume of grant agreements, U.S. DOT experienced significant processing delays for Fiscal Year 2023 awards. During the processing period, U.S. DOT required revisions to its standard grant agreements and provided the City with an updated agreement template on November 3, 2025. To mitigate delays in processing, the grant provides a five-year period of performance from the award date, with eligible grant expenditures required to be completed by September 30, 2028. On December 2, 2025, City Council recognized $651,200 in Federal SS4A grant funding. Pursuant to the executed agreement with U.S. DOT, the City will contribute $162,654 local matching funds, resulting in a project budget of$813,854. The Safe Routes to Parks and Wheelchair Assessment Plan will evaluate pedestrian and bicycle access to City parks, identify existing safety and accessibility barriers, engage community stakeholders, and develop prioritized recommendations for future infrastructure improvements. The Plan will provide the City with an implementation framework to guide future capital projects and support applications for competitive grant funding. The Safe Routes to Parks and Wheelchair Assessment Plan is intended to serve as an implementation and funding framework for future pedestrian, bicycle, and accessibility improvements throughout the City. The City will leverage the approach used for its Safe Routes to School Plan, which has provided a foundation for identifying, prioritizing, developing, and pursuing funding for improvements around schools. To date, the City has successfully secured over $100 million in grant funding for Safe Routes to School and related active transportation improvements, including funding through the Active Transportation Program (ATP) and other competitive funding sources. Similarly, the Safe Routes to Parks Plan will identify specific infrastructure needs and recommended improvements; establish priorities based on safety accessibility, equity, community needs, and feasibility; and develop planning-level cost estimates and GIS mapping necessary to advance projects for future funding applications. The Plan will also identify appropriate federal, state, regional, and local funding opportunities and establish a prioritized list of projects that can be pursued as funding opportunities become available. This approach will allow the City to move from planning to implementation by using the completed Plan as a foundation for developing grant applications, capital improvement projects, and future design and construction efforts. Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026 Page 4 By establishing a citywide, data-driven, community-supported list of prioritized Safe Routes to Parks projects, the City will be better positioned to compete for discretionary funding programs such as the Active Transportation Program, Highway Safety Improvement Program, Safe Streets and Roads for All, and other Federal, State, and regional funding sources. The Plan will also identify opportunities to coordinate park access improvements with roadway, sidewalk, bicycle, transit, and accessibility projects already planned or programmed by the City and partner agencies. This approach is consistent with the City's existing Safe Routes to School implementation model and is intended to create a repeatable pipeline of grant-ready projects that can be pursued over multiple funding cycles. Request for Proposal (RFP) No. 26-028A was issued February 26, 2026 on the City's online bid management and publication system. A summary of vendor participation and results is as follows: 546 Vendors notified 0 Santa Ana vendors notified 45 Vendors downloaded the RFP packet 5 Responsive proposals received 0 Responsive proposals received from Santa Ana vendors Proposals were solicited, opened on March 30, 2026, and evaluated. Five proposals were submitted by the RFP deadline and were determined to be responsive to the specifications and met the City's requirements. An evaluation committee reviewed and rated the proposals according to the criteria listed in the RFP. The following summarizes the rankings of all responding firms: Firm City Ranking KTU&A San Diego, CA 1 Toole Design Group Los Angeles, CA 2 Alta Planning & Design Los Angeles, CA 3 Mark Thomas Irvine, CA 4 HDR Engineering, Inc. Irvine, CA 5 Based on a comprehensive evaluation of the proposals, the evaluation committee determined that KTU&A demonstrated the best overall understanding of the City's vision for the Safe Routes to Parks and Wheelchair Assessment Plan and is uniquely qualified to deliver a community-centered planning process tailored to Santa Ana. KTU&A's proposal reflects extensive experience preparing multimodal transportation, active transportation, and community planning projects for California public agencies, with particular emphasis on integrating transportation planning, urban design, accessibility, and placemaking. The proposed project team demonstrated a strong understanding of Santa Ana's existing planning efforts, including the Vision Zero Action Plan, Safe Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026 Page 5 Routes to School Plan, and Sidewalk Connectivity Plan, and presented an approach that builds upon these efforts while focusing on implementation-ready recommendations that improve access to parks for residents of all ages and abilities. The evaluation committee highly ranked KTU&A's collaborative and multidisciplinary approach, which emphasizes meaningful community engagement, coordination with local stakeholders, and context-sensitive solutions that reflect the unique character and needs of Santa Ana's neighborhoods. KTU&A's experience working within Southern California communities, combined with its understanding of equitable transportation planning and public realm design, positions the firm to successfully develop a plan that not only identifies infrastructure improvements, but also creates a practical roadmap for future capital investment and competitive grant funding opportunities. Based on the proposal, interview, and overall evaluation, the committee determined that KTU&A offers the best overall value and project approach to successfully complete the Safe Routes to Parks and Wheelchair Assessment Plan in accordance with the City's objectives. Staff recommends awarding an agreement to the highest-ranked firm, KTU&A (Exhibit 1), based on evaluations of both the proposal (Exhibit 2) and interview performance. KTU&A demonstrated the ability to allocate the necessary staffing and resources to complete the project within the timeline allotted by the grant funding source. ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. FISCAL IMPACT With the approval of the requested appropriation adjustment, a portion of the accumulated fund balance will be appropriated for spending in the Measure M2 Local Fairshare St., Improvements Other Than Buildings expenditure account (No. 03217662- 66220). The spendable portion of the fund balance is estimated at $1,862,161.31 as of June 30, 2027, which is sufficient to allow for the recommended appropriation of $83,486. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers into Fiscal Year 2027-2028. (Exhibit 3). Funding will be budgeted and made available in the following account for the specified year, subject to City Council approval: Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026 Page 6 Accounting Fiscal Unit —Account Fund Accounting Unit, Amount Year No. Description Account Description Pro'ect No. APPROPRIATION ADJUSTMENT Measure M- Measure M2 Local 2026-27 03217662- Street Fairshare St, $83,486 66220 (26-6100) Construction Improvements Other Than Buildings CURRENT BUDGET 14717611- Pub SVS-Street Safety 2026-27 66220 Street Safety Projects, Improvements $651,200 26-6100 Programs Other Than Buildings 03217662- Measure M- Measure M2 Local 2026-27 66220 Street Fairshare St, $79,168 (26-6100) Construction Improvements Other Than Buildings TOTAL $813,854 EXHIBIT(S) 1. Agreement with KTU&A 2. KTU&A Proposal 3. Capital Improvement Project Worksheet Submitted By: Rodolfo Rosas, P.E., Acting Executive Director of Public Works Approved By: Alvaro Nunez, City Manager Exhibit I AGREEMENT WITH KTU&A TO PROVIDE TRANSPORTATION PLANNING AND TRAFFIC ENGINEERING SERVICES THIS AGREEMENT is made and entered into on this 15th day of September,2026 by and between KTU&A ("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California("City"). RECITALS A. On February 26, 2026, the City issued Request for Proposals ("RFP") No. 26-028A, by which it sought a Consultant to perform transportation planning and traffic engineering services for the Safe Routes to Parks and Wheelchair Assessment Plan. B. Consultant submitted a responsive proposal that was selected by the City. Consultant represents that it is able and willing to provide the services described in the scope of work that was included in RFP 26-028A. C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: 1. SCOPE OF SERVICES Consultant shall perform during the terin of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in Exhibit A, attached hereto and incorporated by reference. 2. COMPENSATION a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Exhibit B. The total amount to be expended during the term of this Agreement shall not exceed $813,854, including any extension periods. b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. City and Consultant agree that all payments due and owing under this Agreement shall be made through Automated Clearing House (ACH)transfers. Consultant agrees to execute the City's standard ACH Vendor Payment Authorization and provide required documentation. Upon verification of the data provided, the City will be authorized to deposit payments directly into Consultant's account(s) with financial institutions. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. 3. TERM This Agreement shall commence on the date first written above for a one (1) 'year term with the option for the City to grant up to two (2), one M-Year extension(s), exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 16,below. 4. PREVAILING WAGES Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and"maintenance"projects. If the services being performed are part of an applicable "public works" or"maintenance"project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 5. INDEPENDENT CONTRACTOR Consultant shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 6. OWNERSHIP OF MATERIALS This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. 7. INSURANCE Insurance requirements attached hereto as Exhibit C and incorporated by reference. 8. INDEMNIFICATION Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1)for personal injury, damages,just compensation,restitution,judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section l of this Agreement; and(2) from any claim that personal injury, damages,just compensation, restitution,judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages,just compensation,restitution,judicial or equitable relief suffered, or alleged to have been suffered,by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution,judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding.Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence,recklessness, or willful misconduct of the Consultant. 9. INTELLECTUAL PROPERTY INDEMNIFICATION Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States' letters patent,trademark, or copyright infringement, including costs,contained in the work product or documents provided by Consultant to the City pursuant to this Agreement. 10. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 11. CONFIDENTIALITY If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance,but in no event less than reasonable care. "Confidential Information"shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that(a)has been disclosed in publicly available sources; (b)is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City. 12. CONFLICT OF INTEREST CLAUSE a. The recipient or subrecipient must maintain written standards of conduct covering conflicts of interest and governing the actions of its employees engaged in the selection, award, and administration of contracts. No employee, officer, agent, or board member with a real or apparent conflict of interest may participate in the selection, award, or administration of a contract supported by the Federal award. A conflict of interest includes when the employee, officer, agent, or board member, any member of their immediate family, their partner, or an organization that employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from an entity considered for a contract. An employee, officer, agent, and board member of the recipient or subrecipient may neither solicit nor accept gratuities, favors, or anything of monetary value from contractors. However, the recipient or subrecipient may set standards for situations where the financial interest is not substantial or a gift is an unsolicited item of nominal value. The recipient's or subrecipient's standards of conduct must also provide for disciplinary actions to be applied for violations by its employees, officers, agents, or board members. b. If the recipient or subrecipient has a parent, affiliate, or subsidiary organization that is not a State, local government, or Indian Tribe, the recipient or subrecipient must also maintain written standards of conduct covering organizational conflicts of interest. Organizational conflicts of interest mean that because of relationships with a parent company, affiliate, or subsidiary organization,the recipient or subrecipient is unable or appears to be unable to be impartial in conducting a procurement action involving a related organization. c. Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. d. No immediate family members of either the Mayor, City Council Member, or any appointed City Official, including appointed board and commission members, as defined under the City's Municipal Code, whose position with the City shall award or influence the award of this Agreement, or any competing contract or amendment thereof, shall be employed in any capacity by the Consultant or have any other direct or indirect financial benefit or interest in this Agreement. e. The section also prohibits the awarding of any agreement, contract, grant, or any amendment to those awards, to any former full-time employee for one-year from date of employee separation except for any Ca1PERS retiree as authorized by City Council resolution £ The Consultant must comply with all conflict of interest laws, ordinances, and regulations now in effect or hereafter to be enacted during the term of this Agreement. The Consultant warrants that it is not now aware of any facts which conflict with the prohibitions defined above. If the Consultant hereafter becomes aware of any facts that might reasonably be expected to create a conflict of interest, it must immediately make full written disclosure of such facts to the City. Full written disclosure must include, but is not limited to, identification of all persons implicated and a complete description of all relevant circumstances. Failure to comply with the provisions of this paragraph will be a material breach of this Agreement. g. Consultant covenants that none of its directors, officers, employees, or agents shall participate in selecting or administrating any subcontract supported(in whole or in part) by City funds stemming from the Agreement where the awarding of the subcontract has any direct or indirect financial benefit or interest to any individual, as defined in subsections (d) and(e) above. 13. NON-DISCRIMINATION Consultant shall not discriminate because of race, color, creed,religion, sex,marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 14. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to,the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein. 15. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Contractors retained by City. 16. TERMINATION This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions: a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. 17. WAIVER No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies. 18. JURISDICTION-VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 19. PROFESSIONAL LICENSES Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 20. FEDERAL REGULATIONS KTU&A shall comply with all applicable contractual provisions required by the United States Office of Management and Budget(OMB), as set for the in 2 CRF Part 200,whether or not expressly set forth in this document,including but not limited to those provisions set forth below.Notwithstanding, anything to the contrary herein,including without limitation , the language in this Agreement, the actual language contained in federal statutes, federal regulations,federally promulgated materials and state statutes, shall control in determining any obligations under federal law in the event of a conflict with any terms, language or provisions contained in this Agreement. KTU&A shall not perform any act, fail to perform any act, or refuse to comply with any requests, which would cause City to be in violation of the federal terms and conditions. a. Federal Regulations—Recipient must comply with the government cost principles,uniform administrative requirements and audit requirements for federal grant program housed within Title 2, Part 180 of the Code of Federal Regulations. b. Debarment and Suspension — As required by Executive Orders 12549 and 12689, and 2 CFR §200.214 and codified in 2 CFR Part 200, Recipient must provide protection against waste, fraud, and abuse by debarring or suspending those persons deemed irresponsible in their dealings with the Federal government. C. Audit Records—With respect to all matters covered by this agreement all records shall be made available for audit and inspection by CITY, the grant agency and/or their duly authorized representatives for a period of three (3) years from the date of submission of the final expenditure report by the City of Santa Ana. For a period of three years after final delivery hereunder or until all claims related to this Agreement are finally settled, whichever is later, Recipient shall preserve and maintain all documents, papers and records relevant to the services provided in accordance with this Agreement, including the Attachments hereto. For the same time period, Recipient shall make said documents, papers and records available to City and the agency from which City received grant funds or their duly authorized representative(s), for examination, copying, or mechanical reproduction on or off the premises of Recipient, upon request during usual working hours. d. Reports—Recipient shall provide to City all records and information requested by City for inclusion in quarterly reports and such other reports or records as City may be required to provide to the agency from which City received grant funds or other persons or agencies. e. Section 504 of the Rehabilitation Act of 1973 (Handicapped) — All recipients of federal funds must comply with Section 504 of the Rehabilitation Act of 1973 (The Act). Therefore, the federal funds recipient pursuant to the requirements of The Act hereby gives assurance that no otherwise qualified handicapped person shall, solely by reason of handicap be excluded from the participation in, be denied the benefits of or be subject to discrimination, including discrimination in employment, in any program or activity that receives or benefits from federal financial assistance. The Recipient agrees it will ensure that requirements of The Act shall be included in the agreements with and be binding on all of its contractors, subcontractors, assignees or successors. £ Americans with Disabilities Act of 1990 — (ADA) Recipient must comply with all requirements of the Americans with Disabilities Act of 1990 (ADA), as applicable. g. Political Activity—None of the funds, materials,property, or services provided directly or indirectly under this agreement shall be used for any partisan political activity, or to further the election or defeat of any candidate for public office, or otherwise in violation of the provisions of the "Hatch Act". h. No Lobbying — Recipient will comply with all applicable lobbying prohibitions and laws, including those found in the Byrd Anti-Lobbying Amendment(31 U.S.C. 1352,et seq.),and agrees that none of the funds provided under this award may be expended by the Recipient to pay any person to influence, or attempt to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any federal action concerning the award or renewal of any federal contract, grant, loan, or cooperative agreement. i. Non-Discrimination and Equal Opportunity —Recipient will comply,and all its contractors (or subrecipients)will comply, with Title VI of the Civil Rights Act of 1964, as amended; Section 504 of the Rehabilitation Act of 1964, as amended; Subtitle A, Title II of the Americans with Disabilities Act (ADA) (1990); Title IX of the Education Amendments of 1972; the Age Discrimination Act of 1975, as amended; Drug Abuse Office and Treatment Act of 1972, as amended; Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970, as amended; Section 523 and 527 of the Public Health Service Act of 1912, as amended; Title VIII of the Civil Rights Act of 1968, as amended; Department of Justice Non-Discrimination Regulations, 28 CFR Part 42, Subparts C, D, E, and G; and Department of Justice regulations on disability discrimination, 28 CFR Part 35 and 39. In the event a Federal or State court, Federal or State administrative agency, or the Recipient makes a finding of discrimination after a due process hearing on the grounds of race, color, religion, national origin, sex, or disability against a recipient of funds, the Recipient will forward a copy of the findings to CITY which will, in turn, submit the findings to the Office of Civil Rights, Office of Justice Programs, U.S. Department of Justice. If applicable, recipient will comply with the equal opportunity clause in 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375. j. Equal Employment Opportunity — Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Executive Order 11246 of September 24, 1965, entitled "Equal Employment Opportunity," as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR chapter 60), as applicable. k. Public Contracts Code — Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the California Public Contract Code Section 10295.3, as applicable. 1. Copeland "Anti-Kickback" Act — Recipient will comply, and all its contractors (or subrecipients)will comply,with all requirements of the Copeland"Anti-Kickback"Act(40 U.S.C. 3145) as supplemented in Department of Labor regulations (29 CFR Part 3), as applicable. in. Davis-Bacon Act — Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable. n. Work Hours and Safety —Recipient will comply, and all its contractors (or subrecipients) will comply,with all requirements of Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3702 and 3704) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable. o. Clean Air Act — 1. The Consultant agrees to comply with all applicable standards,orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. § 7401 et seq. 2. The Consultant agrees to report each violation to CITY and understands and agrees that the CITY will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency, and the appropriate Environmental Protection Agency Regional Office. 3. The Consultant agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA. P. Energy and Conservation —Recipient will comply, and all its contractors(or subrecipients) will comply, with all requirements of the Energy Policy and Conservation Act (42 U.S.C. 6201), as applicable. q. Waste Disposal — Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as applicable. r. Patent Rights—Recipient agrees that the Department of Homeland Security shall have the authority to seek patent rights for any process,product, invention or discovery developed and paid for with funding through this Agreement based on the requirements of 37 CFR§ 401 and any other implementing regulations, as applicable. S. Copyright — Recipient may copyright any books, publications or other copyrightable materials developed in the course of or under this Agreement. However, the federal awarding agency, State Administrative Agency (SAA) and City reserve a royalty-free, non-exclusive, and irrevocable license to reproduce, publish or otherwise use, and to authorize others to use, for federal government, SAA and/or City purpose: (1) the copyright in any work developed through this Agreement; and (2) any rights of copyright to which the subcontractor purchases ownership with support through this grant. The Federal government's, SAA's and City's rights identified above must be conveyed to the publisher and the language of the publisher's release form must ensure the preservation of these rights. t. Equal Employment in Construction Contracts — Pursuant to Equal Employment Opportunity requirements of 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375, as to any construction contract thereunder, if applicable, during the performance of this contract, the Consultant agrees as follows: (1) The Consultant will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Consultant will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color,religion, sex, sexual orientation, gender identity, or national origin. Such action shall include,but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The Consultant will, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. (3) The Consultant will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as apart of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the Consultant's legal duty to furnish information. (4) The Consultant will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers'representatives of the Consultant's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (5) The Consultant will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. (6) The Consultant will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules,regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (7) In the event of the Consultant's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule,regulation, or order of the Secretary of Labor, or as otherwise provided by law. (8) The Consultant will include the portion of the sentence immediately preceding paragraph(1) and the provisions of paragraphs (1)through(8)in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Consultant will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance. U. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment—Recipient will comply, and all its contractors (or subrecipients)will comply, with all requirements under Uniform Guidance 2 CFR §200.216. Recipient will comply with FEMA Policy 405-143-1, Prohibitions on Expending FEMA Award Funds on Covered Telecommunications Equipment or Services (Interim), which prohibits grant recipients and subrecipients from obligating or expending loan or grant funds to procure or obtain, extend or renew a contract to procure or obtain, or to enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. As described in Public Law 115-232, section 889, covered telecommunications equipment: (1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities). (2) For the purpose of public safety, security of government facilities,physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company(or any subsidiary or affiliate of such entities). (3) Telecommunications or video surveillance services produced by such entities or using such equipment. (4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country. V. Domestic Preferences for Procurements/Subcontracts— Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements under Uniform Guidance 2 CFR §200.322. Recipient shall comply with the federal and recipient standards in the award of any subcontracts. For purposes of this Agreement, subcontracts shall include but not be limited to purchase agreements, rental or lease agreements, third party agreements, consultant service contracts and construction subcontracts. Recipient shall ensure that the terms of this Agreement with the CITY are incorporated into all Subcontractor Agreements. The recipient shall submit all Subcontractor Agreements to the CITY for review prior to the release of any funds to the subcontractor. The recipient shall withhold funds to any subcontractor agency that fails to comply with the terms and conditions of this Agreement and their respective Subcontractor Agreement. (1) Recovered Materials Recipient shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired competitively within a timeframe providing for compliance with the contract performance schedule; Meeting contract performance requirements; or at a reasonable price. Information about this requirement, along with the list of EPA-designated items, is available at EPA's Comprehensive Procurement Guidelines webpage: https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The Consultant also agrees to comply with all other applicable requirements of Section 6002 of the Solid Waste Disposal Act. (2) Domestic Preference for Procurements Recipient should, to the greatest extent practicable, provide a preference for the purchase,acquisition,or use of goods,products,or materials produced in the United States. This includes,but is not limited to iron, aluminum, steel, cement, and other manufactured products. For purposes of this clause: Produced in the United States means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States. Manufactured products mean items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber. W. Termination for Cause and Convenience— Should recipient fail for any reason to comply with the contractual obligations of this agreement within the time specified by this Agreement,the CITY reserves the right to terminate the Agreement, reserving all rights under state and federal law. X. Contractual/Legal Remedies for Breach of Contract— Should recipient fail for any reason to comply with the contractual obligations of this Agreement and/or willfully, knowingly or negligently breach any term, condition or requirement of the agreement, City may impose sanctions including but not limited to damages (liquidated damages and or penalties) and /or any other remedy available pursuant to the Agreement of the laws then in effect. 21. NOTICE Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail,postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons: To City: City Clerk City of Santa Ana 20 Civic Center Plaza(M-30) P.O. Box 1988 Santa Ana, California 92702-1988 With courtesy copies to: Public Works Agency City of Santa Ana 20 Civic Center Plaza(M-42) P.O. Box 1988 Santa Ana, California 92702 To Consultant: KTU&A Attention: Joe Punsalan, Principal 1200 F Street San Diego, California, 92101 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. 23. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: CITY OF SANTA ANA JENNIFER L. HALL ALVARO NUNEZ City Clerk City Manager APPROVED AS TO FORM: CONSULTANT: SONIA R. CARVALHO City Attorney By: 4 _ Kyl ellesen By: Joe Punsalan Assistant City Attorney Title: Principal RECOMMENDED FOR APPROVAL: 4v� R6Tblfo Rosas(Aug 27,2026 20:54:13 PDT) Rodolfo Rosas, P.E. Acting Executive Director Public Works Agency EXHIBIT A w'4 CITY OF SANTA ANA EXHIBIT 1 - SCOPE OF SERVICES INTRODUCTION The City of Santa Ana is one of the largest and most densely populated cities in Orange County. Santa Ana has a population of over 310,000 and serves as the county seat. With many large industries and firms, Santa Ana is also a family-friendly city, with rich culture on display in the city's museums and many tourist attractions. The City of Santa Ana is centrally located in the heart of Orange County and is bounded by Interstate-5 to the north, Interstate-405 to the south and State Route-55 to the east. The City has over 100 miles of roadway including 15 major arterials that move over 500,000 vehicles per day. The City of Santa Ana is planning and delivering infrastructure improvements to its roadway network to prioritize safety and accessibility for all users and abilities. As per the approved General Plan Mobility Element, Goal M-3 calls for a safe, balanced, and integrated network of travel ways for nonmotorized modes of transportation that connects people to activity centers, inspiring healthy and active lifestyles. Policy M-3.3, Safe Routes to Schools and Parks, calls for the development and implementation of safe routes to schools and parks by partnering with the school districts, residents, property owners, and community stakeholders. The City's Safe Mobility Santa Ana (SMSA) Plan (2016) and Active Transportation Plan (2019) demonstrate immense community support for making real improvements to address safety problems. Understanding that there are unique challenges for the youth population, the City adopted the Santa Ana Safe Routes to School Plan (SRTP) in 2020. The SRTP was a multi-agency partnership to advance walking and biking as safe and healthy ways to get to school and back in our communities. In 2024, the City adopted its Vision Zero Action Plan, which served as an update to the SMSA Plan to address increasing collisions citywide. The Vision Zero Action Plan evaluated mobility priorities and identified innovative transportation solutions for the city's most vulnerable road users. The City owns, operates, and maintains 48 parks (Exhibit 1-13 - City Parkland by Classification): • City Parks (5) • Community Parks (17) • Neighborhood Parks (11) • Pocket Parks (8) • Urban Plazas (3) • Special Use Facilities (4) Some of the roads fronting these parks or parks adjacent to schools have been evaluated per the Vision Zero Action Plan and Safe Routes to School Plans. However, the majority of the routes to and from the 48 parks have not been studied and resulted in the need for a Safe Routes to Parks Plan to augment previous planning efforts. The City applied and was awarded a Planning and Demonstration grant through the Fiscal Year 2023 Safe Streets and Roads for All Grant program, which supports the planning, infrastructure, behavioral, and operational initiatives to prevent death and serious injury on roads and streets involving all roadway users, including pedestrians; bicyclists; public transportation, personal conveyance, and micromobility users; motorists; and commercial vehicle operators. (9) CITY OF SANTA ANA Safety Impact As documented in the application, between 2017 and 2021 the City of Santa Ana experienced 69 bicycle and pedestrian fatalities, equating to a fatality rate of 4.48 per 100,000 residents. Another 66 bicycle and pedestrian fatalities occurred between 2021 and 2025. This rate is unacceptably high and underscores the urgent need for targeted traffic safety interventions. At the national level, the Federal Highway Administration (FHWA) Safety Office has prioritized efforts to reduce pedestrian and bicyclist fatalities in jurisdictions with the highest fatality numbers and rates. In recognition of this need, the City of Santa Ana was designated in 2015 as one of 35 nationwide pedestrian safety focus cities or MPOS per FHWA's Pedestrian and Bicyclist Focused Approach to Safety. In 2025, Santa Ana continues to be identified as a focus area for pedestrian and bicycle safety by the Southern California Association of Governments (one of 24 cities and MPOs). Further, the California Office of Traffic Safety (OTS) provides rankings so that individual cities could compare their city's traffic safety statistics to those of other cities with similar sized populations. In 2023, Santa Ana ranked among the highest statewide for collisions out of a list of 15 similar cities, highlighted below. • Total Fatal and Injury: 4 of 15 • Pedestrians: 5 of 15 • Pedestrians < 15 years old: 3 of 15 • Bicycle: 4 of 15 • Speed Related: 3 of 15 • Nighttime: 5 of 15 • Hit and Run: 5 of 15 These designations collectively demonstrate that Santa Ana has a documented and persistent traffic collision history that necessitates comprehensive and equitable safety improvements. Speed and general lack of lighting continue to be primary factors in fatal and severely injury-related collisions. Equity Considerations Equity is central to this project. Approximately 57.9 percent of Santa Ana's population resides within underserved census tracts, where an estimated 55 percent of residents do not have access to a personal vehicle. As a result, many community members rely heavily on walking, bicycling, and public transit for daily mobility. Santa Ana is one of the most transit-dependent cities in Orange County, with 55 of the county's 100 busiest bus stops located within city limits. For many residents, accessing essential destinations such as parks and schools requires traveling on foot or by bicycle. The City of Santa Ana Safe Mobility Plan and Vision Zero Action Plan found that areas with higher concentrations of poverty, lower educational attainment, youth, and Latino populations experience disproportionate safety risks due to the absence of a truly multimodal transportation system. This lack of safe infrastructure places lower-income residents, youth, and Latino communities -who are more reliant on walking, bicycling, and transit - at increased risk of traffic-related injuries and fatalities. (9) CITY OF SANTA ANA SCOPE OF WORK The proposed Safe Routes to Parks and Wheelchair Assessment Plan will identify walking and biking routes utilized by the community to access the City's parks and associated facilities. The Plan will document the needed traffic safety improvements through robust multi-lingual community engagement, aligning with the recommendations and filling in the gap from both the Vision Zero and Safe Routes to Schools Plans. The Wheelchair Assessment component will identify missing and non-ADA compliant curb ramps by comparing the projects that have been constructed subsequent to the 2017 Sidewalk Connectivity Plan (Exhibit 1-D). The resulting Safe Routes to Parks Plan will document recommended traffic safety improvements at specific routes to and from parks that are not already addressed as part of a related plan. In additional to proven safety countermeasures, the Plan will look to incorporate local art and innovation to augment traditional strategies. The Plan will be developed to be highly competitive for future grant funding related to implementation of the recommendations. The Plan will also incorporate the findings of the citywide assessment of wheelchair ramps. In 2017, the City completed its Sidewalk Connectivity Plan (Exhibit 1-D). The Sidewalk Connectivity Plan performed a self-evaluation process to assess existing sidewalks and curb ramp facilities in the public right-of-way. Ramp conditions were documented using GIS and incorporated into the City's asset management system to support tracking and prioritization of improvements. This assessment will document locations where curb ramps are present, missing, or non-compliant with Americans with Disabilities Act (ADA) standards, reflecting all projects constructed through the City's Capital Improvement Program, Safe Routes to Schools Plan, and other projects built since the 2017 Sidewalk Connectivity Plan was completed. Locations with missing or non-compliant curb ramps will be prioritized for future capital improvements and integrated into the final Plan. Ensuring ADA accessibility is a critical mobility need for Santa Ana residents and an essential element of an equitable transportation system. This Scope of Work describes the minimum work elements necessary for the various tasks related to the Safe Routes to Parks and Wheelchair Assessment Plan. The major project components of this scope of work include the following tasks to be completed: Task 1: Project Management This task focuses on the management of the project to ensure that the project meets funding expenditure, milestone, and reporting deadlines. The City shall be the lead agency for the Safe Routes to Parks and Wheelchair Assessment Plan, and the designated City Project Manager will coordinate project management through the Traffic Engineering Section of the Public Works Agency. However, because this Project will require cooperation with other internal and external agencies, the Consultant shall show a demonstrated ability to interface and coordinate with the multiple agencies. Other agencies will provide necessary input on project design including, but not limited to: • City Public Works Agency (Parks and Recreation, Traffic, CIP Engineering) • City Planning and Building Agency (PBA) • Santa Ana Police Department (SAPD) • Orange County Transportation Authority (OCTA) • Orange County Fire Authority (OCFA) • California Department of Transportation (Caltrans) • Santa Ana Unified School District (SAUSD) (9) CITY OF SANTA ANA Subtask 1.1:Administration and Project Management This sub-task includes the requirements for schedules, cost control, progress reports, invoicing, and administration of all consultant work. Project Management Plan: The consultant shall provide a comprehensive plan for project management to communicate the scope of work, constraints, and technical requirements to all project participants. The plan shall include coordination strategies with project stakeholders to ensure timely completion of project. The plan shall also include an organization chart with description of participant responsibilities, a baseline schedule prepared using the Critical Path Method, and work breakdown structure that identifies the duration and completion of key project activities milestones. The budgeted hours and resource allocation for each task and subtask shall also be defined. The consultant shall submit a copy of the Project Management Plan (PMP) for this Project within thirty (30) calendar days of contract execution. The draft PMP shall be provided to the City of Santa Ana Project Manager for review and input. At the discretion of the City of Santa Ana Project Manager, it may be distributed to project participants at the start of the project. If distributed to project participants, a kick-off meeting shall be held to review the plan requirements within thirty (30) calendar days of contract execution. Monthly Progress Status Reports and Schedule Updates: The consultant shall prepare and submit an initial Project Master Schedule following contract execution. Upon approval by City of Santa Ana, the schedule will become the Project Baseline Schedule. The following elements must be included by consultant in the Baseline Schedule: • Work items and deliverables identified in accordance with a Work Breakdown Structure (WBS), reflecting the requirements of this scope of work developed by consultant and approved by City of Santa Ana. • Work items of third parties that may affect or be affected by consultant's activities and develop proposed solution. • The Project Master Schedule shall include all data necessary to represent the total project and the critical path shall be clearly identified. • The order, sequence and interdependence of significant work items shall be reflected in the Project Master Schedule. The consultant shall prepare and submit monthly progress reports to the City of Santa Ana's Project Manager, including updates on key milestones, Project schedule, identification of issues, and percent complete detail for each task worked on during the reporting period. The Project progress and schedule updates shall be reported as Earned Value (percent complete) against the Baseline Schedule. The report will also describe anticipated activities to be undertaken in the next reporting period, and any new or changed, challenges or risks that may affect schedule, scope, and budget. Subtask 1.2: Kick-Off and Project Development Team Meetings A Project Kick-Off Meeting shall be scheduled with City of Santa Ana immediately following the contract execution. The meeting will include administrative items, such as progress reports and invoicing requirements, and Project critical path. The consultant shall prepare the agenda and notes following the meeting. The project team members will include City of Santa Ana's Project Manager, consultant staff and key project stakeholders that will help guide the direction of the study. The consultant shall schedule, coordinate, and attend monthly project development team (PDT) meetings throughout the duration of the project. The consultant shall prepare meeting materials on project related issues discussed, including agendas, power point presentations, handouts, progress plans, meeting notes and notations for specific (9) CITY OF SANTA ANA or directed follow-up action items. PDT meetings can be in-person or hybrid via Microsoft Teams or Zoom. Subtask 1.3: Federal Safe Streets and Roads for All(SS4A) Grant Program Reporting This sub-task includes the development of plan and reporting documents required to adhere to the grant funding guidelines (SS4A) for the project. The consultant will assist the City with SS4A reporting requirements and invoicing guidelines. Task 1—Deliverables - Monthly invoices and Progress Reports - Project Management Plan and Schedule - Kick-Off Meeting agenda and notes - PDT meeting materials, agendas, and notes - SS4A grant reporting methodology and plans Task 2: Existing Analysis and Assessment This task includes the data collection effort necessary to develop a thorough understanding of all the Project needs and challenges. Subtask 2.1: Data Collection The consultant shall develop a data collection technical memorandum, documenting the approach to collecting various data surrounding the City's park system. This sub-task includes gathering existing condition information that includes, but is not limited to: • Traffic counts • Bicycle and Pedestrian counts • Most recent 5-year collision data • Posted speed limits and 85t" percentile speeds • Bus boardings and alightings at bus stops The City has an extensive data base and the consultant shall work with the City to identify and obtain any existing sources of data for purposes of identifying gaps in data. Existing conditions should also include a field survey to observe any conditions not reflected in traditional data. Traffic counts, including bicycle and pedestrian counts, shall be conducted in accordance with the Southern California Association of Governments' (SCAG)Active Transportation Database methodology. Count data will be used for warrant analyses, tracking mobility trends, and as support for future grant opportunities. Subtask 2.2: Walk and Bike Audits The consultant, with support from City staff and local community groups, shall facilitate a series of walk and bike audits at each of the 48 parks and facilities. The walk and bike audits shall make every effort to identify uplifted sidewalks, missing curb ramps, potential crosswalk locations, needed bicycle infrastructure, traffic calming measures, and any traffic signal improvements. Each walking audit shall include the opportunity for residents or other park patrons to participate. Understanding this task covers a large geographical area, the City is open to suggestions regarding the audits. (9) CITY OF SANTA ANA Task 2— Deliverables: - Data Collection Technical Memorandum - Existing Bicycle and Pedestrian Facilities Map - Existing Conditions Technical Memorandum Task 3: Community Outreach and Engagement The Plan will require extensive community engagement to develop traffic safety improvements that are both community driven and supported by the findings of the ongoing Santa Ana Vision Zero Plan. The City will leverage its well-established relationship with 64 citywide neighborhood associations and working relationships with residents and non-profit partners that understand safety programs and facility design. The proposed project scope for the City of Santa Ana Safe Routes to Parks and Wheelchair Assessment Plan will include a community outreach and engagement strategy designed to actively engage residents in identifying the walking and bicycling routes used to access the City's 48 parks and recreational facilities. Community stakeholders will include, but not be limited to, neighborhood associations, community-based organizations, schools, youth sports leagues, local nonprofit organizations, the Orange County Health Care Agency, the Orange County Transportation Authority, Orange County Fire Authority, and relevant City departments such as Parks and Recreation, Traffic Engineering, Police, and Planning. The outreach and engagement strategy should build upon the foundation established by the Santa Ana Vision Zero Plan, as well as other previous engagement efforts conducted as part of related plans and studies. Community workshops, interactive sessions, and facilitated dialogue, supplemented with walking and bicycle audits, have typically been successful in providing opportunities community members to identify specific traffic safety concerns, using a variety of in-person, online, and hybrid tools. Routes identified by residents will be compared with corridors identified in both the Vision Zero Plan and Safe Routes to Schools plan for purposes in identifying gaps. The ongoing Santa Ana Vision Zero Plan update has identified 20 high-injury safety corridors characterized by multiple travel lanes, high traffic volumes, and elevated vehicle speeds. Many city parks front these corridors or are accessible only by crossing similar high-risk roadways. Even parks not directly adjacent to these corridors often require residents to cross them, increasing exposure to traffic-related hazards. While the Vision Zero Plan identifies priority corridors, it does not specifically address safe routes to and from parks. The Safe Routes to Schools Plan may cover corridors for parks adjacent to schools. This project addresses that gap by developing a focused plan that identifies targeted traffic safety improvements for walking and bicycling routes connecting residents to park facilities within a quarter-mile radius throughout the City of Santa Ana. Subtask 3.1: Outreach and Engagement Plan A detailed Outreach and Engagement Plan shall be submitted, documenting the stakeholders, proposed approach, and overall strategy. Understanding there are 48 parks and facilities citywide, the consultant shall develop an innovative and streamlined approach that reflects the input, feedback, and concerns of the communities the parks serve. Consultant shall coordinate with the City of Santa Ana to form a stakeholder group that will provide appropriate feedback from the community adjacent to parks and facilities. It is anticipated that the stakeholder group will include but not be limited to local neighborhood associations, business associations, schools, local non-profits including Latino Health Access and Santa Ana Active Streets, Orange County Health Care Agency, The Bicycle Tree, emergency services, etc. Stakeholder meetings should be scheduled quarterly for the duration of the project. Consultant is responsible for setting meeting agenda and minutes. (9) CITY OF SANTA ANA Subtask 3.2: Website, Social Media, and Surveys Consultant shall work with the City's Public Affairs Information Officer to create and submit material to be posted on the City's website and social media channels, such as plan announcements and documents to be posted throughout the duration of the project. The City's website will include an explanation of the project, key schedule milestones, and provide a means for online feedback. Consultant is responsible creating a digital outreach, advertisement, and engagement campaign that will include project fact sheets, online surveys, social media posts and e-newsletters. The online survey should be conducted before any recommendations are made to understand pain points and focus areas. All media should be available in English, Spanish and Vietnamese. Subtask 3.3: Community Workshops Consultant will facilitate at least two (2) community workshops, to be held at during key phases of the project. Consultant will coordinate with the City of Santa Ana to identify appropriate locations within the city to host community workshops. The first round of workshops will include community engagement to provide an overview of the project and receive community input related to pedestrian and bicycle traffic safety concerns, transit concerns, and general mobility challenges getting to and from the parks. The second round of community workshops will present the findings and draft of the Safe Routes to Parks Plan. The consultant shall be responsible for all materials used in these workshops, including boards, printouts, sign in sheets, comment cards, and other handouts. All community meetings should include a Spanish and Vietnamese translator. Subtask 3.4: City Council Meetings Consultant shall attend and present at up to two (2) City Council meetings following each of the community workshops. Consultant shall be responsible for development of the slide deck and providing input for the City staff reports. Task 3— Deliverables: - Stakeholder Group Meetings, Agendas and Minutes (quarterly, up to 5) - Online Social Media Campaign, including Website, Advertisements, and Surveys - Community Workshops (2), Agendas and Minutes - Attendance and Presentation at City Council Meetings (2) Task 4: Analysis Subtask 4.1: Collision Analysis The analysis will consist of a thorough review and study of the data collected, particularly the citywide collisions within the most recent five-year period. Special focus will be placed on all pedestrian and bicycle involved collisions, focusing on severe injuries and fatalities. The analysis will review collisions to identify correctable collision patterns. The review will include, but not be limited to; time of day, day of the week, age of parties, year by year trends, primary collision factors, type of collisions, severity of injury, and fatalities. Subtask 4.2: Local Prioritization and Field Review Conduct a safety evaluation and field reviews for street segments and intersections that present the highest risk to vulnerable roadways users (bicyclists and pedestrians). A prioritization of risk factors shall be established as part of this Task and may include collision patterns, severity of injuries, and proximity to school, parks, or other pedestrian/bicycle generating uses. The field reviews shall be conducted when parks are most utilized. (9) CITY OF SANTA ANA Subtask 4.3: Recommended Countermeasures/Toolbox Based on the data collection, field review and collision analysis; street improvements/counter-measures shall be proposed to mitigate potential future collisions, including multiple alternatives where appropriate. The alternative street improvement options may vary in cost or ease of implementation. Countermeasures shall include engineering, enforcement, and education activities. All options will be considered, from low-cost, highly effective improvements to new technological and/or infrastructure changes. This project will encourage use of innovative and creative street improvement options. Subtask 4.4: Consistency Review All proposed countermeasures shall be reviewed for consistency with local, regional, and state policies, regulations, and guidelines. Potential countermeasures shall not be ruled out due to inconsistency, however inconsistencies shall be identified and recommendations to allow implementation offered. These recommendations may include, but not be limited to; engineering surveys for speed limit reductions, reclassification of streets, or obtaining approval for pilot/study projects. Subtask 4.5: Cost Estimates and Funding Sources Cost estimates for identified improvements shall be developed by the Consultant for the purposes of pursuing future grant opportunities. Consultant shall provide the City with a comprehensive list of potential funding sources, including Federal, State, Regional, and Local funding sources. Links to specific grant programs should be provided, along with deadlines for applications. Subtask 4.6: Improvement Prioritization A prioritization system to rank proposed countermeasures along street segments or intersections with the highest opportunity for collision reductions shall be developed. The prioritization system will establish criteria from the data collection, community survey, field review, and collision analysis. Criteria may include, but not be limited to; volumes of motor vehicles, volumes of pedestrians and bicyclists, speed of motor vehicles, number of collisions, collision patterns, severity of injuries, ease of implementation, cost, and proximity to specific land-uses. Subtask 4.7: Agency Coordination In addition to this project, the consultant must be in coordination with SCAG's Sustainable Communities Program — Active Transportation & Safety project (Move OC: A Vibrant Path to Active Transportation, OCTA) and the Go Human Program for consistency amongst plans. Subtask 4.8: GIS Mapping The Consultant shall create new Safe Routes to Parks maps for each park site that identifies all of the needed improvements/infrastructure gaps in the park area and dictates the official safe routes to parks. These maps shall be designed to meet the City of Santa Ana GIS standards. Each school site shall be prioritized based on identified criteria. Task 4—Deliverables: - Collision Analysis - Improvement Prioritization Technical Memorandum - Cost Estimates - GIS Maps Task 5: Wheelchair Assessment The Plan will also incorporate the findings of the citywide assessment of wheelchair ramps. In 2017, the City completed its Sidewalk Connectivity Plan (Exhibt 1-C). The Sidewalk Connectivity Plan performed a (9) CITY OF SANTA ANA self-evaluation process to assess existing sidewalks and curb ramp facilities in the public right-of-way. Ramp conditions were documented using GIS and incorporated into the City's asset management system to support tracking and prioritization of improvements. This assessment will document locations where curb ramps are present, missing, or non-compliant with Americans with Disabilities Act (ADA) standards, reflecting all projects constructed through the City's Capital Improvement Program, Safe Routes to Schools Plan, and other projects built since the 2017 Sidewalk Connectivity Plan was completed. Locations with missing or non-compliant curb ramps will be prioritized for future capital improvements and integrated into the final Plan. Ensuring ADA accessibility is a critical mobility need for Santa Ana residents and an essential element of an equitable transportation system. The Wheelchair Assessment will be included as an Appendix to the Plan. Task 6: Safe Routes to Parks and Wheelchair Assessment Plan The Consultant shall prepare a comprehensive citywide Safe Routes to Parks and Wheelchair Assessment Plan. The report shall incorporate and be structured around the 6 E's: • Education • Encouragement • Enforcement • Engineering • Evaluation • Equity All recommended projects and programs shall include order of magnitude or planning level cost estimates. The consultant shall provide the City with all applicable files at the close of the project, including graphic and GIS base files. The Consultant shall be available to attend a City Council meeting and present the final Safe Routes to Parks and Wheelchair Assessment Plan for adoption. The final report shall include, but not be limited to the following: i. Introduction ii. Relationship to Other Plans, Projects, and Documents iii. Collision Analysis iv. Outreach Summary V. Toolbox of Potential Countermeasures vi. Recommended Improvements vii. Cost Estimates viii. Prioritization ix. Matrix and Maps of Proposed Countermeasures X. Appendices (include all relevant data) Task 6—Deliverables (One hard copy and an electronic version of each): - Draft Safe Routes to Parks and Wheelchair Assessment Plan - Final Safe Routes to Parks and Wheelchair Assessment Plan w'4 CITY OF SANTA ANA EXHIBIT 1 -A - TENTATIVE PROJECT SCHEDULE AND MILESTONES Tentative Project Schedule and Milestones Task Starting Date Ending Date Kickoff Meeting & Notice to Proceed May 2026 May 2026 Existing Analysis and Assessment May 2026 September 2026 Outreach and Planning June 2026 November 2026 Countermeasure Development July 2026 December 2026 Plan Production and Approval January 2027 September 2027 w'4 CITY OF SANTA ANA EXHIBIT 1 -13 - CITY PARKLAND BY CLASSIFICATION The City includes a variety of parkland, classified as either community-serving, neighborhood-serving, or other parks and facilities. There is a total of 22 community-serving parks (5 Citywide Parks and 17 Community Parks), 11 Neighborhood Parks, and 15 Other Parks and Facilities (8 Pocket Parks, 3 Urban Plazas, and 4 Special Use Facilities), summarized below. FOTAL ACREAGE JjjjjW COMMUNITY-SERVING PARKS Citywide Parks 5 168.2 Centennial Park Santiago Park Community Paris 17 129.O Windsor Park, Bomo I oral Park Oornmunity-Serving Parks Subtotal 22 297.2 NEIGH SORHOOD-SERVING PARKS Neighborhood Parks 11 19.5 Mabury Park, Edna Park Neighborhood Parks Subtotal 11 19.5 OTHER PARKS AND FACILITIES Pocket Parks 8 3.7 Sarah May Dovmie Herb warden, French Park Urban Plazas 3 6.0 Plaza Calle Cuatm, Sasscer Park Special Use Facilities 4 32,7 Santa Ana Zoo at Prentice Paris, Cabrillo Tennis Center the.- -larks and Facilities Subtotal 15 42.4 OTHER RESOURCES w'4 CITY OF SANTA ANA EXHIBIT 1 -C - EXISTING PARKS AND FACILITIES MAP Far ! EI n ge ark t- — �7 T`J C�. r" i I Memgry lane �d S�anti o i _ Park • ck Par k-•--J s U N I NC ;in 0 Pamir - Edna Pp rto la Park f`• � 1/Riverview Park + I ® I i '0 ,aJ Mabwy Park I r_J Rosda Park •J .e 1 Pare#s �C�brk j • EI Splvador ©r �-' Mgnoosa ark i 5 Ca�ssaa Chas= Park � ulrsh •,, -, t'ark I®y Saddlebah kj CamPpBsno CPark tY .. k ar it i A Bch Park i Heritage``Park Sy'ta � I� Anita ParkLl 0 �� I ' ® �� Pacilq Elenric � 0 L_ r Jerome Park Vark s _Windsor Park i ILA PaAIR�Certenn,w Memorial Park / / .. Delh.Park Adams Park S q offt / - tie a7tyleMPark ' / \ Carl Thornton Pa�c U CW / /. ,v. L •-------• Bo o Koral / 1----- ark .----- Oo os t ikaaes COSTA MESA t r r J Joint-Use School Sites Pocket Parks Q Willard InlerrmMiate School O Sarah kay Downie Herb harden o plaza Calk(uatrc (7 Garfield Elementary Schod ®French Park Q SasscerParl RoaereliVaker Elementary Sckal O'7A Sheet inange Park ©Crric Center D Write Ma Elementraryschool 0 Farylew Titan*Habitat Restoranon EQ MadisonElementaySdrool rfl hKaddenTrianglePark Special Use Facilities FQ(rod(lei doSthool RfaFfeo-ndOcudemlExeruse Par k O Santa AmZDDatPrenhtePark O Monroe ElementarySthod O fnendship Park ®SanteAuStadiwn ®Garfeld We%Pa 4 O CatrilloiemeCenter ®ikal Mathander fermis Center Legend (#Aykwi&Aars rhln•r, f.rruwroratrt lcrgaro@,yvar4errar.0 City Park Pocket:Park Parks and Facilities Proaded by Ohms Communny Park Urban Plaza Nelgttborttood Park tl♦Special Use Fa[u4y —Mapr Roads•rre nays Rail LrteWetro Rail — -T-oil Corridor ONe(Qr91aFGapwC ;City of Santa Ana • Malor Recreation Pare Resource —i Surrouoing Cities and Unincorporateo Areas raohty Undeveloped Pack 501301 _Jo"-Use School Site Waterbodles EXHIBIT B '^`"#�tr n r F +fie ' lTt N rG�jRro$ 1 1u+w.�♦r '•t, war' av Ltq , t, ftn� .1G '", "96p`�`" AN n� 'gyp- ! a� AV ,�i� 4� - b� r"' � v ��• �i � V0.' yc4 t9 '+1 'Q"qr �a or V MOP MRS jo All All xi .._ -yam � F4 r�. 3 I"- ` a. b '�tiFY �:a `5 Sy}� •� 71I �i :z c. ,+ d{.R• F ,� �� �✓ � tw-'` Y ,x�l r � �."�-��"�a.r�+ � ,e'Rr �i"k 5. �• S y r�r i r UV'� 7fe f STOP ' I oil Cost roposal Blame NINE am Team Project Management - - 2 Eaisdng Analysisand Assessment. 3 Community Engagement �® 4 Andy* S WheelchalrAmessmaat 6 Sate Routes te Pado and Wheelchair Assessment Plan 2. Cost Proposal - Schedule! T(!^ City of Santa Ana Safe Routes to Parks and Wheelchair Assessment Plan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Anticipated Project Schedule 1.1 Project ManagemmtPlan 1.2 Kickoff Meeting and Project Devel opment Tea m(PDT)Meet i ngs 1.3 Federal Safe Streetsand Roadsfor All(SS4A}Grant Program Reporting 2.1 Data Collectian(I nc l udes Lit Rev i ew) 22 WW k and 81 ke Udits 2.2.1 TEchnical Walk and Bike Audit 2.22 Walk and Talk Events 2,3 ExistiogConditions Technical Memorandum 3.1 Outreach and Engagement P'Iarr 3.2 Website,Social Media,and Survey 313 Community Workshops(2) 3.31 Pop-up Events(4) 3.3.2 StakeholderMeetings(S) j3.4"Cily il Meetings 4.1 Collision Anaiy9s 4.2 Local Prioritization and Fleld Review 4.3 Recommended Cou ntermeasu res/Toolbox 4.4 Can sistency Review 4.5 Cost Estimates and Funding5ources 4.6 Improvement Prioritization(Includes CAD concepts) 4.7 Agency Coordination 4.8 GISMapping 5.1 Wheelchair Assessment 6.1 Draft Plan 6.2, Final Plan FF� CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/29 EXHIBIT C Prior to undertaking performance of work under this Agreement, Consultant shall maintain and shall require any subcontractors to obtain and maintain insurance as described below for the entire Term of this Agreement against claims for injuries to persons or damage to property which may arise from or in connection with services, products and materials supplied to City.Total cost of such insurance shall be borne by Consultant. MINIMUM SCOPE AND LIMIT OF INSURANCE 1. Commercial General Liability(CGL): Insurance Services Office Form CG 00 01covering CGL on an "occurrence" basis, including products and completed operations, property damage, bodily injury and personal &advertising injury with limits no less than $2,000,000 per occurrence and $4,000,000 aggregate. Required policy limits can be met with primary and umbrella/excess insurance policies. 2. Automobile Liability(AL): Insurance Services Office Form CA 00 01 covering Code 1 (any auto), with limits no less than $1,000,000 combined single limits. In the event Consultant does not maintain commercial automobile liability insurance, City will accept evidence of personal automobile insurance, provided that such policy is endorsed for business use and provides coverage with a minimum limit of$1,000,000. Required policy limits can be met with primary and umbrella/excess insurance policies. 3. Workers'Compensation (WC): as required by the State of California,with Statutory Limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per accident, policy or employee, for bodily injury or disease. Coverage is not required if Consultant has no employees and signs request to waive such insurance. 4. Professional Liability(PL)/Errors and Omissions(E&O):with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 aggregate. If Consultant maintains broader coverage and/or higher limits than the minimum requirements for each line of coverage shown above, City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Consultant.Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City. Other Insurance Provisions The above required insurance policies are to contain or be endorsed to contain the following provisions: 1. City, its City Council, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds, under Consultant's CGL and AL policies,with respect to any liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, equipment, and personnel furnished in connection with such work or operations. 2. Consultant's Insurance company(ies) agrees to waive all rights of subrogation against City, its City Council, its officers, officials, employees, agents, and volunteers for losses paid under the terms of Consultant's CGL,AL, and WC policies which arise from work performed by Consultant under this Agreement. 3. For any claims related to this contract, Consultant's insurance coverage shall be primary and any insurance maintained by City, its City Council, its officers, officials, employees, agents, or volunteers shall not contribute with it. 4. A severability of interest provision must apply for all the additional insureds, ensuring that Consultant's insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the insurer's limits of liability. 5. Insurance policies required herein shall provide that coverage shall not be canceled, suspended, voided, reduced in coverage or in limits, non-renewed by the carrier,or materially changed except after thirty(30) days prior written notice has been given to City. Ten (10)days prior written notice shall be provided to City for policy cancellation or non-renewal due to non- payment of premium. 6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, Attention: Michael Arizabal, 20 Civic Center Plaza, M-43, Santa Ana, CA 92701.The name and location of project must be included in the Description of Operations section of each certificate. Self-Insured Retentions Self-insured retentions must be declared to and approved by the City.The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. Acceptability of Insurers Insurance is to be placed with insurers authorized to conduct business in the State of California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable to City. Verification of Coverage Consultant shall furnish City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive Consultant's obligation to provide them. City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at anytime. Special Risks or Circumstances City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. 0 76/26/2026 (MM/DDYYYY) CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsements . PRODUCER ACT NAME: Certificate Department Cavignac PHONE FAX 451 A Street, Suite 1800 A/c No EXt: 619-744-0574 A/c No):619-234-8601 San Diego CA 92101 ADDRESS, certificates@cavignac.com INSURER(S)AFFORDING COVERAGE NAIC# INSURERA:Travelers Property Casualty Company of America 25674 INSURED KTU&APL-01 INSURERB: Berkley Insurance Company 32603 KTU&A 1200 F Street INSURERC:Travelers Indemnity Co of Conn 25682 San Diego, CA 92101 INSURERD: Hartford Casualty Insurance Co 29424 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1964445717 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDLSUBRTYPE OF INSURANCE INSD WVD POLICY NUMBER POLICY EFF POLICY EXP LTR MM DD YYYY MM DD YYYY LIMITS A X COMMERCIAL GENERAL LIABILITY Y Y 6801 H979452 9/1/2025 9/1/2026 EACH OCCURRENCE $1,000,000 F�_] DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES Ea c.."ence $1,000,000 X Cross Liability MED EXP(Any one person) $10,000 X Contractual Liab PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIE S PER: GENERAL AGGREGATE $2,000,000 X POLICY� ECT � LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ C AUTOMOBILE LIABILITY Y Y BA2S035976 9/1/2025 9/1/2026 COM BINED SINGLE LIMIT $1,000,000 Ea accident ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTYDAMAGE $ AUTOS ONLY AUTOS ONLY Per accident X NoOwnedAutos $ A UMBRELLALIAB X OCCUR CUP1C934653 9/1/2025 9/1/2026 EACH OCCURRENCE $4,000,000 X EXCESS LIAB CLAIMS-MADE AGGREGATE $4,000,000 DED X RETENTION$n $ D WORKERS COMPENSATION Y 72WEGGG6436 9/1/2025 9/1/2026 X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? ❑ N I A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 B Professional Liability AEC909023610 911121125 9/1/2026 Each Claim $5,000,000 Aggregate $5,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Additional Insured coverage applies to General Liability and Automobile Liability for City of Santa Ana, its City Council,its officers,officials,employees,agents, and volunteers per policy form. Primary coverage applies to General Liability and Automobile Liability per policy form.Waiver of subrogation applies to General Liability,Automobile Liability,and Workers Compensation per policy form. Professional Liability-Claims made form,defense costs included within limit. If the insurance company elects to cancel or non-renew coverage for any reason other than nonpayment of premium Cavignac will provide 30 days notice of such cancellation or nonrenewal. Excess/Umbrella policy follows form over underlying policies: General Liability,Auto Liability&Employers Liability(additional insured and waiver of subrogation apply when afforded on underlying policies). APPROVED CERTIFICATE HOLDER CANCELLATION By Tu Tran Nguyen at 11:48 am,JulO6,2026 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Santa Ana 20 Civic Center Plaza Santa Ana CA 92701 AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Policy#BA2S035976 COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GENERAL DESCRIPTION OF COVERAGE—This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. BROAD FORM NAMED INSURED H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF B. BLANKET ADDITIONAL INSURED USE—INCREASED LIMIT C. EMPLOYEE HIRED AUTO I. PHYSICAL DAMAGE — TRANSPORTATION EXPENSES—INCREASED LIMIT D. EMPLOYEES AS INSURED J. PERSONAL PROPERTY E. SUPPLEMENTARY PAYMENTS — INCREASED K. AIRBAGS LIMITS L. NOTICE AND KNOWLEDGE OF ACCIDENT OR F. HIRED AUTO — LIMITED WORLDWIDE COV- LOSS ERAGE—INDEMNITY BASIS M. BLANKET WAIVER OF SUBROGATION G. WAIVER OF DEDUCTIBLE—GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS PROVISIONS A. BROAD FORM NAMED INSURED this insurance applies and only to the extent that The following is added to Paragraph A.1., Who Is person or organization qualifies as an "insured" An Insured, of SECTION II—COVERED AUTOS under the Who Is An Insured provision contained LIABILITY COVERAGE: in Section II. Any organization you newly acquire or form dur- C. EMPLOYEE HIRED AUTO ing the policy period over which you maintain 1. The following is added to Paragraph A.1., 50% or more ownership interest and that is not Who Is An Insured, of SECTION II — COV- separately insured for Business Auto Coverage. ERED AUTOS LIABILITY COVERAGE: Coverage under this provision is afforded only un- An "employee" of yours is an "insured" while til the 180th day after you acquire or form the or- operating an "auto" hired or rented under a ganization or the end of the policy period, which- contract or agreement in an "employee's" ever is earlier. name, with your permission, while performing duties related to the conduct of your busi- B. BLANKET ADDITIONAL INSURED ness. The following is added to Paragraph c. in A.1., 2. The following replaces Paragraph b. in B.5., Who Is An Insured, of SECTION II — COVERED Other Insurance, of SECTION IV — BUSI- AUTOS LIABILITY COVERAGE: NESS AUTO CONDITIONS: Any person or organization who is required under b. For Hired Auto Physical Damage Cover- a written contract or agreement between you and age, the following are deemed to be cov- that person or organization, that is signed and ered "autos"you own: executed by you before the "bodily injury" or (1) Any covered "auto" you lease, hire, "property damage" occurs and that is in effect rent or borrow; and during the policy period, to be named as an addi- (2) Any covered "auto" hired or rented by tional insured is an "insured" for Covered Autos your "employee" under a contract in Liability Coverage, but only for damages to which an "employee's" name, with your CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Pagel of 4 Includes copyrighted material of Insurance Services Office, Inc.with its permission. Policy#BA2S035976 COMMERCIAL AUTO permission, while performing duties (a) With respect to any claim made or "suit" related to the conduct of your busi- brought outside the United States of ness. America, the territories and possessions However, any "auto" that is leased, hired, of the United States of America, Puerto rented or borrowed with a driver is not a Rico and Canada: covered "auto". (i) You must arrange to defend the "in- D. EMPLOYEES AS INSURED sured" against, and investigate or set- The following is added to Paragraph A.1., Who Is tle any such claim or "suit" and keep An Insured, of SECTION II—COVERED AUTOS us advised of all proceedings and ac- tions. LIABILITY COVERAGE: (ii) Neither you nor any other involved Any "employee" of yours is an "insured"while us- "insured" will make any settlement ing a covered "auto"you don't own, hire or borrow without our consent. in your business or your personal affairs. E. SUPPLEMENTARY PAYMENTS — INCREASED (iii) in may, at our discretion, participate LIMITS in defending the "insured" against, or in the settlement of, any claim or 1. The following replaces Paragraph A.2.a.(2), "suit". of SECTION II—COVERED AUTOS LIABIL- (iv) We will reimburse the "insured" for ITY COVERAGE: sums that the "insured" legally must (2) Up to $3,000 for cost of bail bonds (in- pay as damages because of "bodily cluding bonds for related traffic law viola- injury" or"property damage" to which tions) required because of an "accident" this insurance applies, that the "in- we cover. We do not have to furnish sured" pays with our consent, but these bonds. only up to the limit described in Para- 2. The following replaces Paragraph A.2.a.(4), graph C., Limits Of Insurance, of of SECTION II—COVERED AUTOS LIABIL- SECTION II — COVERED AUTOS ITY COVERAGE: LIABILITY COVERAGE. (4) All reasonable expenses incurred by the (v) We will reimburse the "insured" for "insured" at our request, including actual the reasonable expenses incurred loss of earnings up to $500 a day be- with our consent for your investiga- cause of time off from work. tion of such claims and your defense F. HIRED AUTO — LIMITED WORLDWIDE COV- "s the "insured" against any such ERAGE—INDEMNITY BASIS "suit", but only up to and included within the limit described in Para- The following replaces Subparagraph (5) in Para- graph C., Limits Of Insurance, of graph B.7., Policy Period, Coverage Territory, SECTION II — COVERED AUTOS of SECTION IV — BUSINESS AUTO CONDI- LIABILITY COVERAGE, and not in TIONS: addition to such limit. Our duty to (5) Anywhere in the world, except any country or make such payments ends when we jurisdiction while any trade sanction, em- have used up the applicable limit of bargo, or similar regulation imposed by the insurance in payments for damages, United States of America applies to and pro- settlements or defense expenses. hibits the transaction of business with or (b) This insurance is excess over any valid within such country or jurisdiction, for Cov- and collectible other insurance available ered Autos Liability Coverage for any covered to the "insured" whether primary, excess, "auto" that you lease, hire, rent or borrow contingent or on any other basis. without a driver for a period of 30 days or less (c) This insurance is not a substitute for re- and that is not an "auto" you lease, hire, rent quired or compulsory insurance in any or borrow from any of your "employees", country outside the United States, its ter- partners (if you are a partnership), members ritories and possessions, Puerto Rico and (if you are a limited liability company) or Canada. members of their households. Page 2 of 4 ©2015 The Travelers Indemnity Company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office, Inc.with its permission. Policy#BA2S035976 COMMERCIAL AUTO You agree to maintain all required or (2) In or on your covered "auto". compulsory insurance in any such coun- This coverage applies only in the event of a total try up to the minimum limits required by theft of your covered "auto". local law. Your failure to comply with No deductibles apply to this Personal Property compulsory insurance requirements will not invalidate the coverage afforded by coverage. this policy, but we will only be liable to the K. AIRBAGS same extent we would have been liable The following is added to Paragraph B.3., Exclu- had you complied with the compulsory in- sions, of SECTION III — PHYSICAL DAMAGE surance requirements. COVERAGE: (d) It is understood that we are not an admit- Exclusion 3.a. does not apply to 'loss" to one or ted or authorized insurer outside the more airbags in a covered "auto" you own that in- United States of America, its territories flate due to a cause other than a cause of 'loss" and possessions, Puerto Rico and Can- set forth in Paragraphs A.1.b. and A.1.c., but ada. We assume no responsibility for the only: furnishing of certificates of insurance, or a. If that "auto" is a covered "auto" for Compre- for compliance in any way with the laws hensive Coverage under this policy; of other countries relating to insurance. b. The airbags are not covered under any war- G. WAIVER OF DEDUCTIBLE—GLASS ranty; and The following is added to Paragraph D., Deducti- c. The airbags were not intentionally inflated. ble, of SECTION III — PHYSICAL DAMAGE We will pay up to a maximum of $1,000 for any COVERAGE: one'loss". No deductible for a covered "auto" will apply to L. NOTICE AND KNOWLEDGE OF ACCIDENT OR glass damage if the glass is repaired rather than LOSS replaced. The following is added to Paragraph A.2.a., of H. HIRED AUTO PHYSICAL DAMAGE— LOSS OF SECTION IV— BUSINESS AUTO CONDITIONS: USE—INCREASED LIMIT Your duty to give us or our authorized representa- The following replaces the last sentence of Para- tive prompt notice of the "accident" or 'loss" ap- graph AA.b., Loss Of Use Expenses, of SEC- plies only when the "accident' or 'loss" is known TION III—PHYSICAL DAMAGE COVERAGE: to: However, the most we will pay for any expenses (a) You (if you are an individual); for loss of use is $65 per day, to a maximum of (b) A partner(if you are a partnership); $750 for any one"accident'. (c) A member (if you are a limited liability com- I. PHYSICAL DAMAGE — TRANSPORTATION pany); EXPENSES—INCREASED LIMIT (d) An executive officer, director or insurance The following replaces the first sentence in Para- manager (if you are a corporation or other or- graph A.4.a., Transportation Expenses, of ganization); or SECTION III — PHYSICAL DAMAGE COVER- (e) Any"employee" authorized by you to give no- AGE: tice of the"accident' or"loss". We will pay up to $50 per day to a maximum of M. BLANKET WAIVER OF SUBROGATION $1,500 for temporary transportation expense in- The following replaces Paragraph A.5., Transfer curred by you because of the total theft of a cov- Of Rights Of Recovery Against Others To Us, ered "auto' of the private passenger type. of SECTION IV — BUSINESS AUTO CONDI- J. PERSONAL PROPERTY TIONS: The following is added to Paragraph AA., Cover- S. Transfer Of Rights Of Recovery Against age Extensions, of SECTION III — PHYSICAL Others To Us DAMAGE COVERAGE: We waive any right of recovery we may have Personal Property against any person or organization to the ex- We will a u to $400 for 'loss" to wearing a - tent required of you by a written contract pay p g p signed and executed prior to any "accident' parel and other personal property which is: or"loss", provided that the "accident' or"loss" (1) Owned by an "insured"; and arises out of operations contemplated by CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc.with its permission. Policy#BA2S035976 COMMERCIAL AUTO such contract. The waiver applies only to the The unintentional omission of, or unintentional person or organization designated in such error in, any information given by you shall not contract. prejudice your rights under this insurance. How- N. UNINTENTIONAL ERRORS OR OMISSIONS ever this provision does not affect our right to col- The following is added to Paragraph B.2., Con- lect additional premium or exercise our right of cealment, Misrepresentation, Or Fraud, of cancellation or non-renewal. SECTION IV—BUSINESS AUTO CONDITIONS: Page 4 Of 4 ©2015 The Travelers Indemnity Company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office, Inc.with its permission. Policy #BA2S035976 COMMERCIAL AUTO 4. Loss Payment — Physical Damage Cover- son or organization holding, storing or trans- ages porting property for a fee regardless of any At our option, we may: other provision of this Coverage Form. a. Pay for, repair or replace damaged or sto- 5. Other Insurance len property; a. For any covered "auto" you own, this b. Return the stolen property, at our ex- Coverage Form provides primary insur- pense. We will pay for any damage that ance. For any covered "auto" you don't results to the "auto" from the theft; or own, the insurance provided by this Cov- erage Form is excess over any other col- c. Take all or any part of the damaged or lectible insurance. However, while a cov- stolen property at an agreed or appraised ered "auto" which is a "trailer" is con- value. nected to another vehicle, the Covered If we pay for the "loss", our payment will in- Autos Liability Coverage this Coverage clude the applicable sales tax for the dam- Form provides for the"trailer" is: aged or stolen property. (1) Excess while it is connected to a mo- 5. Transfer Of Rights Of Recovery Against for vehicle you do not own; or Others To Us (2) Primary while it is connected to a If any person or organization to or for whom covered "auto" you own. we make payment under this Coverage Form b. For Hired Auto Physical Damage Cover- has rights to recover damages from another, age, any covered "auto" you lease, hire, those rights are transferred to us. That person rent or borrow is deemed to be a covered or organization must do everything necessary "auto" you own. However, any "auto" that to secure our rights and must do nothing after is leased, hired, rented or borrowed with "accident" or"loss" to impair them. a driver is not a covered "auto". B. General Conditions c. Regardless of the provisions of Para- 1. Bankruptcy graph a. above, this Coverage Form's Bankruptcy or insolvency of the "insured" or Covered Autos Liability Coverage is pri- the "insured's" estate will not relieve us of any mary for any liability assumed under an obligations under this Coverage Form. "insured contract". 2. Concealment, Misrepresentation Or Fraud d. When this Coverage Form and any other Coverage Form or policy covers on the This Coverage Form is void in any case of same basis, either excess or primary, we fraud by you at any time as it relates to this will pay only our share. Our share is the Coverage Form. It is also void if you or any proportion that the Limit of Insurance of other "insured", at any time, intentionally con- our Coverage Form bears to the total of ceals or misrepresents a material fact con- the limits of all the Coverage Forms and cerning: policies covering on the same basis. a. This Coverage Form; 6. Premium Audit b. The covered "auto"; a. The estimated premium for this Coverage c. Your interest in the covered "auto"; or Form is based on the exposures you told d. A claim under this Coverage Form. us you would have when this policy be- gan. We will compute the final premium 3. Liberalization due when we determine your actual ex- If we revise this Coverage Form to provide posures. The estimated total premium will more coverage without additional premium be credited against the final premium due charge, your policy will automatically provide and the first Named Insured will be billed the additional coverage as of the day the re- for the balance, if any. The due date for vision is effective in your state. the final premium or retrospective pre- 4. No Benefit To Bailee — Physical Damage mium is the date shown as the due date Coverages on the bill. If the estimated total premium exceeds the final premium due, the first We will not recognize any assignment or Named Insured will get a refund. grant any coverage for the benefit of any per- CA 00 01 10 13 Q Insurance Services Office, Inc., 2011 Page 9 of 12 POLICY NUMBER:580- 3 H979452 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance prodded under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Names of Additional Insured Person(s) or Organization(s): Any person or organization that you agree in a written contract to include as an additional insured on this Coverage Part, provided that such written contract was signed by you before,and is in effect when, the"bodily injury" or"property damage" occurs or the "personal injury" or"advertising injury"offense is committed. Location of Covered Operations: Any project to which a written contract with the Additional Insured Persons)or Organizations) in the Schedule applies. (information required to complete this Schedule, if not shown above, will be shown in the Declarations.) A. Section 11 —Who Is An Insured is amended to in- This insurance does not apply to "bodily injury" or clude as an additional insured the person(s) or "property damage" occurring, or "personal injury" organization(s) shown in the Schedule, but only or "advertising injury" arising out of an offense with respect to liability for"bodily injury", "property committed, after: damage" "personal injury" or "advertising injury" 1. All work, including materials, parts or equip- caused, in whole or in park, by: ment furnished in connection with such work, 1. Your acts or omissions, or on the project (other than service, mainte- 2. The acts or omissions of those acting on your nance or repairs) to be performed by or on behalf; behalf of the additional insured(s) at the loca- tion of the covered operations has been com- in the performance of your ongoing operations for pleted; or the additional insureds) at the location(s) desig- nated above. 2. That portion of "your work" out of which the injury or damage arises has been put to its in- B. With respect to the insurance afforded to these tended use by any person or organization additional insureds, the following additional exclu- other than another contractor or subcontrac- sions apply: for engaged in performing operations for a principal as a part of the same project. CG D3 61 03 05 Copyright 2005 The St. Paul Travelers Companies, Inc. All rights reserved. CG T8 02 09 24ncludes copyrighted material of Insurance Services Office, Inc. with its permission. DATE OF ISSUE: 07/18/2025 Page 1 of 1 POLICY NUMBER:680- 1 H979452 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s)Or Organization(s): Any person or organization that you agree in a written contract to include as an additional insured on this Coverage Part for "bodily injury" or"property damage" included in the products-completed operations hazard, provided that such contract was signed by you before, and is in effect when,the "bodily injury or "property damage"occurs. Location And Description Of Completed Operations Any project to which a written contract with the Additional Insured Person(s) or Organization(s) in the Schedule applies. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Section II — Who Is An Insured is amended to in- location designated and described in the schedule of elude as an additional insured the person(s) or or- this endorsement performed for that additional in- ganization(s) shown in the Schedule, but only with sured and included in the "products-completed opera- respect to liability for "bodily injury" or "property dam- tions hazard". age" caused, in whole or in part, by "your work" at the CG 20 37 07 04 CG T8 03 09 25 ISO Properties, Inc., 2004 DATE OF ISSUE: 07/18/2025 Page 1 of 1 Policy Nymber: 6801H979452 COMMERCIAL GENERAL LIABILITY occupational therapist or occupational that is available to any of your "employees" therapy assistant, physical therapist or for "bodily injury" that arises out of providing speech-language pathologist; or or failing to provide "incidental medical (b) First aid or "Good Samaritan services" services" to any person to the extent not by any of your"employees" or "volunteer subject to Paragraph 2.a.(1) of Section II — workers", other than an employed or Who Is An Insured. volunteer doctor. Any such "employees" K. MEDICAL PAYMENTS—INCREASED LIMIT or"volunteer workers" providing or failing to provide first aid or "Good Samaritan The following replaces Paragraph 7. of services" during their work hours for you SECTION III —LIMITS OF INSURANCE: will be deemed to be acting within the 7. Subject to Paragraph S. above, the Medical scope of their employment by you or Expense Limit is the most we will pay under performing duties related to the conduct Coverage C for all medical expenses of your business. because of "bodily injury" sustained by any 3. The following replaces the last sentence of one person, and will be the higher of: Paragraph S. of SECTION III — LIMITS OF a. $10,000; or INSURANCE: For the purposes of determining the b. The amount shown in the Declarations of applicable Each Occurrence Limit, all related this Coverage Part for Medical Expense acts or omissions committed in providing or Limit. failing to provide "incidental medical L. AMENDMENT OF EXCESS INSURANCE services", first aid or "Good Samaritan CONDITION— PROFESSIONAL LIABILITY services" to any one person will be deemed to be one "occurrence". The following is added to Paragraph 4.b., 4. The following exclusion is added to Excess Insurance, of SECTION IV — COMMERCIAL GENERAL LIABILITY Paragraph 2., Exclusions, of SECTION I — CONDITIONS: COVERAGES — COVERAGE A — BODILY INJURY AND PROPERTY DAMAGE This insurance is excess over any of the other LIABILITY: insurance, whether primary, excess, contingent or on any other basis, that is Professional Sale Of Pharmaceuticals Liability or similar coverage, to the extent the "Bodily injury" or "property damage" arising "= loss is not subject to the professional services out of the violation of a penal statute or exclusion of Coverage A or Coverage B. ordinance relating to the sale of pharmaceuticals committed by, or with the M. BLANKET WAIVER OF SUBROGATION — knowledge or consent of the insured. WHEN REQUIRED BY WRITTEN CONTRACT S. The following is added to the DEFINITIONS OR AGREEMENT Section: The following is added to Paragraph 8., Transfer Of Rights Of Recovery Against Others To Us, "Incidental medical services" means: of SECTION IV — COMMERCIAL GENERAL a. Medical, surgical, dental, laboratory, x- LIABILITY CONDITIONS: ray or nursing service or treatment, If the insured has agreed in a written contract or advice or instruction, or the related agreement to waive that insured's right of furnishing of food or beverages; or recovery against any person or organization, we b. The furnishing or dispensing of drugs or waive our right of recovery against such person medical, dental, or surgical supplies or or organization, but only for payments we make appliances. because of: 6. The following is added to Paragraph 4.b., a. "Bodily injury" or "property damage" that Excess Insurance, of SECTION IV — occurs; or COMMERCIAL GENERAL LIABILITY CONDITIONS: b. "Personal and advertising injury" caused by This insurance is excess over any valid and an offense that is committed; collectible other insurance, whether primary, subsequent to the signing of that contract or excess, contingent or on any other basis, agreement. CG D3 79 02 19 ©2017 The Travelers Indemnity Company.All rights reserved. Page 5 of 6 Includes copyrighted material of Insurance Services Office,Inc.with its permission. Policy No. 6801 H979452 COMMERCIAL GENERAL LIABILITY c. Method Of Sharing a. The statements in the Declarations are If all of the other insurance permits contribution accurate and complete; by equal shares, we will follow this method also. b. Those statements are based upon Under this approach each insurer contributes representations you made to us; and equal amounts until it has paid its applicable c. We have issued this policy in reliance upon limit of insurance or none of the loss remains, your representations. whichever comes first. The unintentional omission of, or unintentional error If any of the other insurance does not permit in, any information provided by you which we relied contribution by equal shares, we will contribute upon in issuing this policy will not prejudice your by limits. Under this method, each insurer's rights under this insurance. However, this provision share is based on the ratio of its applicable limit does not affect our right to collect additional of insurance to the total applicable limits of premium or to exercise our rights of cancellation or insurance of all insurers. nonrenewal in accordance with applicable insurance d. Primary And Non-Contributory Insurance If laws or regulations. Required By Written Contract 7. Separation Of Insureds If you specifically agree in a written contract or Except with respect to the Limits of Insurance, and agreement that the insurance afforded to an any rights or duties specifically assigned in this insured under this Coverage Part must apply on Coverage Part to the first Named Insured, this a primary basis, or a primary and non- insurance applies: contributory basis, this insurance is primary to a. As if each Named Insured were the only other insurance that is available to such insured Named Insured; and which covers such insured as a named insured, and we will not share with that other insurance, b. Separately to each insured against whom claim provided that: is made or"suit" is brought. (1) The "bodily injury" or "property damage" for 8• Transfer Of Rights Of Recovery Against Others which coverage is sought occurs; and To Us (2) The "personal and advertising injury" for If the insured has rights to recover all or part of any which coverage is sought is caused by an payment we have made under this Coverage Part, offense that is committed; those rights are transferred to us. The insured must do nothing after loss to impair them. At our request, subsequent to the signing of that contract or the insured will bring "suit" or transfer those rights agreement by you. to us and help us enforce them. S. Premium Audit 9. When We Do Not Renew a. We will compute all premiums for this Coverage If we decide not to renew this Coverage Part, we will Part in accordance with our rules and rates. mail or deliver to the first Named Insured shown in b. Premium shown in this Coverage Part as the Declarations written notice of the nonrenewal advance premium is a deposit premium only. At not less than 30 days before the expiration date. the close of each audit period we will compute If notice is mailed, proof of mailing will be sufficient the earned premium for that period and send proof of notice. notice to the first Named Insured. The due date SECTION V—DEFINITIONS for audit and retrospective premiums is the date 1. "Advertisement" means a notice that is broadcast or shown as the due date on the bill. If the sum of published to the general public or specific market the advance and audit premiums paid for the policy period is greater than the earned segments about your goods, products or services premium, we will return the excess to the first for the purpose of attracting customers or Named Insured. supporters. For the purposes of this definition: c. The first Named Insured must keep records of a. Notices that are published include material the information we need for premium placed on the Internet or on similar electronic computation, and send us copies at such times means of communication; and as we may request. b. Regarding websites, only that part of a website 6. Representations that is about your goods, products or services for the purposes of attracting customers or By accepting this policy, you agree: supporters is considered an advertisement. Page 16 of 21 ©2017 The Travelers Indemnity Company.All rights reserved. CG T1 00 02 19 Includes copyrighted material of Insurance Services Office, Inc.with its permission. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA Policy Number: 72 WEG GG6436 Endorsement Number: Effective Date: 09/01/25 Effective hour is the same as stated on the Information Page of the policy. Named Insured and Address: KTU&A 3916 NORMAL ST SAN DIEGO CA 92103 We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be 2 % of the California workers' compensation premium otherwise due on such remuneration. SCHEDULE Person or Organization Job Description Any person or organization for whom you are required by written contract or agreement to obtain this waiver of rights from us Countersigned by Authorized Representative Form WC 04 03 06 (1) Printed in U.S.A. Process Date: 07/23/25 Policy Expiration Date: 09/01/26 09 15 26 PWA 07 Exh 1 - KTUA (26-028A) - Agreement (CAO 7.27.26)(2211542. 1 ) Final Audit Report 2026-08-28 Created: 2026-08-28 By: Skylar Wilk(swilk@santa-ana.org) Status: Signed Transaction ID: CBJCHBCAABAALIME8ZIQ8aAKmLFmiaK4CrjEto4ew8c0 "09 15 26 PWA 07 Exh 1 - KTUA (26-028A) - Agreement (CAO 7.27.26)(2211542. 1 )" History Document created by Skylar Wilk (swilk@santa-ana.org) 2026-08-28-1:20:06 AM GMT Document emailed to Rudy Rosas (rrosas@santa-ana.org)for signature 2026-08-28-1:20:30 AM GMT Email viewed by Rudy Rosas (rrosas@santa-ana.org) 2026-08-28-1:20:44 AM GMT Signer Rudy Rosas (rrosas@santa-ana.org) entered name at signing as Rodolfo Rosas 2026-08-28-3:54:11 AM GMT Document e-signed by Rodolfo Rosas (rrosas@santa-ana.org) Signature Date:2026-08-28-3:54:13 AM GMT-Time Source:server-Signature Appearance Selected: MOBI LE_DRAW Agreement completed. 2026-08-28-3:54:13 AM GMT Adobe Acrobat Sign SAFE ROUTES TO PARKS AND WHEELCHAIR ASSESSMENT PLAN CITY OF SANTA ANA REQUEST FOR PROPOSAL NO. 26-028A I MARCH 30, 2026 +�t .. 46, im ua f r Rai .�� _ i 1 7T 4 lap, � j w-. - -- - STOP • -.� AW Pltl" $ -+e - 1R him M y d IIIPilll � 7 ill I Ili L lei ...............�s�um[ Vr I 4 r :;• e r r it r t x _ fl Sri a. Cover Letter/ KTUA 1200 F Street San Diego,CA 92101 I 619.294.4477 www.ktua.com March 30, 2026 Mike Arizabal,Senior Transportation Analyst City of Santa Ana —Public Works Agency 20 Civic Center Plaza Santa Ana, CA 92701 Dear Mr.Arizabal and Members of the Selection Committee I'm excited to submit our interest in continuing our longstanding partnership with the City of Santa Ana. Over the years,we have built a strong track record of delivering thoughtful,community-driven plans that reflect the City's vision and priorities. Our work on key initiatives including the Downtown Complete Streets Plan, Central Santa Ana Complete Streets Plan, Active Transportation Plan, landscape design for Standard Avenue,the Vision Zero Action Plan and the current update, demonstrates our familiarity with Santa Ana's neighborhoods,stakeholders, and implementation challenges.This experience allows us to move efficiently and effectively from planning to action while maintaining a high level of collaboration with City staff and the community. We are also park planners and bring a holistic perspective that extends beyond park boundaries.We recognize that improvements do not stop at the park edge; rather,they must address safety, accessibility, and connectivity within and around these spaces.We anticipate that community engagement will surface important feedback related to park conditions and needs, and we are committed to documenting and synthesizing this input in a way that supports coordination across City departments. This integrated approach ensures that park planning efforts contribute to broader mobility, safety, and quality- of-life goals. We take pride in developing plans that are not only visionary but also feasible and implementable. Over the past decade, our concepts, planning efforts, and robust community engagement strategies have helped the City secure more than $36 million in grant funding. In less than six years, many of these ideas have been realized through built improvements throughout Downtown Santa Ana, an outcome that reflects both the City's leadership and the strength of our partnership.We are committed to continuing this momentum by delivering practical,fundable solutions that lead to measurable outcomes. We value the meaningful relationships we have built with City staff, stakeholders, and residents, and we are eager to continue this collaboration. KTUA looks forward to the opportunity to support the City of Santa Ana in advancing safe, accessible, and vibrant parks and community spaces. KTUA acknowledges the Addenda released by the city on 03/16/2026. Sincerely, 1 KTUA AUTHORIZED REPRESENTATIVE Joe Punsalan I Principal Planner Phone: (619) 294-4477 x127 1 Email:joe@ktua.com CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/1 b. Services Provided/ VT(J.^ TASK 1: PROJECT MANAGEMENT the Orange County Transportation Authority(OCTA), Santa Task 1.1 Project Management PI Ana Unified School District, etc. KTUA will be responsible for creating all meeting materials,such as agendas, handouts, KTUA will prepare a Project Management Plan (PMP)for presentations, and meeting notes. the Safe Routes to Parks and Wheelchair Assessment Plan (Plan)that includes key team contacts; scope, schedule, Task 1.3 Federal Safe Streets and Roads for All (SS4A) and budget; progress tracking and reporting procedures; Grant Program Reporting invoicing processes and documentation standards; and KTUA has extensive experience with managing grant-funded document control and QA/QC protocols. The PMP will define projects, including several funded by the SS4A program, procedures for managing tasks, resources, communication, such as the City of Rialto Safety Action Plan,Town of Apple and performance,with mechanisms for early issue Valley Complete Streets Action Plan (SS4A grant), and the identification and resolution. Once approved by the City, it Safe Mobility Santa Ana Plan update. KTUA will support the will serve as the guiding document for project execution, City with any reporting and invoicing requirements outlined and any changes will require approval from both parties.The by the SS4A Grant Program. PMP will be submitted for review and approval within thirty (30) days of contract execution. TASK 1 DELIVERABLES Following contract execution, KTUA will also prepare Project Management Plan and Schedule a comprehensive Project Master Schedule,to become Kick-Off Meeting Agenda and Notes the Project Baseline Schedule upon approval by the • Monthly Invoices and Progress Reports City. This schedule will detail all tasks, subtasks,start dates, durations, deliverable deadlines, milestones, and PDT Monthly Meeting Materials,Agendas, and Notes dependencies, including critical path activities. Deliverables SS4A Grant Reporting Methodology and Plans will be submitted to the Project Development Team (PDT) per the schedule,with a two-week review period, after TASK 2: EXISTING ANALYSIS AND ASSESSMENT which comments will be addressed, and two(2) revised Task 2.1 Data Collection submissions will be provided. With extensive experience working in Santa Ana, including Task 1.2 Kickoff Meeting and Project Development current work on the Santa Ana Vision Zero Plan update,the Team (PDT) Meetings KTUA team has the unique privilege of having consistent, KTUA will schedule and facilitate a virtual kick-off meeting present-day experience collecting and analyzing City data. within thirty(30) calendar days of contract execution. Proper selection and use of data is integral to supporting the KTUA will prepare the agenda and the meeting notes. development of a plan that is cohesive with other ongoing Recommended objectives for the kickoff meeting may City efforts. The KTUA team will identify and develop a list of include, but are not limited to: data to be used in Task 2 analyses, including, but not limited to: • Establish communication channels and protocols Review project objectives Traffic counts • Refine Project Management Plan and Schedule Bicycle and pedestrian counts • Identify known preliminary issues, if any Most recent 5-year collision data • Develop ideas and strategies for community Posted speed limits and 85th percentile speeds engagement Bus boardings and alightings at bus stops • Develop a list of background data/plans to request and Sidewalk and curb ramp data review • Lighting data KTUA will schedule up to 16 monthly virtual PDT meetings Additionally, existing conditions will be observed and to maintain strong communication and transparency, recorded during fieldwork conducted by the KTUA team in and meet milestones. Monthly meetings will include the the project's early stages. Data not directly available will be consultant team,the City's project manager, and key submitted in a request to the City. stakeholders,such as the City's Public Works, Parks and Recreation, and Planning and Building agencies, as well as CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/ b. Services Provided/ KTUA Subtasks 2.2.2 Walk and Talk Events Sub-Task 2.1.1 Literature Review KTUA will conduct a thorough literature review of To ensure diversity and inclusion,six(6)qualitative audits will be conducted with specific community members; existing local and regional planning documents to ensure these sessions will be referred to as "Walk/Bike and Talk" consistency with related planning efforts and support events. The KTUA team will develop an audit tool featuring future project development. This review will summarize colloquial, simple, and easily understandable language key information, including vision statements, goals and tailored for community members who may not be familiar policies, priority corridors, planned improvements, and with technical terminology for use during these "Walk/Bike previous recommendations,from documents such as the and Talk" events.This tool will enable community members Santa Ana General Plan, Parks Master Plan, Vision Zero to identify existing issues allowing them to pinpoint problems Plan and update, Safe Routes to School Plan, and others as such as uneven sidewalks, missing curb ramps, potential applicable. locations for crosswalks, necessary bicycle infrastructure, Reviewing these documents will help ensure that the Plan traffic calming measures, and any required enhancements aligns with ongoing and past initiatives.The City's recently to roadway signage and suggest potential improvements. completed Parks Master Plan,Safe Routes to School The Walk/Bike&Talk events include:1) an event exclusively Plan, and Vision Zero Plan will be particularly valuable in for youth; 2) an event exclusively for seniors;3) an event identifying current community priorities and project corridor exclusively for individuals with special needs-,4)an needs. event involving cyclists; 5) an event with members of the Task 2.2 Walk and Bike Audits Stakeholder Group; and 6)an event open to any member of The KTUA team proposes technical Walk and Bike Audits, the community 1 as well as `Walk and Talk' events,to ensure high-quality data is collected while meaningfully engaging community members in the data collection process.This combination of data collection provides a unique opportunity to gather both 4 quantitative and qualitative data. Subtask 2.2.1 Technical Walk and Bike Audits Evari will conduct technical walk and bike audits for each of the Cit 's 48 arks and facilities,focusing on the s" Y p g , pedestrian and bicycle access routes within a quarter- VVrVtr mile radius of each park location. Using the mobile field —� data collection platform developed under Task 2.1, Evari field crews will systematically document infrastructure conditions along routes to and from each park, capturing attributes including missing or damaged sidewalks, missing or non-compliant curb ramps, potential crosswalk locations, Because many parks are located near schools, most events bicycle infrastructure gaps,traffic calming needs,traffic will begin at school sites to maximize safety and comfort signal deficiencies, signage, and pedestrian-scale lighting for participants, particularly those who may feel cautious conditions. moving through the community amid the current political Field crews will document conditions using point, line, and climate. Each event will be kept under 45 minutes to polygon features tied to the project geodatabase,with further support participant comfort. Community members data made available to the full project team through the will be invited to share their needs and typical routes to interactive web GIS applications developed under Task 2.1. and around City parks. At each of these events,translation services will be provided in Spanish and Vietnamese, and To efficiently cover all 48 locations, Evari will organize the audits into geographic clusters and,where feasible, necessary accommodations will be made to suit the specific coordinate scheduling with KTUA to align with community needs of each group taking into account age, physical Walk/Bike and Talk events(Subtask 2.2.2). Field audits will condition, and capabilities. Latino Health Access (LHA) be conducted during periods of peak park utilization to maintains established relationships with senior centers and ensure observations reflect typical user conditions. organizations that serve older adults and youth, as well as a relationship with the Regional Center of Orange County, which works with individuals with special needs. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/3 b. Services Provided/ KTUA The Walk/Bike and Talk events schedule will be posted Task 3.1 Outreach and Engagement Plan on the project website; emailed and distributed to project LHA will create and submit an inclusive Outreach and stakeholder members, other LHA partners, promotores and Engagement plan designed to provide opportunities for participants; promoted via City's website and newsletters people of various ages to participate.This plan will allow us (COSAS and Santa Ana Neighborhood) as well of Latino to meet the community"where they are" not only physically, Health Access Facebook, Instagram,Tik-Tok; and shared but also in terms of their current level of knowledge regarding with the network of neighborhood associations and Com- the subject matter, by creating educational infographics and a Link leaders.Additionally, printed copies of the schedule survey featuring easy-to-understand vocabulary, conducting will be distributed to the various community centers located in-person outreach in areas surrounding the parks, inviting within or near the parks.The schedule and invitation residents to attend community workshops, and/or to complete emails to participate will also be sent to staff from OCTA, the survey. LHA will take the time to provide project context SAUSD, OCFA, and OCHCA;furthermore, staff from other and education regarding active transportation,safety, mobility, City departments including Parks & Recreation, Planning & and access during every in-person interaction we have. This Building, Community Development, and SAPD. project and the outreach efforts will enable LHA to reach areas LHA will maintain a record of all outreach and promotion and individuals that could not be reached during the Vision regarding the audits, and will take attendance at each of Zero projects and the Santa Ana STPS plans, especially those the audits and the Walk/Bike &Talk events, which may be walking and bicycling on routes that connect to park facilities. shared with City staff if necessary. LHA, in collaboration with the City of Santa Ana,will establish Task 2.3 Existing Conditions Technical Memorandum a stakeholder group comprising at least 20-25 members. First, Based on the findings from Tasks 2.1 and 2.2, KTUA will LHA will compile a preliminary list of 40 potential stakeholders, prepare an Existing Conditions Technical Memorandum that which will include community members including youth and summarizes opportunities, constraints, and challenges to be seniors who walk or use public transportation to access the addressed in the Plan.This report will become the Existing city's parks, also local CBOs (such as Santa Ana Active Street, Conditions chapter of the final Plan. The Bicycle Tree, KidWorks, El Centro Cultural de Mexico, THRIVE Santa Ana, Community HUB Santa Ana, etc.), as well TASK 2 DELIVERABLES as representatives from public institutions(OCTA, SAUSD, • Data Collection/Existing Conditions Technical OCFA, OCHCA, City of Santa Ana departments: Parks& Memorandum Recreation, Planning & Building, Community Development, and Walk and Talk Events (6) and Summaries SAPD), leaders from the different neighborhood association, • Com-Link, sports leagues,faith based groups and businesses. • Existing Bicycle and Pedestrian Facilities Map The KTUA team will plan and facilitate up to five (5) Existing Conditions Technical Memorandum Stakeholder meetings and be responsible for the preparation of agendas, presentation slides and meeting summaries. TASK 3: COMMUNITY OUTREACH AND Task 3.2 Website, Social Media, and Survey ENGAGEMENT Website The KTUA team believes that the most effective project is The KTUA team will develop a dynamic website that will be one that is built by the community and for the community. used throughout the entire planning process. Content will be The project will be conducted in an open and transparent developed for each major milestone, including, but not limited manner with community members participating throughout to, project updates, information about upcoming outreach the process. In-person and indirect outreach strategies will opportunities, event summaries, links to relevant Santa Ana be utilized, including the creation of a diverse stakeholder planning efforts, etc.An interactive online map will be included group, pop-ups, community workshops, survey collection that allows residents and stakeholders to provide location- and social media promotion and invitations, project specific comments and easily view the various datasets outreach and education conducted through presentations, collected in Task 2.1.The City will be asked to create a simple announcements, pop-ups at city and community events, landing page on its website that residents can bookmark emails, phone calls,text messages,social media posts, and use to navigate to the consultant team's custom project newsletters, mass distribution of the audit schedule, and website. flyers for community workshops. https://parks-master-plan-sample-1-2-ktuagis.hub.arcgis.com/ CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/4 b. Services Provided/ KTIJi l Evari will provide support by including interactive web-based residents observe regarding getting to and from city parks. GIS applications built on relational SQL databases, providing The survey will be available for a long window of time, the project team and City staff with dynamic tools that go providing residents with an easily accessible opportunity to beyond static map viewers. These applications will allow share their input without attending an in-person event. LHA users to query,filter, and visualize collected data across will share the survey link via email and text message with multiple dimensions,for example,viewing collision clusters members of the stakeholder group, community partners, by severity and mode, overlaying infrastructure gaps against and LHA promotores and participants; additionally, LHA equity indicators, or comparing field audit findings across will coordinate with the administrators of the COSAS and park service areas. Neighborhood Santa Ana newsletters to ensure the survey is Promotional Materials&Social Media Graphics disseminated on those platforms as well.The online survey will be made available in English, Spanish, and Vietnamese. The KTUA team will create graphics and social media For those who do attend in-person events, printed surveys materials to spread project awareness and promote in English, Spanish,Vietnamese, and,when applicable, outreach events throughout the planning process. Items Cantonese,will be available to increase survey participation such as flyers,social media caption text, and press releases rates. will be developed. Unique branding will be developed that will be used across all digital and printed media.A project Task 3.3 Community Workshops and Pop-Ups logo,color palette,fonts, and taglines will be designed LHA, in collaboration with KTUA and with the support based on the City's branding guidelines. All materials will of stakeholders and the City will plan and facilitate also be provided in English,Spanish, and Vietnamese. two(2)community workshops.The workshops will be an opportunity not only for the community to offer • recommendations but also for us to present preliminary results from the audits and surveys.The first workshop will be in the middle of the engagement timeline,we will present an overview of the project vision and will provide an opportunity to gather community input regarding concerns about pedestrian and cyclist traffic safety, public PLAN DE TRANSPORTE transportation issues, and general mobility challenges related to traveling to and from local parks. The second workshop will be held near the end of the project and will be •Ciudad de Santa ' •estd llevando•cabo un Plan designed to present the findings as well as the draft of the de .. .. .mejorar la Safe Routes to Parks Plan to the community.•ad da• •a • modos de transporte no motorizado, '•corninar,andar Four(4) pop-up events will be held prior to the last p community workshop.The intention behind these events is• modos de transporte sean una mejor opci6n. to meet people where they are, inviting them to complete the survey and/or attend the community workshops.These pop-ups will take place at City or community events, as well as at key locations situated near parks.The goal is to host a total of six events (four pop-ups and two workshops) and, whenever possible,to distribute them so that at least one o�ti' • • event is held in each City ward. LHA will remain in constant communication with the City of Santa Ana to identify suitable locations and to confirm specific venues and dates. LHA will incorporate popular education principles to ensure Survey that the pop-ups and workshops are both interactive, LHA will support KTUA with the creation of a comprehensive engaging and educational. LHA and KTUA will create all and culturally relevant survey that will be made available for materials used in workshops, including boards, printouts, in-person events and online. The survey will be conducted visual aids, posters,comment cards, maps, etc., attendees before any recommendations are developed to understand will rotate through various stations. Staff members from the focus areas, priorities, and constraints and opportunities City and the KTUA team will be present to provide support CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN / b. Services Provided/ KTUA and answer questions from the community. Spanish and be given the opportunity to comment on recommendations Vietnamese interpreters will be available at the community to ensure the final Plan reflects the City's broader goals and workshops,while English-to-Spanish interpretation services vision for the future. will be provided at the pop-up events. TASK 3 DELIVERABLES LHA will share promotional materials and workshops flyers Community Engagement Plan through its base of participants, posted on the project website and the City's social media platforms, LHA social Online Social Media Materials, including website, media platforms(Facebook, Instagram, TikTok), and shared outreach promotion, and surveys with stakeholders, community centers, local CBOs, Com- Two(2) Community Workshops,Agendas, and Minutes Link, City of Santa Ana, Neighborhood Initiatives, Santa Ana Four(4) Pop-Up Events,Agendas, and Minutes Unified's Family and Community Engagement team, among others,to support with the social media and newsletter Five(5)Virtual Stakeholder Group Meetings,Agendas promotion. LHA will maintain a record of all outreach and and Minutes promotion regarding the workshops, and will capture Attendance and Presentation at City Council Meetings attendance at each event to share it with City staff when (2) necessary. LHA will be proactive in selecting locations and TASK 4: ANALYSIS times that are safer for the community,which is currently fearful of participating, and will work closely with the Orange Task 4.1 Collision Analysis County Rapid Response Network to monitor the area before KTUA will use guidance from the following sources to and during in-person community events. conduct the collision analysis: 36 Public Enyageme_n�overarchin�g Themes • Local Roadway Safety Manual (LRSM) Systemic Safety Project Selection Tool r The Caltrans Systemic Safety Analysis Report Program ;a.�=;. • .� (SSARP) Guidelines CM= I�; ;�I The current Vision Zero Plan Update (to provide �4O longitudinal consistency) j O The collision analysis will consist of a systematic review and study of the data collected, using sources such as SCAG's Subtosk 3.3.1 Stakeholder Meetings High Injury Network(HIN)and the California Highway Patrol's KTUA will facilitate up to five(5)virtual stakeholder meetings Statewide Integrated Traffic Records System (SWITRS). designed to give City staff and other key stakeholders Data will be pulled for collisions occurring in the past five the opportunity to provide specific feedback and years,with a special focus on all pedestrian and bicycle- recommendations unique to the needs of those attending involved collisions.The analysis will review collisions to the meeting. Examples of stakeholders who may be part identify correctable collision patterns, including , but not of the meetings include, but are not limited to, City Public limited to:time of day, day of the week, lighting conditions, Works Agency, City Planning Building Agency,Santa Ana age of parties,year-by-year trends, primary collision factors, Police Department, Orange County Transportation Authority, types of collisions, severity of injury, and fatalities. The Santa Ana Unified School District, and Caltrans. KTUA will data analysis will focus on instances of severe injuries and prepare meeting agendas, presentations, and summaries. fatalities. Task 3.4 City Council Meetings Task 4.2 Local Prioritization and Field Review KTUA will attend and present at up to two (2) City Council Task 4.2 will use a two-step prioritization matrix to identify meetings,with one presentation following each community sites (intersections or corridors)that will be explored further workshop.These presentations will be designed to provide in Tasks 4.3 and 4.6. This prioritization matrix will begin Council members with updates on draft recommendations with a review of quantitative data using criteria grouped and how they align with residents' input received during the into three categories: (1) Environmental Justice, (2) Safety, community engagement process. Council members will also and (3) Park Usage and Parks Master Plan park access recommendations.The data for these groups may include CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN / '. b. Services Provided/ KTUA demographic data, CalEnviroScreen and Healthy Places Index scores, road classifications, crash data within '/4 mile ofCorridor Recommendations parks, crime data within'/4 mile of parks, existing and future Develop recommendations and Task 4.4 population counts, average daily traffic(ADT), etc. This data concept drawings (in AutoCAD)for Task 4.5 will be used to determine general locations where certain 3-5 projects. Task 4.6 criteria indicating the need for safety countermeasures Identify costs associated for all Task 4.7 are most prevalent. From here, a review of qualitative data recommended improvements, Task 4.8 will be conducted with specific data criteria grouped into including the concept drawings). two categories: (1) Community Input and (2) City Priorities. This data will help refine the locations of all recommended Step 4: Park-by-Park Recomenclations projects. The criteria selected and methodology used for the Craft recommendations for the prioritization matrix were developed with various remaining park travelsheds •prioritization methodologies in mind, including: Incorporate safest routes within each Task 4.2park corridor Task 4.7 • Industry best practices/standards(National Recreation Provide a ranked,CIP-style list of and Park Association (NRPA),AmericaWalks,Safe Routes improvements for park sites Partnership, etc.) • KTUA's engagement toolkits Step Identify Sources• City of Santa Ana Safe Routes to School Plan Identify funding sources that may be • City of Santa Ana Parks Master Plan used to support the implementation Task 4.5 • City of Santa Ana Vision Zero Plan and Update of the proposed improvements The GIS tools the KTUA team have access to can also support scenario-driven decision-making, such as Task 4.3 Recommended Countermeasures Toolbox adjusting prioritization weights in real time to see how Countermeasure Development changes to criteria like collision severity, equity score, or The development of recommended countermeasures will proximity to schools reshape the ranking of recommended be based on a comprehensive approach that combines improvements.This approach gives City staff and the existing conditions analysis as well as the KTUA team's stakeholders a transparent, repeatable framework they experience in active transportation, complete streets, and can continue to use beyond the life of this project-for park planning. To illustrate potential countermeasures,the grant applications, capital improvement programming, and KTUA team will develop typologies based on the City's ongoing performance tracking. street classifications (Principal Arterial, Major Arterial, Primary Arterial,Secondary Arterial, Divided Collector, Collector, Task 4 Prioritization Process etc.) and the six park types identified in the 2022 Parks and Recreation Master Plan (Citywide Parks, Community Parks, Neighborhood Parks, Pocket Parks, Urban Plazas, _ Prioritize Park Corridors and Special Use Facilities).Typologies will describe the potential countermeasures that are appropriate for each • Run prioritization matrix on all 48 Task 4.1 park and street classification combination. For example, parks Task 4.2 a Community Park that is located on a Major Arterial may have recommendations that prioritize separated bikeways, bike boxes,green transition striping, enhanced crossings, - • 2: Develop Typologies pedestrian lighting, speed feedback signs, and wayfinding signage,where as a Pocket Park located on a Local Street • Develop typologies for the SRTP plan, using the existing five(5) park types Task 4.2 may prioritize bicycle routes with sharrows, high-visibility from the Park Master Plan Task 4.7 crosswalks, curb extensions, and neighborhood traffic circles. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /7 b. Services Provided/ KTUA �J Q 3000 W.Edinger Avenue Acre ® 6a.m.to 10pm Acres Street Typology Recommendations Major Arterials AM Ask- Amenities Li Ball Diamond Basketball Courts Drinking Fountain Multi-purpose Field _ f • 466 Parking stalls High-Visibility Green Transition Class IV Cycle Track Regulatory& Speed Management Playground Crosswalk Striping Wayfinding Signage 6 Picnic tables Local Streets Restroom • Sports Field Lighting • Picnic Shelters _ • Skate Park STOP • Lake — Dan Young Soccer Complex • Football • Hiking Exercise Trail High-Visibility LED Stop Signs Class III Bicycle Rectangular Rapid Speed Management Crosswalk Route Flashing Beacons (RRFB) Tailored Countermeasure Cutsheets by Typology transportation movements.Additionally, recommendations KTUA will design each typology combination as a cut sheet to improve placemaking will add to the comfort of the that includes information such as: descriptions of park environment and can enhance the branding of Santa Ana's and street classifications,typical amenities found in the parks as a network of open space across the city. park, a list of mobility recommendations, a list of existing Evaluation focuses on identifying metrics for quantifying City parks that match this typology, and an illustrative 3D the benefits from bicycle and pedestrian improvements. rendering. The development of these typologies will serve Examples of evaluation countermeasures may include as a template for the City to use as it explores the types bicycle and pedestrian counts, level of traffic stress, and of recommendations to pursue during project design and the percent reduction in bicyclist and pedestrian collisions. implementation. See graphic above. This information can then be used by the City of Santa Ana Designed by Engineers to Advance Implementation to determine if other areas would benefit from this type of improvement, as well as provide the City with metrics to Countermeasures will be recommended based on guidance assist with reporting and grant funding pursuits. from the 6 E's of Safe Routes to School Planning. In particular,Arcadis will focus on countermeasures related to Examples of engineering and evaluation countermeasures, but 'Engineering' and 'Evaluation' strategies. not limited to,that will effectively slow traffic and create safer routes to parks are listed in the table below. • Engineering focuses on recommendations that physically alter the built environment to slow vehicle traffic, improve pedestrian and bicyclist visibility, and create a safer environment for vulnerable travelers. This is particularly important for vulnerable travelers trying to access park space in vehicle-dominant areas of Santa Ana. Countermeasures in Santa Ana should focus on traffic calming, and enhanced accessibility and safety, including ITS-based solutions that prioritize active CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN / 8 b. Services Provided' `T Engineering Evaluation Mode Shift Intersection Treatments - Eco-Totem Pole Displays - High visibility crosswalks - Bicycle/Pedestrian Counts and Trends -Curb extensions Safety -Traffic circle - Bicycle/Pedestrian Injuries and Fatalities - Raised crosswalks - Level of Traffic Stress - Pedestrian refuge islands -Traffic Speed (85th Percentile Speeds) - Bicycle protected intersections Network Quality/Connectivity - Leading Pedestrian annd bike intervals - Bicycle/Pedestrian Level of Service (PLOS) - Connectivity/Gap Closures Placemaking Corrridor-Wide - Improved wayfinding signage -Speed humps - Improved pedestrian scale lighting - Install or widen sidewalks -Street furniture - Protected bike infrastructure - Gateways - Mid-block crossings - Parklets -ADA Compliance - Intersection murals and crosswalk art -Treatments for visually impaired travelers - Increased urban tree canopy - Bioswales and rain gardens Task 4.4 Consistency Review grant applications,the KTUA team will also develop a KTUA will review countermeasures for consistency comprehensive list of potential funding sources, including with local, regional, and state policies, regulations, and Federal, State, Regional, and Local funding sources. This guidelines, as well as Safe Routes to Parks best practices deliverable will also include grant deadlines and direct links developed by the Safe Routes Partnership. The KTUA to specific grant programs.As the City is no stranger to team will also ensure countermeasures align with related applying for and winning competitive active transportation plans, including the Vision Zero Plan Update and previously grants, identifying this information and gathering the adopted Santa Ana Safe Routes to Schools plan, First Street data and concepts early will help position the City as a Multimodal Study, and other previous active transportation competitive grant applicant to receive the funding needed to efforts, as well as OC Active (currently undergoing an implement the Plan's recommendations. update) by OCTA,which was led by Arcadis and KTUA and Task 4.6 Improvement Prioritization included a 6 Es toolkit for Orange County. Task 4.6 will use a specialized prioritization methodology Task 4.5 Cost Estimates and Funding Sources to help the City make informed decisions on which projects Arcadis will develop cost estimates for the projects and to implement in short, mid, and long-term timeframes. countermeasures identified in Task 4.2,Task 4.3, and Task This methodology will use criteria similar to those in 4.6. Cost estimates will be derived from a variety of reliable Task 4.2, but will also incorporate new criteria specific to resources, including the Caltrans Consumer Construction project implementation, such as the complexity and cost Cost Indexes(CCI)and recently constructed projects in of the proposed recommendations, potential impacts on Southern California. Costs will be provided as unit costs and maintenance operations, consistency/coordination with as total costs based on the concepts developed in Task 4.6. other ongoing projects, etc. The results of this prioritization process will result in a table that indicates which projects the Cost estimates can be used by the City to inform City should consider pursuing as funding opportunities arise future grant application pursuits. To facilitate future in the near future. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /9 b. Services Provided/ KTUA KTUA has extensive experience assisting cities with project Task 4.8 GIS Mapping implementation by purposefully designing plans with grant- KTUA will create maps for each of the forty-eight(48) park ready projects that can be used to develop competitive sites. Each map will include critical existing conditions grant applications. For example,the City of Santa Ana has data as well as recommendations identified in Task 4.2. secured over$36 million in grant funding as a result of the Recommendations may include, but are not limited to, five previous plans that the KTUA team has led. sidewalk gap closures, new ADA curb ramps, proposed Task 4.6.1 Concept Drawing; bicycle facilities, enhanced crossings, etc. These maps will Upon reviewing the results of the improvement prioritization be designed to meet City GIS requirements. process mentioned above,the City will select three to TASK 4 DELIVERABLES five projects they would like the KTUA team to develop as Collision Analysis concept drawings. Concepts will be designed in AutoCAD at a conceptual level that clearly communicates the potential Improvement Prioritization Technical Memorandum improvements appropriate for the selected project.The Cost Estimates concept designs are meant to be flexible and tailored to the Ten (10)Corridor Concepts project such as a half-mile corridor concept design or a more detailed intersection design. Concept drawings will include GIS Maps the following: TASK 5: WHEELCHAIR ASSESSMENT • An aerial layout of the top priority corridors 5.1 Wheelchair Assessment • Conceptual design of the proposed roadway/bikeway Evari will lead the citywide wheelchair assessment by geometry and traffic-calming features updating the City's 2017 Sidewalk Connectivity Plan curb • Conceptual design of pedestrian crossing safety ramp inventory to reflect current conditions. Evari will elements(crosswalks, median refuge islands, curb employ a tiered assessment methodology that leverages the ramps) City's existing GIS data and maximizes the value of field work • Basic callouts identifying the improvements and already conducted under Task 2. potential major impacts to existing surface culture The 2017 curb ramp inventory,which includes ramp • Potential for conceptual traffic signal modification design presence,visual compliance status,truncated dome (depending on chosen countermeasure) condition,obstructions, and impedance scoring,will serve as the baseline dataset. Evari will collect post-2017 project • Potential for conceptual signing and striping design records from the City's Capital Improvement Program,Safe (depending on chosen countermeasure) Routes to Schools Plan, and other completed construction The goal of these concept drawings will be to close gaps projects to identify locations where curb ramps were to improve access, safety, and comfort.The drawings likely constructed, replaced, or modified since the original can also serve as guidance, along with the typology assessment. recommendations,to complete other corridors or Curb ramp locations within the quarter-mile park buffer will intersections identified. The City can use these concepts be updated directly using field data captured during the to make future grant applications more competitive and technical walk and bike audits (Subtask 2.2.1), eliminating accelerate project implementation. the need for duplicate field visits. For locations outside the Task 4.7 Agency Coordination quarter-mile buffer, Evari will conduct a systematic desktop review using current aerial and street-level imagery to verify KTUA will coordinate with partner agencies, such as SCAG ramp status against the 2017 baseline and flag locations and OCTA,to review ongoing/previously planned projects that appear changed, missing,or inconclusive for targeted and minimize project redundancies. The goal will be to field verification. Only locations that cannot be definitively ensure all new projects identified through this Plan will close assessed through desktop review will require in-person gaps and complement any projects already planned within inspection. Santa Ana. This agency coordination will complement the consistency review described in Task 4.4. The result will be an updated citywide curb ramp inventory maintaining the original attribute schema, delivered in the City's GIS environment,with missing and non-compliant CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/10 b. Services Provided/ KTUA locations prioritized for future capital improvements.This updated inventory will be included as an appendix to the final Safe Routes to Parks and Wheelchair Assessment Plan. TASK 5 DELIVERABLES • Citywide curb ramp inventory(GIS shapefile) TASK 6: SAFE ROUTES TO PARKS AND WHEELCHAIR ASSESSMENT PLAN Task 6.1 Draft Plan KTUA will create a draft Plan structured around the 6 E's (Education, Encouragement, Enforcement, Engineering, Evaluation, and Equity) established by Safe Routes to School planning principles.The Plan will be a friendly, graphic-heavy, easy-to-understand document that reflects all of the work completed. It will be purposefully designed for implementation to support the City's commitment to improving the lives of residents and visitors throughout Santa Ana. The draft Plan will be provided to the City for review via PDF. KTUA will provide two (2) rounds of revisions in preparation for sharing the final Plan with the City Council for adoption. Task 6.2 Final P KTUA will incorporate all City staff feedback collected through two routes of revisions and export a final version of the Plan. KTUA will prepare and present the final Plan to the City Council for adoption at an in person meeting. Upon completion of the Plan,the consultant team will provide the City with all applicable files at the close of the project,such as GIS datasets, engagement summaries, photos, CAD files, cost estimate spreadsheets, etc. TASK 6 DELIVERABLES • Draft Safe Routes to Parks and Wheelchair Assessment Plan • Final Safe Routes to Parks and Wheelchair Assessment Plan • PowerPoint presentation for City Council adoption • Consolidated project files shared via Dropbox/Box/ Sharepoint CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /11 c. Firm and Team Experience/ KTUA i., it INSIGHTFUL PLANNING INSPIRED DESIGN KTUA is a collaboration of planners, landscape architects, GIS analysts, and graphic designers focused on the creation of livable outdoor areas meant to foster community. Founded in Established in 1970 and with the partnership of our clients, KTUA has expanded the Q boundaries of a traditional landscape architecture office by incorporating active 1 ✓7 (55 Years) transportation,trail planning, parks and recreation planning,federal planning, and natural California Corporation resource management practices into our portfolio.With this diversity,we are able to help shape the bigger picture while addressing the fine-grained details that contribute to our client's sustainable natural and built environments. Planning Services Landscape Architecture Services Generation Leadership • Existing Condition Assessments Multi-Disciplinary Team Management • Chris Langdon, President • Data/Geospatial Analysis Community Engagement • Mark Carpenter,Treasurer • Community Engagement Conceptual Design • Joe Punsalan, Secretary • Visioning Schematic Design/Design • Conceptual Plans Development Brooke Whalen,Vice President • Master Plans Construction Documents • Visual Simulations Construction Administration • Grant Writing In-House Irrigation Design • 3D Modeling/Rendering Employees • 9 Landscape Architects Managing Principal Agent:Joe Punsalan Project Manager:Jacob Leon • 8 Planners Phone Number:(619) 294-4477 Phone Number: (818)468-9974 • 2 Landscape Designers Email:joeC@ktua.com Email:jacobCCktua.com • 2 Irrigation Designers 2 GIS Analysts 2 Marketing • 2 Accounting e � Office - / Location F j San Diego(Main Office) w 1200 F Street t` San Diego, CA 92101 Phone: 619-294-4477 CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/12 c. Firm and Team Experience/ KTUA Subconsultant Firms + LATINO LATI 1 HEALTH ACCESS HEALTH ACCESS Latino Health Access (LHA), a 501(c)(3) public health organization founded in 1993, advances health, equity, and sustainable change through community-driven education,services, and civic participation. With nearly 15 years of experience in active transportation outreach, LHA partners with cities and agencies across Orange County to deliver inclusive programs in schools, parks, and neighborhoods, removing participation barriers with childcare,translation, and transportation support.A pioneer of the Promotor de Salud/Community Health Worker model, LHA trains trusted community members to connect residents with services, navigate systems, and lead efforts that build community capacity,voice, and equitable policy change. !MI. !M�� ��� POARCADIS Arcadis is a global design and consulting firm with over 36,000 professionals in 70+ countries, delivering sustainable solutions for natural and built environments since 1888. Its Mobility team develops safe, accessible, and equitable multimodal transportation systems by combining data-driven insights,technical expertise, and inclusive community engagement. Using innovative tools and best practices like Dutch design standards, Arcadis tailors solutions to local contexts such as Santa Ana, partnering with trusted organizations like Santa Ana Active Streets to ensure culturally fluent, community- supported outcomes. rI,# EVAf1I Consulting CONSULTINGEVARI Evari Consulting, Inc. (Evari) is a Small Business Enterprise(SBE)and Women- Owned Business Enterprise(WBE)founded in 2009,specializing in GIS-driven data collection, spatial database management, and interactive web applications for municipal infrastructure and planning. Evari develops mobile data platforms, enterprise geodatabases, and custom web dashboards with dynamic querying and scenario- based prioritization.The firm has delivered GIS and infrastructure projects nationwide, including street lighting master plans,ADA assessments, parks inventories, and active transportation planning. Evari has six employees,with two assigned to this project. KATHERINE PADILLA&ASSOCIATES, KATHERINE PADILLA &ASSOCIATES, INC. Katherine Padilla &Associates(KPA), Inc. is a full-service communications firm founded in 1994, specializing in strategic community outreach, public information campaigns, and community-based research.The firm offers services including workshops,focus groups, branding and design,social media, multimedia production, and translation, supported by a diverse, bilingual team. Certified as a WBE, DBE, MBE, and SBE, KPA has extensive experience partnering with cities, counties, and agencies across California to deliver effective, culturally responsive communication and engagement CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/13 c. Firm and Team Experience/ KTUA VE' ONE WAV _ _ r The area in the City of Santa Ana between the Regional Transportation Center (SARTC)and Downtown includes a variety of land uses:transit oriented development, Client Contact Information: high density housing, schools, churches, recreational centers, parks,transportation City of Santa Ana center and commercial. The transportation modes servicing this area cover a broad Zed Kekula, Senior Civil Engineer spectrum including pedestrian, bicyclist,transit and motorist.Although the scale of (714) 647-5606 Downtown and the SARTC are walkable and bikeable,the study area faces multiple ZKekula@santa-ana.org challenges from high vehicle speeds,wide streets, a lack of bicycle facilities,the Total Contract Amount/KTUA presence of schools, uncontrolled pedestrian crossings, and unsafe access to transit Fee: and shopping. $219,122/$150,389 To address these challenges, KTUA worked with the City to develop a Downtown Complete Streets Plan between Downtown and the Santa Ana Regional Project Completion: Transportation Center to improve access and mobility for all modes. The plan 08/2015 identified Complete Streets methods and designs to improve these modes within and Description of Services Provided: around Downtown. Complete Street Planning A large multi-lingual public outreach component included surveys, community Community Engagement advisory meetings, and a neighborhood workshop- a consecutive three-day workshop where walking and biking tours were conducted to gather input and Key KTUA Personnel: salan intimately experience the Downtown area. The outcome was a plan with detailed Joe recommendations for physical changes to streets,sidewalks and intersections Jacobbeon Leon that supports safe, active transportation along and across this study area.Through the public input process, stakeholder collaboration and primarily through the neighborhood workshop,five priority projects were identified and developed with preliminary designs. These concepts included planning level designs,3D illustrations and costs estimates.The five projects were branded during the workshops with unique names such as Who's on Third (Third Street), First on First(First Street), Cycle Track Square (Downtown to SARTC connection), Civic Duty(Civic Center Drive) and Ross is Boss(Ross Street). CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/14 c. Team and Team Experience/ KTUA low ,f :IIT1 Ri _ r ' ,l.t i �r•1r, 1" Ya:� a yr' � & ,��� - - .. 1 1 1 1 1 • • 31*31:144 1 1 Building on the momentum of the award-winning Santa Ana Downtown Zone Complete Streets Plan, KTUA was retained to continue the Complete Streets planning Client Contact Information: effort for Central Santa Ana. To support this effort, KTUA created several StoryMaps City of Santa Ana to help keep residents informed and to tackle technical topics.The City has identified Zed Kekula, Senior Civil Engineer five existing corridors to be part of the study with the goal of adding connections (714) 647-5606 between them, and adding new corridors for a complete network. Because of the ZKekulaC@santa-ana.org success of the outreach process, designs and grant procurement for the Downtown Total Contract Amount/KTUA project,the process for Central Santa Ana was almost identical,while incorporating Fee: additional grassroots organizations to conduct the outreach. $297,000/$297,000 As part of this project, a four-day workshop was completed averaging more than 30 people per day over an entire weekend. Translation services and materials were Project Completion: provided in Spanish.Various activities took place such as tactical urbanism with a 09/2017 demonstration cycle track and parklet, walking and biking tours and a bus-walk tour Description of Services Provided: combination.The activities allowed participants to experience the City streets and Complete Street Planning transit firsthand and provide insight as to what they would like to see improved. Public Outreach Participants engaged in various mapping and table exercises to narrow down the various options to their most important priorities.A follow up workshop was then Key KTUA Personnel: conducted to select the top ten corridors to be included in the final plan. Participants Joe Punsalan were also involved in the recommendations of each corridor which included Jacob Leon intersection art,traffic calming and streetscape improvements. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/15 WstO , +•�I � �� ENEM I ti i FNRH VEN AV-'•�w •�.� -.•-••- u-n-.! 1 1 — ———_1�.'T_sT,G - ,�''� ','R,1 '1 j__E,FT�1T __�+•$j� • 1 1 1 1=1 1.'� � _ 1 EFlUns. —r —Ts, 1 1 I — T __ it L.--j;1--•l-J- 1•• 4F I 1 , 1 E HE N 1 NI 1 1 1 1 1 1 l i T, _— edc WEN"1 1 iu_•1 —,•- -,_ r VJFA;FAO°L�tAV T- —1— r ———_ J e 1 Lu-u-u- �••-••''Santa Ana Boundary E�L:ER AV••J••� ,1 L..-..i Master Plan Proposed �! ! 1 I r 1 1 1 1 ! + Bikeways I I I 1 1 EMN&TrI'M—L P•AIIRG?l AT ———Class I:Mufti-use Path y 1 1 HI 1 1 I i r -- -—.1-q ———G °I-►�► 1 -�.'� :• a•+ + +. a .. ——-Class II:Bicycle Lane pi I ——— — � I— ———Class III: Bicycle Route 1 ! 1 "~ 1 y 1 1 WARNER + f � �• •4 CI 4 �6:-+' Class IV:Separated I —�q �— ——EWARNERAVt , ' I•! ; ,. +• + ! '�+ ' u Bikeway Existing Bikeways +! 1 1 ! � t * • Class I:Mufti-use Path I 1 j- 1 ♦—`W SEGER��GM AV I —- —— "€oveR Rb 0' r + + Class II:Bicycle Lane �� S 1 1 `I 1 ml -—— ♦�, �� t y: ; + `-f+ •� Class III: Bicycle Route I - 1 WI =1 I Class IV:Separated I�! � ———— —- �e E n� Bikeway y 1 al �• �, L �� L<_.-_ +• nr-n-AilFu .-n-n�n-n� F Aww•w wINiLYL =R-V SAFE MOBILITY 1 I 1 1 UPDATE 1 1 1 I VISION ZERO) The Santa Ana Vision Zero Update (SAVZ) builds on the original SMSA from 2016 to evaluate citywide traffic safety through a comprehensive analysis of traffic collisions. Client Contact Information: The analysis phase includes identifying contributing factors or patterns in the collision City of Santa Ana data,to locate specific hot spot locations, citywide trends, and best practices in traffic Zed Kekula, Senior Civil Engineer safety to identify solutions that will evolve the roadway network in Santa Ana into one (714) 647-5606 where roadway users can make transportation decisions and unanticipated mistakes ZKekula@santa-ana.org without risk of severe injury or death. The plan will utilize the FHWA-sanctioned Safe Total Contract Amount/KTUA Fee: Systems approach to improve the safety across the network, using low-cost but $179,965/$120,190 highly effective countermeasures. KTUA provided data collection, analysis, GIS map production, and led the safety Project Completion: evaluation and field reviews for street segments and intersections that present 02/2024 the highest risk to vulnerable roadways users(bicyclists and pedestrians). The Description of Services Provided: prioritization of risk factors established included collision patterns, severity of injuries, GIS and proximity to school, parks, and other pedestrian/bicycle generating uses. Collision Analysis and Based on the data collection,field review and collision analysis; countermeasures Countermeasures for proposed projects were recommended and CAD drawings were produced in Safe Routes to School AutoCAD for 20 corridors, segments, and intersections to mitigate potential future collisions and facilitate safe and comfortable trips for children's travel to and from school. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/16 c. Firm and Team Experience/ KTUA iv. Relevant Project Experience � I BIKE LAND " � 1 STOP A The Santa Ana Standard Avenue Protected Bikeway project implemented a Class 2 buffered bike lane along Standard Avenue from Warner Avenue to Edinger Avenue, Client Contact Information: a Class 4 protected bike lane from Edinger Avenue to Chestnut Avenue, and a Class City of Santa Ana 3 bicycle boulevard from Chestnut Avenue to 3rd Street.This design also included Zed Kekula, Senior Civil Engineer a fully protected intersection at Standard Avenue and McFadden Avenue as well (714) 647-5606 as partial protection/curb extensions at other various intersections. Signalized ZKekulaC@santa-ana.org bicycle crossings included separate bicycle phasing and signal heads. Pedestrian Total Contract Amount/KTUA improvements along the corridor include high-visibility crosswalks and bulb outs at all Fee: crossings and rectangular rapid flashing beacons at unsignalized crossings. $30,840/$30,540 KTUA prepared conceptual renderings to effectively convey the proposed project features at community workshops and assisted in facilitating those Project Completion: meetings. KTUA also assisted with landscape design, placemaking and a landscape 09/2021 construction document package with specifications. Due to the experience is Description of Services Provided: planning, designing, and implementing bikeways, as well as the Central Santa Ana Landscape Architecture Complete Streets Plan, KTUA provided bikeway and pedestrian design review for the Complete Streets Planning various submittals. Key KTUA Personnel: • Joe Punsalan • Jacob Leon • Stephen Nunez .Grant Win* CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /17 c. Firm and Team Experience/ KTUA ao , m Visit the -- project r—i✓' ;< -- _ .- _ - - - - — website earn more!OW - C- l b The Town of Apple Valley Complete Streets Action Plan (Plan) is a community-driven roadmap that has redefined the Town's approach to safety and mobility. Informed by Client Contact Information: extensive public outreach and data analysis,the Plan identified 14 priority projects to Rich Berger,San Bernardino improve walking, biking,transit, and ADA accessibility,with a focus on underserved County Transportation Authority areas and high-need corridors. Six projects also include grant-ready conceptual Planning Manager designs, detailed geoengineering surveys, 3D renderings, and cost estimates to (760)792-0998 accelerate implementation and support future grant applications. The technical Rberger@gosbcta.com depth of the Plan allowed the Town to move immediately from the planning phase Total Contract Amount/KTUA into the grant application phase,setting a new standard for how small to mid-sized Fee: jurisdictions can accelerate infrastructure delivery. $749,914/$459,545 To ensure the Plan addressed community priorities,the Town conducted a robust communityengagement strate that included a community survey,five pop-up Project Completion: strategy Y Y pp- p events, eight focus groups and interviews, six advisory committee meetings, one Ongoing 2026 virtual town hall, and two Town Council meetings. Through these activities,the Town Description of Services Provided: engaged over 1,000 residents and gained insights into community needs that data Complete Streets Planning alone could not provide. The effectiveness of the Plan is best demonstrated by its immediate results.Within Key KTUA Personnel: six months of adoption,the Town was awarded $10.9 million through the federal Safe • Joe Punsalan Streets and Roads for All (SS4A) program and SBCTA Article 3 funds. This success Jacob Leon establishes a ten-year pipeline of impactful capital projects that will enhance the Isabel Perez quality of life for Apple Valley residents well into the mid-2030s. Nicole Rogge • Marina Varano • Amanda Herbst *Grant Win* CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/18 c. Firm and Team Experience/ KTUA I Y lop tA 00 7777, . y .� y KTUA developed an Active Transportation Plan to provide a clear and comprehensive framework for safe, more convenient transit and non-motorized transportation options Client Contact Information: throughout the City.The plan identified and created a methodology to improve bicycle City of Rialto and pedestrian connectivity and safety by: expanding existing bicycle networks, Amparo Corona improving pedestrian circulation, reducing vehicle trips, creating complete streets, Principal Budget and Financial prioritizing access to transit, creating a first and last mile transit routes plan, and Analyst prioritizing improvements to help build a healthy and livable community.The plan (909)421-7244 improves connectivity of the city's bicycle network to the region's network. acorona@rialtoca.gov A critical component of this ATP was the Safe Routes to Parks plan which was Total Contract Amount/KTUA vital to understand and enhance public safety, promote equitable park access, Fee: and improve the overall health and well-being of residents.This analysis and $199,040/$152,991 recommendations offered a unique opportunity to enhance safety and accessibility on both a citywide and targeted scale around parks.The methodology emulated the Project Completion: safe routes to schools framework with inclusive community engagement and mobility 03/2020 enhancements for all ages and abilities. Description of Services Provided: The project was guided by a Technical Advisory Committee which suggested pop- Active Transportation up outreach at City events was the best solution to garner community input. KTUA Planning kept the project on an expedited schedule by moving forward with other critical tasks Community Engagement that didn't require community input. Once these tasks were completed and in place, Safe Routes to Parks community input was incorporated, and the project was delivered on time. Key KTUA Personnel: • Joe Punsalan • Jacob Leon CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/19 c. Firm and Team Experience/ KTUA El Centro Active Transportation & Safe Routes to School Plan WaIkBikeElCentro 0 FACTSHEET C�0 CITY OF EL CENTRO ACTIVE TRANSPO AFE ROUTES TO SCHOOL 1' M1 PLAN This combined Active Transportation/Safe Routes to School Plan (ATP/SR2S Plan) assessed existing active transportation modes and provided infrastructure and policy Client Contact Information: recommendations intended to encourage more biking and walking throughout the City of El Centro city. The scope included a sidewalk inventory to identify gaps, and to provide a plan Adriana Nava for sidewalk repair and replacement. Particular focus was also paid to identifying Community Services Director preferred routes for students to walk or bike to school.This is the city's first ATP/ (760)337-4545 SR2S Plan and significant community engagement was an integral part of developing anava@cityofelcentro.org the plan, including bi-lingual participation and outreach "pop-ups" at established Total Contract Amount/KTUA city events. This ATP/SR2S Plan is in compliance with active transportation program Fee: guidelines and is intended to be used to both guide future infrastructure investments $149,896/$99,520 and to support requests for future grant funding. Project Completion: 02/2019 Description of Services Provided: • Safe Routes to School • Public Outreach • Bi-Lingual Participation Key KTUA Personnel: • Jacob Leon CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/20 c. Firm and Team Experience/ KTUA SBCTMid Owner Contact/Reference: ` ` ROUTES • • ` SBCTA Josh Lee KTUA played a key role in supporting Lochner(Formerly known as KOA at the time (909) 884-8276 of this project) in developing the San Bernardino Safe Routes to School Plan Phase jlee@gosbcta.com II. KTUA provided assistance with project branding, announcements,flyers, social media content, and organizing/participating in stakeholder meetings and pop-up Total Contract Amount/KTUA events. The Safe Routes to School plan covered most cities in San Bernardino Fee: County, but KTUA specifically led walk audits in Ontario, Montclair, San Bernardino, $70,760/$70,760 Yucca Valley, and Joshua Tree. KTUA also provided walking, bicycling,traffic calming, and other related active transportation recommendations for each of the Project Completion: schools we were responsible for. Joe Punsalan and Jacob Leon were the project 09/2017 leads from KTUA. Description of Services Provided: • Safe Routes to School • Public Outreach Key Personnel: • Joe Punsalan • Jacob Leon CITY OF UPLAND MOBILITY MASTER PLAN Owner Contact/Reference: Ad Yesenia Diaz Assistant Engineer KTUA conducted a policy review and data analysis to understand existing Upland Public Works Land conditions; spearheaded a comprehensive,year-long community engagement Development&Transportation process to understand community needs; and developed project recommendations Division to improve safe and efficient active transportation and public transit options for (909) 931-4137 Upland. ydiaz@uplandca.gov The relative quality and quantity of mobility infrastructure of the City is well-served Total Contract Amount/KTUA by an aging but nominally sufficient pedestrian network,whereas safety and Fee: comfort in accessing regional non-vehicular mobility options such as light rail, bus, and multipurpose paths is deficient.This is especially true for the disadvantaged $269,862/$155,170 communities within the wealthier 80,000-person City of Upland,though public Project Completion: outreach efforts were challenged to reach this population. In-person and online 10/2025 outreach methods were employed through multiple channels,with metrics for tracking success in reaching these areas slowly and surely improving.Walk audits Description of Services Provided: in these neighborhoods were key outreach endeavors for understanding issues and Active Transportation distributing more information about surveys and additional opportunities for input. Planning • Community Engagement • Safe Routes to School Key Personnel: • Joe Punsalan • Alex Samarin • Madeline Pysher • Marina Varano CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /21 c. Firm and Team Experience/ KTUA ADDITIONAL PROJECT LIST: • County of San Diego,Safe and Equitable Access to Parks and Everyday Destinations(SEAPED) • City of Placentia, Open Spaces and Urban Greening • Port of San Diego,Shelter Island and Harbor Island Bikeways • City of La Verne Parks and Recreation Master Plan • City of Santa Fe Springs Park, Recreation, and Community Services Master Plan • City of Clovis,Wayfinding and Trail Design Guidelines • City of Arroyo Grande,Active Transportation Plan • City of Moorpark Parks Master Plan • County of San Diego, San Dieguito Road Pathway • City of Merced, Merced Park, Recreation, & Open Space Master Plan • City of Bellflower Parks and Recreation Master Plan • City of Whittier Parks and Recreation Master Plan • OC Active: Orange County Active Transportation Plan CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /22 c. Firm and Team Experience/ KTUA LATINO � . PARCADIS HEALTH ACCESS Orange County iidiispUlLdLIUH AAULIIU�y,��.'kctive I OCTA Safe Travels Education Program (STEP) Orange County Transportation Authorityl Orange County, CA The Orange County Safe Routes to School Program Arcadis was engaged by OCTA to develop the first (2020-2023), managed by OCTA and OCHCA, Latino countywide active transportation plan covering all 34 cities Health Access, and Walk& Rollers, provided 25 elementary and the County.The plan identifies regional bikeways, schools with free educational activities and resources to pedestrian priority areas, and includes abicycle/pedestrian encourage safe walking and biking to school. Latino Health best practices toolkit with strategies, case studies, and Access conducted outreach to 20 schools, implementing tools based on the Five E's: education, encouragement, 3-4 activities at 8 of them, including bike rodeos, school enforcement, engineering, and evaluation. Emphasizing assemblies,Walk to School Days, and parent presentations. equity,the plan addresses the needs of disadvantaged and The program also distributed safety materials such as underserved communities across Orange County. helmets and reflective armbands, along with banners and suggested safe routes maps for each school.Approximately The team used a mix of traditional and innovative outreach 600 students were reached per school,totaling about 4,800 methods to ensure an engaging and inclusive process.To students across the 8 participating schools. identify priority areas, KTUA applied a GIS-based bicycle OCTA Next Travels Education Program 2024-2027 and pedestrian propensity model to pinpoint improvement locations. The project also featured creative outreach, This project is a continuation of the STEP program, providing including a school-focused chalk art contest,community— another 25 elementary schools with free educational police engagement opportunities, and joint walk-to-school activities and resources to encourage families to walk and day events with the Orange County Public Health Agency. bike to school safely and more often. Running from 2020 to Metro D (Purple) Line First/Last Mile Plan and First/Last Mile 2023,the program is managed by OCTA and OCHCA and Planning Guidelinesl Los Angeles Metro I Los Angeles, CA supported by Latino Health Access, and Walk& Rollers,with Latino Health Access leading school engagement and the Arcadis planned and designed First/Last Mile(FLM) educational component.The effort aims to reach at least 150 improvements for seven future Purple Line subway stations elementary schools countywide and deliver 3-4 educational between Wilshire/La Brea and Westwood/VA Hospital. The activities at 25 of those schools. work included walk audits within a half-mile of each station, Santa Ana Safe Routes to School Plan (2019-2020) analysis of existing conditions, stakeholder coordination with UCLA, LADOT,the VA, and the City of Beverly Hills, The project was supported by Latino Health Access and extensive community engagement through interviews, promoting, attending, and supporting school audits while walk audits, and online surveys in partnership with Los also serving as a stakeholder member. Angeles Walks. The team developed and prioritized active Santa Ana Street Lighting Master transportation strategies based on implementation factors, A citywide street lighting Master Plan (2023-2025), advancing top projects to 30%design with pathway maps managed by the City of Santa Ana and developed with and rough-order-of-magnitude cost estimates. In parallel, Clanton &Associates, Inc., Evari GIS Consulting, Inc., Arcadis created Metro's First/Last Mile Planning Guidelines, IronStride Solutions, and Latino Health Access, assessed establishing a consistent process, clarifying agency roles, existing conditions, established updated industry-based and ensuring FLM improvements are integrated into transit guidelines, and identified near-term projects and cost projects and not value-engineered out. scenarios for improvements and maintenance. Latino Health Los Angeles Department of Regional Planning: East Access led outreach and engagement, including workshops, San Gabriel Valley Mobility Action Planl Los Angeles stakeholder meetings,flyers, surveys, educational Department of Regional Planning I East San Gabriel Valley, presentations,Spanish translations, social media outreach, CA survey collection, and stakeholder list development. As a subconsultant to KTUA,Arcadis worked on the Dracea Avenue Neighborhood Greenway Corridor Study, developing traffic calming and active transportation CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /2" c. Firm and Team Experience/ KTUA improvements.The study's goal was to transform Dracea facilities.The analysis produced GIS-based visualizations Avenue into a safe, accessible greenway for bicyclists and summary statistics documenting lighting levels along and pedestrians. The corridor serves schools, residential each route, providing project stakeholders defensible, data- neighborhoods, and commercial uses, requiring a context- driven evidence to support targeted lighting improvement sensitive approach to safety and mobility. recommendations and quick-build concepts designed to Project work included a physical inventory of corridor improve park access at several under-resourced locations conditions, public life surveys, and the development of a throughout the City. traffic calming toolkit tailored to local conditions. The team City of El Monte Sidewalk Inventory&Web GIS Data prepared preliminary design guidelines and concept-level Management I City of El Monte I El Monte, CA recommendations to improve pedestrian and bicyclist safety Together with KTUA, Evari conducted a comprehensive 250- while supporting neighborhood livability. mile sidewalk inventory for the City of El Monte in support of the City's Vision Zero Action Plan.Working without any prior ���•� E VAR I C o n s u l t i n g sidewalk data, Evari designed and deployed a mobile GIS field collection platform to systematically document sidewalk City of Santa Ana Street Light Inventory&Street Lighting conditions, curb ramp types, and infrastructure deficiencies Master Plan I City of Santa Ana I Santa Ana, CA across the entire city. Field crews used tablets to capture georeferenced point-location data linked to standardized Evari provided GIS data collection, analysis, and web attribute schemas,while WebGIS dashboards provided the application development services for the City of Santa Ana's project team and City staff with real-time visibility into audit Street Lighting Master Plan. Evari completed a citywide progress and findings as fieldwork unfolded. inventory of approximately 16,000 streetlight fixtures, using a combination of deep learning Al screening and mobile Evari's GIS team analyzed the collected data alongside field data collection to verify, update, and supplement the collision records to identify high-concentration corridors, bicycle and pedestrian incident hotspots, primary collision City's existing GIS data.Web GIS-based project tracking dashboards were developed for the City and project factors, and recommended countermeasures—with stakeholders, including automated reporting to flag comparisons to statewide and peer city statistics. immediate maintenance needs. Building on the inventory, Evari developed interactive web GIS applications that integrated streetlight data with collision history, pedestrian crosswalk locations, KA bicycle facility information,school walksheds, and other KATHERINE PADILLA &ASSOCIATES, INC. contextual datasets to support prioritization and community engagement.This work gave the Evari team direct Santa Ana Safe Routes to School I City of Santa Ana familiarity with the City of Santa Ana's GIS environment, KPA supported the City of Santa Ana in the implementation data standards, and stakeholder coordination processes, of the Safe Routes to School (SRTS) Plan. KPA was providing a strong foundation for the data collection, GIS responsible for managing outreach to schools throughout mapping, and web application development proposed under the city, including frequent communication with school the Safe Routes to Parks and Wheelchair Assessment Plan. administrators to explain the program and its benefits. Safe and Equitable Access to Parks and Everyday The team scheduled walk audits, managed audit tracking Destinations(SEAPED) I Circulate San Diego I San Diego, databases, and coordinated the distribution and collection CA of tally sheets. KPA also conducted site visits to answer questions, reinforce participation, and emphasize the Evari provided pedestrian-scale lighting analysis for the Safe importance of audits in strengthening grant applications for and Equitable Access to Parks and Everyday Destinations state funding aimed at improving infrastructure for walking, (SEAPED) project, evaluating exterior lighting conditions biking, and school access. along streets and sidewalks within a quarter-mile travel shed of six San Diego parks. Using photometric modeling, Evari El Centro Imperial Avenue Complete Streets I City of El assessed lighting performance across pedestrian access Centro routes to identify underlit segments that pose safety risks Launched in fall 2023,the Imperial Avenue Complete to pedestrians and bicyclists traveling to and from park Streets Plan aims to transform one of El Centro's primary CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /24 c. Firm and Team Experience/ KTUA corridors into a safer, more vibrant, and pedestrian-friendly route. Serving as the project's outreach lead under prime consultant KTUA, KPA developed a robust engagement strategy that included bilingual press releases, e-blasts, social media content, and bilingual outreach materials. KPA also coordinated logistics for community meetings and pop-up events, conducted bilingual intercept surveys, and produced summary reports capturing community input. Community voices played a central role in shaping the plan, which preserves Imperial Avenue as a key regional roadway while including much-needed safety and beautification enhancements. City of Costa Mesa I Costa Mesa Pedestrian Master Plan The City of Costa Mesa launched the Costa Mesa Pedestrian Master Plan to serve as a road map to identify solutions to improve walkability in the city. The plan proposed pedestrian improvements to infrastructure for connecting communities to schools, parks, businesses and other destinations in Costa Mesa. KPA led the community engagement component of the project, using a combination of walk audits, surveys, and virtual community meetings to collect feedback from residents and stakeholders. All outreach materials were developed in both English and Spanish to ensure inclusive participation. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /25 c. Firm and Team Experience/ KTUA v. Team organization including key staff, subconsultants,and an organizational chart. vi. Resumes for all key staff proposed describing relevant experience can be found in the appendix,on page#30 Joe Punsalan ii Leon ManagerPrincipal-in-Charge Project AmandaMarina Varano Herbst Deputy i g Senior Planner MadelineIsabel Perez Senior Planner ISIS Planner SUBCONSULTANTS LHA ARCADIS EVARI Community Engagement Transportation Engineering GIS/Wheelchair Inventory Study Rosario"Charis"Galeas Braulio Ranierz,PE Brian Gaze,AICP Moises Vasquez Cristina Martinez,AICP Dan Hamalainen,GISP Nallely Enriquez Eric Tunell Karen Iniguez-Suiata, PE KPA Community Engagement Support Jessica Padilla Katherine Padilla Xavier Sibaia CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /26 d. Proposed Work Plan/ KTUA i, ii, iii To expand our observations and exceed the needs of this safety, particularly in addressing speeding, racing, and project, our team has developed and will employ many the need for enhanced traffic control measures, and recognized industry best-practices tools and community pedestrian safety such as implementing stop bars at engagement strategies, and apply with context specific to intersections.We understand there may be concerns with Santa Ana. Our team understands the types of services this project and the ongoing Vision Zero project that KTUA required in the RFP and have completed many projects is concurrently working on. By aligning with Vision Zero with similar scopes of services, successfully throughout the principles, KTUA will deliver actionable recommendations state. KTUA has also supported funding efforts by refining that extend beyond parks to create safer, connected the scope and analysis to assist our client's efforts for grant streets for all users and destinations. Recognizing the applications, providing added value tasks, infographics, City's workload and concurrent planning efforts, KTUA's narratives, and summaries to essentially, "plug and play" extended team is structured to function as seamless staff elements of the plan into an application. extension, coordinating closely with ongoing initiatives Our team will bring the following ethos to this project. while maintaining project momentum.With clearly defined roles and a proactive approach, KTUA will guide the project Values and Vision,A Road Map to the Future—An agency's efficiently, incorporating City input at critical milestones values reflect their leadership and staff values, and those of while advancing toward a practical, implementable plan that the community they represent. This Safe Routes to Parks and reflects both community needs and policy priorities within Wheelchair Assessment Plan will help the City update these the expedited timeline, values and vision so that it can best determine the direction and priorities needed to make meaningful change. KTUA's approach goes beyond the scope by delivering added value tasks that strengthen both the planning A Strong and Comprehensive Community Engagement process and long-term implementation. Drawing from its Process— Community engagement is needed to genuinely experience as both active transportation and park planners, understand the community's issues, determine the value of KTUA applies a Safe Routes to School informed framework public services, and provide a vision for the future that the that expands the conversation beyond park boundaries community supports.We have found that effective outreach to include the full journey to and from these spaces. means going to the public instead of expecting the public This perspective allows the team to capture real-world to come to us.The KTUA team's effective and flexible challenges related to access, safety, and connectivity,while community engagement is the basis for measuring the guiding community input toward actionable improvements quantitative and qualitative components of this plan. along surrounding corridors. Through interactive strategies Community Driven Design Options—The efforts need to such as walk and bike audits and "Walk and Talks," KTUA focus on listening to public and staff input(as well as from will engage residents directly in the field, creating a deeper elected officials)about issues, concerns, solutions, and understanding of on-the-ground conditions and fostering priorities to direct the conceptual designs. The City has a meaningful dialogue that informs practical solutions. great infrastructure base to build upon for safe, connected, In addition to engagement, KTUA provides enhanced and implementable recommendations. technical deliverables designed to support the City's KTUA recognizes that today's political climate can directly future decision-making. The team will develop park affect community participation, particularly when concerns typologies, aligned with the City's Parks Master Plan,to related to enforcement create hesitation around attending establish tailored access and safety strategies for different public workshops and events.This has been a consistent park types, supported by conceptual corridor plans for challenge across recent projects, where fear and uncertainty high-priority examples. KTUA will also prepare targeted can limit engagement from key community members. To recommendations for all parks, ensuring a comprehensive address this, KTUA has partnered with trusted, community- and systemwide approach. based organizations such as Latino Health Access,which To meet the project timeline,the team has been intentionally brings culturally competent outreach strategies and structured to provide the capacity and flexibility needed established relationships within the community.Through to deliver within the 18-month schedule.With overlapping these partnerships, KTUA will foster safe,welcoming outreach efforts and clearly defined subconsultant roles, environments for engagement, ensuring that workshops, KTUA ensures consistent progress while maintaining high- walk and talks, and conversations are inclusive, accessible, quality engagement and analysis.The result is a forward- and reflective of the community's full voice. looking, implementable plan that equips the City with clear At the same time, KTUA understands and supports the guidance for improving safe access to parks well into the City Council's strong commitment to improving roadway future. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/27 t tj `. s' .�vai:'v'�i R {',�✓l +,� l is.+`' b' +, !_: �q• �.4' f� l� _ t ,gQy��r, � 1" '' $ ,j.• , �ryvl � �' .-aar�ry� .'�/'+t'1Fm, •�y�,t� i �� •y v7 � 1 r •, i��� �•+�►� �/I`�vlo '{l� r a � � ���, � _ � q4 i.. ^�. .; ,r��, O 1 C� ;, J�� ,�` ���µ�' ��.re. r dr�P dl�.• �� q �f'e Y4. + ����y�.� �. ,Y. a ` mow• .,p1��� `� � � .9$ d��dy4\ta�a7y,►• 1��frrl at`•i> '.7z � s �. `2 • - w§ -.- ..��v+ z ''� iM1_�,, � . to :'� i.k ��•'" t'. u��y b � qy�e�� d�,4E,- \ & �v 01 ya.+ � � .�J N �� �'�' �t i m�Ya•, iN� '�` -:�' - ,n 3 A r PI t �d • • aid Ji ► . . � , �- _ . � � �.� � STOP':_ y moor -_ter w Cost roposal NOINNNO Non N■■o 111111 1111111 1111111�o �o Coo =031 N■■o Miami: 11111111 111111111 00181111 goo ■■ 10�1111111111111111111� 1911E0 '1 II'�I ' III li��l�ll �111111 Ifflul 111111 il IYI IN �IIII III IS I IGNMI �iil�iiiir j�iiiii iiiiiii�l ii iill � Ilii iiaiil IRIMI NEON 11001i Islamic IIIIIIIII in long lii��ia liiiiiiil i� ilai IMIMI 111111 ooi ii�ii� i0m000 iiiii�� i imi �� v■0 oim 1111111 11111111e IN NINO MEN INIHIR INNUMIN ININHUNIN SEEM i��9 ilili! ii111iB iilil�ii1191191 IN icesINIMI MEN ���ai� i=vo��o i�oe���ia �a �as� MEMO I��I � iii! lii i i � iiii�il it liIl aMI ON eoeo IaIMMIo 00IIIII00 00 oao0 Me: N■■v 111111 M00mMIo 110111100 m oaoo f 2. Cost Proposal - Schedule City of Santa Ana Safe Routes to Parks and Wheelchair Assessment Plan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Anticipated Project Schedule 1.2 Project Management Plan 1.2 Kickoff Meetingand Project Development Team(PDT)Meetings 1.3 Federal Safe Streets and Roadsfor All(SS4A)Grant Program Reporting 2.1 Data Collection(includes Lit Review) 2.2 Walk and Bike Audits 2.2.1 Technical Walk and Bike Audit 2.2.2 Walk and Talk Events 2.3 Existing Conditions Technical Memorandum 3.1 Outreach and Engagement Plan 3.2 Website,Social Media,and Survey 3.3 Community Workshops(2) 3.3.1 Pop-up Events(4) 3.3.2 Stakeholder Meetings(5) 3.4 City Council Meetings 4.2 Collision Analysis 4.2 Local Prioritization and Field Review 4.3 Recommended Countermeasures/Toolbox 4.4 Consistency Review 4.5 Cost Estimates and Funding5ources 4.6 Improvement Prioritization(Includes CAD concepts) 4.7 Agency Coordination 4.8 GIS Mappi ng 5.1 Wheelchai r Assessment 6.1 Draft Plan 6.2 Final Plan CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /29 c� y y \v � J i Cert *ifica ins 3. Certifications & Attachments/ KTUA The certifications and attachments are acknowledged and signed and submitted separately through PlanetBids. CITY OF SANTA ANA ATTACHMENT A - PROPOSER'S CERTIFICATION KTU&A Corporation LEGAL NAME OF COMPANY TYPE OF BUSINES STRUCTURE 1200 F Street, San Diego, CA 92101 BUSINESS ADDRESS Joe Punsalan Principal Transportation Planner NAME OF AUTHORIZED AGENT TITLE joe@ktua.com (619) 294-4477 x127 E-MAIL ADDRESS PHONE NUMBER SMALL, LOCAL BUSINESS PREFERENCE Is your firm claiming small, local business preference for this soliciation? Yes, my firm is a small Santa Ana business* Yes, my firm is a small Orange County business** x No, my firm is not claiming local business preference *Small Santa Ana business shall mean a business certified by the state department of general services as a small business,which has a substantial presence through either a headquarters or branch office within the geographical boundaries of the city,and which headquarters or branch office was established prior to the city inviting bids for the respective procurement. **Small Orange County business shall mean a business certified by the state department of general services as a small business, which has a substantial presence through either a headquarters or branch office within the geographical boundaries of Orange County, and which headquarters or branch office was established prior to the city inviting bids for the respective procurement. IF YOU ANSWERED YES, THEN YOU MUST SUBMIT YOUR BUSINESS LICENSE AND CA DEPARTMENT OF GENERAL SERVICES SMALL BUSINESS CERTIFICATION WITH YOUR PROPOSAL.A post office box address within the city shall not qualify as a valid business location. Proposer understands and agrees that this written RFP (or any part thereof specifically designated and accepted by the City of Santa Ana, hereinafter City)shall constitute the entire agreement between Proposer and the City only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Executive Director or his duly authorized agent, and signed by the City Attorney, denoting her approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to Proposer or deposited with the United States Postal Service properly addressed to the Proposer with the correct postage affixed thereto. Proposer further agrees that upon delivery(as defined above)of the accepted agreement he/she will furnish City all required bonds and certificate of liability insurance within ten (10) days (excluding Saturdays, Sundays and City's legal holidays), or the funds, check, draft, or Proposer's bond substituted in lieu thereof THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/30 3. Certifications & Attachments/ KTUA �1 CITY OF SANTA ANA ATTACHMENT B - REFERENCES Consultant shall provide three (3)references from other similar public agencies for which services similar to those specified in this RFP have been performed, including contact names and telephone numbers. The respondent grants permission for the City to contact any individuals listed as references for additional information regarding your firm's qualifications. City may disqualify a Proposer if: • References fail to substantiate Proposer's description of services and deliverables provided; or • References fail to support that Proposer has a continuing pattern of providing capable, productive, and skilled personnel, or • City is unable to reach the point of contact with reasonable effort. It is the Proposer's responsibility to inform the point of contact(s) of normal City working hours. List and describe fully the contracts performed by your firm which demonstrate your ability to provide the supplies, equipment or services included in the scope of the proposal specifications. Attach additional pages if required. REFERENCE Customer Name: Town of Apple Valley Contact Individual: Rich Berger(now with SBCTA) Address: 14955 Dale Evans Parkway Phone Number: (760) 792-0998 Apple Valley, CA 92307 Email: Rberger@gosbcta.com Contract Amount: $749,914 Year: 11/2023 -2025 Description of supplies, equipment, or services provided: Town of Apple Valley Complete Streets Action Plan REFERENCE Customer Name: City of Upland Contact Individual: Yesenia Diaz Address: 460 N Euclid Avenue Phone Number: (909) 931-4137 Upland, CA 91786 Email: ydiaz@uplandca.gov Contract Amount: $269,862 Year: 01/2024 - 10/2025 Description of supplies, equipment, or services provided: City of Upland Master Mobility Plan REFERENCE Customer Name: City of El Centro Contact Individual: Angel Hernandez THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /31 3. Certifications & Attachments/ KTUA (V CITY OF SANTA ANA Address: 1275 W. Main Street Phone Number: (760) 337-3864 El Centro, CA 92243 Email: angel_hernandez@cityofelcentro.org Contract Amount: $329,250 Year: 06/2023- 02/2025 Description of supplies, equipment, or services provided: City of El Centro Imperial Avenue Complete Streets Plan THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /32 3. Certifications & Attachments/ KTUA .. CITY OF SANTA ANA ATTACHMENT C - CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY, AND VOLUNTARY EXCLUSION This certification is required by the regulations implementing Executive Order 12549, as amended, Nonprocurement Debarment and Suspension, 2 CFR Part 2998, Subpart C, Responsibilities of Participants Regarding Transactions. The regulations were published as Part VII of the May 26, 1988, Federal Register(Pages 19160-19211), and as subsequently amended in 81 Federal Register 25585. (Before completing certification, read instructions which are an integral part of certification) 1. Pursuant to 2 CFR 180.335, the prospective primary participant, (i.e. grantee) certifies to the best of its knowledge and belief, that it and its principals: a. Are not presently excluded or disqualified; b. Have not been convicted within the preceding three years of any of the offenses listed in 2CFR 180.800(a) or had a civil judgment rendered against them for one of those offenses within that time period. c. Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local)with commission of any of the offenses listed in 2 CFR 180.800(a); and d. Have not had one or more public transactions (Federal, State or local) terminated within the preceding three years for cause or default. 2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. 11�0---4- Signature Joe Punsalan, Principal Transportation Planner Name and Title of Official Authorized to Certify On Behalf of Vendor 03/30/2026 Date THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /33 3. Certifications & Attachments/ KTUA laCITY OF SANTA ANA ATTACHMENT D - NON-LOBBYING CERTIFICATION The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency,a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension,continuation, renewal,amendment,or modification of any Federal contract,grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that Il,s ch sub recipients shall certify and disclose accordingly. Signed: Title: Principal Transportation Planner Firm: KTU&A Date: 03/30/2026 THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /34 3. Certifications & Attachments/ KTUA la CITY OF SANTA ANA ATTACHMENT E - NON-DISCRIMINATION CERTIFICATION The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows: 1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion,sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Consultant's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Consultant's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. 7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1)through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a subconsultant or vendor as a result of such direction THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /35 3. Certifications & Attachments/ KTUA _._�. CITY OF SANTA ANA by the administering agency, the Consultant may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter. 1\0 Signed: Title: Principal Transportation Planner Firm: KTU&A Date: 03/30/2026 THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /36 3. Certifications & Attachments CITY OF SANTA ANA ATTACHMENT F - NON-COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) To the CITY OF SANTA ANA In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the proposer declares that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from bidding; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham proposal. Note: The above non-collusion affidavit is part of the proposal. Signing this proposal on the signature portion thereof shall also constitute signature of this non-collusion affidavit. Proposers are cautioned that making a false certification may subject the certifier to criminal prosecution. This form must be notarized. Signed State of County of Subscribed and sworn to (or affirmed) before me on this day of 20 , by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. See Attached Notary Certificate Comm. #2547503 Exp: 02 09 30 Notary Public Signature Notary Public Seal THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /37 Certifications & Attachments ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of SAN DIEGO ) On MARCH 18TH, 2026 before me, HAILEY SNELL, NOTARY PUBLIC (insert name and title of the officer) personally appeared JOSEPH PUNSALAN who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. „ HAILEY SNELL WITNESS my hand and official seal. .. COMM.#2547503 H NOTARY PUBLIC-CALIFORNJA V SAN DIEGO COUNTY My Commission Expires ' FEBRUARY 9,2= Signature jey (Seal) CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/38 3. Certifications & Attachments/ KTUA CITY OF SANTA ANA ATTACHMENT F - NON-COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) To the CITY OF SANTA ANA In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the proposer declares that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from bidding; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham proposal. Note: The above non-collusion affidavit is part of the proposal. Signing this proposal on the signature portion thereof shall also constitute signature of this non-collusion affidavit. Proposers are cautioned that making a false certification may subject the certifier to criminal prosecution. This form must be notarized. Signed State of County of Subscribed and sworn to (or affirmed) before me on this day of 20 , by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Notary Public Signature Notary Public Seal THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /39 3. Certifications & Attachments/ KTUA "? CITY OF SANTA ANA ATTACHMENT G - SAM.GOV UEI VERIFICATION On April 4, 2022, the federal government stopped using the DUNS Number to uniquely identify entities. Now, entities doing business with the federal government use the Unique Entity ID created in SAM.gov. They no longer have to go to a third-party website to obtain their identifier. This transition allows the government to streamline the entity identification and validation process, making it easier and less burdensome for entities to do business with the federal government. This RFP includes federal funding, and as such, the proposer must provide verification of their SAM.gov UEI and active registration status. Please attach your entity's registration from SAM.gov, including UEI and active registration status. Respondents must have active registration on Sam.Gov at time of proposal submittal in order to be considered for award. Proposer's UEI: DD7UNQVTKEM6 SAM.gov Registration Expiration Date: 09/18/2026 Signed: Date: 03/30/2026 THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN /40 3. Certifications & Attachments/ KTUA KipKristie Bevacqua<kristie@ktua.com> Registration Activated for KTU&A/ DD7UNQVTKEM6 / OLPA2 in the U.S. Government's System for Award Management (SAM.gov) 1 message donotreply@sam.gov<donotreply@sam.gov> Thu, Sep 18, 2025 at 10:46 AM To: markc@ktua.com, sharon@ktua.com, kristie@ktua.com Cc: markc@ktua.com, sharon@ktua.com, kristie@ktua.com Mark Carpenter, Sharon Singleton, Kristie Bevacqua, The registration for KTU&A/DD7UNQVTKEM6/OLPA2 is now active in the U.S.federal government's System for Award Management(SAM.gov). If you did not provide a Commercial and Government Entity (CAGE)Code during the registration process, one has been assigned to you by the Defense Logistics Agency(DLA)CAGE Program. To remain eligible to do business with the federal government, you must renew your entity's registration in SAM.gov every year. The annual renewal date for the registration is 2026-09-18 13:08:24.391. You may invite additional users to manage or review your entity registration by following these steps: 1. Go to the SAM.gov website and sign in 2. On your Workspace page, scroll down to the"User Directory" 3. Enter the email address of the user you want to invite and select the email address from the list 4. On the next page, select the"Assign Role" button in the top right corner of the page 5. On the assign role page, follow the instructions provided and then select"Send Invitation"at the bottom of the page 6. The user will be notified All invitees will receive an email message from SAM.gov with instructions on how to complete the process. Remember, it is free to register in SAM.gov. Get free help at SAM.gov in the"Help" section and at the Federal Service Desk (FSD)where you will find SAM.gov user guides, quick start guides, helpful hints, videos, and frequently asked questions. If you are going through entity validation at SAM.gov for the first time and have questions, visit this list of FAQs. In addition, if you are located in the U.S. and its outlying areas, you can get FREE support from your local APEX Accelerator(formerly known as PTAC), an official resource for government contracting assistance. Go to https://www.apexaccelerators.us to find your closest office. Do not reply to this auto-generated email. This email was sent from Production. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/41 SANTA ANA 'NO A r f.) 1� .3 ■ Appendix- Resumes/ KTUA Joe Punsalan is a principal and oversees KTUA's parks and active transportation planning practice for clients throughout California. He is actively engaged in citywide is park master plan projects and large-scale active transportation planning projects such as complete street plans and corridor studies, active transportation plans, vision zero, and first/last mile connectivity. He is responsible for scope development, data analysis, public engagement and facilitation of workshops,focus group and 0 stakeholder meetings, report writing, grant writing and reporting, and staff and consultant team management. He has a background in GIS for mapping, research and analysis, and uses a simplified approach to displaying complex methodologies. I Project manager responsible for stakeholder and public outreach coordination, workshop and meeting facilitation, data gathering and analysis.Analysis included Joe Punsallan I Principal Parks bicycle and pedestrian level of traffic stress and collision assessment. Responsible / Transportation " , Planner for the coordination between traffic engineering and outreach subconsultants for all aspects of the project. Other tasks include preparing materials, organizing,walk audit routing, leading a bike tour during the three-day charrette process, document Education and presentation preparation, bike and pedestrian project development and cost • B.A., Geography, Sacramento estimating. State University,1998 CITY OF SANTA ANA CENTRAL SANTA ANA COMPLETE STREETS PLAN Project manager.As a result of the award-winning success of the Downtown Registrations Complete Streets Plan,this project provided similar planning, design and • ITE Professional Transportation outreach efforts for Central Santa Ana.The project included a five-day workshop Planner incorporating a demonstration project,walking and biking tours and workshop • LEED Green Associate activities. Responsible for the coordination of workshops, activities, presentations, • GISP, GIS Certification Institute and staffing.Additional tasks include community advisory presentations,facilitation #53646, exp. 1/31/2028 and subconsultant coordination. Managed corridor prioritization, data collection and preliminary engineering design review for ten corridors • League of American Bicyclists League Certified Instructor CITY OF SANTA ANA SAFE MOBILITY SANTA ANA UPDATE(SANTA ANA VISION ZERO) #2005 Principal, responsible for overseeing the development of a comprehensive Vision Zero Plan with a Safe Routes to School (SRTS) component.Assisted in overseeing Affiliations subconsultants, data collection, analysis, and GIS map production. Coordinated the • Association of Pedestrian and successful comprehensive outreach tasks that included pop-up workshops,walk Bicycle Professionals(APBP) audits, neighborhood meetings and online engagement.Assisted and oversaw the • League of American Bicyclists data collection,field review and collision analysis; countermeasures for proposed projects and the CAD drawings for 20 corridors, segments, and intersections to • California Parks and Recreation mitigate potential future collisions and facilitate safe and comfortable trips for Society(CPRS) children's travel to and from school. • Women in Transportation • Circulate San Diego Principal-in-charge overseeing task development and completion from the team and subconsultants. In-charge of quality control, client relations and overseeing major tasks, project development and community engagement. CITY OF SAN DIEGO VISION ZERO Team leader for the development of visual simulations for four priority corridors: University Avenue, Market Street, Garnet Avenue and Imperial Avenue. Responsible for task assignment, bicycle and pedestrian design options, MUTCD and NACTO compliance and quality control. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /42 Appendix- Resumes/ KTUA Jacob Leon is dedicated to parks and recreation planning,trail and open space planning,complete streets planning, and community outreach. His project responsibilities entail project management, existing conditions analysis,overseeing community engagement,facilitating community workshops and special meetings with elected officials, and developing comprehensive project recommendations. He is passionate about raising awareness of the benefits of thoughtful urban planning and public realm design, equitable access to parks and open space, and safe transportation infrastructure. His passion for nature, parks,trails and genuine F community engagement reinforces his commitment to clients and the communities he works in throughout California. Project manager responsible for day-to-day coordination between the client and Jacob Leon I sub consultants.Jacob will oversee the community engagement process,the Project Manager development of conceptual drawings for seven (7)corridors, and ensure all elements from the 2024 Plan are updated correctly with this planning effort. Education CITY OF SANTA ANA CENTRAL SANTA ANA COMPLETE STREETS PLAN" • Bachelor of Landscape Key team member responsible for supporting all tasks associated with existing Architecture, California conditions analysis, community engagement, and recommendation development. Polytechnic State University, Jacob was responsible for Spanish translation and interpretation for all outreach San Luis Obispo, 2013 events, developing 3D renderings for proposed recommendations, creating concepts in CAD, and assembling the final plan in Indesign. Registrations CITY OF SANTA ANA ACTIVE TRANSPORTATION PLAN • 2014 LEED Green Associate Assistant project manager/associate planner, supported all major tasks. Special focus on comprehensive community engagement strategies, events, and materials. Assisted Affiliations the team with existing conditions analysis, project development, cost estimation, and • American Society of Landscape document production. Helped identify project recommendations and assisted with the Architects design and review of key priority projects. • California Parks and Recreation Society TOWN OF APPLE VALLEY COMPLETE STREETS PLAN Project manager responsible for day-to-day coordination between the client and • American Planning Association sub consultants. Played a vital role in supporting all community engagement efforts • Association of Pedestrian and due to the Town's diverse demographics. Helped facilitate and attended focus Bicycle Professionals group meetings, pop-ups,workshops, and Advisory Committee meetings. Led the • ACE Mentor- Board of Directors conceptual development of proposed complete-street improvements for several SDHS Geotech Academy- corridors. Provided guidance on cost estimates and the development of the final • Board of Directors report. CITY OF EL CENTRO IMPERIAL AVENUE COMPLETE STREETS PLAN,EL CENTRO,CA Project manager responsible for coordinating all elements of the scope of work between the client and project team.Tasks include facilitating monthly meetings, helping coordinate and facilitate community engagement efforts, overseeing the development of alternative conceptual drawings, and overseeing the development of the preferred concept that incorporates practical and innovative Complete Streets solutions that align with existing local and regional plans. Community engagement efforts include facilitating workshops, pop-up events, stakeholder meetings, and presentations to elected officials. Jacob's Spanish-speaking proficiency allows him to provide equitable community engagement communication throughout the planning process.Jacob is also responsible for managing all subconsultants. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /4- Appendix- Resumes/ KTUA Marina Varano is as senior planner serving on numerous active transportation and park master plans since joining KTUA. She has a Master's in City and Regional Planning from Cal Poly, San Luis Obispo and holds a B.S. in Environmental Studies from the University of California, Santa Barbara. Marina previously worked for the City of San Luis Obispo's Office of Sustainability and Natural Resources while in graduate school, where she contributed to climate action planning and implementation, as well as open space conservation planning projects. With a passion for sustainable and healthy communities, Marina hopes to contribute to impactful planning projects that will shape our cities for the better. TOWN OF APPLE VALLEY COMPLETE STREETS ACTION PLAN Deputy project manager/Senior Planner responsible for managing timelines, coordinating with clients and subconsultants, and leading advisory committee and Marina Varano I DeputyTown Hall meetings. Guided development of a comprehensive plan identifying high- Project Manager need complete streets improvements for underserved communities, including grant- ready projects.Within six months of adoption,the client secured nearly$10M in funding and pursued additional sources. Education • Master of City& Regional CITY OF UPLAND MOBILITY MASTER PLAN Planning, California Polytechnic Deputy project manager/Senior Planner. Key responsibilities include overseeing State University, San Luis project timelines and tasks; managing relationships with clients,stakeholders, and Obispo sub-consultants; conducting policy review and data analysis to understand existing conditions;spearheading a comprehensive,year-long community engagement process • B.S. in Environmental Studies to understand community needs, including walk audits,surveys, pop-up booths, with a minor in Earth Science, community workshops, and technical advisory committee meetings; and developing University of California, Santa project recommendations to improve safe and efficient active transportation and public Barbara, 2016 transit options for Upland. Registrations CITY OF ARROYO GRANDE ACTIVE TRANSPORTATION PLAN • California Planning Leadership Deputy project manager/Senior Planner. Key responsibilities include overseeing Academy, 2025 project timelines and tasks; managing relationships with clients,stakeholders, and sub-consultants; conducting policy review and data analysis to understand existing Affiliations conditions; planning and delivering diverse and meaningful community engagement • American Planning Association experiences; and developing an award-winning and deeply community-driven active (Member) transportation plan for a small city with substantial potential for and interest in walking • Association of Pedestrian and and biking. Bicycle Professionals (Member) MOORPARK PARKS AND RECREATION MASTER PLAN Deputy project manager/Senior Planner. Key responsibilities include executing project tasks to meet deliverables; managing relationships with clients, stakeholders, and subconsultants; planning and executing a range of community engagement methods, including pop-up booths,focus group meetings, interviews with leadership, and workshops; and developing a comprehensive, community-driven Parks and Recreation Master Plan. SAN DIEGUITO ROAD PATHWAY PRELIMINARY ENGINEERING REPORT Project manager/senior planner. Key responsibilities include managing project timelines and consultant teams, conducting site visits, analyzing existing conditions, and developing recommendations for a shared use pathway along San Dieguito Road in unincorporated San Diego County. Deliverables include a Conceptual Alignment Study, Pathway Analysis, and Preliminary Engineering Report(PER)to support future implementation. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /44 Appendix- Resumes/ KTI, •''4 Amanda Herbst is a senior planner at KTUA. She earned a B.A. in Political Science from Point Loma Nazarene University and is pursuing a Master's in City Planning Ilk at San Diego State University. Before entering urban planning,she worked in the nonprofit sector serving vulnerable populations in San Diego County. During graduate ► �— ,, "°�:♦-= school, she worked as a land use planner at a planning and engineering firm and as a research assistant at SDSU,where she studied links between young breast cancer -- - incidence and "locally undesirable land uses." This work strengthened her passion for creating healthier connections between the built and natural environments and `III ensuring equitable access to spaces that support emotional, social, and physical well- s- being. TOWN OF APPLE VALLEY COMPLETE STREETS ACTION PLAN Senior planner. Key responsibilities included supporting and attending community HerbstAmanda engagement efforts such as workshops and pop up events, analyzing community Senior Planner feedback, asset inventory collection, graphic creation, and report writing and AL development. Education PORT OF SAN DIEGO SHELTERMARBOR ISLAND BIKEWAYS • BA Political Science, Point Loma Senior planner. Key responsibilities included the identification and analysis of existing Nazarene University, 2020 literature related to Harbor and Shelter Island active transportation efforts, data collection and analysis of existing conditions, and the development of bicycle facility • Master City Planning, San Diego feasibility recommendations. State University,(expected 2026) CITY OF LA VERNE PARKS AND RECREATION MASTER PLAN Senior planner. Key responsibilities included supporting and attending community Affiliations engagement efforts such as workshops and pop up events, analyzing community • American Planning Association feedback, asset inventory collection, graphic creation, and report writing and (member) development. • San Diego Bird Alliance SANTA FE SPRINGS PARKS AND RECREATION MASTER PLAN (member) Senior planner. Key responsibilities included identifying and analyizing existing literature related to the City's parks and recreation system,leading tot the development of a comprehensive literature review. Collected and summarized community feedback after project workshops and events. Supported report development through content editing and document formatting. CLOVIS WAYFINDING AND TRAIL DESIGN GUIDELINES Senior planner. Key responsibilities include the identification and analysis of existing literature related to active transportation and trails projects or policies in the City of Clovis. Responsible for using identified literature to develop a comprehensive literature review to guide the wayfinding and design guidelines document development. Developed report text and provided input and support on proposed recommendations/guidelines. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /45 Appendix- Resumes/ KTUA Isabel Perez joined the KTUA team as a Planner and Designer after earning her B.A. in Urban Studies and Planning from the University of California San Diego. Her technical skills include the Adobe Creative Suite,ArcGIS,AutoCAD, Lumion, Revit, and SketchUp—all of which she actively uses to create high-quality graphics,three- dimensional models, and renderings for a range of projects involving trails, active transportation, complete streets, and parks and recreation planning. Before joining KTUA she became a LEED Green Associate, held a Planning Intern position for a local --� urban planning and design firm, and helped develop the Sustainable Food Systems course for the Department of Urban Studies and Planning at UCSD. Planner/designer. Key responsibilities included conducting fieldwork and extensive research to develop written and graphical community engagement materials to encourage public participation. Additionally, provided support throughout all Isabel Perez I Senior Planner phases of the project,from developing branding to priority project planning-level recommendations. Education �ITY OF SANTA ANA VISION ZERO UPDATE • B.A. Urban Studies and Deputy project manager. Coordinated day-to-day communication between the project Planning, University of California manager, client, and subconsultants to maintain schedule alignment and project San Diego, 2023 momentum.Supported the development of project materials across all phases,from existing-conditions analysis through public outreach. Provided Spanish translation Registrations and interpretation support at outreach events and for all public facing material. • LEED Green Associate Additionally, contributed to the preparation of final deliverables for seven new planning-level corridor concepts. CITY OF EL CENTRO IMPERIAL AVENUE COMPLETE STREETS PLAN Planner/designer. Managed the creation of physical and digital community engagement material,field work of existing conditions, and took part in public engagement events for the curation of appropriate graphical material and text to be included within the final document. CITY OF SAN DIEGO,SAFE AND EQUITABLE ACCESS TO PARKS AND EVERYDAY DESTINATIONS(SEAPED) Senior planner/designer. Managed and coordinated with the project team throughout all phases of the project. Key responsibilities included analyzing existing and proposed projects to ensure alignment with ongoing quick-build efforts within the study's focus areas and proposing planning-level quick-build recommendations. MERCED PARK,RECREATION,AND OPEN SPACE MASTER PLAN The Merced Park, Recreation, and Open Space Master Plan is an ongoing project for the City of Merced. Isabel's role consists of: attending community events to inform the public about the project and gathering community input to be used for the development of the Plan,the development of outreach materials, community feedback analysis, and final Plan recommendations. A unique aspect of working on this project has been the diverse facility types found throughout the city, one of them being a zoo. The result of the project is a Plan that is expected to serve as a guide in the pursuit of future funding opportunities for the betterment of parks, recreation, and programming offered throughout the city. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /46 Appendix- Resumes/ KTUA Madeline Pysher is a Planner and GIS Analyst at KTUA. She holds a B.A. in Urban Planning and Sustainable Development with minors in Geographic Information Systems • and Environmental Justice, specializing in equity mapping and analysis. She previously £�-t> interned with a Metropolitan Planning Organization and Regional Transportation Planning Organization. Madeline is a LEED Green Associate and is skilled in ArcGIS, i Microsoft Access, SketchUp,Adobe Creative Suite, and Python. Irt ; rye CITY OF SANTA ANA VISION ZERO UPDATE Planner/spatial analyst. Primary responsibilities in developing the City of Santa Ana Vision Zero Update included analyzing data and fostering community engagement. Collected, processed, and conveyed updated collision data using charts and maps. Fostered community engagement by creating an online comment map and contributing to an online survey, allowing the public to provide valuable feedback on the Vision Zero Update. Madeline CITY OF UPLAND MOBILITY MASTER PLAN Designed existing conditions maps for the Upland Mobility Master Plan utilizing copious data sources and spatial modeling techniques. I coordinated with and Education participated in leading Walk Audits around crucial connection corridors in Upland to • B.A. Urban Planning and foster understanding of the communities mobility needs. I created an online community Sustainable Development, with comment map to integrate public feedback into the planning process. I contributed a double minor in Geographic to the creation of Safe Routes to School and future bike path recommendations, and Information Services and implemented visual representations for those recommendations into the final report. Environmental Justice,Western Washington University, 2024 UPLAND SAFE ROUTES TO SCHOOL Primary responsibilities in developing the City of Upland Master Mobility Plan (MMP) include analyzing different data sources during the existing conditions phase and creating maps that accurately reflect the city's current environmental, social, and physical conditions. Recommendations for Safe Routes to School were analyzed using a half mile walking distance from schools, a walk-audit with professionals and students, documentation of existing infrastructure, and community feedback—all to identify gaps in active transportation safety for pedestrians and cyclists traveling to and from schools in Upland. TOWN OF APPLE VALLEY COMPLETE STREETS ACTION PLAN Planner/spatial analyst. Key responsibilities include utilizing geospatial data and aerial imagery software to assist in graphical materials as well as the creation of an interactive map useful for assessing final recommendations. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/47 Appendix- Resumes/ KTUA LATINO _ HEALTH Born and raised in Sinaloa, Mexico, Charis was the first ACCESS ,, in her family to earn a bachelor's degree in Psychology and developed an early passion for community engagement. Since joining Latino Health Access in 2006,she has led youth-focused projects and educational initiatives, k collaborating with stakeholders across Orange County to improve quality of life in underserved communities. She is committed to advancing health and transportation equity through infrastructure, education, and supportive policies. f, COMMUNITY ENGAGEMENT EXPERIENCE IN ORANGE COUNTY • Former Santa Ana Active Streets Coalition (SAAS) Chair and founding member ti Share Ourselves Organization Board Member Co-leaded Youth Engagement for the Santa Ana Building Healthy Communities Initiative ChildrenVouth Engagement • Advocate for the Santa Ana Sundays On Main Open Street(SOMOS) event Department Program Directo • Coordinated the LHAs Integrated Outreach Initiative •Education Coordinated and facilitated Youth educational classes and groups Bachelor's degree in ACTIVE TRANSPORTATION OUTREACH&EDUCATION PROJECTS EXPERIENCE: Psychology(Universidad • Co-led the coordination and implementation of the LHA Downtown Santa Ana Autonoma de Occidente, Wellness Corridor project(2012 - 2015) Sinaloa, Mexico), 2004 • Coded the coordination and implementation of the Santa Ana Active Streets: Registration Active Transportation Leadership Program (2015) • League Certified Instructor Supported the community outreach for the Santa Ana Downtown Complete Streets of the League of American Plan (2015- 2016) Bicyclists(LCI #4933) • Co-led the community outreach and engagement for the Central Santa Ana • Youth Mental Health First Aid Complete Streets Plan (2016-2017) Certification • Led the coordination and implementation of the Santa Ana Bicycle Safety • Adult, Child and Baby First Aid/ Education & Outreach Campaign (2016) CPR/AED Certification Led the coordination and implementation of the Santa Ana Bike Safety Education • Community Emergency Campaign (2017-2018) Response Team (CERT) • Led the coordination and implementation of the Outreach and Educational certification Campaign to Improve Bicyclist and Pedestrian Safety in the City of Santa Ana (2018-2019) • Led and Coordinated the community outreach and engagement for the Santa Ana Active Transportation Plan (2018-2019) • Santa Ana Safe Routes to School Plan, Stakeholder member and supported School Audits(2019-2020) • Led the coordination and implementation of the OCTA Bicycle and Pedestrian Educational Safety Campaign (2019-2020) CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/48 Appendix- Resumes/ KTUA LATINO _ HEALTH Nallely earned her bachelor's degree in Public Health ACCESS Sciences from the University of California, Irvine in 2019,where she volunteered with Latino Health Access and developed a passion for grassroots community work. She joined the organization the same year and now serves as Program Coordinator in the Children and Youth Engagement Department. In this role,she leads youth leadership and mentorship programs focused on substance use prevention and supports school-based bike and pedestrian safety initiatives. She has also served on the Leadership Committee for Santa Ana Active Streets, including as co-chair, advocating for safer streets for youth. As the daughter of Mexican immigrant parents, Nallely is committed to empowering youth, advancing mobility justice, and promoting equitable policies through Program • community-centered engagement. Coordinator ACTIVE TRANSPORTATION AND COMMUNITY ENGAGEMENT EXPERIENCE • Santa Ana Vision Zero Update (2026) •Education OCTA Bus Stop Safety and Accessibility Plan (2023-Present) • Bachelor of Science, Public OCTA Next STEP(2024-Present) Health (2019) Santa Ana Street Lighting Master Plan (2024-Present) Registration Connect SoCal (2023) • CPR&AED SAAS Leadership Committee Chair(June 2022-2023) • Youth Mental Health First Aid Safe Mobility Santa Ana/Santa Ana Vision Zero (2022-2023) • OC Safe Travels Educational Program (2020) • Los Alamitos Active Transportation Plan (2020) • OCTA Pedestrian and Bike Safety Program (2020) • SAAS Leadership Committee Member(2019-2023) • Bike and Pedestrian Safety Education Campaign (2019) • Santa Ana Active CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /49 Appendix- Resumes/ KTUA LATINO _ HEALTH Moises Vazquez is a Community Health Worker at ACCESS Latino Health Access, a music educator, musician and a film/theater composer. His career is guided by a deep love for his culture and a �.. ,..� commitment to reciprocity.Whether he is providing emotional and academic support � to youth or composing for the stage, Moises is dedicated to the uplifting and healing of his community through community service and music. ACTIVE TRANSPORTATION AND BIKE&PED EDUCATIONAL PROJECTS EXPERIENCE: • Santa Ana Active Transportation Plan (2018-2019) • OCTA Bicycle and Pedestrian Educational Safety Campaign (2019-2020) • SCAG Go Human Local Community Engagement& Safety Mini-Grants: Santa Ana "Safe Where You Are"(2020) Moises Vazquez I Lead SCAG Go Human Local Community Engagement& Safety Mini-Grants: Placentia Community Health Worker Active Transportation, Health and Safety for Community(2020) • Los Alamitos Active Transportation Plan (2020) Education OCTA Safe Travels Education Program (2020-2023) • Santa Ana College Digital/Music SCAG Go Human Mini grant: Bike,Walk& Roll OC Project(2022) Production Santa Ana Vision Zero Plan (2023) • SCAG Go Human Community Hubs Grant Program: Bike,Walk& Roll OC(2023) • Connect SoCal 2024 Community Partner Program (2023) • Santa Ana Street Lighting Master Plan (2024-2025) • SCAG Go Human Community Streets Grant: Bike,Walk& Roll OC(2024) • OCTA Bus Stop Safety and Accessibility Plan (2024-2026) • OCTA Next Safe Travels Education Program (2024-2026) • Santa Ana Vision Zero Update Plan (2026) CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN / 50 Appendix- Resumes/ KTUA .� ARCADIS Cristina Martinez is a Transportation Planner with 10 years of experience at Arcadis managing regional multimodal plans, active transportation projects,TOD access studies,first-/last-mile planning, and parking management. Her expertise is in complete streets, multimodal connectivity, curbside management, GIS, and environmental justice/social equity. She is a proven leader of multidisciplinary teams—planners, designers, and outreach specialists—delivering collaboratively developed solutions for regional and local clients. OC ACTIVE(ORANGE COUNTYACTIVE TRANSPORTATION PLAN) Planning Lead. Led technical tasks to develop Orange County's first countywide W � active transportation plan and implementation strategies for bikeway and pedestrian improvements. CristinMETRO D(PURPLE)LINE&FIRST-LAST MILE GUIDELINES • Planning Lead. Led First-Last Mile analysis and planning for 4 stations and assisted in Projectdeveloping systemwide First-Last Mile Guidelines to integrate improvements into LA Metro's capital transit process from planning through implementation. Education • Master of Urban and Planning Lead. Led multimodal planning study for sustainable mobility solutions in the Regional Planning, University unincorporated areas of East San Gabriel Valley.Work included innovative community of California, Irvine; B.S., engagement, existing conditions analysis, development of a public web map, and Environmental Science and suitability analysis to identify high-need areas. Policy, Chapman University Registration Project Manager. Managed traffic-calming recommendations for Dracea Avenue • Certified Planner,America to develop a greenway for bicyclists and pedestrians as a subconsultant to KTUA. Institute of Certified Planners Conducted physical inventory, public life surveys, and developed traffic calming toolkit (AICP),#31139 and preliminary design guidelines. Affiliations • American Planning Association WTS International (formerly Women's Transportation Seminar) CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN/ 51 Appendix- Resumes/ KTI!" ARCADIS Eric Tunell is an Urban Planner with 7 years of experience in planning and placemaking, specializing in community engagement and storytelling. He is experienced in active transportation, curb management, and county-level transit—land use integration projects, and is known for innovative public engagement that centers community voices. He previously supported LA Metro's Shared Mobility division and brings 8 years of prior experience in public relations and corporate communications across private and nonprofit sectors. LA METRO D(PURPLE)LINE&FIRST-LAST MILE GUIDELINES Transportation Planner. Supported updates to the agency's First/Last Mile Guidelines as part of the Metro D Line Extension project. Performed research and interviews on best practices for integration of micromobility into transit projects. Conducted policy research and analysis to improve communication and streamline project coordination Eric Turnell I Senior Planner efforts between the agency and local jurisdictions. EAST SAN GABRIEL VALLEY MOBILITY ACTION PLAN Transportation Planner. Facilitated the community engagement effort, contributed to the policy analysis and mobility needs identification and recommendations, wrote final Education report. • Master of Urban Planning, University of Southern LAUU-1 DUbbek S ADWIVI 1PANSPUk[ATION STUDY California; B.A., History,Arizona Transportation Planner. Leading first/last mile and active transportation improvements State University evaluation and recommendations, supporting community and stakeholder engagement activities, conducting walk and bike audits, and supporting traffic impact analysis. Affiliations SCAG CURB SPACE DATA INVENTORY PROJECT • WTS International (formerly WTS n's Transportation Transportation Planner. Served as City of Los Angeles liaison for multi-city project that Seminar) digitized and analyzed curb space, identified and screened focus study corridors for pilot projects, led key stakeholder engagement workshops. • Mpact Conference(formerly Rail-Volution) CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /52 Appendix- Resumes/ KTUA .� ARCADIS Karen Iniguez is a Transportation Planner and a Registered Civil Engineer in California with extensive experience designing local street improvements, signing &striping, bike path plans, and parking facility concepts. She is skilled in multimodal level-of-service analyses,traffic impact studies, and comprehensive transportation evaluations across California. Key project experience includes alternatives analysis and conceptual design for the North San Fernando Valley BRT Corridor and signing/striping and QC for the Figueroa Streetscape final design. She is proficient in AutoCAD, MicroStation, ` Synchro, and Traffix,with a strong track record delivering active-transportation and complete-streets solutions. FIGUEROA STREETSCAPE Transportation Engineer. Led streetscape redesign of Figueroa Street corridor in Los Angeles,featuring protected bike lanes, pedestrian enhancements, and restriping/ Karen Iniguez, PE I Cost resigning for multimodal users. Responsibilities included signing and striping design, Estimates Lead underground utility research, and QA/QC of final plans. CITY OF BAKERSFIELD THOMAS ROAD IMPROVEMENTS PROGRAM(TRIP) Transportation Engineer. Contributed to connecting State Route 58 to I-5 in Bakersfield Education by planning and designing a Class I multi-use path along freeway remnant parcels. M.S., Civil Engineering, Supported feasibility study, bike path route selection, and development of plan/profile University of California, sheets. Prepared local street improvement plans including street profile redesign, Irvine, B.S., Civil Engineering, sidewalks,signing &striping, and ADA curb ramps. University of California, Irvine SANDAG UPTOWN BIKEWAYS PHASE 3 Registrations Transportation Engineer. Supported Phase 3 of SANDAG's Uptown Bikeways project, • PE, Civil Engineer, CA(#88791) adding bicycle and pedestrian facilities across Mission Valley and Hillcrest to reduce congestion,support climate goals, and promote community health. Transportation Engineer.Worked on the design of a live mock-up installation of the bike boulevard, in which temporary neighborhood traffic circles were installed and assessed for effectiveness. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /53 Appendix- Resumes/ KTUA .� ARCADIS Braulio Ramirez is a Principal ITS Engineer/Project Manager with 22 years of experience in Intelligent Transportation Systems,traffic signal design, and communications networks. He has led numerous ITS projects including RTSSP, S ATMS, and TSP, and is skilled in ITS equipment integration,field inventories, line-of- sight surveys, design plan preparation, procurement, construction management, and acceptance testing. ORANGE COUNTY TRANSPORTATION AUTHORITY(OCTA)HARBOR BOULEVARD PILOT INNOVATIVE TSP STUDY Design Lead. Provided design support for advanced detection and safety analytics on a 60-signal Harbor Boulevard corridor(Bravo! 543 bus routes). Managed LIDAR, radar, and camera system installations to detect near-misses,wrong-way drivers, and crosswalk violations during a nine-month evaluation. Scope included ITS Ramirez,Brualio PE I ITS integration, bus performance assessments, cost estimating,funding identification, Advisor d , and risk mitigation. Coordinated multi-jurisdictionally to improve transit efficiency and vulnerable road user safety. CITY OF SANTA ANA MCFADDEN AVENUE TSP PILOT Education Data Collection Lead. Led design of a cloud-based TSP system on McFadden Avenue • B.S. Civil Engineering, California to improve travel time and reliability for OCTA Route 66. Managed needs assessment, State Polytechnic University, vendor evaluations, and concept plan development, resulting in a recommended Pomona solution now in procurement, deployment, and evaluation phases in collaboration with Registrations OCTA and the City of Santa Ana. • PE, Civil Engineer,AL(#54326), CITY OF LONG BEACH ECO-TOTEM POLE DISPLAY CA(#85189), CT(#38206), LA Project Manager and Lead Engineer. Provided ITS support for City of Long Beach (#48956), MA(#59640), ME bicycle/pedestrian totem pole digital display installation to promote active lifestyles (#19000), MI (#6201314414), and enable user monitoring for planning and programming. NH (#18657), NV(#034324), OH (#90734), OR (#107626), TX(#152744), RI (#15698),VT (#018.0136181)) Affiliations Institute of Transportation Engineers • Orange County Traffic Engineering Council CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /54 Appendix- Resumes/ KTUA ����I EVAR 1 Consulting Brian Gaze,AICP has over nineteen years of experience in environmental, land use, and transportation planning, with a focus on applying GIS to support equitable infrastructure and park access planning. His expertise includes developing public- facing WebGIS dashboards, interactive web applications, and mapping tools that communicate safety deficiencies, service gaps, and equity considerations to diverse stakeholders. Since joining Evari in 2019 as Director, Brian has expanded the firm's planning portfolio to include sidewalk and streetlight inventories,Vision Zero data analysis, and web-based engagement platforms. He specializes in connecting field- collected asset data to community engagement processes, ensuring that infrastructure investment strategies are data-driven, equitable, and defensible. 419EV*%&J CITY OF SANTA ANA,CA—STREET LIGHT INVENTORY&STREET LIGHTING MASTER PLAN Project Director. Directed Evari's GIS data collection, analysis, and web application Brian Gaze, ► development for the City's Street Lighting Master Plan. Oversaw a citywide inventory of Project Director approximately 16,000 fixtures using AI-assisted screening and mobile field collection, and guided development of web GIS dashboards integrating collision history, pedestrian crosswalk locations, bicycle facilities, and school walksheds to support Education prioritization and community engagement. • Master of City Planning,San CITY OF EL MONTE,CA—SIDEWALK INVENTORY&WEB GIS DATA MANAGEMENT(WITH KTUA) Diego State University Project Director. Provided executive oversight for a comprehensive 250-mile sidewalk • BA, Communication, UC San inventory supporting the City's Vision Zero Action Plan. Guided planning,staffing, and Diego workflow coordination to ensure field data collection, QA/QC, and GIS integration met standards for accuracy and defensibility. Delivered public-facing dashboards enabling Registration the City to monitor progress and identify safety priorities in real time. • American Institute of Certified Planners (AICP) CITY OF AUSTIN,TX—CITYWIDE LIGHTING PLAN Project Director. Provided strategic direction and executive oversight for Evari's role in Affiliations the City of Austin's Citywide Lighting Plan. Guided development of a state-of-the-art • Caltrans D11 Bicycle and pedestrian safety lighting analysis, including vertical illuminance modeling at crosswalk Pedestrian Advisory Committee, locations to evaluate driver visibility of pedestrians under real-world conditions. Member Directed integration of safety, equity, and land use data into an interactive prioritization framework to support transparent, data-driven capital planning. • Caltrans Statewide Walk+Bike TAC, Member • San Diego Chamber of Commerce Land Use and Transportation Committee,Vice Chair CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN Appendix- Resumes/ KTUA ����I EVAR 1 Consulting Dan Hamalainen, GISP is a GIS and infrastructure data specialist with expertise in field data collection system design, enterprise geodatabase development, and interactive web application development for municipal planning projects. He has managed large- scale infrastructure inventories and condition assessments for parks,sidewalks, curb ramps, and streetlighting systems, leading field teams and developing standardized mobile collection tools and QA/QC protocols. Dan specializes in building scalable GIS platforms that transform complex field data into actionable decision-support tools, including dynamic prioritization dashboards, interactive web maps, and public- facing engagement applications, helping municipalities move from assessment to implementation. TOWN OF MAMMOTH LAKES,CA—PARKS AND RECREATION MASTER PLAN(WITH KTUA) GIS Developer and Inventory Specialist. Designed and implemented the asset Dan Harnalainen, ' I inventory collection system for the Town's Parks and Recreation Master Plan. Project Manager/ GIS Lead Developed the enterprise geodatabase, configured field data collection tools, and built web-based applications for sharing results with Town staff and stakeholders. Produced a standardized, interactive WebGIS environment that enabled transparent reporting Education and data-driven decision-making for the Town's parks and recreation system. MS, Data Intelligence& CITY OF GARDENA,CA—VACANT LOT INVENTORY&ASSESSMENT(WITH KTUA) Geospatial Analytics,Saint Inventory Manager and GIS Developer. Managed a GIS-based inventory and Mary's University of Minnesota assessment of vacant parcels to identify potential sites for new community parks. Ran • BA, Economics, Carleton deep learning models combined with aerial verification to characterize parcels across College six square miles. Developed the project geodatabase, interactive GIS web map, and multilingual StoryMaps displaying candidate sites and proposed park concepts. Registration • Certified GIS Professional (LISP) OREGON DEPARTMENT OF TRANSPORTATION—ADA CURB RAMP ASSET INVENTORY&DATABASE DEVELOPMENT Project Manager. Led GIS data management for the audit of over 12,000 state-owned curb ramps across four Oregon counties, assessing ADA compliance for ODOT. Developed enterprise geodatabase, mobile field collection applications, and office- based QC web applications. Migrated assessment data into construction-phase databases and developed progress tracking applications across the full project I ifecycl e. SAN DIEGO,CA—SAFE AND EQUITABLE ACCESS TO PARKS AND EVERYDAY DESTINATIONS(SEAPED) GIS Lead. Conducted pedestrian-scale photometric modeling of exterior lighting along streets and sidewalks within a quarter-mile travel shed of six San Diego parks, evaluating lighting performance along pedestrian and bicycle access routes. Produced GIS-based visualizations and summary statistics documenting underlit segments to support targeted safety improvement recommendations. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /5,' Appendix- Resumes/ KTUA or Founder and President of Katherine Padilla &Associates(KPA), Inc.for nearly 30 years, Ms. Padilla Otanez is a communications K4,kA strategist specializing in organizational development,facilitation, KATHERINE PADILLA marketing research, and community/government relations,with &ASSOCIATES, INC. additional experience in planning, architecture, and engineering. KPA is a certified DBE/MBE/WBE/SBE firm. She previously managed drafting services for engineering and architecture projects while earning her MBA and BS, and has completed training in NEPA, CEQA, environmental justice, and diversity, equity, and inclusion. IMPERIAL COUNTY TRANSPORTATION COMMISSION REGIONAL LONG-RANCF TRANSPORTATION PLAN UPDATE,IMPERIAL COUNTY Katherine Padilla • Project Manager/Managing Principal. Ms. Padilla Otanez developed the outreach plan, including marketing and branding, and assisted in recruiting and convening the • • • Technical Advisory Committee, including key agencies and community organizations. • • Oversaw all communications including press releases, social media, outreach to 16 community-based organizations, surveys, community meetings, pop-ups events, Education presentations, collateral developments,flyers,fact sheets, promotional materials and • Master of Business displays, and oversaw summary of input to guide project descriptions. Administration, California LA COUNTY NORWALK BL.METRO RAIL STATION FIRST-LAST MILE PLAN,LA COUNTY DEPARTMENT OF State University Los Angeles/ PUBLIC WORKS/LA COUNTY LAMBERT RD METRO RAIL STATION FIRST-LAST MILE PLAN,LA COUNTY Bachelor of Science, Business DEPARTMENT OF PUBLIC WORKS Administration, California State Project Manager/Managing Principal. For these two separate and related projects, University Los Angeles Ms. Padilla Otanez developed the outreach plan and strategy; conducted interviews, with walk audits; planned and facilitated community meetings; developed surveys Registration and press releases; contacted and engaged community-based organizations and • Certified Charrette Planner, stakeholders; and produced outreach materials, such as flyers,factsheets, social media Certified Charrette Manager, messaging; and planned and staffed pop-ups at community events. Certified Public Meeting Facilitator- National Charrette REGIONAL RESILIENCE FRAMEWORK,SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS'SCAG), Institute WITHIN SIX SOUTHERN CA COUNTIES. Trained in Mediation - LA City Community Engagement Project Manager/Principal-in-Charge. KPA was a member Attorney's Office, Dispute a team conducting the SCAG Regional Resilience Framework. KPA was responsible Resolution Program for developing and conducting an Outreach & Engagement Strategy to involve community-based organizations focused on environmental justice from six Southern • Trained in Project Management California counties in a meaningful process to develop the Framework. KPA recruited and Interpersonal and conducted interviews with community-based organizations and tribal communities Communication - UCLA to obtain input to shape the tools of the Framework. KPA developed an outreach plan, Extension recruitment letters, an interview-survey questionnaire, and conducted interviews. • Completed coursework: Global Logistics Specialist Certification TRANSIT-ORIENTED DISTRICT TOOLKIT ATLANTIC WHITTIER,LOS ANGELES LOUNTY. - California State University, Project Manager/Managing Principal. KPA served on the KOA team and Ms. Padilla Long Beach Otanez led the outreach strategy and program on behalf of LA County. Responsibilities included developing a community engagement plan, stakeholder interviews, in-person • Completed training: "The Artions that and online community meeting planning, survey development,student art contest, of Hosting Conversations public relations and social media, and website development. Matter" (Facilitative Techniques) - Berkana Institute, Bangor, PA CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN / 57 Appendix- Resumes/ KTUA iI Ms. Padilla Bowen joined Katherine Padilla and Associates (KPA), Inc. in 2020, bringing more than 20 years of experience in K4,hkA government and nonprofit communications. She specializes in KATHERINE PADILLA project management, event coordination, and meeting facilitation. &ASSOCIATES, INC. Prior to joining KPA, Ms. Padilla Bowen spent 15 years with the City of Carlsbad,where she supported multiple departments, including Community& Economic Development and Public Works, and served as a Public Information Officer in the City's Emergency Operations Center. Earlier in her career, she spent six years leading communications efforts in the nonprofit sector. CITY OF UPLAND MOBILITY MASTER PLAN Senior Associate.As the outreach subconsultant on the Upland Mobility Master Jessica Padilla Bowen 1 Plan, KPA led the charge in designing and implementing an inclusive and meaningful community engagement strategy. Ms. Padilla Bowen developed the comprehensive Senior • outreach plan and coordinated and staffed a wide range of in-person engagement • • • r activities from walk audits to community workshops to popup events, ensuring that LAI community voices were heard and reflected throughout the planning process. Education LOS ANGELES COUNTY DEPARTMENT OF PARKS&RECREATION STRATEGIC PLAN,LA COUNTY DEPART- Master of Public Administration, MENT OF PARKS&RECREATION San Diego State University, Senior Associate. Coordinated meeting space,social media,videography,flyers, and Bachelor of Arts,Theater/ meeting support staffing and materials and attendance tracking at five Strategic Plan Economics, Occidental College, rollout community meetings in each LA County supervisorial district. These meetings Los Angeles were an opportunity for County of LA Parks & Rec Department staff to introduce the Registration Park and Recreation Strategic Plan to community members. • IAP2,APR, PRSA, Certified Professional Coach Senior Associate. Launched in fall 2023,the Imperial Avenue Complete Streets (International Coaching Plan aims to transform one of El Centro's primary corridors into a safer, more vibrant, Federation) and pedestrian-friendly route. Serving as the project's outreach lead under prime consultant KTUA, KPA developed a robust engagement strategy that included bilingual Affiliations press releases,e-blasts,social media content, and bilingual outreach materials. KPA • Certified International also coordinated logistics for community meetings and pop-up events, conducted Association of Public bilingual intercept surveys, and produced summary reports capturing community Participation input. Community voices played a central role in shaping the plan,which preserves • Accredited in Public Relations Imperial Avenue as a key regional roadway while including much-needed safety and beautification enhancements. • Public Relations Society of America member Senior Associate. With KTUA, KPA developed a Community Involvement Strategy plan to involve community members throughout Imperial County. The community outreach focused on leveraging a County-wide TAC,who provided input on the plan and helped get the word out about engagement opportunities, including a survey and pop-up events.To reach the widest amount of community members possible,the team strategically planned and staffed 10 popup events throughout the County,from Back to School Night at Imperial Valley College to Dia de los Muertos and Veterans Day festivals to visits at libraries in more remote areas of the County.This helped the team secure valuable feedback on areas of concern that shaped the plan. Additionally, KPA's strong work on the ATP helped secure a second contract with Imperial Valley Transportation Commission for their Long-Range Transportation Plan. CITY OF SANTA ANA I SAFE ROUTES TO PARKS &WHEELCHAIR ASSESSMENT PLAN / 58 Appendix- Resumes/ KTUA .o Collaborative agency leader and social entrepreneur with a passion for serving community, educational, and arts organizations. KA Engaging communicator with strong people skills and breadth KATHERINE PADILLA of knowledge from life-long learning. Bilingual communicator &ASSOCIATES, INC. (Spanish and English)with expertise in connecting with diverse communities. Led successful merchant and community engagement campaigns. Secured funds and sponsorships and brought together people and organizations to leverage synergies toward achieving program goals. Delivered outstanding PR coverage from Los Angeles Times,the New York Times,the Washington Post, CSPAN, PBS, and other outlets. LOS ANGELES COUNTY DEPARTMENT OF PARKS&RECREATION STRATEGIC PLAN,LA COUNTY DEPART- MENT OF PARKS&RECREATION ItOutreach Associate. Xavier hosted three pop-up community events in Belvedere Park Outreach (East Los Angeles), Mona Park(Compton) and George Lane Park(Lancaster),to raise awareness on DPR's Strategic Plan while conducting a related survey in English and iLj Spanish. Created outreach site visit reports for each event.Assisted with five Strategic Education Plan rollout community meetings in each LA County supervisorial district. • Master of Public Administration, LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS,RE-ENVISIONING WHITEMAN AIRPORT,PACO- City University of New York, Baruch College/Bachelor's Outreach Associate.Xavier canvased the Pacoima area to raise awareness of a in Communication Sciences, community Town Hall meeting. Supported Town Hall and meeting event logistics and Universidad Autonoma edited and translated community comment reports. Metropolitana, Mexico City CONNECTING SAN PEDRO PROJECT PEDESTRIAN IMPROVEMENT&MULTI-MODEL ACCESS Registration Outreach Associate. Planned canvassing tour in Central San Pedro and visiting 140 • Professional Designation in residences and businesses to increase awareness about the project improvements Public Relations, University of and answer questions. Coordinated joint meetings with NW San Pedro and Central California, Los Angeles San Pedro Neighborhood Councils, as well as additional meetings with the San Pedro Historical Waterfront Business Improvement District and San Pedro Chamber of Commerce. Coordinated with graphic designer the production of the project-branded collateral. CITY OF FRESNO SOUTH CENTRAL FRESNO COMMUNITY TRUCK REROUTE STUDY(AB617) Outreach Associate. Wrote Outreach Plan to strategically guide the project communication. Hosted two drop-in stakeholder presentations at City of Fresno Public Library and Community Center, Hosted Community Advisory Group and Technical Advisory Committee (TAC)virtual meetings and wrote meeting briefings. Coordinated with TAC members to disseminate an assessment stakeholder's survey. Coordinated with graphic designer for the production of the project-branded collateral. Outreach Specialist/Translation. Produced Technical Advisory Committee(TAC) meeting reports to capture stakeholder feedback to guide the final plan, helped organize and conduct field outreach and connected with diverse community members through county-wide pop-up events, assisted at virtual meetings and wrote outreach summaries. CITY OF SANTA ANA I SAFE ROUTES TO PARKS&WHEELCHAIR ASSESSMENT PLAN /59