HomeMy WebLinkAbout2008-05•
RESOLUTION NO. 2008-05
KO- 2/7/08
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF SANTA ANA APPROVING CONDITIONAL
USE PERMIT NO. 2007-17 TO ALLOW THE
CONSTRUCTION OF A WIRELESS FACILITY DESIGNED
AS A MONOPINE AT 2555 SOUTH MAIN STREET
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA ANA
AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Conditional Use Permit No. 2007-17 came before the Planning
Commission of the City of Santa Ana for a duly noticed public hearing on
February 11, 2008.
B. Conditional Use Permit No. 2007-17 has been filed with the City of Santa
Ana seeking to allow the construction of a wireless facility designed as a
monopine at 2555 South Main Street.
C. Pursuant to Santa Ana Municipal Code Section 41-198.10, a Conditional
Use Permit is required for major wireless facilities.
D. Santa Ana Municipal Code Section 41-638 authorizes the Planning
Commission to grant a conditional use permit upon making certain
findings.
1. Will the proposed use provide a service or facility which will
contribute to the general well being of the neighborhood or the
community?
The proposed 60-foot tall cellular monopine will provide a
service to Santa Ana residents, businesses and motorists
who subscribe to Metro PCS wireless service by reducing
the gaps in digital cellular service and providing additional
calling capacity for its users, especially for those users
traveling within the south central sector of Santa Ana.
2. Will the proposed use under the circumstances of the particular
case be detrimental to the health, safety, or general welfare of
persons residing or working in the vicinity?
Resolution No. 2008-05
Page 1 of 8
Federal law exempts local jurisdictions from regulating
• health related issues as these issues are covered under
Federal laws. However, the proposed facility will be in
compliance with both the Federal Communications
Commission (FCC) and Federal Aviation Administration
(FAA) safety regulations.
3. Will the proposed use adversely affect the present economic
stability or future economic development of properties surrounding
the area?
The proposed monopine, in conjunction with the existing
landscaping, will be compatible with the surrounding area
and will not adversely affect the economic viability in the
area. The stealth appearance will be the major solution to
maintaining and increasing the economic stability for this
industrial area.
4. Will the proposed use comply with the regulations and conditions
specified in Chapter 41 for such use?
The cellular facility has been designed to comply with the
regulations and conditions identified in Chapter 41 of the
Santa Ana Municipal Code for a major wireless facility.
5. Wili the proposed use adversely affect the Genera! Plan or any
specific plan of the City?
The proposed monopine facility will not adversely affect the
General Plan as cellular facilities that are designed to be
compatible with the surrounding environment are consistent
with the goals and objectives of the Industrial (IND) General
Plan designation.
E. This project was reviewed in accordance with the Guidelines for the
California Environmental Quality Act. The recommendation is exempt
from further review pursuant to Section 15303. This Class 3 exemption
allows in-fill developments for the construction and location of limited
numbers of new, small facilities or structures. Categorical Exemption
Environmental Review No. 2007-139 will be filed for this project.
Section 2. The Planning Commission after conducting the public hearing hereby
approves Conditional Use Permit No. 2007-17 as conditioned in Exhibit "A" attached
hereto and incorporated herein. This decision is based upon the evidence submitted at
the above said hearing, which includes but is not limited to: the Request for Planning
Commission Action dated February 11, 2008 and exhibits attached thereto; and the
. public testimony, all of which are incorporated herein by this reference.
Resolution No. 2008-05
Page 2 of 8
•
ADOPTED this 11th day of February, 2008 by the following vote:
AYES: Commissioners: Alderete, Betancourt, De La Torre, Gartner, Leo,
Mill (6)
NOES: Commissioners: None (0)
ABSENT: Commissioners:
ABSTENTIONS: Commissioners:
Munoz (1)
None (0)
~~~
Christop r Leo
Chairma
APPROVED AS TO FORM:
Joseph W. Fletcher, City Attorney
,~ r ~~._
By: -~`__:,~ l~ ~~ _
Kylee Otto ~ ~~
Assistant City Attorney
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, Martha Ramirez, Planning Commission Secretary, do hereby attest to and certify the
attached Resolution No. 2008-05 to be the original resolution adopted by the Planning
Commission of the City of Santa Ana on February 11, 2008.
Date: 02 G~~O _Q
Planning Commission Secretary
City of Santa Ana
Resolution No. 2008-05
Page 3 of 8
Conditions for Approval for Conditional Use Permit No. 2007-17
Conditional Use Permit No. 2007-17 is approved subject to compliance, to the reasonable
satisfaction of the Planning Manager, with all applicable sections of the Santa Ana
Municipal Code, the California Administrative Code, the California Building Standards
Code and all other applicable regulations.
The applicant must comply in full with each and every condition listed below rip or to
exercising the rights conferred by this conditional use permit.
The applicant must remain in compliance with all conditions listed below throughout the
life of the conditional use permit. Failure to comply with each and every condition may
result in the revocation of the conditional use permit.
A. Planning Division
1. The applicant must comply with all conditions and requirements of the
Development Review Committee for the development project (DP No. 07-
53).
2. Any amendment to this conditional use permit must be submitted to the
Planning Division for review. At that time, staff will determine if
administrative relief is available or the conditional use permit must be
amended.
3. Provide one 48-inch box Canary Island Pine tree (Pinus canariensis)
inside the storage area as shown on the site plan.
4. Provide asix-foot, six-inch wrought iron fence to screen the equipment
cabinets. Metal mesh screening should be attached to the wrought iron
fence in lieu of the required vines.
5. The proposed monopine shall be constructed per the following
specifications:
a) The monopine should have 3.1 branches per foot for a full density
coverage with limited spacing between the branches - 70 percent
of the branches should be eight-foot or longer.
b) Branch disbursement should be random so that longer branches
and shorter branches are intermingled to give a natural
appearance.
c) Branches should exceed all antennas by a minimum of 12 inches.
d) Branches should start at 15 feet above the ground.
Exhibit A
Resolution No. 2008-05
Page 4 of 8
• e) There should be a minimum space of seven feet between the top of
the antenna and the top of the branches.
f) Branches should have an upward sweep similar to that of actual
Canary Island Pines.
g) Branch foliage color should be an olive green with some brown
"needles" to match an actual Canary Island Pine. A sample should
be submitted for approval prior to fabrication.
h) A sample of bark cladding with a custom color should be submitted
for approval prior to fabrication.
i) All antennas shall be covered with "pine antenna socks" that match
the approved foliage color.
j) All "stand-off mounts" and support pipe mounts shall be concealed
behind antennas and painted a darker shade or green (or black)
with a "flat" paint finish to reduce reflection and visibility of the
mounting.
k) Include the tree specifications (selected manufacturers and models)
• with photo simulations (also a site plan review requirement).
I) Show the location of the GPS antenna on all elevations.
m) Provide a "unistrut" detail for the utility cabinet; an "H-frame" is not
acceptable.
n) Provide a note on the plans stating "install underground utilities
sleeving for two carriers during construction of the structure." The
sleeving should go underground through the caisson; shrouds on
the outside of the pole are not acceptable. All utilities, coaxial and
conduit, for the project should be designed to be underground; this
should eliminate the need for an "ice bridge."
o) All exterior conduit and electrical meters shall be installed and
screened in one metal enclosure painted to match the structure.
p) If a permanent generator is located on-site, it must meet all local
and regional requirements.
6. The permit applicant recognizes that the frequencies used by the cellular
facility located at 2555 South Main Street are extremely close to the
• frequencies used by the City of Santa Ana for Public Safety. This
Resolution No. 2008-05
Page 5 of 8
proximity will require extraordinary "comprehensive advanced planning
and frequency coordination" engineering measures to prevent
interference, especially in the choice of frequencies and radio ancillary
hardware. This is encouraged in the "Best Practices Guide" published by
the Association of Public-Safety Communications Officials-International,
Incorporated (APCO), and as endorsed by the Federal Communications
Commission (FCC). Prior to the issuance of any permits to install the
facility, (permit applicant) shall meet in good faith to coordinate the use of
frequencies and equipment with the Communications Division of the
Orange County Sheriff-Coroner Department to minimize, to the greatest
extent possible, any interference with the Public Safety 800 MHz
Countywide Coordinated Communications System (CCCS). Similar
consideration shall be given to any other existing or proposed wireless
communications facility that may be located on the subject property.
7. At all times, the permit applicant shall not prevent the City of Santa Ana
from having adequate spectrum capacity on the City's 800 MHz radio
frequency.
8. Before activating its facility, the permit applicant will submit to a post-
installation test to confirm that "advanced planning and frequency
coordination" of the facility was successful in not interfering with the City of
• Santa Ana Public Safety radio equipment. This test will be conducted by
the Communications Division of the Orange County Sheriff-Coroner
Department or aDivision-approved contractor at the expense of the
applicant. This post-installation testing process shall be repeated for
every proposed frequency addition and/or change to confirm the intent of
the "frequency planning" process has been met.
9. The permit applicant shall provide a 24-hour phone number to which
interference problems may be reported. This condition will also apply to
all existing facilities in the City of Santa Ana.
10. The permit applicant will provide a "single point of contact" in its
Engineering and Maintenance Departments to insure continuity on all
interference issues. The name, telephone number, fax number and a-mail
address of that person shall be provided to the City's designated
representative upon activation of the facility.
11. The permit applicant shall insure that lessee or other user(s) shall comply
with the terms and conditions of this permit, and shall be responsible for
the failure of any lessee or other users under the control of permit
applicant to comply.
Resolution No. 2008-05
Page 6 of 8
. 12. The permit applicant shall provide a coverage and cell site location map
for each existing and proposed facility in Santa Ana.
13. The proposed wireless communication structure must be engineered to
allow the co-location of other service providers.
14. Locate all equipment and related appurtenances (Appleton plug and
electric meter) on the inside of the equipment enclosure or inside the
building and underground all electrical power from the utility source shown
on the approved site plan.
15. Conditional Use Permit No. 2007-17 expires 10 years from the date of City
Council approval.
16. Metro PCS, the leasee for the wireless facility, agrees to remove any
graffiti on the proposed equipment cabinet and wrought iron perimeter
fence. Graffiti removal must be done within 24 hours from occurrence.
u
Resolution No. 2008-05
Page 7 of 8
PROOF OF SERVICE
• (C.C.P. SECTION 1013(a), 2015.5)
STATE OF CALIFORNIA. COUNTY OF ORANGE
I am employed in the aforesaid county; l am over the age of eighteen and not a
party to the within action; my business address is 20 Civic Center Plaza, Ross Annex
Second Floor, Santa Ana, California 92702.
I served the foregoingg document described as: Resolution No. 2008-05
(Conditional Use Permit No. 2007-17) in this action by p acing a true copy t ereof
enc- o~ec~'in seale enve opes a ressed as follows:
John Koos
Metro PCS
2923 Saturn Street, Suite A
Brea, CA 92821
Caster Santa Ana Storage Partners LP
4607 Mission Forge Place
San Diego, CA 92120
[ ] I caused to be delivered by courier, such envelope by hand to the office of the
• addressee(s).
[X] BY MAIL I am readily familiar with my employer's practice of collection and
processing correspondence for mailing. Under that practice it would be deposited with
U.S. Postal Service on that same day with postage thereon fully prepaid at Santa Ana,
California in the ordinary course of business. I am aware that on motion of the party
served, service is presumed invalid if postal cancellation date or postage meter date is
more than one day after date of deposit for mailing in affidavit.
[ ]The document was transmitted by facsimile transmission and was reported as
complete and without error.
I declare under penalty of perjury under the laws of the State of California that
the foregoing is true and correct.
Executed on February 26, 2008 at Santa Ana, California.
MARTHA RAMIREZ
Resolution No. 2008-05
Page 8 of 8