HomeMy WebLinkAboutHANDOUT_55A_FINAL SAN LORENZO LIFT STATION_BLACK AND WHITEn Lorenzo Sewer
Station Project
February 21, 2012
TlO
Existing San Lorenzo Sewer Lift Station
Built in 1960's, retrofitted in the 1980's
Mechanical and electrical equipment are old, outdated and
difficult to maintain in proper operating condition
Location is hard to access beneath Bristol Street
Electrical panels are outdoors — set on the back of sidewalk
Access is a manhole that floods during rain storms
Existing computer software (operating system) is obsolete and
support is not readily available
Routine Maintenance requires the closure of a travel lane and
disruption of traffic on Bristol Street
Existing Lift Station
Access is Difficult
Working Conditions are Cramped
Causes Traffic Congestion- During Maintenance
Proposed Location
San Lorenzo Lift Station Tributary Area
EIR Process
� Environmental Impact Report (EIR) was prepared for the San
Lorenzo Sewer Lift Station in 2010
J EIR was circulated for Public Review and Comment from July
14th through September 10t ", 2010 (58 days)
EIR was originally scheduled for the City Council meeting of
February 7th, 2011; however, the item was pulled to address a
number of last minute comments received the afternoon of the
City Council meeting
The City chose to expand the EIR's analysis of alternatives for
the proposed project and incorporate other minor revisions into
the document
A Draft EIR was prepared and re- circulated for public review
from September 14th through October 31St, 2011
The re- circulated EIR evaluated 21 alternatives to the proposed
project, including 19 alternative site locations
Alternative Site Locations
Findings
None of the alternatives evaluated is environmentally superior
to the proposed project
Many of these alternatives would actually have greater
environmental impacts than the proposed project
The proposed new location for the lift station is an unused sliver
of land at the West end of San Lorenzo Avenue
�ronospd Locatic
i y
I
4,
A*, z
NO
�w
Plan Foot Print
Acquisition
To Construct the new lift station, the City will need to acquire
approximately 292 Square Feet of unused land currently owned
by the Santa Ana California Lodge
A portion of this acquisition includes an existing sewer
easement that was dedicated to the City in the 1960s when that
portion of San Lorenzo Avenue was vacated
There is an existing 12" sewer main currently flowing through
said easement, and this sewer main is operating above capacity
Existing Sewer Easement
ur)
'I
1
46
ti
zvwl
ASEKMENT
TRAeT NO -W?o
?0A1?4f*-f MAP
14
k
'I
1
46
ti
zvwl
ASEKMENT
TRAeT NO -W?o
?0A1?4f*-f MAP
Acquisition Area
New San Lorenzo Sewer Lift Station
Construction of New Lift Station will take 10 -12 months to
complete
Will significantly reduce the chances of a major sewage spill
New facility will include masonry block building to house
electrical equipment and control panels
Building will be approximately 10'x30' and 17' high, and will
include a below ground dry pit to house the pumps, motors and
associated equipment
New facility will include landscape and hardscape improvements
to improve the aesthetics of the area
Will provide a safer and more accessible working area for City
crews
New location will alleviate traffic congestion on Bristol Street for
routine maintenance
Before
CITY OF SANTA ANA
San Lorenzo Sewer Lift Station
After
CITY OF SANTA ANA
San Lorenzo Sewer Lift Station