Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ITERIS, INC. (4)
INSURANCE ON FILE WORK MAY PROCEED A-2026-130 UNTIL INSURANCE EXPIRES 0240 _CITY CLERK SATE: OCT 0 7 2926 0"PwyC2-) AGREEMENT WITH ITERIS TO PROVIDE DESIGN-BUILD SERVICES FOR C.>t4dr► v e 2(DZ) REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROJECT THIS AGREEMENT is made and entered into on this 15th day of September,2026 by and between Iteris, Inc. ("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California ("City"). RECITALS A. On March 11, 2026, City issued Request for Proposal ("RFP") No. 26-026, by which it sought qualified consultants to provide traffic and intelligent transportation systems Design-Build Services for Bristol Street Corridor Regional Traffic Signal Synchronization Project. B. Consultant submitted a responsive proposal that was selected by the City. Consultant represents that it is able and willing to provide the services described in the scope of work that was included in RFP 26-026. C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: 1. SCOPE OF SERVICES Consultant shall perform during the tern of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in the scope of work that was included in RFP No. 26-026, which is attached hereto as Exhibit A and incorporated by reference. 2. COMPENSATION a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Exhibit B, which is attached hereto and incorporated by reference. The total compensation for services provided shall not exceed Four Million, One Hundred and Seventy-Eight Thousand, Six Hundred and Fifty-Seven Dollars ($4,178,657) during the term of the Agreement, including any extension periods. b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. City and Consultant agree that all payments due and owing under this Agreement shall be made through Automated Clearing House (ACH)transfers. Consultant agrees to execute the City's standard ACH Vendor Payment Authorization and provide required Page 1 of 9 documentation. Upon verification of the data provided, the City will be authorized to deposit payments directly into Consultant's account(s) with financial institutions. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. 3. TERM This Agreement shall commence on the date first written above for a three (3) year term, unless terminated earlier in accordance with Section 17, below. The term of this Agreement may be extended for up to two (2), one-year periods upon a writing executed by the City Manager and the City Attorney. 4. PREVAILING WAGES Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and"maintenance"projects. If the services being performed are part of an applicable "public works"or"maintenance"project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 5. INDEPENDENT CONTRACTOR Consultant shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however,the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 6. OWNERSHIP OF MATERIALS This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consul tai Lt shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Page 2of9 Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. 7. INSURANCE Insurance requirements are attached hereto as Exhibit C and incorporated by reference. 8. BONDS Consultant shall furnish two bonds to be approved by the City, one in the amount of One Hundred Percent(100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent(100%)of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the City. Consultant shall,prior to the release of the performance and payment bonds or the retention payment, furnish a warranty perfonnance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent(10%) of the final contract price. 9. INDEMNIFICATION Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel,and representatives from liability: (1)for personal injury, damages,just compensation,restitution,judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages,just compensation,restitution,judicial or equitable relief is due by reason of the terns of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages,just compensation,restitution,judicial or equitable relief suffered, or alleged to have been suffered,by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify,hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City,regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution,judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding.Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8,the above indemnity Page 3 of 9 shall be limited, to the extent required by Civil Code Section 2782,8, to claims that arise out of, pertain to, or relate to the negligence,recklessness, or willful misconduct of the Consultant. 10. INTELLECTUAL PROPERTY INDEMNIFICATION Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States' letters patent,trademark, or copyright infringement, including costs,contained in the work product or documents provided by Consultant to the City pursuant to this Agreement. 11. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3)years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents,proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 12. CONFIDENTIALITY If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that(a)has been disclosed in publicly available sources; (b) is,through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or(e) is independently developed by the Consultant without reference to information disclosed by the City. 13. CONFLICT OF INTEREST CLAUSE a. Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. Page 4 of 9 b. No immediate family members of either the Mayor, City Council Member, or any appointed City Official, including appointed board and commission members, as defined under the City's Municipal Code, whose position with the City shall award or influence the award of this Agreement, or any competing contract or amendment thereof, shall be employed in any capacity by the Consultant or have any other direct or indirect financial benefit or interest in this Agreement. c. The section also prohibits the awarding of any agreement, contract, grant, or any amendment to those awards, to any former full-time employee for one-year from date of employee separation except for any CalPERS retiree as authorized by City Council resolution d. The Consultant must comply with all conflict of interest laws, ordinances, and regulations now in effect or hereafter to be enacted during the term of this Agreement. The Consultant warrants that it is not now aware of any facts which conflict with the prohibitions defined above. If the Consultant hereafter becomes aware of any facts that might reasonably be expected to create a conflict of interest,it must immediately make full written disclosure of such facts to the City. Full written disclosure must include, but is not limited to, identification of all persons implicated and a complete description of all relevant circumstances. Failure to comply with the provisions of this paragraph will be a material breach of this Agreement. e. Consultant covenants that none of its directors, officers, employees, or agents shall participate in selecting or administrating any subcontract supported(in whole or in part) by City funds stemming from the Agreement where the awarding of the subcontract has any direct or indirect financial benefit or interest to any individual, as defined in subsections (b) and(c) above. 14. NON-DISCRIMINATION Consultant shall not discriminate because of race,color, creed,religion, sex,marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 15. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto,the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in Page 5 of 9 addition to,the terms and conditions hereof, shall not bind or obligate Consultant or the City.Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein. 16. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultants retained by City. 17. TERMINATION This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions: a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. 18. WAIVER No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy.No waiver of any breach, failure or right,or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies. 19. JURISDICTION - VENUE This Agreement has been executed and delivered in the State of California.and the validity, interpretation, perfonnance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 20. PROFESSIONAL LICENSES Page 6 of 9 Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals,waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 21. NOTICE Any notice,tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section,to the following persons: To City: City Clerk City of Santa Ana 20 Civic Center Plaza (M-30) P.O. Box 1988 Santa Ana, CA 92702-1988 Fax: (714) 647-6956 With courtesy copies to: Executive Director,Public Works Agency City of Santa Ana 20 Civic Center Plaza (M-21) P.O. Box 1988 Santa Ana, California 92702 Fax: (714) 647-5635 To Consultant: Iteris, Inc. Attn: Steven Bradley, Regional Vice President 1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. 1f sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have Page 7 of 9 been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. 22. CALIFORNIA AIR RESOURCES BOARD (GARB) COMPLIANCE Consultant shall comply, and shall ensure all subcontractors comply, with all applicable requirements of the most current version of the regulations imposed by California Air Resources Board ("CARB") including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments ("Regulation"). Throughout the Project, and for three (3) years thereafter, Consultant shall make available for inspection and copying any and all documents or information associated with Consultant and its subcontractors' fleets including, without limitation, the Certificates of Reported Compliance ("CRCs"), fuel/refueling records, maintenance records, emissions records, and any other information the Consultant is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days' notice from the City. Consultant shall be solely liable for any and all costs associated with compliance with the Regulation as well as for any and all penalties,fines,damages, or costs associated with any and all violations, or failures to comply with the Regulation. Consultant shall defend, indemnify and hold harmless the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Regulation. 23. COMMUNITY WORKFORCE AGREEMENT Consultant shall adhere to the City's Community Workforce Agreement(CWA),a pre-hire collective bargaining agreement, which establishes the labor relations policies and procedures for Consultant to follow in the crafts persons employed to complete the Project as more fully described in the CWA. The CWA may be found on the City's website at: CWA City of Santa Ana 12-20- 2023 24. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. The Agreement is the final and complete agreement and any prior or contemporaneous agreements for similar services between the Parties is superseded by this Agreement. This shall not apply where the Parties are currently engaged and Consultant is providing services not contemplated by this Agreement. C. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. Page 8 of 9 IN WITNESS WHEREOF,the parties hereto have executed this Agreement the date and year first above written. ATTEST: CITY OF SANT N gAM pq O I� ennife �, j e.+'' Alvaro Nunez City erk City Manager APPROVED AS TO FORM: SONIA R. CARVALHO CONSULTANT: City Attorney By: � C Kyle,.*llesen By: Steven Bradley Assistant City Attorney Title:Senior Vice President RECOMMENDED FOR APPROVAL: Ro as, P.E. Acting Executive Director Public Works Agency Page 9 of 9 EXHIBIT A EXHIBIT SCOPE OF SERVICES SCOPE OF WORK Design-Build Services: Bristol Street Corridor Regional Traffic Signal Synchronization Project INTRODUCTION The Orange County Transportation Authority (OCTA) awarded the City of Santa Ana and its Partner Agencies with Regional Traffic Signal Synchronization Program (RTSSP) Project P funding under Measure M2 competitive program. The City of Santa Ana will be the lead and implementing agency for the design and construction of traffic signal improvements and optimized synchronization timing through the project corridor. The Partner Agencies on this project include the cities of Costa Mesa and Newport Beach. The California Department of Transportation (Caltrans) is not a fiscal participant in the project however the project agencies will execute a cooperative agreement with Caltrans for the implementation of optimized signal timing at the Caltrans intersections. There are no proposed physical improvements at the Caltrans signals.A project map and list of all intersections included in this project is included in Attachment A. City seeks to implement the Project through a design-build process whereby a single contract will be awarded for all design, construction, and ongoing operation and maintenance. This RFP details the Project description and includes project management, data collection, signal timing optimization and the proposed improvements that will be the basis for all subsequent design and construction services. The RFP requirements specified herein are directed to all members of the Design-Build Team including engineers, other consulting design professionals, general construction contractors, and other contractors engaged to design and/or construct the proposed improvements. PROJECT DESCRIPTION AND BACKGROUND The Bristol Street corridor is a reinvigorated project originally performed and funded by M2 RTSSP in FY 2014/2015. The Bristol Street corridor extends 10.5 miles from State Route 22 Eastbound Ramp in the City of Santa Ana to Jamboree Road in the City of Newport Beach.The main corridor encompasses 45 signalized intersections and 5 offset signalized intersections controlled by the Cities of Santa Ana, Costa Mesa, Newport Beach and the California Department of Transportation (Caltrans). The project shall be completed in two distinct sequential phases; Primary Implementation (PI) followed by On-going Operations and Maintenance (O&M), respectively. The consultant assigned the Contract or this project shall complete the PI phase within one year of Notice to Proceed. Upon acceptance of the PI phase by City of Santa Ana and a Notice to Proceed into O&M phase, consultant shall then commence the O&M phase. O&M phase shall have a duration of 24 months. Project Closeout of the project length shall occur upon receipt of Final Report, and acceptance by all Agencies. 1 Traffic signals to be synchronized along the corridor are controlled by the individual Agency owners. The Agencies along the corridor utilize several different types of controller assemblies. Controller Unit types employed within the assemblies may include various proprietary pre-Advanced Transportation Controllers(ATC) each having their own respective firmware/operating systems and characteristics; and, some of the newer ATC which is now a requirement of the Comprehensive Transportation Funding Program (CTFP) Guidelines. The respective Agencies also interface these controllers utilizing unique Advanced Transportation Management Systems (ATMS) or Master Central Systems. Per CTFP Guidelines, all ATMS to be installed or modified must comply with all applicable NTCIP standards for communications. SCOPE OF WORK The City of Santa Ana desires to retain an experienced firm (Design-Build Entity) to implement the Bristol Street Corridor Regional Traffic Signal Synchronization Project, approved by Orange County Transportation Authority(OCTA)as part of the 2025 Project P corridors from Renewed Measure M (M2). The City intends to enter into an agreement with the selected Firm for the services described herein and agreed to by both parties. Although the full scope of work shall be negotiated in the Design-Build Contract, as described herein,the selected Design-Build Entity will be expected to fulfill,at a minimum,the services and technical requirements described in the Scope of Work. The project length is approximately 10.5 miles and includes 45 main corridor signalized intersections and 5 offset signalized intersections, starting from State Route 22 Eastbound Ramp in the City of Santa Ana to Jamboree Road in the City of Newport Beach (Attachment A- Project Map and Intersection List). The participating agencies are the Cities of Santa Ana, Costa Mesa, Newport Beach and the California Department of Transportation. Caltrans is a participating agency in the project and the participating Cities are committed to executing a cooperative agreement with Caltrans for the implementation of optimized signal timing at the Caltrans intersections. There are no proposed physical improvements at the Caltrans signals. The goals of the project are to implement all the required timing and traffic signal improvements identified in the Improvement List(Scope of Work-Attachment B), to improve traffic flow, reduce stop and minimize congestion on the Bristol Street corridor. The scope of work includes but is not limited to the following: • Provide project and contract management throughout the project duration. • Provide timing and operation analysis, develop and implement optimized traffic signal synchronization timing for the corridor. • Provide engineering services to prepare plans, specifications and estimates for traffic signal equipment and related infrastructure improvements. • Upon approval by the owning Agencies and City of Santa Ana, procure, furnish and install all approved infrastructure improvements for project. • Provide construction management services to oversee the improvement implementations of the project. • Provide ongoing signal timing and maintenance support for 2-years after initial implementation of the timing. The following specific tasks are required to be performed in the course of providing service for the traffic signal coordination project. Tasks are listed in sequential order for clarity. However, tasks may run concurrently or commence prior to the order listed. 2 E. Task 1: Project Management— Primary Implementation (PI) Phase Project management is ongoing throughout the duration of the PI Phase. This task includes day- to-day project management, such as meetings, progress reports, tracking of schedules, invoicing, and overall administration of the project. The consultant is required to maintain communication to all involved agencies including OCTA as to the ongoing status of the project. The consultant acts as an extension of Santa Ana staff and will act in that capacity at meetings with the respective corridor agencies. The following list is a minimum of what is required of this task: A. The consultant shall prepare a detailed Project Management Plan that includes budget and schedule estimates for all of the tasks described in the scope of work, providing specific project milestones for review and approval. These items shall be detailed and include expected meetings, activities(by work task,whether performed by consultant team or by others), start dates, activity durations, product submittal dates, relationships among work tasks (including critical path items), and a detailed flow chart for the project tasks, and float time. The Project Management Plan shall also define the roles of the Project Manager, Project Assistant(s), and Project Manager's Reporting Contact Person, as well as their corresponding contact information. B. Consultant shall lead two distinct Project Kick-Off Meetings; one with Santa Ana and the second with all Parties. f. The first meeting will be to kick-off the project with Santa Ana; establish communication channels and protocols; discuss the Scope of Work, project schedule, and project budget; gather available information; and obtain a thorough understanding of the goals for the project. Specific topics to discuss include data collection needs, specific Traffic Signal Timing Optimization software programs specified herein, and specific construction items and procurement methodologies; intent of the original application and allowances or variants in design engineering, installation, and implementation; and project schedule. Administrative items to be discussed will include contact persons and secondary contacts for different functions of the project. Invoicing and reporting requirements on invoices with templates will be provided to consultant with explanations on how to provide monthly information on prime, sub-consultant, and vendor expenses on the invoice submittal. 2. The second meeting will be with the Consultant, City, and Partner Agencies that have signalized intersections along the Project. The focus of this meeting shall be to identify specific goals and develop effective strategy to accomplish them. The Consultant shall prepare an agenda to discuss critical tasks and schedule of work and a memorandum to document the Project goals and strategy. Data collection needs and requirements shall be outlined to the Partner Agencies. The Consultant shall notify each agency of the type of work, and when the work is to be performed within that agency. The Consultant shall notify each Partner Agency of any and all documents that need to be produced pertaining to the construction of the facilities and the coordination, including but not limited to: as-built drawings, new Plans, Specifications and Estimates (PS&E) for new construction related to this Project, 3 intersection timing charts, existing Synchro models, aerial photos, Average Daily Traffic (ADT) and Turning Movement Counts (TMC) data, etc. C. Consultant shall conduct monthly progress meeting with participating agencies. Consultant shall prepare agendas, provide status updates, discuss the progress and direction of the work, and provide minutes for all meetings. Consultant may conduct additional meetings as necessary during the course of the project to address immediate issues or needs. D. Consultant is required to make presentations as necessary to OCTA or participating agency's Council, designated Committee or interagency meetings to present project purpose and results. E. Consultant shall document and maintain separate project expenses for each participating agency. This information will be used by Santa Ana to bill Agencies for their respective project match. F. Consultant shall keep a running record of all scope changes and/or any deviations from awarded contract. This information will be used by Santa Ana to request for Scope Changes at the OCTA Semi-Annual Review. This information may be requested by City at any time. G. Consultant shall submit monthly invoices in the agreed format. Each invoice shall include a detailed progress report for the reporting month, all third-party invoices, schedule, and other backup documentation as requested by Santa Ana. Each invoice shall clearly identify the tasks worked on and percent complete. All costs accrued shall be broken down by task and Agency. All supporting documents for costs accrued shall be submitted as back-up. When applicable, the task and associated progress and costs shall be broken out and tracked by Partner Agency. H. Consultant shall ensure all third-party invoices for equipment procurement and sub- contractor work clearly identifies project name, project location, and agency. Consultant will be required to provide backup documentation such as cashed check or ACH Payment for all equipment purchases. I. The consultant shall be familiar with all relevant OCTA project delivery and documentation requirements, including, but not limited to Comprehensive Transportation Funding Programs Guidelines, Project P, and Measure M2. Consultant shall develop project schedule to ensure satisfying project delivery timelines; and advise City of all applicable OCTA requirements. The Consultant shall prepare, coordinate, and submit all necessary reporting and close-out documentations in compliance with OCTA requirements on behalf of the City. J. The Consultant shall create and maintain a file-sharing portal that shall be used for all Project correspondence, file transfer, and schedule management. Platform shall be approved by the City prior to implementation. All email correspondence shall include the City as a recipient. 4 K. Consultant shall perform required coordination, including between project team, lead agency, participating agencies, Caltrans and OCTA. Task 1 Deliverables: 1. Organize and lead Project Kick-off Meetings and prepare agendas and meeting materials. 2. Draft and Final Detailed budget and schedule. 3. Draft and Final Detailed Project Management Plan- one copy for each participating agency. 4. Monthly progress reports, including detailed status of the work effort, outlook, issues/ solutions, and updated schedule shall be e-mailed to the City. 5. Attend all coordination meetings and prepare meeting materials, including agenda, action items, graphics, presentation aides, and notes/minutes. 6. Retain and provide electronic versions of all data files as directed by the City. 7. Prepare graphics and presentation aides required for all meetings. 8. All documents provided in electronic form should be those currently used by the City: Microsoft Office and PDF files. 9. All electronic data produced for the Project shall be provided on a flash drive or file sharing portal. 10. Monthly invoices in a format acceptable to the City, shall include all third-party invoices and other supporting documentation as requested by the City. 11. All reporting and close-out documentations in compliance with OCTA requirements and any applicable regulatory agency. ll. Task 2: Data Collection Data, such as counts, field conditions, and travel time studies, collected along the project will provide the necessary insight to develop appropriate design construction documents and optimal time-of-day traffic signal coordination plans. This data will also be used to measure the effectiveness of the project. Sub-Task 2.9: Counts Since the Bristol Street corridor is part of the OCTA Countywide Baseline Project, OCTA is currently collecting traffic count data, developing traffic signal synchronization timing, and will implement and fine tune new timing for forty-two (42) agency signals along this corridor, except the Caltrans and offset signals. Therefore, counts for this project will be limited to only the three (3) Caltrans intersections on the corridor and no counts are needed for the offset signals. The Consultant shall coordinate the Data Collection task for this project with OCTA's Countywide Baseline Project. Consultant shall coordinate with Caltrans, Santa Ana and Partner Agencies to execute a Cooperative Agreement with Caltrans for this Task. Consultant shall collect, at a minimum, the following count. data necessary to thoroughly understand existing traffic conditions in the study area. A. Coordinate with OCTA Countywide Baseline Project to obtain available 24-hour mid-week and 24-hour weekend machine counts along the project. 24-hour data will be used to determine the peak hour counts and synchronization. 5 B. Coordinate with OCTA Countywide Baseline Project to obtain available vehicle classification counts at all locations where 24-hour counts are taken. C. Consultant shall conduct weekday and weekend peak period turning movement counts (TMC) at the three (3) Caltrans intersections. a. Weekday TMC counts shall be conducted for two hours of each peak period (AM, Mid-day, and PM). b. Weekend TMC counts shall be conducted for one 2-!lour peak period (either on Saturday or Sunday). Exact time and day to be determined from 24 hours counts. D. Consultant shall collect signal timing and signal priority preferences, including, but not limited to, those related to pedestrian and bicycle timing, phase sequence modifications and preferences, and special operations such as conditional service, coordination preferred phase re-service, and ring-barrier logic, as well as the timing optimization software preference at the three (3) Caltrans intersections. E. Consultant shall perform thorough field inventory of the three (3) Caltrans intersections including traffic signal controller, related hardware, geometric layout and existing timing parameters as necessary for timing analysis. F. All counts shall be summarized in Microsoft Excel format. Counts shall also be summarized in a Comma Separated Values (CSV)file in the Universal Traffic Data Format (UTDF) for direct volume import into Synchro by peak period. Copies of the raw data count sheets shall also be provided to each involved Agencies and City of Santa Ana. Sub-Task 2.2: Field Review Consultant shall collect, at a minimum, the following field review necessary to thoroughly understand existing traffic conditions in the study area. A. Consultant shall review the geometric layout, existing traffic signal equipment, and signal synchronization related infrastructure to identify any deficiencies for each intersection and along the whole corridor/route. The review shall include an assessment of the existing intersection geometry, traffic conditions, traffic signal control equipment, and telemetrylinterconnect facilities along the corridor and of each intersection using observation, available as-built plans, consultation with the local agencies, and Party supplied aerial photos. Consultant shall use a standard field form developed by consultant for this review that accounts for each piece of intersection data required. With permission of the local agencies, consultant shall inspect the interior of each traffic control cabinet, inspect the telemetry systems and determine their respective condition and make recommendations for equipment upgrades. Before and after photos of each cabinet shall be included with the field review inventory. Consultant is advised that certain infrastructure and equipment upgrades have been identified previously by the agencies and shall be a requirement of this project. These items are identified subsequently within this document. B. Consultant shall also include an identification of all planned and programmed improvements (widening projects, intersection improvements, etc.) on the study corridor. The identification of these projects should be at minimum a list summarizing all improvements. 6 C. Key components of the corridor review shall include, at minimum, the following: 1. Corridor lane configurations and lane widths; 2. Existing street and lane geometries, curbs, bus turnouts, and medians; 3. Upcoming improvements to the corridor; 4. All Traffic Control Devices related to traffic signal operations at all project intersections, approaches to cross streets, and along project corridor; 5. Traffic signal control device information, such as type of device, brand and make, condition of equipment. Intersection Photographic Documentation Log shall be required; 6. Existing signal operation characteristics- signal phasing, cycle lengths, phase sequence alteration, and protective-permissive, etc.; 7. Crossing Arterial Coordination Operations 8. Crossing Arterial or Street with adjacent intersections within 2700 feet of project unless specifically made not part of the approved, project specific, supplemental application by OCTA. 9. Existing controller and telemetry/interconnect equipment, if any. Note if to be reused; 10. Existing time-referencing setup, if any; 11. Existing Central Master Equipment, if any. Note if to be reused and modified, salvaged and/or new; 12. Existing Field Master Equipment, if any. Note if to be reused and modified, salvaged and/or new; 13. Open each controller cabinet and take digital photos of all equipment inside before and after the installation of new equipment. 14.. Note any deficiencies of traffic control equipment at each intersection; and 15. Note the maintenance condition or existence of the traffic signal equipment, controllers and synchronization related infrastructure. D. Consultant shall also investigate factors that are expected to affect signal progression including, but not limited to: intersections with high pedestrian or bicyclist volumes; over- saturated intersections; uneven lane distribution; high volumes of trucks and buses; high-volume unsignalized intersections, including interchanges; parking maneuvers; presence and location of bus stops; differing signal timing patterns among agencies; etc. E. With the goal of assisting, enhancing, and improving the traffic operations along this corridor, consultant shall identify any deficiencies of the existing traffic signal control and telemetry infrastructure and geometric layout, and provide recommendations towards simple solutions that may be implemented to correct such deficiencies. Consultant shall prepare a report summarizing the findings of the field review. Consultant shall prepare a report summarizing the findings of the data collection and field review completed as part of this task. This report will be incorporated into the Project Report (Task 5). 7 Sub-Task 2.3: 'Before' Travel Time Studies Travel time studies will be used to measure the effectiveness of the project improvements and timing plans. At a minimum, consultant shall conduct the following travel time studies to measure the traffic conditions prior to the development and implementation of new timing plans. Since the Bristol Street corridor is part of the OCTA Countywide Baseline Project, OCTA is currently collecting count data, developing traffic signal synchronization timing, and will implement and fine tune new timing for all forty-two (42) agency signals along this corridor. Concurrently, this project will collect data, develop traffic signal synchronization timing, and implement and fine tune new timing for the three (3) Caltrans signalized intersections along this corridor. The Consultant shall conduct Before Travel Time Studies for all forty-five (45) signals along Bristol Street corridor. The Before study shall be carefully coordinated with OCTA's Countywide Baseline Project. A. Project travel-time data shall be collected using the floating car method, a laptop computer, a GPS receiver unit, and Tru-Traffic. B. Consultant shall complete, at least, five (5) runs in each direction for each of the three weekday timing plans (AM, mid-day, and PM) and one Saturday mid-day plan. Number of runs shall be consistent for both directions and time periods. Based on engineering judgment and in conjunction with approval, consultant should subdivide the corridor into contiguous segments for the 'Before' and 'After' runs. Consultant shall notify and receive approval from Santa Ana on number of runs and contiguous segments to be accomplished. C. Consultant shall conduct a 'Before'field study report representative of the times and days for which synchronization plans will be developed. The report shall identify Measures of Effectiveness (MOE) to evaluate the effects of the synchronization plans. D. MOE's to evaluate shall include, at a minimum, traffic flow, travel time, average speed, number of stops per mile, number of intersections traversed on green vs. stopped by red (Greens per Red) (note:Average Speed, stops per Mile, and Greens per Red are the new OCTA MOE, Corridor Synchronization Performance Index(CSPI)), fuel consumption reduction, pollution reduction, and other pertinent items. E. The CONSULTANT shall include the CSPI as part of the MOEs as they are easily identifiable by lay persons relevant to demonstrating corridor improvements. The identified MOE's shall be compiled for the corridor using the floating car method and from latest Synchro and from Tru-Traffic. F. Consultant shall prepare a memorandum and present the findings to Santa Ana and partnering agencies outlining the findings of the 'Before' field study. 1. The report shall identify MOE to evaluate the effects of the synchronization plans. The identified MOE's shall be compiled for the corridor using the floating car method and from latest Synchro and from Tru-Traffic. 2. The report shall address likely optimization strategies for signal synchronization, specifically focusing on how to consider PROJECT optimization: end-to-end vs. coordinated zones. 3. Ideally, the analysis should include the floating car data and data collected as part of Task 2. However draft versions of the report can include previously collected traffic, travel time, or other data, if considered relevant and available, until the full set of data collected by CONSULTANT as part of Task 2 is available. 4. The memorandum shall provide a very good understanding of traffic patterns on PROJECT throughout the weekdays and throughout the weekend. The CONSULTANT shall perform due diligence with regard to existing and proposed timing operations on arterials that intersect with the PROJECT. 5. Tru-Traffic has the OCTA CSPI calculation formulas available for use, as well as the calculations for the latest emissions for GHG and other MOE's. 6. CONSULTANT shall finalize the memorandum based on comments received from Santa Ana and other involved agencies. G. Consultant shall present to the project team the traffic patterns on project scope and possible synchronization strategies to address the traffic patterns (optimizing the fill corridor versus optimizing segments identified with natural traffic breaks) to provide direction on the preferred signal timing strategy.Any requested presentation shall include as much of the turning movement, 24-hour machine counts, travel time, earlier city counts, etc. as available. Sub-Task 2.: 'After' Travel Time Studies Following the implementation of all system and timing enhancements, consultant shall schedule 'After' travel time studies to measure the effectiveness of the project. Since the Bristol Street corridor is part of the OCTA Countywide Baseline Project, OCTA is currently collecting count data, developing traffic signal synchronization timing, and will implement and fine tune new timing for all the forty-two (42) agency signals along this corridor. Concurrently, this project will collect data, develop traffic signal synchronization timing, and implement and fine tune new timing for the three (3) Caltrans signalized intersections along this corridor. The Consultant shall conduct After Travel Time Studies for all forty-five (45) signals along Bristol Street corridor. The Consultant shall coordinate the After Travel Time Studies with OCTA's Countywide Baseline Project. A. The consultant shall conduct an 'After' field study representative of the times and days for which synchronization plans were developed. The 'After' study must be conducted in the same manner and contain the same MOE's as the'Before' study in order to evaluate the improvements of the synchronization plans. B. At least five (5) runs will be completed in each direction for each of the three weekday timing plans (AM, mid-day, and PM), and at least five (5) runs will be completed in each direction during the Saturday midday plan. 9 C. Project travel-time data shall be collected using the floating car method, a laptop computer, a GPS receiver unit, and the methodologies and software to match the 'Before' study, exactly. MOE's should be compiled for the optimized corridor using the floating car method output in latestTru- Traffic and then from Synch ro/S imTraffic. D. Consultant shall prepare a memorandum comparing the results of the 'Before' and 'After' field study with reference to the specific MOE's. The report shall specifically give data on total project cost for the PI along with a one-year and three-year projection on benefit to cost. Consultant shall present the findings to the Board. E. Consultant shall finalize the memorandum based on comments from City of Santa Ana and involved agencies. GHG calculations shall be performed and incorporated into the memorandum and Final Report. City of Santa Ana may request a presentation on the comparison of the 'Before' and 'After' conditions along the PROJECT. Any requested presentation shall include visuals and short summaries of overall project achievements that can be quickly understood by staff of all levels. Deliverables -__121k_2.: 1. Report summarizing data collection and field review efforts, including intersection turning counts, traffic collision analysis, current traffic signal timing patterns, drawings and photos of intersection features, and recommended mitigations to perceived problems. 2. Deliverable of drawings, photos, and counts to Agencies shall be limited to political boundaries. 3. Draft and Final Memorandum documenting the results of the 'Before' study is to be distributed to City of Santa Ana and Partner Agencies as a discussion item. 4. Draft and Final Memorandum comparing the results of the 'Before' and 'After' studies, including benefit-to-cost ratio, to be distributed to City Santa Ana and Partner Agencies as a discussion item. 5. Electronic versions of all data files and memorandum to City Santa Ana and Partner Agencies. 6. Presentation to the City Santa Ana and Partner Agencies of the 'Before' and 'After' study comparison. Ill. Task 3: System Design and Construction Consultant shall prepare any design construction documents in the form of full-fledged Plans, Specifications, and Estimates (PS&E). Consultant shall prepare such plans for use in the construction of the project per each respective agency standards. Consultant shall supply such documentation to City of Santa Ana and the agency owning the affected facility for approval prior to commencing any construction. Sub-Task 3.9: Design Plans and Standards Consultant will be required to design, procure, install, construct, and implement all desired components of the project as described in List of Improvement (Scope of Work- Attachment B). 10 At a minimum, consultant shall generate design plans as follows to ensure appropriate construction documents are developed to capture all improvements desired by the Agencies. A. Consultant will work directly with City of Santa Ana and Agencies at the outset of conceptual design to affect the most cost effective and time sensitive approach to design plans. B. Consultant shall coordinate with each Agency of the project to assess special construction requirements, needs and desires, either known and proposed or previously unforeseen or unknown but necessary to complete the project. 1. Conduct all required utility research and coordination for project, including ownership, information requests, preliminary notices and final notices. The Consultant shall identify any required relocations. 2. Survey existing conditions to locate existing improvements. Survey data collection should extend outside project limits sufficiently to plot joins to existing improvements, verification of unimpeded intersection sight distance triangles, and others. 3. Existing right-of-way limits and easements shall be identified and shown. Any required temporary construction easements shall be identified. 4. Prepare and submit permit applications to each regulatory agency required for plan approvals. Permit application fees will be paid by the City with proper documentation. Anticipated permits: 1. Encroachment permits from Caltrans 2. No-fee encroachment permits for work within each Partner Agency's right-of-way. May require obtaining a City Business license for each respective Agency. 5. Individual agency design blocks (if available), preferences, standard plans and specifications will be provided to the awarded consultant. C. Consultant shall provide design services for interconnect plans along the project route. The interconnect plans may be submitted as high quality detailed aerial plans at 1" = 40' scale. The plans shall include, but not be limited to, all utilities, locations of control and communications cabinets, conduit runs, pull boxes, RIW and roadway centerlines, North Arrow, etc. The interconnect plans shall also provide terminations details at each signalized intersection and show the communication path from each intersection to a communications hub (if any) and to the appropriate Agency Traffic Management Center (TMC). All connections and terminations shall be indicated. D. Consultant shall provide design services for traffic signal modification plans at intersections where minor phasing or other electrical changes require an "as-built"drawing record change for the intersection. Plans shall be drawn at 1"= 20' scale and include all details described in A above. 11 E. Plans shall be prepared in the latest version of MicroStation and/or AutoCAD software per each respective agency CAD standards. F. Coordinate review of PS&E with each Partner Agency, within jurisdiction, at each level of design. All comments shall be tracked and addressed at each subsequent level of design. G. Comply with all laws, rules and regulations concerning environmental permitting. K Consultant shall prepare maintenance related memoranda listing field conditions, maintenance, and design recommendations at the 60% submittal stage. Consultant shall also prepare an updated engineer's cost estimate to achieve desired and intended operation. Consultant shall negotiate with City of Santa Ana and Agencies to determine what shall be installed and implemented to maintain budgetary control. 1. All work and equipment supplied and/or necessary for project, including all labor and material and insurances,to make project operate as designed and intended shall be included in the lump sum price for project. All work and equipment including labor, material, and insurances for maintaining and operating existing electrical facilities including communications equipment shall be included in the lump sum price for project. 2. All work and equipment including labor, material, and insurances for utility location including potholing shall be included in the lump sum price for project. 3. Consultant shall contact each appropriate Agencies inspection services division to determine inspection costs that might impact project budget. 4. Electrical energy service costs and regular maintenance costs for project facilities under construction shall be borne by the owning Agency. Replacement and/or maintenance costs for project facilities caused by or from damage or negligence from public or Agency shall be borne by the owning Agency. Replacement and/or maintenance costs caused by or from damage or negligence on the part of consultant or sub- consultants, and/or vendors shall be borne by consultant. I. Prepare PS&E package for 60%, 90% and Final level of design. J. Consultant, at the Final Level submittal stage, shall provide all construction documents, including ITS design plans and a list of associated equipment, interconnect design plans and fiber strand splicing/termination diagrams to achieve desired and intended operation. K. Consultant shall prepare scope change documents for submittal to OCTA at the semiannual review for any changes to the improvements listed on the original grant application. 12 Sub-Task 3.2: System Construction and integration All work and equipment supplied for the project shall comply and be done in accordance with the latest standards and provisions of each Partner Agency, latest approved California Department of Transportation (Caltrans) Standard Plans and Standard Specifications, the Standard Specifications for Public Works Construction (SSPWC), as directed by Agency. Individual Agency standards for construction of infrastructure will be provided to consultant. A. Only when Partner Agencies and the City of Santa Ana approves final design plans or provides written approval to proceed with system construction and integration, shall consultant begin the procurement and mobilization of system improvements on the project. B. Consultant shall work directly with City of Santa Ana and Partner Agencies to schedule, construct, and inspect the improvements implemented for this project. 1. NEC Certification is required for all persons who perform work as electricians for contractors licensed as Class C-10 electrical contractors under the Contractor's State License Board Rules and Regulations. 2. The Contractor shall keep the traffic signal system in operations at all times during construction except for the approved switchover shutdowns described below. 3. Traffic Signal shutdown shall be limited to four-hour periods between the hours of 9:00 a.m, and 3:00 p.m, on weekdays (Monday through Thursday), except as authorized by owning Agency. 4. Turn-on of new or rewired traffic signals, or those with a new controller cabinet shall only be scheduled for hours between 9 a.m. and 12 p.m. and shall not begin the functional test on a Friday, weekend, holiday or any day preceding a holiday, except as authorized by owning Agency. The Inspector shall be notified at least five (5) working days before the intended turn-on and provide method and schedule of turn-on procedure. 5. The Inspector shall be notified a minimum of two work days in advance of planned connection of the new or modified traffic signal to the traffic signal communications system, if the new or modified traffic signal is to be connected to the traffic signal communications system. & The contractor shall submit material submittals for approval prior to the start of construction or some cases, before manufacturing. 7. The Contractor shall be responsible for all electrical service details, coordinating and scheduling of work and necessary connections in advance of need. 13 8. The Contractor may perform sub-surface work consisting of the installation of conduit, and foundations, prior to receipt of all electrical materials and equipment. 9. Above-ground signal work shall not commence until such time that the contractor notifies the City of Santa Ana, in writing, of the date that all electrical materials and equipment are received and said work shall start within 15 days after said date. 10. All excavated material shall be removed from the site and backfilled with compacted crushed aggregate base material topped with temporary asphalt concrete on the same working day as removed. 11. All striping, pavement markings, and signing shall be in place prior to signal turn- on and/or opening of street to public travel. C. Consultant shall be responsible for performing or scheduling necessary testing, as specified by the Caltrans Standard Specifications, of all equipment procured for project. 1. All performance testing relative to tasks performed on this project shall be performed by an inspector determined by the owning Agency of the equipment being delivered or installed. 2. Testing of any traffic controller assemblies or traffic controller units shall be done per the policy at the direction of the owning Agency. All costs involved with testing shall be borne by the consultant. D. Unless noted by owning Agency or City of Santa Ana, consultant shall be responsible for the configuration and integration of all devices implemented on project. E. Traffic Management Center(TMC) Improvements Consultant shall be responsible for the procurement, installation and integration of the TMC improvements for each respective Agency as detailed below. 1. Santa Ana Established nearly 35 years ago, the TMC currently operates from an aging facility that is physically separated from the personnel responsible for its daily management. This project proposes relocating the TMC from the 3rd Floor of City Hall to the 4th Floor of the City Hall—Ross Annex Building to enhance operational efficiency through co-location with core staff. As part of a separate, City-led effort, the City of Santa Ana will demolish the existing Remote TMC on the 4th Floor of the City Hall—Ross Annex, including removal of the cubicle wall system, furniture, and ceiling-mounted video wall. The City will also construct the new TMC infrastructure, including walls, windows, doors, electrical systems, lighting, and HVAC. The completed TMC space will be fully equipped to support and integrate new equipment to be installed as part of this project. This works is schedule to start in early Fall 2026. Consultant shall be 14 responsible for carefully coordinating the TMC improvements with the construction of the TMC infrastructure. Consultant shall procure and install the following improvements: 1. Remove and Discard decommissioned equipment at Main TMC on 311 Floor City Hall including video wall, server racks, fiber optic cables, and network cabling. 2. Coordinate with City Staff to relocate existing servers and work stations from Main TMC on 3rd Floor City Hall to New TMC. 3. Furnish and Install 288-SMFO from Vault just outside City Hall Entrance to New TMC. 4. Splice New 288-SMFO TMC Fiber Optic Cable to existing Field Fiber Optic Cable in new splice enclosures as necessary. 5. Furnish and install new Corning Fiber Distribution Unit and terminate all new Fiber Strands at New TMC. 6. Furnish and Install two (2) new Server Racks at New TMC Server room. Server racks shall be bolted down to floor. 7. Furnish and Install three (3) new Furniture Consoles at New TMC 8. Furnish and Install three(3) Dell Precision Tower Workstations with Intel@ XeonO W5-2465X (16 cores) or approved equivalent and Monitors at New TMC 9. Furnish and Install Planar Clarity Matrix G3 (6x2 55")Video Wall System including Video Wall LCD's, mounting system, server processors, rack, Software, Video Extenders, Power Supply, cabling and all ancillary materials needed for the intended operation. 10. Furnish and Install APC Rack Mounted UPS—APC Smart APS Ultra Line Model#SRTL3KRM 1 UC with two (2)APC Ultra External Batter Pack Model#SRTL50RMBP1 U-LI 11. Furnish and Install Econolite.Centracs ATMS License (350 Traffic Signals, 3 year license) The Consultant shall collaborate with City of Santa Ana staff to define and refine the final scope and details of the TMC improvements. Documentation of the existing TMC layout and system architecture, along with the conceptual design proposed for the relocation, is provided in Attachment C. The Consultant shall use the conceptual plan as the basis for development of the final design. 2. Costa Mesa Consultant shall procure and install the following improvements: 1. Furnish and Install two (2) Dell Precision Tower Workstations with Intelt Xeon®W5-2465X (16 cores) or approved equivalent. 2. Furnish and Install Econolite Centracs ATMS License and Support (135 Traffic Signals, 3 year support) 1 Furnish and Install Dell Server fully equipped to support Econolite Centracs ATMS software 15 4. Furnish and Install Core TMC Layer 3 Ethernet Switch- Etherwan EG97023-2VZ(wf Ten (10) 10GB SFP's and Power Supply) 5. Furnish and Install Layer 3 Ethernet Switch at Newport Boulevard/Fair Drive HUB for connection back to TMC- Etherwan IG5-08164-CIN (wlTen (10) 1GB, Four(4) 10GB SFP's and Power Supply) 6. Furnish Field Rugged Laptop Dell Pro Rugged 14 Laptop configured with Econolite Local Edition Software 7. Furnish and Install TMC Furniture—Two (2) Herman Miller Aeron Chairs 8. Furnish and Install NTP Server- Masterclock NTP100-GNSS wl maximum length coax GPS antenna for outdoor installation 9. Furnish and Install Genetec VMS License- (30 cameras, 3-year support) 10. Furnish and Install APC Rack Mounted UPS—APC Smart UPS, 2200VA, 120V with SmartConnect Port. Model## SMTL2200RM2UC IL Sub-Task 3.3: Construction Management A. Consultant shall provide Agencies with construction management support throughout the system construction stage of project. The Consultant shall provide professional construction management services, including inspection, quality control, Critical Path Method (CPM) schedule management, utility coordination, and administration services during construction. Work shall be performed in accordance with City of Santa Ana standards of practice. The Consultant shall respond to all requests for information (RFIs), review shop drawing and material submittals, plans, and any other Project related documents. The Consultant shall assist the City with reviewing and negotiating proposed Construction Change Orders. The Consultant is expected to support the Project Construction Contractor with system integration (including, but not limited to instaliinglimplementing and integrating all hardware and software) during the construction phase of the project. The Consultant is expected to coordinate with the Construction Contractor for installing and/or integrating new traffic signal controllers and cabinets, communication hardware, communication equipment, ITS equipment, etc. During construction, each agency will provide construction inspection services for those components subject to agency inspection. However, overall construction management will be required of the Consultant. Construction management services include Pre- Construction meeting, Construction Phase: 1. Arrange and conduct Pre-Construction meeting, inviting the Project Manager, Inspector, public utilities, private entities, general contractor and other project 16 stakeholders. Prepare minutes of Pre-Construction meeting for distribution to all attendees. 2. Provide and maintain sufficient field personnel to administer and manage construction. 3. Review construction schedule, including activity sequences and duration, schedule of submittals and delivery schedule of long lead materials and equipment. Review contractor's update and revisions as may be required to reflect actual progress of work. 4. Schedule and conduct progress meetings to discuss contract issues, procedures, progress, problems, change orders, submittals, request for information (RFIs), deficiencies and schedules. Prepare minutes of progress meetings for distribution to all attendees. 5. Investigate field problems affecting property owners and contractors. 6. Process, review and coordinate with City and Partner Agencies to approve contractor's submittals 7. Process, review and track RFis, submittals, shop drawings, proposed change orders and revisions. 8. Review and evaluate proposed change orders. Review estimates for reasonableness and cost effectiveness and render recommendations to City. Conduct negotiations with contractors and resolve problems. 9. Maintain cost accounting records on authorized work performed under contract unit costs and additional work performed based on actual costs of time (labor) and materials (T&M). 10. Review contractor submittals for extra or unforeseen work. Review potential Construction Change Orders (CCO) for accuracy and provide recommendations) to City staff for proper course of action and processing of CCO's. 11. Develop a reasonable cost control system, including regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes. 12. Assist City in coordinating services of other consultants that may be hired or selected for the project. 13. Respond to contractor's requests for interpretation or clarification of meaning and intent of project plans and specifications. 14. Establish and implement job safety procedures in compliance with CAL-OSHA requirements. Monitor contractor's compliance with established safety program, respond to deficiencies and hazards, and investigate and report on accidents. 15. Track quantities of work completed for progress payments. Develop and implement procedures for review and processing of progress payment applications. Assist City with review and certification for payment. 16. Establish procedures and monitor contractor compliance with state prevailing wage regulations and requirements. 17. Assist City in preparing and processing OCTA reimbursements. 18. Maintain a complete project filing system, including records of all changes and field notes. Filing system shall be in accordance with City procedures. Post-Construction Phase: 1. Evaluate completion of work and recommend to City when work is ready for final inspection. 2. Conduct final inspection/walk through with agency staff. 17 3. Coordinate with Inspector final punch list, including schedule for punch list completion. Monitor and follow through with contractor until completion of all punch list items. 4. Secure and transmit required guarantees, certifications, affidavits, leases, easement deeds, operating & maintenance manuals, warranties and other documents as stipulated in contract documents. 5. Secure and provide neat and orderly material sheets, inspection reports 6. Review and process contractor's request for final payment and release of retention. B. Consultant shall note any modifications, additions, or repair of missing or damaged signal synchronization infrastructure and other assets to be determined. Any changes desired during construction shall be documented and presented to the Agency and City of Santa Ana for approval. A. Consultant shall provide the appropriate warranties and guaranties for all procurement items. Manufacturers' warranties and guaranties furnished for materials used in the work and instruction sheets and parts lists supplied with materials shall be delivered to the owning Agency prior to acceptance of the project. B. Upon completion of construction and acceptance by owning Agency, consultant shall schedule a field visit to document final improvements and photograph final conditions of all devices implemented as part of project. C. Consultant shall prepare as-built plans for any and all improvements that required design plans for project in Sub-Task 3.1. D. At the conclusion of construction, produce As-Built record drawings in both electronic and hard copy format of all improvements. The electronic copy shall include both original file format (AutoCAD/ MicroStation) and PDF. Hard copy shall include one full size (36,,x24") set of plans, on mylar for City records and one set on bond paper. A copy of both formats (electronic and hard copy) shall be provided to each Partner Agency. Deliverables - Task 3: 1. Utility coordination documents and records, including all letters of requests, responses, as-built drawings, utility logs, Preliminary and Final Notices. 2. All permit application submittals and final issued permits. 3. Plans, specifications and estimates for 60% and 90% level design, in both hard copy and electronic copy format. Copies of each level of design shall be provided to each Partner Agency. 4. Review Comment and Resolution tracking log, in Excel format. 5. Original files of the PS&E for each level of design (60%, 90% & Final), including MicroStation/AutoCAD files, Word and Excel files. 6. Any design and quantity calculations. 7. Final PS&E package, signed and stamped by a California Licensed Professional Engineer. 18 8. Final PS&E package shall be in both electronic and hard copy. Electronic file shall be in PDF format. Hard copy shall include one full size (36"x24") set of plans, on bond for City records. Copies of Final design shall be provided to each Partner Agency, 9. Maintenance Memorandum during 60% submittal stage 10. Updated Cost Estimate for any additional improvements not included in this document 11. Procure and install any and all equipment as specified, and/or necessary, to make the proposed systems operate as originally intended, per this Scope of Work and Attachments or Appendices. 12. Negotiate with City of Santa Ana and Agency representatives on alternative procurements or substitutions as deemed necessary during the course of the project. 13. All WARRANTIES and GUARANTIES as specified. 14. All documentation shall be supplied to City of Santa Ana and Agencies in two hard copies and electronic copies. 15. Construction engineering and management records and files, including, but not limited to: a. Pre-Construction meeting agenda and notes b. Construction progress meeting minutes and notes c. Submitted shop drawings and materials submittals and subsequent reviews and responses d. Contractor correspondence e. Contract change order requests, calculations, estimates and documentation f. Compilation of all relevant inspection reports and photos g. Tracking of quantities of work completed and progress payments records and calculations h. Guarantees, certifications, affidavits, leases, easement deeds, operating & maintenance manuals, warranties and other documents as stipulated in contract documents i. Electronic versions of all files, organized and compiled in a logical manner. 16. Final As-Built record drawings in both hard copy and electronic format; provided to each Partner Agency. 111. Task 4: Signal Timing Optimization and Implementation The project aims to improve efficient traffic operations along the regional corridor for all modes of transportation. As part of this task, consultant will evaluate existing timing conditions, generate, implement and fine-tune recommended optimized signal timing plans based on available data and improvements planned in the project. Guidelines and standards for signal synchronization continue to evolve with the innovations in technology. City of Santa Ana encourages consultant to present progressive and forward-thinking optimization solutions for more efficient operations on this project. As stated in Task 2, this corridor is part of OCTA's Countywide Baseline Project which is currently collecting data, developing traffic signal synchronization timing, and will implement and fine tune new timing for all the forty-two (42) agency signals along this corridor, except the Caltrans and 19 offset signals. Therefore, Signal Timing Optimization and Implementation for this project will be limited to only the three (3) Caltrans intersections on the corridor and no timing optimization needed for the offset signals. The Consultant shall closely coordinate Signal Timing Optimization and Implementation with OCTA's Countywide Baseline Project. Consultant shall coordinate with Caltrans, City of Santa Ana and Partner Agencies to execute a Cooperative Agreement with Caltrans for this Task. Sub-Task 4.1:Base Network A. Consultant shall work with the City of Santa Ana, Caltrans and Partner Agencies to develop a model of the three (3) Caltrans intersections and study area and calibrate the model based on field observations of existing conditions. B. Signal synchronization of existing and optimized networks shall be conducted in latest Synchro software. The consultant must be cognizant of the version of Synchro that the receiving Agency is using and provide any files in that version. C. The corridor model must be consistent with all aspects and seamlessly interface with the Countywide Baseline Project. The project shall be developed with latest Synchro and shall be easily imported and/or exported to and from those programs' respective database. It is recommended that the consultant utilize a GIS shapefile layer as the background from Synchro in the development of the base layout files. L a t e s t Tru-Traffic Software version should be used, subsequent to initial optimization, to augment and enhance green band throughput (offset, splits, phase rotation); and, to incorporate specific off band coordinated traffic platoons into the corridor operation as required by data analysis and field observations. Sub-Task 4.2: Bask Timing Review A. The consultant shall gather standards, guidelines, and preferences for basic timing parameters, including walk, pedestrian clearance, yellow, all red, and bicycle clearance. B. Consultant shall prepare excel tables for each Caltrans intersection on the corridor showing both existing and proposed pedestrian walk, pedestrian clearance, yellow change, and all red clearance intervals based on Agency preference and guidance. Timings will be used in optimized timings analysis and set on control systems in the field during implementation, if not already set. C. Consultant shall receive written approval of final recommended basic timing parameters from all Agency prior to proceeding with optimization of the corridor. Sub-Task 4.3: Concept of Operations A. The consultant shall, in concert with all Agency members, develop a Concept of Operations (CONOPS) for all time periods including AM, MID, PM, Weekend, and FREE operational patterns or plans. CONOPS shall provide operational procedures, plans, and 20 strategies on how the traffic should flow optimally for all directions providing as many successive greens as possible to the motorist whether on the primary coordinated band or traversing from a primary coordinated band to another coordinated band or vice versa, Planned Stops will be allowed only as a last resort and must be approved by the PTF prior to implementation. B. CONOPS shall consider all special generators and known congestion points/areas such as freeway interchanges, schools, or shopping centers and analyze them for specific circulation flows and conditions that may require special plans or queue mitigation (flush) operations. For Diamond Interchanges, when possible, off ramp phase single entry operations coupled with coordinated phase through band with offset off ramp band flows should be employed for both directions. Dependent on spacing between off ramp intersections, dual entry operations may be appropriate. C. Consultant shall present from 2 to 3 timing plan operational scenarios dependent on coordinated and crossing arterial traffic conditions for timing plan implementation and the "when", "who", and "how". These scenarios will be part of the initial presentation of the corridor existing conditions, proposed groupings and cycle lengths report. Sub-Task 4,4: Coordinated Optimized Traffic Signal Timing A. Based on a consensus developed from discussions of the scenarios presented and then approved by the Agencies, the consultant shall prepare Coordinated Optimized Traffic Signal Timing Plans for the three (3) Caltrans intersections. B. Consultant will measure the saturation flow rates at key project intersections during one peak hour where the overall intersection volume-to-capacity ratio is greater than or equal to 0.8 as a calibration for the Synchro model. Timing parameters shall provide adequate crossing time to accommodate pedestrians within the phase split. C. Consultant shall develop an operational model within latest SimTraffic Version. The operational analysis will be used to micro-simulate and analyze specific roadway segments with queuing, spill back, starvation, storage blocking, and other queuing interactions, and to analyze and mitigate the conditions discovered by consultant and/or City of Santa Ana and Agencies in field reviews. D. Consultant shall develop optimized signal timings using the results from Synch ro/S i mTraffic, in conjunction with Tru-Traffic and recommend any changes to the signal phasing at each signalized intersection that may improve the efficiency of operations. Output of the modeling software shall not be utilized without proper QA/QC. Engineering judgment shall be utilized to determine final operational parameters. The recommended signal timing plans shall be reviewed by the City of Santa Ana and local Agency staff, 1. Consultant shall prepare, at minimum, three (3) timing plans for a typical weekday which consider the following peak periods: AM PEAK, MID-DAY PEAK, PM PEAK and one (1) Limii g plan for a typical Saturday/Sunday MID- 21 DAY PEAK. Timing plans should be in Synchro, Tru-Traffic, and the preferred timing chart format of Caltrans or each local Agency. 2. Consultant shall prepare, special plans for congestion mitigation based on scenarios approved by the Agencies. E. Consultant shall prepare a memorandum detailing the proposed signal timing optimization and implementation plans for Agencies and City of Santa Ana to review and approve prior to generating timing charts for implementation and fine-tuning. Sub-Task 4.5: Signal Timing Implementation and Fine-Tuning Upon approval of the optimized signal timings by City Santa Ana, Caltrans and Agencies, consultant, at a minimum, shall prepare for new timing implementation and fine-tuning as follows. A. Consultant shall prepare timing charts for each the three (3) Caltrans intersections on the corridor showing the implementation-ready timing parameters based on Agency preference and guidance. These parameters may include, but is not limited to, approved basic timing, sequence, coordination pattern, action plan, day plan, schedule plan, and time of day function. B. Consultant shall implement or assist Caltrans staff in the implementation of new signal timings either through the central traffic signal system (if available) or direct implementation at the intersection controller units. Consultant shall use existing traffic signal interconnection systems, where they exist, and, as a result of the inter- jurisdictional nature of the project, shall implement time-based signal coordination techniques across signals controlled by different Agencies. Updated timing sheets containing the most current controller timing shall immediately be placed within the controller assembly and timeldate stamped and signed by the City designate. C. As the project will be using time-based signal coordination, the consultant shall evaluate the current time-referencing of all traffic signal controllers and recommend a corridor-wide strategy to ensure that all traffic signal controllers are on synchronized time clocks linked to a master time source. Consultant shall verify that all Central Master or Local Field Master, and/or Local Controller unit clocks are: 1. Operating properly and are synchronized; 2. Referencing Coordinated Universal Time (UTC) and the reference for all cycle length calculation shall be 12:00 AM (midnight). D. Consultant shall fine-tune, or assist Caltrans staff in the fine-tuning of, the new settings and timings. Consultant shall fine-tune timings in the field and record all changes. Fine- tuning shall be conducted during times and days that are representative of the times and days for which coordination plans were developed. 22 E. Consultant shall collect detailed notes of any and all implementation and fine-tuning activities by Agencies to include in the Project Report. F. Consultant shall utilize Tru-Traffic software on a laptop with appropriate GPS device and use the floating car method utilized in the project 'Before' Study to fine-tune the corridor operation and verify integrity of system intersection clocks. Synchronized Video shall be used to compare actual conditions to anticipated conditions dictated by the Tru-Traffic time- space diagram so that any anomalies may be corrected prior to the 'After' studies task. ®ellverables - Task 4: 1. Excel Files of pedestrian and vehicle clearance intervals, 2. Concept of Operations Report including Scenarios Report. 3. Memorandum documenting the signal timing optimization and implementation. 4. All optimized and synchronized traffic signal timing plans, including existing corridor conditions and improved corridor conditions customized. 5. Field implementation of optimized traffic signal plans for existing corridor conditions, including all required fine-tuning. 6. Electronic versions of files from all Traffic Signal Modeling Software programs used in project. 7. Electronic versions of all other data files and memorandums. 8. Deliverables of final plans of other participating neighbor Agency to each participating Agency for timing shall only be the coordinated timing intervals and time of day plans. And, they shall be limited to one to three signalized intersections on each side of their respective political boundaries or as approved by participating neighbor Agency. IV. Task 5: Project Report A. Consultant shall prepare a Project Report with an executive summary. The report shall provide complete documentation of the project, including, but not limited to: 1. Project scope, objectives, locations, findings, and recommendations 2. Data collected: counts, travel time studies, and project benefits achieved in terms of fuel savings, travel time, and other measurable parameters 3. For each intersection: lane configurations, signal phasing, turning movement data, and cycle lengths for existing and proposed timings for all peak periods 4. All work performed for system construction and signal timing optimization 5. Implementation schedule and improvements accomplished, including dates 6. Procedures for continuing maintenance, surveillance, and evaluation of the coordinated signal system The report shall document all planned and programmed improvements on the study corridor as well as recommendations based on PI tasks for further infrastructure improvements that would likely improve the corridor signal coordination project results. Consultant shall present the final report and results of the project to the Santa Ana and Partner Agencies. The report shall be completed in accordance with the current CTFP Guidelines. 23 Finally, the report shall provide recommendations with cost and benefit estimates for future improvements to traffic signal infrastructure (signal controllers, vehicle detection, communications, etc.), intersection capacity (appropriate signal phasing, lane strategies. These proposed improvements should be useful in determining future enhancements to the corridor. B. Consultant shall update the Project Report per Agency comments and submit a final version with all appendices in electronic and hard copies. Full appendices shall be provided to Santa Ana and Agency submittals shall be within Agency boundaries, unless approved by Agencies to include for all participants. C. Consultant shall prepare a Project Summary Sheet, one sheet front and back, that describes the project and improvements gained. This sheet will be used by City of Santa Ana and Agencies to present to the elected officials. D, Consultant shall complete the Primary Implementation Phase by obtaining approval from all Agencies and have paid all third-party vendors and sub- consultants/contractors. I]eliverables - Task 5: 1. Draft and Final Project Report (one electronic master, two hardcopies to City of Santa Ana, and one hardcopy per Agency) at the end of the one (1) year Implementation Phase. 2. Draft and Final Project Summary Sheet 3. Follow directions on closing out Primary Implementation Phase 4. Electronic versions of all data files as directed by City of Santa Ana. V. Task 6: Ongoing Operations and Maintenance Phase Prior to beginning the Ongoing Operations and Maintenance (O&M) Phase of the project, consultant shall have completed all PI tasks and received official written approval from the Agencies on completion of their respective project segments of the PI Phase, and; 1. Invoiced and paid all third-party sub-consultants and vendors 2. Invoiced City of Santa Ana for the final invoice 3. Received payment for final invoice Once these three items are complete, an NTP will be issued by the City of Santa Ana to consultant to advance to the O&M Phase. Until the NTP is issued, no work or hours may be charged against the PI phase for the project. As stated in Task 2, Bristol Street corridor is part of the OCTA Countywide Baseline Project, OCTA is currently collecting count data, developing traffic signal synchronization timing, and will implement and fine tune new timing for all forty-two (42) agency signals along this corridor. Subsequently, this project shall provide Operations and Maintenance for all forty-two (42) agency signals, three (3) Caltrans and five(5) offset signalized intersections. The O&M Phase shall be carefully coordinated with OCTA's Countywide Baseline Project. 24 Task 6: Project Management O&M Phase Project Management Costs associated with Task 6 are all inclusive and are not part of Task 1 : Project Management (PI). Project Management is ongoing throughout the duration of the O&M Phase of the project. This task includes day-to-day project management, such as meetings, progress reports, tracking of schedules, invoicing, and overall administration of the project. The Project Management shall continue in full force as specified in the Primary Implementation Phase. Consultant shall invoice monthly for all O&M tasks and shall include with the invoice a filled-out form of work performed based on one- or two-page template provided by City of Santa Ana at Kick-Off Meeting Number 1. Deliverables - Task 6: 1. Electronic versions of all data files as directed by City of Santa Ana. 2. Graphics and presentation aides required for all meetings. 3. Monthly invoicing including filled out Report Template of work performed. VI. Task 7: Continuing Support Consultant shall provide"on-call"signal system and timing support services(forty-two(42)agency signals, three (3) Caltrans and five (5) offset signalized intersections) for a period of two years or - 24 months following the submittal of the Final Project Report and NTP from the City of Santa Ana, to address any future adjustments that may be needed during this period. At a minimum, consultant, shall provide the following continued support during this period. A. During this 24-month period, consultant shall be prepared to review any project intersection requested by the City of Santa Ana or Partner Agencies within (24) hours of written notice, including observing and fine-tuning the signal timing. Depending on the nature of the adjustment, consultant may accomplish the fine-tuning adjustments remotely from the office through the traffic management systems. S. During this 24-month period, consultant shall be prepared to review any request by the Santa Ana or Partner Agencies for system improvement, such as detection and communication, implemented as part of the project within (48) hours of written notice, including conducting a field visit. Consultant shall be responsible for identifying the appropriate response and coordinating with vendors and contractors for systems under warranty. C. Consultant shall drive the length of the project arterial during all designated corridor synchronization timing plan hours of operation on a monthly basis in order to verify that the synchronization timing is working as designed and complete any necessary adjustments. The number of runs and hours shall be approved by all Agencies. 25 D. Consultant shall notify City of Santa Ana and respective corridor Agencies 24 hours prior to commencement of driving periods. All drives shall be documented and sent to City of Santa Ana as part of the monthly invoice. A copy, limited to political boundaries, shall also be sent to each Agency. E. Consultant shall determine the bevel of effort required to address any other signal system or signal timing requests during this period of support. These requests may include, but is not limited to, the following: 1. Update basic timing parameters due to change in Agency guidelines or speed surveys; 2. Evaluate new cycle lengths due to Agency crossing corridor or network update; 3. Configure communication switches due to change in IP schemes; and 4. Evaluate potential issues with signal system outside of project, such as an existing ATMS or Field Master, that significantly impacts the efficiency of the corridor. Consultant shall present level of effort and potential effect on monthly drive of the corridor to City of Santa Ana and Agencies. Note that any additional requests specific to one Agency should not impact the remaining Agencies on project. F. Consultant shall provide a monthly memorandum summarizing the status and trends of the corridor based on the runs conducted. Trip logs for the month from Tru-Traffic shall be provided to the Agencies. The memorandum shall include all additional tasks requested and completed during that month. Performance metrics comparisons from ATSPM, where available, shall also be included in the memorandum. 1. 24 months of on-call support and revised signal timing plans and memorandum documenting recommendations and Agency actions. 2. Monthly memorandum with comparisons from field and ATSPM. 3. Electronic versions of all data files and memorandums. VII. Task 8: Final Technical Memorandum At the end of the three (3)year contract period, consultant shall prepare a Technical Memorandum documenting the Ongoing Operations and Maintenance efforts and procedures for continuing maintenance. The memorandum shall document all planned and programmed improvements on the study corridor as well as recommendations for further infrastructure improvements that would likely improve the corridor signal coordination project results. The memorandum shall be completed in accordance with the current CTFP Guidelines. Consultant shall provide information to City of Santa Ana for the OCTA FINAL REPORT as required by the M2 Ordinance and Chapter 9 of the 2025 CTFP Guidelines. This report is a fill in the form type of report. Deliverables - Task 8: 1. O&M Technical Memorandum 2. Information required for OCTA FINAL REPORT and project closure 26 Vlll. Project Schedule and Milestones Project Schedule and Milestones Task Starting Date Ending Date Task 1: Project Management- PI Phase June 2026 May 2027 Task 2: Data Collection June 2026 September 2026 Task 3: System Design and Construction June 2026 May 2027 Task 4: Signal Timing Optimization and Implementation June 2026 May 2027 Task 5: Project Report April 2027 May 2027 Task 6: Project Management- O&M Phase June 2027 May 2029 Task 7: Continuing Support June 2027 May 2029 Task 6: Final Technical Memorandum April 2029 May 2029 IX. Attachments A. Attachment A—Project Map and Intersection List B. Attachment B—Improvement List C. Attachment C—Santa Ana TMC Conceptual Design 27 CITY OF SANTA ANA ATTACHMENT A PROJECT MAP AND INTERSECTION LIST CITY OF SANTA ANA ATTACHMENT A Bristol Street RTSSP Intersection List Signalized intersections that are part of the project: Main Corridor Cross Street Main Corridor Cross Street 1 Bristol Street* SR-22 EB Ramps* 40 Bristol Street South Irvine Avenue 2 Bnstol Street Riverglen Lane 41 Bristol Street North Birch Street 3 Bristol Street Memory Lane 42 Bristol Street South Birch Street 4 Bristol Street Santa Clara Avenue 43 Bristol Street South Bayview Place 5 Bristol Street Bristol Market Placefl9th Street 44 Bristol Street North Jamboree Road 6 Bristol Street 17th Street 45 Bristol Street South Jamboree Road 7 Bristol Street Washington Avenue 8 Bnstol Street Civic Center Drive 9 Bristol Street Santa Ana Boulevard 10 Bristol Street 1 st Street 11 Bristol Street Bishop Street 12 Bristol Street McFaddden Avenue 13 Bristol Street Wilshire Avenue 14 Bristol Street Edinger Avenue 15 Bristol Street St.Andrew Place 16 Bristol Street Glenwood Place 17 Bristol Street Warner Avenue 18 Bristol Street Central Avenue 19 Bristol Street Hemlock Way 20 Bristol Street Segerstrom Avenue 21 Bristol Street Alton Avenue 22 Bristol Street Bristol Plaza 23 Bristol Street MacArthur Boulevard 24 Bristol Street Callens Common 25 Bristol Street Sunflower Avenue 26 Bristol Street Town Center Drive 27 Bristol Street Anton Boulevard 28 Bristol Street 1-405 NB Ramps 29 Bristol Street` 1-405 SB Ramps' 30 Bristol Street Hotel Way 31 Bristol Street Paularino avenue 32 Bristol Street Baker Street 33 Bristol Street Sobeca Way 34 Bristol Street Randolph Avenue Le end 35 Bristol Street Bear Street Santa Ana 36 Bristol Street Newport Boulevard SB Costa Mesa 37 Bristol Street Newport Boulevard NB Newport Beach 38 Bristol Street Santa Ana Avenue/Redhill Avenue * Caltrans 39 Bristol Street North Campus Drive Offset signalized intersections that are part of the project: Main Street Cross Street 46 Paulanno Avenue Jian Way 47 Anton Boulevard Park Center Drive 48 Anton Boulevard Avenue of the Arts 49 Anton Boulevard Sakioka Drive 50 Bayview Place Bayview Circle CITY OF SANTA ANA ATTACHMENT A Bristol Street RTSSP Map Project Limits and Offset Signals SR-22 8 S9P, .�._ 0 ALT�1v AVTR LEGEND N co -,'Aa ARTH' BLVD J � Bristol Street Corndoi o SANTA = ANN S FLOWE AV CD Santa Ana 7TH ST ANTCN t is costa Mesa E Newport Beach =� ,0s PA1f'v1'nIWU � i~a{Vans fit CEN DR 4ti M A W S TA ANA O 3T �� Sr 000 O 15T ST DR �. t 0 ' fA AN W MCF 4 DINGER NEWPIORTi ,- EACH c� o �y ARHFR ATTACHMENT B IMPROVEMENT LIST CITY OF SANTA ANA ATTACHMENT Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 1 Santa Ana $R-22 Eid Ramp Caltrans Cooperative Agreement(Timing Improvements only) EA 1 2 Santa Ana Riverglen Lane Furnish Ethernet Switch.Etherwan EX78934X-0VB(wl(4)1 GB SFP's and Power Supply) EA 1 3 Santa Ana Riverglen Lane Fumish ATC Controller-Econolite Cobalt Rackmount wl EOS Software EA 1 4 Santa Ana Rlverglen Lane Furnish and Install Signal Cabinet on New Foundation-Econolite ATCC(including now Type IIB Meter EA 1 Pedestal,SCE Conduit,SCE Design Fees,No.BE Pull Box,and necessary Conduits) 5 Santa Ana Riverglen Lane Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 6 Santa Ana Memory Lane Furnish Ethernet Switch-Etherwan EX78934X-OVB(wl(4)1G8 SFP's and Power Supply) EA 1 7 Santa Ana Memory Lane - Furnish ATC Controller-Econolite Cobalt Rackmount wl EOS Software EA 1 8 Santa Ana Santa Clara Avenue Fumish Ethernet Switch-Etherwan EX78934X-OVS(wl(4)1 GB SFP's and Power Supply) EA 1 9 Santa Ana Santa Clara Avenue Furnish ATC Controller-Econolite Cobalt Rackmount wl EOS Software EA 1 10 Santa Ana Bristol Market Place!191h Street Furnish Ethernet Switch-Etherwan EX78934X-i(wl(4)1 GB SFP's and Power Supply) EA 1 11 Santa Ana Bristol Market Place/19th Street Furnish ATC Controller-Econclite Cobalt Rackmount wl EOS Software EA - 1 12 Santa Ana Bristol Market Place/19th Street Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 CITY OF SANTA ANA ATTACHMENT Bristol Street R'TSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 13 Santa Ana Bristol Market Place/19th Street Furnish and Install Audible Pedestrian Detection System-Polara(iN52} EA 1 14 Santa Ana 17th Street Furnish Ethemet Switch-Etherwan EX78934X-OVB(wl(4)1GB SFP's and Power Supply) EA 1 15 Santa Ana 17th Street Furnish ATC Controller-Econclile Cobalt Rackmount wl EOS Software EA 1 16 Santa Ana 17th Street Furnish and Install Audible Pedestrian Detection System-Polara(iN52} EA 1 17 Santa Ana Washington Avenue Furnish Ethernet Switch-Ethenwan EX78934X-OVB(wl(4)1GB SFP's and Power Supply} EA 1 16 Santa Ana Washington Avenue Furnish ATC Controller-Econolite Cobalt Rackmount wl EOS Scflware EA 1 19 Santa Ana Civic Center Drive Funrlsh Ethernet Switch-Etherwan EX78934X-OVB(w/(4)1GB SFP's and Power Supply) EA 1 20 Santa Ana Civic Center Dnve Furnish ATC Controller-Eccnolite Cobalt Rackmount wl ECS Software EA 1 21 Santa Ana Civic Center Drive Furnish and Install CCTV Camera-Axis Q6358-LE(w190W midspan POE injector and pole mount) EA 1 22 Santa Ana Santa Ana Boulevard Furnish Ethernet Switch-Etherwan EX78934X-0VB(wl(4)1GB SFP's and Power Supply) EA 1 23 Santa Ana Santa Ana Boulevard - Furnish and Install CCTV Camera-Axis Q6358-LE(wl SOW midspan POE injector and pole mount) EA 1 24 Santa Ana 1 st Street Furnish Ethernet Switch-Etherwan EX78934X-CVB(w/(4)1 GB SFP's and Power Supply) EA 1 25 Santa Ana rat Street Furnish and Install Audible Pedestrian Detection System-Polara(iN52) EA 1 CITY OF SANTA ANA A17ACHMENT8 Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 26 Santa Ana Bishop Street Furnish Ethernet Switch-Etherwan EX78934X-OVB iwl(4)1GB SFP's and Power Supply) EA 1 27 Santa Ana Bishop Street Furnish ATC Controller-Econolite Cobalt Rackmount w/EOS Software EA. 1 29 Santa Ana McFadden Avenue Fumish Ethernet Switch-Etherwan EX78934X-OVB(w/(4)1 GB 5FP's and Power Supply) EA 1 29 Santa Ana McFadden Avenue Furnish ATC Controller-Econolite Cobalt Rackmount wl FOS Software EA 1 30 Santa Ana Wilshire Avenue Furnish Ethernet Switch-Etherwan EX78934X-OVB(wl(4)10B 5FP's and Power Supply) EA 1 31 Santa Ana Wilshire Avenue Furnish ATC Controller-Econolite Cobalt Rackmount w1 EOS Software EA 1 32 Santa Ana Wilshire Avenue Furnish and Install Signal Cabinet on New Foundation-Ewr ite ATCC(including new Type IIB Meter EA 1 Pedestal,SCE Conduit,SCE Design Fees,No.6E Pull Sox,and necessary Conduits) 33 Santa Ana Edinger Avenue Furnish and Install Signal Cabinet on New Foundation.Econolite ATCC(including new Type IIB Meter EA 1 Pedestal,SCE Conduit,SCE Design Fees,No.6E Pull Box,and necessary Conduits) 34 Santa Ana Edinger Avenue Furnish and Install Audible Pedestrian Detection System-Polara(Ii EA 1 35 Santa Ana St.Andrew Place Furnish ATC Controller-Econaike Cobalt Rackmount w/EOS Software EA 4 36 Santa Ana Glenwood Place Furnish Ethernet Switch-Etherwan EX78934X-OVD{wl(4)1 GB SFP's and Power Supply) EA 1 37 Santa Ana Glenwood Place Furnish ATC Controller-EconoliteCobaltRackmountw/EOSSoftware EA 1 38 Santa Ana Central Avenue Furnish Ethemet Switch-Etherwan EX78934X-OVB(wl(4)1 GB SFP's and Power Supply} EA 1 CITY OF SANTA ANA ATTACHMENT 13 Bristol Street RTSSP Improvement List Item No. Agency Bristol Street@ Item Description Unit Quantity 39 Santa Ana Central Avenue Furnish ATC Controller-Econolite Cobalt Rackmount wl EOS Software EA 1 40 Santa Ana Central Avenue Fumish and Install Signal Cabinet on New Foundation-Econolite ATCC(including new Type 118 Meter 1 Pedestal.SCE Conduit,SCF Design Fees,No.6E Pull Box,and necessary Conduits) EA 41 Santa Ana Central Avenue Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 42 Santa Ana Hemlock Way Furnish Ethomet Switch-Etherwan EX78934X-OVB(wl(4)1 GB SFP's and Power Supply) EA 1 43 Santa Ana Hemlock Way Furnish ATC Controller-Econolite Cobalt Rackmount wl EOS Software EA 1 - 44 Santa Ana Hemlock Way Furnish and Install Signal Cabinet on New Foundation-Econolite ATCC(including new Type 118 Meter FA 1 Pedestal,SCE Conduit,SCE Design Fees,No,6F Poll Box,and necessary Conduits) 45 Santa Ana Hemlock Way Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 46 Santa Ana Segerstrom Avenue Furnls]h and Install Audible Pedestrian Detection System-Polara(iNs2} EA 1 47 Santa Ana Alton Avenue Furnish Ethernet Switch-Etherwan EX78934X-oVS(wl(4)1GB SFP's and Power Supply) EA f 46 Santa Ana Alton Avenuo Furnish ATC Controller,Econolite Cobalt Rackmount w!FOS Software EA 1 49 Santa Ana Bristol Plaza Furnish Ethernet Switch-Flhorwan EX78934X-0VB(wl(4)1GB SFP's and Power Supply) FA 1 50 Santa Ana Bristol Plaza furnish ATC Controller-Econclite Cobalt Rackmount wl EO5 Software EA 1 51 Santa Ana Bdatcl Plaza Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 CITY OF SANTA ANA ATTACHMENTE. Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 52 Santa Ana MacArthur Boulevard Furnish and Install Audible Pedestrian Detection System-Polara(ii EA 1 53 Santa Ana Callons Common Furnish Fthemet Switch-Etherwan EX78934X-OVS(wl(4)1G9 SFP's and Power Supply) EA 1 54 Santa Ana Callens Common Furnish ATC Controller-Eccnollte Cobalt Rackmcunt wi EOS Software EA 1 55 Santa Ana Callens Common Furnish and install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 56 Santa Ana TMC Refer to Exhibit I Scope of Wcrk:Sub-Task 3.2 System Construction and Intergration,F.I.TMC LS 1 Improvements Santa Ana 57 Costa Mesa Sunflower Avenue Furnish and Install Ethernet Switch-Etherwan rX78924H-OVB(wl(2)1GB SFl and Power Supply) EA 1 58 Costa Mesa SunflowerAverue Furnish and Install Layer 3 Ethernet Switch-Etherwan IG5-08164-CIN(wl(10)1GB,(4)1OGB SFP's EA 1 and Power Supply) 59 Costa Mesa Sunflower Avenue Furnish and Install CCTV Camera-Axls 06225-LE(w190W midspan POE injector and pole mount) EA 1 60 Costa Mesa Sunflower Avenue Fumish and Install Video Detection System(4 Camera System)-Fconolite Autoscope Vision EA 1 61 Costa Mesa Sunflower Avenue Furnish and Install Audible Pedestrian Detection System-Palara(OS2) FA 1 52 Costa Mesa Town Center Drive Furnish and Install Ethernet Switch-Etherwan EX78924H-9VB(wl(2)1 GB SFP'S and Power Supply) EA 1 63 Costa Mesa Town Center Drive Furnish and Install CCTVCamera-Axis 06355-LE(w190W midspan PCE injector and pole mount) EA 1 64 Costa Mesa Town Center Drive Furnish and Install Video Detection System(4 Camera System)-Ewnolite Autoscope Vision EA 1 GM OF SANTA ANA ATTACHMENT Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item[]ascription Unit Quantity 65 Costa Mesa Town Center Drive Furnish and Install Audible Pedestrian Detection System-Polara(iNS2) EA 1 66 Costa Mesa Anton Boulevard Furnish and Install Ethernet Switch-Etherwar EX78924H-OVS(wl(4)1GO SFP's and Power Supply) EA 1 67 Costa Mesa Anton Boulevard Furnish and Install CCTV Camara.Axis Q6358-LE(w19OW midspan POE injector and pole mount) EA 1 68 Costa Mesa Anton Boulevard Furnish and Install Video Detection System(4 Camera System)-Econalite Autoscope Vision EA 1 69 Costa Mesa Anton Boulevard Furnish and Install Audible Pedestrian Detection System-Patera(iNS2) EA 1 70 Costa Mesa 1.405 NB Ramp Caltrans Cooperative Agreement(Timing Improvements only) EA 1 71 Costa Mesa 1-405 SB Ramp Cali Cooperative Agreement(Timing Improvements only) EA 1 72 Costa Mesa Hotel Way Furnish and Install Ethernet Switch-Etherwan FX769241(w/(2)1 GB SFF's and Power Supply) EA 1 73 Costa Mesa Hotel Way Furnish and Install CCTV Camara-Axis Q6355-LE(w/9OW midspan POE injector and pole mount) EA 1 74 Costa Mesa Hotel Way Furnish and Install Audible Pedestrian detection System-Po9ara(iN52} EA 1 75 Costa Mesa Paularino Avenue Furnish and Install Ethernet Switch-Etherwan ED3575(wl(2)1GB SFP's and Power Supply) EA 1 76 Costa Mesa Paularino Avenue Furnish and Install CCTV Camera-Axis 06358-LE(w!90W midspan POE injector and pole mount) EA 1 77 Costa Mesa Paularino Avenue Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision FA 1 CITY OF SANTA ANA ATTACHMENT Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 78 Costa Mesa Paulanno Avenue Furnish and Install Audible Pedestrian Detection System-Polara(iN82) FA 1 79 Costa Mesa Baker Street Furnish and Install Ethernet Switch-Ethel EX78924H-OVB(W(4)1 GB SFP's and Power Supply) EA 1 Bo Costa Mesa Baker Street Furnish and Install CCTV Camera-Axis Q6358-1F(w19OW midspan POE injector and pole mount) FA 1 81 Costa Mesa Baker Street Furnish and Install Audible Pedestrian[Detection System-Polara(INS2) EA 1 82 Costa Mesa Sobeca Way Furnish and Install Ethernet Switch-Etherwan EX78924H-OVB(wf(2)1 GB SFP's and Power Supply) EA 1 83 Costa Mesa Sobeca Way Furnish and Install CCTV Camera-Axis Q6355-LE(wf 9OW midspan POE injector and pole mount) EA I 84 Costa Mesa Randolph Avenue Furnish and Install Ethernet Switch-Etherwan EX78924N-OVB(wf(2)1GB SFP's and Power Supply) EA 1 85 Costa Mesa Randolph Avenue Furnish and Install CCTV Camera-Axis Q6355-LE(w)96W midspan POE injector end pole mount) EA 1 66 Costa Mesa Randolph Avenue Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 87 Costa Mesa Randolph Avenue Furnish and Install Audible Pedestrian Detection System-Polara(iN52} EA 1 88 Costa Mesa Bear Street Furnish and Install Ethernet Switch-Etherwan EX78924H-oVB(wf(2)1 GH SFP's and Power Supply) EA 1 Furnish and Install Signal Cabinet on New Foundation-Econclite NEMA TS2-1 P65 Cabinet on Now 89 Costa Mesa Bear Street Foundation(including new Type ill-BF Meter Pedestal,SCE Conduit,SCE Design Fees,No.BE Full EA 1 Box,and necessary Conduits) 90 Costa Mesa Beer Street Furnish and Install CCTV Camera-Axis 06355-LE(wf 9OW midspan POE injector and pole mount) EA 1 CITY OF SANTA ANA ATTACHMENT B Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 91 Costa Mesa Bear Street Furnish and Install Video Detection System(4 Camera System)-Econolite Autoscope Vision EA 1 92 Costa Mesa Bear Street Furnish and Install Audlbfe Pedestrian Detection System-Polara(iNS2) EA 1 93 Costa Mesa Newport Boulevard Southbound Furnish and Install Ethernet Switch-Etharwan EX78924H-OVB(wd(2)1 GB SFP's and Power Supply) EA 1 94 Costa Mesa Newport Boulevard Southbound Furnish and install.ATC Controller-Econolite Cobalt Shelf Mount wl EGS Software EA t- 95 Costa Mesa Newport Boulevard Southbound Furnish and Install CCTV Camera-duds 06358-LE(w!90W midspan POE injector and pole mount) EA 1 - 96 Costa Mesa Newport Boulevard Southbound Furnish and Install Video Detection System(4 Camera System)-Econoiite Autoscope Vision FA 1 97 Costa Mesa Newport Boulevard Southbound Furnish and Install Audible Pedestrian Detection System-Polara(iNS2) EA 1 98 Costa Mesa Newport Boulevard Northbound Furnish and Install Ethernet Switch•Etherwan EX78924H-OVH(wl(2)1GB SFP's and Power Supply) EA 1 99 - Costa Mesa Newport Boulevard Northbound Furnish and Install ATC Controller-Econolite Cal Shelf Mount wI EOS Software EA 1 100 Costa Mesa Newport Boulevard Northbound Furnish and Install CCTV Camera-Axis Q6358-LE(w/90W midspan POF injector and pole mount) EA 1 101 Costa Mesa Newport Boulevard Northbound Fumistl and Install Audible Pedestrian Detection System-Polara(INS2) EA 1 102 Costa Mesa Santa Ana Avenuel Redhill Avenue Furnish and Install Ethernet Switch-Etherwan EX78924H-OVS(wd(2)1GB SFP's and Power Supply) EA 1 1D3 Costa Mesa Santa Ana Avenue/Redhili Avenue Furnish and Install CCTV Camera-Axis 06358-LE(w/90W midspan POE infector and pole mount) FA 1 CITY OF SANTA ANA ATTACHMENT Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 104 Costa Mesa Santa Ana Avenue/Redhill Avenue Furnish and Install Audible Pedestrian Detection System-Polara(iNS2) FA 1 105 Costa Mesa Paularino Avenue @ Jian Way Furnish and Install Ethernet Switch-Ftherwan ED3575(wl(2)1GB SFP's and Power Supply) EA 1 106 Costa Mesa Paularino Avenue @ Jian Way Furnish and Install CCTV Camera-Axis Q6355-LE(w199W midspan POE injector and pole mount) FA 1 107 Costa Mesa Paularino Avenue @ Jian Way Furnish and Install Audible Pedestrian Detection System-Polara('iNS2) EA 1 108 Costa Mesa Anton Boulevard @ Park Center Drive Furnish and Install Elhemet Switch-Etherwan EX789241H-0VB(wf(2)1 GB SFP's and Power Supply) EA 1 109 Costa Mesa . Anton Boulevard @ Park Center Ddve Furnish and Install 12-SMFR Drop Cable EA 1 110 Costa Mesa Anton Boulevard @ Park Center Drive Furnish and Install Fiber Distribution Unit-Coming Connector Housing(w/Splicing,Terminations, EA 1 Corrector Panels,Trays,and Testing) ill Costa Mesa Anton Boulevard @ Park Center Drive Furnish and Install No.6E Pull Box(including conduit sweep) FA 1 112 Costa Mesa Anton Boulevard @ Park Center Drive Furnish and Install Splice Enclosure.Splice 12-SMFO prop Cable and Testing EA 1 113 Costa Mesa Anton Boulevard @ Park Canter Drive Furnish and Install ATC Controller-Econolite Cobalt Shelf Mount wl EOS Software EA 1 114 Costa Mesa Anton Boulevard @ Park Center Drive Furnish and Install CCTV Camera-AXIS Q5355-LE(w190W midspan POE Injector and pole mount) EA 1 115 Costa Mesa Anton Boulevard @ Park Center Drive Furnish and Install Audible Pedestrian Detection System-Polara(iNS2) EA 1 118 Costa Mesa Anton Boulevard @ Avenue of the Arts Furnish and install Ethernet Switch-Etherwan EX78924H-OV5(w1(2)1 GB SFP's and Power Supply) EA 1 CITY OF SANTA ANA ATTACHMENTS Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 117 Costa Mesa Anton Boulevard Avenue of the Arts Furnish and Install 12-SMFO Drop Cable EA 1 Furnish and Install Fiber Distribution Unit-Coming'Connector Housing(wf Splicing,Terminations, 118 costa Mesa Anton Boulevard Avenue of the Arts EA 1 Connector Panels,Trays,and Testing) 119 Costa Mesa Anton Boulevard @,Avenue of the Arts Furnish and Install No.6E Pull Box(including conduit sweep) EA 1 120 Costa Mesa Anton Boulevard @ Avenue of the Arta Furnish and Install Splice Enclosure,Splice 12-S1VFC5 Drop Cable and Testing EA 1 - 121 Costa Mesa Anton Boulevard @ Avenue of the Arts Furnish and Install ATC Controller-Ecwnolite Cobalt Shelf Mount wl EOS Software EA 1 - 122 Costa Mesa Anton Boulevard @ Avenue of the Arts Furnish and Install CCTV Camera-Axis Q5350-LF(w/90W midspan POE injector and pole mount) EA 1 123 Costa Mesa Anton Boulevard 9 Avenue of the Arts Furnish and Install Audible PedBstrian Detaction System-Polara(iNS2} EA 1 124 Costa Mesa Anton Boulevard @ Sakioka Drve Furnish and Install Ethernet Switch-Etherwan EX78924H-OVB(wf(2)1G13 SFP's and Power Supply) EA 1 125 Costa Mesa Anton Boulevard @ Sakioka Drive Furnish and Install 12-SMFO Drop Cable - - EA 1 Furnish and Install Fiber Distribution Unit-Comirg Connector Housing(wf Splicing,Terminations, 126 Costa Mesa Anton Boulevard @Sakioka Drive Connector Panels,Trays,and Testing) EA 1 127 Costa Mesa Anton Boulevard @ Sakioka Drive Furnish and Install No.6E Pull Box(including conduit sweep) EA 1 128 Costa Mesa Anton Boulevard @ Sakioka Drive Furnish and Install Splice Enclosure.Splice 12-SMFO Drop Cable and Testing - EA 1 129 Costa Mesa Anton Boulevard @ Sakioka Drive Furnish and Install ATC Controller-Econolite Cobalt Shelf Mount w!EOS Software EA 1 CITY OF SANTA ANA ATTACHMENTS Bristol Street RTSSP Improvement List Item No. Agency Bristol Street @ Item Description Unit Quantity 130 Costa Mesa Anton Boulevard[d3 Sakioka Drive Furnish and Install CCTV Camera-Axis 06355-LE(w/DOW midspan POE injector and pole mount) EA 1 131 Costa Mesa Anton Boulevard Sakioka Drive Furnish and Install Audible Pedestrian Detection System-Polara(1NS2) EA 1 132 Costa Mesa TMC Refer to Exhibit I Scope of Work:Sub-Task 3.2 System Construction and Intergraticn,E.2.TMC LS I Improvements Costa Mesa 133 Newport Beach Irvine Avenue(South) Furnish and Install Ethernet Switch-Cisco Switch IF-3300-BT2S-E(wl(1)1 GB SFP's and PWR-IE65W- EA 1 PC-AC Power Supply) 134 Newport Beach Irvine Avenue(South) Furnish and Install ATC Controller-Econolite Cobalt Sheltmount w!ASC3 Softwere EA 1 135 Newport Beach Irvine Avenue(South) Furnish and Install CCTV Camera-Axis 06358-LE(w/DOW midspan POE injector and pole mount) EA 1 136 Newport Beach Campus Drive(North) Furnish and Install Ethernet Switch-Cisco Switch IF-3300-ST2S-E(w!(1)1 G3 SFP's and PWR-IE65W- EA 1 PC-AC Power Supply) 137 Newport Beach Campus Drive(North) Furnish and Install ATC Controller-Econolite Cobalt Shelfmount w1 ASC3 Sofiware EA 1 Furnish and Install BBSIUPS on Existing Cabinet-Marathon Power Ruggedized Traffic UPSIH13S 138 Newport Beach Campus Drive(North) 2000VA/I500W TRTC-2004-N1,Marathon Power Manual Power Transfer Switch Closed Version,MK EA 1 Battery Model 8A24 NEU 139 Newport Beach Campus Drive(North) Furnish and Install CCTV Camera-Axis 6300-E(w!DOW midspan POE injector and pole mount)and EA 1 integrate with existing Axis CCTV 140 Newport Beach Campus Drive(North) Furnish and Install Emergency Preemption System(Infrared)(4 Detector System)-Opticom Model 764 EA 1 Phase Selector,Model 722 Optical Detector Units,and necessary Detector Cable and mounting. 141 Newport Beach Birch Street(South) Furnish and Install Ethernet Switch-Cisco Switch IE-3300-8T2S-E(wl(1)1 GB SFP's and PWR-IE65W- EA 1 PC-AC Power Supply) 142 Newport Beach Birch Street(South) Furnish and Install ATC Controller-Econolite Cobalt Shelfmcunt w1 ASC3 Software EA 1 CITY OF SANTA ANA ATTACHMENT B Bristol Street RTSSP Improvement List Item No. Agency Bristol Street@ Item Description Unit Quantity 143 Newport Beach Birch Street(South) Furnish and Install CCTV Camera-Axis 06358-LE(w190W midspan POE injector and pole mount) EA 1 144 Newport Beach Birch Street(North) Furnish and Install Ethernet Switch-Cisco Switch IE-3300-BT2S-F(wI(1)11 SFP's and PWR-IE65W- EA 1 PC-AC Power Supply) 145 Newport Beach Birch Street(North) Furnish and Install ATC Controller-Econollte Cobalt 8hiiounl wlASC3 Software EA 1 Furnish and Install BBSIUPS on Existing Cabinet-Marathon Power Ruggedized Traffic UPSIBBS 146 Newport Beach Birch Street(North) 2000VA11500W TRTC-2004-N1,Marathon Power Manual Power7ransferSwitch Closed Version,MK EA 1 Battery Model BA24 HE 147 Newport Beach Birch Street(North) Furnish and Install CCTV Camera-Axis 6300-E(wf 90W midspan POE injector and pole mount)and EA 1 integrate with exdsting Axis CCTV 148 Newport Beach Birch Street(North) Furnish and Install Emergency Preemption System(Infrared)(4 Detector System)-Gpticom Model 764 EA 1 - Phase Selector,Model 722 Optical Detector Units,and necessary Detector Cable and mounting. 149 Newport Beach Bayview Place(South) Furnish and Install Ethernet Switch-Cisco Switch IE-3300-15T2&-:(wI(1)1 GB SFP's and PWR-IE65W- EA 1 PC-AC Power Supply) 150 Newport Beach Bayviaw Place(South) Furnish and Install ATC Controller-Ecanolile Cobalt Shell wl ASC3 Software EA 1 Furnish and Install BBSIUPS on Existing Cabinet-Marathon Power Ruggedized Traffic UPSIBUS - 151 Newport Beach Bayview Place(South) 2001 TRTC-2004-N1,Marathon Power Manual Power Transfer Switch Closed Version,MK EA 1 Battery Model BA24 HEU 152 Newport Beach Bayview Place(South) Furnish and Install CCTV Camara-Axis Q6358-LE(w19OW midepan POE injector and pole mount) EA 1 153 Newport Beach Bayviow Place(South) Furnish and Install Emergency Preemption System(Infrared)(4 Detector System)-Opticom Model 764 EA 1 Phase Selector,Model 722 Optical Detector Units,and necessary Detector Cable and mounting. 154 Newport Beach Jamboree Road(South) Furnish and Install Ethernet Switch-Cisco Switch IE-3300-BT2S-E(w1(1)1GB SFP's and PWR-IE65W- EA 1 PC-AC Power Supply) 155 Newport Beach Jamboree Road(South) Furnish and install ATC Controller-Ecenolite Cobalt Shell cunt wlASC3 Software EA 1 CITY OF SANTA ANA ATTACHMENT$ Bristol Street RTSSP Improvement List Item No. Agency Bristol Street@ Item Description Unit Quantity Furnish and Install BBSAIPS on Existing Cabinet-Marathon Power Ruggedized Traffic UPSIBBS 156 Newport Beach Jamboree Road(South) 2000VAl1500W TRTC-2004-N1,Marathon Power Manual Power Transfer Switch Closed Version,MK EA 1 Battery Model SA24 HEU 157 Newport Beach Jamboree Road(South) Furnish and Install CCTV Camera-Axis Q6358-LE(wf 90W midspan POE injector and pole mount) EA .1 158 Newport Beach Jamboree Road(South) Furnish and Install Emergency Preemption System(Infrared)(4 Detector System)-Opgccm Model 764 EA 1 Phase Selector,Model 722 Optical Detector Units,and necessary Detector Cable and mounting. 159 Newport Beach Jamboree Road(North) Furnish and Install Ethernet Switch-Cisco Switch IE-3300-8T25-E(wI(1)1 GB SFP's and PWR-IE65W- PA 1 PC-AC Power Supply) 160 Newport Beach Jamboree Road(North) Fumish and Install ATC Controller-Econolite Cobalt Shelfmount wt ASC3 Software EA 1 Furnish and Install BBSIUPS on Existing Cabinet-Marathon Power Ruggedized Traffic UPSIBBS 161 Newport Beach Jamboree Road(North) 2000VAI1500W TRTC-2004-Nl,Marathon Power Manual Power Transfer Switch Closed Version,MK EJ+ 1 Battery Model 8A24 HEU 162 Newport Beach Jamboree Road(North) Furnish and Install CCTV Camera.Axis Q6358-LE(w/90VV midspan POE injector and pole mount) EA 1 163 Newport Beach Jamboree Road{North) Furnish and Install Emergency Preemption System(Infrared)(4 Detector System)-Opticom Model 764 EA 1 Phase Selector,Model 722 Optical Detector Units,and necessary Detector Cable and mounting. 164 Newport Beach Bayview Place Bayview Circle Furnish and Install Ethernet Switch-Cisco Switch IE-3300.8T25-E(wl(1)1 GB SFP's and PWR-IE65W EA 1 PC-AC Power Supply) 165 Newport Beach Bayview Place @ Bayview Circle Furnish and Install ATC Controller-Econollte Cobalt Shelfmount wl AS03 Software EA 1 Furnish and Install BBSIUPS on Existing Cabinet-Marathon Power Ruggedized Traffic UPSIBBS 166 Newport Beach Bayview Place a Bayview Circle 2000VA1150OW TRTC-2004-N1,Marathon Power Manual Power Transfer Switch Closed Version,MK EA 1 Battery Model 8A24-1 167 Newport Beach Bayview Place @ Bayview Circle Fumish and Install CCTV Camera-Axis 06358dE(w190W midspan POE injector and pole mount) EA 1 168 Newport Beach Bayview Place 0 Bayview Circe Furnish and Install Emergency Preemption System(Infrared)(4 Detector System)-Opticom Model 764 BA 1 Phase Selector,Model 722 Optical Detector Units,and necessary Detector Cable and mounting. ATTACHMENT C SANTA ANA TMC CONCEPTUAL DESIGN ?o�N oRaNceC Citywide Traffic Signal and ITS Master Plan Final I Version 3.0 2.4 Traffic Management Center The city has a Main Traffic Management Center(TMC) located at the City Hall Building, 20 Civic Center Plaza, Santa Ana,CA 92701.There is also a Remote TMC located with the same address in the adjacent Ross Annex Building.The Annex building is where all the traffic staff offices are located and represents a better location for the TMC.The Main TMC and the Remote TMC are depicted in Figures 28 and 29. Figure 28 — City of Santa Ana Main TMC and Partial Floor Plan w�t�r Oe r r � r r �t+tom c ['wNal'R++.s Crinrre Rr+� ��o�aroc pro '_cZ Citywide Traffic Signal and ITS Master Plan Final Version 3.0 Figure 19 — City of Santa Ana Remote TMC & Partial Floor Plan � �� �!T �Ir �� � a arrrtr � •w. � - - I EEL, I T— —7F Fj-1 CYy: "* ~ ti s, i tfl�ty OAANGF� Citywide Traffic Signal and ITS Master Plan 1 ` l Final Version 3.0 Figure 30 — City of Santo Ana TMC Equipment Room 3 is 2 1.r. Figure 23 in Section 2.3 depicts the existing Main TMC Systems Architecture.These systems were deployed in 2015, and have served the city well, but they are at, or reaching their final life cycle. Many of the components employed in that system are no longer supported by their manufacturers and are classified as End-of-Life (EOL)or End-of-Service(EOS). As depicted in Figure 23,the TMC systems communicate to the entire traffic network through seventeen (17) separate fiber optic legs. Each cable is terminated on 1 of 3 FDUs(Fiber Distribution Units) housed in the TMC server racks. These (17) communication legs are all landed on the Brocade Fastlron FCX624S-F Layer 3 Ethernet Switch which acts as the central Gateway on the network. This switch communicates with the Brocade Fastlron FCX624S Switch via a fiber opticjumper cable. The FCX624S switch then communicates with all the TMC servers via the TX Ports. Figure 30 displays the existing TMC server racks. With the City's future plans to move the Main TMC into the Annex Building, allowing the city to decommission the Remote TMC,an opportunity exists for upgrading these systems rather than attempting to move and re-use them.The remainder of this section provides recommended options for this move and expansion of the Santa Ana TMC.The goal for these options is to maintain at least the current level of operation for the TMC and minimize cost impacts. 2.4.1 TMC Software-Advanced Transportation Management System The City of Santa Ana uses Econolite Centracs(version 2.0) Central Advanced Transportation Management System (ATMS).Centracs is used to facilitate the operation of the existing traffic control system via the existing communication infrastructure. Figure 31 displays a representation of a Centracs Citywide status map, utilized for staff to quickly identify signals that are offline, online, or in need of assistance. Centracs ATMS enables city staff to monitor traffic throughout the entire city ITS network, allowing them to make real-time traffic-related responses and decisions from a TMC. The ATMS allows a minimal staff to manage an entire traffic operation from the TMC. Iteris, Inc. 144 �y ORA,yCF W_ I�li Citywide Traffic Signal and ITS Master Plan ell Final Version 3.0 al— Figure 31 —Centracs AIMS Status Display a 0 •^a,�. q mm-os a c po-oe oir. moo^'—"'•-"�-- �6"'9 �► -4 o � � 2.4.2 TMC Software - Video Management Software The City's CCTV cameras are managed and monitored through Milestone XProtect Video Management software(VMS). With XProtect all city cameras are available to city staff at workstations running Milestone VMS Client software, and they are available for display on to the video wall from the display PCs in the equipment room. City staff actively use the CCTV cameras to monitor back-ups at the intersections and the cameras are typically fixed on movements that are most congested. Figure 32 displays video using the Milestone XProtect VMS software.XProtect provides a single layer client software interface,and multi-layer maps help to improve traffic monitoring operations by city staff from a centralized location.XProtect helps staff to ensure traffic is monitored, and that proactive or reactive measures can be quickly set in motion. Figure 32 —Milestone XProtect VMS software City of Santa Ana - wArHaw{.,rvl.,nm - � - - 8 - -- 0 0 8 x. 9 a � a e S Citywide Traffic Signal and n.1 V st Piad Final Versioci n 3 fl figure 27-City of Santa Ana t—Ong TMC System Archlrecrure V eigadm TM(:Area �1:' Eouiomunt poem �— lSeariry uzr:,;;A pGp • � I T -[ - p Yance !n Ce�lln8 Speakers u • q Barracuda[Eoutl Gen Frcwall K3lq •- I Adv Threa[proteC[ida 4.2 SAVISU NG J046 aP with 500-0A Set Back interface I mniperrve[works SHM340 Service Gateway LlnkSyS g pact I Smcad¢Fastircn Warkgropp Swatch EC1r634S-F I i I d I I ` 1 n.5 xrnw�k Jnkf all 4nw�ra-,ems l _Cnv Nar•'oA lira > ns nermh.ink•6 1 JJ [i Switch Brocade F-i—Fcx6245 GSE224NA( Vir Wag PCs(71 Foundry Fastlrnn Edge%424 DNE Precision I Synalogy Flash Station FS2SG0 T3G2G Mint Tower I with NVIDIA a $ANfNAS Smrage System Quadro KI20G 4GH i Sys 1 p Rack StaTlan 12--Bay NM (.—OP pprts per Recaser Ampihe (MiWil—VMS Recpl,iing 5erver) PC)each diiV.g4 L,ditech Onisersal many ors kdt and IR Remoie CENTRA[.S 5erver3 j of wall- SlinBbm li - CENTRALS Served II LENTRACS Served Sant HDp5b700 Btu-Ray layer llne.seaePg —DPro HEIMT WarnxlJlTy i PVMistake ��------cm lumps—�TMCWPrkstationStorage Bladeall PC"' SmaftN¢E2 MReriune r C Wreless 5martketI I al-Tud It �',� Keytward/Mouse City of Santa Ana TMC and Network System Diagram ,e.au �N oRAryc F 3 G o Citywide Traffic Signal and ITS Master Plan i , Final i Version 3.0 manufacturers begin to produce CV-enabled vehicles,the City of Santa Ana can be planning and implementing the infrastructure that will harness the transportation data that will be produced by a growing number of vehicles on the City's streets and facilitate the safe and environmentally friendly operation of its transportation network. It should be noted that with the addition of connected vehicle technology the City can realize significant cost savings by deploying a sensor that combines technology that is currently being purchased and deployed separately. Iteris recommends deploying the BlueTOAD Spectra CV(or equivalent).This second-generation unit ships able to operate in either DSRC or C-V2X mode and follows prescribed federal standards and guidelines, as and when they evolve. This product, which is combined with the BlueTOAD Spectra travel time solution greatly increases day-one ROL This would grow the already deployed BlueTOAD Spectra system the City of Santa Ana currently has around the City. Additionally,these units have the capability to facilitate Emergency Vehicle Preemption (EVP)that was discussed earlier in this document and is currently being deployed using separate hardware. 3.2 Traffic Management Center (TMC) Upgrades The City has a Main Traffic Management Center(TMC) located at the City Hall Building, (20 Civic Center Plaza, Santa Ana, CA 92701).There is also a Remote TMC located with the same address in the adjacent Ross Annex Building. The Annex where all traffic operations staff offices are located and represents a better location for the City's TMC operations.The Main and Remote TMCs are depicted in Figure 39. Figure 39 — City of Santa Ana Existing Main TMC and Remote TMC s r a City staff are proposing to relocate the existing Main TMC facility and related systems into the Annex Building.This will allow them to decommission the existing Main and Remote TMC(RTMC), and thereby centralize their traffic operations and related systems within a new Main TMC area.This new Main TMC is to be located on the same floor and traffic operations area, as currently employed by all traffic personnel.This will realize better efficiencies, and coordination of traffic operations for City staff. �y+N or+aHcer 32 Citywide Traffic Signal and ITS Master Plan Final Version 3.0 Figure 40— Proposed Main TMC Floor Plan and Expansion Diagram _ Proposed new Main TMc shown with f new console furniture and 5x1255" Video wail in new space along with other proposed console furniture Y J. LF s � r , r i 1 f — Repurposeexisting 55"Samsung Monitors L Proposed new TMC \— Reconfigure existngcubicle space X2fulis&e Equipment Room A conceptual proposed floor plan option for this relocation effort is depicted in Figure 40,for planning purposes only.This represents a possible floor plan that provides up to four operator workstation areas,view windows for visitors, and a new video wall that can deliver a third more view space on the video wall. Isometric views of this proposed plan are depicted in Figure 41. Now this plan impacts the existing conditions and how it relates to the overall space is depicted in Figure 42. A review of this plan presents what can be considered a `net zero loss impact'to currently available cubicle office spaces. In fact,the two smaller existing cubicles become two full size spaces as per all other cubicles in the floor space. In this configuration, no current cubicle spaces are lost with this new Main TMC relocation, and the RTMC area becomes a much larger TMC space that can house significantly more operators and operations. 64 2 Q�N ORANCe O � K Citywide Traffic Signal and ITS Master Plan Final I Version 3.0 Figure 41 — isometric Views of proposed Main TMC Floor Plan and Expansion Diagram I f- The existing Main TMC employs older SAMSUNG LCD monitors configured to work in a video wall setup. These systems and related TMC hardware/software are reaching(or have reached)their End of Life (EOL) status, and should be replaced, as part of any TMC upgrades or expansions that are planned.Some of these systems may be repurposed for displays to be used in staff offices, conference rooms or public areas. Paired with a Next Unit of Computing(NUC)these systems could run video software to display city traffic conditions or other city information.Two repurposed displays are shown in Figure 42.The following section provides some recommended TMC equipment options,as depicted in Figures 40,41 and 42.These options are shown and discussed here so that City staff can gain an understanding of available hardware that can support the operations of the Main TMC.With these options we can also define some anticipated budgets for this level of upgrade. 1 �}: Citywide Traffic S,gg M and ITS Mes9ef Plan 'F Final i Verslnn 3.0 i Figure JI-Pupa Sed Win TVC Reloc —a and Expansion Diagram r�.[erown EvrtiwAnnea Byjfd!9igE]lR4F�IkVGfHfMCI Wru Cnnitenrar'an. r�9wvvea.-��snxu.ro„re peu{Flgs'ff'f^14An�6v'ltlfna Ma'nTMC CvnfiRu raflan Floe,%gyp i���� __ _ _ _ _ _ II i g� ly a�Aleel nnnn�.e�.ildiassw�Fp�.A =��wr �'� w,uauw ww•�o _ � . - 3TM1 eye O _ e City of Santa Ana Proposed Main TMC x _ Relocation iferis =O�p oreanr�e o i Citywide Traffic Signal and ITS Master Plan .�. it Final I Version 3.0 3.2.1 Proposed Video Wall Equipment Iteris recommends the PLANAR Clarity Matrix G3 ( https://www.planar.com/products/lcd-video-walls/clarity- matrix-lcd/) video wall system to replace the existing Main TMC and RTMC video walls. With the new Main TMC design proposed,the PLANAR system will allow City staff to fully maximize the available room for the overall operations, and the 6x2 55"size configuration will allow integration and display of all TMC systems and software for display on the video wall. Display of the Signal System,Video Management Systems, and any other TMC related software will be available to TMC operators on the video wall, or the console workstations.Some key features of the proposed video wall solution approach include: 1. PLANAR Clarity Matrix Video Wall LCDs comes with: a. EasyAxisTM mounting system provides for mounting less than 4"from wall surface and perfect panel-to-panel alignment for an exceptional looking integrated wall. b. Thin tiled bezels with as narrow as thin as.88mm (0.035") or 1.7mm (0.067") c. Off TV-remotely co-locate processors, power,content sources—to be located in rack d. Off TV-board power supply modules--does not require 120VAC on wall behind monitors e. Reduced heat load at LCD monitors, hence no heat into the TMC space extending monitor life f. Fewer points of failure at the video wall realizes High MTBF and low MTTR g. Ambient light sensor reduces the entire video wall brightness during dark times of the day, lowering operating costs. 2. Reduced Cable Count to the Wall:Two power cables are daisy-chained, and one single Cat 6 per panel is all that is needed between the video wall and the equipment rack 3. Built-in Video Extenders: Eliminates compatibility issues and costs of third-party extenders. 4. WaIlDirector Software:An intuitive and powerful software tool to simplify installation, configuration, and operation of the video wall, Comes standard with the QUAD processors eliminating costly 3`d party video wall controllers.WaIlDirector, provides simple one button presets allowing users to: a. Set-up and configure a video wall design, b. Recall windowing layouts, c. Drag and drop sources on the video wall canvas, d. Easily manipulate the window size and position, e. Capture the health status of all video wall components. 5. Reduced Back Footprint: Power Supply(PS) and Video Controller(VC)modules are all that is required to operate the video wall and fit into 6 rack units of the equipment rack space for every four monitors. 6. Reduced Floor Space Requirements: Meeting ADA compliance and improving the layout of the room is a benefit of this design. Note also that no space or power is required behind the video wall, as with existing SAMSUNG systems.This makes for much more available room in the equipment room and less cabling to/from.An issue with the current deployment. 7. Image Scaling: Planar Big Picture Plus Processing, Planar WallSync, PiP,4K at 60Hz upscaling and downscaling Figure 43 depicts examples for the use of the PLANAR G3 Video Wall Systems for the College Station Texas TMCs deployed by Iteris,like the system recommended here for City of Santa Ana.These systems were 42 55"video walls whereas Santa Ana is recommended at a 6x2 55"maximum size recommendation.Employing the PLANAR G3 system can allow for this type of expansion should city staff wish to phase the video wall deployment. ao��oRnticec a� z Citywide Traffic Signal and ITS Master Plan Final I Version 3.0 Figure 43 Example TMC Monitor Walls (4x2 55" and 4x2 46") Employing PLANAR LCO Tiled Monitor Systems i_ a- a+ai :-•ems.=i.. 5 _ f City of College Station, Texas-Signal Shop TMC City of College Station,Texas- Main TMC 42 5S" PLANAR Monitor Wall 4x2 46" PLANAR Monitor Wall In terms of estimated costs,a 4x2 55" LX55M video wall matching the current Sant Ana Main TMC configuration would cost about$70,000—like the systems shown in Figure 43. This could be a starting point for the City and would allow for future expansion to a 6x2 size wall if budget was a problem.To deploy video wall like what is depicted in Figure 43, but in a 6x2 55" LX55M G3 video wall configuration, as can be recommended here for City of Santa Ana;equipment costs are estimated at around $101,000 MSRP.That configuration represents the largest video wall that could fit in the proposed room, as depicted in Figures 40, 41,and 42. 3.2.2 Proposed TMC Furniture There are many options for control room furniture that can be explored with City staff.The plans shown in the previous section depict the use of Winsted (https://www.winsted.com/console-products/)furniture consoles.This recommendation is made primarily from the experience Iteris has with this company, deploying several TMC and using their consoles. Figure 43 shows the use of this furniture for the College Station TMCs deployed by Iteris.The proposed console furniture configurations depicted in Section 3.1 is comprised of a Site-Line(https://www.winsted.com/sightline-consoles/) Dual operator Peninsula console with two Single Operator Curved Insite Line(https://www.winsted.corn/iinsight-consoles/)of consoles.The console configuration shown for the proposed Santa Ana Main TMC(shown in Figure 41) is estimated at $60,000 for all three consoles. 3.2.3 Proposed TMC Workstations While existing TMC workstations may still be operational,the need to upgrade these machines is a consideration City staff must plan and budget for as part of any upgrade.Since the City uses Milestone Xprotect for their VMS, it can be assumed Xprotect will demand the most out of any PC required for at TMC. Employing Milestone's Husky IVO solutions is a good approach to deploying proper pre-configured hardware. At minimum this is a good indication of the minimum configuration City staff should plan for. Employing Milestone's configuration tool for their Husky IV©workstations returned the following minimum configuration: o�N onan,ce Z Citywide Traffic Signal and ITS Master Plan Final N Version 3.0 *milestone I Husky lYa Camera Configuration Cams DPs ihi Rae.% Days :ndar CcmF{c.:tq PPS Rate fi(lbi Notes in 24 .0 30 N?&C Meerum 720p[128U720} 30 2643 Configuration Summary/ IR Carerdi 101) Data ra:e 26A CO hlmtiser Storage rtgcrred. '7.11 TS Storage ii overtedd: 4.r;1 TO Hardware Selected 350 Tower quantity Technical Specification f—Fac!cr D—i7—e,Farm 7-:3r P,O—Sor Type Ir,i6%Care"'r3-1 G1X ❑peranng syclerr w.rnn•a51111'f-r,r•:nc.•:a; Harp Drive gays _,3 s'i rtern l; �.SdiIm1.R".$l[Ifdge 1 B T3 RAID SL Ppn11 16G0.RA DD,RAJD1 Pov.er i,:Ppiy 4FG W RA it G87Da4 qpc"J:l':X Sys[erf 7"rl' .254r-6 r,V.29Ue It S�:1 While Husky can be recommended, a comparable Dell solution that could be recommended, would be as follows: Customize Option Selection SKO/Pmdrrct Cade Quantity Processor mlel.RCr,m-MIA UOUX(19.25 W cache,10—s.2D threads.3.70 GHz 1339-6D.'1VK389-CGEV}[412-AALFl1 I So A 70 GHI TurSe.165 W] 04QS7KC Operating Sgster-z Windows 11 Pm,English,French,Spanish 1519.AQCEI!G60Ld09 1 chassis options Precision 5820 Toa'et COre X 954W PGfe Flii Chassis CL WX 1221-OGTPI Y G79GHYC 1 Graphics Card NVIOIA,F RTX-'AS000.24 GB GDDR6,4 DP 1490-6GZH}r GmSC9x I Memory 128 G8,8 x 16 GB,DORI [37aAGlOi!GA68CDN I Systems Management No 0113anJ Systems Maoog—rrt [831-AiNOVPRO 1 Operating System(8ori Drive Intel NVMe PCEa SSD tPront PCle Flex8ay) €414-11 Fi 1 Storage Drive CarttrtldlCfS Intel Integrated ccniroiEer iA$T e;r-h 1-2 1 Flex®ay NVIvIe PCIe Drives [321-60'Ng i GCDHBPJ 1 Hard Drive I TP.N12,PCIe NVMG SSD,Cla.a 40 [400-AV0R![401-ABJR[i 1TC40ME 1 Additian81 Starage 1TE.V-`UI NVIAc.SSD,SED Opal2A.Class 49 €409-A.VDR]1301-ARGMI 1TSi 1 This solution from Dell would retail for around$5,000 including (2) 27" monitors. Iteris, Inc. 69 EXHIBIT B teris.com 400 SanOta Ana,CIA 92705e, Suite 100 iteH5 Carneg ALMAVIVA GROUP COST PROPOSAL June 18, 2026 Cesar Rodriguez, Senior Civil Engineer City of Santa Ana—Public Works Agency 20 Civic Center Plaza Santa Ana, CA 92701 Re: Cost Estimate for RFP No.26-026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project 11477-451.25 Dear Mr. Rodriguez: Iteris, Inc. (Iteris)is submitting this budgetary cost proposal response to Request for Proposal(RFP)for 26.026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization project,The Proposal Pricing (page 2)summarizes Iteris'Cost Proposal.All Improvements shall be performed in accordance with the Improvement Item cost(beginning page 4). Per the City's request, backup costs for each improvement Item is also provided as Attachment A. Iteris proposes Joshua McNeill, PE, TE, PTOE, as Project Manager for this project. He will be the principal contact with the City of Santa Ana, Mr. McNeill will oversee work from project inception to completion and will also be responsible for coordinating staff activities and meetings. I, Steven Bradley, PE, am authorized to negotiate this contract on behalf of Iteris. Iteris is a qualified firm with valid California Civil Engineering, Traffic Engineering and Electrical Engineering licenses to complete the detailed scope of work. By submitting this proposal, Iteris asserts that we have fully read the RFP and any addenda issued by the City,the proposed Contract and any other Contract Documents, and affirms that the terms and conditions stated therein are fully understood and are acceptable to Iteris. Iteris accepts the terms and conditions of the Contract Documents and indicates our ability and willingness to perform the requested services under such terms and conditions, Iteris acknowledges Q&A Set 1 released via email/Planetbids portal on March 28, 2026. This proposal is valid for a minimum of one hundred eighty(180)days following proposal deadline. Thank you for the opportunity to submit our proposal. Iteris looks forward to assisting the City of Santa Ana with this important project. Please contact me at(949)270-9647 or sdb@iteris.com, or the designated Project Manager(PM), Mr. McNeill, at(949) 270-9579 or JMcNeill@iteris.com, should you have any questions. Sincerely, Iteris,Inc. Steven Bradley, PE Senior Vice President Mobility Consulting Services,West Steven Bradley, PE is authorized to negotiate the contract on behalf of!fens and our project manager. w .. COST PROPOSAL I CITY OF SANTA ANA RFP No. 26-026--Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project PROPOSAL PRICING Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services (Exhibit 1) and am qualified to provide services being requested as specified herein. I understand and agree that I am responsible for reporting any errors,omissions or discrepancies to the City for clarification prior to the submission of my proposal. PROPOSER'S STATEMENT: I have read, understood and agree to the terms and conditions on all pages of the Request for Proposals. Upon request, I will transfer and deliver goods or services to the City in accordance with said terms and conditions. Agency Project Tasks Santa Ana Costa Mesa Newport Beach Total Cost (24 Signals) (18 Signals) (8 Signals) Task 1: Project Management- $5o,79Q $39,050 $17,400 $107,240 PI Phase Task 2: Data Collection $28,484 $21,480 $7,720 $57,684 SubTask 3.1: System Design $145,693 $80,200 $34,800 $260,693 SubTask 3.2: System $1,511,545 $988,471 $334,561 $2,834,577 Construction and Integration SubTask 3.3: Construction $162,175 $151,400 $57,650 $371,225 Management Task 4:Signal Timing Optimization and $5,250 $9,340 $- $14,590 Implementation Task 5: Project Report $22,634 $18,490 $8,140 $49,264 Task 6: Project Management - $9,512 $7,200 $3,400 $20,112 O&M Phase Task 7:Continuing Support $52,255 $40,050 $16,170 $108,475 Task 8: Final Technical $6,624 $5,470 $2,760 $14,854 Memorandum TOTAL $1,994,962 $1,361,151 $482,601 $3,838,714 Iteris,Inc. 12 COST PROPOSAL I CITY OF SANTA ANA RFP No.26-026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project Iteris Inc. 949 270-9400 LEGAL NAME OF COMPANY PHONE AND FAX NUMBERS _1700 Carnegie Ave, Santa Ana, CA 92705 BUSINESS ADDRESS Steven Bradley Senior Vice President _ PRINTED NAME OF AUTHORIZED AGENT TITLE 6/18/26 sdb@iteris.com SIGNATURE OF AUTHORIZED AGENT DATE E-MAIL ADDRESS 1096882 FEDERAL ID NUMBER (IF APPLICABLE) CONTRACTOR LICENSE NUMBER (IF APPLICABLE) 320481 CITY OF SANTA ANA BUSINESS LICENSE NUMBER (PLEASE PROVIDE IFAVAILABLE,BUT NOT REQUIRED UNTIL AND IFAN AWARD 15 MADE TO PROPOSER) Iteris,Inc. 13 - �� MM COST PROPOSAL I CITY OF SANTA ANA RFP No.26-026—Design-Build Services-Bri5tol Street Corridor Regional Traffic Signal Synchronization Project Item.No. Agency Bristol Street @ Item Description Unit Quantity Yunex Total Iteris Conelruct€on Equipment Total 1 Santa Ana SR-22 EB Ramp Calirans Cooperative Agreement{Timi ng Improvements only) Eft 1 $ 2.452.36 $ 2,452.38 2 Santa Ana Riverglen Lane Furnish Ethernet Swich-Etherwan EX78934X-OVB{w(4)1GBSFP`s and Power Supply) EA 1 $ 5,791.16 S 5,791.15 3 Santa Ana Riverglen Lane Furnish ATC Cori Econalit.Cabak Rackmount wf£OS Software FA 1 $ 6.215.47 S 6,215.47 4 Santa Ana Riverglen Lane Furnish and Install Signal Cabinet on New Foundation-E—lite ATCC(Including new $ 46,675.DO S 19,300.23 $ 65,975.2E Type 1113 Meter Pedestal,SCE Conduit.SCE Design Fees,No.6E Pull Box,and necessary EA 1 Conduits 5 Santa Ana Riverglen Lane Furnish and Install Video Detection System(4 Camera Systerri Eoono6ite Autoi EA 1 $ 7,325.00 S 30.325.58 $ 37,650 56 Vision 6 Santa Ana Memory Lane Furnish Ethernet Swtch-E4herwan EX75934X-CV13{w((4)1GB SFP's and Power Supply) EA 1 $ 5.791.16 $ 5,791.16 7 Santa Ana Memory tare Furnish ATC Controller-Econclite Cobalt Rscklnountwf EOS Sothe EA 1 S 6,215.47 $ 6,215,47 a Santa Ana Santa Clara Avenue Furnish Ethernet Switch-Ethaavan EX78934X-OVE{wl(4)'1 SFP's and Pourer Supply) EA 1 5 5.791.16 $ 5,791.16 9 Santa Ana Santa Clara Avenue Furnish ATC Controller-Econahts Col Rackmount wf EOS Software EA. i S 6,215.47 $ 6,215.47 10 Santa Ana Bristol Market Place! Furnish Ethernet Switch-Etherwan EX78934X-OVB(wf(4)1GB SFP's and Power Supply) EA 1 $ 5.79i.le $ 5,791.16 19th Street 11 Santa Ana Bnstol Market Place! Furnish ATC Controller-Econolite Cobalt Rackmount wf FOS Software EA 1 $ 6,216.47 $ 6,215.d7 19th Street 12 Santa Ana Bristol Market Place! Furnish and Install Video Detection System(4 Camera System)-Econolite Autoseope EA 1 S 7,325.00 $ 3u 32558 $ 37 e5n,58 19th Sir--: Vision 13 Santa Ana 0ril Market Placef Furnish and Install Audible Pedestrian Deteci System-Pelara(iNS2 I 1 $ 3,950.00 $ 7;312.32 $ 11,262.32 19th Street 14 Santa Ana 171h Sri et Furnish Ethernet Swtch-Etherean EX78934X.OVS(W(4)1GB SFP's and Powe^Supply) EA 1 5 5,791_i6 S 5791.16 15 Santa Ana 17tri Street Furnish ATC Controller-Econolite Cobalt Rackmauntwf FOS Software EA 1 $ 6,215,47 S 6,215.47 16 Santa Ana 17th Street Furnish and Install Audible Pedestrian Detedpon System-Polara(iNS2) EA 1 3.95C.00 S 7,312.32 $ 11 262.32 17 Santa Ana Washington Avenue Furnish Ethernet Switch-Etherwan EX78934X-CVB(wl(4)1 GB SFP's and Power Supply) EA 1 $ 5,791.16 S 5,791.16 18 Santa Ana Washington Avenue Furnish ATC Cor i .Econolite Cobalt Rackmountwf EOS Software FA 1 $ 6,215.47 5 6,215.47 19 Santa Ana Civic Center Drive Furnish Ethernet Switch-Etherean EX78934X-0VB lwf(4)1 GB SFP's and Pourer Supply) EA 1 5 5,791.16 $ 5,791.15 20 Santa Ana Civic Center Ddve Furnish ATC Controller-Econolite Cobalt Rackmount wf E055o1fhrare EA 1 5 6,215.47 $ 6,215.47 21 Santa Ana Civic Center Drive Furnish and l nstall CC TV Camera-Axis 46356-LE iwf SOW midepan POE injector and EA 1 $ 2,375.00 S 3,626.97 S 6,001.97 r,bla unt R Santa Ana Santa Ana Bculevard Furnish Ethernet Swltdi.Etherwan EX78934X-CVB(wl(4l.1GB Si and Power Supply) EA 1 5 5,791.15 S 5.791.16 23 Santa Ana Santa Ana Boulevard Furnish and Install CCTV Camera-Axis W50-LE(wf SOW midepan POE injector and EA i 8 2,375.0C $ 3,626.97 S 6,001.97 MI.mount 24 Santa Ana 1st Street Furnish Ethernet Switch Etherwan EX78934X-0VB(vd(4}108 SFP's and Power Supply) EA 1 $ 5,791.16 S 6,791.16 25 Santa Ana 1st Street Furnish and Install Audible Pedestrlan Dalecpon System-Polara(iNS2) EA 1 S 3,950.00 $ 7,312.32 S 11,262.32 25 Santa Ana Bishop Street Furnish Ethernet Switch-Ethenvan EX78934X-CVB(W(4)1 GB SFP's and Power Supply) EA 1 $ 5,791.15 5 5.791,16 27 Santa Ana Bishop Street Furnish ATC Controller-Econolite Cobalt Rackrnaunt wf FOS Sothvers EA 1 $ 6,215.47 3 6,215.47 28 Senta Ana MCFaddep Avenue Furnish Ethernet Switch-Ethenwan EX78934X-OVS(vw(4)1G8 SFP's and Power Supply) EA 1 S 5,791.16 S 5.791_ie 29 Santa Ana McFadden Avenue Furnish ATC Controller-Econclite Cobalt Rackmount wsr FOS Sollware EA 1 $ 6.215.47 S 9,215,47 30 Santa Ana Wilshire Avenue Furnish Ethernet Switch-Etherwan EX78934X-OVS(wf(4)lGB SFP's and Power Supply) E4 1 $ 5,791.16 $ 5,791,16 - -31 Santa Ana Wilshire Avenue Furnish ATC Cantmller-Econolita Cobalt Rai mount w)EOS Software EA 1 $ 8.215.47 S 5,21SA7 32 Santa Ana Wilshire Avenue Furnish and lni Signal Cabinet on New Foundation-Econolite All(Induding new S 46,675,00 $ 19.300.28 $ 65,975.28 Type IIB Meter Pedestal,SCE Conduit,SCE Design Fees,No 6E Pull Boy.,and necessary EA 1 Conduits 33 Santo Are Edinger Avenue Furnish and Install Signal Cabinet on New Foundation-Econclite ATCO(induding raw S 46,675,o0 $ 19.300128 $ 65,975.28 Type IlB Meter Pedestal,SCE Canal SCE Design Fees,No.6E Pull Box,and necessary EA 1 Condu is 34 Santa Ana Edinger Avenue Furnish and Install Audible Pedestrian Detection Systam-Polars QNl EA 1 S 3,Sim on. $ 7,312.32 $ 11,262:32 Iteris,Inc.14 COST PROPOSAL I CITY OF SANTA ANA UP No.26-026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project Item No. Agency Bristol Street It..Description Unit Quantity Yorri Total I there Construction Equipment Total 35 Santa Ana SL Andrew place Furnish ATC Controller-Eccnoiite Cahalt Rackmount W EOS Software EA 1 i S 6,215.47 $ 6,215.47 35 Santa An Glenwood Place Furnish Ethernet$Mitch-Ent-an EX78934X-OVS(w1(41 tGB SFP's and Power Supply) FA 1 5 5,791.16 $ 5,791.16 37 Santa Ana Glenwood Place Furnish ATC Controller-Edon,tits Cobalt Rackmountwl EOS Software EA 1 $ 6,215.47 $ 6,21S.47 38 Santa Ana Central Avenue Furnish Ethernet Switch-Etheiwan EX71104X-Ol(wl(4)1GB SFF's and Power Supply) EA 1 S 5,79t,16 5 5.791.16 39 Santa Ana Central Avenue Furnish ATC Controller-Fermi Cobalt Rackmount 1d EOS SaM1ware EA 1 $ 6 215.47 S 5,215,47 40 Santa Ana Central Avenue Fwnish antl Install Signal Cabinet on New Foundadan-Econoliue ATCC(inoluil new $ 46,875,00 S 19,300.28 $ 65,975.26 Type IIB Meter Pedestal,SCE Chi SCE Design Fees,No.6E Pull Box.and necessary EA 1 Conduits 41 Santa Ana Central Avenue Furnish and Install Video Detection System{4 Camera Systerl Epsa iia Autaarope EA 1 $ 7.325.00 S 30,325.58 $ 37,650.59 vision 42 Santa Ana Hemlock Way Furnish Ethernet Swatch-Etherwan EX78934X-OVB(wl(4)1GS SFP's and Power Supply) 1 $ 5.791.16 S 5,791.16 43 Santa Ana Handock Way Furnish ATC Controller-Econalite Cobalt RacknwuntW EOS Softeure EA 1 $ 6,215.47 S 5.21547 44 Santa Ana Harrdoek Way Furnish and Install Signal Cabinet on Naw Foundation-Econ rlits ATCC uncludng new 5 46,675.00 5 19.30028 $ 55,97628 Type In Meter Pedestal,SCE Candid[,SCE Design Fees,No,BE Pull Sax,and necessary EA 1 Conduits 45 Santa Ana Hemlock Way Furnish and Install Video Detection Sy. tam(4 Camera System)-Eoorollte Autuscppe FA 1 S 7,32500 $ 30,32558 $ 37,650,58 Vision 46 Santa Ana Segerstrom Avenue Furnish and Install Audible Pedestrian Detection System-Polara(iNS2l EA 1 S 3,95000 $ 7,312.32 $ 11262.32 47 Santa And Altar Avenue Furnish Ethernet&wriich-Etherwan EX78934X-OVB(wf(4)1GB SFP's and Power Supply) EA 1 $ 5,791.16 5 5,791,15 48 Santa Ana Alton Avenue Fumish ATC COMrOIIer-Ecnnolits Cobalt Rackmountwl EOS Software EA 1 $ 5,215,47 $ 6,21ISAT 49 Santa Ana Btistol Plaza Furnish Ethernet Swish-Etllerwan EX78934X-OVP(wf(4)1GB SFP's and Power Supply} EA 1 $ 5,791.16 $ 5,791,16 so Santa Ana Bristol plaza Furnish ATC Controller-Econalite Cobalt Rackmount W I Software EA 1 5 6.215.47 S 6.215.47 51 Santa Ana Rinser Plaza Furnish and Install Video Dataation System(4 Camera System)-Elite Auioscope EA. 1 $ 7,325cl) $ 30,325,58 $ 371155 Vision 52 Santa Ana Mpc/utfidrBqulevapm Furnish and Install Audi ble Pedestrian Deteetion System P9lana(iN321 EA 1 5 3,950,00 S 7,312.32 $ 11,262.32 53 Senla Ana Callers Common Furnish Ethernet SWlteh-Ethenean EX75934X-OVS(W(4)1GB SFP"s and Power Supply) EA 1 $ 5,791,16 s 5,721.16 54 Santa Ana Calls-Common Furnish ATC Controller-Econolite Cobalt Rackmountwl EOS Software EA 1 $ 6,215.47 S 6,21547 55 Sane Ana Callers Common Furnish--'install Video Detection System(4 Cen—Syatamr Ecandite Auescope EA 1 S 7,325.00 $ 30,325.5S $ 37,650.55 Vision 56 Santa Ana TMC Refer to Exhibit l Scope of WarkSub-Task 32 System Constiuctian and lmer9ration,I LS 1 $ 125,152.21 5 417,037,03 $ 542,ISR24 TMC Improvements Santa Ana 57 Costa Mass 'Sunflower Avenue Furniah and Install Ethernet Si Etherven EX78924H I(wl(2)Iru SFP's and EA 1 $ - 858.73 $ 3,971.48 $ 4,828.21 Power Su 58 Costa Mass Sunflower Avenue Furnish antl install Lays,3 Ethernet SvircM Ethervem IGS08164-CIN(W(10)1GB,(4) EA 1 $ 8.400.00 $ 15.271.73 $ 23,671,73 10GB SFP's and Power Su 1 59 Cosa Mesa Sunflower Avenue Furnish and Install CCTV Camera-Axis QS225-LE(o l 9OW midspan POE injector and EA 1 $ 2,375.0 $ 4,061.22 $ 6,41R22 Ea mount 60 Costa Mesa Sunflower Avenue Furnish and Install Video Detection System(2 Camera System}-Mioviaion EA 1 $ 4,251 5 30,052.1C $ 34,3a210 61 Costa Mesa Sunflower Avenue Furnish and Install Audible Pedestrian Detection System-Polara hDS2) EA 1 $ 3,950.00 $ B,272.98 $ 12,222.99 82 Cosa Mesa Town Center Drive Furniah and Instal Ethernet Switch-Etherwan EX78924H-1(wl(2)1GE$FPe and EA 1 $ - 135S73 $ 3.971.48 $ 4,82821 Power Supply) 83 Costa Mesa Town center Drive Furnish and[.tell CCTV Camera-Axis G63WLE(ad 90W midspan POE iniecer and EA 1 $ 2,375C0 $ $526.97 $ 6,001.97 Dole mount 64 Costa Mesa Town Center Drive Furnish and Install Video Ceteston System(2 Camera Systemi Miovision EA 1 $ 4,250.00 S 36,D5219 $ 34,302.10 65 Costa Mesa Town Center Drive Furnish and install Audible Pedestrian Detection System Polara(iNS2) EA 1 $ 3,950.00 S 7,312.32 $ 11,21 86 Costa Mesa Anton Boulevard Furnish and Install Ethernet Swith-Etherwan EX76924H-0VHSwf(4)1GBSPP's and EA 1 8 856.73 3 4,839.38 $ BOB,11 Power Su I 67 Crete Mesa Anton Boulevard Furnish and Install CCTV Camera-Axis 06358-LE(w190W midspan POE injector and EA 1 $ 2,375.00 $ 3.626-97 $ 6,001,97 le mount nton 58 Costa Mesa A Boul evard Furnish and Install Vudeo Detection System-Mlaveatn EA 1 $ 4,2W00 S 30,052.10 $ 34,302.10 59 Costa Mesa Anton Boulevard Furnish and Install Audible Pedesti an caledian System,Polara(iNS2) EA 1 $ 3,950.00 $ 7.312.32 $ 11,267 32 Iteris,Inc,15 COST PROPOSAL I CITY OF SANTA ANA RFP No.26-026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project 4tem No. Agency Bristol Streets Rem Descllptlon Unit Quantity Yuoex.Total III Construction Equipment Total 70 Costa Mesa IADS NB Ramp Cali Cooperative Agreement(Timing Improvements only) EA 1 $ 2,452.36 3 2,452.36 71 Costa Mesa IAO6 SO Ramp Caltrans Cooperative Agreement(Tinting improvements only) EA 1 $ 2,452:86 $ 2,452.36 72 Costa Mesa Hotel Way Furnish and Install Ethernet Switch Etherwan EX78924HAVB(wl(2Y I OR Sil and EA 1 5 858.73 S 3,971.48 $ 4,628.21 Power Su 73 Costa Mesa Hotel Way Fumish and Install CCTV Camera-Axis Q6358-LE(wl 90W midspan POE injector and EA 1 $ 2.37300 $ 3,626.97 $ S,061.97 le rind-0 74 Costa Mesa Hotel Way Furnish and Install Audible Pedestrian Detection System-Polar,(iNS2) EA 1 $ 3.950.00 S 7,312.32 $ 11,262.32. 75 Costa Mesa Paularino Avenue Furnish and Install Ethernet Swtch-Eth—n E03575(wl(2)1GB SFP'e and Power EA 1 $ 856.73 $ 3.003.09 $ 3,859.82 supply) 76 Costa Mass Paularino Avenue Furnish and install CCTV Camera.A<a 06358-LE Iw/9PW midspan POE injector and 6A 1 $ 2,375-00 5 3,626.97 $ 6.001,97 e mount 77 Costa Mesa Paularino Avenue Furnish and Install Video Detection System(2 Camera System)-Miovisian EA 1 S 4,26audd $ 30.052.10 $ 34,3C2.10 78 Costa Mesa Paularino Avenue Furnish and Install Audi Pedestrian Detection Systerh Polar.(iNS2) EA 1 $ 3950.00 $ 7,312.32 $ -11 262,32 79 Costa Mesa sake,Street Furnish and Install Ethernet Switch-Etherwan EX78924H-0VB(wl(4)1 GB SFP's and EA 1 $ 866.73 8 4.539.38 $ 5,696.11 Power Su I Be Costa Mesa Baker Street Furnish.and Install CCTV Camera-Axis 06358-LE(wl 91 midspan POE injector and EA 1 s 2,375.00 $ 3,626.97 $ 6,001.97 Idi unE 81 Costa Mesa Baker Street Furnish and Install Audible Pedestrian Detection System-Polare(iNS2) EA 1 $ 3,950.00 $ 7,312.32 8 11.262.32 82 Costa Mesa Sobeca Way Furnish and Install Ethernet Si Ethemium E 78924H-0VB(wW(2)1 GB SFP's and EA 1 $ 856.73 8 3,971.43 $ 4.828.21 Power Su 83 Costa Mesa Sobeca Way Furnish and Install CCN Camara-Axis Q6358-LE(I 90W midspan POE injector and EA 1 $ 2.375,00 $ 3.626.97 $ 61 e mount 84 Costa Mesa Randolph Avenue Furnish and Install Ethernet Switch-Etherwan EX78924i(wl(2)1GO Sl and EA 1 $ 856.73 $ 3,971,48 $ 4.828.21 Power Su 1 85 Costa Mesa Randolph Avenue Furnish and Install CCTV Camera-Avis Q6358-LE Iw190W midspan POE injector and EA 1 ; 2.373 00 $ 3,826.97 $ 6,001 97 e mount 86 Costa Mesa Randolph Avenue Furnish and Install Video Detection System(2 Camara Systamt-Mievurion FA 1 $ 4,250.00 $ 30,D5ZIC $ 34.302.10 87 Costa Mesa Randolph Avenue Furnish and Install Audible Pedestrian Oeteclton System-Pokers(iNS2) EA 1 $ 3.951 $ 7,312.32 $ 11262.32 88 Costa Mesa Bear Street Furnish and Install Ethernet Swich-Ethsrwan EX76924H-CVB Iwi 1211 GB SFP"sand E4 1 $ 856.73 ff 3,971.48 $ 4,11 1 Power suppli 89 Costa Mesa Bear Street Furnish and Install Signal Cabinet on New Foundation-Econotlte NEMA 7S2-1 P66 $ 46,255.00 $ 21 811.37 $ 69,666.37 Cabinet on New Foundation(including maw Type III-BF Meter Pedestal,SCE Conduit, EA 1 SCE Design Fees No.6E Pull Box and necessary Conduits 90 Costa Mesa Bear Sheet Furnish and Install CCTV Camera-Axis 06358-LE(wl 90W midspan POE injector and EA 1 $ 2,375.00 $ 3,626.97 S 01I01.97 e mount 91 Costa Mesa Bear Street Furnish and Install visa.Detection System(2 Camara System)-Mlovision EA 1 $ 4,250.00 $ 30,0tizlo $ 34.302.1C 92 Costa Mesa Baar Street F.umiah and Install Audible Pedestrran Catectioo System-Polara{11492) EA 1 $ 3,95ti $ 7.312.32 S 11,262.32 93 Costa Mesa Newpan Boulevard 58 Furnish and Install Ethernet Stitch-Ediervvan EX78924H-0VB(wl(2}1GB SFP's and EA 1 $ 856.73 $ 3,971.48 S 4,628,21 Power Su 94 Costa Mesa Newport Boulevard SB Furnish and install ATC Controller-Econolite Cobalt Shelf Mount W ECS Software EA. 1 S 892,04 $ 5.723.31 S 6,615,35 95 Costs Mesa Newport 8eulevard$8 Furnish and Install CCN Co..-Axis Q6358-LE(w!90W midspan POE injector and EA 1 $ 2.375.00 $ 3,626.97 8 6,001.97 Is mount 96 Costa Maine Nawpor SBoulevard 88 Furnish and Install Video Detection System(2 Camara 5yaterni Mtovision EA 1 $ 4.250.00 $ 30,05210 $ 34,302.10 97 Costa Maas Newpan Boulevard SB Furnish and Install Audlole Pedestrian Oatasdon System-Polar.(iNS2) EA 1 S 3,950.00 $ 7,312.32 $ 11,262.22 98 Costa Mesa Newport Boulevard NB Furnish and Install Ethernet Switch-Etherwan EX78924H-0VB(w!(2)iGB SFPs and Eft 1 $ 85673 $ 3,971.48 S 4,628.21 Power Su 99 Costs Mesa Newport Boulevard NB Furnish and Install ATC Controller-Econdite Cobalt Shelf Mount wl EOS Software EA 1 $ 89204 $ 5,723.31 $ 6,619.31 100 Costa Mesa Newport Boulevard N8 Furnish and Install CCTV Camera-Axis 06358-LE(wf BOW midspan POE injector and EA 1 $ 2.375_.00 $ 3,626,97 $ 6 out 97 le mount lot Costa Mesa Newport Boulevard Ne Furnish and Install Audible Pedestrian Detection System-Polar.(iNS2) EA 1 $ 3,960.00 $ 7,312,32 $ 11,262.32 P12Costa Mesa Santa Ana A .a/ Furnish end Install Ethernet ewteh-Ether an EX78924H-0V8(wl(2)10B SFPs and $ 856.73 $ 3.971.48 $ 4,828.21 Redhill Avenue Power Supplyl Costa Mesa Santa Ana Avenue! Furnish and€nstall CCTV Camera Axis Q5358-LE(a 90W midpan POE injector and E4 1 $ 2,375.00 $ 3,62697 $ 6.001.97 Redhill Avenue IemoutCosta Mesa Santa Ana Avenue/ Furnish and Inslell Audible Pedestrian Oetecuon System-Porain(iNS2} 1 $ 3.95000 $ 7.312.32 $ 1126232 Redhill Avenue Costa Mesa Paularino Avenue Q Furnish and Install Ethernet Snitch Etherwen E03575(kW(2)11 SFP's and Power EA 1 $ 858,73 $ 3,003,09 $ 3,559.82. Lem Wry Sootily) Iteris,Inc.16 COST PROPOSAL I CITY OF SANTA ANA RFP No.26-026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project Item Not Agency Bristol Street @ Itam Description Unit Quantity Yunex Total Merlin Construction Equipment Total 100 Costa Mesa Pacladno Avenue Q Furnish and Install CCTV Camara-Axis Q6358-LE iW 90W midapan POE injector and CA 1 $ 2.375.00 $ 3.626-97 $ 6,001.97 Jan We ole mount 107 Costa Mesa Paularino Avenue C Furnish and install Audible Pedestrian Detection System Polara(iNS2) EA t $ 3,950.6C $ 7,312.32 5 11,262.32. Jian Way 108 Costa Mesa Anton Boulevard @ Furnish and Install Ethernet Ssdtch-Etherwon EX789241i(w!(2)10B SFP's and EA 1 $ 856.73 S 3,971.46 5 4,828.21 Park Center Drive Power 5urol rut) Costa Mesa Anton Boulevard @ Furnish and Install 12SMFO Drop Cable EA 1 6 1,915.00 $ $ 7,815.09 Park Center Drive 110 Costa Mesa Anton$aNeva,, Famish and Install Fiber Distribution unit-Coming Gonnecto[Housing(w!Splicm3. EA 1 5 1.875,00 8 S 1,375,00 Pa rk Cancer Drive Terminations Connector Panels,Tras.antl Tes[in 111 Costa Mesa Anton Boulevard Furnish and Install No.GE Pull Box(including conduit sweep) EA 1 $ 6,975.00 S $ 6,875.00 Park Center Drive 112 Costa Mesa Antan Boulevard Q Furnish and Install Splice Enclosure.Splice 12-SMFO Drop Cable and Testing EA 1 $ 3.45000 S $ 3,450,00 P/x Center Drive 113 Costa Mesa Anilevard� Furnish and Install ATC Controller-Ecanalite Cobalt Shelf Mount wl EOS SoH—re EA 1 $ 89204 $ 5,723.31 $ 6,615.35 Park Canter Drive 114 Costa Musa An Boulevard� Furnish and Install CCTV Camera-Axis Q6358i Iwl 9aW midspan POE injector and EA 1 $ 2.37500 $ 3,826.97 S 6,001,97 Park Center Drive demount 115 Costa Mesa Anton BaWevard0 Furnish and Install Audible Paol ion Detection System-Pdara(iNS2) E4 1 S 3,950,00 $ 7,312.32 5 11,26232 Park Center Drive 116 Costa Mesa Anton Boulevard Q Furniah and Install Ethernet Switch-Etherwan EX.78924m0VB(wI(2)106 Sill and EA 1 $ 856.73 $ 3,971-40 $ 4,828.21 Avenue of the Arts Povver Su II 117 Costa Mesa Anton Boulevard 0 Furnish and Install 12-SMF0 Drop Cable EA 1 $ 11,915.00 $ $ 1,915A0 Avenue of the Arts i18 Carats Mesa An Wn Baulevartl Q Furnish and Install Fiber Distribution Unit-Corning Gannedor Housing(col Splicing, Fit 1 $ 1,875.DO $ 3 1,875.00 Avenue of the Arts Terminations_Connector Panels Tn.' ra s.antl Tasdn 119 Costa Mass Anton Boulevard Fumish antl Install No.6E Pull Box includingconduit sweep} - EA 1 5 6,976.00 S 3 6,975,00 Avenue of the Arts 12C Costa Mesa Anton Bad..rd @ Furnish and Install Splice Enclosure.Splice 12-$MFO Drop Cable and Testing FA 1 $ 3,450.00 S $ 3,450.00 Avenue of the Arts 121 Costa Mesa Anton Boulevard� Furnish and Install ATC Controller-Ecorr its Cobalt Shelf MnurRwlEOS Software EA 1 $ 692.04 5 5,723.31 $ 6,615-35 Avenue ' the Arts 122 Costa Mesta Anton Boulevard @ Furnlsh and Install CCTV Camera-Axis Q6356-LE fw!96W midapan PCE micctor and EA 1 $ 2,375.00 S 3.6211 $ 6,C0t.97 Avenue of the Arts demount 123 Costa Moss Anton Badevard @ Furnlsh and Install Audible Fairest—Oatection System Polara(iNS2) EA 1 $ 3,950.00 $ 7,312.32 $ 11,262-32 Av snue of the Arts 124 Ceara.Mesa Anton Boulevard @ Furnish and Install Ethernet Svntch-Ethetwan EC'78924H-OVB Owl 12)iGB SFF,and EA 1 $ 856.73 S 3,B71,48 $ 4,828.21 Saldoka Drive Power Su 125 Costs Mesa Anton Boulevard @ Furnish and Install 12SMFO Drop Cable EA 1 $ 1.315.00 S $ 1,915,00 Saldaka Dnve t2S Costa Mesa Anton Boulevard 6 Furnish and Install Fitter DisVibudon Unit-Doming Connector Bousin;l.1 Splicing, EA 1 $ 1815.00 $ $ 1,875.00 'Saltioka Drive Yerminil',ns.Connector Panels.ha s and 7asun 127 Costa Mesa Anton Boulevard Q Furnish and Install No.5£Pull Box(including conduit sweep) EA 1 $ 6,976.00 $ $ 6,975.00 Salack.I'—128 Costa Mesa Anton Boulevard C Furnish and Install Splice Enclosure.Splice 12-$MFO Drop Cable and Testing 1 S 3,45090 $ $ 3,450.00 Sakioka Dave 129 Costa Mesa Anton Boulevard Q Furnish and Install ATC Controller-Ecanoiit.Cobalt She[[Mount wf EOS SORware EA 1 $ 69204 $ 5,723.31 $ 115 Sakioka Dnve 130 Costa Moas Anton Boulevard C Furnish and Install CCTV Camera-Axis 053WLE(wl 90VV midapan POE injector and FA 1 $ 2,376,00 $ 3.625.97 $ 6,001.97 Sddb.Drive demount 131 Costa Mesa Anton Bouevard* Furnish and Install Audible Pedestrian Detection System Polam(iNS2 I 'EA 1 $ 3,960.00 $ 7,312.32 $ 11,262.32 Sakiaka Drive 112 Costa Mass TMC Refer to Exhibit I Scope of Work.Sub-Task 3.2 System construction and Intergrakan.F 2. L$ 1 $ 26,87C.00 $ 938,160.24 $ 164,834.24 TMC Ito ravemanis Costa Mesa t33 Newport Beach Irvine Avenue(Sauml Furniah and miter Ethernet SwBeh-0ixe swtt-hlE-33OMT23-E(vo(1)1U9$FP's and EA 1 $ 1,001.98 $ 4,556.18 S 5.558,16 _ PVVR-IE66W-PC-AC Power Su i 134 Newport Beach Irvine Avenue(South} Furnish end Install ATC Controller-Econolite Cobalt ShMfmount col ASC3 Software EA 1 $ 892,04 $ 5.921.23 $ 6,613.27 135 Neeport Beach Irvine Avenue{South} Furnish and Install CCTV Camera-Axis Q6356-LE(wf 90W midapan POE injector and EA 1 $ 2,553,27 $ 3.825.97 $ 6.180.24 e mount 136 Nawport Beach Campus Drive(Nadh] Furdshand Install Ethernet SWoh-Cisco Switch IF-330"T2S.E{wl(1)108 SFP's and 1 s 856,73 $ 4,555.18 $ 5,412.92 PVJR-IE6SW-PC-AC Power Su I 137 Neagart Beach Campus Drive lNerth) Furnish and Install ATC Controller-Ecan lite Cobalt Shafts. col ASC3 Somwans EA q $ 892.04 $ 5,921.23 $ b,813.27 Iteris,Inc.1 7 COST PROPOSAL I CITY OF SANTA ANA RFP No.26-026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project Item No. Agency Bristol S1reat@ It..oeseNption Unit Quantity Yunex.Total Iteris Construction Equipment Total 139 Newport Beach Campus Drive(North) Furnish and Install BBSIUPS on Existing Cabinet-Marathon Power Ruggedized Traffic $ 3A70.92 $ 5,719.48 8 9,590,40 UPSIEES 2ODOVA11500W TRTC-2004-N1,Marathon Power Manual Power Transfer EA 1 Switch Closed Versson MK Bti Model 8A24 HEU 139 Newport Beach Campus Drive tNol Furnish and Install CCTV Camera-Axis6300-EpW90W msdspan POE injector and pole EA 1 S 3,152.83 $ 2.456.17 $ -5,611_00 mouth and integrate with si Aria CCTV 14D Newport Beach Campus Drive(N,r[h) Furnish and Install Emergency Preemption System.(Infrared)(4 Deier4ur System)- $ 6.234.23 $ 12.245.8S 5 18.485.12 Opticom Model 764 Phase S®Iri Model 722 Optical Detect.,Units,and necessary EA 1 ❑etecmr Cable and mouhen. 141 Newport Beach Birch Street jicouth) Fumish'and Install Ethemet Switch-Cisco Switch 1E-3300-8T25-E(wl fly IGS SFP's and EA 1 $ 656.73 $ 4,556.18 $ 5,41292 PWR-IE65W-PC-AC Power Su 142 Newport Beach Birch Straet(Seuth) Fumish and Install ATC Controller-Econolile Cobalt Sheifrini wl ASC3 Software EA 1 $ 59204 S 5,921,23 5 6,013.27 143 Newport Beach Birch Street(South) Furnish and Install CCTV Camera-Axis 06358-LE(w1 BOW micapan POE Injector and EA 1 $ 2.553.27 S 3,626,07 $ 6,180,24 e mcunt 144 Newport Beach Birch Street(North) Furnish and Install Ethernet Switch-Cisco Switch lE-33OMTZS-E(w1(1)138 SFP's antl EA 1 S 956.73 S 4,556,18 $ 5.412.92 PWRIE65W-PC-AC Power Su 145 Newport Beach Birch Street(Norm) Furnish and Install ATC Controller-Econolite Caball shaltmeunt wl ASC3 Software EA 1 $ 692.04 S 5,921.23 S 6.513.27 146 Newport Beach Birch Street(North) Furnish and Install RSSAJPS on E-ang Catsnet-Marathon Power Ruggediied Traffic $ 3,870.92 S 5,719,48 $ 9.590.40 LJPSIBPS 2g00VA11500W TRTC-2004-Nt,Marathon Power Manual Power Transfer EA i Svdtch Closed Version MK Boner MotleI BA24 HEU 147 Newport Beach Birch Street(North) Fumish and Install CCN Camera-Axis 6300.E(wf 90W midspan POE injector end pole EA 1 S 3,152.83 $ 2,458.17 $ 5,611.00 mcunl and site rate vim existin Axis CCN 145 Newport Beech Birch Street(North) Furnish and Install Emergenry Preemption System(Infrared)(4 Detector Systeml- S 6,239.23 $ 12,245.89 S 13,485.12 Oplicom Model 764 Phase Selector.Model 722 Optical Detector Units,and necessary FA I Dslemer Cade and m 11 n. 149 Newport Beach Bayview Place(SoAh) Furnish and In.tallEmarnet Snitch- Is.Switch IE-3300-8T2S-E last(1)1 GB SFP's and EA 1 S 856,73 $ 4,6SB_1B $ 5.412.92 PWR-IE65W-PC-AC Power 5' 150 Newport Beach Bayview Place{Snuthi Furnish and Install ATC Controller-Ec—lita Cobalt Shelfmount wl ASC-3 Software EA 1 $ 692,04 $ 5,S21.23 S 6,813.27 151 Newport Beach Bayview PI.-iSauth) Fumish and Install BBSIUPS on E-rang Cathie!-Marathon Power Ru99.4aird Traffic $ 3,870,92 S 5,719.48 S 9,59©4C LJPS/BB5 2000V/V1506W TRTG202N1,Marathon Power Manual Power Transfer EA 1 Switch Closed Version MK Bette Model 8A24 HEU 152 Newport Beach Bayview Place(South) Furnish and Install CCTV Camera-Am.Q6358-LE(wl SOW midspan POE Injector and $ 2,553.27 S 362697 $ 8,180.24 le mount � 1 153 Newport Beach Bayview,Place(Seuih) Furnish antl Instah Emergency Preemption System{Imrarei(4 Defector SystemF $ 6,239,23 $ 12,245.$9 $ 18,485.12 Ophoom Model 764 Phase Selector,Model 722 optical Detector Units,and necessary EA 1 Detect rCable and hcuntin. 154 Newport Beach Jamboree Road Fumish and Install Ethemet Switch-Osed SNrtch IE-330"T23-E(wl(1)1GB SFP's and FA 1 $ 856.73 S 4,556.18 $ 5.412-92. South PWR-IE65W-PGAC Power S,,ppll 155 Newport Beach Jamboree Road Fumish and Install ATC Oontrdlar-Econolita Cobalt Shelfmountwl ASC3 Schware EA 1 $ 89294 $ 5.921.23 $ 8.813.27 South 156 Newport Beach Jamboree Road Fumish and Instals BESI)PS an Existing Cabinet-Marathon Power Ruggedized Traffic $ 3,87092 S 5..719.48 $ 9,59Q40 f$oulh) UPSIBBS 2000VA11500W TRTC-2004-N1,Marathon Power Manual Pourer Transfer EA 1 Switch Cl ad Version MK Batte More18A24 HEV 157 Newport Beach Jamboree Read Furnish and Install CCTV Camera-Axis G6356-LE(W 9OW mldspen POE injector end E4 1 $ 2,55327 $ 3,626.97 $ 5.180.24 South ole mount 168 Newport Beach Jamboree Road Furnish and Install Emergency Preemption System thfrsradl(4 Detector Sys[em)- $ 6,239.23 S 12,245.89 $. 18,455.12 (South) Opticnm Model 764 Phase Selector,Model 722 Optical Detector Units,and necessay EA 1 Detector Cable and moumur 159 Newport Beach Jamboree Road(North)Furnish and Install Ethernet Switch-Gseo Switch IE-3300-8T25-E(ad(i)1 GB SFP's and EA 1 $ 856 73 $ 4,556.18 $ 5,412.92 PWR-IE65W-PC-AC Power Supply) 160 Newport Beach Jamboree Road(Narth)Fumish and l nstall ATC Controller-Ecanolite Cobalt Shelfmount wl ASC3 Software EA 1 $ 892.04 S 5,011.23 $ 581327 161 Newport Beach Jamboree Road(North)Fumish and Install BBSIUPS on Existing Cabinet-Marathon Power Ruggrall Traffic $ 3,87092 3 5.719.48 $ 9,590.40 UPSYBBS 2000VAI7500Vv TRTG2004-N1,Marathon Power Manual Power Trans far EA 1 Switch Clasad Version MIS Palter Mode18A24 HEU 162 Newport Beach Jamboree Road fNanhl Furnish and Install CCTV Camera-Axis U6358-LE(wd SOW midepan POE,nje,t,r and EA 1 $ 2,552.27 $ 3.626.97 S 61 iti lamount; 163 Newport Beach Jamboree Road{North)Furnish and Install Emergency Preemption System(Infraredi(4 Detector System)B 8 61 $ 12,245.09 $ 18,485.12 Optical Model 784 Phase Sale tor,Model 722 Optical Detector Units.,and necessary EA 1 Detector Calve and co- 164 Newport Beach Bay—Place0 Furnish an d Install Ethernet Switch-Cisco SVAtch lE-3300.8T2S.E(wl(ij IGO SFP's and FA 1 S 856.73 S 4,556.18 $ 5412,92 Ba view Circle PWRdhB5W-PGAC Power Su 4 165 Newport Beach Bayview Place@ Furnish and Install ATC Controlled-Ecoaofits Cal Shelfmountwl ASC3 Software EA 1 S 892.D4 5 5,921.21 It 6,813.27 Ba.view Cad. Ittal Inc- 18 COST PROPOSAL I CITY OF SANTA ANA RFP No.26-026—Design-build Services-6ri5tol Street Corridor Regional Traffic Signal Synchronization Project It..No. Agency Bristol street @ Item Description unit Quantity Yanex Total Iteris Construction Equipment Total 166 Newport heath Bayview Place @ Furnish and Install BBSNPS on Existing Calmat-Merathnn Powet Rugged-d Traffic $ 3,a70,92 $ 5,7194E 5 9,59a46 Bayview Circle UP&BBS2040VAf1500WTRTC-2004-1,11,Mara[hon Pnwer Manual Power Transfer EA t Glmteh Closed Vogl-MK Battar,Medal8424 HEu 167 Newport Beach Bayview Place @ Furnish and Install GCTV Camera-Axis 06356-LE{w)90W rr dspan POE injector and EA 1 E 2,553.27 $ 3,626,97 $ 6.180.24 Ba few air4e ale mount ice Newport beach Bayview Place a Furnish and Install Emergency Preemphon System(Infrared)(4 Dated.,System)- $ 6239 23 $ 12,245,88 S 18,485.12 Bayview Circle Ople—Model 764 phase Selector,Made1722 Optioai Deledor Units,and necessary EA t Detsclar cable and mounting Iteris,Inc. 9 COST PROPOSAL I CITY OF SANTA ANA RFP No.26-026—Design-Build Services-Bristol Street Corridor Regional Traffic Signal Synchronization Project Bristol Street Corridor Improvements DescriptionCity of Santa Ana # Item DEMOLITION&RELOCATION Remove and discard decommissioned equipment at Main TMC(3rd 1 Floor City Hall):video wall,server racks,fiber optic cables,and network LS $25,103.80 cabling 2 Coordinate with City Staff to relocate existing servers and workstations LS $25,063.17 from Main TMC(3rd Floor City Hall)to New TMC FIBER OPTIC INFRASTRUCTURE 3 Furnish and instail 288-SMFO from Vault just outside City Hall Entrance LS $45,020.85 to New TMC 4 Splice new 288-SMFO TMC Fiber Optic Cable to existing Field Fiber LS $13,894.31 Optic Cable in new splice enclosures(as necessary) 5 Furnish and install new Corning Fiber Distribution Unit;terminate all new LS $27,211.89 fiber strands at New TMC SERVER ROOM EQUIPMENT 6 Furnish and install two(2)new Server Racks at New TMC Server Room LS $17,989.34 (bolted to floor) 7 Furnish and install APC Rack Mounted UPS—Smart APS Ultra, Model L,S $14,615.43 #SRTL3KRM1UC 8 Furnish and install two(2)APC Ultra External Battery Pack, Model LS $17,796.86 #SRTLSORMBP1 U-LI OPERATOR WORKSTATIONS&FURNITURE 9 Furnish and install three(3)Furniture Consoles at New TMC LS $78,586.62 10 Furnish and install three(3)Dell Precision Tower Workstations—Intel LS $65,684.34 Xeon W5-2465X(16 cores)or approved equivalent,with monitors VIDEO WALL SYSTEM Furnish and install Planar Clarity Matrix G3 Video Wall System(6x2, 11 55")including, LCD displays, mounting systern. server processors,rack, LS $172,696.50 software,video extenders,power supply,cabling,and all ancillary materials SOFTWARE&LICENSING 12 Furnish and install Econolite Centracs ATMS License—350 traffic LS $71,214.13 signals,3-year license SANTA ANA TMC IMPROVEMENTS TOTAL $574,877.24 City of Costa Mesa # Item Description Unit Cost OPERATOR WORKSTATIONS 1 Furnish and install two(2)Dell Precision Tower Workstations—Intel LS $29,238.25 Xeon W5-2465X(16 cores)or approved equivalent 2 Furnish field rugged laptop—Dell Pro Rugged 14 LS $5,281.28 SERVER&NETWORK INFRASTRUCTURE 3 Furnish and install Dell Server fully equipped to support Econolite LS $49,269.68 Centracs ATMS software 4 Furnish and install Care TMC Layer 3 Ethernet Switch—Etherwan LS $42,089.47 FG97023-2V7(w!Ten(10) 10GB SFPs and Power Supply) Furnish and install Layer 3 Ethernet Switch at Newport Blvd/Fair Drive 5 HUB-•Etherwan 1G5-08164-CIN(wl Ten (10) 1GB, Four(4) 10GB SFPs LS $19,179.58 and Power Supply) 6 Furnish and install NTP Server—Masterclack NTP100-GNSS with LS $3,164.07 maximum length coax GPS antenna for outdoor installation UPS POWER 7 Furnish and install APC Rack Mounted UPS—Smart UPS 2200VA 120V LS $3,010.97 with SmartConnect Port, Model#SMTL2204RM2UC FURNITURE 8 Furnish and install two(2)Herman Miller Aeron Chairs LS $0.00 SOFTWARE&LICENSING 9 Furnish and install Econolite Centracs ATMS License and Support— LS $13,596.95 135 traffic signals, 1-year support 10 Furnish and install Genetec VMS License—30 cameras,3-year support LS $0.00 COSTA MESA TMC IMPROVEMENTS TOTAL $164,830.24 Iteris,Inc. 10 EXHIBIT C—Insurance Requirements Prior to undertaking performance of work under this Agreement,Consultant shall maintain and shall require any subcontractors to obtain and maintain insurance as described below for the entire Term of this Agreement against claims for injuries to persons or damage to property which may arise from or in connection with services, products and materials supplied to City.Total cost of such insurance shall be borne by Consultant. MINIMUM SCOPE AND LIMIT OF INSURANCE 1. Commercial General Liability(CGL): Insurance Services Office Form CG 00 01covering CGL on an "occurrence" basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than$2,000,000 per occurrence and $4,000,000 aggregate. Required policy limits can be met with primary and umbrella/excess insurance policies. 2. Automobile Liability(ALA: Insurance Services Office Form CA 00 01 covering Code 1 (any auto), with limits no less than$1,000,000 combined single limits. In the event Consultant does not maintain commercial automobile liability insurance, City will accept evidence of personal automobile insurance, provided that such policy is endorsed for business use and provides coverage with a minimum limit of$1,000,000, Required policy limits can be met with primary and umbrella/excess insurance policies. 3. Workers'Compensation(WC):as required by the State of California,with Statutory Limits, and Employer's Liability Insurance with limit of no less than$1,000,000 per accident, policy or employee,for bodily injury or disease. Coverage is not required if Consultant has no employees and signs request to waive such insurance. 4. Professional Liability(PQ/Errors and Omissions(E&O):with limits no less than$2,000,000 per occurrence or claim,and$4,000,000 aggregate. If Consultant maintains broader coverage and/or higher limits than the minimum requirements for each line of coverage shown above,City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Consultant.Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City. Other Insurance Provisions The above required insurance policies are to contain or be endorsed to contain the following provisions: 1. City, its City Council, its officers,officials, employees, agents, and volunteers are to be covered as additional insureds, under Consultant's CGL and AL policies,with respect to any liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts,equipment, and personnel furnished in connection with such work or operations. 2. Consultant's Insurance company(ies) agrees to waive all rights of subrogation against City, its City Council, its officers, officials, employees, agents, and volunteers for losses paid under the terms of Consultant's CGL,AL, and WC policies which arise from work performed by Consultant under this Agreement. 3. For any claims related to this contract, Consultant's insurance coverage shall be primary and any insurance maintained by City, its City Council, its officers, officials, employees,agents, or volunteers shall not contribute with it. 4. A severability of interest provision must apply for all the additional insureds, ensuring that Consultant's insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the insurer's limits of liability. 5. Insurance policies required herein shall provide that coverage shall not be canceled,suspended, voided, reduced in coverage or in limits, non-renewed by the carrier,or materially changed except after thirty (30)days prior written notice has been given to City.Ten (10)days prior written notice shall be provided to City for policy cancellation or non-renewal due to non- payment of premium. 6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, Attention: Cesar Rodriguez, 20 Civic Center Plaza, M-43,Santa Ana, CA 92701.The name and location of project must be included in the Description of Operations section of each certificate. Self-insured Retentions Self-insured retentions must be declared to and approved by the City.The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. Acceptability of Insurers Insurance is to be placed with insurers authorized to conduct business in the State of California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable to City. Verification of Coverage Consultant shall furnish City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements before work begins. However,failure to obtain the required documents prior to the work beginning shall not waive Consultant's obligation to provide them. City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications,at any time. Special Risks or Circumstances City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage,or other special circumstances. CERTIFICATE OF LIABILITY INSURANCE �ATE`M 0911 SI2IYYYY' 426 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.if SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Aon Risk Insurance Services West, Inc. PHONE (866) 283-7122 FAx (SQO) 363-0105 LOS Angel e5 CA Office (A/C.No.Extl: A1C.No. 707 Wilshire Boulevard E-MAIL Suite 2600 ADDRESS: Los Angeles CA 90017-0460 USA INSt1RER(9)AFFORDING COVERAGE NAIC# INSURED INSURER A: Valley Forge Insurance Co 20508 Iteris, Inc. INSURERS: The Continental Insurance Company 35289 1700 Carnegie Avenue Suite 100 INSURERC: AIG Specialty Insurance Company 26B83 Santa Ana CA 92705 USA INSURER D: INSURER E: INSURER F: COVERAGES THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONSAND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Limits shown are as requesied LYR TYPE OF INSURANCE INS POLICY EXP D WVD POLICY NUMBER MMlDDlYYYY MMIDDl LIMITS A X COMMERCIAL GENERAL LIABILITY 1 3 4 YYYYEACH OCCURRENCE $1,000,0ao CLAIMS-MARE OCCUR PREMISES fLa occurrence S1,000,000 MED EXP(Any one person) $15,000 PERSONAL&ADV INJURY $1,000,000 GENLAGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $2,000,000 X POLICY ❑PRO ❑LOC PRODUCTS-COMROPAGG $2,000,000 JECT OTHER: °' AUTOMOBILE LIABILITY 8018834790 04/01/202 6 04/01/202 7 COMBINED SINGLE LIMIT $1,000,Q00 Ea accident X ANYAUTO BODILY INJURY{Per person) OWNED SCHEDULED BODILY INJURY{Per accdent) AUTOS ONLY AUTOS HIREDAUTOS NON-OWNED PROPERTY DAMAGE ONLY AUTOS ONLY Per accident B X UMBRELLA LIAB X I. OCCUR 801-8834742 04/01/2026 04/01/2Q27 EACH OCCURRENCE $5,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $S,000,000 DED RETENTION B WORKERS COMPENSATION AND 8019835079 04/01/2026 04/01/2027 X PER STATUTE OTH, EMPLOYERS'LIABILITY Y f N ADS ER ANY PROPRIETOR f PARTNER i EXEGJTIVE E.L.EACHACCIDENT s1,000,000 B OFPICERIMEMBER EXCLUDED, N/A 8018834966 04/01/2026 04/01/2027 (Mandatory in NH) ��JJ CA E,L,DISEASE-EA EMPLOYEE $1,000,000 II yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 C E&O - Technology 05078970E 12/31/2025 12/31/2026 Tech/E&I & A&E E&0 $10,000,000 Architects & Engineers E&o JClaims Made SIR $294,078 SIR applies per policy terns & condi ions DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) Re: City of Santa Ana Design Build Services for Regional Traffic Signal Synchronization Project (RTSSP) City of Santa Ana, its city council, its officers, officials, employees, agents, and volunteers are included as additional insureds in accordance with the policy provisions of General Liability and Auto Liability policies on a Primary and Non-contributory. waiver of Subrogation is granted in favor of city of Santa Ana, its City Council, its officers, officials, employees, agents, and volunteers with respects to General Liability, Auto Liability, and Workers compensation policies. APPROVED CERTIFICATE HOLDER CANCELLATION 6yTuTrarz Nguyen at 71 33am,Sep 21,2028 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Santa Ana Attn: Cesar Rodri?Uez AUTHORIZED REPRESENTATIVE 20 civic Center Plaza, M-43 Santa Ana, CA 92701 „�r� (—L-7 � [}�/,/• ,.yam ©1988-2015 ACORD CORPORATION.All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: 8018834238 COMMERCIAL GENERAL LIABILITY CG 2010 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organizations) Locations}Of Covered Operations City of Santa Ana, its City Council, its officers, officials, employees, agents, and volunteers nformation required to complete this Schedule, if not shown above,will be shown in the Declarations. A. Section 11 — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following additional organization(s) shown in the Schedule, but only exclusions apply: with respect to liability for"bodily injury", "property This insurance does not apply to "bodily injury" or damage" or "personal and advertising injury" "property damage"occurring after: caused, in whole or in part, by: 1. All work, including materials, parts or 1. Your acts or omissions; or equipment furnished in connection with such 2. The acts or omissions of those acting on your work, on the project (other than service, behalf; maintenance or repairs) to be performed by or in the performance of your ongoing operations for on behalf of the additional insured(s) at the the additional insured(s) at the location(s) location of the covered operations has been designated above. completed; or However: 2. That portion of "your work" out of which the injury or damage arises has been put to its 1. The insurance afforded to such additional intended use by any person or organization insured only applies to the extent permitted by other than another contractor or subcontractor law; and engaged in performing operations for a 2. If coverage provided to the additional insured is principal as a part of the same project. required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 2010 0413 ©Insurance Services Office, Inc,, 2012 Page 1 of 2 C. With respect to the insurance afforded to these 2. Available under the applicable Limits of additional insureds, the following is added to Insurance shown in the Declarations; Section III—Limits Of Insurance., whichever is less. If coverage provided to the additional insured is This endorsement shall not increase the required by a contract or agreement, the most we applicable Limits of Insurance shown in the will pay on behalf of the additional insured is the Declarations. amount of insurance: 1. Required by the contract or agreement; or Page 2 of 2 ©Insurance Services Office, Inc., 2012 CG 20 10 0413 CNA PARAMOUNT CNA Waiver of Transfer of Rights of Recovery Agai nst Others to the Insurer Endorsement This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: City of Santa Ana, its City Council, its officers, officials, employees, agents, and volunteers (Information required to complete this Schedule, if not shown above, will be shown in the Declarations.) Under COMMERCIAL GENERAL LIABILITY CONDITIONS, it is understood and agreed that the condition entitled Transfer Of Rights Of Recovery Against Others To Us is amended by the addition of the following: With respect to the person or organization shown in the Schedule above, the Insurer waives any right of recovery the Insurer may have against such person or organization because of payments the Insurer makes for injury or damage arising out of the Named Insured's ongoing operations or your work included in the products-completed operations hazard. All other terms and conditions of the Policy remain unchanged. This endorsement,which forms a part of and is for attachment to the Policy issued by the designated Insurers,takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA75008XX(10-16) Policy No: 8018834238 Effective Date: 411f2026 Insured Name: Iteris, Inc. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission. CNA Business Auto Policy Policy Endorsement DESIGNATED INSURED FOR COVERED AUTOSCOVERAGE THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: ITERIS, INC. Endorsement Effective Date: 04/01/2026 SCHEDULE Name Of Person(s) Or Or anization(s): City of Santa Ana, its City Council, its officers, officials, employees,agents, and volunteers Form No: CA 20 48 10 13 Policy No: 3018834790 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date:4101/2026 Endorsement No: 1; Page: 1 of 1 Underwriting Company: Valley Forge Insurance Company, 151 0410112026 Policy Page: 1 of 1 N Franklin St, Chicago, IL 60606 o Copyright Insurance Services Office, Inc., 2011 CNA Business Auto Policy Policy Endorsement ' WAIVER OF OF OF • AGAINST OTHERS TO US (WAIVER OF SUBROGATION) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: ITERIS, INC. Endorsement Effective Date: 04/01/2026 SCHEDULE Name(s) Of Person(s) Or Organizations): City of Santa Ana, its City Council, its officers, officials, employees,agents, and volunteers I Form No: CA 04 44 10 13 Policy No: 8018834790 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date:04/01/2026 Endorsement No: 1 Page: 1 of 1 Policy Page: 1 of 1 Underwriting Company: Valley Forge Insurance Company, 151 N Franklin St, Chicago, IL 60606 ®Copyright Insurance Services Office, Inc., 2011 CNA Workers Compensation And Employers Liability Insurance Policy Endorsement WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be 2% of the California workers' compensation premium otherwise due on such remuneration. Schedule Person or Organization Job Description City of Santa Ana,its City Council,its officers,officials,employees,agents,and volunteersAll other terms and conditions of the policy remain unchanged. This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective Date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below. Form No: WC 04 03 06 (04-19841 Policy No:WC 8018834966 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date:0410 1/202 6 Endorsement No: 19; Page: 1 of 1 Underwriting Company: American Casualty of Readings PA 151 N Franklin St, Chicago, IL 60606 ®Copyright 1998 by the Workers' Compensation Insurance Rating Bureau of California.All rights reserved. From the WCIRB's California Workers' Compensation Insurance Forms Manual®2001. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement It is understood and agreed that this endorsement amends the COMMERCIAL GENERAL LIABILITY COVERAGE PART as follows. If any other endorsement attached to this policy amends any provision also amended by this endorsement, then that other endorsement controls with respect to such provision, and the changes made by this endorsement with respect to such provision do not apply. TABLE OF CONTENTS 1. Additional Insureds 2. Additional Insured-Primary And Non-Contributory To Additional Insured's Insurance 3. Bodily Injury—Expanded Definition 4. Broad Knowledge of Occurrence/Notice of Occurrence 5. Broad Named Insured 6. Estates,Legal Representatives and Spouses 7. Expected Or Intended Injury—Exception for Reasonable Force 8. In Rem Actions 9. Incidental Health Care Malpractice Coverage 10. Joint VentureslPartnershiplLimited Liability Companies 11. Legal Liability—Damage To Premises 12. Medical Payments 13. Non-owned Aircraft Coverage 14. Non-owned Watercraft 15. Personal And Advertising Injury—Discrimination or Humiliation 16. Personal And Advertising Injury-Limited Contractual Liability 17. Property Damage-Elevators 18. Supplementary Payments 19. Property Damage—Patterns,Molds and Dies 20. Unintentional Failure To Disclose Hazards 21. Waiver of Subrogation—Blanket CNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental Insurance Co. Effective Date: 0410 1/2 0 2 6 Insured Name: ITEMS, INC. Copyright CNA All Rights Reserved. includes copyrighted material of Insurance Set vices Mics,Inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement 1. ADDITIONAL INSUREDS a. WHO IS AN INSURED is amended to incude as an Insured any person or organization described in paragraphs A. through K.below whom a Named Insured is required to add as an additional insured on this Coverage Part under a written contract or written agreement, provided such contract or agreement: (1) is currently in effector becomes effective during the tern of this Coverage Part;and (2) was executed prior to: (a) the bodily injury or property damage;or (b) the offense that caused the personal and advertising injury, for which such additional insured seeks coverage. b. However, subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with. (1) a higher limit of insurance than required by such contract or agreement;or (2) coverage broader than required by such contract or agreement,and in no event broader than that described by the applicable paragraph A.through K.below. Any coverage granted by this endorsement shall apply only to the extent permissible by law. A. Controlling Interest Any person or organization with a controlling interest in a Named Insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury arising out of- 1, such person or organization's financial control of a Named Insured;or 2. premises such person or organization owns, maintains or controls while a Named Insured leases or occupies such premises; provided that the coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by,on behalf of,or for such additional insured. B. Co-owner of Insured Premises A co-owner of a premises co-owned by a Named Insured and covered under this insurance but only with respect to such co-owner's liability for bodily injury, property damage or personal and advertising injury as co-owner of such premises, C. Grantor of Franchise Any person or organization that has granted a franchise to a Named Insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury as grantor of a franchise to the Named Insured. D. Lessor of Equipment Any person or organization from whom a Named Insured leases equipment, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused, in whole or in part, by the Named Insured's maintenance, operation or use of such equipment, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. CNA74872XX(1-15) Policy No: 8018834238 Page t of 1 Endorsement No: The Continental Insurance co. Effective Date: 0410112026 Insured Name: ITERIS, INC. Copyright CNA All Rights Reserved. Indudes copyrighted material of Insurance Services Cflice,Inc.,with its permission. C.NA CNA PARAMOUNT Technology General Liability Extension Endorsement E. Lessor of Land Any person or organization from whom a Named Insured leases land but only with respect to liability for bodily injury,property damage or personal and advertising injury arlising out of the ownership, maintenance or use of such land, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of,or for such additional insured. F. Lessor of Premises An owner or lessor of premises leased to the Named Insured, or such owner or lessor's real estate manager, but onlywith respect to liability for bodily injury,property damage or personal and advertising injury arising out of the ownership,maintenance or use of such part of the premises leased to the Named Insured, and provided that the occurrence giving rise to such bodily injury or property damage,or the offense giving rise to such personal and advertising injury, takes place prior to the termination of such lease. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of,or for such additional insured. G. Mortgagee,Assignee or Receiver A mortgagee, assignee or receiver of premises but only with respect to such mortgagee, assignee or receiver's liability for bodily injury, property damage or personal and advertising injury arising out of the Named Insured's ownership, maintenance,or use of a premises by a Named Insured. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by,on behalf of,or for such additional insured. H. State or Governmental Agency or Subdivision or Political Subdivisions —Permits A state or governmental agency or subdivision or political subdivision that has issued a permit or authorization but only with respect to such state or governmental agency or subdivision or political subdivision's liability for bodily injury, property damage or personal and advertising injury arising out of: 1, the following hazards in connection with premises a Named Insured owns, rents, or controls and to which this insurance applies: a. the existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoistaway openings, sidewalk vaults,street banners,or decorations and similar exposures:or b. the construction,erection,or removal of elevators; or c. the ownership, maintenance or use of any elevators covered by this insurance,or 2. the permitted or authorized operations performed by a Named Insured or on a Named Insured's behalf. The coverage granted by this paragraph does not apply to: a. Bodily injury,property damage or personal and advertising injury arising out of operations performed for the state or governmental agency or subdivision or political subdivision;or b. Bodily injury or property damage included within the products-completed operations hazard, With respect to this provision's requirement that additional insured status must be requested under a written contract or agreement, the Insurer will treat as a written contract any governmental permit that requires the Named Insured to add the governmental entity as an additional insured. CNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental Insurance Cc. Effective Date: 04/01/2026 Insured Name:ITERIS, INC. Copyright WA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement I. Trade Show Event Lessor 1. With respect to a Named Insured's participation in a trade show event as an exhibitor, presenter or displayer, any person or organization whom the Named Insured is required to include as an additional insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury caused by: a, the Named Insured's acts or omissions; or b. the acts or omissions of those acting on the Named Insured's behalf, in the performance of the Named Insured's ongoing operations at the trade show event premises during the trade show event. 2. The coverage granted by this paragraph does not apply to bodily injury or property damage included within the products-completed operations hazard. J. Vendor Any person or organization but only with respect to such person or organization's liability for bodily injury or property damage arising out of your products which are distributed or sold in the regular course of such person or organization's business, provided that: 1. The coverage granted by this paragraph does not apply to: a, bodily injury or property damage forwhich such person or organization is obligated to pay damages by reason of the assumption of liability in a contract or agreement unless such liability exists in the absence of the contract or agreement; b. any express warranty unauthorized by the Named Insured, c, any physical or chemical change in any product made intentionally by such person or organization; d. repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container, e. any failure to make any inspections,adjustments, tests or servicing that such person or organization has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; f. demonstration, installation, servicing or repair operations, except such operations performed at such person or organization's premises in connection with the sale of a product; g. products which, after distribution or sale by the Named Insured, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for such person or organization; or h, bodily injury or property damage arising out of the sole negligence of such person or organization for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: (1) the exceptions contained in Subparagraphs d.or f,above;or (2) such inspections, adjustments, tests or servicing as such person or organization has agreed with the Named Insured to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. 2. This Paragraph J.does not apply to any insured person or organization,from whom the Named Insured has acquired such products, nor to any ingredient, part or container, entering Into, accompanying or containing such products CNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental insurance Co. Effective Date: 04/01/2026 Insured Name: ITERISr INC. Gopyrght cNA All Rights Reserved. Includes copyrighted material cf Insurance Services Office,Inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement 3. This Paragraph J.also does not apply. a. to any vendor specifically scheduled as an additional insured by endorsement to this Coverage Part; b, to any of your products for which coverage is excluded by endorsement to this Coverage Part;nor c. if bodily injury or property damage Included within the products-completed operations hazard is excluded by endorsement to this Coverage Part. K. Other Person Or Organization 1 Your Work Any person or organ€nation who is not an additional insured under Paragraphs A. through J. above. Such additional insured is an Insured solely for bodily injury, property damage or personal and advertising injury forwhich such additional insured is[fable because of the Named Insured's acts or omissions. The coverage granted by this paragraph does not apply to any person or organization: 1. who is specifically scheduled as an additional insured on another endorsement to this Coverage Part;nor 2. for bodily injury or property damage included within the products-completed operations hazard except to the extent all of the following apply: a, this Coverage Part provides such coverage; b, the written contract or agreement described in the opening paragraph of this ADDITIONAL INSUREDS Provision requires the Named Insured to provide the additional insured such coverage;and c, the bodily injury or property damage results from your work that is the subject of the written contract or agreement,and such work has not been excluded by endorsement to this Coverage Part. 2. ADDITIONAL INSURED-PRIMARY AND NON-CONTRIBUTORY TO ADDITIONAL INSURED'S INSURANCE A. The Other Insurance Condition In the COMMERCIAL GENERAL LIABILITY CONDITIONS Section is amended to add the following paragraph: If the Named Insured has agreed in writing in a contract or agreement that this insurance is primary and non- crntriNutory relative to an additional insured's own insurance, then this insurance is primary, and the Insurer will not seek contribution from that other insurance. For the purpose of this Provision 2.,the additional insured's own insurance means Insurance on which the additional insured is a named insured B. With respect to persons or organizations that qualify as additional insureds pursuant to paragraph 1.K. of this endorsement,the following sentence is added to the paragraph above: Otherwise, and notwithstanding anything to the contrary elsewhere in this Condition, the insurance provided to such person or organization is excess of any other insurance available to such person or organization. 3. BODILY INJURY--EXPANDED DEFINITION Under DEFINITIONS,the definition of bodily injury is deleted and replaced by the following: Bodily injury means physical injury,sickness or disease sustained by a person, including death, humiliation, shock, mental anguish or mental injury sustained by that person at any time which results as a consequence of the physical injury,sickness or disease. 4. BROAD KNOWLEDGE OF OCCURRENCE!NOTICE OF OCCURRENCE Under CONDITIONS,the condition entitled Duties in The Event of Occurrence,Offense,Claim or Suit Condition is amended to add the following provisions: A. BROAD KNOWLEDGE OF OCCURRENCE CNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental Insurance Co. Effective Date: 0410112026 Insured Name:ITERIs, INC. Copynght CNA All Rights Reserved. faclucies copyrighted material of Insurance Services office,Inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement The Named Insured must give the Insurer or the insurer's authorized representative notice of an occurrence, offense or claim only when the occurrence,offense or claim is known to a natural person Named Insured,to a partner, executive officer,manager or member of a Named Insured,or to an employee designated by any of the above to give such notice, B, NOTICE OF OCCURRENCE The Named Insured's rights under this Coverage Part will not be prejudiced it the Named Insured fails to give the Insurer notice of an occurrence, offense or claim and that failure is solely due to the Named Insured's reasonable belief that the bodily injury or property damage is not covered under this Coverage Part. However, the Named Insured shall give written notice of such occurrence, offense or claim to the Insurer as soon as the Named Insured is aware that this insurance may apply to such occurrence, offense or claim. 5. BROAD NAMED INSURED WHO IS AN INSURED is amended to delete its Paragraph 3, in its entirety and replace it with the following: 3. Pursuant to the limitations described in Paragraph 4. below, any organization in which a Named Insured has management control a, on the effective date of this Coverage Part;or b. by reason of a Named Insured creating or acquiring the organization during the policy period, qualifies as a Named Insured, provided that there is no other similar liability Insurance, whether primary, contributory,excess,contingent or otherwise, which provides coverage to such organization, or which would have provided coverage but for the exhaustion of its limit, and without regard to whether its coverage is broader or narrower than that provided by this insurance. But this BROAD NAMED INSURED provision does not apply to: (a) any partnership or joint venture'.or (b) any organization for which coverage is excluded by another endorsement attached to this Coverage Part, For the purpose of this provision, and of this endorsement's JOINT VENTURES ! PARTNERSHIP I LIMITED LIABILITY COMPANIES provision, management control means: A. owning interests representing more than 50% of the voting, appointment or designation power for the selection of a majority of the Board of Directors of a corporation,or the members of the management board of a limited liability company;or B. having the right, pursuant to a written trust agreement,to protect,control the use of,encumber or transfer or sell property held by a trust. 4. With respect to organizations which qualify as Named Insureds by virtue of Paragraph 3, above, this insurance does not apply to: a. bodily injury or property damage that first occurred prior to the date of management control, or that first occurs after management control ceases;not b, personal or advertising injury caused by an offense that first occurred prior to the date of management control or that first occurs after management control ceases. 5. The insurance provided by this Coverage Part applies to Named Insureds when trading under their own names or under such other trading names or doing-business-as names (dba)as any Named Insured should choose to employ. CNM74872^XX(1-115) Policy No: 80168.34238 Page t of 1 Endorsement No: The Continental Insurance Co. Effective Date: 04/01/2026 Insured Name: ITERIS, INC. Copyright CNA All Rights Reserved. Includes copyrightad material of Insurance Services Office,Inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement 6. ESTATES, LEGAL REPRESENTATIVES,AND SPOUSES The estates,heirs,legal representatives and spouses of any natural person Insured shall also be insured under this policy,- provided, however,coverage is afforded to such estates, heirs, legal representatives, and spouses only for claims arising solely out of their capacity or status as such and, in the case of a spouse, Where such claim seeks damages from marital community property, jointly held property or property transferred from such natural person Insured to such spouse. No coverage is provided for any act, error or omission of an estate, heir, legal representative,or spouse outside the scope of such person's capacity or status as such, provided however that the spouse of a natural person Named Insured and the spouses of members or partners of joint venture or partnership Named Insureds are Insureds with respect to such spouses' acts,errors or omissions in the conduct of the Named Insured's business. 7. EXPECTED OR INTENDED INJURY-EXCEPTION FOR REASONABLE FORCE Under COVERAGES, Coverage A - Bodily Injury And Property Damage Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Expected or Intended Injury and replace it with the followll This insurance does not apply to: Expected or Intended Injury Bodily injury or property damage expected or intended from the standpoint of the Insured.This exclusion does not apply to bodily injury or property damage resulting from the use of reasonable force to protect persons or property. 8. IN REM ACTIONS A quasi in rem action against any vessel owned or operated by or for the Named Insured,or chartered by or for the Named Insured, will be treated in the same manner as though the action were in personam against the Named Insured, 9. INCIDENTAL HEALTH CARE MALPRACTICE COVERAGE Solely with respect to bodily injury that arises out of a health care incident; A. Under COVERAGES,Coverage A- Bodily Injury And Property Damage Liability,the Insuring Agreement is amended to replace Paragraphs 1.b.(1)and 1.b.(2)with the following: b. This insurance applies to bodily injury provided that the professional health care services are incidental to the Named Insured's primary business purpose,and only if: (1) such bodily injury is caused by an occurrence that takes place in the coverage territory. (2) the bodily injury first occurs during the policy period. All bodily injury arising from an occurrence will be deemed to have occurred at the time of the first act, error,or omission that is part of the occurrence; and B. Under COVERAGES, Coverage A - Bodily Injury And Property Damage Liability, the paragraph entitled Exclusions is amended to: i. add the following to the Employers Liability exclusion: This exclusion applies only if the bodily injury arising from a health care incident is covered by other liability insurance available to the Insured (or which would have been available but for exhaustion of its limits). ii. delete the exclusion entitled Contractual Liability and replace it with the following: This insurance does not apply to: GNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental Insurance Co. Effective Date: 04/01/2026 Insured Name: ITt RiS, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc„with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement Contractual Liability the Insured's actual or alleged liability under any oral or written contract or agreement, including but not limited to express warranties or guarantees, iii, add the following additional exclusions. This insurance does not apply to: Discrimination any actual or alleged discrimination, humiliation or harassment, that includes but shall not be limited to claims based on an individual's race, creed, color, age, gender, national origin, religion, disability, marital status or sexual orientation. Dishonesty or Crime Any actual or a[eged dishonest, criminal or malicious act,error or omission. MedicareiMedicald Fraud any actual or alleged violation of law with respect to Medicare, Medicaid,Tricare or any similar federal, state or local governmental program. Services Excluded by Endorsement Any health care incident for which coverage is excluded by endorsement. C. DEFINITIONS is amended to: i, add the following definitions = Health care incident means an act, error or omission by the Named Insured's employees or volunteer workers in the rendering of: a. professional healthcare services on behalf of the Named Insured or b. Good Samaritan services rendered in an emergency and for which no payment is demanded or received. Professional health care services means any health care services or the related furnishing of food, beverages, medical supplies or appliances by the following providers in their capacity as such but solely to the extent they are duly licensed as required: a. Physician; b. Nurse; c. Nurse practitioner; d. Emergency medical technician; e. Paramedic; f. Dentist; g. Physical therapist; h. Psychologist; i. Speech therapist; j. Other allied health professional; or Professional health care services does not include any services tendered in connection with human clinical CNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental Insurance Co. Effective Date: 04/01/2026 Insured Name; ITE&Is, INC. Copyright CNA Alt Rig Ms Reserved. Includes copyrighted material of Insurance Senrices Office,Inc.,with its permission. CNA CNA PARAMOUNT Technology General liability Extension Endorsement ii. delete the definition of occurrence and replace it with the following: Occurrence means a health care incident.All acts, errors or omissions that are logically connected by any common fact,circumstance,situation,transaction,event,advice or decision will be. considered to constitute a single occurrence; ii amend the definition.of Insured to: a. add the following: • the Named Insured's employees are Insureds with respect to: (1) bodily injury to a cc-employee while in the course of the co-employee's employment by the Named Insured or while performing duties related to the conduct of the Named Insured's business; and (2) bodily injury to a volunteer worker while performing duties related to the conduct of the Named Insured's business; when such bodily injury arises out of a health care incident. • the Named Insured's volunteer workers are Insureds with respect to: (1) bodily injury to a co-volunteer worker while performing duties related to the conduct of the Named Insured's business; and (2) bodily injury to an employee while in the course of the employee's employment by the Named Insured or while performing duties related to the conduct of the Named Insured's business, when such bodily injury arises out of a health care incident. b. delete Subparagraphs(a), (b),(c)and (d)of Paragraph 2,a,(1)of WHO IS AN INSURED e. add the following: Insured does not include any physician while acting in his or her capacity as such. D. The Other Insurance condition is amended to delete Paragraph b.(1) in its entirety and replace it with the following: Other Insurance b. Excess Insurance (1) To the extent this insurance applies, it is excess over any other insurance,self insurance or risk transfer instrument, whether primary, excess, contingent or on any other basis, except for insurance purchased specifically by the Named Insured to be excess of this coverage. 10, JOINT VENTURES 1 PARTNERSHIP 1 LIMITED LIABILITY COMPANIES WHO IS AN INSURED is amended to delete its last paragraph and replace it with the following: No person or organization is an Insured with respect to: • the conduct of any current or past partnership or joint venture that is not shown as a Named Insured in the Declarations,nor • the conduct of a current or past limited liability company in which a Named Insured's interest doesidid not rise to the level of management control; except that if the Named Insured was a joint venturer, partner, or member of such a limited liability company, and such joint venture, partnership or limited liability company terminated prior to or during the policy period, then such CNA74872XX(1-15) Policy NO: 8018834238 Page 1 of 1 Endorsement No: The Continental InstLrance Cc. Effective Date: 04/01/2026 Insured Name: ITERIS, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement Named Insured is an Insured with respect to its interest in such joint venture, partnership or limited liability company but only to the extent that: a. any offense giving rise to personal and advertising injury occurred prior to such termination date, and the personal and advertising injury arising out of such offense,first occurred after such termination date: b. the bodily injury or property damage first occurred after such termination date;and c. there is no other valid and collectible insurance purchased specifically to insure the partnership,joint venture or limited liability company 11. LEGAL LIABILITY—DAMAGE TO PREMISES A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete the first paragraph immediately following subparagraph (6)of the damage to Property exclusion and replace it Wth the following: Paragraphs (1), (3) and (4) of this exclusion do not apply to property damage (other than damage by fire, lightning, explosion, smoke or leakage from automatic fire protective systems)to premises rented to the Named Insured or temporarily occupied by the Named Insured with the permission of the owner, nor to the contents of premises rented to the Named Insured for a period of 7 or fewer consecutive days.A separate limit of insurance applies to Damage To Premises Rented To You as described in LIMITS OF INSURANCE. B. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete its last paragraph and replace it with the following: Exclusions c. through n, do not apply to damage by fire, lightning, explosion, smoke or leakage from automatic fire protective systems to premises while rented to a Named Insured or temporarily occupied by a Named Insured with permission of the owner, nor to damage to the contents of premises rented to a Named Insured for a period of 7 or fewer consecutive days- A separate limit of insurance applies to this coverage as described in the LIMITS OF INSURANCE Section. C. LIMITS OF INSURANCE is amended to delete Paragraph 6. (the Damage To Premises Rented To You Limit)and replace itwith the following: 6. Subject to Paragraph 5. above, (the Each Occurrence Limit), the Damage To Premises Rented To You Limit is the most the Insurer will pay under COVERAGE A for damages because of property damage to: a, any one premises while rented to a Named Insured or temporarily occupied by a Named Insured with the permission of the owner; and b. contents of such premises if the premises is rented to the Named Insured for a period of 7 or fewer conseGLltlVe days. The Damage To Premises Rented To You Limit is$500,000. unless a higher Damage to Premises Rented to You Limit is shown in the Declarations. D. The Other Insurance Condition is amended to delete Paragraph b.(1)(a)(ii),and replace it with the following: (ii) That is property insurance for premises rented to a Named Insured,for premises temporarily occupied by the Named Insured with the permission of the owner;or for personal property of others in the Named Insured's care, custody or control; E. This Provision 11.does not apply if liability for damage to premises rented to a Named Insured is excluded by another endorsement attached to this Coverage Part. CNA741(1-15) Policy No:8018834238 Page 1 of 1 Endorsement No: The Cont.i.nental Insurance Co. Effective Date! 04/01/2026 Insured Name: TTERIS, INC. Copyright CNA All Flights Reserved. Includes copyrighted rnawerial of Insurance Services Office,inc,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement 12. MEDICAL PAYMENTS A. LIMITS OF INSURANCE is amended to delete Paragraph 7.(the Medical Expense Limit)and replace it with the following: 7. Subject to Paragraph 5. above (the Each Occurrence Limit), the Medical Expense Llmlt is the most the Insurer will pay under Coverage C— Medical Payments for all medical expenses because of bodily injury sustained by any one person. The Medical Expense Limit is the greater of: (1) $15,000 unless a different amount is shown here: ;or (2) the amount shown in the Declarations for Medical Expense Limit. B. Under COVERAGES, the Insuring Agreement of Coverage C — Medical Payments is amended to replace Paragraph 1,a.(3)(b)with the following: (b) The expenses are incurred and reported to the Insurer within three years of the date of the accident; and 13. NON-OWNED AIRCRAFT Under COVERAGES, Coverage A -- Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended as follows: The exclusion entitled Aircraft,Auto or Watercraft is amended to add the following: This exclusion does not apply to an aircraft not owned by any Named Insured, provided that: 1. the pilot in command holds a currently effective certificate issued by the duly constituted authorlty of the United States of America or Canada,designating that person as a commercial or airline transport pilot; 2. the alrcraft is rented with a trained,paid crew to the Named Insured;and 3. the aircraft is not being used to carry persons or property for a charge. 14. NON-OWNED WATERCRAFT Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete subparagraph (2) of the exclusion entitled Aircraft, Auto or Watercraft, and replace it with the following. This exclusion does not apply to: (2) a watercraft that is not owned by any Named Insured,provided the watercraft is: (a) less than 75 feet long;and (b) not being used to carry persons or property for a charge. 15. PERSONAL AND ADVERTISING INJURY DISCRIMINATION OR HUMILIATION A. Under DEFINITIONS,the definition of personal and advertising injury is amended to add the following tort: Discrimination or humiliation that results in injury to the feelings or reputation of a naturai person. B. Under COVERAGES, Coverage B — Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to: 1, delete the Exclusion entitled Knowing Violation Of Rights Of Another and replace itwith the following. This insurance does not apply to. CNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental Insurance Co_ Effective Date: 04/0112026 Insured Name: IT2RI5, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office,Inc„with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement Knowing Violation of Rights of Another Personal and advertising injury caused by or at the direction of the Insured with the knowledge thatthe act would violate the rights of another and would inflict personal and advertising injury.This exclusion shall not apply to discrimination or humiliation that results in injury to the feelings or reputation of a natural person, but only if such discrimination or humiliation is not done intentionally by or at the direction of: (a) the Named Insured;Or (b) any executive officer, director, stockholder, partner, member or manager (if the Named Insured is a limited liability company)of the Named Insured. 2, add the following exclusions: "This insurance aoes not apply to: Employment Related Discrimination Discrimination or humiliation directly or indirectly related to the employment, prospective employment, past employment or termination of employment of any person by any Insured, Premises Related Discrimination discrimination or humiliation arising out of the sale, rental, lease or sub-lease or prospective sale, rental, ;ease or sub-lease of any room,dwelling or premises by or at the direction of any Insured. Netwlthstanding the above, there is no coverage for fines or penalties levied or imposed by a governmental entity because of discrimination. The coverage provided by this PERSONAL AND ADVERTISING INJURY -DISCRIMINATION OR HUMILIATION Provision does not apply to any person or organization whose status as an Insured derives solely from • Provision 1, ADDITIONAL INSURED of this endorsement;or attachment of an additional insured endorsement to this Coverage Part, 16. PERSONAL AND ADVERTISING INJURY -LIMITED CONTRACTUAL LIABILITY A. Under COVERAGES, Coverage B Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Contractual Liability and replace itwith the following: This insurance does not apply to; Contractual Liability Personal and advertising injury for which the Insured has assumed liability in a contract or agreement. This exclusion does not apply to liability for damages: (1) that the Insured would have in the absence of the contract or agreement;or (2) assumed in a contract or agreement that is an insured contract provided the offense that caused such personal or advertising injury first occurred subsequent to the execution of such insured contract. Solely for the purpose of liability assumed in an insured contract,reasonable attorney fees and necessary litigation expenses incurred by or for a party other than an Insured are deemed to be damages because of personal and advertising injury provided: (a) liability to such party for, or for the cost of, that party's defense has also been assumed in such insured contract:and (b) such attorney fees and litigation expenses are for defense of such party against a civil or alternative dispute resolution proceeding in which covered damages are alleged. CNA74872XX(11-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continentai Insurance Co. Effective Date'. 04/01/2026 Insured Name: iTERiS, INC. Copyright CNA Ail flights Reserved. Includes copyrighted material of Insurance Services OfSice,inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement B. Solely for the purpose of the coverage provided by this paragraph, DEFINITIONS is amended to delete the definition of insured contract in its entirety,and replace itwith the following: Insured contract means that part of a written contract or written agreement pertaining to the Named Insured's business under which the Named Insured assumes the tort liability of another party to pay for personal or advertising injury arising out of the offense of false arrest, detention or imprisonment. Tort liability means a liability that would be imposed by law in the absence of any contract or agreement. C. Solely for the purpose of the coverage provided by this paragraph,the following changes are made to the Section entitled SUPPLEMENTARY PAYMENTS-COVERAGES A AND B: 1. Paragraph 2.d. is replaced by the following: d. The allegations in the suit and the information the Insurer knows about the offense alleged in such suit are such that no conflict appears to exist between the interests of the Insured and the interests of the indemnitee; 2. The first unnumbered paragraph beneath Paragraph 2.f.(2)(h)is deleted and replaced by the following: So long as the above conditions are met, attorneys fees incurred by the Insurer in the defense of that indemnitee,necessary litigation expenses incurred by the Insurer,and necessary litigation expenses incurred by the indemnitee at the Insurer's request will be paid as defense costs. Notwithstanding the provisions of Paragraph e,(2)of the Contractual Liability exclusion (as amended by this Endorsement), such payments will not be deemed to be damages for personal and advertising injury and will not reduce the limits of insurance. D. This PERSONAL AND ADVERTISING INJURY-LIMITED CONTRACTUAL LIABILITY Provision does not apply if Coverage B-Personal and Advertising Injury Liability is excluded by another endorsement attached to this Coverage Part 17, PROPERTY DAMAGE-ELEVATORS A. Under COVERAGES, Coverage A - Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended such that the Damage to Your Product Exclusion and subparagraphs (3), (4) and (6)of the Damage to Property Exclusion do not apply to property damage that results from the use of elevators. B. Solely for the purpose of the coverage provided by this PROPERTY DAMAGE - ELEVATORS Provision, the Other Insurance conditions is amended to add the following paragraph: This insurance is excess over any of the other insurance, whether primary, excess, contingent or on any other basis that is Property insurance covering property of others damaged from the use of elevators, 18. SUPPLEMENTARY PAYMENTS The section entitled SUPPLEMENTARY PAYMENTS--COVERAGES A AND B is amended as follows: A. Paragraph 1.b,is amended to delete the$250 limit shown for the cost of bail bonds and replace it with a$5,000. limit;and B. Paragraph 1,d is amended to delete the limit of $250 shown for daily loss of earnings and replace it with a $1,000.I imit. 19. PROPERTY DAMAGE-PATTERNS MOLDS AND DIES Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete subparagraphs(3)and(4)of the Exclusion entitled Damage to Property, but only with respect to patterns,molds or dies that are in the care.custody or control of the Insured,an4d only if such patterns, molds or dies are not being used to perform operations at the time of loss.A limit of insurance of$25,000 per policy period applies to this PROPERTY DAMAGE-PATTERNS MOLDS AND DIES coverage,and this limit: CNA74872XX(1-15) Policy No: 8018834238 Page 1 of 1 Endorsement No: The Continental Insurance Co. Effective pate: 04/01/2026 Insured Name:ITERIS, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance services Office,Inc.,with its permission. CNA CNA PARAMOUNT Technology General Liability Extension Endorsement A. is included within the General Aggregate Limit as described in LIMITS OF INSURANCE;and B. applies excess over any valid and collectible property insurance available to the Insured, including any deductible appi'cable to such insurance;the Other Insurance condition is changed accordingly_ 20. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS If the Named Insured unintentionally fails to disclose all existing hazards at the inception date of the Named Insured's Coverage Part,the Insurerwill not deny coverage under this Coverage Part because of such failure. 21. WAIVER OF SUBROGATION-BLANKET Under CONDITIONS, the condition entitled Transfer Of Rights Of Recovery Against Others To Us is amended to add the following: The Insurer waives any right of recovery the Insurer may have against any person or organization because of payments the Insurer makes for injury or damage arising out of: 1. the Named Insured's ongoing operations:or 2, your work included in the products-completed operations hazard, However,this waiver applies only when the Named Insured has agreed in writing to waive such rights of recovery in a written contract or written agreement,and only if such contract or agreement: 1. is in effect or becomes effective during the term of this Coverage Part; and 2. was executed prior to the bodily iniurv. property damage or personal and advertising iniury nivinn rise to the claim. All other terms and conditions of the Policy remain unchanged. This endorsement,which forms a part of and is for attachment to the Policy issued by the designated Insurers,takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA74872XX(1-15) ^olicy Na: 8018834236 Page 1 of 1 Endorsement No: The Continental Insurance Co. Effective pate: 04101/2026 Insured Name: ITEaI5, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance services Office,Inc.,with its permission. CITY OF SANTA ANA SB 1383 ORGANICS RECYCLING WAIVER APPLICATION Property/Customer Name: MAYAS INSURANCE Hauler Customer ID: 2203690 Physical Property Address: fi326 N GRAND AVE Contact Person: (�p.,�rc` VC'-L Phone: , �_ ,A�y, . 0 L9 Email: oA rat,�Ce • Co rv+ Is your business in a plaza? Yes ❑ No Type of business: Property Management Name,Contact and Phone: 3 VL&'VtCxe1- coot, `� I� y � ,�`� 33 C! t�_o l Does your property have an existing internal program that results in the recycling of food waste and/or yard waste(e.g.:food donation,landscaper hauls to composting facility,on-site composting,etc.)? ❑Yes ® No Does your property manager pay for and provide landscaping services? ❑Yes P No -If no,and if your business/property contracts directly with a landscaper that hauls away yard waste,please complete below. Landscaping Phone TName of green waste Company: Number: processing facility utilized: I would like to apply for a waiver for the following reason(s): DE MINIMIS GENERATION PHYSICAL.SPACE CONSTRAINT -� Your total trash,recyclables,and organics service is C reater than ore ual to two cubic yards per week,and the property generates less than 20 gallons of food waste,food-soiled paper,and yard waste per week combined. Lack of sufficient space for an organic waste container ❑ (containers are available in 35-and 64-gallon carts and Your total trash,recyclables,and organics service is 2-yard dumpsters). �%tst less than two cubic yards per week,and the property generates less than 10t'allons of t6cl w te,food-soiled paper,and yard waste per week omb' e . 1 certify th he fore ing is true and Corr t: 1 a Signat re Print Name and Title Date CFTY USE ONLY Hauler Recommendation De Minimis Orga Yes❑No Space Constraint Organics: ❑Yes®No Site Assessment Conducted by: IVZC ,d4ssessment Date: Reviewer Recommendation De Minimis Organics: Yes❑No Space Constraint Organics: ❑Yes❑No Reviewed by: Title: Date: City Determination De Minimis Organics: ❑Yes❑No Spate Constraint Organics: ❑Yes❑No Determination made by: Title: Date: Comments: Last revised 11/15/23 f