Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
HDR ENGINEERING, INC. (4)
INSURANCE ON FILE WORK MAY PROCEED UNTIL�INS U�RJNCE EXPIRES A-2026-149 202-Z CITY CLER !)ATF, bCT sj s P W A 0) FIRST AMENDMENT TO AGREEMENT WITH HDR ENGINEERING i�r�ZwbQ1 C�Z) TO PERFORM ENGINEERING AND TRANSPORTATION PLANNING SERVICES FOR THE FIRST STREET MULTIMODAL BOULEVARD STUDY THIS FIRST AMENDMENT to the above referenced Agreement is entered into on this 6th day of October, 2026 by and between HDR Engineering, Inc. ("Consultant"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California("City"). RECITALS A. On May 20, 2025, the City and Consultant entered into Agreement #A-2025-073 ("Agreement") following a comprehensive Request for Proposal procurement process to for traffic engineering and transportation planning services associated with the First Street Multimodal Boulevard Study("Project") in accordance with the terms of the RFP No.25- 029 ("RFP"). The Agreement runs for an initial two (2) year term with options to extend the term for up to two (2), additional one (1) year terms, if needed. The Agreement is current and in-effect. B. Consultant has substantially completed the planning, public outreach, transportation analysis,and preliminary engineering services identified in the original Agreement and has advanced the Project to approximately the 60 percent design phase. C. As the Project advanced through design development, additional engineering analyses were identified as necessary to satisfy City engineering standards, Orange County regulatory requirements, and accepted engineering design practices. Specifically, completion of a Drainage Report, Geotechnical Pavement Design Memorandum, and Water Quality Management Plan (WQMP), Right of Way (ROW) Engineering, Utility Coordination, additional Storm Drain Design, Utility Potholing, and contract administration are all additional tasks necessary to advance the Project through the 90 percent and 100 percent Plans, Specifications and Estimates(PS&E)milestones. D. Consultant is uniquely qualified to perform these additional services because of its familiarity with the Project, existing engineering analyses, community outreach, and ongoing design efforts. Utilizing Consultant to complete the additional work will maintain project continuity, avoid duplication of effort, and minimize schedule impacts. E. Pursuant to Santa Ana Municipal Code Section 2-807, City staff coordinated with the Purchasing Manager in regards to the additional work contemplated by the Consultant. The Purchasing Manager approved the exception to process for bid requirements consistent with City code and the procurement process established under the RFP. E. The Parties desire to amend the Agreement to: (1)amend the scope of services; (2)utilize the grant contingency funds authorized by Council on March 20,2025 and additional grant funds identified in Amendment No. 1 to the Cooperative Agreement with Orange County Transportation Authority to increase the compensation by Six Hundred Thousand Four Hundred Eighty-Nine Dollars and Eighty-Five Cents ($600,489.85) to compensate the Page 1 of 4 Consultant for said additional services; and (3)to amend the fees and rates to include the costs for the additional services detailed herein. No other changes are contemplated by this First Amendment. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth,the parties agree as follows: 1. SECTION 1,SCOPE OF SERVICES Exhibit A to Section 1 of the Agreement is hereby amended to include additional professional engineering services,attached hereto and incorporated by reference: a. Preparation of a Drainage Report, including hydrologic and hydraulic analyses, drainage area mapping, roadway spread calculations, evaluation of existing and proposed storm drain facilities, and preparation of final drainage recommendations (Exhibit A-1). b. Preparation of a Geotechnical Pavement Design Memorandum, including subsurface exploration, laboratory testing, pavement design recommendations, traffic signal foundation recommendations, and geotechnical engineering analyses(Exhibit A-2). c. Preparation of a Water Quality Management Plan (WQMP), including stormwater treatment calculations, Best Management Practice (BMP) design, preparation of technical specifications, regulatory documentation, and completion of Orange County recordation requirements(Exhibit A-3). d. Preparation of Right-of-Way(ROW)Engineering,including fifteen(15)title reports to support new roadway easements,five(5)additional title reports to support intersection curb returns where the documented ROW does not match existing improvements, performing ROW engineering to verify existing parcel boundaries for affected parcels, preparation of Plats and Legal descriptions to support 15 new parcel takes, and address comments. HDR will begin utility coordination with Southern California Edison (SCE). The coordination effort will include the preparation of utility impact exhibits specific to SCE facilities in order to facilitate relocation coordination with SCE and other utility owners. Two(2)additional drainage systems are required by PWA for inclusion into the design package. These two systems will replace deficient systems located at the Main Street and Broadway Street intersections. The HDR design team will prepare new plans and profile design plans for these two drainage systems and include the plans in their 90% and 100% design submittals. This task will include plans, specifications and cost estimates for the added drainage items and will be incorporated into the drainage report with supporting hydraulic calculations. Page 2 of 4 Utility Potholes: The HDR team will complete 35 utility potholes to locate existing utilities at critical points along the corridor including proposed utility crossing and traffic signal locations. The utility pothole information will be supplied to the PWA in the form of a field report and the pothole data will be added to the First Street utility plans. (Exhibit A-4). 2. SECTION 2.a, COMPENSATION, is hereby amended to increase the total compensation by an additional Six Hundred Thousand Four Hundred Eighty-Nine Dollars and Eighty-Five Cents($600,489.85). The total amount to be expended during the term of the Agreement shall not exceed Four Million, Four-Hundred Seventy Thousand, Four Hundred Eighty-Nine Dollars and Eighty-Five Cents($4,470,489.85). 3. SECTION 2.a,COMPENSATION,is hereby amended to include as Exhibit B-1 to this First Amendment the rates and fee schedules for the additional scopes of work detailed in this First Amendment. 4. Except as modified by this First Amendment, all terms and conditions of the Agreement shall remain in full force and effect. [signature page to follow] Page 3 of 4 IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to Agreement the date and year first above written. ATTEST: CITY OF SANTA ANA P ennifer all Alvaro Nunez City Cle City Manager ROVED AS TO FORM: SONIA R. CARVALHO CONSULTANT: City Attorney By: Kyle llesen Thomas T. Kim Assistant City Attorney Senior Vice President RECOMMENDED FOR APPROVAL: kopy fo Rofat Rodolfo Rosas(Sep 28,2026 09:51:57 PDT) Rodolfo Rosas,P.E. Acting Executive Director, Public Works Agency Page 4 of 4 EXHIBIT A-1 SCOPE OF WORK Drainage Report FN First Street MM Design, Bristol to Standard—Drainage Report City of Santa Ana May 21,2026 Prepared by HDR Engineering, Inc. General Scope of Work For the First Street MM Design, Bristol to Standard Project(Project), HDR Engineering, Inc.(HDR)will provide a Drainage Report for the 60%, 90%, and 100%level of the Project design.The Drainage Report will highlight the drainage analyses on the existing and proposed drainage systems between Bristol Street and Standard Ave in Santa Ana,California. Detailed Scope of Work Task 1 Data Review HDR will review the available data provided by the City of Santa Ana and the Project team. Key information to review will be previous drainage reports, hydrologic and hydraulic models of the existing drainage systems, topographic survey, as-built data,and maintenance records for the Project site. Task 2 Drainage Report HDR will review readily available data and prepare design calculations to assess roadway spread,roadway flow depth,and the hydraulic capacity of the existing and proposed drainage systems. HDR will prepare a draft and final Drainage Report,which will include basis of design for the drainage improvements,calculations to assess the existing drainage systems,and the calculations for the proposed drainage improvements or impacts to drainage facilities.The results and design recommendations will be summarized in the Drainage Report.The report is expected to include the following: • Basis of design for drainage facilities • An evaluation of the existing facilities and proposed conditions • Unusual and special conditions • Drainage area mapping and hydrologic calculations • Hydraulic analyses Deliverables: • Draft Drainage Report(PDF) • Final Drainage Report(PDF) hdrinc.com HDR Engineering.Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 pg.1 925.465.2700 FN Assumptions • HDR's deliverables will be provided in PDF format. • Available drainage reports, hydrologic and hydraulic modeling data will be provided by city of Santa Ana to HDR. • Evaluation of the existing storm drain system will be limited to the Project limits along First Street and located between Bristol Street and Standard Ave. • Downstream control elevations will be obtained from the existing drainage models and will be used as a basis for the design of the proposed storm drain system. It is assumed that the existing models will be used as-is and no further modifications to the models will be required. If no downstream control elevations are available,it is assumed that the highest value of either an elevation of 0.5 feet below the existing local depression or 2 feet below the lowest existing street gutter grade will be used. • Hydrology will be analyzed based on guidance from the County of Orange Department of Public Works Local Drainage Manual and the Orange County Flood Control District Design Manual. • Hydraulic analysis will be analyzed based on guidance from the County of Orange Department of Public Works Local Drainage Manual and the Orange County Flood Control District Design Manual. • Autodesk Hydraflow or equivalent software and HDR's proprietary calculation spreadsheets will be utilized for roadway and pipe hydraulic calculations. • It is assumed that the Project will require stormwater treatment and Best Management Practices (BMPs)will be included as part of the drainage design. • The design of BMPs will be subject to a Water Quality Management Plan(WQMP)document prepared under a separate scope of work. • It is assumed that there will be one set of comments through one review cycle for the draft Drainage Report and one set of comments on the Final Drainage Report.The Final Drainage report will be updated to reflect the final design plans prepared by HDR.Additionally, it is assumed that there will be no additional comments on the Final Drainage Report.A revised Final Drainage Report will be provided to the city as a final deliverable. HDR Engineering,Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 pg.2 925.465,2700 EXHIBIT A-2 SCOPE OF WORK Geotechnical Pavement Design Report First Street—Pavement Evaluation PROJECT UNDERSTANDING We understand that First Street, extending between Bristol Street and Standard Avenue in the City of Santa Ana, is proposed to be improved. The total length of the proposed alignment is about 1.6 miles. The design scope is to widen the existing sidewalks from 8' to 17' (feet) in width and also to shift the median. The existing pavement section will need to be replaced. Additionally, new traffic signal foundations and performing storm drain reconstruction work that may involve excavations down to a depth of 12' is planned. SCOPE OF WORK Our scope of work is expected to consist of the following tasks: • Review geotechnical maps and reports in our in-house library that are relevant to the site. • Obtain a "no fee" encroachment permit through the City of Santa. • Prepare a geotechnical exploration/work plan and support the design team in acquiring encroachment permit from the City of Santa Ana to perform geotechnical exploration within local streets. Additionally, a soil boring permit from the County of Orange will be acquired. • Premark the proposed boring locations and contact Underground Service Alert (USA) for utility clearance. In addition, each proposed boring location will be cleared for utilities using geophysical techniques. • Traffic control will be provided for the proposed subsurface exploration according to the WATCH manual. Traffic control plans will be prepared where required at additional expense. • Perform a subsurface exploration consisting of drilling, logging, and sampling 8 hollow-stem auger(HSA) borings along the subject roadway. The proposed borings will be advanced to a target depth between approximately 10 and 20 feet below existing ground surface or to practical refusal whichever is shallower. We will obtain Standard Penetration Test and Modified California Ring samples and will be logged by a member of our technical staff. The borings will be backfilled with cement bentonite grout, the surface will be patched with rapid set concrete and black pigment will be added to match the color of the existing pavement. Soil cuttings will be placed in 55-gallon drums and dispose after analytical testing is completed at a regulated disposal facility. • Perform laboratory testing on selected soil samples to estimate the engineering properties of the subsurface soils, including in-situ moisture content, grain-size analysis, strength tests, consolidation, sand equivalent, expansion, and R-Value. • Perform geotechnical analysis of the collected data for pavement design. • Prepare a geotechnical design memorandum presenting our findings, traffic light foundations, and pavement design recommendations. Deliverable A Geotechnical Design Memorandum (electronic only) Schedule We will start our literature review and scheduling of our subcontractors upon receipt of a written notice-to-proceed. We expect our field exploration to be completed within two weeks after receipt of the encroachment permit. The Geotechnical Design Memorandum will be available to you within six weeks after the field exploration. Progress briefings and preliminary design recommendations can be provided as the data is developed. Assumptions Page 1 of 2 1 YZ First Street—Pavement Evaluation ➢ This project is subject to the Prevailing Wage Law. ➢ The encroachment permit from the City of Santa Ana will be considered a "no fee" permit. ➢ One single round of reviews/comments from the City of Santa Ana reviewer is assumed for our scope. After comments are addressed a final geotechnical design memorandum will be provided to the Client. ➢ Well permit coordination and fees from the Orange County Department of Environmental Health Services are included in our geotechnical scope. ➢ Our field exploration assumes to be performed during regular working hours. ➢ Pavement design will be performed using Caltrans R-Value Highway Design Manual method. ➢ City of Santa Ana will provide location near the project site for the temporary storage for drums. Pavement restoration will be completed using rapid-set concrete with black dye. Other methods of pavement restoration are not included in this scope of services. Our scope does not include infiltration testing for use in the design of water quality best management practice (BMP). However, infiltration testing can be provided upon request at an additional cost. ➢ Available underground utility mapping information will be referenced prior to the field exploration. As required by the state of California, we will also notify Underground Service Alert of the locations of our planned explorations prior to drilling. We will take the precautions to avoid utilities; however, despite reasonable efforts, there are inherent risks to utility damage from drilling. We cannot assume responsibility for the inherent risks if the utilities are not accurately marked at the site. Our proposal does not include costs or other provisions for utility repairs. ➢ Identification, handling, and treatment of materials that need to be environmentally addressed are beyond the scope of our geotechnical engineering services. If such materials are encountered, we will notify you immediately and a proposal for handling of such materials will be submitted upon request. Page 2 of 2 KR SLWn 1�3f'Okid 3Zl.11.lO3f'011d:NNNN-AA ON.LOBP)Hd eU _ m Q 01 u Wi J a< 06 CD m" ca Y3 w c c p w m m wui co 2r 0+41 ViS BJnHOIVVY A 1HS 33S 00+61 VIS 3Nn1 of n -I aj O Y�Y I Y o3 8 cu � yl 4I N - tn 1 s� �3 ss €t i E Z O O O Q btl t8 SQ t0 co CO 40 tD �C,4 .—i _� :. I I ��• G N N N N L11 N N I Ilk m W i I r� I � I 11 I C i •J �r 1, � z i ' I y I -J d U) 10 Y F z s H to _ _w Tm 1HJR!3AOBH 33S 00+44 V1S 3NI1H01`dW y 3llWn l�roed 3llll 1�3f'Okld NNNN-AA ON 1�3f`OFJd a f - J_ Q 010 Wa F o< J� a< W 4F 3 0 V � m u CO 6 1�31 MO138 335 00+4Z V1S 3NnFI�1VW A 1HS 31 8 00i6Z V18 mnH31VW I is is�m�oo tC 03 It Z O N gB Y3 t aa+u co o i 9.i w�, i new r rN � I 63U 83 I � L �3 I I 2 e - W I o^ I g8 W a' I 8� yF � � ❑ g Y d g3 ( I t (n U) I Eo� vh I i g� tl I LL, I r gN 83 1 k' I 141S4M 4EL� -,p I LE•LE'.900 Mtl —� i I ' A 1F44 395 00+6L V1S 3NnHD1VW 11-M 3AOEW 338 DOtbZ V1S aWlHJ1VYY I�i SLPIn 1O3r OHd awl la3r'OHd da/V4-A t'0N 1-)3roHd e " J_ Q O n Wi J a< ya wn 7 1H331 MO-l39 33S 00+K V.S 3NI-IH3IVA A IW 33S 00+6C V1S @NnHO1VW m oo+u �■ oo i ' 'i I > D n b> fi` eb d� 1 LL 03 I 1 I j aw = o o� I _y 1 I r 03 � j ■� Z a U) Lu $ y f o3 ■� L r Z SIM 4F co— • i -2s 71 '17 83 I 51 n' ,— I 9 o � I 83 Qo , ■ r 8i 'f m R a 8 y$}} y I o ■� m 8 NN I I y o D A L-IS 338 00+6Z V1S 3P1HOlVW 11-pIF13A09V Op}{.E V13 3NnFiO1VW - t� J:N m � \§ k c � k§ k! -j §J0, �g 2} \| §k § � a I-En MO,33800+»VIBanHOlm - � �| , 82___RCH3_ / ) \ a E )\ . . « . y ; � . �- . � , ; . | 2 ■ ; < a IF , 4 g , § \ ■ ® - § AIM____FKDI m I■av33 00+»VISA HOI& __� « allhn 10a'08d 31ll110mw` :NNNN-AA'ON 1�3f`ONd_ n� B A - � J_ Q WA iWp' F L< of � 30 � n s 5 Y Yi 3 fi3 �tl i=JT1 MO139 zlM 00+Z9 V1S 3NIl401VW a c a A IM 33S 00+99 V1S 3N7-OlVW am a _ isas�,v,ur ' OiS[Z4oF kdV i �I � tle �E N ili � �Yy Wd tl� w -- §y _ m3 W n� i Y r - --- OL N X N00+ OD F o •�� i i qy � � a� m a i t a1 nz 3 NA 1H8 ass 00+86 V1S 3N HO1VW 1H'JR1 3A09V 338 00+Z5 V1S 3N,-OlVW S18Yn lO3f OHd 31ll11O3romd 4JNNN-AA'ON lO3POkld - J_ a 1H31 Mo-as 338 00+19 VJS BWWDiVh He �■ t yWE mA 1HS 338 00+99 V1S 3NnH_Ol" g ga tj tea° I N8p �H OW 0 ry �_ - - i F- C y�L M I M■ m + o Q F NO � 16 oo+ F � � ■��' a eew � � mN n s o�tME ■ o a i ' ss m- ZCO - a A 1-8 33S 00+w V1S 3NnHoaw 1-YM 3AOSV 338 00+19 V1S 3NnHJ1VH ��� SMrl 103rOHd Er=103f'OHd*WFAA-ON IZ 3FUJd _ J _ Q �5$� u �n Wi J ti Qa y< ON W u� A 1HS 399 00+VL V1S 3MWOIVW iIre � C t t t AL "tl a s) SI mz ff 89 Jz 3 MO-129 33S 00+69 V1S 3NnHO1VW y F_ I i \ o j t m" ii YII� i = g m �In I '2�ry fl I �0 I y I F Z � I I aF ■ ■ ■ ■ R■ cn tiLU r- LU i oom ,■� mW I I Q ■� $� cU I ■� o HE ■ ❑ -w �w+rr4t— tir —� MAMMON■ q„ gN n_ 'gw i z ❑ �y v I zp o� F � ��, I w oa+u iv I i �' � ZtrLL?B6C qdv �^�' 1 ! � o � I 191S13011 i o : :�'2RLl$9fi[MdH A 1HS MS 00+99 V1S 3NnH31VW IMIH HAM 33S 00+69 V1S 3WHOIVW - s SUNn 1O3f`OHd a-=1O3f'ONd mNJ-AA ON 1O3POHd n a a - a o Wi F� as a mU 6 a � � y� gy b E fi 1d31 MO-M MS 00+8L V1S 3NnHOlVY4 A 1HS EBB 00+ZB V1S 3NnH31VW N $$ U) m I W N � —I J JEOL �N o F E� I m`3 �w �■ O �sw j I �a I W a � I m r I I w ! I 11S _ � \e, I I go A im 00+4L V1S 3NnFp1VW 1HUH 3hOGV 33S 00+9L V1S 3NnHO1VW .Y S11WI'1 103row 3-M 1O 'OHd:NNNN-AA'ON 1�3fxOkld n - J_ QQ 2 � F J� as Stu-aF 3 W N C0� UJ � allII _ b t 133-1 MO-139;1 S 00+99 VJS 3NnHoivn f A 1HS 33S 00+06 V.S 3NnH1'J1VW 33 IM _ o v i u z mgw gm �y rY 0 100 �m Q a1.io G( I ■� U m ■� J z S I i i �• "� NI i I II g� Sx U) d $3 VSVN S6'B6C pdb o A JAS 33S 00+ZB VIS W-111O1M 1HOIH 3AOHV 338 00+99 V1S 3NnHO1VW rna•am-xawi-xx.�-�xs' ��U� _n!03rOUd 3-M__A a_ , \| ) �k ■! §§ §_ �� ■! �| 26 wg @| � & k |d d !! ! ! )§ | � _m,:12S____gym ( ; t I � \ ;} ! j|( l � ' . � —j , , . �%■ � a Icr , ® : . »] -- « - , LHS900+mViS,mOIm _Q_»99S 00+Q__HOiQ : _ _ � EXHIBIT A-3 SCOPE OF WORK Water Quality Management Plan(WQMP) FN First Street MM Design, Bristol to Standard—WQMP Report City of Santa Ana June 5,2026 Prepared by HDR Engineering,Inc. General Scope of Work According to this scope of work, HDR will prepare a Water Quality Management Report(WQMP)for the First Street Multimodal project (Project). The report will comply with City of Santa Ana permanent stormwater requirements. This includes basing the design on the North Orange County Technical Guidance Document (TGD) for the Water Quality Management Plan (WQMP). According to the TGD, the project(as part of street, road, highway category) is considered a Priority Project and will require preparation of a WQMP for the post construction phase. The related city WQMP template will be populated for the project.The final WQMP report will be co-signed by the engineer of record and the City of Santa Ana. The city will take over maintenance responsibilities for all installed WQMPs. Detailed Scope of Work Task 1 Draft 90%WQMP Report HDR will review the available data provided by the City of Santa Ana and the Project team. Key information to review will be previous drainage reports, hydrologic and hydraulic models of the existing drainage systems, topographic survey,as-built data, and maintenance records for the Project site. Based on discussions with the City of Santa Ana,it is assumed that Filterra treatment systems and/or equivalent proprietary modular treatment systems will be incorporated into the project design. Storm capture volumes will be prepared to inform preparation of the conceptual BMP layout. Treatment BMPs will be allocated to the Project corridor based on stormwater capture locations. In addition, the proposed BMPs will be reflected in the roadway and drainage plans including location of said BMPs, details, notes, and connection to existing or proposed storm drains, as applicable. Related technical specifications and cost estimates will be provided at the 90% and 100%design submittals.After the Draft WQMP is complete,it will be submitted to the city for review and comment. Task 2 Final WQMP Report HDR will update the WQMP based upon the comments received from the 90%submittal and any changes to the storm drain and roadway design that impact the drainage areas and WQMP calculations.WQMP information such as the calculations and BMP exhibit will be updated as needed.The proposed BMPs will be refined in the drainage plans including location of said BMPs,details,notes,and connection to the existing or proposed storm drains, as applicable).After the Draft 100%WQMP is complete, it will be submitted to the city for review and hdrinc.com HDR Engineering Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 pg. 925.465.2700 0- comment.Once the city provides comments,those comments will be addressed to close the 100%phase.Once the WQMP is approved, HDR will complete the required Orange County recordation process. Deliverables: • Draft 90%WQMP Report(PDF) • Final WQMP Report(PDF) Assumptions • Onsite soils are not contaminated. • Filterra treatment systems or similar modular wetlands treatment systems will be utilized on the Project. • Bioswales or other natural treatment systems requiring site specific landscape design are not included in this scope of work. • Comparative BMP alternative analysis to select a preferred BMP alternative is not included. • One round of comments from the city. • If applicable, preparation of Preliminary SWPPP(PSWPPP),and SMARTS administration support, for issuance of WDID number from SWRCBIRWQCB is not included. • It is assumed that the Project will require construction phase Best Management Practices(BMPs). Construction BMPs will be included on the erosion control plans. HDR Engineering,Inc.,3003 Oak Road,Suite 500,Walnut Creek,CA 94596 pg.2 925.465.2700 EXHIBIT A-4 SCOPE OF WORK Right of Way Engineering, Utility Coordination, Storm Drain Design,Utility Potholing Santa Ana First Street Multimodal Boulevard Project Contract Amendment — ROW Engineering, Utilities, Storm Drain Systems, and Potholes Task 5.5a ROW Engineering The HDR team will perform the following ROW engineering activities. a. Order 15 title reports to support new roadway easements.All title reports will be supplied to the city for review. b. Order 5 additional title reports to support intersection curb returns where the documented ROW does not match existing improvements. c. Perform ROW engineering to verify existing parcel boundaries for affected parcels. d. Prepare Plats and legal descriptions to support 15 new parcel takes. e. Address comments and assume one round of agency review and comment resolution on P&Ls with the city. Task 5.5b Utility Coordination The city traffic department has requested that HDR begin utility coordination with SCE. The utility coordination with SCE and other third-party utilities is expected to take 6-12 months. A budget has been identified to begin the utility coordination effort with SCE. This scope of work will include the preparation of utility impact exhibits specific to SCE facilities in order to facilitate relocation coordination with SCE and other utility owners.The budget of$40,000 has been established for attendance at coordination meetings and the preparation of exhibits between October 1 and December 31, 2026. The city of Santa Ana will take the lead on any agreements required by SCE and other third party utility owners. Task 5.5c Additional Storm Drain Design The city has requested that two additional drainage systems be included in the First Street MM design. These two systems will replace deficient systems located at the Main Street and Broadway Street intersections. The HDR design team will prepare new plans and profile design plans for these two drainage systems and include the plans in our 90%and 100%design submittals.The additional budget for this task will include plans,specifications and cost estimates for the added drainage items.The added drainage systems will be included in our drainage report with supporting hydraulic calculations. Task 5.5d Utility Potholes The HDR team will include BESS test labs on our design team as a contractor to complete 35 utility potholes.These potholes will be used to locate existing utilities at critical points along the corridor including proposed utility crossing and traffic signal locations.The utility pothole information will be supplied to the city in the form of a field report and the pothole data will be added to the First Street utility plans. Task 5.5e Contract Administration HDR will coordinate with the subconsultants and with City staff to amend or establish contracts for these tasks. This task includes time for the project manager, principal in charge and project control specialist to complete and administer these agreements in addition to day to day management of the overarching contract. Optional Task: Record of Survey At this time, it is not clear if record of survey will be required.This will be determined once titles are pulled for each property.This optional task may be needed if record of survey is required to prepare the map and associated County fees. EXHIBIT B-1 RATES AND FEE SCHEDULES 0 0 0 0 0 0 o p O o 0 0 0 CD 0 0 iy O O O O O O O �D d N `0 1 p W w CO V 0� may- O l!1 c-1 p In r, ^ N .-+ l[7 — .-� (D N M OD 1 N4 6I} fR fA -GPI V3 L! � ia 613� t m O O O O O O G fR fH V} S cc 0 0 MN d' 1 n m T N N a S C co N N W Q W ~ O W Ln N O V V 0 co N N N CD `N CO CO CD m N fA � O •� O U � N C CO O CO N V O G •� H w N M N co N V M co N W u Q0 y � co a c CV) coc0 c0 cn co N V N N N V} O O M O O O O O O O O O O a � fisr • 42 N Q _N U ' a C U EL c • f° Q U c � � � c 5 a y t o c o` Q 12 c o � 3 c • ¢ 0 rL 2 ea'c o .• y c o ,cmi o V c b aQi U > •m of Nk O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - LL O m N O a O M O M O N p V 01 M ei O I V D O W O Ln n n W N sp.t9 [A �A FA s3 fN to M tH A K � U3 6~4 K [R iR � O O O O 0 0 O U O O N 0 0 W O O O M O N D O H iA N m N N � fR fA ER O N OM r � rVy r W I N H w � N .� pp 0 G vi N N W 0 N fn C W � O m m N f N N V N co N N O ¢a o es m M U O O O O a en c c N Z U C 7 o Q � W N E N W m C O N c F d p E E e w d 6 e n O n a b w a lam m D 16 W m C o o = CD o 0 CD c o ] g o o CD ] c o CD § q \ \ \ \ m \ \ \ & R 2 % % ƒ \ 2 ƒ _ & \ ( / « A 3 @ 7 CD 3 ° Z - ? { \ \ ) # * 3 \ 3 \ $ Q =LU 3 Ei i s m 3 g a m e \ / ( � a g o c o / # o o \ \ ! \ _ } c o o c c o o c oCL > \ / w \ \ � ( / - \ _ \ a } \ � * \ \ J \ \ ( � \ \ t 2 J \ \ L ` Q \ \ _ z / \ 2 6 \ J J /ƒ O O O O O O O O m M O O It Ln 0 O I- r- 0 0 0 0 0 O M M ER O O 00 O - O •- N N O O LO 0 0 LO 00 00 O N M O •• O r�: I� LU,) r- U) O N 00 (- LO q7 O U) L N N N N (N 60 N O N N N 69� N 69 61, a9 PA 613 EF? to EH • U)- EPr 69 EA 69 Cl) M 00 M O ffl O - O r- O N O r- L 64 ER O O O O O O - O 0 0 0 O 0 0 Y O 0 0U-j O N O L Lf) O N Ln M In ?0 6F} Efl 04 9 J a z °' O o � O L o LL '6 -a Q O O N N a L LU O cNo ° � v U IL a� c U — O � w m 0. 3co v7 c • -p co O- fB E in w m L E o ° O c W o —a) o 0 o U 00 LL L .0 0)-0 O)MO m C O1 U° r CZEO° yiO U) o rn° oL rn ° - .� -0 . 2 ao O N CN N O N O M ••C O Q C L� p _C y C O H C N Q Q N O N ,C N (�B ° O a C E N Z O Q) u a) C O L_ (0 a) Q _U - Q L Q O Q' _ O o 0 LU U U U w p .- in � a O - M orn �- cq — cam o 0 0 • a • W Q' i i i i i U d p � (II � U •C7 N H H N m LL ACORD Page 1 of 2 CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 07/02/2026 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT WTW Certificate Center Willis Towers Watson Midwest, Inc. NAME: c/o 26 CenturyBlvd PHONE 1-877-945-7378 N :C No: 1-888-467-2379 P.O. Box 305191 E-MAIL ADDRESS: certificates@wtwco.com Nashville, IN 372305191 USA INSURER(S)AFFORDING COVERAGE NAIC# INSURED INSURER A: Liberty Mutual Fire Insurance Company 23035 HDR Engineering, Inc. INSURER B: Ohio Casualty Insurance Company 24074 _ 1917 South 67th Street INSURER C: Liberty Insurance Corporation 92909 Omaha, NE 68106 INSURER D INSURER E INSURER F COVERAGES CERTIFICATE NUMBER:W47122522 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.*LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LIMITS SHOWN ARE INCLUSIVE OF AMOUNTS REQUESTED BY THE CERTIFICATE HOLDER AND MAY NOT REFLECT POLICY LIMIT AMOUNTS IN EXCESS OF THOSE REQUESTED. *Not Applicable in WY INSR ADDL SUBR LTR TYPE OF INSURANCE POLICY NUMBER MM/DD/YYYY) (MM/DDIYYYYI LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 CLAIMS-MADE X�OCCUR DAMAGE TO RENTED PREMISES Ea occurrence $ 1,000,000 A X Contractual Liability Y Y TB2-641-444950-036 06/01/2026 06/01/2027 MED EXP(Any one person) S 10,000 PERSONAL&ADV INJURY $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY X PRO- GENERAL AGGREGATE $ 9,000,000 JECT X LOC PRODUCTS-COMP/OPAGG $ 4,000,000 OTHER. AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT X ANY AUTO Ea accident $ 2,000,000 BODILY INJURY(Per person) $ A OWNED SCHEDULED Y Y AS2-641-444950-046 06/01/2026 06/01/2027 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident $ UMBRELLALIAB X OCCUR H EACH OCCURRENCE $ 6,000,000 X EXCESS LIAB CLAIMS-MADE Y Y EUO(27)57919363 06/01/2026 06/01/2027 AGGREGATE $ 6,000,000 DED X RETENTION$0 WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY YIN N X STATUTE E C ANYPROPRIETOR/PARTNER/EXECUTIVE No N/A Y E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? WA7-64D-444950-016 06/Ol/2026 06/O1/2027 If yes, NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,maybe attached if more space is required) Certificate Holder is named as Additional Insured on General Liability, Automobile Liability and Umbrella/Excess Liability on a Primary, Non-contributory basis where required by written contract. Waiver of Subrogation applies on General Liability, Automobile Liability, Umbrella/Excess Liability and Workers Compensation where required by written contract and as permitted by law. Umbrella/Excess policy is follow form over General Liability, Auto Liability and Employers Liability. CERTIFICATE HOLDER CANCELLATION APPROVED By Tu Tran NguyetBEDEtLIVERED 026 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE RE THE EXPIRATION DATE THEREOF, NOTICE WILL IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Santa Ana Attention: Zdenek Kekula AUTHORIZED REPRESENTATIVE 20 Civic Center Plaza, M-43, Santa Ana, CA 92701 ©1988-2025 ACORD CORPORATION. All rights reserved. ACORD 25(2025/12) The ACORD name and logo are registered marks of ACORD SR ID: 30211184 BATCH: 4513363 ACC)R ® CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DDIYYYY) `. 6/1/2027 7/1/2026 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Lockton Companies,LLC CONTACT NAME: DBA Lockton Insurance Brokers,LLC in CA PHONE FAX CA license#OF15767 A/C No Ext: (A,., A/C No): E-MAIL 444 W.47th St.,Ste.900 ADDRESS: Kansas City MO 64112-1906 INSURER(S)AFFORDING COVERAGE NAIC# (816)960-9000 kcasu@IOCkton.com INSURER A:Lloyds of London INSURED HDR ENGINEERING,INC. INSURER B: 1579266 1917 SOUTH 67TH STREET INSURER C: OMAHA,NE 68106 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: 21878853 REVISION NUMBER: XXXXXXX THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LTR INSO WVD POLICY NUMBER MMIDD MMIDD/YYYY LIMITS COMMERCIAL GENERAL LIABILITY NOT APPLICABLE EACH OCCURRENCE $ XXXXXXX DAMIGE TO RENT CLAIMS-MADE OCCUR PRE. SES Ea occurrence) ccuence $ XXXXXXX MED EXP(Any one person) $ XXXXXXX PERSONAL&ADV INJURY $ XXXXXXX GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ XXXXXXX POLICY PRO ❑ JECT LOC PRODUCTS-COMP/OP AGG $ XXXX OTHER: $ AUTOMOBILE LIABILITY NOT APPLICABLE COMBINED SINGLE LIMIT Ea accident $ XXXXXXX ANY AUTO BODILY INJURY(Per person) $ XXXyOyM OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS XXXXXXX HIRED NON-OWNED I PROPERTY DAMAGE $ XXXXXXX AUTOS ONLY AUTOS ONLY Per accident $ XXXXXXX UMBRELLA LIAB OCCUR NOT APPLICABLE EACH OCCURRENCE $ XXXXXXX EXCESS LIAB HCLAIMS-MADE AGGREGATE $ XXXXXXX DED RETENTION$ $ XX'X'EXX WORKERS COMPENSATION NOT APPLICABLE PER PER ANY EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ E.L.EACH ACCIDENT $ XxXXXxx OFFICERIMEMBER EXCLUDED? N I A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ XXXXXXX DESC describe under RIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ XXXxxXX A ARCH&ENG PROF LIAB N Y P001412600. 6/1/2026 6/1/2027 PER CLAIM:$3,000,000 INCL.POLLUTION LIAB. AGGREGATE:$4,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) RE:FIRST STREET MULTIMODAL BOULEVARD STUDY PROJECT#10431116;WAIVER OF SUBROGATION APPLIES ON PROFESSIONAL AND POLLUTION LIABILITY AS REQUIRED BY WRITTEN CONTRACT AND WHERE ALLOWED BY LAW.COVERAGE IS SUBJECT TO THE TERMS AND CONDITIONS OF THE POLICY. APPROVED By Tu Tran Nguyen at 8:04 am,Jul 08,2026 CERTIFICATE HOLDER CANCELLATION See Attachments SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 21878853 THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN CITY OF SANTA ANA ACCORDANCE WITH THE POLICY PROVISIONS. 20 CIVIC CENTER PLAZA(M-30) P.O.BOX 1988 AUTHORIZED REPRESENTAT SANTAANA, CA 92702-1988 ©198&=1015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Attachment Code:D608624 Master ID: 1579266,Certificate ID:21878853 This endorsement, effective: 06/01/2026-06/01/2027 Forms apart of policy no.: P001412600 Issued to: HDR ENGINEERING, INC. By: Lloyd's of London NOTICE OF CANCELLATION TO CERTIFICATE HOLDERS ENDORSEMENT Except with respect to cancellation for non-payment of premium (10 day notice cancellation), the Insurers shall give 30 days'notice of cancellation to the Certificate Holder(s)set forth herein, provided that: 1.The First Named Insured is required by contract to give notice of cancellation to the Certificate Holder, and 2. Prior to the Insurers sending its notice of cancellation to the First Named Insured,the First Named Insured shall provide the Insurers, in writing,either directly or through the First Named Insured broker of record, the name of each person or organization requiring notice of cancellation and the corresponding address for such person or for the employee responsible for receipt of notice of cancellation on behalf of such organization. Notice of cancellation will be sent in accordance with the terms and conditions of the policy, except that the Insurers may provide written notice individually or collectively to the Certificate Holders by email at the current email address given by the First Named Insured. Proof of sending of the notice of cancellation by email shall be sufficient proof of notice. Any failure to provide notice of cancellation to the Certificate Holder due to inaccurate or incomplete information provided by the First Named Insured shall remain the sole responsibility of the First Named Insured. The following definitions apply to this endorsement: 1. First Named Insured means the Named Insured shown in the Declarations. ALL OTHER TERMS AND CONDITIONS OF THE POLICY SHALL REMAIN UNCHANGED. Attachment Code:D691306 Certificate ID:21878853 Insured:HDR,Inc. Insurer: Lloyd's of London Professional Liability Policy#P001412600 Effective Date of Policy: 6/1/2026 Expiration Date of Policy: 6/1/2027 Waiver of Subrogation IX. Conditions 1. Subrogation In the event of any payment under this policy,the insurer shall be subrogated to all the Insured's rights of recovery against any person or organization and the Insured shall execute and deliver instruments and papers and do whatever else is necessary to secure such rights.The Insured shall do nothing to prejudice such rights. The insurers shall not exercise any such right against any persons, firms or corporations included in the definition of an Insured or against the Insured's clients if prior to the Claim a waiver of subrogation was so required and accepted under a specific contractual undertaking by the Insured.All recoveries obtained through subrogation shall be applied towards the Insured's Deductible first with the remaining balance payable to the Company. AGENCY CUSTOMER ID: _ LOC#: ADDITIONAL REMARKS SCHEDULE Page 2 Of 2 AGENCY NAMEDINSURED Willis Towers Watson Midwest, Inc. HDR Engineering, Inc. 1917 South 67th Street POLICY NUMBER Omaha, NE 68106 See Page 1 CARRIER NAIC CODE See Page 1 See Page 1 EFFECTIVE DATE: See Page 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance Project: FIRST STREET MULTIMODAL BOULEVARD STUDY PROJECT #10431116 Additional Insureds and Waiver of Subrogation: City of Santa Ana, its City Council, officers, officials, employees, agents, and volunteers ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SR ID; 30211184 BATCH:4513363 CERT: W47122522 Policy Number: TB2-641-444950-036 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED LOCATION(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Location(s): All locations owned by or rented to the Named Insured Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. For all sums which the insured becomes legally b. Claims made or"suits"brought; or obligated to pay as damages caused by "occur- c. Persons or organizations making claims or rences" under Section I—Coverage A,and for all bringing"suits". medical expenses caused by accidents under Section I — Coverage C, which can be attributed 3. Any payments made under Coverage A for only to operations at a single designated "loca- damages or under Coverage C for medical tion"shown in the Schedule above: expenses shall reduce the Designated Loca- tion General Aggregate Limit for that desig- 1. A separate Designated Location General Hated "location". Such payments shall not re- Aggregate Limit applies each designated duce the General Aggregate Limit shown in "location", and that limit t equal to the the Declarations nor shall they reduce any amount of the General Aggregate Limit other Designated Location General Aggre- gate Limit for any other designated "location" 2. The Designated Location General Aggregate shown in the Schedule above. Limit is the most we will pay for the sum of all 4. The limits shown in the Declarations for Each damages under Coverage A, except damag- Occurrence, Damage To Premises Rented To es because of bodily injury" or 'property You and Medical Expense continue to apply. damage" included in the "products-completed However, instead of being subject to the operations hazard", and for medical expenses General Aggregate Limit shown in the Decla- under Coverage C regardless of the number rations, such limits will be subject to the appli- of: cable Designated Location General Aggre- a. Insureds; gate Limit. CG 25 04 05 09 ©Insurance Services Office, Inc., 2008 Page 1 of 2 B. For all sums which the insured becomes legally C. When coverage for liability arising out of the obligated to pay as damages caused by "occur- "products-completed operations hazard" is pro- rences" under Section I—Coverage A,and for all vided, any payments for damages because of medical expenses caused by accidents under "bodily injury" or "property damage" included in Section I — Coverage C, which cannot be at- the "products-completed operations hazard" will tributed only to operations at a single designated reduce the Products-completed Operations Ag- "location" shown in the Schedule above: gregate Limit, and not reduce the General Ag- 1. Any payments made under Coverage A for gregate Limit nor the Designated Location Gen- damages or under Coverage C for medical eral Aggregate Limit. expenses shall reduce the amount available D. For the purposes of this endorsement, the Defi- under the General Aggregate Limit or the nitions Section is amended by the addition of Products-completed Operations Aggregate the following definition: Limit,whichever is applicable;and "Location"means premises involving the same or 2. Such payments shall not reduce any Desig- connecting lots, or premises whose connection is nated Location General Aggregate Limit. interrupted only by a street, roadway, waterway or right-of-way of a railroad. E. The provisions of Section III — Limits Of Insur- ance not otherwise modified by this endorsement shall continue to apply as stipulated. Page 2 of 2 © Insurance Services Office, Inc., 2008 CG 25 04 05 09 Policy Number: TB2-641-444950-036 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): All construction projects not located at premises owned, leased or rented by a Named Insured Information required to complete this Schedule, if not shown above,will be shown in the Declarations. A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for obligated to pay as damages caused by 'Occur- damages or under Coverage C for medical rences" under Section I—Coverage A,and for all expenses shall reduce the Designated Con- medical expenses caused by accidents under struction Project General Aggregate Limit for Section I -- Coverage C, which can be attributed that designated construction project. Such only to ongoing operations at a single designated payments shall not reduce the General Ag- construction project shown in the Schedule gregate Limit shown in the Declarations not- above'. shall they reduce any other Designated Con- 1. A separate Designated Construction Project struction Project General Aggregate Limit for General Aggregate Limit applies to each des- any other designated construction project ignated construction project, and that limit is shown in the Schedule above. equal to the amount of the General Aggregate 4. The limits shown in the Declarations for Each Limit shown in the Declarations. Occurrence, Damage To Premises Rented To 2. The Designated Construction Project General You and Medical Expense continue to apply. Aggregate Limit is the most we will pay for the However, instead of being subject to the sum of all damages under Coverage A, ex- General Aggregate Limit shown in the Decla- cept damages because of "bodily injury" or rations, such limits will be subject to the appli- "property damage" included in the "products- cable Designated Construction Project Gen- completed operations hazard", and for medi- eral Aggregate Limit. cal expenses under Coverage C regardless of the number of: a. Insureds; b. Claims made or"suits"brought; or c. Persons or organizations making claims or bringing"suits CG 25 03 05 09 ©Insurance Services Office, Inc., 2008 Page 1 of 2 13 B. For all sums which the insured becomes legally C. When coverage for liability arising out of the obligated to pay as damages caused by 'occur- "products-completed operations hazard" is pro- rences" under Section I—Coverage A,and for all vided, any payments for damages because of medical expenses caused by accidents under "bodily injury" or "property damage" included in Section I — Coverage C, which cannot be at- the "products-completed operations hazard" will tributed only to ongoing operations at a single reduce the Products-completed Operations Ag- designated construction project shown in the gregate Limit, and not reduce the General Ag- Schedule above: gregate Limit nor the Designated Construction 1. Any payments made under Coverage A for Project General Aggregate Limit. damages or under Coverage C for medical D. If the applicable designated construction project expenses shall reduce the amount available has been abandoned, delayed, or abandoned under the General Aggregate Limit or the and then restarted, or if the authorized contract- Products-completed Operations Aggregate ing parties deviate from plans, blueprints, de- Limit,whichever is applicable; and signs, specifications or timetables, the project will 2. Such payments shall not reduce any Desig- still be deemed to be the same construction pro- nated Construction Project General Aggre- ject. gate Limit. E. The provisions of Section III — Limits Of Insur- ance not otherwise modified by this endorsement shall continue to apply as stipulated. Page 2 of 2 0 Insurance Services Office, Inc., 2008 CG 25 03 05 09 POLICY NUMBER:TB2-641-444950- COMMERCIAL GENERAL LIABILITY 036 CG 20 10 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A Section II — Who Is An Insured is amended to 1. All work, including materials, parts or include as an additional insured the person(s) or equipment furnished in connection with such organization(s) shown in the Schedule, but only with work, on the project (other than service, respect to liability for "bodily injury", "property maintenance or repairs) to be performed by or damage' or "personal and advertising injury" on behalf of the additional insured(s) at the caused, in whole or in part, by: location of the covered operations has been 1. Your acts or omissions, or completed; or 2. The acts or omissions of those acting on your 2. That portion of "your work" out of which the behalf; injury or damage arises has been put to its in the performance of your ongoing operations for intended use by any person or organization the additional insured(s) at the location(s) other than another contractor or subcontractor designated above. engaged in performing operations for a principal as a part of the same project. However: C. With respect to the insurance afforded to these 1. The insurance afforded to such additional additional insureds, the following is added to insured only applies to the extent permitted by Section III—Limits Of Insurance: law; and If coverage provided to the additional insured is 2. If coverage provided to the additional insured is required by a contract or agreement, the most we required by a contract or agreement, the will pay on behalf of the additional insured is the insurance afforded to such additional insured will amount of insurance: not be broader than that which you are required 1. Required by the contract or agreement;or by the contract or agreement to provide for such additional insured. 2. Available under the applicable limits of R With respect to the insurance afforded to these insurance; additional insureds, the following additional whichever is less. exclusions apply: This endorsement shall not increase the This insurance does not apply to "bodily injury" or applicable limits of insurance. "property damage"occurring after: SCHEDULE Name Of Additional Insured Person(s) Location(s) Of Covered Operations Or Organization(s): Any person or organization with whom you have agreed All locations as required by a written contract or through written contract, agreement or permit to provide agreement entered into prior to an'occurrence'or additional insured coverage offense Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 20 10 12 19 ©Insurance Services Office,Inc., 2018 Page 1 of 1 POLICY NUMBER:TB2-641-444950- COMMERCIAL GENERAL LIABILITY 036 CG 20 37 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART A Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following is added to organization(s) shown in the Schedule, but only Section III—Limits Of Insurance: with respect to liability for "bodily injury" or If coverage provided to the additional insured is "property damage" caused, in whole or in part, by required by a contract or agreement, the most we "your work" at the location designated and will pay on behalf of the additional insured is the described in the Schedule of this endorsement amount of insurance: performed for that additional insured and included in the"products-completed operations hazard". 1. Required by the contractor agreement;or However: 2. Available under the applicable limits of 1. The insurance afforded to such additional insurance; insured only applies to the extent permitted by whichever is less. law; and This endorsement shall not increase the applicable 2. If coverage provided to the additional insured is limits of insurance. required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. SCHEDULE Name Of Additional Insured Person(s) OrOrganization(s): Location And Description Of Completed Operations Any person or organization to whom or to which you are Any location where you have agreed,through written, required to provide additional insured status in a written contract, agreement,or permit,to provide additional contract, agreement or permit except where such insured coverage for completed operations contact or agreement is prohibited. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 20 37 12 19 0 Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number TB2-641-444950-036 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY- OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to Section IV-Conditions 4. Other Insurance and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance;and (2) You have agreed prior to a loss, that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. (3) This insurance is excess over any other insurance available to the additional insured for which it is also covered as an additional insured by attachment of an endorsement to another policy providing coverage for the same"occurrence", claim or"suit`. LD 24 153 08 16 ©2016 Liberty Mutual Insurance Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. POLICY NUMBER: TB2-641-444950-036 COMMERCIAL GENERAL LIABILITY CG 24 0412 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s)Or Organization(s): As required by written contract or agreement. Information required to complete this Schedule, if not shown above,will be shown in the Declarations. 'The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV—Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s)shown in the Schedule above. CG 24 04 1219 ©Insurance Services Office, Inc.,2018 Page 1 of 1 POLICY NUMBER:AS2-641-444950-046 COMMERCIAL AUTO CA20481013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s)who are "insureds"for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. SCHEDULE Name Of Person(s)Or Organization(s): As required by written contract Information required to complete this Schedule, if not shown above,will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured"for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.1. of Section II — Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I — Covered Autos Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 ©Insurance Services Office, Inc., 2011 Page 1 of 1 Policy Number:AS2-641-444950-046 Issued by: Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED-NONCONTRIBUTING This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIERS COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement,the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s)who are"insureds"under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage form. Schedule Name of Person(s)or Organizations(s): Any person or organization where the Named Insured has agreed by written contract to include such person or organization Regarding Designated Contract or Project: Any Each person or organization shown in the Schedule of this endorsement is an"insured"for Liability Coverage,but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. The following is added to the Other Insurance Condition: If you have agreed in a written agreement that this policy will be primary and without right of contribution from any insurance in force for an Additional Insured for liability arising out of your operations, and the agreement was executed prior to the "bodily injury" or "property damage", then this insurance will be primary and we will not seek contribution from such insurance. AC 84 23 0811 © 2010, Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office,Inc., with its permission. POLICY NUMBER. AS2-641-444950-046 COMMERCIAL AUTO CA04441013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. SCHEDULE Name(s)Of Person(s)Or Organization(s): Any person or organization for whom you perform work under a written contract of the contract requires you to obtain this agreement from us but only if the contract is executed prior to the injury or damage occurring. Information required to complete this Schedule, if not shown above,will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a c ontract with that person or organization. CA 04 4410 13 ©Insurance Services Office, Inc., 2011 Page 1 of 1 WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule Where required by contract or written agreement prior to loss. Issued by:Liberty Insurance Corporation For attachment to Policy No WA7-64D-444950-016 Effective Date 06/01/2026 Premium Issued to:HDR Engineering,Inc. WC 00 03 13 ©1983 National Council on Compensation Insurance, Inc. Page 1 of 1 Ed.4/1/1984 Policy Number TB2-641-444950-036 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION OR MATERIAL REDUCTION IN COVERAGE TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY—UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)/ Email Address or mailing address: Number Days Notice: Or anization(s): As required by written contract or As required by written contract or 30 written agreement written agreement A. If we cancel this policy for any reason other than nonpayment of premium, or make a material reduction in coverage, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation or material reduction of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 04 03 14 ©2014 Liberty Mutual Insurance.All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Policy Number AS2-641-444950-046 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION OR MATERIAL REDUCTION IN COVERAGE TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY—UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)/ Email Address or mailing address: Number Days Notice: Or anization(s): As required by written contract 30 or written agreement A. If we cancel this policy for any reason other than nonpayment of premium, or make a material reduction in coverage, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation or material reduction of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 04 03 14 ©2014 Liberty Mutual Insurance.All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Policy Number: EUO(27)57919363 Issued by: Ohio Casualty Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY—UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)/ Email Address or mailing address: Number Days Notice: Organization(s): Per Schedule on File with Broker 30 A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule above We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 01 05 11 ©2011 Liberty Mutual Group of Companies.All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. NOTICE OF CANCELLATION TO THIRD PARTIES A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule below. We will send notice to the email or mailing address listed below at least 10 days, or the number of days listed below, if any, before cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. Schedule Name of Other Person(s)/ Email Address or mailing address: Number Days Notice: Organization(s): As required by written 30 contract or agreement All other terms and conditions of this policy remain unchanged. Issued by Liberty Insurance Corporation For attachment to Policy No.WA7-64D-444950-016 Effective Date 06/01/2026 Premium$ Issued to HDR Engineering,Inc. Endorsement No. WC 99 20 75 ©2016 Liberty Mutual Insurance Page 1 of 1 Ed.12/01/2016