Honorable Mayor Amezcua,
On behalf of Executive Secretary Ernesto Medrano, please find attached a letter of support for the Santa Ana
Data Center.
Thank you for your time and consideration.
Respectfully,
Alejandra "Alex" Gallardo
Executive Assistant to Executive Secretary Ernesto Medrano
LA/OC Building Trades Council
1626 Beverly Boulevard
Los Angeles, CA 90026
T: 213-483-4222 ext 102 F: 213-483-4419
E: agallardo((�)laocbuildingtrades.org
BUILUI NG&CONSTE-ON
This email and any attachments may be confidential or legally privileged. If you received this message in error or are not the
intended recipient,please destroy the e-mail message and any attachments or copies.
1
. Los Angeles/Orange Counties
Elk
Building and Construction
Trades Council
Affiliated with the Building&Construction Trades Dept.,AFL-CIO
September 14, 2026
Mayor Valerie Amezcua
20 Civic Center Plaza
Santa Ana, CA 92701
Dear Mayor Amezcua,
Residents and constituents have valid concerns about the impact that data center
construction will have on their communities. Ensuring local stakeholders and the
public are engaged in the development of these facilities at the earliest stages
through a transparent process is essential.
Data center projects and the energy systems and infrastructure that support them
must be built and operated responsibly with a commitment to high-quality
construction, good jobs, strong environmental stewardship, and strong partnerships
with the communities they serve. At a time when the nation's power grid, roads,
bridges, schools, and other public infrastructure require significant investment,
data center development must strengthen, rather than strain, these systems.
Developers must also invest responsibly in grid infrastructure, including new
generation and grid upgrades, to protect ratepayers from bearing the costs of data
center projects' energy needs.
We view the following practices as necessary when developing and operating data
centers; without them, no further data center development should proceed:
• Incorporate strong labor standards from the supply chain through operations and
maintenance
• Employ local workers and pay at least the prevailing wage
• Use registered apprentices
• Negotiate community benefits agreements with local stakeholders
• Establish strong safety practices and procure from domestic sources
• Pay your fair share for the resources used to operate and maintain data centers
• Mitigate impacts on local air quality, drinking water and water supplies
Following these high standards and others is necessary to ensure that projects are built
efficiently, safely, and on- or under-budget.
We look forward to working with you to develop strong guardrails that protect
communities, workers, and environmental resources.
(213) 483-4222 1 1626 Beverly Boulevard Los Angeles, CA 90026 1 laocbuildingtrades.org
In Solidarity,
.
Ernesto Medrano
Executive Secretary EM:ag/OPEIU#537/afl-cio
CC: Mayor Pro Tem David Penaloza
Councilmembers Thai Viet Phan
Councilmember Benjamin Vazquez
Councilmember Jessie Lopez
Councilmember Phil Bacerra
Councilmember Johnathan Ryan Hernandez
2
Becerra, Alexis
From: Bulmaro Vicente <boomer@chispaoc.org>
Sent: Tuesday, September 15, 2026 1:11 PM
To: eComment
Subject: Public Comment CC 9.15.26 - Item 32
Attachments: 09.15.26 Chispa Item 32- Letter of Support.pdf
Attention: This email originated from outside of City of Santa Ana.Use caution when opening attachments or links.
Hi,
On behalf of Chispa please find our letter of support for Item 32.
In Solidarity,
Boomer
Policy and Political Director I Chispa
e: boomerPchispaoc.org c: 714-747.4271
1505 E 17th Street Suite 117 Santa Ana, CA 92705
Chispa is building a political home for young Latinxs in Orange County! Please consider making a donation to help us
build our casita. Chispa is a project of Beyond Impact, a 501c4 non-profit organization.
0 .....
...........
...ry.M.o�ao...
� .........
........
.F..........
Fom...........
i
/ ,
September 15, 2026
Mayor Amezcua and Members of the Council
City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
Re: SUPPORT - Item 32: Data Center Regulation Item
Dear Mayor Amezcua and Members of the Santa Ana City Council,
On behalf of Chispa, I write to express our strong support for Item 32, Councilmember Jessie
Lopez's request directing City of Santa Ana (City) staff to evaluate the need for and prepare a
temporary moratorium on the acceptance and processing of new data center use applications
while the City studies appropriate long-term regulations. The City must be proactive rather than
reactive. Decisions that could affect our water, electrical infrastructure, environment, public
health, and limited land resources for decades deserve meaningful public scrutiny.
The rapid growth of artificial intelligence and other technologies is driving increased demand for
data center infrastructure. Yet the City's Municipal Code does not currently define or specifically
regulate data centers as a distinct land use. As outlined in the Councilmember requested item,
data centers can require significant amounts of electricity and water and may create impacts
related to noise, heat, emissions, backup generators, hazardous materials, and fire protection.
These facilities can also consume substantial amounts of industrial land while generating
relatively modest permanent employment compared with their infrastructure and resource
demands.
For a densely populated community like Santa Ana, these questions deserve careful
consideration before additional facilities are approved. Our residents deserve to know how much
water and electricity these facilities could consume, what environmental and public health
impacts they could create, and whether their economic benefits justify the resources and land
they require.
Importantly, the City has at least one data center or colocation facility currently operating within
city limits. We therefore strongly support directing staff to identify the number and location of
data centers currently operating in Santa Ana, their permitting and approval history, and whether
any new applications are pending. Before determining an appropriate long term policy, the City
and the public need a clear understanding of what infrastructure already exists and what
additional development may be proposed.
A temporary moratorium does not require the City to determine its permanent policy today.
Instead, it gives the City an opportunity to gather information, evaluate potential impacts, engage
residents, and establish thoughtful standards before additional projects move forward.
Other California communities have already taken action to address these concerns. The City of
Coachella adopted a 45-day urgency moratorium on data center development in June 2026 and
subsequently extended the moratorium through June 2027 to provide additional time to study the
issue. The Coachella City Council has also moved toward permanently prohibiting data center
uses citywide. Similarly, Monterey Park has prohibited data centers through both a City Council
ordinance and a voter-approved ballot measure, which passed with 86 percent of the vote in June
2026.
These actions demonstrate that Santa Ana is not alone in confronting the significant questions
raised by the rapid expansion of data centers. Taking the time to understand their potential
impacts and develop appropriate safeguards is a responsible approach to long term planning.
We respectfully urge the City Council to support Item 32 and direct staff to evaluate a
temporary moratorium, report back on existing and pending data center development, and
develop a transparent process for considering appropriate long-term regulations.
Thank you for your continued commitment to protecting Santa Ana residents and ensuring that
development decisions reflect the long-term needs of our community.
Best,
Bulmaro Vicente,
Policy and Political Director
Becerra, Alexis
From: Thai, Minh
Sent: Tuesday, September 15, 2026 3:17 PM
To: Antolin O Cardenas; Hall, Jennifer
Cc: Nunez, Alvaro
Subject: FW: City Council Agenda Item 32 - SCE Resource Letter
Attachments: SantaAnaCityCouncil9.15.26.pdf
Tony,
Doing well. Hope you are as well. I am forwarding to City Clerk Jennifer Hall SCE's letter. She will distribute to the City
Council for tonight's meeting.
Thank you.
(DMinh Thai I Assistant City Manager
City of Santa Ana I City Manager's Office
714.647.5200 120 Civic Center Plazal Santa Ana, CA 92701
The mySantaAna mobile app puts the power of the Santa Ana city government in the palm of your hand! The free app
allows residents to quickly and easily report issues to the City, access City services, and find news and events.
Download the App:
A P P Store
Click here to report an issue directly from the City's website
From:Antolin O Cardenas<TONY.CARDENAS@SCE.COM>
Sent:Tuesday, September 15, 2026 1:20 PM
To: Nunez,Alvaro<ANunez@santa-ana.org>
Cc:Thai, Minh <mthai@santa-ana.org>
Subject: City Council Agenda Item 32-SCE Resource Letter
Attention:This email originated from outside of City of Santa Ana.Use caution when opening attachments or links.
Alvaro,
I hope all is well. I appreciate the proactive meetings with Minh, Rudy, and their teams as we continue working together
to advance the City's priority projects. Thank you for keeping the lines of communication open and for supporting these
valuable discussions.
Attached is a letter regarding tonight's City Council Agenda Item 32 related to potential policy considerations for data
centers. Could your team please share it with the City Council as an informational resource? I hope it may be helpful as
the City Council considers the item and evaluates the various perspectives before them.
1
Thank you for your continued partnership.
TONY CARDENAS
Government Relations Manager
Local Public Affairs I Orange County
Southern California Edison
(714) 403-0889 1 Tony.Cardenas(aTsce.com
- -----------------------------------------------
my forWhat's hd.
2
EISOUTHERN CALIFORNIA
EDISON`�
September 15, 2026
Santa Ana City Council
20 Civic Center Plaza
Santa Ana, CA 92701
RE: Agenda Item 32 - Data Center Development and Related Policies
Dear Mayor and Members of the City Council:
On behalf of Southern California Edison (SCE), I am submitting the following comments
regarding Agenda Item 32 regarding data center development and related policies under
consideration by the City of Santa Ana. SCE appreciates the City's interest in better
understanding and exploring important issues related to data center development within the
community and thanks you for the opportunity to provide comments for the record.
SCE supports the connection of new large-load customers and is committed to ensuring that the
costs of necessary grid upgrades are allocated fairly. When planned appropriately, growth
driven by new large-load customers can strengthen the electric grid in the surrounding
communities and contribute to downward pressure on rates for existing customers.
We encourage all potential large-load customers and the City to engage early and share key
project information, including anticipated size, timing, location, and operating profile with SCE
as they begin to plan their projects. Early coordination enables us to better assess grid impacts,
forecast demand accurately, and identify whether infrastructure upgrades may be needed in the
surrounding community. We remain committed to working collaboratively with all large-load
customers to support efficient interconnection processes and timely energization.
SCE evaluates new large loads through the California Public Utilities Commission (CPUC)-
required grid and resource planning processes that prioritize reliability, safety, and affordability.
These planning efforts help ensure that new demand is integrated responsibly and in alignment
with California's ambitious clean energy goals. As the City of Santa Ana considers new policy
related to large-load customers, SCE remains committed to our ongoing partnership with the
City and to serving as a reliable resource on electric infrastructure and energy planning matters.
Thank you for the opportunity to provide comments. SCE respects the City's role in weighing a
variety of community interests and perspectives and remains committed to continuing our
collaborative partnership with the City of Santa Ana as these discussions move forward.
Sincerely,
Tony Cardenas, Government Relations Manager
Southern California Edison - (714) 403-0889