HomeMy WebLinkAbout20E - AA - BRISTOL WIDENING ws REQUEST FOR COUNCIL ACTION a CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JANUARY 22, 2013 TITLE: APPROVED CONTRACT AWARD TO ALL AMERICAN ? As Recommended ASPHALT FOR BRISTOL STREET ? As Amended WIDENING FROM 2ND TO 10TH STREETS ? Ordinance on Reading El Ordinance on 2 I d Reading AND WATER AND SEWER MAIN ? Implementing Resolution IMPROVEMENTS FROM 3RDTO 10TH ? Set Public Hearing For STREETS (PROJECT NOS. 081700, 126421 & 126422 ) CONTINUED TO t l _.tfL Q- FILE NUMBER CITY MANAGER RECOMMENDED ACTION 1. Award a construction contract to the lowest bidder, All American Asphalt, Inc., for the Bristol Street widening from 2nd to 10th Streets, and for the water and sewer system improvements from 3rd to 10th Streets, in accordance with their bid in the amount of $6,169,256. 2. Approve the Cost Analysis, as shown in Exhibit 1, for a total estimated project delivery cost of $7,711,582. 3. Approve an appropriation adjustment accepting Orange County Transportation Authority Comprehensive Transportation Funding Programs Measure M2 Arterial Capacity Enhancements allocation in the amount of $3,120,000 into the Measure M Street Construction revenue account (03217002-52332) and appropriating the same to the Measure M2 Street Construction expenditure account (03217662-66220). Also, accepting Orange County Transportation Authority Prop 1 B Bond funding in the amount of $3,120,000 into the Prop 1 B Bond revenue account (03017002-52363) and appropriating the same to the Prop 1B Bond expenditure account (03017660-66220), for the Bristol Street Widening Project (No. 08-1700). DISCUSSION Bristol Street is a regionally significant north-south corridor which is designated as a major arterial highway in the City's General Plan Circulation Element. Bristol Street between Warner Avenue and Memory Lane is a long-term widening project scheduled to be completed in several phases as funding becomes available. Two phases have already been completed, and it is anticipated that two more phases, including this one, will be needed to complete the widening. This phase will widen Bristol Street between 2nd and 10th Streets, as shown in Exhibit 2. 20E-1 Contract Award for Bristol Street Widening and Bristol Street Water and Sewer Main Improvements January 22, 2013 Page 2 This project will widen Bristol Street from two to three lanes in each direction, add bike lanes, increase the sidewalk width, and add parkway and median landscaping. The widening will also include new traffic signals at the Santa Ana Boulevard and Civic Center Drive intersection, bus turnouts to improve traffic flow, bioswales to reduce surface run-off, sound walls adjacent to residential parcels, water and sewer system improvements, and a storm drain to improve drainage. Once completed, these improvements will enhance the ride quality, surface drainage, and visual appearance of the Bristol Street corridor. The Notice Inviting Bids was advertised on October 16 & 17, 2012, and bids were opened on November 15, 2012. A summary of the bid invitations mailed, bids received, and bid results is as follows: Contractor Participation Data Santa Ana Contractors receiving notices: 22 Contractors requesting bidding documents: 34 Bids received: 4 Bids received from Santa Ana Contractors: 0 Bid Results Summary RANK BIDDERS NAME LOCATION BID AMOUNT 1 All American Asphalt, Inc............. Corona ._._..._......_........._._....._..._...._$6,169,256_......_ _ 2 Lonerock, Inc. _ _ . _ . _ . _ _ . Laguna Hills $6.643..645 . . . . _ _ 3 ..._RJ...._ Noble Company, Inc............................. Oran ._e.................................................................$6,852,178 4 Excel Paving Company, Inc. Lon Beach $7,482,458 A total of four bids were received and all were deemed responsive. The lowest bid was submitted by All American Asphalt, Inc., for $6,169,256, which is below the Engineer's estimate of $6,726,445. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the proposed project has been determined to be adequately evaluated in the previously prepared Environmental Impact Report/Environmental Impact Assessment EIR No. 89-01 approved by City Council in 1990. 20E-2 Contract Award for Bristol Street Widening and Bristol Street Water and Sewer Main Improvements January 22, 2013 Page 3 FISCAL IMPACT A project cost analysis determined that an estimated $7,403,108 is needed to complete this project phase. There are sufficient funds available to cover those project costs. The proposed expenditure accounts include: OCTA Bristol Street Corridor Improvements Fund (Account 05917661-66220, Project No. 08-1700), Measure M2 Street Construction Fund (Account 03217662-66220, Project No. 081700), Prop 1B Bond Fund (Account 03017660-66220, Project No. 081700), Acquisition & Construction Water Utility Capital Projects Fund (Account 06617647- 66301, Project No. 126421) and Sanitary Sewer Services Fund (Account 05617640-66220, Project No. 126422). APPROVED AS TO FUNDS AND ACCOUNTS: w .r .1 7 Raul Godinez II Francisco Gutierrez Executive Director Executive Director Public Works Agency Finance & Management Services Agency RG/TC Exhibits: 1. Cost Analysis 2. Project Location Map II 20E-3 20E-4 COST ANALYSIS PROJECT NOS. 081700, 126421 AND 126422 BRISTOL STREET WIDENING BRISTOL STREET WATER AND SEWER STSTEM IMPROVEMENTS Cost Analysis Construction Contract $6,169,256 Construction Contingencies $6'16,926 Total Construction $6,786,182 Contract Administration $178,500 Inspection and Testing $538,500 Survey Staking $208,400 Total Ancillary $925,400 TOTAL PROJECT DELIVERY COST $7,711,582 Exhibit 1 20E-5 20E-6 K TENTH STREET CIVIC CENTER DR SEVENTH STREET W W CC C1~ SIXTH STREET ,r CD (f) FIFTH STREET m SANTA ANA BOULEVARD x w J a THIRD STREET 0 SECOND STREET to, oRA/yC~ I /1 p LOCATION MAP or Z o ~ < SANTA ANA 1 IT [ CONTRACT AWARD TO ALL AMERICAN ASPHALT FOR THE BRISTOL STREET WIDENM FROM 2ND ST. TO WTH ST. I - THE WATER AND SEWER MANN MIROVEMENTS FROM 3RD ST.TO WTH ST. -T" (PROJECT NOS. 081700.128421 + 128422) PUBLIC WORKS AGENCY EXHIBIT 1 Exhibit 2 20E-7 20E-8