HomeMy WebLinkAboutItem 18 - Turnkey Energy Services Public Works Agency
www.santa-ana.gov/pw
Item # 18
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
November 17, 2026
TOPIC: Agreement for Turnkey Energy Services
AGENDA TITLE
Award of an Agreement with Willdan Energy Solutions for Turnkey Energy Services,
Including Energy Assessments, Design, and Construction of Energy-Saving Projects
(Specification No. 25-128) (General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute an agreement with Willdan Energy Solutions to
provide turnkey energy services, including energy assessments, design, and
construction of energy-saving projects in an amount not-to-exceed $149,016 for a one-
year term beginning November 17, 2026 and expiring November 18, 2027, with
provisions for four, one-year extensions (Agreement No. A-2026-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The Public Works Agency (PWA) oversees the operation and maintenance of City
buildings and related systems and coordinates projects to improve facility efficiency,
reliability, and long-term operating performance. The City has opportunities to improve
aging facility infrastructure and reduce utility and maintenance costs through projects
that install solar panels, replace heating and ventilation systems, and upgrade electrical
systems and lighting. Working with a qualified Energy Services Company (ESCO)
provides a coordinated approach to evaluating these opportunities, identifying potential
funding and financing sources, and developing projects that can improve facility
performance while minimizing the need for upfront capital requirements.
The proposed agreement supports the General Plan's Conservation Element by
providing a coordinated approach to evaluating energy efficiency improvements,
renewable energy opportunities, and potential funding sources. These services will help
the City identify projects that modernize aging infrastructure, reduce energy
consumption, and improve long-term facility performance. The agreement also supports
strategic priorities related to infrastructure investment, environmental sustainability, and
City Council 18 - 1 11/17/2026
Agreement for Turnkey Energy Services
November 17, 2026
Page 2
fiscal responsibility.
Staff continues to seek opportunities to lower operating costs through energy
efficiencies and modern project delivery models. California Government Code Section
(GCS) 4217 presents an opportunity to work with a qualified Energy Services Company
(ESCO) to implement turnkey infrastructure upgrades through energy services,
cogeneration, and Energy Savings Performance Contracts (ESPC). "Turnkey" means
the ESCO manages the project from initial assessment and design through permitting,
construction, testing, and delivery of a complete, operational system. This provides the
City with a single point of accountability throughout project development and
implementation.
California Government Code Sections 4217.13 and 4217.16 provide public agencies a
flexible way to fund and buy energy projects without traditional, strict low-bid
requirements. The initial costs to construct these infrastructure upgrades typically would
require the City to pay from existing fund balances or incur debt. By working with a
qualified ESCO, public agencies can fund these projects by leveraging the energy
savings themselves, rather than relying entirely on immediate capital budgets through
ESPCs. Through ESPCs, projects are funded through guaranteed energy savings they
generate. The utility savings pay off the equipment and installation over time.
For example, a solar and battery storage project for the Police Administration and Jail
campus was modeled that could have a total construction and financing cost of about
$24 million. The annual energy savings from the solar and battery project would be
used to pay the project costs. Over the 30-year modeled period, the project is estimated
to generate approximately $50.6 million in savings. The project would pay for itself in
about 20 years and the City would have a net energy cost savings of$26.6 million over
the 30-year period, with no upfront City capital contribution. These estimates would
require validation through the investment grade audit, including confirmation of incentive
eligibility, energy savings, and financing terms.
Additionally, ESCOs often provide a "guaranteed savings" provision in case actual utility
savings do not meet the expected savings. Through this guaranteed savings provision,
the ESCO is responsible for the difference between projected and actual utility cost
savings and the City bears no risk.
Procurement
The City issued a Request for Qualifications (RFQ) on November 5, 2025 to identify
qualified energy service providers with the technical expertise, experience, financial
capacity, and licensing necessary to deliver turnkey energy services. Based on the
qualifications submitted, the City established a pre-qualified list of firms who were
subsequently invited to submit proposals in response to the Request for Proposals
(RFP) for turnkey energy services.
City Council 18 — 2 11/17/2026
Agreement for Turnkey Energy Services
November 17, 2026
Page 3
Request for Proposals (RFP) No. 25-128 was advertised on July 20, 2026 on the City's
online bid management and publication system, PlanetBids (Exhibit 1). A summary of
vendor participation and results is as follows:
4 Vendors notified
0 Santa Ana vendors notified
2 Vendors downloaded the bid packet
2 Bids received
0 Bids received from Santa Ana vendors
Proposals were opened on August 7, 2026 and evaluated. Two (2) bids were submitted
by the RFP deadline and both were determined to be responsive to the specifications
and met the City's requirements. The two (2) proposals were evaluated by a selection
committee comprised of personnel from the Public Works Agency and Finance and
Management Services Agency. Based on criteria outlined in the RFP, the following
summarizes the top responding firms:
Firm ity Rankin
Willdan Energy Solutions Anaheim, CA 1
OPTERRA Energy Services Irvine, CA 12
Staff recommends Willdan Energy Solutions (Willdan) based on the firm's relevant
public agency experience, proposed technical approach, open-book pricing, and fixed
contractual markups. These features provide the City with greater visibility into project
costs as design scopes are developed. Additionally, Willdan incorporates a "guaranteed
savings" provision in case actual utility savings do not meet the expected savings.
Through this guaranteed savings provision, Willdan is responsible for the difference
between projected and actual utility cost savings. As detailed in Willdan's proposal, this
process includes a four-phase approach, all of which Willdan will provide.
Phase 1: Preliminary Engineering Analysis: At no cost to the City, Willdan will evaluate
City facilities, utility usage, potential improvements, and identify preliminary project
opportunities and funding.
• Phase 2: Investment Grade Audit (IGA): Based on the City's review of preliminary
engineering analysis, staff would direct Willdan to develop select project scopes and
designs, establish estimated costs and savings, evaluate incentives and financing, and
prepare a measurement and verification plan. The IGA would evaluate potential
improvements such as lighting, HVAC and controls, solar generation, battery storage,
and other measures identified through the facility evaluation.
Phase 3: Project Selection and Implementation: Following completion of the IGA, staff
will present recommended projects to the City Council for consideration, including
associated costs, projected savings, financing terms, and applicable findings under
City Council 18 — 3 11/17/2026
Agreement for Turnkey Energy Services
November 17, 2026
Page 4
Government Code Section 4217. Upon Council approval, Willdan will proceed with
implementation of the selected projects, including construction, commissioning, and
staff training.
• Phase 4: Measurement and Verification: Following implementation, Willdan will verify
project performance and savings in accordance with the requirements established for
the approved projects and provide ongoing support under the approved agreement.
Financial Approach
The proposed turnkey energy services approach will allow the City to evaluate potential
energy efficiency and infrastructure improvements with no upfront payment for the IGA.
If the City elects not to proceed with any projects following completion of the IGA, the
City will be responsible for the cost of the IGA in the amount of$149,016. If the City
proceeds with any projects, the audit cost will be incorporated into the project cost and
financing.
Staff Recommendation
Staff recommends awarding an agreement to the highest-ranked firm, Willdan Energy
Solutions, for a term beginning November 17, 2026 and ending November 16, 2027 with
four, one-year extensions (Exhibit 2). Willdan has over 55 years of experience advising
California cities and has completed more than 300 performance contracting projects
over the past five years, including projects for the Cities of Orange, San Diego, Dublin,
and Fairfield. The firm has extensive experience delivering projects under California
Government Code Section 4217.12 and has demonstrated experience integrating
SoCaIREN incentives and financing into energy projects. Willdan's experience with
municipal energy efficiency, electrification, renewable energy, and infrastructure
improvements makes the firm well qualified to provide the turnkey services the City
requires.
ENVIRONMENTAL IMPACT
Award of this agreement does not commit the City to any specific project and is not a
project under the California Environmental Quality Act (CEQA) at this time. Energy-
efficiency and infrastructure improvements of the type anticipated under this agreement
generally reduce facility energy consumption, lower utility costs, and support the
generation and use of clean energy. Reduced reliance on utility-supplied power in turn
reduces greenhouse gas emissions and other air pollutants associated with electricity
generation. Because the desired scopes of work have not yet been identified, the
specific environmental benefits and impacts of this effort remain unknown. Anticipated
energy savings and associated emissions reductions will be quantified through the
Investment Grade Audit, and any required environmental review for the selected
projects will be completed prior to implementation and City Council approval.
City Council 18 — 4 11/17/2026
Agreement for Turnkey Energy Services
November 17, 2026
Page 5
FISCAL IMPACT
The total cost of the Investment Grade Audit (IGA) is $149,016. This amount will not be
paid upfront. If, at the conclusion of the IGA the City elects not to proceed with any
proposed projects, the City will be responsible for paying Willdan Energy Solutions
$149,016 as partial cost recovery. If the City proceeds to construction with projects
evaluated through the IGA, the audit fee will be incorporated into the overall project
cost. After completing the IGA, staff will return to City Council with recommended
projects, associated costs, projected savings, and proposed financing terms for
consideration.
Funds are budgeted and available in the following account in Fiscal Year 2026-2027.
Any remaining balances not expended at the end of the fiscal year will be presented to
City Council for approval of carryovers into Fiscal Year 2027-2028.
Accounting Unit
Fiscal Fund Accounting Unit,
Year —Account No. Description Account Description Amount
Project No.
CURRENT BUDGET
PWA—Service
,
2026-27 01117017-62300 General Fund Enhancement
Contract Services- $149,016
Professional
TOTAL $149,016
EXHIBIT(S)
1. RFP No. (25-128)
2. Agreement with Willdan Energy Solutions
Submitted By: Rodolfo Rosas, P.E., Executive Director of Public Works
Approved By: Alvaro Nunez, City Manager
City Council 18 — 5 11/17/2026
Exhibit 1
CITY OF SANTA ANA
s-F.C .r
CIIu'S0.NIM-'
n-ii nnron��:
REQUEST FOR PROPOSAL (RFP) NO. 25-128
FOR
Turnkey Energy Services
KEY RFP DATES: The schedule below is tentative and subject to change at the discretion
of City, with appropriate notice to prospective Proposers.
Issue Date: Thursday, July 23, 2026
Deadline for Questions: Tuesday, July 28, 2026, 2:00 P.M.
Proposal Due Date: Thursday, August 6, 2026, 2:00 P.M.
BID CONTACT:
Oscar Gudino
ogudino@santa-ana.org
City Council 18 — 6 11/17/2026
CITY OF SANTA ANA
TABLE OF CONTENTS
I. BACKGROUND..............................................................................................................................3
II. OVERVIEW OF PROJECT ............................................................................................................3
IV. TERM OF AGREEMENT................................................................................................................3
V. GENERAL PROPOSAL INFORMATION .......................................................................................3
VI. PROPOSAL RESPONSE INSTRUCTIONS...................................................................................6
VII. SAMPLE AGREEMENT...............................................................................................................12
Vill. INSURANCE REQUIREMENTS ..................................................................................................12
IX. SELECTION PROCEDURES & CRITERIA..................................................................................12
X. AWARD OF AGREEMENT ..........................................................................................................15
XI. IMPLEMENTATION......................................................................................................................15
EXHIBITS:
Exhibits provided for Proposers'reference only. These are not to be included with proposal submittal.
EXHIBIT 1: SCOPE OF SERVICES
EXHIBIT 2: SAMPLE AGREEMENT
EXHIBIT 3: INSURANCE REQUIREMENTS
ATTACHMENTS(Required with Proposal submittals):
ATTACHMENT A: PROPOSER'S CERTIFICATION
ATTACHMENT B: REFERENCES
ATTACHMENT C: DEBARMENT QUESTIONNAIRE
ATTACHMENT D: NON-LOBBYING CERTIFICATION
ATTACHMENT E: NON-DISCRIMINATION CERTIFICATION
ATTACHMENT F: NON-COLLUSION AFFIDAVIT
City Council 18 — 7 11/17/2026
(9) CITY OF SANTA ANA
I. BACKGROUND
The City of Santa Ana, California, is rich in culture and pride, the county seat of Orange County, and
encompasses an area of approximately 27 square miles. For more information, please visit
https://www.santa-ana.org/
II. OVERVIEW OF PROJECT
The City of Santa Ana (City) is seeking proposals from qualified firms and organizations (Proposers) to
provide turnkey energy services. See EXHIBIT 1 for complete Scope of Services.
The term "Vendor", "Proposer", "Firm", "Contractor", and "Consultants"shall refer to any legal entity or
entities submitting a proposal in response to this Request for Proposals (RFP).
III. TERM OF AGREEMENT
The anticipated term of the agreement is for an initial period of three (3) years. The City may, at its
discretion, extend the agreement with the same or more limited scope of required services for two (2)
additional one (1) year periods, upon mutual agreement contingent upon City Council approval, or City
Manager or City Attorney authorization, as appropriate.The total term of the awarded agreement shall
not exceed five (5)years.
Usage is not guaranteed. Execution of an agreement between the City and successful firm(s) and/or
individual(s)does not guarantee work throughout the duration of the contract period. Numerous factors
will be evaluated by the City in its delivery of project and assignments, including technical expertise
required.
IV. GENERAL PROPOSAL INFORMATION
A. SUBMITTAL INSTRUCTIONS
It is the responsibility of the Proposer to ensure that any proposals submitted have been uploaded
to PlanetBids prior to the RFP due date and time. Proposals,including all required sections and forms,
shall be submitted electronically via the City's Bid Management System, PlanetBids. No other form
of submittal will be accepted, except as expressly provided below.
PlanetBids will not accept late proposals and no exceptions shall be made. Proposers will receive an
e-bid confirmation number with a time stamp from PlanetBids indicating that their proposal was
submitted successfully. The City will only receive and consider those proposals that were transmitted
successfully. Submit proposal online at:
https://vendors.planetbids.com/portal/20137/portal-home.
An exception to the foregoing requirements may be considered only when a Proposer can
demonstrate, to the City's satisfaction, that its inability to timely submit a proposal through
PlanetBids was the direct result of an error, omission, or failure attributable to the City or the City's
contractors. In such circumstances, the Proposer must still submit its complete proposal
electronically via email to the City prior to the RFP due date and time in order to be considered
responsive, unless there is a documented and verifiable system-wide issue clearly attributable to the
City Council 18 — 8 11/17/2026
CITY OF SANTA ANA
City that prevents such electronic submission.The Proposer must provide written documentation or
other credible evidence substantiating that the delay or failure was caused by the City or its
contractors.The City reserves sole discretion to determine whether the exception applies.
Except for the limited exception described above, the Proposer shall be solely responsible for
informing itself with respect to the proper utilization of the bid management system, for ensuring
the capability of their computer system to upload the required documents, and for the stability of
their internet service. Failure of the Proposer to successfully submit an electronic proposal shall be
at the Proposer's sole risk and no relief will be given for late and/or improperly submitted proposals.
Proposers experiencing any technical difficulties with the bid submission process may contact
PlanetBids at (818) 992-1771. Questions of an operational nature may be directed to the City's
assigned Buyer. Neither the City, nor PlanetBids, makes any guarantee as to the timely availability of
assistance, or assurance that any given problem will be resolved by the bid submission deadline.
All notifications, updates and addenda will be posted online on PlanetBids at
https://vendors.planetbids.com/portal/20137/portal-home. Proposers shall be responsible for
monitoring the site to obtain information regarding this solicitation. Failure to respond to required
updates may result in a determination of a nonresponsive proposal.
B. COMMUNICATION /CONTACT WITH CITY STAFF
Unless otherwise authorized herein, Proposers who are considering submitting a proposal in
response to this RFP, or who submit a proposal in response to this RFP, are only to communicate
with the assigned Buyer(s), and no other City staff about this RFP from the date this RFP is issued
until a contract is awarded. The City will provide all official communication concerning this RFP in
writing via the City's Bid Management System, PlanetBids.
The City will not be responsible for or bound by any oral communication or any other information or
contact that occurs outside the official communication process specified herein, unless confirmed in
writing by the designated Buyer(s).
C. REQUEST FOR INFORMATION OR CLARIFICATION /QUESTIONS
Questions regarding this RFP shall be submitted via PlanetBids no later than the date and time shown
at the schedule of key RFP dates on the cover page of this RFP. Responses to all questions will be
posted on PlanetBids at least three (3) business days prior to close of the RFP. No verbal requests or
responses will be accepted.
Significant interpretations or clarifications will be addressed via addenda to this RFP, which will be
released and posted on PlanetBids under the "Addenda/Emails"tab.
D. EXCEPTIONS
Requests submitted for City's consideration of proposed terms and conditions, including
modifications to the City's RFP and/or Contract terms and conditions must be submitted by the
deadline for questions.Such requests should include an attachment in Word or PDF format on formal
company letterhead that shows the requested modifications.Should the Proposer be considered for
award recommendation and progress into the negotiations phase, the requests for exceptions or
modifications to the City's terms and conditions will be discussed at that time.The City will not accept
any requests after the deadline for questions and reserves the right to reject or strike any requests
for exceptions or additional terms and conditions related to Agreement, RFP, and insurance and
indemnification terms and conditions.
City Council 18 — 9 11/17/2026
CITY OF SANTA ANA
E. ADDENDA
Any changes in RFP from the date of release to date of submittal will result in an addendum or
amendment. Notification of such addendum or amendment shall be posted on City's PlanetBids
system, https://vendors.planetbids.com/portal/20137/portal-home. Proposers shall be responsible
for monitoring the site to obtain information regarding this solicitation.
F. UNDERSTANDING PROPOSAL
It is the responsibility of each Proposer to inquire about any criteria, condition, term, provision, or
requirement of the RFP that the Proposer does not understand. Responses to inquiries, if they
significantly change or clarify the RFP requirements or any aspect of the procurement
process, will be forwarded by addenda to all Proposers. The City will not be bound by any oral
responses to inquiries. By submitting proposals, Proposers assert that they have fully read the RFP
and any addenda issued by the City,the proposed Contract and any other Contract Documents, and
affirm that the terms and conditions stated therein are fully understood and are acceptable to the
Proposer. Each Proposer accepts the terms and conditions of the Contract Documents and indicates
their ability and willingness to perform the requested services under such terms and conditions. Any
exceptions to the terms and conditions set forth in the Contract Document shall be submitted to the
City by the deadline to submit requests for information or clarification/questions set forth herein.
G. WITHDRAWALS
Proposers are responsible for verifying all prices and information before submitting a proposal.
Prior to the proposal due date,the Proposer or Proposer's representative may withdraw the proposal
by providing written notice of the proposal withdrawal to the Buyer(s). Verbal or telephonic
withdrawals are not permissible.
H. PROTEST PROCEDURES
Only respondents who have actually submitted a proposal may file a "protest"to an RFP with the
City's Purchasing Department. In order for a Proposer's protest to be considered valid,the protest
must:
1. Be filed in writing before 5:00 p.m. of the 5th business day following the posting of RFP
Results/Notice of Intent to Award on the City's online bidding system;
2. Clearly identify the specific irregularity or accusation;
3. Clearly identify the specific City staff determination or recommendation being protested;
4. Specify, in detail, the grounds of the protest and the facts supporting the protest; and
5. Include all relevant, supporting documentation with the protest at time of filing.
If the protest does not comply with each of these requirements, it will be rejected as invalid. If the
protest is valid, the City's Purchasing Manager, or other designated City staff member, shall review
the basis of the protest and all relevant information. The decision from the Purchasing Manager, or
her/her designee, is final and no further appeals will be considered.
City Council 18 — 10 11/17/2026
CITY OF SANTA ANA
I. PUBLIC AGENCIES
Other public agencies, as defined by California Government Code Section 6500, may choose to use
the terms of this Contract, subject to Contractor's acceptance.The City is not liable or
responsible for any obligations related to a subsequent contract between Contractor and another
public agency.
J. BUSINESS LICENSE
The City requires any person, including but not limited to, an individual, corporation, Contractor,
Subcontractor, and Sole Proprietor who wishes to conduct any business within the City of Santa Ana
must secure a City of Santa Ana business license prior to the execution of a contract. The awarded
party shall maintain a current business license throughout the term of the resulting contract.
Procedure to obtain a City of Santa Ana business license is available by contacting the Finance and
Management Services Agency at (714) 647-5447 or on the City's website www.santa-ana.org.
V. PROPOSAL RESPONSE INSTRUCTIONS
Proposals are to be prepared in such a way as to provide a straightforward, concise delineation of
capabilities to satisfy the requirements of this RFP. Colored displays, promotional materials, photographs
etc., are not necessary or desired. Emphasis should be concentrated on conformance to RFP instructions,
responsiveness to the RFP requirements, and on completeness and clarity of content. Digital dividers and
clear organization of content and material are encouraged.
1. Required Proposal Structure: proposals shall be organized in the following order and clearly labeled:
I. Executive Summary (maximum 2 pages)
II. Firm Qualifications and Experience (maximum 5 pages)
III. Team Structure and Key Personnel (maximum 3 pages)
IV. Technical Approach (maximum 10 pages)
V. Financial Approach (maximum 5 pages)
VI. Pricing and Cost Structure (maximum 5 pages)
VII. Risk Management and Project Delivery Approach (maximum 5 pages)
VIII. Value-Added Services (maximum 3 pages)
Total proposal length shall not exceed 40 pages, excluding resumes, required forms, and appendices.
2. Please provide the following sample work products for the City's review,the goal of requesting this
information is to ensure reasonable expectations for the resulting reports &deliverables throughout the
ESPC process:
a. Investment Grade Audit (IGA) inclusive of scope of work, financials, and project-specific plans for
M&V, O&M, Commissioning, etc.
b. Measurement&Verification Report
3. In addition to the existing terms & conditions of the RFP &sample contract documents, please confirm
the acceptance of the terms &conditions of the sample Energy Savings Performance Contract (ESPC)
template issued by the Energy Services Coalition (ESC). If you have specific exclusions, please provide
and the evaluation committee will take this under consideration.
City Council 18 — 11 11/17/2026
CITY OF SANTA ANA
a. Energy Savings Performance Contract-
https://www.energyservicescoalition.org/Data/Sites/1/documents/resources/model/08-
AttachmentG-Energy Performance Contract.doc
4. In addition to the existing terms& conditions of the RFP &sample contract documents, please confirm
acceptance of the following minimum standard contract clauses. If you have specific exclusions, please
provide and the evaluation committee will take this under consideration.These terms will be
incorporated into future IGAA and ESPC Agreements, as applicable:
Additional Minimum Standard Contract Clauses
1. Payment through Performance Contract:Owner shall have no payment obligations under this
contract provided that ESCO and Owner execute an ESPC within 60 days after issuance of the Notice
of Acceptance of the final Investment Grade Audit. The IGA fee shall be incorporated into ESCO's
project costs in the ESPC and paid for through the ESPC funding mechanisms.
2. Funding Sources to Support Annual Payment: The following payment sources identified in the
Investment Grade Audit Report will be considered acceptable:
a. Annual utility cost savings
b. Material/commodity savings, only in years when savings are achieved, including avoided costs
such as lamp and ballast replacements, scheduled replacement of parts, etc. (savings for this
line item will be limited to those that can be thoroughly documented and approved. Such
savings must only be attributed to the cash flow in years when savings will occur).
c. Maintenance cost& capital cost avoidance savings such as terminated service contracts on
equipment(savings will be limited to those that can be thoroughly documented and are subject
to the approval of the City. Such savings must only be attributed to the cash flow in years when
savings will occur).
d. Grants/Rebates/Incentive Programs
3. Eguity cash outlay-At option of the Owner, an equity cash outlay, pending funding approval, maybe
used to supplement savings. This is only by direction of the Owner. The ESCO shall proceed with
development of a fully self funding project paid only through cost savings stated above.
4. Annual Savings Exceed Annual Costs:Annual savings shall exceed annual payments each and every
year while the performance guarantee is in effect. This means that excess savings in other years and
interim savings during the construction period shall not be allocated to meet shortfalls in any other
year. Annual payments shall include debt service, ESCO fees, maintenance services, M&V services,
third party consultant services, and other services.
5. Annual Guaranteed Cost Savings: An annual contractual guarantee with the associated annual M&V
report will be provided by the ESCO for every year of the contract term. However, the Owner reserves
the right to terminate the Guarantee after the first performance year from the date of project
acceptance. If the Owner exercises that option, the ESCO will have no more savings guarantee
requirements.Any savings guarantee shall be made available as a continued option for each
subsequent year of the contract term. The Owner may cancel the guarantee at any time after the
minimum requirement period.
City Council 18 — 12 11/17/2026
CITY OF SANTA ANA
6. Interim Savings during Construction Period: Savings accrued during the construction period will not
be allocated to the annual savings of any year unless the Owner directs the selected ESCO to include
it. See "Annual Savings Exceed Annual Costs"above. Any interim cost savings realized are retained
by the Owner.
7. Excess Savings(beyond the guaranteed amount): Excess savings will be retained by Owner and will
not be allocated to cover shortfalls in savings in other years. See "Annual Savings Exceed Annual
Costs"above.
8. Use of Stated Cost Markups: The individual cost markups disclosed in the ESCO proposal shall be the
values that are used as part of the ESCO project cost build-up and open book pricing model. The
markups presented in the ESCO proposal can be negotiated downward, however the cost markups
stated in the proposal shall be the maximum markups allowed by the ESCO.
9. Open Book Pricing: Open book pricing will be required, such that the ESCO willfully disclose all costs,
including all costs of subcontractors and vendors. ESCO will maintain cost accounting records on
authorized work performed under actual costs for labor and material, or other basis requiring
accounting records. Costs will be evaluated by the Owner and its consultants through price analysis
to compare costs with reasonable criteria such as established catalog and market prices or historical
price benchmarks. Stated cost markups will be clearly applied. ESCO will provide access to records
and preserve them during the construction phase of the project.
10. Contingency: Any unused contingency cost at the end of the construction period will be applied to
the project and will not be retained by the ESCO.
11. Equipment Compatibility or Standardization: All equipment installed that is comparable to similar
equipment at the facilities, shall have compatibility with existing systems, and/or be of the some
manufacturer for standardization of equipment Owner-wide, unless an exception is made by the
Owner.
12. Available Funds—Contingency—Remedies: The Owner is prohibited by law from making fiscal
commitments beyond the term of its current fiscal period. Therefore, ESCO's compensation is
contingent upon the continuing availability of Owner appropriations. Payments pursuant to this
contract shall only be made from available funds encumbered for this Contract, and the Owner's
liability for such payments shall be limited to the amount remaining of such encumbered funds.
13. Inflation and Escalation Rates: Any general inflation rates and/or escalation rates will be pre-
approved by Owner and mutually agreed upon.
14. Energy Escalation Rates: Where the annual debt service payments are set up to escalate each year
in anticipation of annually escalating energy cost savings, a calculator will be used to determine the
maximum value as developed by the National Institute of Standards and Technology(NIST)and the
US Department of Energy's Federal Energy Management Program (FEMP). The energy escalation
calculation tool can be found at the following website:https.Ilpages.nist.gov/eerc/
15. Measurement and Verification Plan: The M&V plan will be developed per the most recent IPMVP
guidelines for M&V of annual guaranteed savings. This plan and report shall be thoroughly reviewed
by the Owner and its P Party Owner's Representative. Energy-related cost savings shall be
City Council 18 — 13 11/17/2026
CITY OF SANTA ANA
measured and/or calculated as specified in the savings M&V Plan. Upon acceptance of construction
by the Owner, an annual M&V Report shall be provided to the Owner for the previous performance
year to provide verification of savings. The M&V report shall be submitted within 60 days of the
anniversary of the performance period Commencement Date.
16. In the event the Energy and Cost Savings achieved during such guarantee year are less than the
Guaranteed Energy and Cost Savings as defined in the agreed to Savings Guarantee, the ESCO shall
pay the Owner an amount equal to the shortfall. The ESCO shall remit such payments to the Owner
within an agreed upon time frame(in days)of written notice by the Owner of such monies due. The
ESCO shall also be obligated to remedy the ECM deficiencies causing the shortfall at no cost to the
Owner.
17. Independent Review of Project: The Owner's 3r1 Party Owner's Representative fee to provide an
independent oversight of the project shall be included in the project cash flow model and be paid for
from the annual savings guarantee. ESCOs shall include this as a line item in their cost buildup and
cash flow document at the direction of the Owner.
18. Contract Price: The agreed to Contract Sum for the Work will be a fixed firm price as set forth in the
final Project Cost& Project Cash Flow and agreed to upon acceptance of the IGA Report and
signature of the project Energy Services Agreement.
19. Project Commissioning: The ESCO shall conduct a thorough and systematic performance test of each
element and total system of the installed equipment in accordance with the procedures specified in a
Systems Start-Up and Commissioning plan. This will take place prior to acceptance of the project by
the Owner. Testing shall be designed to determine if the equipment is functioning in accordance
with both its published specifications and the details of the IGA Report and supporting
documentation for each ECM, and to determine if modified building systems, sub-systems or
components are functioning properly within the new integrated environment. The ESCO shall provide
notice to the Owner of the scheduled test(s) and the Owner and/or its designees shall have the right
to be present at any or all such tests conducted by ESCO and/or manufacturers of the equipment.
The ESCO shall be responsible for correcting and/or adjusting all deficiencies in systems and
equipment operations that may be observed during system commissioning procedures as specified in
the Systems Start-Up and Commissioning plan. Prior to Owner acceptance, the ESCO shall also
provide the Owner with reasonable satisfactory documentary evidence that the equipment installed
is the equipment specified in the IGA report and that the all equipment is operating as intended per
the approved project specifications and scope of work.
20. Standards of Comfort:ESCO will maintain and operate the equipment in a manner which will provide
the standards of heating, cooling, ventilation, hot water supply, and lighting quality and levels as
defined by the Owner during the IGA phase. During the term of this Contract, ESCO and the Owner
will maintain and operate the equipment in a manner that will provide the standards of comfort and
levels of operation as described in the IGA report.
21. Hazardous Materials: In the event ESCO discovers Hazardous or Excluded Materials(as agreed to in
the Contract), ESCO shall immediately cease work, remove all ESCO personnel or subcontractors from
the site, and notify the Owner. The Owner shall be responsible to handle such Materials at its
City Council 18 — 14 11/17/2026
CITY OF SANTA ANA
expense. ESCO shall undertake no further work on the Project Site(s)except as authorized by the
Owner in writing. Notwithstanding anything in the project Contract to the contrary, any such event
of discovery or remediation by the Owner shall not constitute a default by the Owner. In the event of
such stoppage of work by ESCO, the Time for Completion of Work will be automatically extended by
the amount of time of the work stoppage and any additional costs incurred by ESCO as a result will
be added by Change Order.
22. ESCO shall be responsible for any hazardous or other materials, including, without limitation, those
listed in this section that it may bring to the Project Site(s).
23. Fluorescent Lamp and Ballast Disposal:ESCO will enter into an agreement with an approved PCB
ballast disposal company that will provide an informational packet, packing receptacles and
instructions, labels and shipping materials, transportation, and recycling or incineration services for
PCB ballasts. All capacitors and asphalt potting compound materials removed from Owner's PCB
ballasts will be incinerated in a federally approved facility. After proper disposal, a Certificate of
Destruction will be provided by the approved facility to Owner. ESCO's responsibility shall be for the
proper and legal management of any of Owner's PCB ballasts removed as a result of the installation
of the Equipment and shall be limited only until said PCB ballasts are loaded onto an approved ESCO
PCB ballast disposal vehicle for transportation.
24. ESCO will enter into an agreement with an approved lamp disposal company who will provide
approved containers, materials required to label, transportation, recycling, or incineration in
accordance with EPA requirements, and a copy of the manifest.
25. Project Training: The ESCO shall conduct a training program that is agreed to with the Owner and
per the IGA report. The training must be completed prior to final acceptance of the equipment
installation. The ESCO shall provide ongoing training whenever needed with respect to updated or
altered equipment, including upgraded software. Such training shall be provided at no charge to the
Owner and shall have no effect on prior acceptance of equipment installation.
26. ESCO Performance: ESCO shall perform all tasks/phases under the Contract, including construction
and installation of the equipment in such a manner so as not to harm the structural integrity of the
buildings or their operating systems and so as to conform to the Standards of Comfort and the
Construction Schedule agreed to in the Contract. ESCO shall repair and restore to its original
condition any area of damage caused by ESCO's performance under this Contract. The Owner
reserves the right to review the work performed by ESCO and to direct ESCO to take certain
corrective action if, in the opinion of the Owner, the structural integrity of the Project Site(s)or its
operating system is or will be harmed. All costs associated with such corrective action to damage
caused by ESCO's performance of the work shall be borne by ESCO.
27. ESCO shall remain responsible for the professional and technical accuracy of all services performed,
whether by the ESCO or its subcontractors or others on its behalf, throughout the term of this
Contract.
5. Please provide a list of sub-tasks and a detailed schedule for your approach to Phases 1 &2 of the
Preliminary Analysis and Investment Grade Audit (IGA).
City Council 18 — 15 11/17/2026
(9) CITY OF SANTA ANA
6. Pricing, please complete the following Maximum Project Markups chart.
MAXIMUM MARKUPS
Project Budget Categories
A Subcontractor Costs (Contractor Costs to ESCO)
B Other Direct Purchases of Equipment, Material, N/A
Supplies, etc
C Total of Hard Costs c=a+b
D Project Development
E Design/Engineering
F Project Management
G Permits
H Performance Bond
I Payment Bond/Insurance
J Commissioning
K Measurement &Verification
L Training
MI Contingency
N Warranty Service
O Total of ESCO Fees o=sum(d:n)
P Overhead
Q Profit
R PROJECT PRICE SUB TOTAL w/OH &P r= c+o+ p+q
Assumptions for Cost Markup Table Above:
Rows D- N are calculated as a percent of Row C
Rows P &Q are calculated as a percent of the sum of Rows C& 0
6. Please complete the following Maximum Investment Grade Audit and Project Development Proposal, on
a cost per square foot basis:
Proposed Fixed cost per
sf
Investment Grade Audit and Project Proposal $/sf
7. Certifications/Attachments
In addition to the SOQ and Cost Proposal, the following forms, included in this RFP, shall be
signed and included as part of the proposal submittal package:
• ATTACHMENT A: PROPOSER'S CERTIFICATION
City Council 18 — 16 11/17/2026
CITY OF SANTA ANA
• ATTACHMENT B: REFERENCES
• ATTACHMENT C: DEBARMENT QUESTIONNAIRE
• ATTACHMENT D: NON-LOBBYING CERTIFICATION
• ATTACHMENT E: NON-DISCRIMINATION CERTIFICATION
• ATTACHMENT F: NON-COLLUSION AFFIDAVIT
8. Interview Requirements
Firms will be invited to participate in an interview process consisting of:
• A 30-minute presentation summarizing the firm's approach and experience
• A 15-minute question and answer session
We anticipate interviews to take place shortly after the submission of your proposals and a detailed
agenda &topics for discussion will be distributed with your invitation.
The proposal must be completely responsive to the RFP. Incomplete proposals will be deemed as
nonresponsive and will be rejected. The City reserves the right to reject any or all proposals submitted
and no representation is made hereby that any commitment will be awarded pursuant to this RFP or
otherwise.
PLEASE NOTE:
• All forms above must be signed by a representative of the Firm that is legally authorized
to contractually bind the Proposer.
• Attachment F:Non-Collusion Affidavit must be notiarized.
VI. SAMPLE AGREEMENT
See Exhibit 2—Sample Agreement
VII. INSURANCE REQUIREMENTS
See Exhibit 3—Insurance Requirements
Vill. SELECTION PROCEDURES&CRITERIA
A. Evaluation: The City will establish a proposal review committee. The review committee will evaluate
proposals based on the response to the RFP,which includes adherence to outlined directions and format,
and the City evaluation criteria set forth below.
B. Local Preference Points:The City encourages the utilization of small, local businesses on projects ranging
from $15,000 to $100,000 in total cost. All Formal and Informal Proposals for Services will be evaluated
on a 100-point scale. Up to 20 bonus points are available during the Interview Phase,when applicable.
a. Seven (7%) percent local preference will be added to the evaluation scores of small Santa Ana
businesses for projects between $15,000 and $100,000 in total cost.
b. Four(4%) percent local preference will be added to the evaluation scores of small Orange County
businesses for projects between $15,000 and $100,000 in total cost.
Per City of Santa Ana Ordinance NS-2828, "In order for the preference to apply, a bidder must certify
under penalty of perjury, that the bidder qualifies as a local business or Orange County business. The
preference is waived if the certification does not appear on the bid." Additionally, respondents must
City Council 18 — 17 11/17/2026
(9) CITY OF SANTA ANA
provide a copy of their Department of General Services small business certification in order to qualify for
Local Prefernce Points.The City does not accept small certifications from any other agency.
C. Scoring Criteria: Proposers will be ranked by the review committee based on the following criteria:
CATEGORY POINTS
Proposer Qualifications and References
o Number of years the company has been involved in the energy-efficiency
related business
o Number of years the company has offered Energy Savings Performance
Contracting
o Number of performance contracting projects completed by the company in
the 5 years immediately preceding the date of this RFP 125
o Experience with projects of similar size, scope or type of work expected to
be required of City.
o Proven California ESPC experience (4217.12 compliance)
o Demonstrated SoCaIREN integration success
o Financial soundness and expected stability of the company
o Quality of provided project references
Team Qualifications The technical qualifications and experience of the organization
are adequately described as they relate to the Scope of Work(SOW).
o Provide an organization chart and the resumes (up to one page each)for 125
each of the key project personnel to confirm that they have the necessary
professional qualifications and experience for the work to be performed.
Technical Approach
o Preliminary Assessment Approach and Realism of savings assumptions
o Investment Grade Audit approach, depth of facility assessment
methodology and baseline development
o Integration of renewable and resilience (battery/storage)
o Innovation (Al energy optimization, advanced controls) 125
o Commissioning approach
o Quality of M&V plan (IPMVP rigor)
o Operations& Maintenance approach
o Handling of Savings Shortfalls
City Council 18 — 18 11/17/2026
CITY OF SANTA ANA
Financial Approach
o Transparency of financial model assumptions
o Demonstrated ability to structure cash-flow positive projects
o Approach to supporting past clients in exploring the pros, cons, and other
key considerations of various financing strategies commonly employed for
Energy Savings Performance Contracts 50
o Recommendations for the City of Santa Ana to consider in evaluating
potential financing vehicles for an Energy Services Agreement (ESA)
o Past experience capturing utility rebates,tax incentives, and/or grants on
behalf of customers
o Utility rate escalation strategy and risk allocation clarity
Cost Proposal
o Project Cost Breakdown, including standardized proforma template
submission
o Investment Grade Audit Fee
o Self-Performed Work Fees 50
o Annual Costs and Fees
o Contingency
o Equipment/Labor Cost Competition
o Open Book Pricing
Value Add
o Improvements to working environment, improvements to the living 25
environment, green building considerations, greenhouse gas reductions,
alignment with other city environmental and community engagement
opportunities.
TOTAL POSSIBLE SCORE
500
(Before interviews—if held)
Interviews
o The City reserves the right to conduct interviews with the highest-rated 20
firm(s). In the event the City does perform an interview process,the
following is the maximum number of additive points that may be applied to
the proposal score. Total possible score may exceed 500 points.
D. Rankings: A final score will be calculated for each submitted proposal and used to rank Proposers.
Based upon the foregoing criteria, all proposals shall be ranked by score. Only those proposals
receiving a score above 350 will be considered for award. The City reserves the right to award the
contract to any Proposer(s) with a score above 350. The review committee will evaluate Proposers
based on their response to the RFP and the City evaluation criteria set forth above.
E. Interviews: The review committee may invite the Proposers to interview. If invited to interview,
Proposers must be prepared to include key personnel in the interview and/or presentation. The City
reserves the right to seek additional information from any or all Proposers invited to present
City Council 18 — 19 11/17/2026
CITY OF SANTA ANA
proposals. A final score will be calculated for each submitted proposal and used to rank Proposers.
City reserves the right to begin negotiations and enter into a contract without holding interviews, or
further discussions.
F. Selection: The City is under no obligation to accept any proposal and reserves the right to negotiate
with respondents as to fees and terms.The City may reject proposals at its sole discretion. If proposal
fails to satisfy any requirements outlined in this RFP, it may be considered non-responsive and may
be rejected.
The City shall not be obligated to accept the lowest priced proposals, but will make awards in the
best interests of the City after all factors have been evaluated. The review committee will
recommend the qualified Proposers to the City Council or City Manager for award of contract, as
appropriate.
IX. AWARD OF AGREEMENT
Selected Contractor(s) will be notified in writing. Any award is contingent upon the successful
negotiation of final contract terms.
A. EXECUTION OF AGREEMENT
A standard agreement is included as EXHIBIT 2 Sample Agreement of this RFP. "Proposer" will
hereinafter be referred to as "Consultant" or "Contractor" in standard agreement. The term of the
agreement will begin after the agreement is fully executed, and all required bonds, insurance
documents and contents of the payment information packet have been received and approved.
X. IMPLEMENTATION
A. KICK-OFF MEETINGS
The successful Proposer will be required to meet with City staff prior to commencement of services
or at any time as required by the City,to discuss and agree on operational issues including transition
of services and scheduling.
City Council 18 — 20 11/17/2026
CITY OF SANTA ANA
EXHIBIT 1 -
SCOPE OF SERVICES
Project Overview
The City of Santa Ana ("City") seeks proposals from experienced Energy Service Companies (ESCOs) or energy
consulting firms to deliver comprehensive energy services for City facilities in accordance with applicable
California Government Code.
This procurement is being conducted in accordance with California Government Code Section 4217.12, which
authorizes the City to enter into energy service contracts based on demonstrated cost savings and performance
guarantees.
The selected firm will partner with the City to evaluate, design,finance, and implement energy-efficiency and
infrastructure-improvement projects that reduce energy consumption, operating expenses, and greenhouse gas
emissions, and deferred maintenance liabilities.
The selected firm will be required to coordinate with the Southern California Regional Energy Network
(SoCaIREN) Public Agency Programs to layer available SoCaIREN incentives and 0%financing into the proposed
project scope.The vendor will provide all documentation required by SoCaIREN to submit relevant incentive and
financing applications.
The selected firm shall develop recommendations that align with the City's Climate Action Plan, long-term
capital planning objectives, and asset management priorities while maximizing grants, rebates, incentives, and
other available funding opportunities.
The City seeks an ESCO partner that delivers low-risk, financially sound, and innovative energy solutions aligned
with decarbonization, resilience, and operational efficiency goals. Proposers must demonstrate strong California
ESPC experience,financial strength, and successful delivery of similar public-sector projects.
1.Scope of Services
The selected vendor shall provide comprehensive turnkey services, including planning, design,financing
assistance, permitting, construction, commissioning, and performance verification.
The scope shall include, but is not limited to, the following phases:
2. Phase 1—Preliminary Energy Assessment(Feasibility)
The chosen firm shall conduct a thorough review of City facilities and infrastructure to pinpoint energy-saving
opportunities.
Tasks may include:
• Utility data analysis and benchmarking
• Site assessments of City facilities
• Identification of Energy Conservation Measures (ECMs)
• Integration of electrification, resilience, and renewable strategies
• Preliminary cost-benefit analysis
• Identification and coordination of applicable incentives,grants, and financing opportunities, including
SoCaIREN Public Agency Programs, rebates, and 0%financing options, as applicable to the proposed
project scope.
City Council 18 — 21 11/17/2026
(9) CITY OF SANTA ANA
• Priorize Energy Conservation Measures (ECMs) based on anticipated lifecycle cost savings, operational
benefirs, implementation complexity, and available funding opportunities.
The vendor shall support the City in evaluating, incorporating eligible funding, and financing opportunities into
the overall project approach, including coordination with SoCaIREN Public Agency Programs to maximize
applicable incentives, rebates, and 0%financing opportunities.
3. Phase 2—Investment Grade Audit
The selected vendor shall conduct an Investment Grade Audit(IGA) to identify feasible projects.
The audit shall include:
• Standardized baseline methodology(weather normalization, occupancy, exclusions)
• Detailed engineering analysis
• Equipment condition assessment
• Detailed cost estimates
• Utility savings projections
• Measurement and verification methodology
• Financial analysis and funding strategy
• Identification of grants and incentive programs
• Preparation of implementation plan and schedule
• Detailed risk mitigation and construction phasing plans
For reach recommended ECM, provide estimated construction cost, annual utility savings, estimated
maintenance svings, expected service life, simple payback, available incentives, and recommended
implementation priority.The firm shall provide grant identification and grant writing services to support project
funding opportunities. Completion of the Investment Grade Audit shall not obligate the City to implement any or
all recommended Energy Conservation Measures.
4. Phase 3—Project Design and Implementation
Upon City approval of the recommended project scope, the firm shall provide full project delivery services,
including:
• Engineering design
• Equipment procurement
• Construction management
• Equipment installation and integration
• System startup and commissioning
• Training of City staff
All work shall comply with applicable codes and regulations.
The firm shall be responsible for securing all required permits and approvals through the City's Planning and
Building Agency(PBA) and any other applicable regulatory agencies.The firm shall coordinate implementation
activities to minimize impacts to City operations and maintain continuity of public services whenever practical.
5. Phase 4—Measurement,Verification, and Performance Guarantee
The selected vendor shall verify energy savings in accordance with industry standards.
City Council 18 — 22 11/17/2026
(9) CITY OF SANTA ANA
Services may include:
• Energy savings verification
• Monitoring and reporting
• Performance guarantees
• Ongoing system optimization and support services
Annual reporting should clearly compare guaranteed savings to actual savings and identify recommended
operational adjustments to optimize performance,
6. Potential Energy Conservation Measures(ECMs)
Projects may include, but are not limited to:
• HVAC system upgrades or replacements
• Interior and exterior lighting upgrades
• Building automation systems (BAS)
• Solar photovoltaic (PV) systems
• Battery energy storage systems
• Building envelope improvements
• EV charging infrastructure
• Water conservation measures
• Integration of electrification, resilience, and renewable strategies
• Infrastructure improvements that reduce operating costs
• Smart irrigation controls and water pumping optimization
• Microgrids where operationally justified
• Other innovative technologies demonstrated to reduce lifecycle operating costs
All services shall include engineering, permitting, installation, commissioning, training, and warranty support.
7. Financial and Pricing Requirements
Proposers shall submit a concise proposal outlining your approach to the following key financial aspects of the
proposal:
• Standardized financial pro forma template
• Full disclosure of escalation assumptions
• Sensitivity analysis (rate changes, savings underperformance)
• Open-book pricing with auditable cost structure
City Council 18 — 23 11/17/2026
CITY OF SANTA ANA
EXHIBIT 2 -
SAMPLE AGREEMENT
CONSULTANT AGREEMENT
CITY OF SANTA ANA
THIS AGREEMENT is made and entered into on this day of , 20_ by and between
, ("Consultant"), and the City of Santa
Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State
of California ("City").
RECITALS
A. The City desires to retain a Consultant having special skill and knowledge in the field of: [insert summation
of services]
B. Consultant represents that Consultant is able and willing to provide such services to the City.
C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field
and that any services performed by Consultant under this Agreement will be performed in compliance with
such standards as may reasonably be expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and
conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform during the term of this Agreement, the tasks and obligations including all labor,
materials, tools, equipment, and incidental customary work required to fully and adequately complete the services
described and set forth in Scope of Services - Exhibit A, attached hereto and incorporated by reference.
2. COMPENSATION
3. TERM
This Agreement shall commence on [enter a Start Date or"the date first written above"] for a number W
year term with the option for the City to grant up to a number M-year extension(s), exercisable by a writing by the
City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant
and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-
employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the
professional manner in which Consultant performs the services which are the subject matter of this Agreement;
however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable
standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all
applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or
sublicense any and all copyrights, designs,and other intellectual property embodied in plans,specifications,studies,
City Council 18 — 24 11/17/2026
(9) CITY OF SANTA ANA
drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression,
including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes,
which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data").
Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual
license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and
warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such
representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City
shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not
within the purposes intended by this Agreement shall be at City's sole risk.
6. INSURANCE
Insurance requirements are attached hereto as Exhibit[x].
7. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents,
employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just
compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and
claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors,
agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this
Agreement;and(2)from any claim that personal injury,damages,just compensation, restitution,judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless
agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or
alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or
effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs
for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any
action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution,judicial or equitable relief due to personal or property rights arises by reason of the terms
of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation
in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code
Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims
that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers,agents, representatives,and employees against
any and all liability, including costs, for infringement of any United States' letters patent, trademark, or copyright
infringement, including costs, contained in the work product or documents provided by Consultant to the City
pursuant to this Agreement.
9. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this
Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this
Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three
(3) years, or for any longer period required by law, from the date of final payment to Consultant under this
Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of
the City to examine, audit, and make transcripts or copies of such records and any other documents created
pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data,
documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of
final payment to Consultant under this Agreement.
10. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably
understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information
except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to
City Council 18 — 25 11/17/2026
(9) CITY OF SANTA ANA
protect its own information of like importance, but in no event less than reasonable care. "Confidential Information"
shall include all nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually,electronically,or by other means. Confidential information disclosed to either
party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of
non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available
sources; (b)is,through no fault of the Consultant disclosed in a publicly available source; (c)is in rightful possession
of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or(e) is
independently developed by the Consultant without reference to information disclosed by the City.
11. CONFLICT OF INTEREST CLAUSE
a. Consultant covenants that it presently has no interests and shall not have interests, direct or indirect,
which would conflict in any manner with performance of services specified under this Agreement.
b. No immediate family members of either the Mayor, City Council Member, or any appointed City Official,
including appointed board and commission members, as defined under the City's Municipal Code,
whose position with the City shall award or influence the award of this Agreement, or any competing
contract or amendment thereof, shall be employed in any capacity by the Consultant or have any other
direct or indirect financial benefit or interest in this Agreement.
c. The section also prohibits the awarding of any agreement, contract, grant, or any amendment to those
awards, to any former full-time employee for one-year from date of employee separation except for any
CaIPERS retiree as authorized by City Council resolution
d. The Consultant must comply with all conflict of interest laws, ordinances, and regulations now in effect
or hereafter to be enacted during the term of this Agreement. The Consultant warrants that it is not now
aware of any facts which conflict with the prohibitions defined above. If the Consultant hereafter
becomes aware of any facts that might reasonably be expected to create a conflict of interest, it must
immediately make full written disclosure of such facts to the City. Full written disclosure must include,
but is not limited to, identification of all persons implicated and a complete description of all relevant
circumstances. Failure to comply with the provisions of this paragraph will be a material breach of this
Agreement.
e. Consultant covenants that none of its directors, officers, employees, or agents shall participate in
selecting or administrating any subcontract supported (in whole or in part)by City funds stemming from
the Agreement where the awarding of the subcontract has any direct or indirect financial benefit or
interest to any individual, as defined in subsections (b)and (c) above.
12. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual
orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and
veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the
recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities
or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall
comply with all applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and
supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between
the terms of this Agreement and any attachments hereto,the terms of this Agreement shall prevail. This Agreement
may not be modified except by written instrument signed by the City and by an authorized representative of
Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are
inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City.
Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally
or otherwise, have been made by any party, or anyone acting on behalf of any party,which is not embodied herein.
City Council 18 — 26 11/17/2026
(9) CITY OF SANTA ANA
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may
not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and
any such assignment,transfer, delegation or subcontract without the City's prior written consent shall be considered
null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services
which are the subject to this Agreement performed by City personnel or by other Consultants retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such
event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services
performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the
City all work product(s) completed as of such date, and in such case such work product shall be
the property of the City unless prohibited by law, and Consultant consents to the City's use thereof
for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance specified in
the Recitals of this Agreement.
16. WAIVER
No waiver of breach,failure of any condition,or any right or remedy contained in or granted by the provisions
of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right
or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach,
failure, right or remedy,whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing
so specifies.
17. JURISDICTION -VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation,
performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the
laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any
action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits,
approvals,waivers, and exemptions necessary for the provision of the services hereunder and required by the laws
and regulations of the United States, the State of California, the City of Santa Ana and all other governmental
agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits,
licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice,tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing
and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage
prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following
persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
City Council 18 — 27 11/17/2026
(9) CITY OF SANTA ANA
Fax: 714-647-6956
With courtesy copies to:
Executive Director, ------- Agency
City of Santa Ana
20 Civic Center Plaza (M-xx)
P.O. Box 1988
Santa Ana, California 92702
Fax:
To Consultant:
First& Last Name
Title
Consultant Firm Name
Address
City, State, Zip
Fax:
A party may change its address by giving notice in writing to the other party. Thereafter, any communication
shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed
to have been given three (3)days after it has been deposited in the United States mail, duly registered or certified,
with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed
to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames,
weekends, federal, state, County or City holidays shall be excluded.
MISCELLANEOUS PROVISIONS
Each undersigned represents and warrants that its signature herein below has the power, authority
and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify
City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the
event that such authority or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the
body of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nunez
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO CONSULTANT:
City Attorney
By:
Assistant City Attorney (name)
(title)
RECOMMENDED FOR APPROVAL:
City Council 18 — 28 11/17/2026
(9) CITY OF SANTA ANA
Executive Director
[INSERT] Agency
City Council 18 — 29 11/17/2026
CITY OF SANTA ANA
EXHIBIT 3 -
INSURANCE REQUIREMENTS
Contractor shall procure and maintain for the duration of the agreement, the following insurance coverages:
MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts and shall be at least as
broad as:
• Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an
"occurrence" basis, including products and completed operations, property damage, bodily injury and
personal&advertising injury with limits no less than$2,000,000 per occurrence and$4,000,000 aggregate.
• Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1 (any auto), with
combined single limits of $1,000,000. In the event Contractor does not maintain commercial automobile
liability insurance, City will accept evidence of personal automobile insurance with existing limits,which can
be lower than $1,000,000.
• Workers' Compensation (WC): as required by the State of California,with statutory limits, and Employer's
Liability Insurance with limit of no less than $1,000,000 per accident, per employee, per policy for bodily
injury or disease. This requirement can be waived if Contractor has no employees.
• Professional Liability (PL): with limits no less than $1,000,000 per occurrence or claim, and $2,000,000
aggregate.
If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires
and shall be entitled to the broader coverage and/or the higher limits maintained by Contractor.Any available
insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to
City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, its City Council, its officers, officials, employees, agents,
and volunteers are to be covered as additional insureds with respect to liability arising out of work or
operations performed by or on behalf of the Contractor including materials, parts, equipment, and
personnel furnished in connection with such work or operations.
2. CGL, AL, and WC policies: Insurance company(ies) agrees to waive all rights of subrogation against
City, its City Council, its officers, officials, employees, agents, and volunteers for losses paid under
the terms of any policy which arise from work performed by Contractor for City.
3. All required insurance policies: For any claims related to this contract, Contractor's insurance
coverage shall be primary and any insurance maintained by City, its City Council, its officers, officials,
employees, agents, or volunteers shall not contribute with it.
4. All required insurance policies: A severability of interest provision must apply for all the additional
insureds, ensuring that Contractor's insurance shall apply separately to each insured against whom a
claim is made or suit is brought, except with respect to the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be canceled, suspended,
voided, reduced in coverage or in limits, non-renewed by the carrier, or materially changed except
after thirty (30)days prior written notice has been given to City. Ten (10)days prior written notice
shall be provided to City for policy cancellation or non-renewal due to non-payment.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, Attention:
(Name of Department Staff Responsible for Agreement), Address of Department Responsible for
Agreement, M-XX, Santa Ana, CA 92701. The name and location of the project or event should be
included in the Description of Operations section of each certificate.
Self-Insured Retentions
City Council 18 — 30 11/17/2026
(9) CITY OF SANTA ANA
Self-insured retentions must be declared to and approved by the City. City may require Contractor to
purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations,
claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of California with a current
A.M. Best rating of no less than A:VII, unless otherwise acceptable to City.
Verification of Coverage
Contractor shall furnish City with original Certificates of Insurance including all required amendatory
endorsements (or copies of the applicable policy language effecting coverage required by this clause)and a
copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to Entity
before work begins. However, failure to obtain the required documents prior to the work beginning shall not
waive the Contractor's obligation to provide them. City reserves the right to require complete, certified copies
of all required insurance policies, including endorsements required by these specifications, at any time.
Claims Made Policies
If any of the required policies provide coverage on a claims-made basis:
1. The retroactive date must be shown and must be before the date of the contract or the beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at least three (3) years after
completion of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a
retroactive date prior to the contract effective date, Contractor must purchase "extended reporting" coverage
for a minimum of three (3)years after completion of work.
Subcontractors
Contractor shall require and verify that all sub-contractors maintain insurance meeting all the
requirements stated herein, and Contractor shall ensure that City is an additional insured on
insurance required from sub-contractors.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior
experience, insurer, coverage, or other special circumstances.
City Council 18 — 31 11/17/2026
CITY OF SANTA ANA
ATTACHMENT A -
PROPOSER'S CERTIFICATION
LEGAL NAME OF COMPANY TYPE OF BUSINES STRUCTURE
BUSINESS ADDRESS
NAME OF AUTHORIZED AGENT TITLE
E-MAILADDRESS PHONE NUMBER
SMALL, LOCAL BUSINESS PREFERENCE
Is your firm claiming small, local business preference for this soliciation?
Yes, my firm is a small Santa Ana business*
Yes, my firm is a small Orange County business**
No, my firm is not claiming local business preference
*Small Santa Ana business shall mean a business certified by the state department of general services as a small business,
which has a substantial presence through either a headquarters or branch office within the geographical boundaries of the
city,and which headquarters or branch office was established prior to the city inviting bids for the respective procurement.
**Small Orange County business shall mean a business certified by the state department of general services as a small
business,which has a substantial presence through either a headquarters or branch office within the geographical boundaries
of Orange County, and which headquarters or branch office was established prior to the city inviting bids for the respective
procurement.
IF YOU ANSWERED YES, THEN YOU MUST SUBMIT YOUR BUSINESS LICENSE AND CA DEPARTMENT OF GENERAL
SERVICES SMALL BUSINESS CERTIFICATION WITH YOUR PROPOSAL. A post office box address within the city shall
not qualify as a valid business location.
Proposer understands and agrees that this written RFP (or any part thereof specifically designated and accepted by
the City of Santa Ana,hereinafter City)shall constitute the entire agreement between Proposer and the City only after
it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal
noting hereon the action of approval of the Council,signed by the Executive Director or his duly authorized agent,and
signed by the City Attorney,denoting her approval of the form of this document,and its execution,and when it or an
exact copy of it has been either delivered to Proposer or deposited with the United States Postal Service properly
addressed to the Proposer with the correct postage affixed thereto.
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"IN1.11§2 CONSIDERED NONRESPONSWP17/2026
(9) CITY OF SANTA ANA
Proposer further agrees that upon delivery(as defined above)of the accepted agreement he/she will furnish City all
required bonds and certificate of liability insurance within ten(10)days(excluding Saturdays,Sundays and City's legal
holidays), or the funds, check, draft, or Proposer's bond substituted in lieu thereof accompanying this proposal shall
become the property of the City and shall be considered as payment of damages due to the delay and other causes
suffered by City because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof
of damages actually suffered by City is difficult to ascertain; otherwise said funds, check drafts, or Proposer's bond
substituted in lieu thereof shall be returned to the undersigned.
Proposer understands that a proposal is required for the entire work, that the estimated quantities set forth in the
RFP schedule are solely for the purpose of comparing proposals,and that final compensation under the contract will
be based upon the actual quantities of work satisfactorily completed.
All terms contained in the specifications, the certification of nondiscrimination by contractors, and the required
insurance certificates are to be incorporated by reference into this agreement and are made specifically as part of this
RFP.
Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for
Proposals. I have examined the Scope of Services(Exhibit 1) and am qualified to provide services being requested
as specified herein. I understand and agree that I am responsible for reporting any errors, omissions or
discrepancies to the City for clarification prior to the submission of my proposal.
PROPOSER'S STATEMENTS: I have read, understood and agree to the terms and conditions on all pages of the
Request for Proposals, including all Exhibits. I am able to provide the required insurance coverage and
endorsements. Upon request, I will transfer and deliver goods or services to the City in accordance with said terms
and conditions.
CHECK ONE (1) BOX BELOW
I have read, understood and agree to any and all provisions, including but not limited to insurance
requirements and terms and conditions, contained in Exhitbit 2—Sample Agreement and Exhibit
I have concerns to the provisions contained in Exhibit 2—Sample Agreement and have included them in
my proposal submission for consideration.
CHECK ONE (1) BOX BELOW
Are you registered,active, and in good standing with the California Secretary of State?
Yes
No
Comments:
Signed:
Title:
Firm:
Date:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"IN11.1-:§8 CONSIDERED NONRESPONSIVP-17/2026
CITY OF SANTA ANA
ATTACHMENT B -
REFERENCES
Consultant shall provide three (3) references from other similar public agencies for which services similar to
those specified in this RFP have been performed, including contact names and telephone numbers. The
respondent grants permission for the City to contact any individuals listed as references for additional
information regarding your firm's qualifications.
City may disqualify a Proposer if:
• References fail to substantiate Proposer's description of services and deliverables provided; or
• References fail to support that Proposer has a continuing pattern of providing capable, productive, and skilled
personnel, or
• City is unable to reach the point of contact with reasonable effort. It is the Proposer's responsibility to inform
the point of contact(s) of normal City working hours.
List and describe fully the contracts performed by your firm which demonstrate your ability to provide the
supplies, equipment or services included in the scope of the proposal specifications.
Attach additional pages if required.
REFERENCE
Customer Name: Contact Individual:
Address: Phone Number:
Email:
Contract Amount: Year:
Description of supplies, equipment, or services provided:
REFERENCE
Customer Name: Contact Individual:
Address: Phone Number:
Email:
Contract Amount: Year:
Description of supplies, equipment, or services provided:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"INILL:§F CONSIDERED NONRESPONSIVP-17/2026
(9) CITY OF SANTA ANA
REFERENCE
Customer Name: Contact Individual:
Address: Phone Number:
Email:
Contract Amount: Year:
Description of supplies, equipment, or services provided:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"%NILL:§g CONSIDERED NONRESPONSWP17/2026
CITY OF SANTA ANA
ATTACHMENT C -
DEBARMENT QUESTIONNAIRE
The (Proposer/Bidder/Contractor/Consultant)shall complete, under penalty of perjury,the following
questionnaire:
Has the (Proposer/Bidder/Contractor/Consultant), any officer of the (Proposer/Bidder/Contractor/Consultant),
or any employee of the (Proposer/Bidder/Contractor/Consultant)who has a proprietary interest in the
(Proposer/Bidder/Contractor/Consultant), ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of law or a safety
regulation?
Yes No
If the answer is yes, explain the circumstances in the following space:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"%NILL§g CONSIDERED NONRESPONSWP17/2026
CITY OF SANTA ANA
ATTACHMENT D -
NON-LOBBYING CERTIFICATION
The prospective participant certifies, by signing and submitting this bid or proposal,to the best of his or her
knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any
person for influencing or attempting to influence an officer or employee of any Federal agency,a Member
of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal
loan, the entering into of any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any Federal contract,grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence an officer or employee of any Federal agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection
with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and
submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was
made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction
imposed by Section 1352,Title 31, U.S.Code. Any person who fails to file the required certification shall be subject
to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that
the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all
such subrecipients shall certify and disclose accordingly.
Signed:
Title:
Firm:
Date:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"%NILL:§V CONSIDERED NONRESPONSIVP-17/2026
CITY OF SANTA ANA
ATTACHMENT E -
NOWDISCRIMINATION CERTIFICATION
The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows:
1. The Consultant shall not discriminate against any employee or applicant for employment because of race,
color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants
are employed, and that employees are treated during employment without, regard to their race, color,
religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment,
upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay
or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees
to post in conspicuous places, available to employees and applicants for employment, notices to be provided
setting forth the provisions of this nondiscrimination clause.
2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the
Consultant, state that all qualified applicants will receive consideration for employment without regard to
race, color, religion, sex, or national origin.
3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective
bargaining agreement or other contract or understanding, a notice to be provided advising the said labor
union or workers' representatives of the Consultant's commitments under this section, and shall post copies
of the notice in conspicuous places available to employees and applicants for employment.
4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the
rules, regulations, and relevant orders of the Secretary of Labor.
5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24,
1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit
access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for
purposes of investigation, to ascertain compliance with such rules, regulations, and orders.
6. In the event of the Consultant's non-compliance with the nondiscrimination clauses of this contract or with
any of the said rules, regulations,or orders,the contract may be canceled,terminated,or suspended in whole
or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted
construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24,
1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246
of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided
by law.
7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the
provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules,
regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of
September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the
administering agency may direct as means of enforcing such provisions, including sanctions for
noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened
with, litigation with a subconsultant or vendor as a result of such direction by the administering agency, the
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"%NILL:§A CONSIDERED NONRESPONSIVP-17/2026
(9) CITY OF SANTA ANA
Consultant may request that the United States enter into such litigation to protect the interests of the United
States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no
discrimination shall be made in the employment of persons upon public works because of race, religious
creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such
persons,except as provided in Section 1420,and any consultant of public works violating this Section is subject
to all the penalties imposed for a violation of the Chapter.
Signed:
Title:
Firm:
Date:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"INILL"CONSIDERED NONRESPONSWP17/2026
CITY OF SANTA ANA
ATTACHMENT F -
NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
To the CITY OF SANTA ANA
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the proposer declares
that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company,
association,organization,or corporation;that the proposal is genuine and not collusive or sham;that the proposer
has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has
not directly or indirectly colluded, conspired, connived or agreed with any proposer or anyone else to put in a
sham proposal, or that anyone shall refrain from bidding; that the proposer has not in any manner, directly or
indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the
proposer or any proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any
other proposer, or to secure any advantage against the public body awarding the contract of anyone interested
in the proposed contract; that all statements contained in the proposal are true; and, further, that the proposer
has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents
thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation,
partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate
a collusive or sham proposal.
Note: The above non-collusion affidavit is part of the proposal. Signing this proposal on the signature portion
thereof shall also constitute signature of this non-collusion affidavit. Proposers are cautioned that making a false
certification may subject the certifier to criminal prosecution.
Signed
State of County of
Subscribed and sworn to (or affirmed) before me on this _day of 20 , by
proved to me on the basis of satisfactory evidence to be the person(s)who
appeared before me.
Notary Public Signature Notary Public Seal
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
City COLWPOSALS THAT DO NOT CONTAIN THIS FOR"%NILL,"CONSIDERED NONRESPONSWP17/2026
EXHIBIT 2
AGREEMENT WITH WILLDAN ENERGY SOLUTIONS
TO PROVIDE TURNKEY ENERGY SERVICES
THIS AGREEMENT is made and entered into on this 17th day of November, 2026 by and
between Willdan Energy Solutions ("Consultant"), and the City of Santa Ana, a charter city and
municipal corporation organized and existing under the Constitution and laws of the State of
California ("City").
RECITALS
A. On July 23,2026,City issued Request for Proposal("RFP")No. 25-128,by which it sought
qualified consultants to provide Turnkey Energy Services.
B. Consultant submitted a responsive proposal that was selected by the City. Consultant
represents that it is able and willing to provide the services described in the scope of work
included with RFP No. 25-128 to the City.
C. In undertaking the performance of this Agreement, Consultant represents that it is
knowledgeable in its field and that any services performed by Consultant under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the
terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform during the term of this Agreement, the tasks and obligations
including all labor, materials, tools, equipment, and incidental customary work required to fully
and adequately complete the services described and set forth in Exhibit A, attached hereto and
incorporated by reference.
2. COMPENSATION
a. City agrees to pay, and Consultant agrees to accept as total payment for its services for
City, the rates and charges identified in Exhibit B. The total amount to be expended
during the term of this Agreement shall not exceed $149,016.
b. Payment by City shall be made within forty-five (45) days following receipt of proper
invoice evidencing work performed, subject to City accounting procedures. City and
Consultant agree that all payments due and owing under this Agreement shall be made
through Automated Clearing House (ACH) transfers. Consultant agrees to execute the
City's standard ACH Vendor Payment Authorization and provide required
documentation. Upon verification of the data provided, the City will be authorized to
deposit payments directly into Consultant's account(s) with financial institutions.
Payment need not be made for work which fails to meet the standards of performance
set forth in the Recitals which may reasonably be expected by City.
Page 1 of 8
City Council 18 — 41 11/17/2026
3. TERM
This Agreement shall commence on the date first written above for a one (1) 'year term,
with the option for the City to grant up to four (4) one-year extension(s), exercisable by a writing
by the City Manager and the City Attorney, unless terminated earlier in accordance with Section
15, below.
4. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an
independent Consultant and not an employee of the City. This Agreement is not intended nor shall
it be construed to create an employer-employee relationship, a joint venture relationship, or to
allow the City to exercise discretion or control over the professional manner in which Consultant
performs the services which are the subject matter of this Agreement; however, the services to be
provided by Consultant shall be provided in a manner consistent with all applicable standards and
regulations governing such services. Consultant shall pay all salaries and wages, employer's social
security taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use,
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property
embodied in plans, specifications, studies, drawings, estimates, and other documents or works of
authorship fixed in any tangible medium of expression, including but not limited to, physical
drawings or data magnetically or otherwise recorded on computer diskettes,which are prepared or
caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant
shall require all subcontractors to agree in writing that City is granted a non-exclusive and
perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all
Documents & Data. Consultant makes no such representation and warranty in regard to
Documents & Data which were provided to Consultant by the City. City shall not be limited in
any way in its use of the Documents and Data at any time, provided that any such use not within
the purposes intended by this Agreement shall be at City's sole risk.
6. INSURANCE
Insurance requirements are attached hereto as Exhibit C.
7. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers,
agents, employees, contractors, special counsel, and representatives from liability: (1) for personal
injury, damages,just compensation,restitution,judicial or equitable relief arising out of claims for
personal injury, including death, and claims for property damage, which may arise from the
Page 2 of 8
City Council 18 — 42 11/17/2026
negligent operations of the Consultant, its subcontractors, agents, employees, or other persons
acting on its behalf which relates to the services described in section 1 of this Agreement; and (2)
from any claim that personal injury, damages,just compensation, restitution,judicial or equitable
relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages,just compensation, restitution,judicial
or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in
this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant
further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including
fees and costs for special counsel to be selected by the City, regarding any action by a third party
challenging the validity of this Agreement, or asserting that personal injury, damages, just
compensation, restitution,judicial or equitable relief due to personal or property rights arises by
reason of the terms of, or effects arising from this Agreement. City may make all reasonable
decisions with respect to its representation in any legal proceeding.Notwithstanding the foregoing,
to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out
of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
For all other claims, Consultant's obligations shall not extend to claims that arise out of the sole
or active negligence or willful misconduct of the indemnified parties.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and
employees against any and all liability, including costs, for infringement of any United States'
letters patent,trademark,or copyright infringement,including costs, contained in the work product
or documents provided by Consultant to the City pursuant to this Agreement.
9. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed
under this Agreement. Consultant shall maintain complete and accurate records with respect to
the costs incurred under this Agreement and any services, expenditures, and disbursements
charged to the City for a minimum period of three (3) years, or for any longer period required by
law, from the date of final payment to Consultant under this Agreement. All such records and
invoices shall be clearly identifiable. Consultant shall allow a representative of the City to
examine, audit, and make transcripts or copies of such records and any other documents created
pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all
work, data, documents, proceedings, and activities related to this Agreement for a period of three
(3)years from the date of final payment to Consultant under this Agreement.
10. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Consultant agrees that
it shall not use or disclose such information except in the performance of this Agreement, and
further agrees to exercise the same degree of care it uses to protect its own information of like
importance, but in no event less than reasonable care. "Confidential Information" shall include all
nonpublic information. Confidential information includes not only written information, but also
information transferred orally, visually, electronically, or by other means. Confidential
Page 3 of 8
City Council 18 — 43 11/17/2026
information disclosed to either party by any subsidiary and/or agent of the other party is covered
by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any
information that(a)has been disclosed in publicly available sources; (b) is, through no fault of the
Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant
without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e)
is independently developed by the Consultant without reference to information disclosed by the
City.
11. CONFLICT OF INTEREST CLAUSE
a. Consultant covenants that it presently has no interests and shall not have interests,
direct or indirect, which would conflict in any manner with performance of services
specified under this Agreement.
b. No immediate family members of either the Mayor, City Council Member, or any
appointed City Official, including appointed board and commission members, as
defined under the City's Municipal Code, whose position with the City shall award or
influence the award of this Agreement, or any competing contract or amendment
thereof, shall be employed in any capacity by the Consultant or have any other direct
or indirect financial benefit or interest in this Agreement.
c. The section also prohibits the awarding of any agreement, contract, grant, or any
amendment to those awards, to any former full-time employee for one-year from date
of employee separation except for any CalPERS retiree as authorized by City Council
resolution
d. The Consultant must comply with all conflict of interest laws, ordinances, and
regulations now in effect or hereafter to be enacted during the term of this Agreement.
The Consultant warrants that it is not now aware of any facts which conflict with the
prohibitions defined above. If the Consultant hereafter becomes aware of any facts that
might reasonably be expected to create a conflict of interest,it must immediately make
full written disclosure of such facts to the City. Full written disclosure must include,
but is not limited to, identification of all persons implicated and a complete description
of all relevant circumstances. Failure to comply with the provisions of this paragraph
will be a material breach of this Agreement.
e. Consultant covenants that none of its directors, officers, employees, or agents shall
participate in selecting or administrating any subcontract supported(in whole or in part)
by City funds stemming from the Agreement where the awarding of the subcontract
has any direct or indirect financial benefit or interest to any individual, as defined in
subsections (b) and (c) above.
12. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed,religion, sex,marital status,
sexual orientation, gender identity, gender expression, gender, medical conditions, genetic
Page 4 of 8
City Council 18 — 44 11/17/2026
information, or military and veteran status, age, national origin, ancestry, or disability, as defined
and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization,
promotion,termination or other employment related activities or any services provided under this
Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all
applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Consultant, and supersedes any and all other agreements, oral or written, between the parties. In
the event of a conflict between the terms of this Agreement and any attachments hereto,the terms
of this Agreement shall prevail. This Agreement may not be modified except by written instrument
signed by the City and by an authorized representative of Consultant. The parties agree that any
terms or conditions of any purchase order or other instrument that are inconsistent with, or in
addition to,the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each
party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any
party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant,
Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior
written consent of the City and any such assignment, transfer, delegation or subcontract without
the City's prior written consent shall be considered null and void. Nothing in this Agreement shall
be construed to limit the City's ability to have any of the services which are the subject to this
Agreement performed by City personnel or by other Consultants retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant
compensation for all services performed by Consultant prior to receipt of such notice of
termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to
deliver to the City all work product(s) completed as of such date, and in such case
such work product shall be the property of the City unless prohibited by law, and
Consultant consents to the City's use thereof for such purposes as the City deems
appropriate.
b. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or
Page 5 of 8
City Council 18 — 45 11/17/2026
granted by the provisions of this Agreement shall be effective unless it is in writing and signed by
the party waiving the breach, failure,right or remedy.No waiver of any breach, failure or right, or
remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not
similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION-VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be
determined and governed by the laws of the State of California. Both parties further agree that
Orange County, California, shall be the venue for any action or proceeding that may be brought or
arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder
and required by the laws and regulations of the United States, the State of California, the City of
Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and
in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and
exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice,tender, demand, delivery, or other communication pursuant to this Agreement
shall be in writing and shall be deemed to be properly given if delivered in person or mailed by
first class or certified mail,postage prepaid, or sent by fax or other telegraphic communication in
the manner provided in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza(M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza(M-21)
P.O. Box 1988
Santa Ana, California 92702
Fax: (714) 647-5635
Page 6 of 8
City Council 18 — 46 11/17/2026
To Consultant:
Willdan Energy Solutions
Attention: Colton Gorman
2401 E. Katella Avenue, Suite 300
Anaheim, CA 92806
A party may change its address by giving notice in writing to the other party. Thereafter,
any communication shall be addressed and transmitted to the new address. If sent by mail,
communication shall be effective or deemed to have been given three (3) days after it has been
deposited in the United States mail, duly registered or certified, with postage prepaid, and
addressed as set forth above. If sent by fax, communication shall be effective or deemed to have
been given twenty-four (24)hours after the time set forth on the transmission report issued by the
transmitting facsimile machine, addressed as set forth above. For purposes of calculating these
time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the
power, authority and right to bind their respective parties to each of the terms of
this Agreement, and shall indemnify City fully, including reasonable costs and
attorney's fees, for any injuries or damages to City in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this Agreement.
[signatures on following page]
Page 7 of 8
City Council 18 — 47 11/17/2026
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first
above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nunez
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO CONSULTANT:
City Attorney
By:A� �T($&A� wceaffff
Kyle ellesen By: SVP, Preconstruction & Risk
Assistant City Attorney Title:
RECOMMENDED FOR APPROVAL:
&Voa(oG fo losas
Rodolfo Rosas(Oct 30,2026 15:54:05 PDT)
Rodolfo Rosas, P.E.
Executive Director
Public Works Agency
Page 8 of 8
City Council 18 — 48 11/17/2026
EXHIBIT A
City Council 18 — 49 11/17/2026
r CITY OF SANTA ANA
SCOPE OF
SERVICES
Project Overview
The City of Santa Ana ("City")seeks proposals from experienced Energy Service Companies (ESCOs) or energy
consulting firms to deliver comprehensive energy services for City facilities in accordance with applicable
California Government Code.
This procurement is being conducted in accordance with California Government Code Section 4217.12,which
authorizes the City to enter into energy service contracts based on demonstrated cost savings and performance
guarantees.
The selected firm will partner with the City to evaluate, design, finance, and implement energy-efficiency and
infrastructure-improvement projects that reduce energy consumption, operating expenses, and greenhouse gas
emissions, and deferred maintenance liabilities.
The selected firm will be required to coordinate with the Southern California Regional Energy Network
(SoCaIREN) Public Agency Programs to layer available SoCaIREN incentives and 0%financing into the proposed
project scope.The vendor will provide all documentation required by SoCaIREN to submit relevant incentive and
financing applications.
The selected firm shall develop recommendations that align with the City's Climate Action Plan, long-term
capital planning objectives, and asset management priorities while maximizing grants, rebates, incentives, and
other available funding opportunities.
The City seeks an ESCO partner that delivers low-risk, financially sound, and innovative energy solutions aligned
with decarbonization, resilience, and operational efficiency goals. Proposers must demonstrate strong California
ESPC experience,financial strength, and successful delivery of similar public-sector projects.
1.Scope of Services
The selected vendor shall provide comprehensive turnkey services, including planning, design, financing
assistance, permitting, construction, commissioning, and performance verification.
The scope shall include, but is not limited to, the following phases:
2. Phase 1—Preliminary Energy Assessment (Feasibility)
The chosen firm shall conduct a thorough review of City facilities and infrastructure to pinpoint energy-saving
opportunities.
Tasks may include:
• Utility data analysis and benchmarking
• Site assessments of City facilities
• Identification of Energy Conservation Measures (ECMs)
• Integration of electrification, resilience, and renewable strategies
• Preliminary cost-benefit analysis
• Identification and coordination of applicable incentives,grants, and financing opportunities, including
SoCaIREN Public Agency Programs, rebates, and 0%financing options, as applicable to the proposed
project scope.
City Council 18 — 50 11/17/2026
(9) CITY OF SANTA ANA
• Priorize Energy Conservation Measures (ECMs) based on anticipated lifecycle cost savings, operational
benefirs, implementation complexity, and available funding opportunities.
The vendor shall support the City in evaluating, incorporating eligible funding, and financing opportunities into
the overall project approach, including coordination with SoCaIREN Public Agency Programs to maximize
applicable incentives, rebates, and 0%financing opportunities.
3. Phase 2—Investment Grade Audit
The selected vendor shall conduct an Investment Grade Audit(IGA) to identify feasible projects.
The audit shall include:
• Standardized baseline methodology(weather normalization, occupancy, exclusions)
• Detailed engineering analysis
• Equipment condition assessment
• Detailed cost estimates
• Utility savings projections
• Measurement and verification methodology
• Financial analysis and funding strategy
• Identification of grants and incentive programs
• Preparation of implementation plan and schedule
• Detailed risk mitigation and construction phasing plans
For reach recommended ECM, provide estimated construction cost, annual utility savings, estimated
maintenance svings, expected service life, simple payback, available incentives, and recommended
implementation priority.The firm shall provide grant identification and grant writing services to support project
funding opportunities. Completion of the Investment Grade Audit shall not obligate the City to implement any or
all recommended Energy Conservation Measures.
4. Phase 3—Project Design and Implementation
Upon City approval of the recommended project scope, the firm shall provide full project delivery services,
including:
• Engineering design
• Equipment procurement
• Construction management
• Equipment installation and integration
• System startup and commissioning
• Training of City staff
All work shall comply with applicable codes and regulations.
The firm shall be responsible for securing all required permits and approvals through the City's Planning and
Building Agency(PBA) and any other applicable regulatory agencies.The firm shall coordinate implementation
activities to minimize impacts to City operations and maintain continuity of public services whenever practical.
5. Phase 4—Measurement,Verification, and Performance Guarantee
The selected vendor shall verify energy savings in accordance with industry standards.
City Council 18 — 51 11/17/2026
(9) CITY OF SANTA ANA
Services may include:
• Energy savings verification
• Monitoring and reporting
• Performance guarantees
• Ongoing system optimization and support services
Annual reporting should clearly compare guaranteed savings to actual savings and identify recommended
operational adjustments to optimize performance,
6. Potential Energy Conservation Measures(ECMs)
Projects may include, but are not limited to:
• HVAC system upgrades or replacements
• Interior and exterior lighting upgrades
• Building automation systems (BAS)
• Solar photovoltaic (PV) systems
• Battery energy storage systems
• Building envelope improvements
• EV charging infrastructure
• Water conservation measures
• Integration of electrification, resilience, and renewable strategies
• Infrastructure improvements that reduce operating costs
• Smart irrigation controls and water pumping optimization
• Microgrids where operationally justified
• Other innovative technologies demonstrated to reduce lifecycle operating costs
All services shall include engineering, permitting, installation, commissioning, training, and warranty support.
7. Financial and Pricing Requirements
Proposers shall submit a concise proposal outlining your approach to the following key financial aspects of the
proposal:
• Standardized financial pro forma template
• Full disclosure of escalation assumptions
• Sensitivity analysis (rate changes, savings underperformance)
• Open-book pricing with auditable cost structure
City Council 18 — 52 11/17/2026
EXHIBIT B
City Council 18 — 53 11/17/2026
City of Santa Ana
Section V, .- 1 of _
V. Financial Approach
Transparent Financial Model
As part of every IGA we prepare, Willdan provides our customers with a standardized financial pro forma
template. In this proforma, every assumption is disclosed on its face: utility rate schedules and escalation
rates(pre-approved and mutually agreed with the City), inflation, O&M cost trajectories, incentive timing,
and financing terms.Where annual debt service escalates in anticipation of escalating savings,the
escalation rate is capped using the NIST/FEMP Energy Escalation Rate Calculator(pages.nist.gov/eerc), per
the City's contract clauses. Each pro forma ships with a sensitivity analysis showing project performance
under utility rate changes and savings underperformance scenarios.
Willdan uses Project Site construction management software to manage and track subcontractor labor and
material cost documentation, including work performed by our Willdan employees.The City can easily
access and review information such as costs, schedules, invoices, meeting minutes, action items, and more.
Costpoint accounting software manages our project-level expenses, and it is integrated with Project Site to
manage commitments, open purchase orders, and balance the remaining to complete.
■ Transparent Bidding Phase: Subcontractor solicitations and responses are entered and stored in Project
Site,tabulated,and compared by the Willdan Team and the City for final selection.
■ Construction Billing Phase: Subcontracts are issued through Project Site, AIA Schedule of Values is
created, percentage complete is tracked and stored, and we review and finalize with subcontractor.
Ability to Structure Cash-Flow Positive Projects
Willdan structures projects so annual savings exceed annual payments, with debt service, ESCO fees,
maintenance, M&V, and the City's third-party Owner's Representative fee all included, in each and every
year of the guarantee. Acceptable payment sources follow the City's hierarchy: annual utility cost savings;
thoroughly documented material and commodity savings in the years they occur; documented
maintenance and capital-avoidance savings in the years they occur; and grants, rebates, and incentive
programs.
The City of Orange program we presented to their Council on July 8, 2026 shows the mechanics. Orange's
$15.1 M turnkey ESPC is financed over 20 years at 4.50%, and the $2.1 M federal ITC direct payment
(Section 48E, received at the end of Year 2) is applied as a principal paydown that re-amortizes the loan and
drops the annual payment from $1,213,967 to $1,039,397, keeping payments below guaranteed savings in
every year of the term.Another $2.9M in Year 2 incentives is layered into the same cash flow. Orange's
companion AMI water meter program is fully self-funding, projected to generate roughly$500K in annual
free cash flow after all project costs while freeing about$400K per year of CIP capacity for other priorities.
The City of Calabasas is on the same path with a $9.1 M self-financing program presented in July 2026,
spanning solar PV at three sites, HVAC replacements with cloud-based controls, roofing, lighting, and EV
charging.There, a solar equipment safe-harbor purchase Willdan structured ahead of the July 4, 2026
federal deadline preserved an estimated $1.2M ITC direct payment to the City on its roughly$4M solar
scope, and the City has four years to complete construction while keeping the full payment. Escondido USD
($19M) and Yosemite USD ($7.53M)followed the same design, combining multiple outside funding
sources to reach net-positive cash flow from year one.Any equity cash outlay is solely at the City's option;
Willdan's default design is a fully self-funding project.
Pros, Cons, and Key Considerations of Various Financing Strategies
Willdan's in-house financial services team routinely walks public agencies through the practical trade-offs of
ESPC financing. In brief:
■ Tax-exempt lease-purchase (TELP/lease-revenue):fastest to close, no voter approval, equipment serves as
security; best for 10-20 year ESPC terms. Consideration: subject to annual appropriation,which the City's
clauses already contemplate.
Pa ii ctfnrPrr,P-1 NIr, 9F-1?Rfnr
It-city Council 18 — 54 Turnkey EnergVTMv7c�2026 19
City of Santa Ana
Section V, .g- 2 of _
• SoCaIREN 0%financing: lowest possible cost of capital for eligible measures; Willdan will maximize eligible
scope and prepare all documentation. Consideration: program caps and eligibility windows, layered rather
than stand-alone.
■ Direct purchase/capital funds: no financing cost, maximum lifetime savings; consideration: consumes
capital capacity the City may prefer to preserve.
■ Revenue bonds/COPs: scale for very large phases at attractive rates; consideration: issuance cost and
timeline only justified above a size threshold.
• On-bill and utility financing / ESA structures: align payments with the utility bill and can shift performance
risk; consideration: rate and term flexibility varies by program.
Beyond structuring options, Willdan Financial Services(WFS), a Willdan Group company, maintains its own
registered municipal advisors, so the entire financing evaluation and procurement process is fully SEC
compliant. Willdan also recommends the City engage its own independent registered municipal advisor;
we will work closely with the City's advisor to ensure every option available to the City has been surfaced
and reviewed under the highest scrutiny.
Recommendations for the City of Santa Ana
Our financing philosophy in one line: free money first,then cheaper money,then patient money.
• Start with the funding that does not have to be repaid: grants, incentives, rebates, and tax credits,
including IRA direct-pay on solar, storage, and charging; SGIP for storage; Carl Moyer for vehicle
electrification; and CEDA for decarbonization design. Because we administer utility incentive programs
ourselves,we build the project to maximize what it can claim.
■ Next,pursue ongoing dollars such as carbon credits,rate and tariff work,and revenue recovery.
These reduce the City's costs or grow its revenue before we ever talk about borrowing.
Only then do we finance the balance,and at the lowest available cost:SoCaIREN 0%financing for all
eligible measures,zero-percent on-bill financing through SCE for qualifying scopes, one-percent CEC
loans, green bonds, and tax-exempt lease purchase as the flexible backstop.
Every dollar of free money is a dollar the savings don't have to carry.Willdan will model each vehicle side-
by-side in the IGA pro forma so Council can compare total cost of ownership on one page.
Experience Capturing Rebates, Incentives, and Grants
Willdan is among California's largest administrators and implementers of utility incentive programs,trusted
by the state's largest utilities, including a $330M commercial direct-install program for LADWP.As the
implementer,Willdan has delivered more than $250M in rebates to municipal customers in California and
$1.413 nationwide.We know how incentives are scored, reserved, and paid because our teams run these
programs.
For our own clients, Willdan has secured more than $3 billion in financing, incentives, and grants over the
last 15 years. That total includes $950 million in grants, incentives, and rebates and $200 million in 0%
financing, supported by more than 60 in-house financial staff who develop tax-exempt lease purchase
financing, incentive applications, and grant submittals on every project. Recent examples:
• City of Orange(July 2026): structured a $2.1 M federal ITC elective payment under Section 48E as a
financing principal paydown, with $2.9M in Year 2 incentives layered into the program pro forma.
• City of Fairfield: secured $12.4M in FTAfunding within a $22M fleet electrification and facilities program.
• County of Sonoma: $3.9M in project incentives on a$30M self-funding ESPC, plus more than $9.4M in
local grants we helped the County secure.
■ Los Angeles USD: standardized LED retrofits across 1,438 schools, 100%funded by utility incentives,
delivering 22.9M+ kWh in savings.
For Santa Ana,this capability is built into the program: Willdan provides grant identification and grant-
writing services during Phase 2 at no separate cost, layers SoCaIREN incentives and 0%financing into the
pro forma, and pursues federal elective-pay credits wherever the City's measures qualify.
Pa ii ctfr,r Prr,P-1 NIr, 9F-19P fnr
City Council 18 — 55 Turnkey EnergVTMv7c�2026 20
City of Santa Ana
Section V, g- 3 of 4 _
Utility Rate Escalation Strategy and Risk Allocation
Our escalation strategy starts from measured rate history. Southern California ratepayers have seen
residential rates climb sharply since 2016: SCE is up 69%, PG&E 101%, and SDG&E 98%, per the Public
Advocates Office Q1 2026 Electric Rates Report.The drivers are structural: authorized wildfire mitigation
and liability recovery,the rooftop solar cost shift onto non-solar customers, and continued distribution
capital spending.This is the same record we used to support a 5.5% escalation assumption in the City of
Orange program now moving to contract. For Santa Ana, baseline tariffs are modeled at the City's actual
current SCE and SoCalGas rates, account by account, and the escalation assumption is documented,
sourced, and mutually agreed with the City before it enters the pro forma.
Two caps keep the assumption honest. Where annual payments escalate in anticipation of escalating
savings,the rate is limited to the ceiling produced by the NIST/FEMP Energy Escalation Rate Calculator,
consistent with the City's minimum standard contract clauses, and any general inflation or escalation rate
must be pre-approved by the City. If actual rates outrun the assumption,the upside belongs to Santa Ana:
excess savings are retained by the City and are never used to cover another year's shortfall.
Risk allocation is written into the pro forma, line by line:
• Savings performance risk:Willdan.Verified shortfalls in any guarantee year are paid to the City in cash,
and the measure causing them is remedied at Willdan's expense.
• Rate risk:structured in the City's favor.Guaranteed savings are verified in energy units and priced per
the approved M&V plan, so a rate drop cannot manufacture a paper shortfall, while rate increases flow to
the City as excess savings.
• Construction period:the City keeps it. Interim savings realized during construction are retained by the
City and excluded from the annual guarantee.
- The annual test: no netting. Savings must exceed all annual payments(debt service,Willdan fees, M&V
services, and the City's third-party Owner's Representative fee) in each and every year,with surpluses never
borrowed across years.
The result is a pro forma the City can stress in any direction and a guarantee that holds in the year it is
tested.
Sensitivity Analysis to Rate Changes and/or Savings Underperformance
Every IGA pro forma includes a sensitivity workbook the City can exercise on its own.We model utility rates
under three scenarios(current rates held flat,the mutually agreed escalation rate, and the NIST/FEMP EERC
ceiling)and savings performance at 100%, 95%, and 90% of projections, then show annual cash flow,
cumulative position, and coverage of the annual payment under each combination.The City sees before
award exactly how the program behaves if rates move or savings come in low.
These scenarios are stress tests, not open questions: under the risk-allocation framework in the preceding
section, any verified underperformance is Willdan's to remedy and any rate-driven variance resolves in the
City's favor.The sensitivity workbook simply lets the City confirm, before award, that the annual guarantee
test holds under every combination.
Open-Book Pricing with Auditable Cost Structure
Open-Book Pricing
Our approach to open book pricing is informed by our 60+-year firm history. We are experienced in public
work and operating on your side of the table, and currently have $548 M in active public projects under
development, over 80%($450 M)of them utilizing open book pricing.
Open book pricing includes providing the City with copies of the actual quotes, invoices, and payments.
Each identified measure will show the actual cost,Willdan mark-ups,fee structure, M&V, etc.; once the City
decides to enter into a contract with Willdan,the costs are set as a guaranteed maximum price.The City
takes no additional risk for cost overruns, while gaining all the benefit of actual subcontractor and/or
equipment costs.
Pa 11—tf„r Prr,P-1 NIr, 9F-19P fnr
City Council 18 — 56 Turnkey EnergVTMv7c�2026 21�
1
City of Santa Ana
Section age of d _
Auditable Cost Structure
Our cost structure is builtto be audited. Willdan maintains cost accounting records for all authorized work
on the basis of actual labor and material costs, keeps those records open to the City and its consultants
throughout construction, and preserves them for a minimum of three years after final payment, consistent
with the City's contract and records requirements.The audit trail runs unbroken from subcontractor quote
to purchase order to invoice to payment application, with every entry mapped to its ECM and to the
corresponding line of the standardized pro forma.
What the City can audit, and how:
■ Disclosed maximum markups. Every markup in the Section A chart is applied visibly on each invoice and
can be negotiated downward, never upward.
• Competitive cost basis. Equipment packages and installation subcontracts are bid to the market, and bid
tabulations are shared with the City, so price analysis against catalog, market, and historical benchmarks
starts from documents the City already holds.
• Contingency log. Contingency use is tracked in an itemized log reported monthly with each open book
invoice, and unused contingency at the end of construction is applied to the project, never retained by
Willdan.
• Prevailing wage transparency. Labor costs for self-performed work remain subject to the same open
book requirements, with certified payroll available for review.
■ Independent verification.We welcome review by the City's third-party Owner's Representative and carry
that fee as a cash-flow line item at the City's direction, per the City's minimum standard contract clauses.
Pa ii ctfnr Prr,P-1 NIr, 9F_19P fnr
ff-City Council 18 - 57 Turnkey EnergVTMv7c�2026
City of Santa Ana
VI. Pricing and Cost Structure
Project Cost Breakdown and Proforma Template
As stated in the Financial Approach section prior,Willdan provides proformas with every IGA we prepare.
For illustrative purposes, a sample project proforma is provided below.
Sample Recommended Project Proforma
i.,,�;�,. Solar,HVACTotal Payments CUItNIIatlYie
LeaseYear Costs (thl" Payment Lighting O&M Net
Savings Incentives) Costs Costs Costs
Savings
2 Year
Construction $ 6,583,196 $ - $ 1,332295 $ 7,615,491 $ - $ 7,615,491 $ 7,615,491
Period
Year $ 4,554,691 $ 710,000 $ 917,596 $ 6,182,287 $ (8,380,041) $ (235,000) $ (8,615,041) $ (2,432,754) $ 5.182,737
Year $ 4,737,469 $ 9,102,002 $ 949,712 S 14,789,182 $ (8,380,041) $ (235,000) S (8,615,041) $ 6,174,142 $ 11.356,879
Year $ 4,92E,050 $ $ 982,952 $ 5,911,001 $ (8,380,041) $ (235,000) S (8,615,041) $ (2,7C4,039) $ 8652,840
Year4 $ 5,12E,784 $ $ 1,017,355 $ 6,144,130 $ (8,380041) $ (235,000) $ (8,615,041) $ (2,470,902) $ 6,181,038
Year $ 5,334,038 $ $ 1,352,962 $ 6,387,000 $ (8,380,041) $ (235,000) $ (8,615,041) $ (2,228,041) $ 3953,898
Year $ 5,55C,194 $ $ 1,089,816 $ 6,640,010 S (8,380,041) $ (8,380,041) $ (1,740,031) S 2.213,867
Year $ 5,775,654 $ $ 1,127,959 $ 6,903,613 $ (8,380,041) S (8,380,041) $ (1,476,428) $ 737,439
Year $ 6,01C,837 $ $ 1,107,438 $ 7,178,275 $ (8380,041) $ 8,380,041 $ (12C1,760) $ 1464,327)
Year $ 6,25C,103 $ - $ 11200,290 $ 7,464,401 $ (0,300,041) $ (0,300,041) $ (915,560) $ (1.379,006)
Year10 $ 6,512,151 $ $ 1,250,589 $ 7,762,740 $ (8,380,041) $ (8,380,041) $ (617,301) $ (1,997,187)
Year11 $ 6,779,223 $ $ 1,294,359 S 8,073,583 $ (8,380,041) $ (8,380,041) $ (3C(3,458) $ 2.303,645)
Year12 $ 7,057,903 $ $ 1,339,662 $ 8,397,565 $ (8,380,041) S (8,380,041) S 17,525 $ (2,286,120)
Year13 $ 7,348,719 $ $ 1,386,550 $ 8,735,269 $ (8,380,041) S (8,380,041) S 355,229 $ (1,930,891)
Year 14 $ 7,652,222 $ $ 1,435,079 $ 9,087,302 $ (8,380041) $ (8,380,041) $ 7C7,261 $ (1.223,630)
Year 15 $ 7,968,991 $ $ 1,485,307 $ 9,454,298 $ (8380,041) $ (8,380,041) $ 1074,258 $ 1149,373)
Year16 $ 6,874,934 $ $ 1,537 293 $ 8,412,227 $ (8,380,041) $ (8,380,041) $ 22,187 $ 1117,186)
Year17 $ 7,148,845 $ - $ 1,591 098 $ 3,739,943 $ (8,380,041) $ (8,380,041) $ 359,902 $ 242,716
Year18 $ 7,434,361 $ $ 1,546.787 $ 9,081,148 $ (8,380,041) $ (8,380,041) $ 7C1,107 $ 943,824
Year 119 $ i,13z,uuz $ $ 1,iu4,4z4 $ 9,436,4zti $ (8380,D41) $ (t1,38uu41) $ 1,Ut6,38b $ 2.u0D,2U9
Year20 $ 8,042,306 $ $ 1,764,079 $ 9,806,385 $ (8,380,041) $ (8,380,041) $ 1,426,345 $ 3.426,554
Year21 $ 8,36`,841 $ $ 1,925,822 $ 10,191,662 $ (8,380,041) S (8,380,041) S 1,811,622 $ 5238,176
Year22 $ 8,703,197 $ $ 1;389,726 $ 10,592,922 $ (8,380,041) 1$ 8,380,041 $ 2,212,881 $ 7451,057
Year23 $ 9,054,993 $ $ 1,955,866 $ 11,01Q'52 $ (8380041 $ 8,380,041) $ 2,63g819 $ 10081,876
Year24 $ 9,421,879 $ $ 2,324,321 $ 11446,200 $ (8,380,041) $ (8,380,041) $ 3,D66,159 $ 13.148,035
Year25 $ 9,804,531 $ $ 2,095,173 $ 11,899,704 $ (8,380,041) 1$ (8,380,041)1$ 3,519,663 1$ 16667698
Year35 $ 2,695j 1$ $ 2,955,448 $ 5,650,633 1$ $ $ 5,6W,633 1$ 64230,954
Total $202,882-881 $9,812,GO2 $62,212,086 $274,906,968 (209,501,014) i (210,676,014) 3 64,230,954
Investment Grade Audit and Project Development Proposal
By starting our process with a Master Plan as the foundational "road map,"Willdan is able to focus on
scopes that are financially justifiable and best align with each client's goals: this allows us to offer a much
lower IGA fee than most traditional ESCOs who aren't comfortable taking this financial/engineering risk.
The onus is then on the Willdan team to create a viable and impactful project or suite of projects for the City
of Santa Ana.
We are confident through our collaborative IGA process that we can and will deliver projects that the City
will be strongly motivated to implement with us.
ProposedInvestment Grade Audit and Project Development Proposal
Investment Grade Audit and Project Proposal $0.12/sf
Explanations
This "not-to-exceed" cost per square foot proposal for the IGA fee is currently determined by:
1. Utilizing a decarbonization master plan deliverable.
2. Willdan plans a comprehensive design approach as part of the IGA.
3. Covering planned consultants.
4. Other unknowns at this time.
Pa ii ctfr,r Prr,nr,cal Nin 9F_1?R fr,r
mr-City Council 18 — 58 Turnkey EnergVTMv7c�2026 23
City of Santa Ana
Section V1, Page 2
Willdan will work closely with the City upon selection to more clearly define the parameters for the IGA to
determine the actual fee to move forward with.
Consistent with the City's minimum standard contract clauses,the City has no payment obligation for the
IGA provided the parties execute an ESPC within 60 days of the Notice of Acceptance of the final IGA,the
IGA fee is incorporated into project costs and paid through the ESPC funding mechanisms. The Preliminary
Energy Master Plan (Phase 1) is provided at no cost to the City regardless of outcome.
Maximum Project Markups
Willdan provides a straight-forward project cost breakdown that shows how incidental and ancillary work
will be charged. We provide fully open book contracts and detailed invoicing, eliminating confusion
around project cost breakdowns.
Per the City's request,Willdan's Maximum markups forthe categories requested is provided below.
CategoriesProject Budget
A Subcontractor Costs (Contractor Costs to ESCO) NA
B Other Direct Purchases of Equipment, Material, Supplies, etc. NA
C Total of Hard Costs NA
D Project Development 2.5%
E Design/Engineering 5.0%
F Project Management 5.0%
G Permits 0.5%
H Performance Bond 0.8%
1 Payment Bond/Insurance 0.8%
J Commissioning 2.0%
K Measurement&Verification 1.5%
L Training 0.5%
M Contingency 3.0%
N Warranty Service 1.0%
O Total of ESCO Fees 22.6%
P Overhead 9.0%
Q Profit 5.0%
R PROJECT PRICE SUBTOTAL w/OH&P r= c + o +p + q
Assumptions:Rows D—N are calculated as a percent of Row C. Rows P& Q are calculated as a percent of the sum of Rows C
&O.
Effective total markup over hard costs (informational): 39.8%
Blue cells are the maximum markup inputs;Row 0 and the effective total recalculate automatically.
Pa ii ctfnr Prr,P-1 NIr, 9F_19P fnr
mr-City Council 18 — 59 Turnkey EnergVTMv7c�2026 24
City of Santa Ana
Section V1, Page 3
of _
Self-Performed Work Fees
Willdan self-performs energy auditing, engineering design, constructability review, procurement,
construction management, commissioning,training, and M&V with in-house staff. Fees for self-performed
work are billed as described below, and are auditable on the same open-book basis as subcontracted
work.
Labor Rates Table for Self-Performed Work
Position Description Hourly Rate Development Manager $169.00
Lead Project Engineer $162.00
Project Engineer $141.00
Construction Manager $134.00
Construction Superintendent $115.00
Operations& Maintenance Manager $107.00
Measurement&Verification Manager $113.00
HVAC Skilled Trades Professional $121.00
Electrical Skilled Trades Professional $132.00
Annual Costs and Fees
Willdan does not drive profit on ongoing O&M costs from our clients like traditional ESCOs: our goal is to
ensure we provide the correct level of services and support that our clients need and expect of us.
The chart below summarizes how the annual cost is determined, how the fee is charged to the project, and
when it is applied for M&V, warranty, and other fees.
Annual Cost and Fees
DetermineAnnual Cost How Annual Cost Is
Category Fhe Project
After the first year of M&V,
Annual cost varies based on the the City can choose to We bill M&V quarterly;the
Measurement and method selected at each building,the continue additional years City can choose to renew
Verification number of meters, and the type of of M&V, charged as a line after presentation of third-
IPMVP options selected item in our open book quarter M&V report
pricing
Determined based on anticipated Separate line item in our
Warranty equipment failure rates,time to field open book pricing Quarterly
warranty claims, and follow-up
Depends on the scope of services,
such as SkySpark, MBCx, etc.that the
Equipment City decides it would like to include as Separate line item in our Upfront or billed monthly
Performance an ongoing service. Typically for the duration of the
Monitoring determine number of years and open book pricing service
include in ESPC, but can also be paid
on an ongoing basis
Ongoing Scope of work determined for Cx Separate proposal from Billed monthly for the
Commissioning services ESPC duration of the service
City Council 18 — 60 Turnkey Energy'��v7c�2026 251
City of Santa Ana
Section V1, Page 4 . 51P
AppliedAnnual Cost How Annual Cost Is Determine How Fee Is Charged To When It Is
Category The Project
Can determine number of years and Separate proposal from Upfront or billed monthly
Annual Training include in upfront ESPC, or paid on an ESPC for the duration of the
ongoing basis service
Contingency
Willdan's typical model is to perform a full design upfront to reduce construction risk.We pride ourselves
on being a "No Change Order" organization and absorb the subcontractor change orders if they occur. We
plan a transparent contingency for each project as described below, and unused contingency funds at the
end of construction will be returned to the City, or the City may choose to add additional work to the
contract via change order.
Contingency for Lighting, Electrical, Mechanical, and Controls
We plan our transparent contingency budget based on the expected overall project risk.Typically, we
include a negotiated 3-5%contingency budget.The contingency budget is based on the level of risk for
the scope of work being performed. For example, projects with a less complex scope(e.g., lighting-only
scopes)or scopes with 100% design completed at time of subcontractor bids, contingency may be less
than 5%. For complex mechanical redesign and retrofits of antiquated or historic buildings without 100%
design documents, contingency may be greater than 5%.
Contingency to Cover Changes in Work Scope and Subcontractor Change Orders
Covering Changes in Work Scope or Subcontractor Change Orders: Contingency funds are used to cover
unforeseen conditions discovered during construction that were not reflected within the IGA. Contingency
funds will be tracked within a Contingency Log and have itemized reporting monthly with each open book
invoice.The Willdan Construction Team will review the contingency log during regularly scheduled
meetings for transparency of the balance of contingency throughout the project. Contingency can also be
used to add or change the scope directed by the City.
Equipment/Labor Cost Competition
Because we are 100%vendor-neutral, Willdan works with all qualified manufacturers/vendors to solicit bids
on equipment for cost and value competition. On average, our equipment competition process saves
customers 10%+ on material costs.
Our equipment bidding process draws on 20+ year relationships with manufacturers and includes the steps
outline below, and on the page immediately following:
Request Enter
Identify Letters of Subcontractor RFP to Conduct Review
10. Qualified 0. Mandatory Bid Review '0.rRecommencla
Subcontractors Interest to ..
Prequalify System Subcontractors I Jobsite Walks I I with city
1. Document Specifications& Requirements- Establish equipment specification and requirements
documents(e.g., CRI, e-components, devices, accessories, rated lamp life).
2. Review Submittals and Specifications with SBUSD-Confirm document and consensus on equipment
approach.
3. RFP to Qualified Equipment Providers-Send RFP and request pricing from qualified
man ufactu rers/vendors.
Pa ii octfr,rPr P-1 Nin 9F_1?Rfnr
ff-City Council 18 — 61 Turnkey EnergVTMv7c�2026 26
City of Santa Ana
Section V1, Page 5 of _
4. Secure Qualified Discounts-Strive for first contact to the manufacturer to get product(s)qualified and
specified for a project.
5. Obtain formal equipment price credits(price reductions) in writing to guarantee 10%+ savings on material
costs.
6. Obtain Best Value Additions- Have RFP respondents provide, in writing,value additions,such as history of
on-time delivery/supply chain stability, warranty terms, etc.
7. Review and Organize RFP Response-Organize qualifying manufacturer RFP responses into an easy-to-read
format for the City to review with us.
8. Review Recommendations with the City: our summary for the City includes(in addition to access to source
files): Best pricing negotiated by the Willdan team; Good,""Better," and "Best"options; explanation of
manufacturer resources to support the RFP including energy calculations and photometric studies, local
field staff support site visits to confirm selection, and audits or other data collection; equipment flow
management(staging,warehousing, etc.);formal proposal details prices and terms for all equipment;
submittal binder details all technical attributes and warranties.
Open-Book Pricing
As introduced in the section prior, Willdan operates fully open-book: all costs, including all subcontractor
and vendor costs, are disclosed, cost accounting records are maintained on actual labor and material costs,
and the City and its consultants are welcome to evaluate costs against catalog, market, and historical
benchmarks. The markups stated below are maximums:they may be negotiated downward, never
upward. Unused contingency at the end of construction is applied to the project, it is never retained by
Willdan.
Per the City's request, a sample Open-Book invoice is provided below.
Example of a Wiiidan Open Book Contract Invoice
itemized scopes of
work supplemented
with subcontractor and - -
vendor invoices
Full transparency on all
markups and fees
Pa ii octfnrPrr,P-1 NIr, 9F_1?Rfnr
City Council 18 - 62 Turnkey EnergVTMv7c�2026
EXHIBIT C
City Council 18 — 63 11/17/2026
r CITY OF SANTA ANA
INSURANCE REQUIREMENTS
Contractor shall procure and maintain for the duration of the agreement, the following insurance coverages:
MINIMUM SCOPE AND LIMIT OF INSURANCE
Contractor shall maintain limits of insurance coverage in the following minimum amounts and shall be at least as
broad as:
• Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an
"occurrence" basis, including products and completed operations, property damage, bodily injury and
personal&advertising injury with limits no less than$2,000,000 per occurrence and$4,000,000 aggregate.
• Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1 (any auto), with
combined single limits of $1,000,000. In the event Contractor does not maintain commercial automobile
liability insurance, City will accept evidence of personal automobile insurance with existing limits, which can
be lower than $1,000,000.
• Workers' Compensation (WC): as required by the State of California, with statutory limits, and Employer's
Liability Insurance with limit of no less than $1,000,000 per accident, per employee, per policy for bodily
injury or disease. This requirement can be waived if Contractor has no employees.
• Professional Liability (PL): with limits no less than $1,000,000 per occurrence or claim, and $2,000,000
aggregate.
If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires
and shall be entitled to the broader coverage and/or the higher limits maintained by Contractor. Any available
insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to
City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. CGL and AL policies: City of Santa Ana, its City Council, its officers, officials, employees, agents,
and volunteers are to be covered as additional insureds with respect to liability arising out of work or
operations performed by or on behalf of the Contractor including materials, parts, equipment, and
personnel furnished in connection with such work or operations.
2. CGL, AL, and WC policies: Insurance company(ies) agrees to waive all rights of subrogation against
City, its City Council, its officers, officials, employees, agents, and volunteers for losses paid under
the terms of any policy which arise from work performed by Contractor for City.
3. All required insurance policies: For any claims related to this contract, Contractor's insurance
coverage shall be primary and any insurance maintained by City, its City Council, its officers, officials,
employees, agents, or volunteers shall not contribute with it.
4. All required insurance policies: A severability of interest provision must apply for all the additional
insureds, ensuring that Contractor's insurance shall apply separately to each insured against whom a
claim is made or suit is brought, except with respect to the insurer's limits of liability.
5. Each insurance policy required herein shall provide that coverage shall not be canceled, suspended,
voided, reduced in coverage or in limits, non-renewed by the carrier, or materially changed except
after thirty (30)days prior written notice has been given to City. Ten (10) days prior written notice
shall be provided to City for policy cancellation or non-renewal due to non-payment.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, Attention:
Leilani Tellez, 20 Civic Center Plaza, M-11, Santa Ana, CA 92701. The name and location of the
project or event should be included in the Description of Operations section of each certificate.
Self-Insured Retentions
City Council 18 — 64 11/17/2026
(9) CITY OF SANTA ANA
Self-insured retentions must be declared to and approved by the City. City may require Contractor to
purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations,
claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state of California with a current
A.M. Best rating of no less than ANII, unless otherwise acceptable to City.
Verification of Coverage
Contractor shall furnish City with original Certificates of Insurance including all required amendatory
endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a
copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to Entity
before work begins. However, failure to obtain the required documents prior to the work beginning shall not
waive the Contractor's obligation to provide them. City reserves the right to require complete, certified copies
of all required insurance policies, including endorsements required by these specifications, at any time.
Claims Made Policies
If any of the required policies provide coverage on a claims-made basis..
1. The retroactive date must be shown and must be before the date of the contract or the beginning of work.
2. Insurance must be maintained and evidence of insurance must be provided for at least three (3) years after
completion of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a
retroactive date prior to the contract effective date, Contractor must purchase"extended reporting" coverage
for a minimum of three (3) years after completion of work.
Subcontractors
Contractor shall require and verify that all sub-contractors maintain insurance meeting all the
requirements stated herein, and Contractor shall ensure that City is an additional insured on
insurance required from sub-contractors.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior
experience, insurer, coverage, or other special circumstances.
City Council 18 — 65 11/17/2026