1 AMENDMENT NO. 1 TO
2 COOPERATIVE AGREEMENT NO. C4-2053
3 BETWEEN
4 ORANGE COUNTY TRANSPORTATION AUTHORITY
5 AND
6 CITY OF SANTA ANA
7 FOR
8 FIRST STREET MULTIMODAL BOULEVARD STUDY
9 THIS AMENDMENT NO. 1 is effective this day of 2026("Effective Date"), by
10 and between the Orange County Transportation Authority, 550 South Main Street, P.O. Box 14184,
11 Orange California 92863-1584, a public corporation of the State of California (herein referred to as
12 "AUTHORITY") and the City of Santa Ana, 20 Civic Center Plaza, Santa Ana, California 92702, a
13 municipal corporation duly organized and existing under the constitution and laws of the State of
14 California (herein referred to as"CITY"), each individually known as "PARTY", and collectively referred to
15 as"PARTIES',
RECITALS:
16
17 WHEREAS, by Agreement C-4-2053 dated February 18, 2025, AUTHORITY and CITY entered
18 into an agreement for CITY to act as the lead agency for preliminary engineering, right-of-way,
19 construction, and construction management of the First Street Multimodal Boulevard Study Project
20 (hereinafter referred to as"PROJECT'); and
21 WHEREAS, the PROJECT is funded with Regional Early Action Planning Grant Program of 2021
22 (hereinafter referred to as"REAP 2.0") funds; and
23 WHEREAS, CITY and AUTHORITY agree to increase the level of effort for the PROJECT to
24 adequately address and incorporate all necessary PROJECT components identified through the latest
25 findings during the conceptual planning and preliminary PROJECT plans, specifications, and estimates;
26 and
Page 1 of 3
AMENDMENT NO. 1 TO
COOPERATIVE AGREEMENT NO. C-4-2053
1 WHEREAS, AUTHORITY and CITY agree to increase the Agreement's maximum cumulative
2 payment obligation by Three Hundred Eighty-Two Thousand Eight Hundred Ninety-Six Dollars and
3 Eighty-Five Cents ($382,896.85) to complete CITY-required PROJECT components; and
4 WHEREAS, AUTHORITY and CITY agree that the increased obligation will be fully funded
5 through REAP 2.0 funds; and
6 WHEREAS, CITY's City Council approved this Amendment No. 1 on the (j"'— day of
7 C --r 2026.
8 NOW, THEREFORE, it is mutually understood and agreed by the AUTHORITY and CITY as
9 follows:
10 1. Amend ARTICLE 3. RESPONSIBILITIES OF AUTHORITY, page 4 of 12, paragraph D.,
11 lines 10 and 11, to delete and, in lieu thereof, insert:
12 "D. AUTHORITY shall allocate the CITY's share of the PROJECT in the amount not to exceed
13 Four Million Six Hundred Eighty-Two Thousand Eight Hundred Ninety-Six Dollars and Eighty-Five
14 Cents ($4,682,896.85) for the PROJECT using REAP funds."
15 2. Amend ARTICLE 6. MAXIMUM OBLIGATION, page 7 of 12, to delete in its entirety and,
16 in lieu thereof, insert:
17 "ARTICLE 6. MAXIMUM OBLIGATION
18 Notwithstanding any provisions of this Agreement to the contrary, AUTHORITY and CITY
19 mutually agree that AUTHORITY's maximum cumulative payment obligation hereunder shall be Four
20 Million Six Hundred Eighty-Two Thousand Eight Hundred Ninety-Six Dollars and Eighty-Five Cents
21 ($4,682,896.85), unless agreed to and amended by both PARTIES."
22 I
23
24 1
25 I
26 1
Page 2 of 3
AMENDMENT NO. 1 TO
COOPERATIVE AGREEMENT NO. C-4-2053
1 The balance of Agreement No. C-4-2053 remains unchanged.
2 IN WITNESS WHEREOF, the PARTIES hereto have caused this Amendment No. 1 to
3 Agreement No. C-4-2053 to be executed as of the date of the last signature below.
4 CITY OF S TA ANA ORANGE COUNTY TRANSPORTATION AUTHORITY
5
6 By: �� By.
Alvaro Nunez Lydia Bilynsky
7 City Manager Department Manager, Capital Projects
Dated:
9
10 ATTEST: APPROVED AS TO FORM:
11
By: By:
12mifer L. I II °�a James M. Donich
13 '"City Cler General Counsel
14 Dated:
15
16 APPROVED AS TO FORM:
17
By; r ; c .
18 K.yie Nellesen
19 Assistant City Attorney
20 RECOMMENDED FOR APPROVAL:
21 �o (Ot r� �Qf of
22 By: Rodolfo Rosas(Oct 22,2026 13:37:18 PDT)
Rodolfo Rosas, P.E.
� j 23 Executive Director, Public Works Agency
24 10/22/2026
Dated:
26
Page 3of3
C42053_AM01 _for execution (CAO 10.22.26)
(2241255. 1 ) (003)
Final Audit Report 2026-10-22
Created: 2026-10-22
By: Skylar Wilk(swilk@santa-ana.org)
Status: Signed
Transaction ID: CBJCHBCAABAAJ465txH5adITE8Lt9CyVCPAGgda_N4r1
T42053_AM01_for execution (CAO 10.22.26)(2241255. 1 ) (003)
" History
L) Document created by Skylar Wilk (swilk@santa-ana.org)
2026-10-22-8:33:09 PM GMT
L Document emailed to Rudy Rosas (rrosas@santa-ana.org) for signature
2026-10-22-8:33:14 PM GMT
tI Email viewed by Rudy Rosas (rrosas@santa-ana.org)
2026-10-22-8:34:07 PM GMT
a Signer Rudy Rosas (rrosas@santa-ana.org) entered name at signing as Rodolfo Rosas
2026-10-22-8:37:16 PM GMT
r�;uo Document e-signed by Rodolfo Rosas (rrosas@santa-ana.org)
Signature Date:2026-10-22-8:37:18 PM GMT-Time Source:server-Signature Appearance Selected:TYPE
Q Agreement completed.
2026-10-22-8:37:18 PM GMT
Adobe Acrobat Sign