Loading...
HomeMy WebLinkAbout2026-047 - Walnut Pump Station PFAS Treatment System Funding RESOLUTION NO. 2026-047 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTAANA SUPPORTING AND ADOPTING THE FINDINGS THAT THE CITY OF SANTA ANA WALNUT PUMP STATION PFAS TREATMENT PROJECT IS EXEMPT FROM CEQA PURSUANT TO SECTION 15303 OF THE CEQA GUIDELINES WHEREAS, the City of Santa Ana staff determined that a treatment plant for per- and polyfluoroalkyl substances ("PFAS") is required to reduce concentrations in drinking water extracted from the groundwater basin at existing and future well connections; and WHEREAS, the City of Santa Ana, in its capacity under the California Environmental Quality Act (CEQA), has conducted an evaluation of the potential for environmental impacts associated with the City of Santa Ana Walnut Pump Station PFAS Treatment Project (including wells 16, 29, 33 and 41); and WHEREAS, such evaluation determined that the City of Santa Ana Walnut Pump Station PFAS Treatment Project is consistent with the applicable Categorical Exemption (Class 3, Section 15303) under CEQA as it consists of the construction and operation of a treatment plant at Walnut Pump Station for the treatment of PFAS contaminants from several existing groundwater production well sites. The treatment plant will use ion exchange (IX) treatment protocol through the use of IX vessels along with associated water conveyance facilities. The sites have been disturbed by the development of the existing groundwater production wells, and the Project would not require any new ground disturbances. The facility would treat groundwater pumped from the production wells and convey it to existing water distribution pipelines for potable water consumption. The Project would not require any vegetation removal and occurs within an area that is highly urbanized. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa ,Ana, that: Section 1. Adopts the finding that the City of Santa Ana Walnut Pump Station PFAS Treatment Project is exempt from CEQA pursuant to Section 15303 of the CEQA Guidelines because it consists of the construction and operation of small treatment plant and associated connection facilities at previously disturbed sites representing the development of limited numbers of new, small facilities or structures and it would not result in any significant impacts to the environment. Section 2. This Resolution shall take effect immediately upon its adoption by the City Council, and the City Clerk shall attest to and certify the vote adopting this Resolution. Resolution No. 2026-047 Page 1 of 2 ADOPTED this 6t" day of October, 2026. Valtr ie Am cua Ma APPROVED AS TO FORM: Sonia R. Carvalho, City Attorney By: -Z114 lka�� Ky ellesen Assistant City Attorney AYES: Councilmembers Amezcua Bacerra Hernandez Penaloza Phan Vazquez 6 NOES: Councilmembers None (0) ABSTAIN: Councilmembers None 0 ABSENT: Councilmembers Lopez (1) CERTIFICATE OF ATTESTATION AND ORIGINALITY 1, JENNIFER L. HALL, City Clerk, do hereby attest to and certify the attached Resolution No. 2026-047 to be the original resolution adopted by the City Council of the City of Santa Ana on October 6, 2026. ,• l, {{ Date: ennifer all Ci r C ity a Resolution No. 2026-047 Page 2 of 2