HomeMy WebLinkAbout2005-26
RESOLUTION NO. 2005-26
KO - 8/24/05
A RESOLUTION OF THE PLANNING
COMMISSION OF THE CITY OF SANTA ANA
APPROVING CONDITIONAL USE PERMIT NO.
2005-21 AS CONDITIONED TO ALLOW ADRIVE-
THROUGH WINDOW AND APPROVING THE
MODIFICATION OF VARIANCE NO. 1995-09 FOR
THE PROPERTY LOCATED AT 3770 WEST
MCFADDEN AVENUE
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF
SANTA ANA AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Applicant has filed Conditional Use Permit No. 2005-21 seeking to allow a
drive-through window service and to modify Variance No. 1995-09 to allow
the further reduction of parking spaces for the property located at 3770
West McFadden Avenue.
B. Conditional Use Permit No. 2005-21 and the modification of Variance No.
1995-09 came before the Planning Commission of the City of Santa Ana
for a public hearing August 8, 2005.
C. Santa Ana Municipal Code Section 41.424.5 permits eating
establishments with drive-through service with a conditional use permit.
Santa Ana Municipal Code Section 41-638 authorizes the City Council to
grant a conditional use permit upon making certain findings.
1. Will the proposed use provide a service or facility which will
contribute to the general well being of the neighborhood or the
community?
The proposed Starbucks drive-through will contribute to the
general well being of the area by providing a new restaurant
with amenities available to both pedestrians and vehicles
traveling along Harbor Boulevard and McFadden Avenue.
2. Will the proposed use under the circumstances of the particular
case be detrimental to the health, safety or general welfare of
persons residing or working in the vicinity?
• The drive-through window service, in conjunction with the
proposed conditions, will not be detrimental to the health,
Resolution No. 2005-26
Page 1 of 5
safety or general welfare of persons working in the area.
• The circulation, design, and layout of the proposed drive-
though lane has been designed to minimize any adverse
impacts that may be generated as a result of the new drive-
. through lane. Conditions have been incorporated into the
project to help minimize any adverse impacts that the project
might generate as the result of its drive-through use. The
project will be reviewed after ninety days, six months, one
year and annually thereafter to ensure that the business is in
compliance with conditions approved for the project.
3. Will the proposed use adversely affect the present economic
stability or future economic development of properties surrounding
the area?
The new restaurant with drive-through service, in conjunction
with upgrades of landscaping and circulation, will provide
both a visual upgrade and new economic activity for this
area of Harbor Boulevard and McFadden Avenue. The
overall economic stability of the area will be strengthened
with additional commercial services in the area.
4. Will the proposed use comply with the regulations and conditions
• specified in Chapter 41 of the Santa Ana Municipal Code for such
use?
The proposed restaurant and drive-through window operation will
be in compliance with all applicable provisions of Chapter 41 of the
Santa Ana Municipal Code and design standards for drive-through
facilities. The drive-through lane will meet the stacking lane
requirement of 160 linear feet, as required by code. Except for the
parking requirements, the proposed project is consistent with the
site development standards established in the North Harbor
Specific Plan. The proposed project is requesting approval of
variance to reduce its required amount of parking. Should the
variance be approved, the project will be consistent with the North
Harbor Specific Plan.
5. Will the proposed use adversely affect the General Plan or any
specific plan of the City?
The drive-through lane for Starbucks is consistent with the
General Plan land use designation of General Commercial
as support commercial uses, including restaurants, are
permitted by right. The project supports General Plan Land
Use Policy Number 2.7, which promotes the rehabilitation of
Resolution No. 2005-26
Page 2 of 5
commercial properties and encourages increased levels of
• capital investment.
D. Santa Ana Municipal Code Section 41-638 authorizes the City Council to
grant a Variance upon making certain findings.
That because of special circumstances applicable to the subject
property, including size, shape, topography, location or
surroundings, that the strict application of the zoning ordinance is
found to deprive the subject property of privileges not otherwise at
variance with the intent and purpose of the provisions of this
Chapter.
The Riverview West Marketplace is a contained site
surrounded by existing commercial development. The
shared parking analysis, prepared by Douglas MacPherson,
Traffic Engineer, has determined that sufficient parking will
be provided for the project during times of peak demand.
The variance will allow the applicant the ability to use the
property in a manner that is consistent with similar
surrounding commercial uses.
2. That the granting of a variance is necessary for the preservation
• and enjoyment of one or more substantial property rights.
The granting of the variance will preserve the owner's ability
to provide new development within an underutilized
shopping center. The proposed tenants will bring additional
revenue and clientele to the existing shopping center and will
not create any encumbrances to property rights.
3. That the granting of a variance will not be materially detrimental to
the public welfare or injurious to surrounding property.
The granting of the variance will not be materially detrimental
to the public welfare or injurious to surrounding property
because the proposed tenant pads are within an existing
shopping center that will not generate additional operational
impacts to the surrounding areas. A mitigated negative
declaration was prepared which incorporated various
mitigation measures to ensure that any impacts are reduced
to below any level of significance.
4. That the granting of a variance will not adversely affect the General
Plan of the City.
The granting of the variance will not adversely affect the
• General Plan of the City since both the drive-though
Resolution No. 2005-26
Page 3 of 5
Starbucks and proposed sit-down restaurant are both in
• conformance with City development standards for
commercial uses and are consistent with the General
Commercial (GC) General Plan land use designation.
E. In accordance with the California Environmental Quality Act, Mitigated
Negative Declaration Environmental Review No. 2004-251 has been
prepared for this project. The Negative Declaration was available for
public review from July 29, 2005 through August 17, 2005. The mitigation
monitoring program is contained as a condition of approval.
Section 2. The Planning Commission of the City of Santa Ana after conducting
the public hearing hereby approves for the property located at 3770 West McFadden
Avenue:
1. Conditional Use Permit No. 2005-21 as conditioned in Exhibit A attached
hereto and incorporated herein as though fully set forth and
2. The modification of Variance No. 1995-09 as conditioned in Exhibit B
attached hereto and incorporated herein as though fully set forth.
These decisions are based upon the evidence submitted at the abovesaid hearing,
which includes but not is not limited to: the Staff report and exhibits attached thereto;
and the public testimony all of which are incorporated herein by this reference.
ADOPTED this 8th day of August, 2005 by the following vote:
AYES: Commissioners: Cribb, De La Torre, Gartner, Lutz, Mondo, Nalle(6)
NOES: Commissioners: None (0)
ABSENT: Commissioners: Leo (1)
ABSTENTIONS: Commissioners: None (0)
Glenn Mo`ndo
Chairperson
Resolution No. 2005-26
Page 4 of 5
APPROVED AS TO FORM:
• Joseph W. Fletcher, City Attorney
By: ~ ~~~.
Kylee O. Otto
Assistant City ttorney
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARTHA RAMIREZ, Clerk of the Planning Commission, do hereby attest to and
certify the attached Resolution No. 2005-26 to be the original resolution adopted by the
Planning Commission of the City of Santa Ana on August 8, 2005.
Date: O a~ ~
Clerk of the Planning Commissio
City of Santa Ana
Resolution No. 2005-26
Page 5 of 5
• Conditions for Approval for Conditional Use Permit No. 2005-21
Conditional Use Permit No. 2005-21 is approved subject to compliance, to the
reasonable satisfaction of the Planning Manager, with applicable sections of the
Santa Ana Municipal Code, the California Administrative Code, the Uniform Fire
Code, the Uniform Building Code, and all other applicable regulations. In addition,
it shall meet the following conditions of approval:
The applicant must comply with each and every condition listed below rip or to
exercising the rights conferred by the conditional use permit.
The applicant must remain in compliance with all conditions listed below throughout
the life of the conditional use permit. Failure to comply with each and every
condition may result in the revocation of the conditional use permit.
A. Planning Division
All proposed site improvements must conform to the Site Plan
Review approval of DP No. 04-101.
2. Any amendment to the conditional use permit must be submitted to
the Planning Division and Police Department for review. At that time,
staff will determine if administrative relief is available or if the
• conditional use permit must be amended.
3. All mitigation measures identified in the Mitigated Negative
Declaration Environmental Review No. 2004-251 are incorporated as
conditions of approval for this project.
4. The berm and proposed landscaping surrounding the drive-through
lane must consist of mature landscaping that will adequately screen
the drive-through lane.
C~
Exhibit A
• Conditions for Modification of Variance No. 1995-09
Modification to Variance No. 1995-09 is approved subject to compliance, to the
reasonable satisfaction of the Planning Manager, with all applicable sections of the
Santa Ana Municipal Code, the California Administrative Code, the Uniform Fire
Code, the Uniform Building Code and all other applicable regulations.
The applicant must comply in full with each and every condition listed below prior
to exercising the rights conferred by this variance.
The applicant must remain in compliance with all conditions listed below
throughout the life of the variance. Failure to comply with each and every
condition may result in the revocation of the variance.
A. Planning Division
TRAFFIC, CIRCULATION AND PARKING
Parking reduction may not exceed
spaces-} eleven percent (157 parking spaces). (Modified by the
Planning Commission on August 8, 2005)
• 2 On-site circulation is to be designed to accommodate WB-50 semi-
trucks which will be making regular deliveries to this site.
3. Prepare revised Covenants, Conditions and Restrictions (CC&Rs
and agreements for parking access, property maintenance,
sewage, public utilities and landscaping, reciprocal access
easements and agreements, emergency vehicle access, drainage,
fire hydrants and sprinkler systems to include the proposed
buildings. (Added by the Planning Commission on August 8,
2005)
LANDSCAPING
4. Twenty-six 36 inch box trees are to be located at project entry points
located along and near public rights-of-way;
5. All parking lot trees are to be a minimum of 24 inch box (in lieu of
15 gallon required by code);
fi No less than 40 four foot by four foot tree wells are to be located
throughout the parking areas;
•
Exhibit B
Page 1 of 7
7. A palm tree theme (minimum 24 inch box) along pedestrian
• walkways and along the main drive aisle in front of Wal*mart
and Buildings B through G is to be provided.
8. No less than 70 landscape planters with minimum dimensions of 8
1/2' x 18' are to be provided throughout the parking areas.
9. Submit a revised landscape plan to indicate the location and
replacement of all dead or underdeveloped plants, trees, or
groundcover within the entire shopping center. (Added by the
Planning Commission on August 8, 2005)
10. A landscape treatment shall be provided along the southerly wall
abutting single family dwellings and submitted to the city for review
and approval. (Added by the Planning Commission on August
8, 2005)
PARKING AREAS
11. Cart corrals are to be provided and designed architecturally
similar in materials, color and design to the buildings on the site.
(Pipe rail equipment is not acxeptable.)
• 12. All parking areas along the property perimeter with vehicles
facing Harbor Boulevard and McFadden Avenue are to have the
parking space decreased to 16 feet and the 15 foot landscape setback
increased to 17 feet. This includes the following parking areas:
south of Building J, east of Building L, between Buildings K and L,
north of Wal*mart.
SITE DESIGN
13. No doors or exits are permitted on the street side of Buildings J, K
and L if there is a 15 foot minimum street setback. Should exits be
necessary, each building must be set back an additional five feet allowing
for a sidewalk to run parallel to each building for access.
14. There are to be no exposed downspouts, scupper drains, mechanical
equipment, electrical equipment, plumbing or conduit on the outside of
the building.
SIGNAGE
15. The project entry trellis located on the corner is to be maintained free of
any advertising or banners. Only the name of the center may be placed
• on this structure.
Exhibit B
Page 2 of 7
• 16. Submit a revised sign program for the shopping center in
compliance with Chapter 41 of the Santa Ana Municipal Code.
(Added by the Planning Commission on August 8, 2005)
MISCELLANEOUS ITEMS
17. A lot line adjustment shall be recorded for the removal of existing
lot lines located below any proposed buildings. (Added by the
Planning Commission on August 8, 2005)
18. Recyclable materials storage is to be provided on-site at a location to
be approved by staff prior to permit isssuanoe.
19. An ATM and postal station are to be provided in the project development.
These may be integrated into any part of any building. The location of
these facilities is to be resolved with staff prior to permit issuance.
20. No deliveries may occur for tenants other than Wal*mart before 7:00
a.m. or after 9:00 p.m. Monday through Friday; nor before 9:00 a.m. or
after 6:00 p.m. on Saturdays, Sundays and federal holidays.
Wal*mart truck deliveries shall be targeted to avoid these restricted delivery
hours. Trucks arriving within these restricted times must take all measures
. necessary to minimize noise to adjacent residences. Under no
circumstances shall Wal*mart trucks be parked with motors or
refrigeration units in operation along the eastern edge of the Wal*mart
building between the restricted hours indicated above.
Six months following the opening of the Wal*mart store the Planning
Commission shall review the project and may at such time amend this
condition to completely prohibit deliveries to Wal*mart during the same
hours as apply to other businesses on the site, if the Planning
Commission determines that such deliveries cause an unreasonable
disturbance to nearby residences. Any such amendment of this
condition may be appealed to the City Council.
21. The trash compactor located at the southwest comer at the southeast
corner of Wal*mart (south side) shall not be operated between the
hours of 7:00 a.m. and 9:00 p.m. every day.
22 The project shall comply with all mitigation measures identified in
the Mitigated Negative Declaration and Mitigation Monitoring Program,
Environmental Review No. 2004-251.
23. Project shall comply with conditions and requirements of site plan
• review DP No. 95-55R and DP No. 04-101.
Exhibit B
Page 3 of 7
• LOADING ZONES
24. The loading dodos of Buildings A-E are to be fully enclosed so that there is
no outdoor unloading activity and the trucks back up to a sealed lock
area.
25. A maximum 12 foot high block wall to screen for noise and visual impacts
must be constructed at the loading dodos in order to protect the residential
uses to the east and south of this property from noise and nuisance
activity.
Building G, H, and L Architecture
26. Project design is approved for Buildings G, H, and L in concept and
are to be refined with staff prior to submittal into plan check. Should no
resolution be achieved, these are to be brought back to Planning
Commission for final approval.
B. Public Works Agency
Prior to site plan approval, complete the following:
• 1. Revise the site plan to note trash compactor locations proposed for
Wal'~mart are not final and shall be revised for the approval of Public
Works Agency and Planning and Building Agency prior to approval of the
Wal*mart building permit
2. Revise the site plan to note the raised Harbor Boulevard median and
pocket and island shall be modified.
3 Revise the site plan to note the traffic signal of Harbor and McFadden will
be modified and relocated.
4 Revise the site plan to note new street trees shall be planted on
Harbor Boulevard and McFadden Avenue.
5. Revise the site plan to note all utilities shall be relocated to be no
closer than 10 feet to any driveway.
Prior to issuance of a building permit, complete the following:
1. Pay cash payment of $5,000.00 towards future traffic signal installation at
McFadden Avenue and Jackson Street.
Exhibit B
Page 4 of 7
Prior to release of utilities, complete the following:
1. Dedicate a 25' X 25' comer cut-0fF at the comer of Harbor Boulevard and
McFadden Avenue.
2 Dedicate a traffic signal easement at the McFadden Avenue main
driveway entrance, as per approved traffic signal plans.
3 Dedicate two bus tum-outs area on McFadden Avenue, as per approved
improvement plan.
4 Dedicate wheelchair ramps access at the signalized drive approach on
McFadden Avenue, as per approved improvement plan.
5 The dedication deeds and easements must be prepared by the
developer's engineer or licensed Land Surveyor and submitted to the
Public Works Agency for checking.
6 Harbor Boulevard
~ Modify the existing median island and pocket for south bound left
tum into the project site per improvement plan.
~ Construct right tum lane including curb, gutter, pavement and 10'
wide sidewalk as per approved improvement plan.
c) Construct a 35' radius curb return at the southeast comer of
Harbor Boulevard and McFadden Avenue, including sidewalk,
and wheelchair ramp per approved improvement plan.
d) Relocate and modify traffic signal at intersection of McFadden
Avenue and Harbor Boulevard as per approved traffic signal plan.
~ Relocate utility boxes, poles and meters for new right hand turn
lane, new 35' curb radius and new drive approaches.
~ Pave Harbor Boulevard to good edge of pavement, per
approved improvement plan.
~ Construct northerly drive approach per City Standard #1112,
Case 2, (W=35', A=45', X=3') and per approved improvement
plan.
h) Construct southerly drive approach per City Standard #1112,
Case 2 (W=32', A=42', X=3') and per approved improvement plan.
Exhibit B
Page 5 of 7
• i) Relocate pull box, Southern California Edison vault, all other
utility boxes, utility poles and utility meters within 10' from the
proposed drive approaches.
j) Install pavement striping and signage as per approved
channelization plan.
k) Install "NO STOPPING ANYTIME" zone.
I) Relocate power poles as per approved improvement plan.
m) Construct and relocate ornamental street lights as per
approved improvement plan.
n) Close existing drive approaches with curb, gutter and full
width sidewalk.
o) Construct street tree wells and plant minimum 24 inch box
trees per City Standard #1124 at locations in accordance with
approved improvement plans.
7. McFadden Avenue
• ~ Construct signalized drive approach (W=56') and 25' curb radii
with two wheelchair ramps per approved improvement plan.
b) Construct drive approach near garden center per City Standard
#1112, Case 2 (Vw32', A=42', X=3') and per approved
improvement plan.
c) Construct most easterly drive approach per City Standard
#1112, Case 2 (W=40', A=50', X=3') and per approved
improvement plan.
d) Remove existing sidewalk and construct new full width 10'
wide sidewalk per approved improvement plan.
e) Remove existing curb and gutter and construct new curb and
gutter per approved improvement plan.
t) Remove existing paving and construct new paving to street
centerline per approved improvement plan.
g) Construct new landscaped medians per approved
improvement plan.
Exhibit B
Page 6 of 7
h) Install new traffic signal at the main driveway
entrance per approved traffic signal plans.
i) Install pavement striping and signage as per approved
channelization plan.
j) Install school crossing signs per approved improvement plan.
k) Install "NO STOPPING ANYTIME" zone.
1) Close existing driveways with sidewalk curb and
gutter.
m) Construct two bus turnouts and 12' X 80' P.C.C. bus
pad, as per approved improvement plan. (See Exhibit "A").
n) Construct street tree wells and plant all new minimum 24
inch box trees per City Standard #1124 at locations in
accordance with approved improvement plans.
r~
~J
o) Furnish ornamental street lighting
service as directed by the City Engineer.
C. Police Det~artrnent
with underground
1. The applicant shall provide/employ two uniformed state licensed
security officer for the parking area. The officer shall be on duty
anytime there are employees or patrons onsite. The applicant shall
provide the officers with a form of transportation that will enable them
to access all areas of the site quickly. The security officers
employed by the applicant shall first be approved by the Chief of Police,
or his designate, before Cert~cate of Occupancy is approved.
2. The Conditional Use Permit shall be reviewed at six months, at one year
and then annually thereafter by the Police Department for any
modification to the conditions of approval.
Exhibit B
Page 7 of 7