HomeMy WebLinkAboutALL AMERICAN ASPHALT (9)Recording Requested By,
And When Recorded Mail To:
Clerk of the Council, City of Santa Ana
20 Civic Center Plaza, P.O. Box 1988
Santa Ana CA 92702
101�1 -`' F =ii 12, 9-2
Recorded in Official Records, Orange County
Huh Nguyen, Clerk- Recorder
�7111IIIIIIII���IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII !I���IIII NO FEE
*$ R 0 0 0 6 5 1 9 1 1 6$ A
2014000067132 2:39 pm 02/20/14
63 416 N12 F13 1
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a
municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana,
California, 92701, is the owner of the property hereinafter described, that said owner has caused
construction of Broadway Rehabilitation; Anahurst Pl. to First St. & Edinger Ave. to First St.
o under contract entered into on July 16, 2012 with All American Asphalt, on which contract
w Fidelity and Deposit Company of Maryland is surety. The property on which such work
cimprovement was placed is in the City of Santa Ana, County of Orange, State of California, and
c z described as Project Nos. 11 -6736 and 11 -6746 located at Broadway. The work improvement on
aw
said property was accepted as completed on December 5, 2013.
�w
0
p CITY OF SAI�l A, A MUNICIPAL CORPORATION
wo by ✓in
z Dated: 2 y 3 � Acting City Engineer
A TITLE
ai Fy
VERIFICATION
I, the undersigned, say: I am the Acting City ngineer of
the City of Santa Ana, California; I executed the foregoing Notice of Completion acting on
behalf of the owner of the property therein described; I make this verification on behalf of said
corporation by authorization of the City Council of the City of Santa Ana•, I have read said notice
and know the contents thereof; and I declare under penalty of perjury that the facts therein stated
are true.
Executed on at Santa Ana, C ' orn a
�1
(Signature of individual swearing that the
contents of Notice of Completion are true.)
THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN (10) DAYS AFTER COMPLETION
r 2;?
A
0
i
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
JULY 16, 2012
TITLE:
CONTRACT AWARD FOR BROADWAY
REHABILITATION FROM ANAHURST
PLACE TO FIRST STREET WITH ALL
AMERICAN ASPHALT (PROJECT NOS.
116736 AND 116746)
� �`-r --Q
CITY ANA ER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED N- � � ��-
i
� As Recommended d3
� As Amended
� Ordinance on 1�` Reading
� Ordinance on 2ntl Reading
0 Implementing Resolution
0 Set Public Hearing For
CONTINUED TO
FILE NUMBER
Award a contract to All American Asphalt, Inc., the lowest responsible bidder, in accordance
with unit bid prices in the estimated amount of $2,443,348 for construction of the Broadway
Rehabilitation from Anahurst Place to First Street.
2. Approve a Funding Analysis with a total estimated construction cost of $3,054,000.
DISCUSSION
The City's Pavement Management System has identified Broadway from Anahurst Place to First
Street (Exhibit 1) as a high priority for rehabilitation. The pavement has deteriorated due to
weather, age, heavy usage, and poor drainage_ Portions of the adjacent curb and gutter,
driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require
replacement. Improvements include reconstruction of the pavement, replacement of damaged
concrete curb and gutter, driveway approaches, sidewalk, and the construction of new cross
gutter. Once completed, these improvements will extend the life of the pavement and enhance
the ride quality, surface drainage, and appearance of the street.
The Notice Inviting Bids was advertised on June 4 and 5, 2012, and bids were opened on June
20, 2012. A summary of the bid invitations mailed, the bids received, and the bid results are as
follows:
Santa Ana Contractors receiving notices: 13
Contractors requesting bidding documents: 18
Bids received: 4
Bids received from Santa Ana Contractors: 1
Contract Award for Broadway Rehabilitation
from Anahurst Place to First Street
July 16, 2012
Page 2
NAME OF RESPONSIVE BIDDER
1 . All American Asphalt, Inc.
2. R.J. Noble Company, Inc.
3. Hardy &Harper, Inc.
4. Excel Paving Company, Inc.
CITY BID AMOUNT
Corona
$2,443,348.00
Orange
$2,574,992.75
Santa Ana
$2,891 ,069.00
Long Beach
$2,929,000.00
The Engineer's estimate was $2,531 ,918. A total of four bids were received and all were
responsive. The lowest bid was submitted by All American Asphalt, Inc. for $2,443,348.
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the proposed project is exempt from
future review. Categorical Exemption Environmental Review No. 2012 -51 will be filed for the
project.
FISCAL IMPACT
The Funding Analysis shows a total estimated construction cost of $3,054,000 for the project
(Exhibit 2). Funds are available in the Proposition 1 B Fund (accounting unit 03017660 - 66220),
the Federal Clean Water Protection Enterprise Fund (accounting unit 05717640 - 66220) and
Street Lights Fund (accounting unit 0117630 - 66220).
Y' i- "-1
Raul Godinez IK)
Executive Direc�or
Public Works Agency
RG /ET
Exhibits: 1 . Project Location Map
2. Funding Analysis
APPROVED AS TO FUNDS AND ACCOUNTS:
n�S�� � �d , � � 11� e rvi
Francisco Gutierrez
Executive Director
Finance &Management Services Agency
CAMILE ST
BISHOP ST
RICHLAN� ST
RUSSELL AVE
WILSHIRE AVE
BORCHAR� AVE
E�INGER AVE
POMONA ST
ST GERTRU�E PL
1ST ST
WALNUT ST
PINE ST
CHESTNUT AVE
HIGHLAND ST
CUBBON ST
MC FA��EN AVE
Q
Q
O
fz
m
COMMERCIAL ST
ST ANDREW PL
ANAHURST PL
9/.�OgO�q Y PL
��
m
N
EXHIBIT 1 "'�' °R..N°
arc° @ °o
O
2
saNTA ANA CONTRACT AWARD FOR BROADWAY
CITY COUNCIL TITLE= REHABILITATION FROM ANAHURST
l P W � , AGENDA GATE ALL AMERICAN ASPHALT WITH
� JULY 16, 2012 (PROJECT NOS. 116736 AND 116746)
PIIEY IC uOflKS eGENCY I
FUNDING ANALYSIS
PROJECT NOS. 116736 AND 116746
BROADWAY REHABILITATION FROM ANAHURST PLACE TO FIRST STREET
Construction Contract
$2,443,348
Contract Administration
$134,400
Inspection and Testing
$158,800
Survey Staking
$73,118
Contingencies
$244, 334
TOTAL ESTIMATED CONSTRUCTION COSTS 3.054.000
Exhibit 2
4 y q Ip
uM r e,
THE REGISTER
625 N GRAND AVE, SANTA ANA, CA 92701
Telephone (714) 796 -7000 / Fax (714) 796 -6059
PROOF OF PUBLICATION
(2015,5 C.C.P.)
State of California )
County of ORANGE )SS
Notice Type: BID - NOTICE INVITING BIDS
Ad Description:
BROADWAY REHABILITATION: Anahurst to 1st St
I am a citizen of the United States and a resident of the State of California; I am
over the age of eighteen years, and not a party to or interested in the above
entitled matter. I am the principal clerk of the printer and publisher of the THE
REGISTER, a newspaper published in the English language in the city of
SANTA ANA, county of ORANGE, and adjudged a newspaper of general
circulation as defined by the laws of the State of California by the Superior
Court of the County of ORANGE, State of California, under date 11/19/1905,
Case No. A21046. That the notice, of which the annexed is a printed copy, has
been published in each regular and entire issue of said newspaper and not in
any supplement thereof on the following dates, to -wit:
06104/2012, 06/05/2012
Executed on: 06/05/2012
At SANTA ANA, California
I certify (or declare) under penalty of perjury that the foregoing is true and
correct.
Signature
CNS /t: 2324972
NOTICE
NOTICE I , HEREBY I N IVEN
that the City of Santa Ana,
California will receive at City
Half -Ross Annex, (M -22), 20
Civic Center Plaza, Santa
Ana, California 92701, the
Public Works Aaenay Third
Of Re.,c_e tl nlst on or
Of ore ah flour oil. )0 p.m.
on June 20th, 2012 sealed
bids and/or {Irrroposals for
PROJECT' N0. 11- 6736:
BROADWAY FROM
ANAHURST PL. TO
EDINGER AVE.
PROJECT NO 11.6746:
BROADWAY FROM
EDINGER
AVE. TO FIRST ST.
Notice is hereby given
BIDDERS that in accordance
with the provisions of the
California Labor Code„ not
less than the prevailing rate
of per diem wages for each
craft or typo of worker and
mechanic needed to execute
the contract in the locality in
which the work is to be
performed, and riot less than
the general prevailing rate of
per diem wages for holiday
and overtime work as
determined by the Director of
Industrial Relations of the
State of California shall be
paid to all workers employed.
Each bid $nett be
accompanied by cash, a
cashiers or certified check
payable to the City of Santa
Ana, or bed bond issued by a
corporate surety, for an
amount not Ness than tar)
percent (I D%) of the
aggregate of the bid, as a
guarantee that the BIDDER
will enter Into the proposed
contract if the same is
awarded to him. The
signature of the BIDDER
on the bid bond MUST be
notarized.
The City Council reserves
the right to reject any or all
bids.
The successful BIDDER
must possess or obtain a
valid California Class A
Contractors license prior to
the scheduled award date of
this contract.
Subshtuhon of securities for
any monies wnnheld by the
City of Santa Ana to ensure
performance is allowed in
accordance with the Public
Contract Code.
Complete g1g tt I sets of
the Plans and Spedfications
will be furnished upon
application at the Public
Works Agency counter, First
Floor, 20 Civic Center Plaza,
Ross Annex, Santa Ana,
Cal forma 92701—Plans and
Specifications are available
In portable document
format (PDF) on a compact
disk (CD) only. There s no
This space for filing stamp only
charge for the Plans and
Specifications on Co. PWA
Counter Business Hours are
9:00am to 4:00pm, Monday
thru Thursday. Call the PWA
Projects Information Line
at 714 -647 -5680 for
availability of CDs.
To request a CD by mail, the
Contractor must submit an
email request to
sarmour ®santa- ana.org and
provide the following
information: Company name,
mailing address, phone
number, FedEx account, and
email Subject heading:
CD Request for <project
no.> < project name>.
Checks are no longer
accepted. Addenda will be
issued by email to those who
received CDs directly from
the Public Works Agency.
DO NOT CALL
PURCHASING DIVISION
REGARDING PUBLIC
WORKS AGENCY
PROJECTS.
6/4,6/5/12
CNS- 2324972lf
THE REGISTER
RRIMMEHEENIN
0 0 0 0 0 2 6 8 3 5 0 0
� o
1
,j
rn
a
V�
N
N
N OD
F-�
N N
�
mV
d.
d Q
w
CL O
Ir
�
O
CD
1
,j
d.
CD
1
f
CITY OF SANTA ANA
PROJECT NO. 1 1 -6736: BROADWAY FROM ANAHURST PL. TO EDINGER AVE.
PROJECT NO. 1 1 -6746: BROADWAY FROM EDINGER AVE. TO FIRST ST.
PROPOSAL 8c CONTRACT AGREEMENT
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: I \ I 1 ��(l ��1 I 1���� -�
REQUIREMENT:
The undersigned declares that he /she has carefully examined the location of the proposed work, that
he /she has examined the Plans and Specifications and read the accompanying instruction to BIDDERS,
and hereby proposes to furnish all material and do all the work required to complete the said work in
accordance with said plans (if any), specifications and special provisions, for the unit prices) or lump
sums) set forth in the following schedule:
Item # Bid Item Unit Quantity Unit Price Amount
1 .
Unclassified Excavation *
CY
4,500
$ /�
$ � 0 7 � Sl7 —
2.
AC Pavement *
TN
12,550
$ ? l �
$ 8% / o�jo —
3.
Pulverize Material and Cement -Treat
SF
239,700
$ . 77
$ � �`/ S G�
Base (CTB) � *
4.
Remove Excess Pulverized Material *
CY
2,380
$ 23. L/o
$ 55 69� —
5.
Pavement Fabric
SY
43,100
$ /. Sv
$ 6y �So —
6.
Cold Milling *
SF
] 4l ,000
$ ,'3 �
$ 5 2 / 70 —
7.
Remove PCC Pavement *
CY
2,400
$ 3Ci—
$ �d6 L /6o —
8.
PCC Curb and Gutter
LF
15,730
$ / `/ —
$ 2Zo 22�j—
9.
PCC Sidewalk (4 ")
SF
12,750
$ 2. io
$ 36 9 �s-
1 O.
PCC Cross Gutter
SF
8,700
$ cS � 2 �
$ s 3 9 yu —
1 1 .
PCC Driveway Approach (T = 6 ")
SF
26,400
$ � . % U
$ / D 2 i �o —
12.
PCC Driveway Approach (T — 8 ")
SF
700
$ 1 2 —
$ � `> U u —
4.Sv
13.
PCC Curb Ramp
SF
14,700
$ '� --{LQ
$ 66 /�d
TO BE INCLUDED IN BID PACKAGE
BP 1 of 15
CITY OF SANTA ANA
PROJECT NO. 1 1 -6736 8r 11 -6746
PROPOSAL 8i CONTRACT AGREEMENT
BID PROPOSAL, continued
Item # Bid Item
14. PCC Pavement (5" thick)
15. PCC Grinding
l6. Adjust Pull Box to Finished Grade
17. Furnish and Install Traffic Signal Pull
Box No. 6 and Adjust to Grade
] 8. Parkway Culvert Type "A" �
19. Adjust Misc. Utility Frame and Cover
to Grade
20. Adjust Manhole to Finished Grade
21. Furnish and Install Water Valve Box
Frame and Cover
22. Furnish and Install Survey Monument
23. Reconstruct PCC Local Depression
(include dowels)
24. Root Shave
25. Adjust Pedestrian Push Button �
26. Furnish and Install Pedestrian Push
Button Type B
27. Traffic 8i Bicycle Loop Detector -j-
28. Signing and Striping
29. Temporary Construction Sign
30. SWPPP Risk Level 2 fi
31. Parkway Culvert Type "B" �
Unit
Quantity
Unit Price
Amount
SF
4,200
$ L) . 3v
$
/yl 06 0 -
LF
60
$ ,i 2 -
$
3 � Zo -
EA
16
$ 510 -
$
� J6o-
EA
4
$ 510 -
$
�oYp -'
EA
4
$ S oou-
$
20 000 -
EA
4
$ 770-
$
368-
EA
34
$ X70 —
$
2 6 1 Sv —
EA
64
$ 5) O —
$
'3 2 6 yw
EA
16
$ 7 7U—
$
1 2 32�-
EA
1
$ $qoo-
$
�;�uo-
EA
35
$ % 00 `-
$
7(906 -
EA
2
$ 21�/ -
$
� -/Zff-
EA
9
$ 2 55-
$
2 29 5-
LS
]
$ /UOoy-
$
/Oc�oo-
EA
6
$ -7 6S-
$
`-) 59 S-
LS
1
$ 255 -
$
2 SSU-
EA
4
$ S000-
$
Z000�—
BP2ofl5
TO BE INCLUDED IN BID PACKAGE
CITY OF SANTA ANA
PROJECT NO. 11 -6736 &� 11 -6746
PROPOSAL 8c CONTRACT AGREEMENT
BID PROPOSAL, continued
Item # Bid Item Unit
Unit Price Amount
32. Pervious Concrete Gutter Plate(W =2') LF 815 $ 20 - bo $ %6 7S9 `
with Dowels @ 36" O.C.*
33. Pervious Concrete Cross Gutter SF 2,258 $ 1 3— $ 2$ 35y —
(T =8 ")
34. Root Shave at Pervious Concrete EA 3 $ Zou— $ �po-
Improvement *
35. Street Light Electrical System j- LS 1 $ 68000— $ G�oo�-
TOTAL BID -------------------------------------------------- - - - - -- $ 2 , y `'/ `3 3 `'/ $ . Do
� The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to
the "25 %" limit as stated in Section 3 -2 of the Standard Specifications. The actual amount for this
item will be dictated by the actual quantity used, and the Agency reserves the right to increase or
decrease the quantity of this item accordingly.
j' This bid item is considered a Specialty Item per Section 2 -3.2 of the Standard Specifications.
PROJECT NO. 1 1 -6736: BROADWAY FROM BIDDER
ANAHURST PL. TO EDINGER AVE.
PROJECT NO. 11 -6746: BROADWAY FROM Firm �� � �(Y�P�V� C�-t�\ ��JI1g�L -�
EDINGER AVE. TO FIRST ST.
`fl0 \�jOX ���9
Address CO �� (1CL C�{ ��$ %Fi-�- '��--`�
Phone Cash �3(� —�/9��
Fax �gSI�J�3cl - �%Ce -1 �
Email
b`C��- cE.���0.kkc��.r� cAr� L
�q./�"l a
BIDDER �5� �( \Q�c
Signature
TO BE INCLUDED BID PACKAGE
BP3of15
CITY OF SANTA ANA
PROJECT NO. 11 -6736 8t 11 -6746
PROPOSAL AND CONTRACT AGREEMENT
LIST OF SUB - CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for
all subcontract work exceeding the following amount:
- Streets, highways including bridge projects; ' /�% of the bid or $10,000,
whichever is greater
- Buildings, parks, or other projects: ' /s% of the bid
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
NAME `j R �
LOCATION p�,�,„ �.: +,�,,
PHONE �1H G''�o_y5o
TYPE OF WORK $ 'i8 oao-
NAME Cam. a to
LOCATION L� �`,,,,�,
PHONE 6Zg- $lo -lam "�8
TYPE OF WORK �(u a,,�t„.� $_'76 bW
NAME Qa� �� a- �cyGlcv..�
LOCATION � ` �� ��
`�.."Vre4s�e.
PHONE �� 68Z -�04 �
TYPE OF WORK �„�v.,� Grti1 $ 1S2.ew-
NAME U (cr.�e c� - �3-4a
LOCATION p���
PHONE 1 I� � � v s�
TYPE OF WORK 5���� $ '�,�4{�00 _
NAME � $ � ��
LOCATION p(w,��,
PHONE -71`1 4� -0'03
TYPE OF WORK _�t•,r,,`� $ -�,uu,�_
Name of��ubmit ' g Bid
� �- �
Sign hire of BIDD�R �j ��21�— � r� �P C,� � \,^�
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK
$
NAME
LOCATION
PHONE
TYPE OF WORK $
TO BE INCLUDED IN BID PACKAGE
BP4of]5
CITY OF SANTA ANA
PROJECT NO. 11 -6736 8z 11 -6746
PROPOSAL 8z CONTRACT AGREEMENT
BIDDER'S STATEMENT
BIDDER understands and agrees that this written proposal (or any part thereof specifically designated
and accepted by the City of Santa Ana, hereinafter AGENCY) shall constitute the entire agreement
between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by
the Clerk of the Council with her signature and official seal noting hereon the action of approval of the
Council, signed by the Public Works Agency Executive Director or his duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its execution, and
when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he /she will
furnish AGENCY all required bonds and certificate of liability insurance within ten (I O) days (excluding
Fridays, Saturdays, Sundays and AGENCY'S legal holidays), or the funds, check, draft, or BIDDERS
bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY
and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY
because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S
bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in
the bid schedule are solely for the purpose of comparing bids, and that final compensation under the
contract will be based upon the actual quantities of work satisfactorily completed.
All terms contained in the Specifications, the Certification of Non - Discrimination by Contractors, and
the Workers' Compensation Insurance Certificate are to be incorporated by reference into this
Agreement and are made specifically as part of this bid.
Name of Firm � 1 f�Y�( \-e,h CLiXI � � ��l�
Signature of
BIDDER ��
Title I�O1'.�Y�
(if an individual, so state)
TO BE INCLUDED IN BID PACKAGE
BPSof15
CITY OF SANTA ANA
PROJECT NO. 11 -6736 8i 11 -6746
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT continued
(If a firm or co- partnership, state the firm name and give the names of all individual co- partners
composing the firm. If a corporation, state legal name of corporation, and names of President,
Secretary, Treasurer and Manager, thereof.) �-1 ` ��� C�1 �P��� _ �j,r�,r� -�j��
Awarded to �� im,�olnaa� [.[a � % -��
qn ale basis of west responsible an responsive
bidder in the amount of
�. - �r -y3.. 3 ��
..
ATTEST:
CLERK OF THE COUN
APPROVED AS TO FORM:
�.C.r
A SST CI Y ATTORNEY
ACTION OF COUNCIL:
Date ,��� J �� 20 /02
ACCEPTED FOR THE CITY OF SANTA ANA:
-,..
EXE TIVE DIR OR
PUBLIC WORKS A ENCY
BP6of15
TO BE INCLUDED IN BID PACKAGE
CITY OF SANTA ANA
PROJECT NO. 11 -6736 8� ] 1 -6746
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR
The undersigned contractor or corporate officer, during the performance of this contract, certifies as
follows:
1. The Contractor shall not discriminate against any employee or applicant for employment because
of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure
that applicants are employed, and that employees are treated during employment without, regard to their
race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff
or termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and
applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination
clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment without
regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he /she has
a collective bargaining agreement or other contract or understanding, a notice to be provided advising
the said labor union or workers' representatives of the Contractor's commitments under this section, and
shall post copies of the notice in conspicuous places available to employees and applicants for
employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
l 965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto,
and will permit access to his /her books, records, and accounts by the administering agency and the
Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations,
and orders.
6. In the event of the Contractor's non - compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or
suspended in whole or in part and the Contractor may be declared ineligible for further Government
contracts or federally assisted construction contracts in accordance with procedures authorized in
Execution Order 1 1246 of September 24, 1965, and such other sanctions may be imposed and remedies
invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order
of the Secretary of Labor, or as otherwise provided by law.
TO BE INCLUDED IN BID PACKAGE
BP7of15
CITY OF SANTA ANA
PROJECT NO. l 1 -6736 8c 11 -6746
PROPOSAL AND CONTRACT AGREEMENT
CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR (continued)
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive
Order 1 1246 of September 24, 1965, so that such provisions will be binding upon each subcontract or
purchase order as the administering agency may direct as means of enforcing such provisions, including
sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in,
or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the
administering agency, the Contractor may request that the United States enter into such litigation to
protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended,
No discrimination shall be made in the employment of persons upon public works because of race,
religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or
sex of such persons, except as provided in Section 1420, and any contractor of public works violating
this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed
Title � J�
Firm �T \ 1
Date �Q,\(G,, \ a-
/ •
Y ��
TO BE INCLUDED IN BID PACKAGE
BP8of15
CITY OF SANTA ANA
PROJECT NO. 11 -6736 8L 11 -6746
PROPOSAL AND CONTRACT AGREEMENT
WORKERS' COMPENSATION INSURANCE CERTIFICATION
As required by California Labor Code Section 1860 and 1861 ,the Contractor certifies as follows:
I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for worker's compensation or to undertake self - insurance in accordance with the
provisions of the Code, and I will comply with such provisions before commencing the performance of
the work of this contract.
If I, as the Contractor, now or at any time during the course of this agreement, qualify as an employer
under California Labor Code Section 3300, unless the hired employees) is (are) persons excluded by
said Labor Code, I shall furnish the City of Santa Ana with an insurance certificate from my workers'
compensation insurance carrier certifying that I carry such insurance and that the policy shall not be
canceled nor the coverage reduced except upon thirty (30) days prior written notice to the City of Santa
Ana.
Signec
Title
Firm
Date �.5�` ��\�a --
TO BE INCLUDED IN BID PACKAGE
BP9of15
CITY OF SANTA ANA
PROJECT NO. 11 -6736 & 11 -6746
PROPOSAL AND CONTRACT AGREEMENT
REFERENCES
The following are the names, addresses, and telephone numbers for three public agencies for which
BIDDER has performed similar work within the past two years.
1 S Q-�e- �GvvszS
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
2.
Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
3.
Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom
BIDDER intends to procure insurance and bonds.
-1—i —7 S T=i q Ve rt) S-� �q dU Cam. s fh2�e (� G9 9 00
tCl�l 2- Yvu�X �0..r-Fn�S i 11SJ rGC-11 C.� Ce�Y�� -�
i C lel\ VA vV 44— -1 CC, C-1 l y-) 9 3 - -1 U
BP 10 of 15 TO BE INCLUDED IN BID PACKAGE
1
"2011"
PAST WORK REFERENCES
City of Compton
205 South Willowbrook Avenue
Compton, CA 90220
Contact: Loujuana Mitchell, (310) 761 -1437
County of Saa Bernardino
825 E. Third Street
San Bernardino, CA 92415
Contact: Franklin Luna, (909) 387 -7920
County of Riverside
2950 Washington Street
Riverside, CA 92504
Contact: David Hylkema, (951) 850 -6075
City of Stanton
7800 Katella Avenue
Stanton, CA 90680 -3162
Contact: Quang Le, (714) 890 -4234
City of Long Beach
333 West Oceaa Blvd., 1 O`h Floor
Long Beach, CA 90802
Contact: Chuck Ramey, (562) 570 -6634
City of Paramount
16400 Colorado Boulevard
Paramount, CA 90723 -5012
Contact: Len Gorecki, (562) 220 -21 1 1
City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
Contact: Dave Verone, (714) 375 -8471
Department of Transportation
464 W. Fourth Street
San Bernardino, CA 924 1 0 -1 400
Contact: Imad Abugharbieh, (951) 277 -8579
Northwood Avenue Reconstruction - - - --
Contract Amount: $1,180,000.00
Start: 10/18/2010
Completed: 5/4/201 1
Cajoa Blvd.
Contract Amount: $565,000.00
Start: 3/ 1 1 /2011
Completed: 4/8/201 1
De Luz Road Rehabilitation
Contract Amount: $740,000.00
Start: 4/25/201 1
Completed: 5/23/201 1
201 O /2011 Citywide Reconstruction
Contract Amount: $322,322.00
Start: 3/1 /201 1
Completed: 4/30/201 1
Annual Contract Street Reconstruction
Contract Amount: $3,433,415.00
Start: 5/ 1 /201 O
Completed: Still On -Going
Neighborhood Street Resurfacing
Contract Amount: $899,909.00
Start: 1 1 / 1/201 O
Completed: 3/30/201 1
Slater Avenue Improvements
Contract Amount: $1,926,341.00
Start: 8/2J201 O
Completed: 2/30/201 1
Route 91 Project
Contract Amount: $5,732,812.00
Start: 3/ 1 /201 O
Completed: 3/30/201 1
CITY OF SANTA ANA
PROJECT NO. l 1 -6736 8c 11 -6746
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code
regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000
or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor under -the
apprenticeship standards for the employment and training of apprentices in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he /she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same manner as
the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to
the California Apprenticeship Council.
Signed ��/ ,
Title
Firm
Date �Q�I����'-
L��
BP 11 of 15
TO BE INCLUDED IN BID PACKAGE
CITY OF SANTA ANA
PROJECT NO. 1 1 -6736 c4z 1 1 -6746
PROPOSAL AND CONTRACT AGREEMENT
NON - COLLUSION AFFIDAVIT
(Title 23 United States Code Section 1 l2 and
Public Contract Code Section 7106)
To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER
declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that
the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham
bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone
else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner,
directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price
of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of
any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further, that the
BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the
contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any
corporation, partnership, company association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid.
Note: The above Non - collusion Affidavit is part of the Proposal. Signing this Proposal on the
signature portion thereof shall also constitute signature of this Non - collusion Affidavit. BIDDERS
are cautioned that making a false certification may subject the certifier to criminal prosecution.
Signed
State of California
County of �i V�2t3iC,(..e_
Subscribed an/d sworn to (or affirmed) before me under penalty of perjury on this � 5`� day of S(�v�,
20� by R � IGl�rt ►bra c�l.� i proved to me on the basis of satisfactory evidence to be the
person(�who appeared before m�
DEBBIE MATSEN
Commissions 1958174
_ �� Notary Public - California z
Z Riversitle County s
M Comm. Ex {res Nov 22, 2015
b�E' y,�Q��T3�
Notary Yubhc ignature Notary Public Seal
TO BE INCLUDED IN BID PACKAGE
BP 12 of 15
CITY OF SANTA ANA
PROJECT NO. 1 1 -6736 8� 1 1 -6746
PROPOSAL AND CONTRACT AGREEMENT
BIDDER'S STATEMENT REGARDING "ANTI- KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid
documents, agrees to comply with the Copeland "Anti- Kickback" Act (18 USC 74) as supplemented in
the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or
subcontractor shall be prohibited from inducing, by any means, any person employed in the construction
or repair of public work, to give up any part of the compensation to which he /she is otherwise entitled.
Signed �.as'� L�,��
Title !�ph2�- ��
Firm -�� � � �i.V�i CCl.1� � � � � �
Date �� \�� \�-
TO BE INCLUDED IN BID PACKAGE
BP 13 of 15
CITY OF SANTA ANA
PROJECT NO. 11 -6736 8z 11 -6746
PROPOSAL AND CONTRACT AGREEMENT
CONTRACTOR'S LICENSING STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that the following is
true and correct.
Contractor's Name: � ` ` �( \�t'� CLL,4�l � Q Y ���
Business Address: �� �k ���� � C� � �(1LL- CF} �'( cam- -��g — � c��
Telephone: CGjS� ��J(12 —�UZ��
State Contractor's License No. and
Class: �LP� �� � � � �- -� °�
Expiration I I � 1 I'
Date:
Signed: , ^ -
Title: � C �.�- � ��,F�l
TO BE INCLUDED IN BID PACKAGE
BP 14 of l S
CITY OF SANTA ANA
PROJECT NO. 1 1 -6736 8z l 1 -6746
PROPOSAL AND CONTRACT AGREEMENT
DISCLOSURE OF LOBBYING ACTIVITIES
Com lete this form to disclose lobb in activities ursuant to 31 U.S.C. 1352
1 . Type of Federal Action
2. Status of Federal Action
3. Report Type:
Q a. Contract
Q a. Bid/ot%r /application
0 a. ini
b. Grant
b. initia] award
b. terial change
c. Corporate Agreement
c, post -award
d. Ban
For Mate al Change only:
e. Loan Guarantee
Year quarter
f. Loan Insurance
da of last re ort
4. Name and Address of Reporting Entity
5. If Reporting Entity in No. 4 is ubawardee, Enter Name and
Address of Prime:
Q Prime Q Subwardcc
Tier , ]fknown
Con ssional District, i '/mown
Con ssiona] D' trict, i Imown
6. Federal DepartmenUAgency:
7. Federal Prow ame/Description
FDA Number, If a licable
S. Federal Action Number, if/mown
9. Award ount, ifkrrown
1 O. a. Name and Address of Lobbying Entity ndividual Per-foaning Services (nxlzecCaxg c��essrjc:�fer�errtfit�»vNo.
Cjrr�xaEn,' kffirrsn�. fO� M% (knri
attach Contin tion Shee s if necess
1 1. Amount of Payment (check all that apply):
13. Type of Payment (check all that apply)
$ Q Actual Q Planned
� a. retainer
b. one -time fee
� c. commission
12. Form of Payment (check al] that apply):
a. cash
� d. contingent fee
b. in -kind; specify: nature
� e. deferred
value
� f. other, s eci
14. Brief Description of Services Performed or to rformed and Dates) of Service, including officer(s), employee(s), or members) contacted, for
Payment indicated in item ] 1
attach Contimration Sheets i necessa
15. Continuation Sheets atfached: Q Yes Q No
16. Infrxn�atia t regiresmd throtr�i this f t is by Title 31 USC Sectiort
1352. 71�isdisclosiucoflobbyingactivi [iesis n��ialrelxv�balicxtoffactupon
Signature '
whichrelia troewasplaoedbytheti�abo ihch�LSactionwasn�adeorarte<ed
o '?
irrho. Thisdisclostueisregt�adpurc r>;,r,* 31 U.S.C.1352. Thismfon-r�or-rwillbe
G�
Print Name 'VY 1
rt�tx3d to the Congress will beavailable forpublicinspection
-- rr ,^,
Any person who fails to file the disclosr ue shall be subjectto a civil pa�alty of
Title � C,Q, !t�i� -S 1 C�J�{�,
less than $1 0,000 and not than $100,000 fixeach such faihne.
_
Tele hone No. %NISI X315 (ACA Date �P I S l �-
Fodaal Use Only:
Authoii�cd for t..ocal Rep uction
Standard Forrn — LLL
/ TO BE INCLUDED IN BID PACKAGE
BP 15 of 15
o � Fidelity and Deposit Company of Maryland
<� Home Office: P.O. Box 1227. Baltimore. MD 21203 -1227
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
That we, ALL AMERICAN ASPHALT BOND NO. 085 97 423
as Principal, (hereinafter called the "Principal "),
and FIDELITY AND DEPOSIT COMPANY OF MARYLAND
P.O. Box 1227, Baltimore, Maryland 21203, a corporation duly organized under the laws of the Slate of Maryland, as
Surety, (hereinafter called the "Surety "), are held and firmly bound unto
City of Santa Ana
as Obligee, (hereinafter called the "Obligee "), in the sum of TEN PERCENT OF THE TOTAL BID PRICE 1N-- - - - - --
Dollars ($ 1 O% OF TOTAL BID PRICE ), for the payment of which sum well and truly to be made, the said Principal
and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
firmly by these presents.
WHEREAS, the Principal has submitted a bid for Broadway from Anahurst PI to Edinger Ave {1 16736)
8 Broadway from Edinger Ave to First St (� � 6746)
Bid Date: June 20, 20'12
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract
with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding
or contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt
payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
into such contract and give such bond or bonds, if the Principal shall pay to the Obligee the dif %rence not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise
to remain in full force and effect.
Signed and sealed this
day of June
A.D., 20'12
ALL AMERICAN ASPHALT (SEAL)
Witness
O� 8 road ' �� VIP
FIDELITY AND DEPOS COMPANY OF MARYLAND
Surety
A. wlkls�•Notary Public By��� A ems° � ~��'�`^�" (SEAL)
Witness Rebecca Haas -Bates
Attorney -in -Fact
Printed in cooperation with the American Institute of Architects (AIA) by Fidelity and Deposi( Company of Maryland . Fideliry end Deposit Company of
Maryland vouches that the language in the document conforms exactly to [he language used in AIA Document A -3IO, February 1970 Edition.
BID70000ZZ0701f
CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT
personally appeared Robert Bradley
Nam efy'J of Signe
who proved to me on the basis of satisfactory evidence to be the
persons whose name(.$) is /are subscribed to the within instrument
and acknowledged to me that he /shtfthey- executed the same in
his'. ;2;�cir authorized ca acit
DEBBIE MATSEN p y(ies), and that by his/+�ar- Ft#aair
Commission a* 1958174 signatures�! on the instrument the person(,eg, or the entity upon behalf
=� Notary Public - Californle � of which the person(�j acted, executed the instrument.
Riverside County
Comm. Ex Tres Nov 22, 2015' I certify under PENALTY OF PERJURY under the laws of the State of
California that the forgoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature �G%G��t -t a /� //��.L4a �
Place Notary Seal Above S� nature of Notarytary —��c
OPTIONAL
Though the information below is not required by law, it may prove valuable to person relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document Bid Bond. City of Santa Ana
Document Date: June 13. 2012 Number of Pages: 1 Pa>?e
signer( Other Than Named Above: Fidelity and Deposit Comnany of Maryland
Capacity(iea) Claimed by Signer(,sf
Signer's Name: Robert Bradley
o Individual
Corporate Officer— Title(,ISf: Vice President
o Partner — o Limited o General
o Attorney in Fact
o Trustee
o Other:
Signer is Representing:
All American Asuhalt
Signer's Name:
o Individual
o Corporate Officer — Title(s):
o Partner — o Limited o General
o Attorney in Fact
o Trustee
o Other:
Signer is Representing:
• -
-�< - �r %�a� -:_ =mar _3 >_.�s�i�c �i��:�T.w.iz. �x L- ;.� >G�: %�:.; =it: a< . =ate - < - .>... =i3. i _ �av_�ar.� . =c<_S .�.z.�t�+�.: +�s.. --mac =mot
State of California
County of Orange
On 6/13/2012 before me, A. Wilkison, Notary Public
Deter Hare Insert Name antl TMIe oT the OHicer '
personally appeared Rebecca Haas -Bates
_ A. WILKISON
_-�K.. � -�: Commission # 1866283
a u� -'t =gym F- Notary Public - California z
� � _. n
a\ ,��" Orange County
\l' My Comm. Expires Sep 26, 2013 ,
Place Notary Seal Apove
who proved to me on the basis of satisfactory evidence to
be the person(:s) whose names) is/aele subscribed to the
within instrument and acknowledged to me that
+re /she /lhey executed the same in i�ia/her /Heir authorized
capacity(tiea), and that by His /herftk+aif signature(c} on the
instrument the person(+.r} or the entity upon behalf of
which the persons} acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is
true and correct.
WITNESS my� /hand and official seal., ^
Signature__[.Ihl'�Jt90000�Q� -- %l
Signature of Notary Pudb
OPT /ONAL
Though the information be /ow is nor required by taw, it may prove va /uab /e to parsons relying on the document
and could prearent fraudulent removal and reattachment or this form to another document.
Description of Attached Document
Title or Type of Document: Bid Bond
Document Date: 6/1 3/2012
Signers) Other Than Named Above: All American
Capacity(ies) Claimed by Signers)
Number of Pages: One (1
Signer's Name: Rebecca Haas -Bates
Signer's Name:
O Individual
C Individual
C' Corporate Officer — Title(s):
O Corporate Officer — Title(s):
C Partner — C Limited � General
r-! Partner — O Limited C General
l� Attorney in Fac[
C! Attorney in Fact
Trustee
Top of thumb here
C Trustee
Top oT thumb here
._. Guardian or Conservator
C Guardian or Conservator
Other:
C Other:
Signer Is Representing:
Signer Is Representing:
Fidelity anti Deposit Company of Marylantl
0200 Nefional Notary Association • 9350 De Soto Ave.. P.O. Box 2x02 •Chatsworth, CA 913132402• www.NalbnalNOtaryorg Item x5907 Fieordeo Call Toll -Free 1- BOde�6 -GB2]
Power of Attorney
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a
corporation of the State of Maryland, by FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant
Secretary, in pursuance of authority granted by Article Vl, Section 2, of the By -Laws of said ny, which are set forth on
the reverse side hereof and are hereby certified to be in full force and effect on the d iQ ereby nominate,
constitute and appoint William SYRKIN, Rebecca HAAS - BATES, Se ADAIR and P_
BAUER, all of Glendale, California, EACH its true and la ne - tti ,execute, seal and
deliver, for, and on its behalf as surety, and as its,a�tr on� €Fg n ertakings, and the execution of
such bonds or undertakings in pursuance e 1. s ..—$�, hall e t Hats said Company, as fully and amply, to all
intents and purposes, as if the � ecut 1 by the regularly elected officers of [he Company at
its office in Baltimo th n � � power of attorney revokes that issued on behalf of Richard
ADAIR, P. BAUERItlar�(2��0
The said Assistant ° es e eby certify that the extract set forth on the reverse side hereof is a true copy of Article VI,
Section 2, of the By- s satd Company, and is now in force.
IN WITNESS WHEREOF, the said Vice - President and Assistant Secretary have hereunto subscribed their names and
affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 27th day of June,
A.D. 2011.
ATTEST:
'gyp DEPO,y��i
t� dw �W� o
°, ttf0 i
t
State of Mazyland
City of Baltimore ss:
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
By.
Eric D. Barnes Asszstant Secretary Frank E. Martin Jr- Vice President
On this 27th day of June, A.D. 2011, before the subscriber, a Notazy Public of the State of Maryland, duly
commissioned and qualified, came FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant Secretazy of
the FIDELITY AND DEPOSIT COMPANY OE MARYLAND, to me personally known to be the individuals and officers
described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being
by me duly sworn, severally and each for himself depose[h and saith, that they are the said officers of the Company aforesaid,
and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal
and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of
the said Corporation.
IN TESTIMONY WHEREOF,'I have hereunto set my hand and affixed my Official Seal the day and year first above
written.
....,.��.u...,,
� �
'i
Constance A. Dunn Notary Public
My Commission Expires: July 14, 2015
POA -F Ott -0033D
EXTRACT FROM BY -LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND
"Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice - President, or any of the Senior
Vice-
Presidents or Vice - Presidents specially authorized so to do by the Board of Directors or by the Executive Committee,
shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident
Vice - Presidents, Assistant Vice - Presidents and Attorneys -in -Fact as [he business of the Company may require, or to
authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations,
policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in
the nature of mortgages,... and to affix the seal of the Company thereto."
CERTIFICATE
I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify
that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that
the Vice - President who executed the said Power of Attorney was one of the additional Vice- Presidents specially authorized
by the Board of Directors to appoint any Attorney -in -Fact as provided in Article VI, Section 2, of the By -Laws of the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the
Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on
the 10th day of May, 1990.
RESOLVED: "That [he facsimile or mechanically reproduced seal of the company and facsimile or mechanically
reproduced signature of any Vice - President, Secretary, or Assistant Sccrclary of the Company, whether made heretofore or
hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and
binding upon the Company with the same force and effect as though manually affixed.-
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company,
this 13th day of June 2012
.1 cci.vlu/// Sr/-returY
� —
ri
�s .
� � ?' s
- -= i
au a ters
To: City Manager Date: October 10, 2012
Raul Godinez II, Executive Director
From: Public Works Agency
PROJECT NOS. 11 -6736 & 11 -6746
BROADWAY REHABILITATION: ANAHURST PL. TO FIRST ST.
Subject: CHANGE ORDER NO. 1
Contractor: All American Asphalt
PO BOX 2229
Corona, CA 92878
Project Description: Broadway Rehabilitation: Anahurst PI. to First St.
Change Order Number: 1
Accounting Unit- Account - Activity Number: 03017660 - 66220 - 11673601028; 03017660 —
66220 — 11674601028
Original Contract: $ 2,443,348.00
of Original
Amount of This
Change Order: $ 78,01 O 3.19%
Previously Approved
Change Orders: $ -O- O.O%
Total Change Orders: $ 78,010 3.19%
REASON FOR CHANGES
NEW CONTRACT LINE ITEMS
1 _ During excavation for curb and gutter replacement it was discovered that
there is existing P.C_C_ pavement below the existing A.C. pavement where
the plans indicate A.C. pavement alone. The combined thickness of the two
pavements has resulted in subgrade that is 2" — 4" too low; therefore it is
recommended to place aggregate base to the specified subgrade elevation.
(PCO #1) Prior approval was received October 4, 2012.
ESTIMATED COST = $12,310
Project 11 -6744
Request for Approval of Change Order No. 1
May 2, 20'12
Page 2 of 2
2. Due to the existence of P.C.C. pavement below the A.C. pavement, the
specified Mirafi 600 pavement reinforcing fabric is no longer applicable to the
conditions. It is recommended to use Tensar Glaspave 50 pavement
reinforcing fabric in lieu of the Mirafi 600 in the areas where the P.C.C.
pavement exists. (PCO #3) Prior approval was received October 4, 20'12.
ESTIMATED COST = $'104,400
BID ITEM ADJUSTMENTS
Due to the substitution of the Mirafi 600 with the Glaspave 50 it is necessary to
reduce the bid item quantity of the Mirafi 600 by 38,700 SY. Prior approval was
received October 4, 20'12.
R ul Go nez II, Executi Director
Pu is Works Agency
ESTIMATED COST = $(38,700)
APPROVED AS TO FUNDS AND
ACCOUNTS:
Francisco Gutierrez, Executive Director
Finance and Management Services Agency
K:\construction \projects \� �- 6736\change orders \MEM RFA CCO #01
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 11 -6736 & 11 -6746; BROADWAY REHABILITATION: Change Order Number 1
ANAHURST TO FIRST
To ALL AMERICAN ASPHALT, INC. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
spec cations on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCILOR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
NEW CONTRACT LINE ITEMS
Item # New Bid Item Unit Quantity Unit Price Total
Tensar Glaspave 50
36 pavement fabric SF 232,000 $0.45 $104,400
37 Aggregate Base TN 200 $61.55 $12,310
CONTRACT BID ITEM QUANTITY ADJUSTMENTS
Quantity
Item # Contract Bid Item Unit Adjustment Unit Price Total
5 Pavement Fabric SY (25,800) $1.50 $ (38,700)
Page 1 of 2
CITY OF SANTA ANA
_ � PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 11 -6736 & 11 -6746; BROADWAY REHABILITATION: Change Order Number 1
ANAHURST TO FIRST
To ALL AMERICAN ASPHALT, INC. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
spec cations on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCILOR CITY MANAGER
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance wi II be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this final change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this final change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes
payment for all work contained in this final change order, plus all payment for interruption of schedules,
extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative
impact on all other work under this Contract. The signing of this final change order constitutes full mutual
accord and satisfaction for all changes and work performed on this project, and that the time and cost paid
per this final change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself,
all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any
whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ _ _ _ _ _ INCREASE � 7S, O 1 O.00
By reason of this order the CONTRACT TIME completion will be adjusted as follows: -O-
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specrfied, and will accept as full
payment therefor the prices hown above.
Acce ed, Dat �b (p Z� Contractor ALL AMERICAN ASPHALT, INC.
By Title � • �L -
r"
Approval recommended by �+ Date
1a . 1 rj • ?..Q� Z.
PUBLIC WORKS AGENCY EXECU V DIRECTOR /
Approved by (\'� - Date ���-k � � ��'
C /TY MANAGER
Page 2 of 2
MEMORANDUM
To:
From:
Paul Walters
City Manager
Raul Godinez II, Executive Director
Public Works Agency
Date: January 2, 2013
Project Nos. 11 -6736 & 11 -6746
Broadway Rehabilitation: Anahurst PI. to First St.
Subject: Change Order No. 2
Contractor: All American Asphalt
PO BOX 2229
Corona, CA 92878
Project Description: Broadway Rehabilitation from Anahurst Place to First Street
Change Order Number: 2
Accounting Unit - Account - Activity Number:
JUSTIFICATION
Change Order Total: ($140,000)
03017660 - 11673601028
03017660 - 11674601028
The project plans call to cold mill 141,000 SF of existing asphalt pavement (AC) down
to existing concrete (PCC), remove PCC, cement treat the base, and then repave with
new AC.
Subsequent to cold milling, we discovered that the majority of existing PCC is
structurally sound and can be used in lieu of the cement treated base, at a significant
cost savings. To accommodate this, approximately 40,000 SF of PCC must be cold
milled 2" to 4" at a negotiated unit price of $1.25/SF. The $50,000 cost of milling PCC
is offset by an estimated cumulative savings of $140,000 from work that is no longer
needed which would involve removing all pavement and subgrade preparation for
paving.
There are two accounts for this project corresponding to different sections of
Broadway; Edinger to First Street and Anahurst Place to Edinger. This Change Order
encompasses both sections and therefore both accounts.
CONTRACT COST SUMMARY
Original Contract Total $2,443,348.00
Amount
% of Contract
Previously Approved CCO
$78,010.00
Increase
3.2%
This Change Order
($140,000.00)
Decrease
-5.7%
Total CCO to date
($61,990.00)
Decrease
-2.5%
Adjusted Contract Total $2,381,358.00
Project 11 -6744 10 G
Request for Approval of Change Order No. 2
January 2, 2013
Page 2 of 4
SCHEDULE IMPACT
No change in contract time.
i
Raul Godinez II, Exe ive Director
Public Works Agency
Attachment: Change Analysis
APPROVED AS TO FUNDS AND
ACCOUNTS:
C
Francisco Gutierrez, Executive Director
Finance & Management Services Agency
Project 11 -6744
Request for Approval of Change Order No. 2
January 2, 2013
Page 3 of 4
CHANGE ANALYSIS
DETAILED JUSTIFICATION
The City's Pavement Management System identified Broadway from Anahurst Place to
First Street as a high priority for rehabilitation. The pavement has deteriorated due to
weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and
gutter, driveway approaches, curb ramps, and sidewalks are either missing or in
disrepair and require replacement. A contract was awarded to All American Asphalt on
July 16, 2012 for the rehabilitation of Broadway; the improvements include the
reconstruction of the pavement, replacement of damaged concrete curb and gutter,
driveway approaches, and sidewalk, and the construction of new cross gutters and
wheelchair ramps.
The contract documents call to cold mill 141,000 SF of the existing Asphalt Concrete
(A.C.) pavement down to the existing P.C.C. pavement, remove the Portland Cement
Concrete (P.C.C.) pavement, then cement treat the base and repave with new A.C.
pavement. Subsequent to the cold milling operation it was discovered that the majority
of the existing P.C.C. pavement is structurally sound and can be used in lieu of the
cement treated base at a significant cost savings. To accommodate this revision, there
is approximately 40,000 SF of P.C.C. pavement that is 2" - 4" too high and needs to be
ground down. A unit price of $1.25/SF was negotiated to grind off the excess P.C.C.
pavement with an estimated quantity of 40,000 SF totaling $50,000. Consequently, by
modifying the street sections an estimated savings of $190,000 was realized by
deleting the P.C.C. removal and cement treating; with an aggregate estimated savings
of $140,000 to the contract; see attached Cost Impact Analysis. Therefore it is
recommended to grind off the excess P.C.C. pavement.
REVISED DETAILS
Project 11 -6744
Request fo'r Approval of Change Order No. 2
January 2, 2013
Page 4 of 4
W. R/W
REINFORCING
FABRIC
2' AC CAP
2" LEVELING
COURSE CONTRACT
10" CEMENT —� SECTION
TREATED BASE
CL
EXIST. SURFACE
REINFORCING
FABRIC
r2' AC CAP
--1EXIST. PCC PyMT. I
J
2 " -3" LEVEL ING
COURSE
REVISED
SECTION
E. R/W
COST ANALYSIS
Revised Bid Item Quantities (The contractor will be paid for actual quantities added and deleted, as verified in
the field.)
Bid Item
Description
Units
Qty
Unit Price
Extended
1
Unclassified Exca
Cy
(1,600)
$ 68.30
$ (109,280.00)
2
AC Pavement
TN
1,600
$ 71.00
$ 113,600.00
3
Cement Treat Base
SF
(141,000)
$ 0.77
$ (108,570.00)
4
Removal of Pulverized
CY
(2,600)
$ 23.40
$ (60,840.00)
5
Fabric
SY
(15,600)
$ 1.50
$ (23,400.00)
7
PCC Pavement removal
CY
(1,800)
$ 36.00
$ (64,800.00)
36
Fabric Glasspave 50
SY
15,600
$ 4.05
$ 63,180.00
38
Coldmill PCC
SF
40,000
$ 1.25
$ 50,000.00
Savings $ (140,110.00)
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 11 -6736 & 11 -6746; Broadway Rehabilitation: Change Order Number 2
Anahurst To First
To All American Asphalt, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PURL-IC WORKS ArFNrV
NEW CONTRACT LINE ITEMS
Item # New Bid Item
38 Cold mill PCC Pavement
Unit Quantity
SF 40,000"
Unit Price Total
$1.25 $50,000
*The quantity of 40,000 SF is an estimate; contractor will be paid for actual quantity of work
completed.
Page 1 of 2
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 11 -6736 & 11 -6746; Broadway Rehabilitation: Change Order Number 2
Anahurst To First
To All American Asphalt, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by
PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation due
the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including
impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on
behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment
for all work contained in this change order, plus all payment for interruption of schedules, extended field
overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other
work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for
all changes and work performed on this project, and that the time and cost paid per this change order
constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all
work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers
agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related
to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ - - - - - INCREASE $ 50,000
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Fifteen (15) Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefor the prices shown above.
Accept%Date t 1 \ -7 -\S Contractor ALL AMERICAN ASPHALT. INC.
\�..1��I�fiti►���
Approval recommended by
Approved by
WORKSAGENCY
CITY MANAGER
Page 2 of 2
Date
1�31•�ot�
Date
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
MAY 6, 2013
TITLE:
CONTINGENCY INCREASE FOR
BROADWAY REHABILITATION;
ANAHURST TO FIRST STREET
(PROJECT NOS. 116736 & 116746)
CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED 4 "-9002
TI"As Recommended] C
❑ As Amended
❑ Ordinance on 1s` Reading
❑ Ordinance on 2 "d Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Increase the contingency for the Broadway Rehabilitation Project by $80,000, which will
increase the total funds available for the construction contract with All American Asphalt, Inc., to
$2,767,682.
DISCUSSION
On July 16, 2012, the City Council awarded a contract for the Broadway Rehabilitation Project to
All American Asphalt, Inc., in the amount of $2,443,348. The City Council also authorized a 10
percent construction contingency in the amount of $244,334, for a total authorized construction
contract expenditure limit of $2,687,682. The project is currently 98 percent complete.
This project consists of reconstructing the pavement; replacing curb and gutter, sidewalks, and
curb ramps; and upgrading the antiquated streetlight system along Broadway from McFadden
Avenue to Borchard Avenue. The high voltage streetlight system is very inefficient, requires
extensive maintenance, and can be very dangerous if a streetlight is knocked down.
The streetlight portion of this project requires the contractor to separate the high voltage streetlights
along Broadway from the existing high voltage system at Birch Street and Russell Avenue (see
Exhibit 1). The work includes removing the single high voltage (5,000 volts) wire from the existing
conduit, installing three new wires into the existing conduit, installing new metal halide fixtures, and
installing conduit and wire to an existing 240V service pedestal located one block east of Broadway
on Borchard Avenue.
The methodology described above to upgrade antiquated streetlight systems has been
successfully completed in other areas of the City. Moreover, this methodology has proven to be
the most cost effective solution to improve and upgrade existing streetlight systems.
CONTINGENCY INCREASE
BROADWAY REHABILITATION PROJECT
May 6, 2013
Page 2 of 4
When the contractor was performing the Broadway streetlights work at Birch Street and Russell
Avenue, it was unexpectedly discovered that the streetlights were interconnected, unlike what is
shown on the as- builts (see Exhibit 1). We found similar conditions at Wilshire Avenue and
Borchard Avenue (see Exhibit 2). Essentially, the existing streetlight system was found to be a
continuous loop, and separating the system was not anticipated. Therefore, the planned streetlight
upgrades need to be expanded as shown on Exhibit 2.
The extra work includes all of the streetlights on Ross Street and Birch Street between McFadden
Avenue and Edinger Avenue at a cost of $162,989. That cost is within the existing contract
contingency.
However, while performing the extra work and exposing the added conduits, they were found to be
severely deteriorated and damaged beyond repair by corrosion and tree roots, necessitating
conduit replacement at an added cost of $93,461. That brings the total cost of the streetlight
upgrades to $256,450, and that amount exceeds the contract contingency by approximately
$80,000 (see Exhibit 3).
The extra work is necessary in order to complete the work and turn the lights back on. Deferring
the conduit replacement would mean the streetlights will be off in the Wilshire Square
neighborhood, and the cost would be higher due to the added re- mobilization cost. Having the
streetlights off for an extended time also increases the City's liability exposure. Therefore, it is
recommended to increase the project contract contingency by $80,000.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
The financial impact is a 3.3% extra cost over the standard contingency for a $2.77 million
contract. Funds are available in the Proposition 1 B Fund (Accounting Unit 03017660).
Ra I 'odinez II
Executive Directo
Public Works Agency
RG:SA
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez
Executive Director
Finance & Management Services Agency TWI-
CONTINGENCY INCREASE
BROADWAY REHABILITATION PROJECT
May 6, 2013
Page 3 of 4
Exhibit 1 a — As -Built
Original Scope of Street
Light Upgrades
Exhibit 1b— Actual Condition
r
1
1
r
f
f
CONTINGENCY INCREASE
BROADWAY REHABILITATION PROJECT
May 6, 2013
Page 4 of 4
Authorized vs. Expended Funds
Contract
Amount
Awarded Amount
$2,443,348
Contract Qty Adjustment
($128,851)
C0#1
$141,191
CO #2
$45,000
CO #3
$10,455
Total Construction
$2,511,143
Cost Extra %
-5.3%
C044 (Proposed Street Lights)
$256,450
Total Estimated Final Cost
$2,767,593
3.3% Aggregate
Authorized
Amount
Contract
$2,443,348
Contingency
$244,334
Total Authorized
$2,687,682
Total Estimated Final Cost $2,767,593
Total Authorized to Date $2,687,682
Requested Additional Funds $79,911
Exhibit 2— Authorized vs. Expended Funds
MEMORANDUM
To:
From:
Kevin O'Rourke
Interim City Manager
Raul Godinez II, Executive Director
Public Works Agency
Date: May 1, 2013
Project Nos. 11 -6736 & 11 -6746
Broadway Rehabilitation: Anahurst PI, to First St.
Subject: Change Order No. 3
Contractor: All American Asphalt
PO BOX 2229
Corona, CA 92878
Project Description: Broadway Rehabilitation from Anahurst Place to First Street
Change Order Number: 3 Change Order Total: $ 10,445.58
Accounting Unit - Account - Activity Number:
JUSTIFICATION
Item 1
03017660 - 11673601028
03017660 - 11674601028
After the start of construction, Design Engineering initiated improving pedestrian safety
along Broadway by adding crosswalks and traffic calming measures. Therefore it was
recommended to narrow six locations and the addition of high visibility crosswalks, red
curb, and street signs.
AGREED COST $ 6,780.58
Item 2
The plans call for removal of the existing curb and installation of new 6" curb and gutter
along both sides of Broadway throughout the length of the project. At 1111 S. Broadway
the existing streetlight pole had been damaged by an auto accident and the top of the
foundation is approximately 4" below the new top of curb, resulting in the hand hole for
the pole to be partially below grade. Therefore it was recommended to remove the
damaged pole, remove and replace the foundation, and install a City supplied pole at
the location.
AGREED COST $ 3,675.00
There are two accounts for this project corresponding to different sections of Broadway;
Edinger to First Street and Anahurst Place to Edinger. Item 1 of this Change Order
encompasses both sections and therefore both accounts. Item 2 of this Change Order
corresponds to Broadway; Edinger to First Street: Accounting unit 03017660 —
11674601028.
Project 11 -6744
Request for Approval of Change Order No. 3
May 1, 2013
Page 2 of 4
CONTRACT COST SUMMARY
Original Contract Total
$2,443,348.00
Amount
% of Contract
Previous Change Orders
($61,990.00) Decrease
-2.5%
Change Order 3
$10,445.58 Increase
.004%
Total CCO to date
($51,541.52) Decrease
-2.1%
Adjusted Contract Total
SCHEDULEIMPACT
$2,381,358.00
Increase contract time by 15 working days.
APPROVED AS TO FUNDS AND
ACCOUNTS:
Raul Godinez II, Executve Director Francisco Gutierrez, Executive Director
Public Works Agency Finance & Management Services Agency
Project 11 -6744
Request for Approval of Change Order No. 3
May 1, 2013
Page 3 of 4
REVISED DETAILS
Item 1
CHANGE ANALYSIS
noun" roar w
RUSSELL AVE
POMMONA M
UT ANDPFW PL
C46kON $T
Project 11 -6744
Request for Approval of Change Order No. 3
May 1, 2013
Page 4 of 4
WAUC7 aT
COST ANALYSIS
Item 1
The cost to narrow the street was completed at unit prices with minimal impact to the
contract price. The agreed cost of $6,780.58 is to add the striping revisions shown in the
Revised Details above.
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 11 -6736 & 11 -6746; Broadway Rehabilitation: Change Order Number 3
Anahurst To First
To All American Asohalt, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle lime.
Change requested by
EXTRA WORK AT AGREED PRICES
PUBLIC WORKS AGENCY
1. Install traffic markings and striping per revised plans dated February 12, 2013, at
bulb -outs in six intersections within the project area and at pervious concrete
locations per PCO #05 dated 2/12/2013.
AGREED PRICE $6780.58
2. Install foundation and City supplied streetlight pole at 1111 South Broadway per PCO
#09 dated 3/07/2013.
AGREED PRICE $ 3,675.00
Page 1 of 2
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
� K • � � � � a: � • � I c y : r: v tee • � : � � �
Project Number 11 -6736 & 11 -6746; Broadway Rehabilitation: Change Order Number
Anahurst To First
To All American Asphalt. Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation due
the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including
impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on
behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment
for all work contained in this change order, plus all payment for interruption of schedules, extended field
overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other
work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for
all changes and work performed on this project, and that the time and cost paid per this change order
constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all
work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers
agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related
to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ - - - - _ INCREASE $ 10,455.58
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Fifteen (15) Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefor the pricestshown above
Date
0
Approval recommended by
Contractor ALL
Title
Approved by
CITYMANAGER
v
Page 2 of 2
Date ��"✓ �'�
Date
MEMORANDUM
Kevin O'Rourke
To: Interim City Manager Date: May 16, 2013
Raul Godinez II, Executive Director
From: Public Works Agency
Project Nos. 11 -6736 & 11 -6746
Broadway Rehabilitation: Anahurst PI. to First St.
Subject: Change Order No. 4
Contractor: All American Asphalt
PO BOX 2229
Corona, CA 92878
Project Description: Broadway Rehabilitation from Anahurst Place to First Street
Change Order Number: 4
Accounting Unit - Account - Activity Number:
JUSTIFICATION
Change Order Total: $ 242,212.00
03017660 - 11673'601028
The streetlight portion of this project requires the contractor to separate the high
voltage streetlights along Broadway from the existing high voltage system on Russell
Avenue just east of Birch Street (see Exhibit 1a). The work includes removing the
single high voltage (5,000 volts) wire from the existing conduit, installing three new
wires into the existing conduit, installing new metal halide fixtures, and installing
conduit and wire to an existing 240V service pedestal located on Borchard Avenue one
block west of Broadway.
When the contractor was performing the Broadway streetlight work on Russell Avenue, it
was discovered that the streetlights were interconnected with the adjacent street, which is
not consistent with the as- builts (see Exhibit 1a). Similar conditions were found on the
streetlights on Wilshire Avenue and on Borchard Avenue (see Exhibit 1b). Essentially,
the existing streetlight system is a continuous loop and separating the system was not in
the original contract. Therefore, the planned streetlight work needed to be expanded. A
prior approval for this work was granted 3/13/2012.
The initial scope of extra work included all of the streetlights on Ross Street and Birch
Street between McFadden Avenue and Edinger Avenue at a cost of $162,989. However,
while performing the extra work, the conduits were found severely deteriorated and
damaged beyond repair by corrosion and tree roots, necessitating replacement at an
added cost of $81,223. Therefore the total cost of the streetlight upgrades is $242,212.
AGREED COST $ 242,212.00
Project 11 -6744
Request for Approval of Change Order No. 4
May 16, 2013
Page 2 of 4
There are two accounts for this project corresponding to different sections of Broadway;
Edinger to First Street and Anahurst Place to Edinger. This Change Order corresponds
to Broadway; Edinger to First Street: Accounting unit 03017660 — 11674601028.
CONTRACT COST SUMMARY
Original Contract Total $2,443,348.00
Amount % of Contract
Previous Change Orders ($51,441.52) Decrease -2.5%
Change Order 4 $244,212.00 Increase 9.99%
Total CCO to date $192,770.48 Increase 7.88%
Adjusted Contract Total $2,634,118.48
V- f' 2, 7,0 V Z.
SCHEDULEIMPACT
Increase contract time by 60 working days.
APPROVED AS TO FUNDS AND
ACCOUNTS:
Raul Godinez II, cutive Director Francisco Gu rrez, Ex9cutive Director
Public Works Agen y Finance & Management Services Agency
Project 11 -6744
Request for Approval of Change Order No. 4
May 16, 2013
Page 3 of 4
CHANGE ANALYSIS
REVISED DETAILS
14
Exhibit 1b — Actual Condition
0
Project 11 -6744
Request for Approval of Change Order No. 4
May 16, 2013
Page 4 of 4
COST ANALYSIS
The agreed cost of $242,212.00 includes all costs for labor, equipment and materials to:
bore for and install 7200 LF of 1 1/2 " conduit; terminate the conduit at each pole; place
new PCC foundation caps; install three new #8 wires; remove the existing incandescent
fixtures; install new metal halide fixtures; and make final connections in the service
pedestals.
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 11 -6736 & 11 -6746; Broadway Rehabilitation: Change Order Number 4
Anahurst To First
To All American Asphalt, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER,
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time,
Change requested by
EXTRA WORK AT AGREED PRICES
PUBLIC WORKS AGENCY
Install new conduit, wire, and metal halide ballast assemblies for the streetlight system
on Ross and Birch Streets per PCO #08 dated 2/06/2013.
Page 1 of 2
AGREED PRICE $ 242,212.00
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number 11 -6736 & 11 -6746; Broadway Rehabilitation: Change Order Number
Anahurst To First
To All American Asphalt, Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER,
Unless otherwise staled, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by
PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation due
the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including
impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on
behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment
for all work contained in this change order, plus all payment for interruption of schedules, extended field
overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other
work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for
all changes and work performed on this project, and that the time and cost paid per this change order
constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all
work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers
agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related
to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ - - - - - INCREASE $ 242,212.00
By reason of this order the CONTRACT TIME completion will be adjusted as follows: Sixty (60) Days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full
payment therefor the prices shown above,
Accepted, Dale f0le7913 Contractor ALL AMERICAN ASPHALT, INC.
By
Approval recommended by
Approved by
Title < &'Yci -w`tr P
PUBLIC WORKS
CITY MANAGER
Page 2 of 2
Date
-� /
°.- _ a mil' l7
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
DECEMBER 2, 2013
TITLE:
CONTINGENCY INCREASE FOR
BROADWAY REHABILITATION FROM
ANAHURST PLACE TO FIRST STREET
(PROJECT NOS. 116736 & 116746)
f(2 Z /,� / /
CITY-MANAGEVQ
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVE
❑ As Recommended/OUA
❑ As Amended
❑ Ordinance on 1" Reading
❑ Ordinance on 2na Reading
❑ Implementing Resolution
❑ Set Public Hearing For_
CONTINUED TO
FILE NUMBER
1. Increase the contingency for the Broadway Rehabilitation Project by $200,000 which will
increase the total construction contract with All American Asphalt, Inc., to $2,967,682.
2. Approve an Appropriation Adjustment recognizing $200,000 in interest earned in the
Proposition 1 B Fund revenue account and appropriating the same into the Proposition 1 B
Fund expenditure account
DISCUSSION
The recommended actions will allow the City to close out and release retention payments to the
construction contractor for the Broadway Rehabilitation from Anahurst Place to First Street
(Broadway Rehabilitation) Project. This project consisted of reconstructing the pavement,
replacing curb and gutter, and repairing sidewalks and curb ramps.
At the November 6, 2006, election, California voters passed Prop 1B to allow the state to sell
$19.9 billion in general obligation bonds for a variety of transportation priorities for cities and counties,
to fund the maintenance and improvement of local transportation facilities. The share of the fund that
the City is allocated is determined by the State Controller's Office. Interest has been earned since the
inception of the funds, but that amount has not been recognized in prior year Capital Improvement
Programs. The recommended appropriation adjustment will recognize the funds in Fiscal Year
2013/2014 and appropriate them for use in the construction of Broadway Rehabilitation Project
(Project No. 116746).
On July 16, 2012, the City Council awarded a contract to All American Asphalt, Inc., in the
amount of $2,443,348. The funding analysis included a 10 percent construction contingency in
the amount of $244,334, for a maximum total authorized construction contract expenditure limit
of $2,687,682.
Contingency Increase
Broadway Rehabilitation Project
December 2, 2013
Page 2
During construction there were cost savings and other cost efficiencies that resulted in a total cost
well below the contract. After evaluation, staff recommended to the City Council the addition of
traffic calming bulb -outs at five intersections along the route (Exhibit 1) and upgrades to the
antiquated streetlight system along Broadway from McFadden Avenue to Borchard Avenue.
On May 6, 2013, the City Council authorized an $80,000 increase in the contract contingency to
complete the bulb -outs and streetlight upgrades. While the actual cost of the additional work
was $242,212, preliminary estimates projected that there would be some contingency remaining
in the construction contract. Therefore, staff requested only what was needed above and
beyond the contract authorized limit.
Now that project construction and final closeout accounting have been completed, it has been
determined that the original contract contingency was needed for the original scope of the
project. Therefore, staff is requesting an additional $200,000 to close out the contract.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
Proposition 1B unrecognized interest earnings will be accepted into the Proposition 1B Fund
revenue account (03017002- 50001) and appropriated into the Proposition 1B Fund expenditure
account (03017660- 66220, Project No. 116746).
Edwin "William' Galvez, P.E.
Interim Executive Director
Public Works Agency
EWG:TC
Exhibits: 1. Bulb -out Locations
APPROVED AS TO FUNDS AND ACCOUNTS:
n6�M111Isc o1 ,
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
SEE BOTTOM LEFT
RCHAFO AVt
A
EDINOER AVE •�•v
O
1 ST _t
y-
FL
BROADWAY BULB -OUT LOCATIONS
ANTA ANA CONTINGENCY INCREASE FOR
City Council BROADWAY REHABILITATION
P� Agenda Date
FROM ANAHUAST PLACE TO FIRST STREET
PUBLIC WORKS AOERCY December 2, 2013 (PROJECT NOS, 116736 + 116746)
EXHIBIT 1