Item 21 - Approve Amendment to Agreements for First Street Multimodal Boulevard Study
Public Works Agency www.santa-ana.gov/pw Item # 21 City of Santa Ana 20 Civic Center Plaza, Santa Ana, CA 92701 Staff Report October 6, 2026 TOPIC: Approve Amendment to Agreements for First Street Multimodal Boulevard Study AGENDA TITLE Amendment to Cooperative Agreement (No. C-4-2053) with Orange County Transportation Authority and First Amendment to the Agreement with HDR Engineering, Inc. for the First Street Multimodal Boulevard Study (Project No. 25-6042) (Non-General Fund) RECOMMENDED ACTION 1. Approve an appropriation adjustment recognizing Regional Early Action Planning 2.0 grant funding in the amount $343,896 into the Public Services-Street Safety Projects, State Grant-Indirect revenue account and appropriate the same amount into the State Safety Projects, Improvements Other Than Buildings expenditure account. (Requires five affirmative votes) 2. Authorize the City Manager to execute a First Amendment to the Cooperative Agreement (No. C-4-2053) with Orange County Transportation Authority that increases the amount by $382,896, for a total of$4,682,896 in Regional Early Action Planning 2.0 grant funding for the First Street Multimodal Boulevard Study for the remaining term expiring December 30, 2026 (Agreement No. A-2026-XXX). 3. Authorize the City Manager to execute a First Amendment to the agreement with HDR Engineering, Inc. and increase the total compensation by $600,489 to provide additional technical studies, right-of-way engineering, and utility coordination for the First Street Multimodal Boulevard Study for a total amount not-to-exceed of $4,470,489, for the remaining term expiring May 20, 2027, and extension options (Agreement A-2026-XXX). 4. Approve an amendment to the Fiscal Year 2026-27 Capital Improvement Program to include $343,896 in study and design funds for the First Street Multimodal Boulevard Study (Project No. 25-6042). GOVERNMENT CODE 484308 APPLIES: Yes Approve Amendment to Agreements for First Street Multimodal Boulevard Study October 6, 2026 Page 2 DISCUSSION The Public Works Agency administers and oversees all capital improvement projects in the City. The First Street Multimodal Boulevard Study is one of the City's priority transportation capital improvement projects and will improve approximately 3.1 miles of First Street into a more accessible multimodal corridor serving pedestrians, bicyclists, transit riders, motorists, and businesses. The project advances the City's Vision Zero Action Plan, Complete Streets Policy, General Plan Mobility Element, and other local and regional transportation initiatives. On February 18, 2025, the City was awarded a $4,300,000 grant from Orange County Transportation Authority (OCTA) through the Southern California Association of Governments' (SCAG) Regional Early Action Planning (REAP 2.0) grant program. The grant will fund a comprehensive study of First Street from Bristol Street to Tustin Avenue and prepare design plans and specifications for the construction of the recommended improvements. On May 20, 2025, HDR Engineering, Inc. (HDR) was awarded an agreement (Exhibit 1) to provide engineering and transportation planning services for the project in a total amount not-to-exceed of$3,870,000 for a term beginning May 21, 2025, and expiring May 20, 2027, with provisions for two, one-year extensions. The City has since been awarded an additional $382,896 in REAP 2.0 grant funding (Exhibit 2), increasing the total grant award from $4,300,000 to $4,682,896. The additional funding will support expanded engineering and technical services necessary to advance the First Street Multimodal Boulevard Study through final design. HDR has successfully completed planning, community engagement, alternatives analysis, and preliminary engineering and on May 5, 2026, the City Council unanimously selected a preferred design alternative. Selection of the preferred design alternative allowed staff and HDR to proceed with preparing the final design plans, specifications, and engineering estimates (PS&E). The project is scoped and funded for 100 percent (100%) PS&E through the Southern California Association of Governments' (SCAG) Regional Early Action Planning (REAP 2.0) grant program. The project is currently at the 60 percent (60%) design phase, where engineering plans have been sufficiently developed to evaluate constructability, utility conflicts, drainage infrastructure, pavement rehabilitation needs, and regulatory requirements. As the project advanced to the 60 percent (60%) design milestone, engineering coordination and design development showed that additional technical studies, right-of- way engineering, utility coordination, and utility potholes were necessary to satisfy City engineering standards, Orange County regulatory requirements, and accepted engineering design practices for the City Council selected design alternative. While the original agreement contemplated preparation of preliminary engineering and design, the need for these additional specialized studies and coordination could not be fully Approve Amendment to Agreements for First Street Multimodal Boulevard Study October 6, 2026 Page 3 identified until the preferred roadway configuration and associated improvements were sufficiently developed. Completion of these studies and utility coordination is necessary to advance the project through the 90 percent (90%) and ultimately the 100 percent (100%) PS&E milestones and prepare the project for future construction funding. The additional work includes preparing a Drainage Report, Geotechnical Pavement Design Memorandum, Water Quality Management Plan (WQMP), Right-of-Way Engineering, Utility Coordination, additional Storm Drain Design, and Utility Potholing and will be fully funded by the SCAG grant. Drainage Report: The proposed project modifies roadway geometry, curb alignments, landscaped parkways, raised medians, bicycle facilities, and portions of the existing storm drain system throughout the corridor. Accordingly, a comprehensive drainage analysis is required to verify that the proposed improvements adequately convey stormwater and comply with City and Orange County drainage design standards. HDR will prepare a Drainage Report that documents the engineering basis for the proposed drainage design through the 60 percent (60%), 90 percent (90%), and 100 percent (100%) design phases. The work includes reviewing existing drainage records, conducting hydrologic and hydraulic analyses, mapping drainage areas, performing roadway spread calculations, evaluating the hydraulic capacity of the existing and proposed storm drain systems, and preparing design recommendations for the proposed drainage improvements. The completed report will serve as the basis for the project's final storm drain design and construction documents. Geotechnical Pavement Design Memorandum: The proposed improvements include roadway reconstruction, widened sidewalks, median modifications, utility improvements, traffic signal foundations, and storm drain construction. These improvements require a detailed geotechnical investigation to establish appropriate pavement structural sections and foundation recommendations. The scope of work includes subsurface exploration, including soil borings throughout the corridor, laboratory testing of soil samples, geotechnical analyses, and preparation of a Geotechnical Pavement Design Memorandum. The memorandum will provide pavement design recommendations, traffic signal foundation recommendations, and engineering parameters necessary for final roadway design. These recommendations will be incorporated into the final PS&E package to ensure long-term pavement performance and reduce future maintenance needs. Water Quality Management Plan: Because the project qualifies as a priority project under the North Orange County Technical Guidance Document, a WQMP is required to comply with post-construction stormwater quality requirements. HDR will prepare the WQMP in accordance with the City's Municipal Separate Storm Approve Amendment to Agreements for First Street Multimodal Boulevard Study October 6, 2026 Page 4 Sewer System (MS4) permit requirements and the North Orange County Technical Guidance Document. The work includes stormwater treatment calculations, sizing and placement of permanent treatment Best Management Practices (BMPs), incorporation of proprietary treatment systems into the roadway and drainage plans, preparation of technical specifications and cost estimates, refinement of BMP layouts through the 90 percent (90%) and 100 percent (100%) design phases, and completion of the required Orange County recordation process following approval. Completion of the WQMP is necessary to obtain regulatory approvals and complete the project's final design. Right-of-Way (ROW) Engineering: HDR will order 15 title reports to support new roadway easements, five (5) additional title reports to support intersection curb returns where the documented ROW does not match existing improvements, perform ROW engineering to verify existing parcel boundaries for affected parcels, prepare Plats and Legal descriptions to support 15 new parcel takes, and address comments. Utility Coordination: HDR will begin utility coordination with Southern California Edison (SCE). The coordination effort will include the preparation of utility impact exhibits specific to SCE facilities in order to facilitate relocation coordination with SCE and other utility owners. Additional Storm Drain Design: Two (2) additional drainage systems are required by PWA for inclusion into the design package. These two systems will replace deficient systems located at the Main Street and Broadway Street intersections. The HDR design team will prepare new plans and profile design plans for these two drainage systems and include the plans in their 90% and 100% design submittals. This task will include plans, specifications, and cost estimates for the added drainage items and will be incorporated into the drainage report with supporting hydraulic calculations. Utility Potholes: The HDR team will complete 35 utility potholes to locate existing utilities at critical points along the corridor including proposed utility crossing and traffic signal locations. The utility pothole information will be supplied to the PWA in the form of a field report and the pothole data will be added to the First Street utility plans. Staff recommends the approval of the proposed Amendment to the Cooperative Agreement with OCTA that increases the amount by $382,896, for a total of$4,682,896. The Cooperative Agreement identifies the roles and responsibilities of each agency, including provisions from SCAG to ensure compliance with REAP 2.0 grant funding guidelines and identify OCTA's responsibilities for reimbursement and reporting to SCAG. The proposed First Amendment increases the original Agreement with HDR Engineering, Inc. by $600,489 to complete these additional engineering services for the remaining term expiring May 20, 2027. The original agreement with HDR totaled $3,870,000. The First Amendment would increase the total compensation to Approve Amendment to Agreements for First Street Multimodal Boulevard Study October 6, 2026 Page 5 $4,470,489, which is fully covered through the grant award of$4,682,896. Staff recommends approval of the First Amendment to Agreement A-2025-073 (Exhibit 3) with HDR Engineering, Inc. to modify the scope of services to complete the First Street Multimodal Study. Using HDR to perform these services provides continuity with the existing design team, avoids duplicating engineering efforts, minimizes project schedule impacts, and allows the City to efficiently advance the project from the current 60 percent design (60%) milestone to 100 percent (100%) PS&E. Completion of these technical studies, ROW engineering, and utility coordination is essential to finalizing the construction documents, obtaining necessary regulatory approvals, and positioning the City to pursue future state and federal construction grant opportunities. The additional work identified in the First Amendment, funded entirely through available REAP 2.0 grant funds, allows the City to complete the engineering necessary to deliver the project while maximizing the use of external funding and requiring no General Fund contribution. ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. FISCAL IMPACT With the approval of the requested appropriation adjustment, $343,896 in REAP 2.0 grant funds will be recognized in the Public Services-Street Safety Projects, State Grant-Indirect revenue account (No. 14717002-52027) and appropriate it for spending in the Regional Early Action Planning Grant, Improvements Other Than Building expenditure account (No. 14717613-66220). With the approval of the requested appropriation adjustment, all funds will be available for expenditure in Fiscal Year 2026-2027. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers into Fiscal Year 2027-2028. Fiscal Accounting Unit- Fund Accounting Unit, Account Amount Year Account No. Description Description Current Budget Regional Early 14717613-66220 Street Safety Action Planning 2026-27 (25-6042) Programs Grant, $217,593 Improvements Approve Amendment to Agreements for First Street Multimodal Boulevard Study October 6, 2026 Page 6 Fiscal Accounting Unit- Fund Accounting Unit, Year Account No. Description Account Amount Description Current Budget Other Than Buildings Reallocation Regional Early 14717613-66220 Action Planning 2026-27 (From 25-6031 to Street Safety Grant, $39,000 25-6042) Programs Improvements Other Than Buildings Appropriation Adjustment Regional Early Action Planning 2026-27 14717613-66220 Street Safety Grant, $343,896 (25-6042) Programs Improvements Other Than Buildings Total $600,489 EXHIBIT(S) 1. Original Agreement with HDR Engineering, Inc. (A-2025-073) 2. First Amendment to Cooperative Agreement (No. C-4-2053) with Orange County Transportation Authority 3. First Amendment to Agreement with HDR Engineering, Inc. 4. Capital Improvement Project Worksheet Submitted By: Rodolfo Rosas, P.E., Acting Executive Director of Public Works Approved By: Alvaro Nunez, City Manager Exhibit 1 p 2025 073 V,11: 4 I.rVy Flog t.l:l=f, CONSULTANT AGREEMENT jUN 12 7025 CITY OF SANTA ANA THIS AGREEMENT is made and entered into on this 20th clay of May, 2025 by and between ", ) I-IDR Engineering, Inc., ("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California `city"} RECITALS A. On February 25.2025.the City issued Request for Proposals ("RTP")No. 25-029, by which it sought a Consultant to perforrn traffic engineering and transportation planning services for the First Street Multimodal Boulevard Study. B. Consultant submitted a responsive proposal that was selected by the City, Consultant represents that it is able and willing to provide the services described in the scope of work that was included in RFP 25-029, C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services perfonned by Consultant tinder this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and strl?lect to the terms and conditions hereinafter set forth, the parties agree as follows; 11 SCOPE OF SERVICES Consultant shall perform during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in in the scope of work that was included in RF'P 25-029, which is attached as Exhibit A and incorporated in full. 2. COMPENSATION a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Exhibit B. attached hereto. The total amount to be expended during the term of this Agreement shall not exceed Three Million. Eight Hrmdred Seventy Thousand Dollars ($3,870,000), including any extension periods. b. Payment by City shall be made within forty-five(45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. City and Consultant agree that all payments due and owing under this Agreement shall be made through Automated Clearing House (ACH)transfers. Consultant agrees to execute the City's standard ACH Vendor Payment Authorization and provide required documentation. Upon verification of the data provided, the City will be authorized to deposit payments directly into Consultant's account(s) with financial institutions. Page I of 11 Payment need not be made for work which fails to meet tht sftndaTcls of pc eformance set forth in the Recitals which may reasmably bo pccied by City. 3, TERM This Agreement shall commence on the date fist written above for a two (2) year term with the option for the City to grant up to two, one t 11-year renewals,exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below. 4. INDEPENDENT CONTRACTOR Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however,the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services.Consultant shall pay all salaries and wages,employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 5. (1VVNRRSHIP OF MATERIALS This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications,studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data!�. Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time,provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. b. INSURANCE Consultant shall procure and maintain for the duration of the contract, and for 5 years thereafter, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by Consultant, its agents, representatives,employees and subcontractors. Page 2 of 11 MINIMUM SCOPE OF INSURANCE Coverage shall be at least as broad as: 1. Commercial General Liability (COL): Insurance Services Office Dorm CG 00 01 covering CGL on an "occurrence"basis, including products and completed operations,property damage, bodily injury and personal&advertising injury with limits no less than$5,000,000 per occurrence and$10,000,000 in the aggregate.Umbrella and excess insurance policies can be used to meet the required limits. 2. Automobile Liability (AL): Insurance Services Office Forni CA 0001 covering Code 1 (any auto),with combined single limit no less than S5,000,000. 3. Workers' Compensation (WC): as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. 4. Builder's Risk (Course of Construction)(BR): Utilizing an "All Risk" (Special Perils) coverage form, with limits equal to the completed value of the project and no co-insurance penalty provisions. 5, Professional Liability (PL): With limits no less than$3,000,000 per occurrence or claim, and $4,000,000 policy aggregate. 6. Pollution Legal Liability and/or Errors and Omissions (PLL): With limits no less than S1,000,000 per occurrence or claim, and$2,000,000 policy aggregate. These insurance requirements shall not in any way act to reduce coverage that is broader or includes higher limits than the .minimums shown above. If the Cmsultant maintains broader coverage and/or higher limits than the minimums shown above, the City shall be entitled to the broader coverage and/or higher limits maintained by the Consultant. Insurance provided under this contract shall not contain any restrictions or limitations which are inconsistent with the City's rights under this contract. Self-Insured Retentions Self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall cause its insurer(s)to reduce or eliminate such self-insured retentions as respects City; or Consultant shall provide a financial guarantee satisfactory to City guaranteeing payment of loss and related investigations,claim administration,and dcfcnsc expenses. Other Insurance Provisions The insurance policies are to contain,or be endorsed to contain,the following provisions: 1. City of Santa Ana, its City Council, officers, officials,employees, agents, and volunteers are to be covered as additional insureds on Consultant's CGL and AL policies with respect to liability arising out of work operations performed by or on behalf of Consultant including materials, parts, and equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of Consultant. Additional insured status can be provided in the form of an endorsement to Consultant's insurance. 2. For any claims related to this project, Consultant's insurance coverage shall be primary insurance coverage as respects City of Santa Ana, its City Council, officers, officials, employees, Page 3 of 11 I i agents, and volunteers. Any insurance or self-insurance maintained by City of Santa Ana, its City Council,officers,officials,employees,agents, or volunteers shall not contribute with it. 3. A severability of interest provision must apply for all the additional insureds, ensuring that Consultant's insurance shall apply separately to each insured against whom a claim is made or suit is brought,except with respect to the insurer's limits of liability. 4. Consultant hereby grants to City a waiver of subrogation which any insurer of said Consultant may acquire against City of Santa Ana, its City Council, officers„officials, employees, agents and volunteers" by virtue of the: payment of any loss under such insurance. Consultant agrees to obtain any endorsernent(s) that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not City has received a waiver of subrogation endorsement from any insurers). 5. Each insurance policy required by this clause shall provide that coverage shall not be canceled, suspended, voided, reduced in scope or in limits, non-renewed by the carrier, or materially changed except after thirty(30) days prior written notice has been given to City and ten (10)days prior written notice of policy cancellation or non-renewal due to non-payment. 6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Sa:ita Ana, Attention: Zdcnek K.ekula, 20 Civic Center Plaza, M43, Santa Ana, CA 92701. 'fhe name and location of project must be indicated in the Description of Operations section of each certificate. Builder's Risk(Course of Construction)Insurance Consultant may submit evidence of Builder's Risk insurance in the form of Course of Construction coverage. Such coverage shall name City of Santa Ana as a loss payee as its interest may appear. If the project does not involve new or major reconstruction, at the option of City, an Installation Floater may be acceptable.For such projects,a Property Installation Floater shall be obtained that provides for the improvement, remodel„ modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at City's site. Claims Made Policies If any coverage required is written on a claims-made coverage form: 1. The retroactive date must be shown, and this date must be before the execution date of the contract. Z. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of work. 3. If coverage is cancelled or non-renewed, and not replaced with another claims-made policy Page 4 of 11 form with a retroactive date prior to the contract effective, or start of work date, Consultant must purchase extended reporting period coverage for a minimum of five(5)years after completion of work. 4.A copy of the claims reporting requirements must be submitted to City. Acceptability of Insurers Insurance is to be placed with insurers authorized to conduct business in the state of California with a current A.M.Best rating of no less than ANII,unless otherwise acceptable to CITY. Wainer of Subrogation Consultant hereby agrees to waive rights of subrogation which any insurer of Consultant may acquire from Consultant by virtue of the payment of any loss. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all work performed by Consultant, its employees, agents and sub-contractors. Verification of Coverage Consultant shall furnish City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause). A statement on a Certificate(s)/Evidence of Insurance will not be accepted in lieu of the actual endorsements required herein. Failure to obtain the required documents prior to the work beginning shall not waive Consultant's obligation to provide there. City reserves the right to require complete, certified copies of all required insurance policies, including endorsements,required by these specifications,at any time. Sub-Contractors Consultant shall require and verify that all sub-contractors maintain insurance meeting all requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from sub-contractors. For CGL coverage, sub-contractors shall provide coverage with a form at least as broad as CG 20 38 04 13. Surety Bonds Consultant shall provide the folloWing Surdy Bonds: 1. Bid Band 2.Performance Bond. 3.Payment Bond 4.Maintenance Bond The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Rond equal to 10%of the contract price is required. Bonds shall he duly executed by a responsible corporate surety, authorized to issue such bonds in the Statc of California and secured through an authorized agent with an office in California. Failure to Maintain Insurance Coverage Page 5 of 11 If Consultant, for any reason, fails to maintain insurance coverage which is required pursuant to this contract, the same shall be deemed a material breach of contract. City, at its sole option, may terminate this contract at any time and obtain damages from Consultant resulting from said breach. Special Risks or Circumstances City reserves the right to modify these requirements, including limits, based on the nature of the risk,prior experience, insurer,coverage, or other circumstances. 7. INDEMNIFICATION Consultant agrees to defend,and shall indemnify and hold harmless the City, its officers, agents,employees,contractors,special counsel,and representatives from liability: (1)for personal injury,damages,just compensation,restitution,judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section l of this Agreement;and (2) from any claim that personal injury,damages,just compensation, restitution,judicial or equitable relief is due by reason of the terms of or cilaccts arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages,just compensation,restitution,judicial or equitable relief suffered,or alleged to have been suffered,by reason of the events referred to in this Section or by reason of the terms of, or effects,arising from this Agreement. The Consultant further agrees to indemnify,hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution,judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding.Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8,the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence,recklessness,or willful misconduct ofthe Consultant. 8. INTELLECTUAL PROPKIM INDEMNIFICATION Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States' letters patent,trademark,or copyright infringement,including casts,contained in the work product or documents provided by Consultant to the City pursuant to this Agreement. 9. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, And disbursements charged to the City for a minimum period of three(3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to Page 6 of 11 examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work,data,documents,proceedings, and activities related to this Agreement for a period of three (3)years from the date of final payment to Consultant under this Agreement. 10. CONFIDENTIALITY If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary,Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance,but in no event less than reasonable care. "Confidential Information"shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that(a)has been disclosed in publicly available sources,(b)is,through no fault of the Consultant disclosed in a publicly available source;(c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or(e) is independently developed by the Consultant without reference to information disclosed by the City. 11. CONFLICT OF INTEREST(`CAUSE Consultant covenants that it presently has no interests and shall not have interests, direct or indirect,which would conflict in any manner with performance of services specified under this Agreement. 12. NON-DISCRIMINATION Consultant shall not discriminate because of race,color,creed,religion,sex,marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion,termination or other employment related activities or any services provided under this Agreement.Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal,state and local laws and regulations. 13. 11XCLUSI,VICTY AND AMENDMENT l'bis Agreement represents the complete and exclusive statement between the City and Consu"Tant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto,the terms " f"s Agreement shall prevail, This Agreement may not be modified except by written instrument igned by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to,the terms and conditions hereof,shall not bind or obligate Consultant or the City.Each Page 7of11 party to this Agreement acknowledges that no representations, inducements, promises or agreements,orally or otherwise, have been made by any party,or anyone acting on behalf of any party, which is not embodied herein. 14. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign,transfer, delegate,or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the:City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other contractors retained by City. 1& TERMINATION This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event,Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination,subject to the following conditions; a. As a condition of such payment,the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. 16. WAIVER No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach,failure, right or remedy.No waiver of any breach,failure or right,or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar,nor shall any waiver constitute a continuing waiver unless the writing so specifics. 17. JURISDICTION'ION -VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County,California,shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 18. PROFESSIONAL LICENSES Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, Page 8 of 11 i permits,approvals,waivers,and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the united States,the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 19. NOTICE Any notice,tender, demand,delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mai led by first class or certified mail,postage prepaid,or sent by fax or other telegraphic communication in the manner provided in this Section, to the fallowing persons: To City: City CIerk City of Santa Ana 20 Civic Center Plaza(M-30) P.O.Box 1988 Santa Ana,CA 92702-1988 Fax: 714-6447-6 956 With courtesy copies to: Executive Director,Public Works Agency City of Santa Ana 20 Civic Center Plaza(M-21) P.O.Hox 1988 Santa Ana,California 92702 To Consultant: Thomas T.Kim Senior Vice President HDR Engineering, Inc. 3220 El Camino Real, Suite 200 Irvine,CA, 92602 Fax: 949403-8234 A party may change its address by ,giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If'sent by fax, communication shall be effective or deemed to have been given twenty-four(24)hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames,weekends,federal, state,County or City holidays shall be excluded. Page 9 of 11 20. MISCELLANEOUS PROVISIONS a, Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable casts and attorney's fees,for any injuries or damages to City in the event that such authority or power is not,in fact,held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. Paige 10 of 11 IN WITNESS WHEREOF,the parties hereto have executed this Agreement the date and year first above written. ATTEST: ;°' CITY OF S TA.ANA r ennifer . Ha A varo Nunez C' er City Manager APPROVED AS TO FORM: SONIA R. CARVALHO CONSULTANT; City Attorney Kyles iesen Thomas T.Kim Assistant City Attorney Senior Vice President RECOMMENDED FOR APPROVAL: �,r a Digitally signed by 1 Ca. b i I J a ba Date:202 W5.05.05 15:01:30-47'00' Nabil Saba Execrative Director Public Works Agency Page 11 of 11 Page I of 2 aCorz©�° CERTIFICATE OF LIABILITY INSURANCE DATE IMMfODlYYYYI 06/02/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT If the Certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A Statement on this certificate noes not confer rights to the eertlficate holder in Iieu of such endorsements). PRODUCER CONAMEN i�TW Certificate Center TACT Willis. Towers Watson tKidwext, Inc.c/o 26 Century Blvd E-M1AIL PHONE 1-877-945-7378 F� 1-888-467-237$ P,C. Box 305191 s• certif_icates@wtwco-com rashville, 1'N 372305191 USA _ iN$URER S AFFORDING COVERAGE NAC 9 INSURER A: Liberty Mutual Eire Insurance Company 23035 INSURED INSURERB! Ohio Casualty Insurance Company 24074 HIM Engineering, Inc. 1917 south 67th Street INSURER C: Liberty Insurance Corporation 42404 Omaha, HE 68106 INSURERB I NSURER E- INSURER F COVERAGES CERTIFICATE NUMBER:W39241779 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BILLOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE SEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADOL SUBR POLICY EFF POLICY EXP LTR POLICYNUMBER _ fmV DrvyyyyjMtD IYYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 CLAIMS-MADE FRI OCCUR PREMISES Ea occlarenca) S 1,000,000 A Contractual Lmabxli cy MED EXP(Any u" erson) S 20,000 Y X T92-641-444950-035 06/01/2025 06/01/2026 PERSONAL&ARV INJURY $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER; GENERAL AGGREGATE $ 4,D00,OOO POLICY®,E� L-I LOC PRODUCTS-COMPIOP AGG S 4,000,000 OTHER! __ S AUTOMOBILEIJASILITY OMBINEOI SINGLE LIMIT S 2,000,000 X ANY AUTO BODILY INJURY(Per person) $ A CANNED SCHEDULED Y ° A32-641-444950-D45 06/01/2025 06/0112026 BODILY INJURY(Per accident) $ AUTOSONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE S AUTOS ONLY AUTOS ONLY Par aeddenl S B UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 5,000,.000 X EXCESSLfAB CLAiMS�MAO€ Y y EUO[26157919363 06/01/2025 06/0112D26 AGGREGATE $ 5,000,000 OEO I X RETENTION$0 _ _ S WORKERS COMPENSATION X I PER p -. AND EMPLOYERS'LIABILITY YIN STATUT€ ER C ANYPROPRIETQRIPARTNERfEXECLrrfVE E.L.EACH ACCIDENT $ 1.1000,000 OFFICERIMEMBEREXCLUDED? No NIA Y NA7-64D-444950-015 06/01/2023 06/01/2026 (Mandatory InNHI E.L.DISEASE-EA EMPLOYEE S 11000,000' IF yyes.describe Under 1,400,000 OCSCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPFRATIONS I LOCATIONS I VEHICLES(ACORO 101,Additional Remarks Schedule•nnay he athotied If more apace mrequired) Certificate Holder is named as Additional Insured on General Liability, Automobile Liability and Umbrella/Excess Liability on a Primary, Nan-contributory basis where required by written contract. Waiver of Subrogation applies on General Liability, Automobile Liability, Umbrella/Excess Liability and Workers Compensation where required by written contract and as permitted by law. Umbrella/Excess policy is follow farm over General Liability, Auto Liability and Employers Liability, Tu Trdn ❑Iy!luNY))grid ay T.+ran ft yen wale 105-cam Nguyen 1�ipjv . CERTIFICATE HOLDER APPRDIIEDI CANCELLATION By Tu Tran Nguyen at 12:07 prn,Jun 03,202S SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Santa Ana 20 Civic Center plaza (M-30) - AU I HOR ILLU REP RESENTAT NE P.O. Box An CA L9 Santa Ana, CA 92702-1988 3 1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD sR ED: 27054621 6ATCH: 3985024 AGENGY CUSTOMER ID: _ LOC#: ADDITIONAL REMARKS SCHEDULENA- Page z of AGENCY NAMEDINSURED _ Mi111s Tamers Watson Midxest+ Ino. BDR Engineering, Ino' 1917 South 67Lh Street POLICY NUMBER Crmaha, WE 69196 See Page 1 CARRIER RAM CODE See Page 1 See Pag© I EFFECTIVE DATE:See Page 1 ADDITIONAL REMARKS TNIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Ceti ficata at Liability Insurance Projeot: FIRST STREET MULTIMODAL BOMEVARD STUDY PROJECT ##10431116 Additional Insureds and Waiver of Subragatian: City, its City ccunoii, its officers, officials, employees, agents, and volunteers ACORD 101 (2008101) 2008 ACORD CORPORATION. All rights reserved, The ACORD name and logo are registered marks of ACORD SR ID: 27854621 BATCH.3985024 CRRT: W39241779 �Y�AC �� 01/202 DATE tMMIDDIYYYY) CERTIFICATE OF LIABILITY INSURANCE 5/27/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER, IMPORTANT; If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the Certificate holder in lieu of such endorsement(s). PRODUCER Locklcln Computes,LLC NAME C7 444 W.47th St.,Ste.900 PHONE L IC xtS l No Kansas City MO 64112-1906 E-MAR (816)960-9000 ADDRESS: kcasu[tl lackttln xorn INSURER(S)AFFORDING.COVERAGE NAIC* INSURER A.LLQyd's of London INSURED HDR ENGINEERING,INC. INSURER B 1552476 1917 SOUTIT 67TI1 STRE17T INSURERC: OMA13A NE 68106 INSURER 0 INSURER E INSURER F: _ COVERAGES CERTIFICATE NUMBER; 21878853 REVISION NUMBER: Xxy1x_>Lxx THIS IS TO CERTIFY THAT THE POLICIES OF INSURANGF.LISTED BELOW HAVE.BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY HE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN (S SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR �rp�Of INSURANCE L SUBR - � - POLICY EFF POLICY EXP LTR POLICY NUMBER _ MMIDDIYYYY MMfDDfYYYY L COMMERCIAL GENERAL LIABILITY NOT APPLICABLE EACH OCCURRENCE S XxxXXx3X CLAINIS-MADE u OCCUR A MI TLRtNILU 5E5 rrance S xxxxxxx MED EXP An ono paraan] S XXXXXXX PERSONAL&ADV INJURY S xi xxxx i GENL AGGREGATE LIMiT APPLIES.PER: GENERAL AGGREGATE S XXXX.SCXX POLICY F, PRO- JECT Lt7C PRODUCTS-COMPIOPAGO S XXXX,CM PRO- F_J OTHER: _ S AUTOMOBILE LIABILITY NOTAPPLICABLE cotes IN®DISINGLE L1+ 5 fix. ANY AUTO BODILY INJURY(Per person) 5 OWNED SCHEDULED BODILY INJURY Wer accidern) 5 AUTOS ONLY AUTOS X X IC�CXXX HIRED NON-OWNED PROPERTY DAMAGE 5 AUTOS ONLY — AUTOS ONLY ra&ci¢gn�}_ 5xxxxxxx UMBRELLA LIAB OCCUR NOT APPLICABLC. EACH OCCURRENCE S xxx EXCESS LIAB CLAIMS-MADE AGGREGATE S XXXXXN X DIED I I RETENTIONS S , x X x WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY NOT APPLICABLE 11AT YIN LITE OFR — ANYAROPRI 0 ETQRIPARTNER)ExEcurIVE E.L.EACH ACCIDENT S O'FFICERWEMBER EXCLUDED? N I A (Mandatory in NH) I E.L.DISEASE-EA iE'MPLOYEEI S xxxx.xxK !F yyes,describe under r DESCRIPTION OF OPERATIONS below E.L.DISEASE•POLICY LIMrr I S x.XXX} A ARCH Bc ING ' N' P001412500 611/2025 (Jl12026 PER CLAIM:S1,000,000 PROFESSIONAL AGGREGATE;$2,000,000 LIABILITY i DESCRIPTION OF OPERATIONS I LOCATIONS f VEHICLES(ACORD 101.Add tlonal Remarks Sehedwa,may he ailacked If mare space is requlrnd) R[::FIRST S i-REI,f MUL11MODAL BOULEVARD STUD'-'PX0JEi"1 #IU431116;WAIVER OF SUBROGATION APPLIES ON PROFESSIONAL LIABILITY REQUIRED BY 4l RITFLN CONTRACT AND WE]ERE ALL OWED BYLAW.COVERAGE 1S SUBJECT TO THE TERMS AND CONDITIONS 01'T14E POLIi APPROVED By Tu Tran Nguyen at 12:07 pm,Jun 031,20 S5 CERTIFICATE HOLDER CANCELLATION See AUL W11IIICIIN SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 21878853 THE EXPIRATION DATE THEREOF. NOTICE WILL BE DELIVERED IN CITY OF SANTA ANA ACCORDANCE WITH THE POLICY PROVISIONS. 20 CMC CENTER PLAZA(M-30) P.O.BOX 1 988 AAUTHORIZED REPRESENTATTV`. ; SAMIA ANA, CA 92702-1988 601988 D15 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD Policy Number:TBZ-641 444950-035 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED LOCATION(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Location(s): All locations owned by or rented to the Named Insured Information required to complete this Schedule, if not shown above,will be shown in the Declarations. A. For all sums which the insured becomes legally b. Claims made or"suits"brought; or obligated to pay as damages caused by "occur- c. Persons or organizations making claims or rences under Section I—Coverage A,and for all bringing"suits". medical expenses caused by accidents under Section I--Coverage C, which can be attributed 3. Any payments made under Coverage A for only to operations at a single designated "loca- damages or under Coverage C for medical tion" shown in the Schedule above: expenses shall reduce the Designated Loca- tion General Aggregate Limit for that desig- 9. A separate designated Location General Hated "location". Such payments shall not re- Aggregate Limit applies each designated duce the General Aggregate Limit shown in '"location"', and that limit t is equal to the the Declarations nor shall they reduce any amount of the General Aggregate Limit other Designated Location General Aggre- gate Limit for any other designated "location" 2. The Designated Location General Aggregate shown in the Schedule above. Limit is the most we will pay for the sum of all 4, The limits shown in the Declarations for Each damages under Coverage A, except damag- Occurrence, Damage To Premises Rented To es because of "bodily injury" or "property You and Medical Expense continue to apply, damage" included in the"products-completed However, instead of being subject to the operations hazard", and for medical expenses General Aggregate Limit shown in the Decla- under Coverage C regardless of the number rations, such limits will be subject to the appli- of: cable Designated Location General Aggre- a. Insureds; gate Limit. CG 25 04 05 09 O Insurance Services Office, Inc.,2008 Page 7 of 2 B. For all sums which the insured becomes legally C. When coverage for liability arising out of the obligated to pay as damages caused by "occur- "products-completed Operations hazard" is pro- rences" under Section I—Coverage A,and for all vided, any payments for damages because of medical expenses caused by accidents under "bodily injury" or "property damage" included in section I — Coverage C, which cannot be at- the "products-completed operations hazard" will tributed only to operations at a single designated reduce the Products-completed Operations Ag- "IocatioW shown in the Schedule above; gregate Limit, and not reduce the General Ag- t. Any payments made under Coverage A for gregate Limit nor the Designated Location Gen- damriges or under Coverage C for medical eral Aggregate Limit. expenses shall reduce the amount available D. For the purposes of this endorsement, the Defi- under the General Aggregate Limit or the nitions Section is amended by the addition of Products-completed Operations Aggregate the following definition: Limit,whichever is applicable;and "Location" means premises involving the same or 2. Souh payments shall not reduce any Desig- connecting lots, or premises whose connection is naked Location General Aggregate Limit. interrupted only by a street, roadway, waterway or right-of-way of a railroad. E. The provisions of Section III — Limits Of Insur- ance not otherwise modified by this endorsement shall continue to apply a$stipulated, Page 2 of 2 0 Insurance Services Office, Inc., 2008 CG 25 04 05 09 Polley Number. T62-6411-444950.035 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): All construction prefects not located at premises owned, teased or rented by a Named Insured Information required to complete this Schedule, if not shown above,will be shown in the Declarations. A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for obligated to pay as damages caused by "occur- damages or under Coverage C for medical rences"under Section I—Coverage A,and for all expenses shall reduce the Designated Con- medical expenses caused by accidents under struction Project General Aggregate Limit for Section I—Coverage C, which can be attributed that designated construction project. Such only to ongoing operations at a single designated payments shall not reduce the General Ag- construction project shown in the Schedule gregate Limit shown in the declarations nor above: shall they reduce any other Designated Con- 9. A separate Designated Construction Project struction Project General Aggregate Limit for General Aggregate Limit applies to each des- any other designated construction project ignated construction project, and that limit is shown in the Schedule above. equal to the amount of the General Aggregate 4. The limits shown in the Declarations for Each Limit shown in the Declarations. -Occurrence, Damage To Premises Rented To 2. The Designated Construction Project General You and Medical Expense continue to apply. Aggregate Limit is the most we will pay for the However, instead of tieing subject to the sum of all damages under Coverage A, ex- General Aggregate Limit shown in the Decla- cept damages because of "bodily injury" or rations, such limits will be subject to the appli- ""property damage" included in the "products- cable Designated Construction Project Gen- completed operations hazard", and for medi- eral Aggregate Limit. cal expenses under Coverage C regardless of the number of; a. Insureds; b. Claims made or"suits"brought;or c. Persons or organizations making claims or bringing"suits". CG 26 03 05 09 0 Insurance Services Office, Inc.,2008 Page 1 of 2 B. For all sums which the insured becomes legally C. When coverage for liability arising out of the obligated to pay as damages caused by 'occur- "products-completed operations hazard" is pro- rences" under Section I—Coverage A,and for all vided, any payments for damages because of medical expenses caused by accidents under "bodily injury" or "property damage" included in Section 1 — Coverage C, which cannot be at- the "products-completed operations hazard" will tributed only to ongoing operations at a single reduce the Products-completed Operations Ag- designated construction project shown in the gregate Limit, and not reduce the General Ag- Schedule above: gregate Limit nor the Designated Construction I. Any payments made under Coverage A for Project General Aggregate Limit. damages or under Coverage C for medical D. If the applicable designated construction project expenses shall reduce the amount available has been abandoned, delayed, or abandoned under the General Aggregate Limit or the and then restarted, or if the authorized contract- Products-completed Operations Aggregate ing parties deviate from plans, blueprints, de- Limit,whichever is applicable;and signs, specifications or timetables. the project will 2. Such payments shall not reduce any Desig- still be deemed to be the same construction pro- nated Construction Project General Aggre- ject. gate Limit. B. The provisions of Section III -- Limits Of Insur- ance not otherwise modified by this endorsement shall continue to apply as stipulated. Page 2 of 2 Q Insurance Services Office, Inc.,2008 CG 25 03 05 09 POLICY NUMBER:T132-641-444950- COMMERCIAL GENERAL LIABILITY 035 CG 20 10 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED -- OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A Section II — Who Is An Insured is amended to 1. All work, including materials, parts or include as an additional insured the person(s) or equipment furnished in connection with such organization(s) shown in the Schedule, but only with work, on the project (other than service respect to liability for "bodily injury", "property maintenance or repairs) to be performed by or damage" or "personal and advertising injury" on behalf of the additional insured(s) at the caused, in whole or in part,by: location of the covered operations has been 1. Your acts or omissions;or completed;or 2. The acts or omissions of those acting on your 2. That portion of "your work" out of which the behalf injury or damage arises has been put to its in the performance of your ongoing operations for intended use by any person or organization the additional insured(s) at the location{s} other than another contractor or subcontractor designated above. engaged in performing operations for a principal as a part of the same project. However. C With respect to the insurance afforded to these 1. The insurance afforded to such additional additional insureds, the following is added to insured only applies to the extent permitted by Section III—Limits Of Insurance: law;and If coverage provided to the additional insured is 2 If coverage provided to the additional insured is required by a contract or agreement, the most we required by a contract or agreement, the will pay on behalf of the additional insured is the insurance afforded to such additional insured will amount of insurance: not be broader than that which you are required 1_ Required by the contractor agreement;or by the contract or agreement to provide for such additional insured. 2. Available under the applicable limits of R With respect to the insurance afforded to these insurance; additional insureds, the following additional whichever is less, exclusions apply: This endorsement shall not increase the This insurance does not apply to "bodily injury" or applicable limits of insurance. "property damage"occurring after: SCHEDULE Name Of Additional Insured Parson(s) Location(s) Of Covered Operations Or Organization(s): Any person or organization with whom you have agreed All locations as required by a written contract or through written contract, agreement or pen-nit to provide agreement entered into prior to an"occurrence"or additional insured coverage offense Information required to complete this Schedule, if not shown above,will be shown in the Declarations. CG 20 10 1219 0 Insurance Services Office,Inc.,2018 Page 1 of 1 POLICY NUMBER:TB2-541444954- COMMERCIAL GENERAL LIABILITY 035 CG 20 37 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS -- COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART A Section II — Who Is An Insured is amended to R With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the fallowing is added to Organizations) shown in the Schedule, but only Section III—Limits Of Insurance: with respect to liability for "bodily injury" or property damage" caused, in whole or in part, by If coverage provided to the additional insured is .pro work"' at the location designated and required by a contract or agreement, the most we will pay on behalf of the additional insured is the described in the Schedule of this endorsement amount of insurance: performed for that additional insured and included in the"products-completed operations hazard". 1. Required by the contract or agreement;or However: 2 Available under the applicable limits of 1. The insurance afforded to such additional insurance; insured only applies to the extent permitted by whichever is less. law;and This endorsement shall not increase the applicable 2 If coverage provided to the additional insured is limits of insurance. required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): Location And Description Of Completed Operations Any person or organization to whom or to which you are Any location where you have agreed,through written, required to provide additional insured status in a written contract,agreement,or permit;to provide additional contract, agreement or permit except where such insured coverage for completed operations contact or agreement is prohibited. Information required to complete this Schedule, if not shown above,will be shown in the Declarations. CG 20 37 12 19 0 Insurance Services Office,Inc., 2018 Page 1 of 1 Policy Number TB2-641-444954-035 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY--- OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to Section IV—Conditions 4. Other Insurance and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and (2) You have agreed prior to a loss,that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. (3) This insurance is excess over any other insurance available to the additional insured for which it is also covered as an additional insured by attachment of an endorsement to another policy providing coverage for the same"occurrence", claim or"suit". LD 24 153 08 16 ©201E Liberty Mutual Insurance Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. POLICY NUMBER:TB2-641-W950-635 COMMERCIAL GENERAL LIABILITY CG 24 04 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s)Or Organization(s): As required by written contract or agreement. Information required to complete this Schedule,if not shown above,will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV—Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s)shown in the Schedule above. CG 24 04 1219 Ca Insurance Services Office,Inc.,2018 Page 1 of 1 POLICY NUMBER:AS2-541-444950-045 COMMERCIAL AUTO CA 20 48 10 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORD BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement Identifies person(s) or organization(s) who are "insureds"for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. SCHEDULE Name Of Person(s)Or Organization(sy: As required by written contract Information required to complete this Schedule, if not shown above,will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured"for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.1. of Section tl — Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I -- Covered Autos Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 0 Insurance Services Office, Inc.,2011 Page 1 of'I Policy Number:AS2-64 1-4 4 4 950--0 4 5 Issued by: Liberty mutual Fire Tnsurance Company THIS ENDORSEMENT"CHANGES THE POLICY.PLEASE READ IT CAREFULLY. DESIGNATED INSURED-NONCONTRIBUTING This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIERS COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s)or organizations)who are"insureds"under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage form. Schedule Name of Person(s)or Organizations(s): Any person or organization where the Named Insured has agracd by written contract to include such person or. organization Regarding Designated Contractor Project: Any. Each person or organization shown in the Schedule of this endorsement is an"insured"for Liability Coverage,but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. The following is added to the Other Insurance Condition: If you have agreed in a written agreement that this policy will be primary and without right of contribution from any insurance in force for an Additional Insured for liability arising out of your operations, and the agreement was executed prior to the "bodily injury" or"property damage", then this insurance will be primary and we will not seek contribution from such insurance. AC 84 23 0811 - 2010,Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office,inc., with its permission. POLICY NUMBER:AS2-641-04495M45 COMMERCIAL AUTO CA04441013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. SCHEDULE Name(s)Of Person(s)Or Organlzatlon(s): Any person or organization for whom you perform work under a written contract of the contract requires you to obtain this agreement from us but only if the contract is executed prior to the injury or damage occurring. Information required to complete this Schedule, if not shown above,will be shown in the Declarations. The "transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a c ontract with that person or organization. CA 04 44 10 13 @ Insurance Services Office,Inc.,2011 Page 1 of 1 WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule Where required by contract or written agreement prior to loss. Issued by:liberty Insurance Corporation For attaclimen[to Policy No WA7.64D-444G50•015 Effective Date 01310112025 Premium 3 Issued io:I IDR Engineering,Inc. WC 00 0313 41983 National Council on Compensation Insurance, Inc. Page 1 of 1 Ed.4/1/1984 Policy Number TB2-641-444958-035 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION OR MATERIAL REDUCTION IN COVERAGE TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY—UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)f Email Address or retailing address: Number Days Notice: O r aniizatio n s : As required by written contract or As required by written contract or 30 written agreement written agreement k If we cancel this policy for any reason other than nonpayment of premium, or make a material reduction in coverage,we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 14 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation or material reduction of coverage is intended as a courtesy only. Our failure to provide such advance notification wilt not extend the policy cancellation date nor negate cancellation of the policy, All other terms and conditions of this policy remain unchanged, LIM 99 44 0314 ©2014 Liberty Mutual Insurance.All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission, Policy Number AS2-641-444950-045 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION OR MATERIAL REDUCTION IN COVERAGE TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY OVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETE❑ OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY--UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)I Email Address or mailing address: Number Days Notice: Organ lization(s): As required by written contract 30 or written agreement A. If we cancel this policy for any reason other than nonpayment of premium, or make a material reduction in coverage,we will notify the persons or organizations shown in the Schedule above.We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. S. This advance notification of a pending cancellation or material reduction of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 04 0314 02014 Liberty Mutual Insurance.All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Servioes Office, Inc.,with its permission. NOTICE OF CANCELLATION TO THIRD PARTIES A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule below. We will send notice to the email or mailing address listed below at least 10 days, or the number of days listed below, if any, before cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured, B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy, Schedule Name of Other Person(s)1 Email Address or mailing address: Number Days Notice: Organ Ization(s): As required by written 30 contract or agreement All other terms and conditions of this policy remain unchanged. Issued by Liberty Insurance Corporatlon For attachment to Policy No.WA7-64D444950-016 Efluctive Nate 06101/2025 Premium$ Issued to HaR Enginoering,Inc, Endorsement No. WC 99 20 75 ©2016 Liberty Mutual Insurance Page 1 of 1 Ed.12I0112016 Attachment Code:D608624 Certificate ID:21878853 This endorsement,effective:0610112025-06/01/2026 Forms a part of policy no.: P001412500 Issued to: HDR ENGINEERING,INC. By: Lloyd's of London NOTICE OF CANCELLATION TO CERTIFICATE HOLDERS ENDORSEMENT Except with respect to cancellation for non-payment of premium(10 day notice cancellation),the Insurers shall give 30 days'notice of cancellation to the Certificate Holder(s)set forth herein,provided that: 1.The First Named Insured is required by contract to give notice of cancellation to the Certificate Holder, and 2. Prior to the Insurers sending its notice of cancellation to the First Named Insured,the First Named Insured shall provide the Insurers,in writing,either directly or through the First Named Insured broker of record,the name of each person or organization requiring notice of cancellation and the corresponding address for such person or for the employee responsible for receipt of notice of cancellation on behalf of such organization. Notice of cancellation will be sent in accordance with the terms and conditions of the policy,except that the Insurers may provide written notice individually or collectively to the Certificate Holders by email at the current email address given by the First Named Insured.Proof of sending of the notice of cancellation by email shall be sufficient proof of notice. Any failure to provide notice of cancellation to the Certificate Holder due to inaccurate or incomplete information provided by the First Named Insured shall remain the sole responsibility of the First Named Insured. The following definitions apply to this endorsement: 1, First Named Insured means the Named Insured shown in the Declarations. ALL OTHER TERMS AND CONDITIONS OF THE POLICY SHALL REMAIN UNCHANGED. Miscellaneous Attachment:M507673 Certificate ID:21878953 Insured.:HDR.,Inc. Insurer:Lloyd's of London Professional Liability Policy#P001412500 Effective Date of Policy: 61112025 Expiration Date of Policy: 6/112026 Waiver of Subrogation IX. Conditions I. Subrogation In the event of any payment under this policy,the insurer shall be subrogatod to all the Insureds rights of recovery against any person or organization and the Insured shall execute and deliver instruments and papers and do whatever else is necessary to secure such rights.The Insured shall do nothing to prejudice such rights.The insurers shall not exercise any such right against any persons,firms or corporations included in the definition of an Insured or against the Insured's clients if prior to the Claim a waiver of subrogation was so required and accepted under a specific contractual undertaking by the Insured. All recoveries obtained through subrogation shall be applied towards the Insurcd's Deductible first with the remaining balance payable to the Company. Exhibit 2 1 AMENDMENT NO. 1 TO 2 COOPERATIVE AGREEMENT NO. C-4-2053 3 BETWEEN 4 ORANGE COUNTY TRANSPORTATION AUTHORITY 5 AND 6 CITY OF SANTA ANA 7 FOR 8 FIRST STREET MULTIMODAL BOULEVARD STUDY 9 THIS AMENDMENT NO. 1 is effective this day of 2026 ("Effective Date"), by 10 and between the Orange County Transportation Authority, 550 South Main Street, P.O. Box 14184, 11 Orange California 92863-1584, a public corporation of the State of California (herein referred to as 12 "AUTHORITY") and the City of Santa Ana, 20 Civic Center Plaza, Santa Ana, California 92702, a 13 municipal corporation duly organized and existing under the constitution and laws of the State of 14 California (herein referred to as "CITY'), each individually known as"PARTY', and collectively referred to 15 as "PARTIES'. RECITALS: 16 17 WHEREAS, by Agreement C-4-2053 dated February 18, 2025, AUTHORITY and CITY entered 18 into an agreement for CITY to act as the lead agency for preliminary engineering, right-of-way, 19 construction, and construction management of the First Street Multimodal Boulevard Study Project 20 (hereinafter referred to as "PROJECT"); and 21 WHEREAS, the PROJECT is funded with Regional Early Action Planning Grant Program of 2021 22 (hereinafter referred to as "REAP 2.0")funds; and 23 WHEREAS, CITY and AUTHORITY agree to increase the level of effort for the PROJECT to 24 adequately address and incorporate all necessary PROJECT components identified through the latest 25 findings during the conceptual planning and preliminary PROJECT plans, specifications, and estimates; 26 and Page 1 of 3 COOPERATIVE AGREEMENT NO. C-4-2053 1 WHEREAS, AUTHORITY and CITY agree to increase the Agreement's maximum cumulative 2 payment obligation by Three Hundred Eighty-Two Thousand Eight Hundred Ninety-Six Dollars and 3 Eighty-Five Cents ($382,896.85)to complete CITY-required PROJECT components; and 4 WHEREAS, AUTHORITY and CITY agree that the increased obligation will be fully funded 5 through REAP 2.0 funds; and 6 WHEREAS, CITY's City Council approved this Amendment No. 1 on day of 7 2026. 8 NOW, THEREFORE, it is mutually understood and agreed by AUTHORITY and CITY as follows: 9 1. Amend ARTICLE 3. RESPONSIBILITIES OF AUTHORITY, page 4 of 12, paragraph D., 10 lines 10 and 11 page 4 of 12, to delete and, in lieu thereof, insert: 11 "D. AUTHORITY shall allocate the CITY's share of the PROJECT in the amount not-to-exceed 12 Four Million Three Hundred Thousand Dollars ($4,682,896.85)for the PROJECT using REAP funds." 13 2. Amend ARTICLE 6. MAXIMUM OBLIGATION, page 7 of 12, to delete in its entirety and, 14 in lieu thereof, insert: 15 "ARTICLE 6. MAXIMUM OBLIGATION 16 Notwithstanding any provisions of this Agreement to the contrary, AUTHORITY and CITY 17 mutually agree that AUTHORITY's maximum cumulative payment obligation hereunder shall be Four 18 Million Six Hundred Eighty-Two Thousand Eight Hundred Ninety-Six Dollars and Eighty-Five Cents 19 ($4,682,896.85), unless agreed to and amended by both PARTIES." 20 / 21 / 22 / 23 / 24 / 25 / 26 / Page 2 of 3 COOPERATIVE AGREEMENT NO. C-4-2053 1 The balance of Agreement No. C-4-2053 remains unchanged. 2 IN WITNESS WHEREOF, the PARTIES hereto have caused this Amendment No. 1 to 3 Agreement No. C-4-2053 to be executed as of the date of the last signature below. 4 CITY OF SANTA ANA ORANGE COUNTY TRANSPORTATION AUTHORITY 5 6 By: By: Alvaro Nunez Lydia Bilynsky 7 City Manager Department Manager, Capital Projects 8 Dated: 9 10 ATTEST: APPROVED AS TO FORM: 11 By: By: 12 Jennifer L. Hall James M. Donich 13 City Clerk General Counsel 14 Dated: 15 16 APPROVED AS TO FORM: By:�� 4&IVL-� 18 a Nellesen 19 Assistant City Attorney 20 RECOMMENDED FOR APPROVAL: 21 422�2z 22 By: Rtdolfo Rosas(Sep 23,2026 19:08:03 PDT) Rodolfo Rosas, P.E. 23 Acting Executive Director, Public Works Agency 24 23/09/2026 25 Dated: 26 Page 3 of 3 Exhibit 3 FIRST AMENDMENT TO AGREEMENT WITH HDR ENGINEERING TO PERFORM ENGINEERING AND TRANSPORTATION PLANNING SERVICES FOR THE FIRST STREET MULTIMODAL BOULEVARD STUDY THIS FIRST AMENDMENT to the above referenced Agreement is entered into on this 6th day of October, 2026 by and between HDR Engineering, Inc. ("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California ("City"). RECITALS A. On May 20, 2025, the City and Consultant entered into Agreement #A-2025-073 ("Agreement") following a comprehensive Request for Proposal procurement process to for traffic engineering and transportation planning services associated with the First Street Multimodal Boulevard Study("Project") in accordance with the terms of the RFP No. 25- 029 ("RFP"). The Agreement runs for an initial two (2) year term with options to extend the term for up to two (2), additional one (1) year terms, if needed. The Agreement is current and in-effect. B. Consultant has substantially completed the planning, public outreach, transportation analysis, and preliminary engineering services identified in the original Agreement and has advanced the Project to approximately the 60 percent design phase. C. As the Project advanced through design development, additional engineering analyses were identified as necessary to satisfy City engineering standards, Orange County regulatory requirements, and accepted engineering design practices. Specifically, completion of a Drainage Report, Geotechnical Pavement Design Memorandum, and Water Quality Management Plan (WQMP), Right of Way (ROW) Engineering, Utility Coordination, additional Storm Drain Design, Utility Potholing, and contract administration are all additional tasks necessary to advance the Project through the 90 percent and 100 percent Plans, Specifications and Estimates (PS&E)milestones. D. Consultant is uniquely qualified to perform these additional services because of its familiarity with the Project, existing engineering analyses, community outreach, and ongoing design efforts. Utilizing Consultant to complete the additional work will maintain project continuity, avoid duplication of effort, and minimize schedule impacts. E. Pursuant to Santa Ana Municipal Code Section 2-807, City staff coordinated with the Purchasing Manager in regards to the additional work contemplated by the Consultant. The Purchasing Manager approved the exception to process for bid requirements consistent with City code and the procurement process established under the RFP. E. The Parties desire to amend the Agreement to: (1) amend the scope of services; (2) utilize the grant contingency funds authorized by Council on March 20, 2025 and additional grant funds identified in Amendment No. l to the Cooperative Agreement with Orange County Transportation Authority to increase the compensation by Six Hundred Thousand Four Hundred Eighty-Nine Dollars and Eighty-Five Cents ($600,489.85) to compensate the Page 1 of 4 Consultant for said additional services; and (3) to amend the fees and rates to include the costs for the additional services detailed herein. No other changes are contemplated by this First Amendment. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: 1. SECTION 1, SCOPE OF SERVICES Exhibit A to Section 1 of the Agreement is hereby amended to include additional professional engineering services, attached hereto and incorporated by reference: a. Preparation of a Drainage Report, including hydrologic and hydraulic analyses, drainage area mapping, roadway spread calculations, evaluation of existing and proposed storm drain facilities, and preparation of final drainage recommendations (Exhibit A-1). b. Preparation of a Geotechnical Pavement Design Memorandum, including subsurface exploration, laboratory testing, pavement design recommendations, traffic signal foundation recommendations, and geotechnical engineering analyses (Exhibit A-2). c. Preparation of a Water Quality Management Plan (WQMP), including stormwater treatment calculations, Best Management Practice (BMP) design, preparation of technical specifications, regulatory documentation, and completion of Orange County recordation requirements (Exhibit A-3). d. Preparation of Right-of-Way(ROW)Engineering, including fifteen(15)title reports to support new roadway easements, five(5) additional title reports to support intersection curb returns where the documented ROW does not match existing improvements, performing ROW engineering to verify existing parcel boundaries for affected parcels, preparation of Plats and Legal descriptions to support 15 new parcel takes, and address comments. HDR will begin utility coordination with Southern California Edison (SCE). The coordination effort will include the preparation of utility impact exhibits specific to SCE facilities in order to facilitate relocation coordination with SCE and other utility owners. Two (2) additional drainage systems are required by PWA for inclusion into the design package. These two systems will replace deficient systems located at the Main Street and Broadway Street intersections. The HDR design team will prepare new plans and profile design plans for these two drainage systems and include the plans in their 90% and 100% design submittals. This task will include plans, specifications and cost estimates for the added drainage items and will be incorporated into the drainage report with supporting hydraulic calculations. Page 2 of 4 Utility Potholes: The HDR team will complete 35 utility potholes to locate existing utilities at critical points along the corridor including proposed utility crossing and traffic signal locations. The utility pothole information will be supplied to the PWA in the form of a field report and the pothole data will be added to the First Street utility plans. (Exhibit A-4). 2. SECTION 2.a, COMPENSATION, is hereby amended to increase the total compensation by an additional Six Hundred Thousand Four Hundred Eighty-Nine Dollars and Eighty-Five Cents ($600,489.85). The total amount to be expended during the term of the Agreement shall not exceed Four Million, Four-Hundred Seventy Thousand, Four Hundred Eighty-Nine Dollars and Eighty-Five Cents ($4,470,489.85). 3. SECTION 2.a, COMPENSATION, is hereby amended to include as Exhibit B-1 to this First Amendment the rates and fee schedules for the additional scopes of work detailed in this First Amendment. 4. Except as modified by this First Amendment, all terms and conditions of the Agreement shall remain in full force and effect. [signature page to follow] Page 3 of 4 IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to Agreement the date and year first above written. ATTEST: CITY OF SANTA ANA Jennifer L. Hall Alvaro Nunez City Clerk City Manager APPROVED AS TO FORM: SONIA R. CARVALHO CONSULTANT: City Attorney By: i�//Z' Kyle K,611lesen Thomas T. Kim Assistant City Attorney Senior Vice President RECOMMENDED FOR APPROVAL: Nvoa( fo Rosas Rodolfo Rosas(Sep 28,2026 09:51:57 PDT) Rodolfo Rosas, P.E. Acting Executive Director, Public Works Agency Page 4 of 4 EXHIBIT A-1 SCOPE OF WORK- Drainage Report FN First Street MM Design, Bristol to Standard— Drainage Report City of Santa Ana May 21, 2026 Prepared by HDR Engineering, Inc. General Scope of Work For the First Street MM Design, Bristol to Standard Project(Project), HDR Engineering, Inc. (HDR)will provide a Drainage Report for the 60%, 90%, and 100%level of the Project design. The Drainage Report will highlight the drainage analyses on the existing and proposed drainage systems between Bristol Street and Standard Ave in Santa Ana, California. Detailed Scope of Work Task 1 Data Review HDR will review the available data provided by the City of Santa Ana and the Project team. Key information to review will be previous drainage reports, hydrologic and hydraulic models of the existing drainage systems, topographic survey, as-built data, and maintenance records for the Project site. Task 2 Drainage Report HDR will review readily available data and prepare design calculations to assess roadway spread, roadway flow depth, and the hydraulic capacity of the existing and proposed drainage systems. HDR will prepare a draft and final Drainage Report,which will include basis of design for the drainage improvements, calculations to assess the existing drainage systems, and the calculations for the proposed drainage improvements or impacts to drainage facilities. The results and design recommendations will be summarized in the Drainage Report. The report is expected to include the following: • Basis of design for drainage facilities • An evaluation of the existing facilities and proposed conditions • Unusual and special conditions • Drainage area mapping and hydrologic calculations • Hydraulic analyses Deliverables: • Draft Drainage Report(PDF) • Final Drainage Report(PDF) hdrinc.com HDR Engineering,Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 pg. 1 925.465.2700 FN Assumptions • HDR's deliverables will be provided in PDF format. • Available drainage reports, hydrologic and hydraulic modeling data will be provided by city of Santa Ana to HDR. • Evaluation of the existing storm drain system will be limited to the Project limits along First Street and located between Bristol Street and Standard Ave. • Downstream control elevations will be obtained from the existing drainage models and will be used as a basis for the design of the proposed storm drain system. It is assumed that the existing models will be used as-is and no further modifications to the models will be required. If no downstream control elevations are available, it is assumed that the highest value of either an elevation of 0.5 feet below the existing local depression or 2 feet below the lowest existing street gutter grade will be used. • Hydrology will be analyzed based on guidance from the County of Orange Department of Public Works Local Drainage Manual and the Orange County Flood Control District Design Manual. • Hydraulic analysis will be analyzed based on guidance from the County of Orange Department of Public Works Local Drainage Manual and the Orange County Flood Control District Design Manual. • Autodesk Hydraflow or equivalent software and HDR's proprietary calculation spreadsheets will be utilized for roadway and pipe hydraulic calculations. • It is assumed that the Project will require stormwater treatment and Best Management Practices (BMPs)will be included as part of the drainage design. • The design of BMPs will be subject to a Water Quality Management Plan (WQMP) document prepared under a separate scope of work. • It is assumed that there will be one set of comments through one review cycle for the draft Drainage Report and one set of comments on the Final Drainage Report. The Final Drainage report will be updated to reflect the final design plans prepared by HDR.Additionally, it is assumed that there will be no additional comments on the Final Drainage Report.A revised Final Drainage Report will be provided to the city as a final deliverable. HDR Engineering,Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 pg.2 925.465.2700 EXHIBIT A-2 SCOPE OF WORK Geotechnical Pavement Design Report First Street— Pavement Evaluation PROJECT UNDERSTANDING We understand that First Street, extending between Bristol Street and Standard Avenue in the City of Santa Ana, is proposed to be improved. The total length of the proposed alignment is about 1.6 miles. The design scope is to widen the existing sidewalks from 8' to 17' (feet) in width and also to shift the median. The existing pavement section will need to be replaced. Additionally, new traffic signal foundations and performing storm drain reconstruction work that may involve excavations down to a depth of 12' is planned. SCOPE OF WORK Our scope of work is expected to consist of the following tasks: • Review geotechnical maps and reports in our in-house library that are relevant to the site. • Obtain a "no fee" encroachment permit through the City of Santa. • Prepare a geotechnical exploration/work plan and support the design team in acquiring encroachment permit from the City of Santa Ana to perform geotechnical exploration within local streets. Additionally, a soil boring permit from the County of Orange will be acquired. • Premark the proposed boring locations and contact Underground Service Alert (USA) for utility clearance. In addition, each proposed boring location will be cleared for utilities using geophysical techniques. • Traffic control will be provided for the proposed subsurface exploration according to the WATCH manual. Traffic control plans will be prepared where required at additional expense. • Perform a subsurface exploration consisting of drilling, logging, and sampling 8 hollow-stem auger (HSA) borings along the subject roadway. The proposed borings will be advanced to a target depth between approximately 10 and 20 feet below existing ground surface or to practical refusal whichever is shallower. We will obtain Standard Penetration Test and Modified California Ring samples and will be logged by a member of our technical staff. The borings will be back-filled with cement bentonite grout, the surface will be patched with rapid set concrete and black pigment will be added to match the color of the existing pavement. Soil cuttings will be placed in 55-gallon drums and dispose after analytical testing is completed at a regulated disposal facility. • Perform laboratory testing on selected soil samples to estimate the engineering properties of the subsurface soils, including in-situ moisture content, grain-size analysis, strength tests, consolidation, sand equivalent, expansion, and R-Value. • Perform geotechnical analysis of the collected data for pavement design. • Prepare a geotechnical design memorandum presenting our findings, traffic light foundations, and pavement design recommendations. Deliverable ➢ A Geotechnical Design Memorandum (electronic only) Schedule We will start our literature review and scheduling of our subcontractors upon receipt of a written notice-to-proceed. We expect our field exploration to be completed within two weeks after receipt of the encroachment permit. The Geotechnical Design Memorandum will be available to you within six weeks after the field exploration. Progress briefings and preliminary design recommendations can be provided as the data is developed. Assumptions Page 1 of 2 First Street— Pavement Evaluation ➢ This project is subject to the Prevailing Wage Law. ➢ The encroachment permit from the City of Santa Ana will be considered a "no fee" permit. ➢ One single round of reviews/comments from the City of Santa Ana reviewer is assumed for our scope. After comments are addressed a final geotechnical design memorandum will be provided to the Client. ➢ Well permit coordination and fees from the Orange County Department of Environmental Health Services are included in our geotechnical scope. ➢ Our field exploration assumes to be performed during regular working hours. ➢ Pavement design will be performed using Caltrans R-Value Highway Design Manual method. ➢ City of Santa Ana will provide location near the project site for the temporary storage for drums. ➢ Pavement restoration will be completed using rapid-set concrete with black dye. Other methods of pavement restoration are not included in this scope of services. ➢ Our scope does not include infiltration testing for use in the design of water quality best management practice (BMP). However, infiltration testing can be provided upon request at an additional cost. Available underground utility mapping information will be referenced prior to the field exploration. As required by the state of California, we will also notify Underground Service Alert of the locations of our planned explorations prior to drilling. We will take the precautions to avoid utilities; however, despite reasonable efforts, there are inherent risks to utility damage from drilling. We cannot assume responsibility for the inherent risks if the utilities are not accurately marked at the site. Our proposal does not include costs or other provisions for utility repairs. ➢ Identification, handling, and treatment of materials that need to be environmentally addressed are beyond the scope of our geotechnical engineering services. If such materials are encountered, we will notify you immediately and a proposal for handling of such materials will be submitted upon request. Page 2 of 2 KR UVYI-1 10grOlid 91M 109MHd:NNNN-)-k*ON lO3f`OHd - z •6 z �a �a J i as �� zN J J J J � J J J � W m Vti d m cow m mLLJ � Cc cc w 3 0+171 V1S 3NnHO1VW A iHS 33S 00+61 V1S 3NI-lHOIV1N 4 ti E N N �} W ���� n"i p� I ❑ a 3 d N iy �7 x w U5 ffi N V�'1 ffl fYJ fIi fii _ _ _ � a� a- �� Sa ob aP N� = O Q O C9 Z o 0 0 0 R7 4 4 4 C i �■ G. w m= i 1w w lI Y r.wII W �S I �mII w I B r I 4 I i a x w a 1S `I o ❑ I yr g° 4 n M I (n p I r I 2 0 F C n J o O oa B CD � I � � a _ o I I 1HOIH 3AO8V 33S 00+b1 V1S 3NI-lHOIVW Ail, --nq W-U N-NNNNN-NN"-ixs= V' Gw 12rOkid91M£9M&mNN-»'!2m& \ § B § : u > . 0. 0 �m . q& 2} §[ CC �! 2: W 2� )` S ay ge33800+rViS EIN aGm xiHS aso E 6s3NI m±m \ [ \2 1 4 { z » - � � � m \\ \ \ -- - - \ [ -_ oo Lu . <\ .// \ r i :: � \ � § - - � / \ i . � i AT z I: � \ � \ La loll- . � ^ , e } m ! /> ~~ Aaa,38o EViS»,3m iHOlH 3Am»2G00+<QG»gam Ilk S11W11103f`Olid 91M 109MHd:NNNN-JU.'ON lO3f`OHd - z B J a o 0 F a C9 a L c a N ;.- w � Ju 7 G 133-1 MO-138 336 00+bE V1S 3NI-lHOIVIN A 1HS 338 00+65 V1S 3NI-lHOIVIN � F - �e W a e� W� wHILL �■ oo J� �■ � I � � 8� ob o� „ \ 03 j I8 c ' I n 0 N v u ay _1______ _______, _____ o� N ■ W C W— ■ > Y" 1 LL oo+ nL ■ O u I I z s _ ■ \\\ ■4 a � � 00 of ■ x I zz s I o C H oc m 1 4 as No W a� w Qm` IF 1 v 1 � ir titi�" A 1HS 33S 00+6Z V1S 3NI-lHOIVW 1HO18 3AO8V 00+h6 V1S 3NI-lHOIVW y�1. wYY`�--nq WO'QON-NNNNN-NN"- S= V' 8LW111O3f`Olid 91M 109MHd:NNNN-AA'ON lO3f`OHd - - z z "ate ,07 _ J a 0. 0 F a (9 a J m as �S Ca a VJ 133l MO-139 338 00+h4 V1S 3NPHOIVW qtill . I la:o I 'i,. B I' I I: DI I � ; A 1HS 33S 00+8V V1S 3NI-lHOIVW sa z In oo I F 3 i of ---------= `z ha O a I - -----'--'-----'¢ 1c > L of a o I W u_ I19I� € ad s to YZ I W I M OC I � SIN F �I O o I � � I O ❑ AI1HS 338 00+66 V1S 3NI-11-10IVW g 1HOIH 3AOSV 33S 00+bb V1S 3NI-1HOIVW w-a•aaN-NNNNN-NN"- S= V' 8LW11103f`Olid 91M 109MHd:NNNN-)-k*ON lO3f`OHd - z B J a 0.. o Ca N w FOm vJ 1=13-1 MO-198 33S 00+Z9 V1S 3NI-lHOIVV4 l 1HS 33S 00+99 V1S 3NI-IHOIVW sm lS lSl MLLb 6Z5LZY16£ttdtl �_¢ Yc N I ^II I �N I I 1 o-f I I I W ❑I ` W 3 � 4 I❑ I O I � _ 0 w i � u ft a `J � 00♦ 00 Ol �I � I r i 7 a a ry 4 i J wr I z y ■ ■ ■ ■a I ay I I � ` I w-i ¢ A 1HS 33S 00+8b V1S 3NI-lHOIVW 1HJI 13A08V 33S 00+Z9 V1S 3NI-IHOlVW YY'y� —QON-NNNNN-NN"- S= V' UVYI-1 1O3f`Olid 91M 109MHd:NNNN-)-k*ON lO3f`OHd - z B z J a oo � F a t9 a of Y a ° O o w i �= 'F'^^LL 7 VJ Jd3l M0-39 338 00+19 V1S 3NI-IHOIVW CEI 4y CO W W 00 11 -- - - o - ■ k iHS 338 00+99 V1S 3NI-IHOIVW m f ,^ e > ry i r �F ¢moo ¢u ¢u i N I an I I W H, 4 F 0 w N u)N $ ■ —_ \ ¢ _■ I `� z �■ � � z a - ryp� m .o= La w= 6 \ 3 • oa wcS m5`c IiF O L _~ ■ _■ ■ co Q I U) I a ■ 1 a - Wp A 1HS 33S 00+99 V1S 3NI-lHOIVW 1H0I 13AOSV 36 00+I9 V1S 3NI-IHOIVW YY'y xoa•aaa-nnnxn-nxxx-ixs= V' 8LW111O3f`Olid 91M 109MHd:NNNN-AA'ON lO3f`OHd - z B J a o 0 �g Wi a Ra J� �8 Ca u, m 3:o a i W u� F 00 G A 1HS 338 00+bL V1S 3NIIHOIVW ! 1d3-1 MO-139 336 00+69 V1S 3NI-IHOIVW a y, S ; I ❑ i- -W a ❑ 1 I C'' I Z y I I I I � LL ii i I 1 1 1 1 � Vi I W - ! son 5 ! I I a B I i � 4 w ■� I r' — > d � ■ a d / ��c� L € I Y � I m I - 4,�,. ❑' 9w C - LA � 4z � � I � I ❑ z � �� iIr 17 o _ � ❑ II ! o A 1HS 33S 00+99 V1S 3NI-lHOIVW 1HJI8 3A013V 338 00+69 V1S 3NI-1HOlVW —QON-NNNNN-NN"- S- V' Gw 12rOkid91M£9M&mNN-»'!2m& § B § : u 080 ■= q! 22 §/ CC �® w& er S \ \ ] \ a9-1 ,Aso tViS 9Gm AiHS DDGo aViS 93m i . d : J | � \� . j � 2 s LU ° ` ----- - - -- - - . , 00 - % : : ■ \ k M _ [ ) : : \� � Ist � � \r - � �All t } \ \ \ xiHS Aso#ViS %3V am»m,MIS o/6s mm/n ����,) � Gw 12rOkid91M£9M&mNN-»'!2m& \ § B § : u : . 080 �& . q! 2§ §§ CC w2er S \ \ ] \ a9-1 MO gesso#VIS 9Gm AalDDB00+«ViS 93m : ) � i , �■ ƒ i - e [ \ � �■ : � � � j , ; ■ . � > \ ; . In : � - © r } ®_,.. . : z) . } � ■ ■ ■ ■ ■ � ' ! � I V .m uu . }` e w ! ■� 9 � ■� , y . \ � ■� - y j e -� z} La � \ / ) � \ \( VNV - Il \ \ � 5 A/s33so=ViS mayi,/m»E13\o 986s mm/& ��� 8LW11103f`Olid 91M 109MHd:NNNN-)-k*ON lO3f`OHd - z B J a Q a V �a F C9 Wi p a z J� a Ya o C� 0 0 w� V� of J u O m � G zd Y Y 133-1 MO-38 33S 00+b6 V1S 3NI-lHOIVW sm -� q I I ®{ 1 { 1 I I � I� a� i i a w ' -41 sow LU .o= W .. m -- > of N . `• Ho+ m .o C� Q a co 0 2 ♦f �' ■� w W fi A \ _ v CD vQ a LLl °JIB o z o a s l V v= T8z I ® z I AAA vJ`!V1NtlS VN N HP£Lb86E ao'Y A 1HS 33S 00+06 V1S 3NI-IHOIVW 1HJIH 3A08V 33S 00+b6 V1S 3NI-IHOIVW W-U N-NNNNN-NNxx-HS= V' EXHIBIT A-3 SCOPE OF WORK Water Quality Management Plan (WQMP) FN First Street MM Design, Bristol to Standard—WQMP Report City of Santa Ana June 5, 2026 Prepared by HDR Engineering, Inc. General Scope of Work According to this scope of work, HDR will prepare a Water Quality Management Report (WQMP) for the First Street Multimodal project (Project). The report will comply with City of Santa Ana permanent stormwater requirements. This includes basing the design on the North Orange County Technical Guidance Document (TGD) for the Water Quality Management Plan (WQMP). According to the TGD, the project(as part of street, road, highway category) is considered a Priority Project and will require preparation of a WQMP for the post construction phase. The related city WQMP template will be populated for the project. The final WQMP report will be co-signed by the engineer of record and the City of Santa Ana. The city will take over maintenance responsibilities for all installed WQMPs. Detailed Scope of Work Task 1 Draft 90%WQMP Report HDR will review the available data provided by the City of Santa Ana and the Project team. Key information to review will be previous drainage reports, hydrologic and hydraulic models of the existing drainage systems, topographic survey, as-built data, and maintenance records for the Project site. Based on discussions with the City of Santa Ana, it is assumed that Filterra treatment systems and/or equivalent proprietary modular treatment systems will be incorporated into the project design. Storm capture volumes will be prepared to inform preparation of the conceptual BMP layout. Treatment BMPs will be allocated to the Project corridor based on stormwater capture locations. In addition, the proposed BMPs will be reflected in the roadway and drainage plans including location of said BMPs, details, notes, and connection to existing or proposed storm drains, as applicable. Related technical specifications and cost estimates will be provided at the 90% and 100% design submittals. After the Draft WQMP is complete, it will be submitted to the city for review and comment. Task 2 Final WQMP Report HDR will update the WQMP based upon the comments received from the 90% submittal and any changes to the storm drain and roadway design that impact the drainage areas and WQMP calculations.WQMP information such as the calculations and BMP exhibit will be updated as needed. The proposed BMPs will be refined in the drainage plans including location of said BMPs, details, notes, and connection to the existing or proposed storm drains, as applicable). After the Draft 100% WQMP is complete, it will be submitted to the city for review and hdrinc.com HDR Engineering,Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 925.465.2700 FN comment.Once the city provides comments,those comments will be addressed to close the 100%phase.Once the WQMP is approved, HDR will complete the required Orange County recordation process. Deliverables: • Draft 90% WQMP Report(PDF) • Final WQMP Report(PDF) Assumptions • Onsite soils are not contaminated. • Filterra treatment systems or similar modular wetlands treatment systems will be utilized on the Project. • Bioswales or other natural treatment systems requiring site specific landscape design are not included in this scope of work. • Comparative BMP alternative analysis to select a preferred BMP alternative is not included. • One round of comments from the city. • If applicable, preparation of Preliminary SWPPP(PSWPPP), and SMARTS administration support, for issuance of WDID number from SWRCB/RWQCB is not included. • It is assumed that the Project will require construction phase Best Management Practices(BMPs). Construction BMPs will be included on the erosion control plans. HDR Engineering,Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 pg.2 925.465.2700 EXHIBIT A-4 SCOPE OF WORK Right of Way Engineering, Utility Coordination, Storm Drain Design, Utility Potholing Santa Ana First Street Multimodal Boulevard Project Contract Amendment — ROW Engineering, Utilities, Storm Drain Systems, and Potholes Task 5.5a ROW Engineering The HDR team will perform the following ROW engineering activities. a. Order 15 title reports to support new roadway easements. All title reports will be supplied to the city for review. b. Order 5 additional title reports to support intersection curb returns where the documented ROW does not match existing improvements. c. Perform ROW engineering to verify existing parcel boundaries for affected parcels. d. Prepare Plats and legal descriptions to support 15 new parcel takes. e. Address comments and assume one round of agency review and comment resolution on P&Ls with the city. Task 5.5b Utility Coordination The city traffic department has requested that HDR begin utility coordination with SCE. The utility coordination with SCE and other third-party utilities is expected to take 6-12 months. A budget has been identified to begin the utility coordination effort with SCE. This scope of work will include the preparation of utility impact exhibits specific to SCE facilities in order to facilitate relocation coordination with SCE and other utility owners. The budget of$40,000 has been established for attendance at coordination meetings and the preparation of exhibits between October 1 and December 31, 2026. The city of Santa Ana will take the lead on any agreements required by SCE and other third party utility owners. Task 5.5c Additional Storm Drain Design The city has requested that two additional drainage systems be included in the First Street MM design. These two systems will replace deficient systems located at the Main Street and Broadway Street intersections. The HDR design team will prepare new plans and profile design plans for these two drainage systems and include the plans in our 90% and 100% design submittals. The additional budget for this task will include plans, specifications and cost estimates for the added drainage items. The added drainage systems will be included in our drainage report with supporting hydraulic calculations. Task 5.5d Utility Potholes The HDR team will include BESS test labs on our design team as a contractor to complete 35 utility potholes. These potholes will be used to locate existing utilities at critical points along the corridor including proposed utility crossing and traffic signal locations. The utility pothole information will be supplied to the city in the form of a field report and the pothole data will be added to the First Street utility plans. Task 5.5e Contract Administration HDR will coordinate with the subconsultants and with City staff to amend or establish contracts for these tasks. This task includes time for the project manager, principal in charge and project control specialist to complete and administer these agreements in addition to day to day management of the overarching contract. Optional Task: Record of Survey At this time, it is not clear if record of survey will be required. This will be determined once titles are pulled for each property. This optional task may be needed if record of survey is required to prepare the map and associated County fees. EXHIBIT B-1 RATES AND FEE SCHEDULES 0 0 0 0 0 g g G G G : s o d a a a 6 o 6 6 6 1- m C \ / \ \ 7 \ Lo 41) 2 & 237 8 8 8 kk k _ S ] § / p ? k R 2 / ) LO E k m = # q = « ■ } - k # § 5 G 3 \ G 3 9 3 / m / # i 2 3 / 2 = m # _ _ / \ (0 \ § q = _ _ _ e # w . � \ 0 0 0 0 0 0 0 0 0 CL \ ^ / % k % CO \ CO \ m / ® a � g n ^ - � s t � \ ( / \ k \ / f / \ S / / \ / \ - ! \ e , J { o 2 $ t $ y R ] LL 0 0 0 0 0 0 0 0 0 0 0 0 M 0 0 0 0 0 u7 0 0 CD m N O O M O C7 O W �1] 07 O M N M of C M M , O V (O c W O r .--i .ti cD 2 M (D m of u7 N N 01 V N N M V EH H? cM-I o7 CO M � 44 EH H3 EH EH EA ffj fH 6? ER 11 6? �3 EA E!7 EA O - O O O o 0 0 U O O co O O OJ O O O Cl) O 10 1-00 iR to r4 V} ER ER M Lo V V W I, � .--I a f/1 co c-I co O �--i N N q V 't N N In N N ci rl S N N O � u9 N O N O � w H} y N c ti DA .O O v ow M co M N CO 00 u) O u 0 Q tst N N .O n of O� N -ITof N -IT -ITM O c to O `y N `o m � •.m � c-i c-i N V N O N O N c w �3 `y O bD m C N f y� N Nt Nw r O N N N O 0 rn O m M U O O O O a f» c m y io 0 3 � o C O G G N U o N E r a o f m m o N c m g c > U sCL E m a�i > m o m > w U m m m e m a O m 2° o w a J w G U 0 i LL ¢ f1 ¢ � L o G q / ? ? o § / ? / - - d $ a a a a g e e d - $ c / % $ - k 7 L.0 _ 7 � 2 � � R 2 2 3 _ a 3 ) 0 to � 5 g 7 \ S \ % \ 2 \ t C,4 a & � � m . j \ ) § % 9 % \ CD (.0 _ \ L _ / § ^ ) \ � a m \ It 04 & co m co LU _ \ / & C*4 $ o 0 00 o o t 2 £ _ ƒ ! co 0 0 0 0 0 0 0 0 0 L E _ t \ 1 ® \ E c & S \ 0 CY kCL ) k » � \ _ \ 2 % m \ [ k ® � \ _CY , � / % 2 % \ \ t ° J ° % % ± \ o a 2 / 2 ■ % _ § CIO. \ { \ \ ƒ � \ O O O O O O O O M M O O �t m O O I` r— 0 0 0 0 0 0 cy') co 69- O rn 00 O O N N 0 0 LO 0 0 LO 00 w O N Cl) C •• O r r- Ld Ld r Lf) O N 00 M L6 4 O Lo LO N N N N N r r VS N O N N N V> N r r 69- V) 69- 00 V> • 69 (f} 69- 6F} r M M CO M O 00- O — O O N O r_: Ls 04 N 60- 6g O O O O O It C) CD O O O O O) O Y . O 0 0 LO O N O Ld Lf) O N L6 O Lf') O N r r 6q C4 r 6s 0 69 69 69 69 6R -- J U Z O 0 � 0 ca Q � a O LL Co J O _0 Q m CO aEi o w O U -0 N U co c U O O CO) -C w m d 4 can) 0- —co E % m LU w o -0 o o U 0 0 Q QH C: 0 N O C: 0) m m O 0 "a . OO N O 0 = O j 7 a) O -t O � C O Q O O 0o -0 -0 C E m � • x O " a) >1E n = _ a� ai o ' W i i i i i Z) iU) i i iZ) O N H N LL F7 O- M M m a :3 i O Q N N N S N O M M m Q� h X oa ZK i�Uo LUO h co a N ommma Q_-2C6 No _ 00 m c N >h N t E Q M i i M Lli 0- O O m m o O a �U N t i= c) M •� Q t @ N QCo Q �=a c m c ,Z-. m e LL LL ❑ N N-C N N--C. ro a' r N U Q Cn O CO. OU,c m m m m CO Q O O Fy m h LL a i 0C') O)O-g-- LL LL OO a� com >� z c c Z Q)h Q m M M CL W U a N O Q o? Q N N C LU a Q O N O ?:U L LL LL al Z > c o.NC� c y m CU � ` c a'm a y��a W o LU p t5 m-Q Go Go Q N N Q)m Q a 2 E N Q 0 LL LL a LU IL Q c0 2y 2a�U7 00 C LU N i i . N i i co n r Q coN N d L}L L}L Z 50 �� O N °.� ° U w ~ m i N co V O W ' 000 W N N O N N N N LUO L y Vj f� LLL ' z ',I,) LL ccN CI) CO L}L co ZIY mc > m o m ° m rn co o co m Q Z > a p m C t 000 o.0 D o w o°o F- L U a' ° o a H `O V O N_ N H Oi V O N N Z +O. Q- .O d V N � a O cco to Q LLB Z a a CO > O Q y m LL 0 O ~ M c o J J >- a a ' �� F- F- U ()cvm H H J fn �- m ° m H ❑W �� o H D cn o a Q � mmy 'c O LL c ms c V Z V LV co °'.c E H .o m O O Lido 6 LU i Q) W 2 -1 c m Q Q I N a cn - k � 3F a W W O O d o Oy O co LLB a LOU iU U Q „. g "_ , U Z