HomeMy WebLinkAbout20D - AA - LED STREET LIGHTS
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY:
JANUARY 22, 2013
TITLE APPROVED
AGREEMENTS WITH SIERRA PACIFIC ? As Recommended
ELECTRICAL CONTRACTING TO ? As Amended
Reading
Is'
PROVIDE AND INSTALL LED STREET F1 Ordinance on
El Ordinance on 2 n "d Reading
LIGHTS AND SOUTHERN CALIFORNIA ? Implementing Resolution
EDISON TO PROVIDE NO-COST ? Set Public Hearing For
FUNDING FOR LED STREET LIGHTS
CONTINUED TO
FILE NUMBER
CITY MANAGER
RECOMMENDED ACTION
1. Authorize the City Manager and Clerk of the Council to execute the following agreements,
subject to non-substantive changes approved by the City Manager and City Attorney:
a) Sierra Pacific Electrical Contracting to provide and install 1,123 LED street lights for an
amount not to exceed $700,000 (Exhibit 1).
b) Southern California Edison to provide no-cost funding through On-Bill Financing for the LED
street lights (Exhibit 2).
2. Approve an appropriation adjustment recognizing $693,027 in funding from Southern California
Edison into the Energy Conservation revenue account (16217002-57384) and appropriating
the same amount to the Energy Conservation expenditure account (16217630-62300) for the
installation of LED street lights.
DISCUSSION
In August 2011, the City Council awarded a pilot contract to install 253 energy-efficient LED street
lights on Main Street and Edinger Avenue, in an effort to reduce street light energy costs. That
project has proven to be successful, as evidenced by a 50 percent energy savings this past year.
As a result, staff has developed a new project involving the replacement of 1,123 City-owned
safety lights with energy-efficient LED lamps at traffic signalized intersections.
Staff investigated financing this project and submitted an application for funding through Southern
California Edison's (SCE) On-Bill Financing (OBF) Program. The OBF program provides zero
percent financing for approved energy-reduction projects. The funds are repaid by the energy
savings on our electric bill over a short payback period. This financing mechanism is being
successfully used on the pilot project with a projected payback of five years. A five-year payback
period is also projected for the new street light project.
20D-1
Agreements with Sierra Pacific Electrical and SCE
to Provide, Install, and Fund LED Street Lights
January 22, 2013
Page 2
This project will replace safety lights at 298 signalized intersections in the city, including several
miscellaneous locations. Due to an internal SCE policy that limits financing to 25 sites per
application, this project has been separated into 10 applications. Consequently, this will require 10
agreements with a combined total not to exceed $700,000 (Exhibit 2).
On September 11, 2012, a Request for Proposals was posted on the City's website:
13 Proposals received
0 Proposals received from Santa Ana vendors*
* LED street lights are a specialized industry. Currently there are no
qualified firms in Santa Ana producing or installing LED street lights.
One of the 13 proposals received was deemed nonresponsive. Nine proposals met the eligibility
criteria for On-Bill Financing; however, one proposer withdrew their proposal based on an inability
to perform. Two lamp fixtures from each of the eight responsive firms were installed and tested by
City staff. The proposal evaluations were based on three factors: the ability of proposed fixtures
to perform as specified (40%); the proposer's experience, ability to perform, and past performance
on similar projects (10%); and the proposal base price (50%). The final ranking is as follows:
Rank Proposer Fixture Final Score
1 Sierra Pacific Leotek 254
2 Aegis Duralight 246
3 Sully-Miller Leotek 235
4 Protech Cree 223
5 Select Cree 221
5 C.P. Engineering Cooper 221
7 P.T.M. General Engineering Cooper 217
8 Siemans Acuity 214
The Leotek Green Cobra fixture proposed by Sierra Pacific Electrical Contracting, the top-rated
firm, produced an average energy savings of 50 percent compared to existing lights. They also
provide more visible light than conventional street lights and are expected to have a useful life of
over 15 years.
SCE originally approved financing for $625,694 through the OBF program; however, the cost of the
successful proposal was $693,027. Based this project cost, the SCE energy efficiency incentive
will be $74,766, with the balance of $600,161 financed through the On-Bill Financing Program.
Because 12 of the sites did not meet SCE funding criteria, they will be funded by the City at a cost
of $18,100. Replacement of the existing high-pressure sodium lamps with energy-efficient LED
street lights will reduce the City's estimated annual energy consumption by 934,572 kWh, and
reduce the impact to the General Fund with an annual energy cost savings of approximately
$120,000.
20D-2
Agreements with Sierra Pacific Electrical and SCE
to Provide, Install, and Fund LED Street Lights
January 22, 2013
Page 3
ENVIRONMENTAL IMPACT
Installation of the LED street lights will reduce the city's carbon footprint by approximately 659
metric tons of CO2, which is the equivalent of removing 137 passenger vehicles from the road.
FISCAL IMPACT
Loan Proceeds received through the SCE On-Bill Financing Program will be deposited into the
Energy Conservation revenue account (16217002-57384) and appropriated into the Energy
Conservation expenditure account (16217630-62300). Loan repayments are available in Account
01117630-62000. Funds for the City's share of $18,000 that does not meet SCE funding criteria
are available in Account 01117630-62300.
APPROVED AS TO FUNDS AND ACCOUNTS:
w
r^-
Raul Godinez II Francisco Gutie
Executive Director/ Executive Director/
Public Works Agency Finance & Management Services Agency
RG/KW
Exhibits: 1. Agreement with Sierra Pacific Electrical Contracting
2. On-Bill Financing Agreement with Southern California Edison
3. On-Bill Financing and Incentives Summary
20D-3
20D-4
EXHIBIT 1
CITY OF SANTA ANA
REQUEST FOR PROPOSALS FOR LED COBRAHEAD STREETLIGHTS
SAMPLE AGREEMENT
THIS AGREEMENT, made and entered into this day of 2012 by
, Inc. (hereinafter "Contractor"), and the City of Santa Ana, a
charter city and municipal corporation organized and existing under the Constitution and
laws of the State of California (hereinafter "City").
RECITALS
A. The City desires to retain a Contractor having special skill and knowledge in the
field of LED street light manufacturing and installation of LED luminaires.
B. Proposer represents that Contractor is able and willing to provide such services
to the City.
C. In undertaking the performance of this Agreement, Contractor represents that it is
knowledgeable in its field and that any services performed by Contractor under this
Agreement will be performed in compliance with such standards as may reasonably be
expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and
subject to the terms and conditions hereinafter set forth, the parties agree as follows:
I.SCOPE OF SERVICES
Contractor shall perform those services as indentified as scope of work in this
Agreement.
ILCOMPENSATION
A. The City agrees to pay, and Contractor agrees to accept as total payment for its
services, the rates and charges identified in scope of work and contract pricing. The
total sum to be expended under this Agreement shall not exceed $ during the
term of this Agreement.
B. Payment by City shall be made within sixty (60) days following receipt of
payment from investor owned utility financing, subject to City accounting procedures.
Payment need not be made for work which fails to meet the standards of performance
set forth in the Recitals which may reasonably be expected by City.
III.TERM
This Agreement shall commence on the date first written above. The contractor shall
20D-5
deliver and install all items under this contract within a period of three (3) months from
this date unless terminated earlier in accordance with Section XII.
IV.INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an
independent contractor and not an employee of the City. This Agreement is not
intended nor shall be construed to create an employer-employee relationship or a joint
venture relationship; however, the services to be provided by Contractor shall be
provided in a manner consistent with all applicable standards and regulations governing
such services. Contractor shall pay all salaries and wages, employer's Social Security
taxes, unemployment insurance and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
V.INSURANCE
Prior to undertaking performance of work under this Agreement, contractor shall
maintain and shall require its subcontractors, if any, to obtain and maintain insurance as
described below:
A. Commercial General Liability Insurance. Contractor shall maintain commercial
general liability insurance naming the City, its officers, agents, volunteers, and
employees as additional insured(s) and shall include, but not be limited to protection
against claims arising from bodily and personal injury, including death resulting there
from and damage to property, resulting from any act or without limitation, act involving
vehicles. The amounts of insurance shall be not less than the following: single limit
coverage applying to bodily and personal injury, including death resulting therefrom, and
property damage, in the total amount of One Million Dollars ($1,000,000.00) per
occurrence. Contractor shall supply City with fully executed additional insured
endorsement in substantially the form attached hereto as Exhibit B upon execution of
this Agreement and shall be approved in form by the City Attorney.
B. Business automobile liability insurance, or equivalent form, with a combined
single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. Such
insurance shall include coverage for owned, hired and non-owned automobiles.
C. Workers Compensation Insurance. In accordance with the provisions of Section
3300 of the Labor Code, Contractor, if Contractor has any employees, is required to be
insured against liability for Workers Compensation or to undertake self-insurance. Prior
to commencing the performance of the work under this Agreement, Contractor agrees to
obtain and maintain any employer's liability insurance with limits not less than One
Million Dollars ($1,000,000.00) per accident.
D. If Contractor is or employs a licensed professional such as an architect or
engineer: Professional liability (errors and omissions) insurance, with a combined single
limit of not less than One Million Dollars ($1,000,000.00) per claim.
E. The following requirements apply to the insurance to be provided by Contractor
pursuant to this section:
20D-6
1. Contractor shall maintain all insurance required above in full force and effect for
the entire period covered by this Agreement.
2. Certificates of Insurance shall be furnished to the City upon execution of this
Agreement and shall be approved in form by the City Attorney.
3. Certificates and policies shall state that the policies shall not be cancelled or
reduced in coverage or changed in any other material aspect without thirty (30) days
prior written notice to the City.
F. If Contractor fails or refuses to produce or maintain the insurance required by this
section or fails or refuses to furnish the City with required proof that insurance has been
procured and is in force and paid for, the City shall have the right, at the City's election,
to forthwith terminate this Agreement. Such termination shall not affect Contractor's
right to be paid for its time and materials expanded prior to notification of termination.
Contractor waives the right to receive compensation and agrees to indemnify the City for
any work performed prior to approval of insurance by the City.
VI.INDEMNIFICATION
Contractor agrees to and shall indemnify and hold harmless the City, its officers, agents,
employees, Contractors, special counsel, and representatives from liability: 1) for
personal injury, damages, just compensation, restitution, judicial or equitable relief
arising out of claims for personal injury, including death, and claims for property damage,
which may arise from the direct or indirect operations of the Contractor or its contractors,
subcontractors, agents, employees, or other persons acting on their behalf which relates
to the services described in Section 1 of this Agreement: and 2) from any claim that
personal injury, damages, just compensation, restitution, judicial or equitable relief is due
by reason of the terms of or effects arising from this Agreement. This indemnity and
hold harmless agreement applies to all claims for damages, just compensation,
restitution, judicial or equitable relief suffered, or alleged to have been suffered, by
reason of the events referred to in this section or by reason of the terms of, or effects,
arising from this Agreement. The Contractor further agrees to indemnify, hold harmless,
and pay all cost for the defense of the City, including fees and costs for special counsel
to be selected by the City, regarding any action by a third party challenging the validity of
this Agreement, or asserting that personal injury, damages, just compensation,
restitution, judicial or equitable relief due to personal or property rights arises by reason
of the terms of, effects arising from this Agreement. City may make all reasonable
decisions with respect to its representative in any legal proceeding.
VII.CONFIDENTIALITY
If Contractor receives from the City information which due to the nature of such
information is reasonably understood to be confidential and/or proprietary, Contractor
agrees that it shall not use or disclose such information except in the performance of this
Agreement, and further agrees to exercise the same degree of care it uses to protect its
own information of like importance, but in no event less than reasonable care.
"Confidential information" shall include all nonpublic information. Confidential information
includes not only written information, but also information transferred orally, visually,
electronically, or by other means. Confidential information disclosed to either party by
any subsidiary and/or agent of the other party is covered by this Agreement. The
20D-7
foregoing obligations of nonuse and nondisclosure shall not apply to any information that
1) has been disclosed in publicly available sources; 2) is, through no fault of the
Contractor, disclosed in a publicly available source; 3) is in rightful possession of the
Contractor without an obligation of confidentially; 4) is required to be disclosed by
operation of law; or 5) is independently developed by the Contractor without reference to
information disclosed by the City.
VIII.CONFLICT OF INTEREST CLAUSE
Contractor covenants that it presently has no interests and shall not have interests,
direct or indirect, which would conflict in any manner with performance if services
specified under this Agreement.
IX.NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this
Agreement shall be in writing and shall be deemed to be properly given if delivered in
person or mailed by first class or certified mail, postage prepaid, or sent by facsimile or
other telegraphic communication in the manner provided in the section, to the following
persons:
To City:
Clerk of the City Council
City of Santa Ana
P.O. Box 1988 M-30
Santa Ana, CA 92702-1988
Fax (714) 647-6956
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
P.O. Box 1988 M-21
Santa Ana, CA 92702
And:
City Attorney
City of Santa Ana
P.O. Box 1988 M-29
Santa Ana, CA 92702
Fax (714) 647-6515
Contractor
X.EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Contractor, and supersedes any and all other agreements, oral or written, between the
I
i
20D-8
parties. In the event of a conflict between the terms of this Agreement and any
attachments hereto, the terms of this Agreement shall prevail. This Agreement may not
be modified except by written instrument signed by the City and by an authorized
representative of Contractor. The parties agree that any terms or conditions of any
purchase order or other instrument that are inconsistent with, or in addition to, that terms
and conditions hereof, shall not bind or obligate Contractor nor the City. Each party to
this Agreement acknowledges that no representatives, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on
behalf of any party, which is not embodied herein.
XI.ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of
Contractor, Contractor may not assign, transfer, delegate, or subcontract any interest
herein without prior written consent of the City, and any such assignment, transfer,
delegation or subcontract without the City's prior written consent shall be considered null
and void. Nothing in this Agreement shall be construed to limit the City's ability to have
any of the services which are the subject to this Agreement performed by the City
personnel or by other Contractor retained by City.
XII.TERMINATION
This Agreement may not be terminated by the City upon thirty (30) days written notice of
termination. In such event, Contractor shall be entitled to receive, and the City shall pay,
Contractor compensation for all services performed by Contractor prior to receipt of such
notice of termination, subject to the following conditions:
A. As a condition of such payment, the Executive Director may require Contractor to
deliver to the City all work products completed as of such date, and in such case such
work product shall be property of the City unless prohibited by law, and Contractor
consents to the City's use thereof for such purposes as the City deems appropriate.
B. Payment need not be made for work which fails to meet the standard of
performance specified in the Recitals of this Agreement.
XIII.DISCRIMINATION
Contractor shall not discriminate because of race, color, creed, religion, sex, marital
status, sexual orientation, age, national origin, ancestry, or disability, as defined and
prohibited by applicable law, in the recruitment, selection, training, utilization, promotion,
termination or other employment related activities. Contractor affirms that it is an equal
opportunity employer and shall comply with all applicable federal, State and local laws
and regulations.
XIV.JURISDICTION - VENUE
This Agreement and all questions relating to its validity, interpretation, performance, and
enforcement shall be government and construed in accordance with the laws of the
State of California. This Agreement has been executed and delivered in the State of
California and the validity, interpretation, performance, and enforcement of any of the
clauses of this Agreement shall be determined and governed by the laws of the State of
20D-9
California. Both parties further agree that Orange County, California, shall be the venue
for any action or proceeding that may be brought or arise out of, in connection with or by
reason of this Agreement.
XV.PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses,
permits, approvals, waivers, and exemptions necessary for the provision of the services
hereunder and required by the laws and regulations of the United Sates, the State of
California, the City of Santa Ana and all other governmental agencies. Contractor shall
notify the City immediately and in writing of their inability to obtain or maintain such permits,
licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination
of this Agreement.
XVI.RESPONSIBILITY FOR DAMAGES
The Contractor shall be responsible for all damages to persons and/or property that
occur as a result of the fault or negligence of said Contractor or his employees in
connection with the performance of this work.
XVILFAILURE TO PERFORM SATISFACTORILY
A. It is agreed and understood that in the short run, if the Contractor fails to perform
the work as specified herein, the Director, 1) will pay only for the amount of service
received as determined by the Director with an appropriate downward adjustment in
contract price, or 2) may have such required work done by City forces or otherwise, and
charge the cost thereof to the Contractor.
Such adjustments will be the estimated cost for performance by City forces plus City
overhead and will include overtime pay as required to complete work.
B. If the Contractor performs the work in such a manner that the amount of payment
withheld due to substandard performance, nonperformance and forfeiture for
noncompletion per schedule totals five (5) percent of the total contract price, the City will
put the Contractor under notice of noncompliance. If the Contractor continues to
perform the work in such a manner that the amount of payment withheld due to
substandard performance, nonperformance and forfeiture for noncompletion per
schedule totals ten (10) percent of the total contract price, the contract is subject to
cancellation at the City's option. In the event of cancellation for unsatisfactory
performance, the original Contractor shall reimburse the City for damage accrued by
changing contractors.
XVIII.SAFETY REQUIREMENTS
All work performed under this contract shall be performed in a manner as to provide
required maximum safety to the public and where applicable, comply with all safety
standards required by CAL-OSHA. The Director reserves the right to issue restraint or
cease and desist orders to the Contractor when unsafe or harmful acts are observed or
reported relative to the performance of the work under this contract.
XIX.HAZARDOUS CONDITIONS
I
20D-10
The Contractor shall maintain all work sites free of hazards to persons and/or property
resulting from its operations. Any hazardous condition noted by the Contractor, which is
not a result of its operations, shall be immediately reported to the Public Works Agency.
XX.UTILITIES
Any damage to utility lines that occurs shall immediately report to the utility company that
is involved. The cost of repair, if required, will be at the Contractor's expense. If
damage occurs to any adjacent shrubs or trees that are to remain on the site, immediate
treatment or necessary replacements of the same shall be at the Contractor's expense.
XXI.ACCESS TO PRIVATE PROPERTY
Prior to any work that will restrict access to private property the Contractor shall notify
each affected property owner or responsible person, informing him of the nature of and
the approximate duration of the restriction.
XXII.PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS
The Contractor shall be responsible for the protection of all improvements adjacent to
the work, such as sprinkler systems, drain pipes, lawns, brick work, plantings, masonry
work, fences, wall, sidewalks, street paving, etc., located on either public or private
property. If any improvements are damaged they shall be replaced in kind at the
Contractor's expense.
XXIII.TRAFFIC CONTROL
The Contractor shall conduct all work in a manner that will insure continuous traffic flow
on the street at all times. In situations where it is necessary to restrict traffic flow per
WATCH, the Contractor will contact the Director for approval.
XXIV.MISCELLANEOUS TRAFFIC DEVICES
Contractor shall provide all traffic control and miscellaneous traffic devices as may be
required for routine and/or extraordinary maintenance of this contract.
Signs used for handling traffic during the course of this contract shall be in accordance
with the WATCH published by Building News, Inc., and made a part of these special
provisions. The method in which signs, barriers and other miscellaneous traffic devices
are used during construction and/or repair shall be in accordance with the publication
mentioned. A copy of said publication is on file in the Public Works Agency.
All signs shall be illuminated or reflectorized when they are used during hours of
darkness. All cones, pylons, barricades, or posts used in the diversion of traffic shall be
provided with flashers, or other satisfactory illumination if in place during hours of
darkness.
XXV.WORK BY CITY FORCES BECAUSE OF NONCONFORMANCE TO CONTRACT
Should the Contractor fail to correct deficiencies or public nuisances that have been created
20D-11
because of his operation, then these will be considered to be of an emergency nature and
cause the City to move in on the project to make corrective work. Such work will be done on a
force account basis with an additional callout charge of Two Hundred Dollars ($200.00) for
each callout.
XXVI.PAYMENT
The Contractor will be paid after completion of the project, upon approval and payment to
the City by Southern California Edison. Contractor shall submit a detailed report of work
performed and materials used in the project. This report shall be accompanied by a billing
in accordance with the contract price for the work performed, and shall become basis for
payment.
XXVII.APPRENTICESHIP STANDARDS
Where required under law, the contractor on this project shall assume full responsibility
for compliance with apprenticeship standards as established by Section 1777.5 of the
California State Labor Code.
XXVIII.SUBCONTRACTORS
The successful proposer shall not, without the written consent of the City:
A. Substitute any person or firm as subcontractor in place of the subcontractor
designated in the original proposal.
B. Permit any subcontract to be assigned or transferred or allow it to be performed
by anyone other than the original subcontractor listed in the proposal.
C. Subcontract any portions of the work after bid is submitted if the cost thereof
exceeds one-half (1/2) of one (1) percent of the total proposal and a subcontractor was
not designated for the work in the original proposal.
XXIX.MISCELLANEOUS PROVISIONS
A. Each undersigned represents and warrants that its signature herein below has
the power, authority and right to bind their respective parties to each of the terms of this
Agreement, and shall indemnify City fully, including reasonable costs and attorney's
fees, for any injuries or damages to City in the event that such authority or power is not,
in fact, held by the signatory or is withdrawn.
B. All exhibits referenced herein and attached hereto shall be incorporated as if fully
set forth in the body of this agreement.
H
20D-12
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and
year first above written.
ATTEST: CITY OF SANTA ANA
Maria H. Huizar Paul Walters
Clerk of the Council City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:
Laura Sheedy
Deputy City Attorney
RECOMMENDED FOR APPROVAL: CONTRACTOR
Raul Godinez II (Name)
Executive Director,
Public Works Agency
(Title)
20D-13
CITY OF SANTA ANA
REQUEST FOR PROPOSALS FOR LED COBRAHEAD STREETLIGHTS
SCOPE OF SERVICES
I. DESCRIPTION AND SCOPE OF WORK
The City of Santa Ana is issuing this Request for Proposals (RFP) for LED
COBRAHEAD STREETLIGHTS. This RFP calls for: removal and disposal of existing
luminaires; furnishing and installing new LED luminaires; all testing, including
photometric and energy consumption, to prove that furnished luminaires perform as
specified.
A. IMPLEMENTATION
1. City staff shall have the right to modify, reduce, or delete the services as
needed by City.
2. The term of the contract shall be for one (1) year which shall commence
on the date that City Council approves the award or the date that all
required bonds and insurance have been approved by the City Attorney,
whichever occurs last.
II. DEFINITIONS
III. TERMS AND CONDITIONS
A. TERM
The term of this contract shall commence the date of City Council award and
approval of all insurance and bonds, and terminate one year from that date,
unless earlier terminated as set forth in Section H, below.
B. COMPENSATION
1. City agrees to pay and contractor agrees to accept as total payment for
its services, the prices set forth in contractor's proposal, attached hereto
and incorporated by reference.
2. Invoices
a. The contractor shall submit a monthly invoice upon completion of the
project to the City.
b. All invoices for work performed under this contract shall be submitted
in a format approved by the City. Invoices shall include the following
information at a minimum:
i. Contractor's invoice number
ii. Beginning and ending dates for services
20D-14
iii. City project number and/or name (if applicable)
iv. Work site address/location (if applicable)
V. Unit cost, subtotals and total for invoice
3. Extra Work
No new work of any kind shall be considered an extra unless a separate
estimate is given for said work and the estimate is approved by the City in
writing before the work is commenced. The contractor will be required to
provide detailed information of such extra work. Documentation of
contract compliance may be required on some occasions. Work
performed prior to obtaining written approval of the City shall not be
included within the Scope of Work and may not be paid.
4. Payment
Payment by City shall be made within sixty (60) days following receipt of
payment from investor owned utility financing, subject to City accounting
procedures. Payment need not be made for work which fails to meet the
standards of performance set forth in the Recitals which may reasonably
be expected by City.
C. INDEPENDENT CONTRACTOR
Contractor shall during the entire term of this contract, be construed to be an
independent contractor and not an employee of the City. This contract is not
intended nor shall it be construed to create an employer-employee relationship, a
joint venture relationship, or to allow the City to exercise discretion or control over
the manner in which contractor performs the services required by this contract.
However, the services to be provided by contractor shall be provided in a manner
consistent with all applicable standards and regulations governing such services.
Contractor shall pay all salaries and wages, employer's Social Security taxes,
unemployment insurance, and similar taxes relating to employees and shall be
responsible for all applicable withholding taxes.
D. INSURANCE
Prior to undertaking performance of work under this contract, contractor shall
maintain and shall require its subcontractors, if any, to obtain and maintain
insurance as described below:
1. Commercial General Liability Insurance. Contractor shall maintain
commercial general liability insurance which shall include, but not be
limited to protection against claims arising from bodily and personal injury,
including death resulting there from and damage to property, resulting
from any act or occurrence arising out of contractor's operations in the
performance of this agreement, including, without limitation, acts involving
vehicles. The amounts of insurance shall be not less than the following:
20D-15
single limit coverage applying to bodily and personal injury, including
death resulting therefrom, and property damage, in the total amount of
One Million Dollars ($1,000,000) per occurrence, Two Million Dollars
($2,000,000) in the aggregate. Such insurance shall (a) name the City,
its officers, employees, agents, volunteers, and representatives as
additional insured(s); (b) be primary and not contributory with respect to
insurance or self-insurance programs maintained by the City; and (c)
contain standard separation of insureds provisions. A sample additional
insured endorsement is attached hereto as Exhibit H.
2. Business automobile liability insurance, or equivalent form, with a
combined single limit of not less than One Million Dollars ($1,000,000) per
occurrence. Such insurance shall include coverage for owned, hired and
non-owned automobiles.
3. Worker's Compensation Insurance. In accordance with the provisions of
Section 3300 of the Labor Code, contractor is required to be insured
against liability for Workers' Compensation or to undertake self-insurance.
Prior to commencing the performance of the work under this contract,
contractor agrees to obtain and maintain any employer's liability
insurance with limits not less than One Million Dollars ($1,000,000) per
accident.
4. If contractor is or employs a licensed professional such as an architect or
engineer: Professional liability (errors and omissions) insurance, with a
combined single limit of not less than One Million Dollars ($1,000,000) per
claim.
5. The following requirements apply to the insurance to be provided by
contractor pursuant to this section:
a. Contractor shall maintain all insurance required above in full force
and effect for the entire period covered by this agreement.
b. Certificates of insurance shall be furnished to the City upon
execution of this contract and shall be approved in form by the
City Attorney.
C. Certificates and policies shall state that the policies shall not be
canceled or reduced in coverage or changed in any other material
aspect without thirty (30) days prior written notice to the City.
6. If contractor fails or refuses to produce or maintain the insurance required
by this section or fails or refuses to furnish the City with required proof
that insurance has been procured and is in force and paid for, the City
shall have the right, at the City's election, to forthwith terminate this
contract. Such termination shall not affect contractor's right to be paid for
its time and materials expended prior to notification of termination.
Contractor waives the right to receive compensation and agrees to
indemnify the City for any work performed prior to approval of insurance
by the City.
20D-16
E. HOLD HARMLESS/ INDEMNIFICATION
To the fullest extent permitted by law, contractor shall indemnify, defend and hold
harmless City, its officers, agents and employees (collectively, the "indemnified
parties") from and against any and all claims (including, without limitation, claims
for bodily injury, death or damage to property), demands, obligations, damages,
actions, causes of action, suits, losses, judgments, fines, penalties, liabilities,
costs and expenses (including, without limitation, attorney's fees, disbursements
and court costs) of every kind and nature whatsoever (individually, a claim;
collectively, "claims"), which may arise from or in any manner related (directly or
indirectly) to any work performed or services provided under this contract
(including, without limitation, defects in workmanship and/or materials) or
contractor's presence or activities conducted performing the work (including the
negligent and/or willful acts, errors and/or omissions of contractor, its principals,
officers, agents, employees, vendors, suppliers, contractors, subcontractors,
anyone employed directly or indirectly by any of them or for whose acts they may
be liable for any or all of them). Notwithstanding the foregoing, nothing herein
shall be construed to require contractor to indemnify the indemnified parties from
any claim arising from the sole negligence or willful misconduct of the
indemnified parties. Nothing in this indemnity shall be construed as authorizing
any award of attorney's fees in any action on or to enforce the terms of this
contract. This indemnity shall apply to all claims and liability regardless of
whether any insurance policies are applicable. The policy limits do not act as a
limitation upon the amount of indemnification to be provided by the contractor.
F. NOTICE
Any notice, tender, demand, delivery or other communication pursuant to this
agreement shall be in writing and shall be deemed to be properly given if
delivered in person or mailed by first class or certified mail, postage prepaid, sent
by telefacsimile communication, or via e-mail to the following persons:
To City: Clerk of the Council
City of Santa Ana
20 Civic Center Plaza (M-30)
Santa Ana, CA 92701
Fax 714-647-6956
With courtesy copy to: Public Works Agency - Construction Engineering
To Contractor:
II
20D-17
G. TERMINATION
The City reserves the right to terminate the contract as follows:
1. In the event contractor fails or refuses to timely perform any of the
provisions of this agreement in the manner required, or if contractor
violates any provision of this agreement, contractor shall be deemed in
default. City shall provide written notice of such default to contractor's
project manager. Contractor shall cure said default within a period of two
(2) working days. If such cure is not completed in a timely manner, City
may assess liquidated damages or terminate the agreement forthwith by
giving written notice to contractor's project manager. City may, in addition
to the other remedies provided in this agreement or authorized by law,
terminate this agreement by giving written notice of termination.
Contractor shall be responsible for all costs incurred by City, including
replacement costs of equipment and labor required to provide service
during contractor's default. In the event of such termination for cause,
City shall pay contractor that portion of compensation specified in the
agreement that is earned and unpaid prior to the effective date of
termination. Contractor shall not be entitled to any compensation for lost
profits it terminated for cause.
2. This agreement may be terminated without cause by City upon thirty (30)
days written notice delivered to the contractor either personally or by mail.
Upon termination, City shall pay to contractor that portion of
compensation specified in the agreement that is earned and unpaid prior
to the effective date of termination.
3. In addition to, or in lieu of, remedies provided in this agreement or
pursuant to law, City shall have the right to withhold all or a portion of
contractor's compensation for contract services if, in the judgment of the
projects manager or designee, the level of service falls below appropriate
standards and/or contractor fails to satisfactorily perform contract
services. City shall have the right to retain funds withheld until the
projects manager or designee determines that contract services are
performed as well and as frequently as required by this agreement.
H. CONTRACTOR OPTION FOR TERMINATION
The contractor may request termination of the contract when conditions during
the contract make it impossible to perform or when prevented from proceeding
with the contract by act of God, by law or official action of a public authority or in
the event on nonpayment by the City. Such request will require one-hundred
eighty (180) days written notice prior to contract termination date requested. In
the event of nonpayment of undisputed sums by the City, contractor shall give
the City thirty (30) working days to cure the alleged breach.
20D-18
I. LIQUIDATED DAMAGES
If the City determines that the contractor breaches its promise to provide services
in compliance with the Terms and Conditions of applicable laws and regulations,
and the specifications set forth above, it would be impracticable and extremely
difficult to determine the damage to City arising from such breach. Therefore, in
the event of contractor's breach, contractor shall pay to City the sum of $500 per
day for such breach, in addition to any cost, fines, etc. levied against the City.
J. EMPLOYMENT OPPORTUNITIES FOR SANTA ANA RESIDENTS
Contractor shall solicit and advertise employment opportunities to Santa Ana
residents. The City shall inform the contractor of areas to publicize recruitment
opportunities, such as work centers and community centers. Such effort and
procedure will be provided to the City for review.
K. COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS
1. Contractor shall perform all requirements under this contract in strict
observance of and in compliance with all applicable environmental, traffic,
safety and any other laws, regulations, ordinances, codes and any other
legislative or statutory requirements.
2. Contractor warrants that the performance of services under this contract
shall be compliant with the current requirements and as they may be
amended or updated throughout the term of this contract.
N. ASSIGNMENT
Inasmuch as this contract is intended to secure the specialized services of
contractor, contractor may not assign, transfer, delegate or subcontract any
interest herein without the prior written consent of City and any such assignment,
transfer, delegation or subcontract without the City's prior written consent shall
be considered null and void.
0. JURISDICTION - VENUE
This contract has been executed and delivered in the State of California and the
validity, interpretation, performance and enforcement of any of the clauses of this
contract shall be determined and governed by the laws of the State of California.
Both parties further agree that Orange County, California, shall be the venue for
any action or proceeding that may be brought or arise out of, in connection with
or by reason of this contract.
P. FINES
The contractor shall be liable for all violation fines levied against the City by
federal, state, or local agencies with regulatory authority related to contractor
provided services.
20D-19
Q. SCOPE OF WORK
SPECIAL PROVISIONS
The Request for Proposals calls for removal and disposal of existing
luminaires; furnishing and installing new LED street lights and all testing,
including photometric and energy consumption, to prove that furnished
luminaires perform as specified.
The Contractor shall provide at its own risk and cost all labor, materials, tools,
equipment, and traffic control per the Work Area Traffic Control Handbook
("WATCH"), transportation, hauling, dumping, and recycling of removed
material as part of this project. The City reserves the right to salvage existing
luminaires. All salvaged luminaires shall be delivered to the City Corporate
Yard at no cost to the City.
1. FUNCTIONS AND RESPONSIBILITIES
A. DIRECTOR
The Director or his authorized representative shall have the authority to
accept/reject materials, workmanship and to make minor changes in work or
schedule. When the performance of the work or completion per schedule is
determined to be substandard, Director may 1) recommend that all or a portion
of payment be withheld, and/or forfeiture for delay be assessed; 2) direct the
work be accomplished by a separate contractor, in order to complete the
necessary work as close to schedule as possible and withhold the resulting
costs. Payment to be withheld shall be deducted from the next monthly
payment due to the Proposer, or if the amount is insufficient to cover payment,
the Proposer shall be liable and will be billed accordingly.
The Director or his authorized representative shall decide all questions, which
may arise as to the manner of performance and completion per schedule,
acceptable fulfillment of the contract by the Proposer, interpretation of the
specifications, and compensation to include completion of work by alternate
sources.
B. PROPOSER
1. Local Office
The Proposer shall maintain a local office with a competent representative who
can be reached during normal working hours and authorized to discuss matters
pertaining to this contract with the Director. Proposer will not be allowed to
store equipment or materials at any contracted area.
2. Submittals
The Proposer shall submit to the Director at the beginning of work, 1) a detailed
job schedule, 2) names and titles of all persons working on the project, and 3)
materials to be used on the project for approval. All submittals shall be
periodically updated as necessary. The Director shall be immediately notified
I
20D-20
of any deviation from schedule or material usage.
3. Identification
All vehicles and equipment on the project site shall be properly marked with
company identification.
4. Licenses and Permits
The Proposer shall, prior to award of contract and without additional expense to
the City, possess all licenses and permits required for the performance of the
work required by this contract, including but not limited to State License C-27, a
City of Santa Ana Business License, and a C-10 Electrical License.
5. Work Force
a. The Proposer shall ensure that all work under this agreement is
supervised by personnel who are technically qualified and possess the
management skills required to implement modern methods and newly
developed procedures.
b. The Proposer shall ensure that all work under this agreement is
performed by fully qualified, experienced personnel, directly employed by the
Proposer or its listed subcontractors. All subcontractors that will perform work
under this agreement shall be listed on this proposal. No other subcontractors
shall be permitted without prior written consent by the Director.
C. The Proposer shall be responsible for skills, methods, appearance and
action of Proposer's employees and its subcontractors and for all work done.
The Contractor's employees shall be United States citizens and/or legal
residents.
d. The Proposer shall perform the work provided for in this proposal under
the direction of the Director. The Director may make inspections at any time
and may request that the Contractor perform additional work or services to
bring Contractor's performance to the level required by this agreement.
6. Material
The Proposer shall submit a list to the Director all materials that the
Proposer proposes to the use in the execution of this work. Said list shall be
submitted before use of any product, pursuant to the provisions of this
agreement. All materials used or submitted shall be in full compliance with all
federal, State, County and local agency laws, guidelines and requirements.
7. Recycling
All waste (including construction and demolition materials) resulting from
work performed under this contract shall be recycled. The Contractor will be
responsible for the disposal of all non-recyclable waste in accordance with all
20D-21
applicable local, State and federal laws and regulations. A recycling and
disposal plan must be submitted for approval prior to start of work.
8. General Maintenance and Clean-Up
All trash and debris shall be removed from all worksites at the end of
each day. The Contractor shall keep sidewalks and all paved areas in parkway
swept and cleaned of any debris, dirt, or soil.
9. Emergency Service
The Proposer shall be able to receive and respond to the City's call for
emergency service twenty-four (24) hours per day, seven (7) days per week.
Response time shall be immediate but not more than two (2) hours to remove
or eliminate a public safety hazard. Contractor shall provide the City with a
local telephone number where contractor can be contacted twenty-four (24)
hours per day, seven (7) days per week.
~I
20D-22
Exhibit 2
On-Bill Financing Agreement
This On-Bill Financing Agreement ("OBF Agreement") is entered into on
20_, (the "Effective Date") by and between the undersigned customer ("Customer") and
Southern California Edison Company ("SCE") (each a "Party," collectively the "Parties").
Recitals
1. Customer and SCE entered into the Energy Management Solutions Incentives Application for
Business Customers on or about , 20 and if applicable, the Customized Solutions
Agreement (individually or collectively referred to as "EMS Agreement"), which is/are attached
hereto and incorporated herein by reference.
2. Customer owns, leases or rents the property listed in the EMS Agreement as the Site and
maintains a service account(s) with SCE for electric service. Customer has completed
installation of eligible energy efficient equipment ("Equipment") at the Site as set forth in the
EMS Agreement and has accepted the equipment as being operational and in good working
order.
3. In Decision 09-09-047, the California Public Utilities Commission authorized SCE to provide
zero-percent interest financing for the installation of certain energy efficient equipment, which
is to be repaid over a specified period through the Customer's electric utility bill(s) ("On-Bill
Financing").
4. Customer desires to enter into this OBF Agreement in order to participate in SCE's On-Bill
Financing program and Customer agrees to repay SCE the Amount Financed (as defined
under "Loan Terms", below) through the Customer's SCE utility bill(s) pursuant to the terms
and conditions of this OBF Agreement.
NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, the
Parties agree as follows:
Terms and Conditions
Defined Terms: Except as the context otherwise requires, capitalized terms used in this OBF
Agreement without definition shall have the same meanings as are set forth in the EMS
Agreement.
Amount Financed: Within thirty (30) days after the Effective Date, SCE will provide a payment for
the Amount Financed to Customer or to a third-party payee designated by Customer under the
Loan Terms, below. Customer's designation of a third-party payee may not be changed or
revoked.
Loan Terms:
Amount Financed ("Amount $ .00
Financed" :
Interest Rate: 0%
Fees: 0
Months to Pay:
First Month Payment
Remaining Monthly Payments:
Service Account to be Billed:
Designated Third-Party Payee (if
an :
Address of Designated Third-
Party
If more than one Service Account will be billed, information regarding the Service Account
number and monthly payment is included in Schedule A attached.
Form 14-792 1
05/2012
20D-23
Promise to Pay: Customer promises to pay SCE the Amount Financed in equal monthly
installments as set forth in the section above and/or Schedule A (Customer's "Loan Obligation").
The first Monthly Payment of Customer's Loan Obligation will appear within sixty (60) days from
the Effective Date on Customer's SCE utility bill(s) for the Service Account(s) listed above.
Manner of Payment: Customer's Monthly Payment amount will appear as a line item labeled
"EE/OBF Installment Charge" on the monthly SCE utility bill(s) for Customer's Service Account(s).
Customer may pay the Loan Obligation in the monthly installments or pre-pay the Loan
Obligation in one lump sum without penalty, but pre-payments for less than the remaining
balance will not be allowed. Customer's Loan Obligation will appear on Customer's monthly
SCE utility bill(s) for the number of months set forth above, or until the Loan Obligation is paid in
full by Customer, whichever occurs first. Customer shall make payments to SCE as directed in the
SCE utility bill(s).
Partial Payments: If Customer is unable to make a full payment of the Loan Obligation in any
given month, payment arrangements may be made at SCE's sole discretion. Any partial
payments will be applied in equal proportion to the energy charges and the Loan Obligation, and
Customer will be considered to be delinquent and in default of both the energy bill and the Loan
Obligation.
Late Payments: No late payment charges or interest will be assessed for delinquent payments on
the Loan Obligation. However, SCE may assess late payment charges for delinquent payments of
energy charges pursuant to SCE's Rule 9 which is incorporated herein by reference.
Returned Payments: SCE may require payment of a $10.00 Returned Check Charge for any
check returned from Customer's financial institution unpaid. The Returned Check Charge will also
apply to any forms of payment that are subsequently dishonored.
Discontinuance of Service: Amounts due under this OBF Agreement will be amounts deemed
due under each SCE utility bill to the Customer's Service Account(s), and a default under this OBF
Agreement will be treated as a default under the Customer's Service Account(s). Customer's Loan
Obligation is subject to the discontinuance provisions of SCE's Rule 11, Discontinuance and
Restoration of Service, Section B, Nonpayment of Bills or Summary Bills which is incorporated
herein by reference.
Breach and Acceleration: Any breach by Customer under the EMS Agreement or this OBF
Agreement shall constitute a breach under all of the above referenced agreements. For purposes
herein, SCE may determine the OBF Agreement to be breached and Customer to be in default if
Customer: (1) sells, assigns or otherwise transfers ownership, possession or title of the Site or the
Equipment, (2) fails to pay the Monthly Payment amount when due, (3) closes, discontinues or
otherwise causes the termination of the Service Account(s), or (4) otherwise breaches this OBF
Agreement and/or the EMS Agreement, and the breach is not cured as specified therein.
Notwithstanding anything to the contrary in the EMS Agreement, a breach and default as set forth
in this section shall not be subject to any additional cure period. Following a breach as set forth in
this section, SCE shall have the right to declare the entire unpaid balance of the Loan Obligation
immediately due and payable.
Purchase Money Security Interest: Customer hereby agrees that SCE may, but is not obligated
to, file a UCC-1 ("Financing Statement") against the Equipment to secure Customer's obligation to
repay the Amount Financed. Customer agrees to execute any and all documents in connection
with the Financing Statement in order for SCE to perfect its security interest in the Equipment.
Customer agrees that SCE is not waiving any of its rights of recovery as against the Customer
should SCE elect to file a Financing Statement.
Form 14-792 2
05/2012
20D-24
Confession of Judgment: Customer irrevocably authorizes and empowers SCE and SCE's
attorneys, upon breach and default by Customer as described in the preceding section, to appear
in any state or federal court in Los Angeles County, California, as Customer's attorney-in-fact and
confess judgment against Customer by entry of a confession of judgment pursuant to Code of Civil
Procedure § 1132 et. seq., or by any other appropriate means, for the full amount due plus all
costs of collection, including without limitation court costs and reasonable attorneys' fees. No
single exercise of the foregoing power to confess judgment will be deemed to exhaust the power,
whether or not any such exercise shall be held by any court to be invalid, voidable, or void; but the
power will continue undiminished and may be exercised from time to time as SCE may elect until
all amounts owing under this OBF Agreement have been paid in full.
Modification: Any change to this OBF Agreement must be in writing and signed by Customer and
SCE; except that during any given month, if Customer is unable to make full payment on the Loan
Obligation, payment arrangements may be made at SCE's sole discretion without modifying this
OBF Agreement in writing. Any written modification or amendment will not be effective unless and
until signed by SCE or such condition is waived by SCE in its sole and absolute discretion.
Term and Termination: It is the Parties intent that the term of this OBF Agreement and the EMS
Agreement run concurrently. Therefore, the OBF Agreement shall continue in effect until the Loan
Obligation is paid in full.
Assignment: Notwithstanding anything to the contrary in this OBF Agreement, Customer may
not assign its rights or delegate its duties under the Agreement.
Additional Representations: Each person signing this OBF Agreement represents and warrants
that he or she is duly authorized and has the legal capacity to execute and deliver this OBF
Agreement on behalf of Customer, and to perform their obligations under this OBF Agreement.
Customer further represents and warrants that if it is a legal entity, it is in good standing in its state
of formation.
Miscellaneous: Except as otherwise specifically provided herein, all terms, provisions,
covenants, representations, warranties, agreements and conditions of the EMS Agreement shall
remain unchanged and in full force and effect. Should a conflict exist between this OBF
Agreement, the EMS Agreement and the documents incorporated by reference, this OBF
Agreement shall control. This OBF Agreement shall be construed and interpreted in accordance
with, and shall be governed and enforced in all respects according to, the laws of the State of
California. This OBF Agreement may be executed in one or more counterparts, each of which
shall be deemed an original but all of which shall constitute one and the same instrument. If any
one or more of the provisions contained in this OBF Agreement shall for any reason be held to be
invalid, illegal or unenforceable in any respect, then this OBF Agreement shall be construed as if
such invalid, illegal or unenforceable term or provision had never been contained herein and all
other provisions of this OBF Agreement shall be construed to remain fully valid, enforceable and
binding on the parties. The Recitals set forth above are hereby incorporated herein by reference.
[Remainder of page intentionally left blank]
Form 14-792 3
05/2012
20D-25
IN WITNESS WHEREOF, the Parties have executed this OBF Agreement as of the Effective
Date.
Customer: Southern California Edison Company:
Authorized Representative: Authorized Representative:
Title: Title:
Signature: Signature:
Date: Date:
Business Address: Business Address:
Telephone No. Telephone No.
Fax No. Fax No.
E-Mail Address: E-Mail Address:
Form 14-792 4
0512012
20D-26
SCHEDULE A
Customer Name:
OBF Loan Number:
Site Service OBF Billing 15 Monthly Remaining Monthly
Account Repayment OBF Loan OBF Loan Payments
Number Service Account Payment
Number
X-XXX- X-XXX-XXXX-XX $XX.XX $XXX.XX per month for X months
XXXX-XX
Total Monthly Repayment $XX.XX $XXX.XX per month
for X months
Form 14-792 5
05/2012
20D-27
Exhibit 3
LED Streetlight On-Bill Financing (OBF)
Energy Saving Incentives Summary
Total Estimated Annual Energy Savings (kWh) 934,572
Total Estimated SCE Energy Savings Incentives $74,766
Total Amount Approved by SCE to be Financed with On-Bill Financing (OBF) $625,694
Total Project Cost to be Financed by OBF $600,161
SCE • Title SCE Project# Billing Type
Santa Ana LED Street Lighting Scope #2 193-12-0500301418 Metered Lights
Number of fixtures 138
kWh Saved 78,451
Project Cost Approved by SCE $88,320
Estimated SCE Incentive $6,276
OBF Amount Approved by SCE $82,044
Estimated payback (years) 4.5
SCF • Title SCE Project tt Billing Type
Santa Ana LED Street Lighting Scope #4 (1 of 9) 198-12-0500262965 Unmetered Lights
Number of fixtures 87
kWh Saved 77,187
Project Cost Approved by SCE $58,240
Estimated SCE Incentive $6,175
OBF Amount Approved by SCE $52,065
Estimated payback (years) 4.5
SCE Application Title SCE Project # Billing Type
Santa Ana LED Street Lighting Scope #4 (2 of 9) 193-12-0500254043 Unmetered Lights
Number of fixtures 86
kWh Saved 81,009
Project Cost Approved by SCE $55,040
Estimated SCE Incentive $6,481
OBF Amount Approved by SCE $48,559
Estimated payback (years) 4.5
20D-28
Exhibit 3
LED Streetlight On-Bill Financing (OBF)
Energy Saving Incentives Summary
SCE Application Title SCE Project 4 Billing Type
Santa Ana LED Street Lighting Scope #4 (3 of 9) 193-12-0500254042 Unmetered Lights
Number of fixtures 92
kWh Saved 86,734
Project Cost Approved by SCE $58,880
Estimated SCE Incentive $6,939
OBF Amount Approved by SCE $51,941
Estimated payback (years) 4.5
SCE Application Title SCE Project # Billing Type
Santa Ana LED Street Lighting Scope #4 (4 of 9) 193-12-0500255252 Unmetered Lights
Number of fixtures 168
kWh Saved 144,241
Project Cost Approved by SCE $107,520
Estimated SCE Incentive $11,539
OBF Amount Approved by SCE $95,981
Estimated payback (years) 4.5
SCE Application Title SCE Project # Billing Type
Santa Ana LED Street Lighting Scope #4 (S of 9) 193-12-0500251911 Unmetered Lights
Number of fixtures 94
kWh Saved 86,535
Project Cost Approved by SCE $60,160
Estimated SCE Incentive $6,923
OBF Amount Approved by SCE $53,237
Estimated payback (years) 4.5
SCE Application Title SCE Project 4 Billing Type
Santa Ana LED Street Lighting Scope #4 (6 of 9) 193-12-0500255099 Unmetered Lights
Number of fixtures 92
kWh Saved 83,997
Project Cost Approved by SCE $58,880
Estimated SCE Incentive $6,720
OBF Amount Approved by SCE $52,160
Estimated payback (years) 4.5
20D-29
Exhibit 3
LED Streetlight On-Bill Financing (OBF)
Energy Saving Incentives Summary
Project SCE Application Title SCE Santa Ana LED Street Lighting Scope #4 (7 of 9) 193-12-500255299 Unmetered Lights
Number of fixtures 86
kWh Saved 74,521
Project Cost Approved by SCE $55,040
Estimated SCE Incentive $5,962
OBF Amount Approved by SCE $49,078
Estimated payback (years) 4.5
SCE Application Project
Santa Ana LED Street Lighting Scope #4 (8 of 9) 193-12-0500314488 Unmetered Lights
Number of fixtures 98
kWh Saved 83,086
Project Cost Approved by SCE $62,720
Estimated SCE Incentive $6,647
OBF Amount Approved by SCE $56,073
Estimated payback (years) 4.5
SCE Application Title SCE Project 4 Billing Type
Santa Ana LED Street Lighting Scope #4 (9 of 9) 193-12-0500305654 Unmetered Lights
Number of fixtures 160
kWh Saved 138,811.00
Project Cost Approved by SCE $95,660
Estimated SCE Incentive $11,105
OBF Amount Approved by SCE $84,555
Estimated payback (years) 4.5
20D-30