Loading...
HomeMy WebLinkAboutWSA - WORKSTUDY_FIXED GUIDEWAY UPDATESANTA ANA –GARDEN GROVE FIXED GUIDEWAY UPDATE JUNE 18, 2012 Fixed Guideway Project Background Rail Corridor Washington Ave. Broadway Flower St. Grade Main St. Separation SARTC Civic Center Dr. Master Plan Station District Grand Ave. Santa Ana Blvd. Fourth St. Transit Zoning Code First St. TRANSIT VISION ELEMENTS 1.Transit Zoning Code –Supports long-term development of successful transit program Adopted June 2010 - 2.Station District –Provides for transit-oriented development (TOD) Under construction - 3.SARTC Master Plan –Received planning grant to develop mixed use “Transit Village” Completed June 2011 - 4.Santa Ana Blvd. Grade Separation –Facilitates future expansion of Fixed Guideway east from SARTC • Conducted over 40 community meetings and extensive outreach to coordinate various projects Fixed Guideway Project Area •• S.A. has a population density of 1.5 times that of L.A.City, County, State & Federal offices and courthouses •• S.A. is the 4th most densely populated City in the U.S.Served by 18 OCTA bus routes •• G.G. is the 3rd most densely populated City in Orange County17.8% of households without a car •• 17,380 residents per square mile13.8% of residents use public transit •• SARTC average weekday visitor count is 2,995Available corridor for Transit (PE ROW) • 48,500 jobs per square mile Fixed Guideway Streetcar Alternatives Santa Ana and Garden Grove City Councils scheduled to select a Locally Preferred Alternative in Fall 2012 INITIAL OPERATING SEGMENT Streetcar 1 (Green): SARTC / Santa Ana Blvd / PE ROW / 4 th St • Streetcar 2 (Red): SARTC / Civic Center Dr / PE ROW / 5 th St • Fixed Guideway Initial Operating Segment (IOS) Alternatives IOS 1 IOS 2 IOS 1: SARTC / Santa Ana Blvd / Raitt/ 4 th St • IOS 2: SARTC / Civic Center Dr / Raitt/ 5 th St • Regional Rail/Streetcar Connectivity Potential FutureFixed Guideway Extension Potential future extensionof • the Fixed Guideway through Garden Grove with connection to Anaheim’s ARC Promotes economic • development along Harbor Blvd. in Garden Grove Connects Anaheimand • Garden Grove to Civic Center and Downtown Santa Ana Fixed Guideway Comparative Schedules Federal Funding Schedule * Pending Funding Availability Local Funding Schedule ** 2 ½ Years ** Includes preliminary engineering, final design, ROW and Vehicle Acquisition Fixed Guideway Pending Key Decisions •Funding strategy (capital and O&M) •Appropriate lead agency for Project Development & Construction Phases •System Owner/Operator