Loading...
HomeMy WebLinkAbout23A - CHESTNUT AVENUE REHABILITATIONREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JANUARY 18, 2011 CLERK OF COUNCIL USE ONLY: TITLE: APPROVED CONTRACT AWARD FOR CHESTNUT ? As Recommended AVENUE REHABILITATION BETWEEN ? As Amended STANDARD AVENUE AND ELK LANE El Ordinance on 1S` Reading ? Ordinance on 2°d Reading (PROJECT NO. 116734) ? Implementing Resolution ? Set Public Hearing For_ CITY MANAGER CONTINUED TO FILE NUMBER RECOMMENDED ACTION Award a contract to Elite Bobcat Service, Inc., the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $713,763 for construction of Chestnut Avenue from Standard Avenue to Elk Lane. 2. Approve a funding analysis with a total estimated construction cost of $856,500. DISCUSSION Chestnut Avenue from Standard Avenue to Elk Lane has been identified as a high priority on the City's Pavement Management System (Exhibit 1). The pavement is deteriorating due to weather, age and heavy usage. Some of the adjacent curbs, gutters, sidewalks and driveway approaches are also in various states of disrepair and require replacement. This project provides for construction of new street pavement and replacement of damaged concrete curbs, gutters, sidewalks, driveway approaches, and curb ramps. Once completed, these improvements will enhance the ride quality, surface drainage and visual appearance of the streets. The Notice Inviting Bids was advertised on December 3 and 6, 2010, and bids were opened on December 22, 2010. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana contractors receiving notices: 16 Contractors requesting bidding documents: 13 Bids received: 6 Bids received from Santa Ana contractors: 1 23A-1 Contract Award For Chestnut Avenue Rehabilitation January 18, 2011 Page 2 While the City made outreach efforts to Santa Ana contractors regarding the Notice Inviting Bids, only one of the 16 Santa Ana contractors submitted a bid as a prime contractor: Hardy and Harper. The other 15 Santa Ana contractors did not submit a bid either because they are either not capable of performing this type of work, unable to obtain insurance because the project is too large, or they work as a subcontractor to certain prime contractors. The bids received are as follows: NAME OF RESPONSIVE BIDDER CITY BID AMOUNT 1. Elite Bobcat Service, Inc. Corona $713,763.00 2. Sully-Miller Contracting Company Brea $721,327.50 3. Hardy & Harper Santa Ana $722,000.00 4. R.J. Noble Company Orange $728,537.84 5. All American Asphalt Corona $747,747.00 6. Excel Paving Company Long Beach $788,983.00 A total of six bids were received and all were responsive. The lowest bid was submitted by Elite Bobcat Service for $713,763, which is below the Engineer's estimate of $740,000. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the proposed project is exempt from future review. Categorical Exemption Environmental Review No. 2010-133 will be filed for the project. FISCAL IMPACT The funding analysis shows a total estimated construction cost of $856,500 for the project (Exhibit 2). Funds are available in the Proposition 42 Fund (accounting unit 02817660-66220). APPROVED AS TO FUNDS AND ACCOUNTS: Raul Godinez I Francisco Gutierrez Executive Direc r Executive Director Public Works Agency Finance & Management Services Agency RG/ET Exhibit 1: Project Location Map 2: Funding Analysis 23A-2 w 0 JQ m Q Q 1Z N s N 0 w A? ® PROJECT AREA SANTA ANA A A MM A ` AGENDA DATE: puke CITY COUNCIL Y Y / LIANU,VtY ,9.2U„ ae vs Amcr EXHIBIT 1 TITLE= CHESTNUT AVENUE REHABILITATION BETWEEN STANDARD AVE. AND ELK N. (PROJECT NO. 116734) W > W Q J K Z Q O J W W 1A a 4 CHESINUI AVtNUt ?Q z a N 23A-4 FUNDING ANALYSIS PROJECT NO. 116734 CHESTNUT AVENUE REHABILITATION FROM STANDARD AVENUE TO ELK LANE Construction Contract $713,763 Contract Administration $18,874 Inspection and Testing $35,830 Survey Staking $16,657 Contingencies $71,376 TOTAL ESTIMATED CONSTRUCTION COSTS 856 500 Exhibit 2 23A-5 23A-6