RESOLUTION NO. 2008-19
KO- 6/5/08
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF SANTA ANA APPROVING MITIGATED NEGATIVE
DECLARATION AND MITIGATION MONITORING PROGRAM
FOR ENVIRONMENTAL REVIEW NO. 2007-60 AND SITE
PLAN REVIEW NO. 2008-03 TO RENOVATE A VACANT
DEALERSHIP AND ADD APPROXIMATELY 23,510 SQUARE
FOOT OF NEW SALES, RECEPTION AND SHOWROOM
AREAS AT 1425 AUTO MALL DRIVE WHICH IS WITHIN
SPECIFIC DEVELOPMENT NO. 60 (SD-60)
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA
ANA AS FOLLOWS:
Section 1. The Planning Commission does hereby find, determine and declare
as follows:
A. The Applicant is requesting approval to renovate a vacant dealership and
add approximately 23,510 square foot of new sales, reception and
• showroom areas at 1425 Auto Mall Drive which is within Specific
Development No. 60 (SD-60) zoning district.
B. Section 41-593.5(c) of the Santa Ana Municipal Code requires a review by
the Planning Commission of all plans within a specific development plan
area to ensure the project is in conformity with the Specific Plan.
C. The mitigated negative declaration and mitigation monitoring program for
Environmental Review No. 2007-60 and Site Plan Review No. 2008-03
came before the Planning Commission of the City of Santa Ana on June 9,
2008.
D. The project is in compliance with all applicable development standards
outlined within the Specific Development Plan (SD-60).
Section 2. The Planning Commission has reviewed and considered the
information contained in the initial study and the mitigated negative declaration and
mitigation monitoring program for Environmental Review No. 2007-60 prepared with
respect to this Project. It is determined that, as required pursuant to the California
Environmental Quality Act ("CEQA") and the State CEQA Guidelines, a mitigated negative
declaration and mitigation monitoring program adequately addresses the expected
environmental impacts of this Project. On the basis of this review, the Planning
Commission finds that there is no evidence from which it can be fairly argued that the
• project will have a significant adverse effect on the environment. The Planning
Resolution No. 2008-19
Page 1 of 6
Commission hereby certifies and approves the mitigated negative declaration and
• mitigation monitoring program and directs that the Notice of Determination be prepared
and filed with the County Clerk of the County of Orange in the manner required by law.
Section 3. The Planning Commission of the City of Santa Ana hereby
approves Site Plan Review No. 2008-03 as conditioned in Exhibit "A" attached hereto and
incorporated herein.
ADOPTED this 9th day of June, 2008 by the following vote:
AYES: Commissioners: Alderete, Betancourt, Gartner, Leo, Mill, Munoz(6)
NOES: Commissioners: None (0)
ABSENT: Commissioners: De La Torre (1)
ABSTENTIONS: Commissioners: None (0)
•
APPROVED AS TO FORM:
Joseph W. Fletcher, City Attorney
~---
By: w
Kylee O. o
Assistant ity Attorney
•
-'
Christoph r Leo
Chairman
Resolution No. 2008-19
Page 2 of 6
CERTIFICATE OF ATTESTATION AND ORIGINALITY
• Plannin Commission Secreta do hereb attest to and certi
I, MARTHA RAMIREZ, g ry, y fY
the attached Resolution No. 2008-19 to be the original resolution adopted by the
Planning Commission of the City of Santa Ana on June 9, 2008.
Date: ~ /~ -' ~
Planning Commission Secretary
City of Santa Ana
•
•
Resolution No. 2008-19
Page 3 of 6
Conditions of Approval for Site Plan Review No. 2008-03
• Site Plan Review No. 2008-03 is approved subject to compliance, to the reasonable
satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal
Code, the California Administrative Code, the Uniform Fire Code, the Uniform Building
Code, and all other applicable regulations. In addition, it shall meet the following
conditions of approval:
The applicant must comply with each and every condition listed below rip or to exercising
the rights conferred by the Site Plan Review.
The applicant must remain in compliance with all conditions listed below throughout the life
of the Site Plan Review. Failure to comply with each and every condition may result in the
revocation of the Site Plan Review.
A. Planning Division
1. All proposed site improvements must conform to the Development Review
approval of DP No. 2007-16 and/or the provisions outlined in Specific
Development No. 60.
2. All landscaping and plant material on the site shall be maintained with at least the
same numbers and types of trees and plant material as indicated on the approved
• landscape plan.
3. The site occupant shall be responsible for maintaining free of litter the area
adjacent to the premises over which he has control.
B. Public Works Agency
1. During construction, the contractor shall comply with SCAQMD Fugitive Dust
Rule 403 to suppress dust generated by construction operations. To ensure
compliance with SCAQMD Fugitive Dust Rule 403, grading plans and demolition
plans for the proposed project shall reflect the following notes:
a. All material excavated or graded will be sufficiently watered to prevent
excessive amounts of dust.
b. All clearing and earthwork activities shall cease during period of high
winds (winds greater than 25 mph averaged over one hour) or during
Stage 1 or Stage 2 smog episodes.
c. Streets surrounding the project site shall be cleaned at the end of each
day of construction.
• Exhibit A
Resolution No. 2008-19
Page 4 of 6
d. All material transported offsite shall either be sufficiently watered or
securely covered to prevent excessive amounts of dust.
e. The amount of area disturbed by clearing and earthwork activities shall be
minimized at all times.
Equipment engines shall be maintained in good condition and in proper
tune according to manufacturer's specifications.
g. To the extent feasible, gasoline powered equipment shall be used for
onsite and offsite construction activities.
2. The project developer shall provide proof of coverage under NPDES General
Construction Activity Storm Water Permit that includes: (a) A copy of the project's
permit issued by the State Water Resource Control Board that identifies the
permit number; and (b) Two copies of the Storm Water Pollution Prevention Plan.
3. Submit and have approved a surface drainage/utility plan that depicts all
applicable "Site Design" structural "Source Control" and "Treatment Control" Best
Management Practices (BMPs) in accordance with the Orange County Drainage
Area Management Plan (DAMP) and the City of Santa Ana Local Implementation
Plan (LIP).
4. Submit for approval a surface drainage/grading/erosion control plan. The plan is
to include existing and proposed elevations at and adjacent to al! property lines.
Drainage routed to the street must be directed beneath the sidewalk and through
the curb.
5. The project developer shall provide proof of coverage under NPDES General
Construction Activity Storm Water Permit that includes: (a) A copy of the project's
permit issued by the State Water Resource Control Board that identifies the
permit number; and (b) Two copies of the Storm Water Pollution Prevention Plan.
6. Prior to issuance of grading permits, the project developer shall submit and have
approved a surface drainage/utility plan that depicts all applicable Site Design,
Structural Source Control and Treatment Control Best Management Practices in
accordance with the Orange County Drainage Area Management Plan (DAMP)
and the City of Santa Ana Local Implementation Plan (LIP).
7. Provide an electronic copy of the "Water Quality Management Plan" (WQMP)
that includes the following:
a. Site Assessment.
b. Site design Best Management Practices (BMP)
Resolution No. 2008-19
Page 5 of 6
c. Applicable Routine Source Control BMP.
• d. Selectin and sizin the Treatment Control BMP.
g 9
e. Mechanism(s) by which funding for long-term operation and maintenance
of all structural BMP will be provided.
f. Operation and Maintenance Plan to describe the long-term operation and
maintenance requirements of all applicable structural BMP and to identify
the entity in charge of implementation.
g. WQMP shall be submitted in an electronic format, Adobe PDF, Microsoft
Word or other electronic format (prior approval required). Two hand
copies of the original signed owner certification page must be submitted
for the City's record.
h. The proposed project would be subject to City of Santa Ana Federal Clean
Water Protection Enterprise Fees.
•
•
Resolution No. 2008-19
Page 6 of 6
PROOF OF SERVICE
(C.C.P. SECTION 1013(a), 2015.5)
STATE OF CALIFORNIA, COUNTY OF ORANGE
I am employed in the aforesaid county; I am over the age of eighteen and
not a party to the within action; my business address is 20 Civic Center Plaza,
Ross Annex Second Floor, Santa Ana, California 92701.
I served the foregoing document described as: Resolution No. 2008-19
(Site Plan Review No. 2008-03) in this action by placing a true copy t ereo
enc~T~m s' eafeTenve opes a ressed as follows:
Lyle Hutson
Ware Malcomb
10 Edelman
Irvine, CA 92618
Vik Keuylian
AK3 Commonwealth, LLC
2441 South Pullman
Santa Ana, CA 92705
[ ] I caused to be delivered by courier, such envelope by hand to the office of the
addressee(s).
[X] BY MAIL I am readily familiar with my employer's practice of collection and
processing correspondence for mailing. Under that practice it would be deposited
• with U.S. Postal Service on that same day with postage thereon fully prepaid at
Santa Ana, California m the ordinary course of business. I am aware that on
motion of the party served, service is presumed invalid if postal cancellation date
or postage meter date is more than one day. after date of deposit for mailing in
affidavit.
[ ]The document was transmitted by EMAIL transmission and was reported as
complete and without error.
I declare under penalty of perjury under the laws of the State of California
that the foregoing is true and correct.
Executed on July 14, 2008 at Santa Ana, California.
MA THA RAM
•