Loading...
HomeMy WebLinkAboutALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.) tPo Recording Requested By, Recorded in Official Records, Orange County And When Recorded Mail To: Hugh Nguyen, Clerk-Recorder Clerk of the Council,City of Santa Ana I III I I III I Ili 111 IIII�IIII,IIII �III,IIII11�1�a�JIJJ I III 11 JillNO III 20 Civic Center Plaza,P.O.Box 1988 Santa Ana,CA 92702 20150000921261:35 pm 02/20/15 227 413 N 12 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 rtt3 �r. ut. rUR U(JUIN't-Y RECORDERS USE ONLY NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ana, California, a municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana, California, 92701, is the owner of the property hereinafter described, that said owner has caused construction of THE BRISTOL STREET WIDENING FROM 2ND ST. TO LOTH ST. AND THE WATER AND SEWER MAIN IMPROVEMENTS FROM 3RD ST. TO IOTH ST under contract entered into on January 7, 2013, with ALL AMERICAN ASPHALT, on which contract o FIDELITY AND DEPOSIT COMPANY OF MARYLAND is surety. The property on which c such work improvement was placed is in the City of Santa Ana, County of Orange, State of z California, and described as Project Nos. 08-1700, 12-6421 & 12-6422 located at: Bristol Street. c The work improvement on said property was accepted as completed on February 13, 2015, o CITY ANA ICIPAL CORPORATION F z by G Dated: City Engineer—Edwin"William"Galvez w a. TITLE ------------------------------------------------------------------------------------------- VERIFICATION 1, the undersigned, say: I am the City Engineer- Edwin"William" Galvez of the City of Santa Ana, California; I executed the foregoing Notice of Completion acting on behalf of the owner of the property therein described; I make this verification on behalf of said corporation by authorization of the City Council of the City of Santa Ana; I have read said notice and know the contents thereof; and I declare under penalty of perjury that the facts therein stated are true. Executed on �N�r �� , at Santa Ana, California �-- SignatuL vid I swearing that the contents of Notice o Completion are true.) THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN(10)DAYS AFTER COMPLETION REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JANUARY 22, 2013 TITLE: APPROVED IAN 2 2 2013') � t} I�F_ CONTRACT AWARD TO ALL AMERICAN ,� As Recommended ASPHALT FOR BRISTOL STREET O As Amended WIDENING FROM 2ND TO 10TH STREETS E3 Ordinance on 2 Reading 0 Ordinance on 2ntl Reading AND WATER AND SEWER MAIN O Implementing Resolution IMPROVEMENTS FROM 3RDTO 10TH O set Public Hearing For STREETS (PROJECT NOS. 081700, 126421 & 126422 ) / CONTINUED TO FILE NUMBER CITY MANAGER RECOMMENDED ACTION 1. Award a construction contract to the lowest bidder, All American Asphalt, Inc., for the Bristol Street widening from 2nd to 10th Streets, and for the water and sewer system improvements from 3rd to 10th Streets, in accordance with their bid in the amount of $6,169,256. 2. Approve the Cost Analysis, as shown in Exhibit 1, for a total estimated project delivery cost of $7,711,582. 3. Approve an appropriation adjustment accepting Orange County Transportation Authority Comprehensive Transportation Funding Programs Measure M2 Arterial Capacity Enhancements allocation in the amount of $3,120,000 into the Measure M Street Construction revenue account (03217002- 52332) and appropriating the same to the Measure M2 Street Construction expenditure account (03217662 - 66220). Also, accepting Orange County Transportation Authority Prop 113 Bond funding in the amount of $3,120,000 into the Prop 1B Bond revenue account (03017002- 52363) and appropriating the same to the Prop 1B Bond expenditure account (03017660- 66220), for the Bristol Street Widening Project (No. 08- 1700). DISCUSSION Bristol Street is a regionally significant north -south corridor which is designated as a major arterial highway in the City's General Plan Circulation Element. Bristol Street between Warner Avenue and Memory Lane is a long -term widening project scheduled to be completed in several phases as funding becomes available_ Two phases have already been completed, and it is anticipated that two more phases, including this one, will be needed to complete the widening. This phase will widen Bristol Street between 2nd and 10th Streets, as shown in Exhibit 2_ Contract Award for Bristol Street Widening and Bristol Street Water and Sewer Main Improvements January 22, 2013 Page 2 This project will widen Bristol Street from two to three lanes in each direction, add bike lanes, increase the sidewalk width, and add parkway and median landscaping. The widening will also include new traffic signals at the Santa Ana Boulevard and Civic Center Drive intersection, bus turnouts to improve traffic flow, bioswales to reduce surface run -off, sound walls adjacent to residential parcels, water and sewer system improvements, and a storm drain to improve drainage. Once completed, these improvements will enhance the ride quality, surface drainage, and visual appearance of the Bristol Street corridor. The Notice Inviting Bids was advertised on October 16 & 17, 2012, and bids were opened on November 15, 2012. A summary of the bid invitations mailed, bids received, and bid results is as follows: Contractor Particioation Data Santa Ana _Contractors _receiving _notices.: 22 __._ _. Contractors requesting bidding documents. 34 Bids received: 4 Bids received from Santa Ana Contractors: O Bid Results Summary RANK BIDDERS NAME LOCATION BID AMOUNT 1 All American Asphalt,__Lnc. Corona $6 169,256 _ 2 Lonerock, Inc. Laguna Hills 645 3 RJ Noble Company, Inc. _ Orange _$6,643 $6,852,178 4 Excel Pavin Com an ,Inc. Lon Beach $7,482,458 A total of four bids were received and all were deemed responsive_ The lowest bid was submitted by All American Asphalt, Inc_, for $6,169,256, which is below the Engineer's estimate of $6,726,445. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the proposed project has been determined to be adequately evaluated in the previously prepared Environmental Impact ReportlEnvironmental Impact Assessment EIR No. 89 -01 approved by City Council in 1990. Contract Award for Bristol Street Widening and Bristol Street Water and Sewer Main Improvements January 22, 2013 Page 3 FISCAL IMPACT A project cost analysis determined that an estimated $7,403,108 is needed to complete this project phase. There are sufficient funds available to cover those project costs. The proposed expenditure accounts include: OCTA Bristol Street Corridor Improvements Fund (Account 05917661- 66220, Project No. 08- 1700), Measure M2 Street Construction Fund (Account 03217662- 66220, Project No. 081700), Prop 1 B Bond Fund (Account 03017660 - 66220, Project No. 081700), Acquisition &Construction Water Utility Capital Projects Fund (Account 06617647- 66301 , Project No. 12-64.2- 1) and Sanitary Sewer Services Fund (Account 05617640- 66220, Project No. 126422). w r Raul Godinez II Executive Director Francisco Gutierrez Executive Director Public Works Agency Finance &Management Services Agency RG/TC Exhibits: 1 . Cost Analysis 2. Project Location Map APPROVED AS TO FUNDS AND ACCOUNTS: COST ANALYSIS PROJECT NOS. 081700, 126421 AND 126422 BRISTOL STREET WIDENING BRISTOL STREET WATER AND SEWER S'r'STEM IMPROVEMENTS Cost Analysis Construction Contract $6,169,256 Construction Contingencies $6'16,926 Total Construction $6,786,182 Contract Administration $178,500 Inspection and Testing $538,500 Survey Staking $208,400 Total Ancillary $925,400 TOTAL PROJECT DELIVERY COST $7,71 1 ,582 Exhibit 1 TES C I V I C CEO �' SANTA ANA .. I T, r ",, y r. I I � .iii,; � .,_. PUBLIC 'RORRS AGENCY SEVE slx� FIFi SANTF THIRD SECOND W W CC C1� O C_I-) �■ JLEVARD CONTRACT AWARD TO ALL AMERICAN ASPHALT FOR THE BRISTOL STREET WQB�K3 FROM 2ND ST. TO LOTH ST. THE WATER ANO SEWER MAW MPROVEbBd'TS FROM 3RD ST.TO 10TH ST. (PROJECT NOS. OBT100, 126427 t 126422) Exhibit 2 EXHIBff 1 THE REGISTER 625 N GRAND AVE, SANTA ANA, CA 92707 Telephone (774) 796 -7000 /Fax (774) 796 -6059 PROOF OF PUBLICATION (20"15.5 C.C.P.) State of Californla ) County of ORANGE ) ss Notice Type: BID - NOTICE INVITING BIDS Ad Description: Bristol Street Widening, 2nd to 70th; Water Maln, 3rd to 70th; Sewer Main, 3rd to 7 Oth I am a citizen of the United States and a resident of the State of Californla; I am over the age of eighteen years, and not a party to or Interested In the above entitled matter. I am the principal clerk of the printer and publisher of the THE REGISTER, a newspaper published in the English language In the city of SANTA ANA, county of ORANGE, and adf udged a newspaper of general circulation as defined by the laws of the State of California by the Superior Court of the Coun[y of ORANGE, State of California, under date 7 7/79/7905. Case No. A27046. That the notice, of which the annexed Is a printed copy, has bean published In each regular and entire issue of Bald newspaper and not in any supplement thereof on the following dates, to -wit: 7 O/7 6/20'12. 7 O/ 7 7/207 2 Executed on: 70/77/2072 At SANTA ANA, California space mr Tlnng stamp only CNS #: 2393509 mrpovale surely for � an 9•nount ,not 1658 Ihan Ian percent (t0 %) of the 6BDragete of the bid, as a guarpntee that the BIDDER will enter Into the Droposetl cpnlracl II tho $ame Is ewerdetl to him. The signature of the BIDDER on Iha bltl bond MUST be notarized. TM1a Clty C.OpnCll reserves the ngnt to re)ect any or all bltls. Tt16 suCC6asfpl BIDDER must possess or obtain e velltl Celllornle Class A Conlrflctor's license prior to the schetluled award dale of this oonlraet. Substitution of secudlles for any monies wllhheltl by the City of Sente Ane to ensure Dedormflnce Is ellowetl In aCCOrtlance with [ne Public Contract Code. II III IIII VIII III IIII III I II II VIII I I I III VIII VIII VIII II I IIII * A 0 0 0 0 0 2 8 4 9 1 4 8 �f y V i n ✓ :rte:: Fz�, nti r 7 u' 49 gFQ rY4 PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 ADDENDUM No. ONE November 1, 2012 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL 8z CONTRACT AGREEMENT BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA I���� REQUIREMENT: The undersigned declares that he /she has carefully examined the location of the proposed work, that he /she has examined the Plans and Specifications and read the accompanying instruction to BIDDERS, and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any), specifications and special provisions, for the unit prices) or lump sums) set forth in the following schedule: Item # Bid Item Unit Quantity Unit Price Amount Proiect No. OS -1700 1. Clearing and Grubbing LS 1 - - -- $ 3�OC�oV 2. Unclassified Excavation * CY 20,100 $ '�3— $ L.�- tc23uo - 3. Disposal of Contaminated Material* CY 150 $ 1 �� $ 2`a�S -� 4. Import and Placement of Imported CY 1,000 $ 28 $ 2��- Material* 5. Aggregate Base* TN 2,100 $ \q $ 3°i°►�� 6. A.C. Pavement * TN 23,150 $ Lo�-F ` $ t' -i-�► �'�=- 7. Asphalt Rubber Hot Mix (ARHM) TN 2,800 $ `l -1 $ 2tS�000 8. Cold Mill SF 32,000 $ .'3� $ l�2 -�`� - 9. Construct PCC Curb and Gutter (A -2 -8) LF 4,000 $ lam- $ �2��0 1 O. Construct PCC Curb and Gutter (A -2 -6) LF 300 $ l q $ � S-1 of 11. Construct PCC Curb (B -1) LF 4,000 $ 13 $ �2�'`� 12. Construct 6" Rolled Median Curb LF 100 $ �� � $ logo � 13. Construct Swale Curb Inlet/Outlet EA 20 $ \Qp� - $ °�.aoc»- TO BE INCLUDED IN BID PACKAGE BP 1 of 20 TO BE INCLUDED IN BID PACKAGE BP 2 of 20 PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 CITY OF SANTA ANA ADDENDUM No. ONE November 1, 2012 PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL 8c CONTRACT AGREEMENT BID PROPOSAL, continued Item # Bid Item Unit uanti Unit Price Amount 14. Construct Parkway Culvert LF 1 O $ � t o - $ -� 1 d� - 15. Construct PCC Median Hardscape (Stamped SF 410 $ ZZ+se $ gZ2S Concrete) 16. Construct PCC Sidewalk (T =4 ") SF 42,000 $ 3•�0 $ ly-'] oo�-� 17. Construct PCC Curb Ramp SF 3,000 $ �{_�� $ 'ZS�ao 18. Construct 6" PCC Driveway SF 310 $ � •"Za $ l wt2 19. Construct 8" PCC Driveway SF 3,100 $ <0.2� $ (°tom- E "-[�" 20. Construct PCC Bus Pad, Including Curb SF 7,900 $ S•�-{� $ l�o�_�o - 21. Adjust Sewer Manhole Frame and Cover to EA 2 $ `1-70 $ � �i-k O- Grade 22. Adjust OCSD Manhole Frame and Cover to EA 9 $ q�l S $ $"1� S Grade 23. Furnish and Install New Water Valve Cover EA 14 $ r- -(r3 -1 $ �1 ('� to Finish Grade, excluding new valves installed with water main project 24. Furnish and Install Survey Monument EA 7 $ --1-] � $ S39 0 25. Traffic Signal Modification at Bristol Street LS 1 - - -- $ � $po.�o - 8r Santa Ana Blvd. -j- 26. Traffic Signal Modification at Bristol Street LS 1 - - -- $ l���v - 8z Civic Center Dr. j' 27. Traffic Signal Removal at Bristol St 8z 5th LS 1 - - -- $ � OZyo- st t 28. CCTV and IP Connnunication System at LS 1 - - -- $ 3Z� o0 Bristol St. and Santa Ana Blvd. (Includes Equipment in Traffic Signal and Communication Cabinets) -�- TO BE INCLUDED IN BID PACKAGE BP 2 of 20 PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 ADDENDUM No. ONE CITY OF SANTA ANA November 1, 2012 PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL 8z CONTRACT AGREEMENT BID PROPOSAL, continued Item # Bid Item Unit Quanti Unit Price Amount 29. CCTV and IP Communication System at LS 1 - - - -- $ 'Z'?�°j�o Bristol St. and Civic Center Dr. (Includes Broadband Antenna System) j- 30 Install 2" PVC Conduit Per Plan LF 1,080 $ l o � $ 1 u'�°° 31. Install 3" PVC Conduit Per Plan LF 900 $ (°I $ l-1 t uO 32. Install 4" PVC Conduit Per Plan LF 3,660 $ 1 �Y $ Ld1® -i � 33. Install No. 6 Pull box EA 18 $ �{��' $ $'3'?�� -4-- 34. 25PR #22 Signal Interconnect Cable LF 1.500 $ 2 -��7 $ 3 ®SS '- 35. SOPR #22 Signal Interconnect Cable LF 1,000 $ 3 -�� $ �_}poo— 36. 24 Strand SMFO Cable LF 4,500 $ �5� $ � \ cr,b� — 37. 6 Strand SMFO Cable LF 1,200 $ Z.a� $ 'Zr -k-i'Z — 38. Twisted -pair Splice Enclosure 8r Splicing EA 1 $ 1 Ion — $ \ � op - 39. Fiber Optic Splice Enclosure EA 1 $ loo- $ 2.1�� 40. Fusion Splice 1 Strand SMFO EA 200 $ �-k- $ (p$ou— 41. Traffic Loop Detector (Caltrans Type E) fi EA 104 $ j 9S � $ Zo2.$O "- 42. Bicycle /Traffic Loop Detector (Caltrans EA 104 $ 231' $ ��- }- 02�-�- — Type D circular) �- 43. Install 1.5" PVC Schedule 40 for street light LF 1,800 $ 1 3 $ �3r -(-'�w - 44. Edison Standard Street Light Pull Box No. 6 EA 1 $ �.�- l �- $ t-1.1 O 45. 6' High Sound Wall per Section "B" LF 32 $ 3��0 "" $ \Ol l"Z" (include footing) TO BE INCLUDED IN BID PACKAGE BP 3 of 20 PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 ADDENDUM No. ONE CITY OF SANTA ANA November 1, 2012 PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL &c CONTRACT AGREEMENT BID PROPOSAL, continued _Item # Bid Item Unit Quanti Unit Price Amount 46. 8' High Sound Wall per Structural Detail 1 LF 200 $ Z'10 $ S`-Fo�•' (include footing) 47. 6' High Masonry wall Per APWA Std. 601- LF 300 $ l34'� $ c{l�� 2 (include footing) 48. Construct Wall Utility Opening Per SPPWC EA 2 $ � ?� � $ � i -E-a�o STD. Plan No. 617 -2 49. Trench Shoring &c Plating (avg. 13.5') LS 1 - - - -- $ 2+- {�0��0- 50. Remove and Construct Veneer Wall at 1309 LF 15 $ 3"3�`- $ � qSo - 7`h St. 51. Remove and Construct Wall /Fence at 1312 LF 20 $ 3°.� $ �'�oo' 7`h St. 52. Pothole Utilities* EA 10 $ $tom $ `aloSZ� _ 53. 18" Reinforced Concrete Pipe(1750 -D) LF 1 100 $ � Sa-" $ � � 3$po - 54. 30" Reinforced Concrete Pipe(1750 -D) LF 110 $ 2010- $ ��lplp0� 55. 36" Reinforced Concrete Pipe(1750 -D) LF 2,100 $ "L�m $ �Zoo��� 56. 1 8" Reinforced Concrete Collar EA 4 $ Cj � - $ 3°iZo - 57. 30" Reinforced Concrete Collar EA 1 $ � $nom" $ t�c�- 58. Junction Chamber Type "B" (D =36" RCP) EA 8 $ lv�l oo_ $ �3i�o�- 59. Junction Chamber Type "C" (D =48" RCP) EA 1 $ Zoo - $ �Zpp- 60. Junction Chamber Type "C" (D =36" RCP) EA 1 $ l o�� $ l030�- 61. 7' Catch Basin Type "B" EA 10 $ �ei9oo - $ �oo�� - TO BE INCLUDED 1N BID PACKAGE BP 4 of 20 PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 ADDENDUM No. ONE November 1, 2012 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL 8t CONTRACT AGREEMENT BID PROPOSAL, continued Item # Bid Item Unit Quanti Unit Price Amount 62. 9' Catch Basin Type "B" EA 1 $ �"�{ oo' $ c-100 63. 15' Catch Basin Type "B" EA 1 $ Q�o�" $ �'kjp- 64. 18' Catch Basin Type "B" EA 1 $ Q�-loo - $ �-J of 65. 24' Catch Basin Type "B" EA 1 $ � *� - $ \\ $�- 66. Construct Pipe to Pipe Junction Structure EA 1 $ 2t w- $ �l�J- 67. Construct Pipe Slope Anchor EA 2 $ 1 �co- $ 300 — 68. Construct Support for Ex. Sewer Lateral per EA 1 $ Z'� oo� $ �Z-joo "- APWA Std. 224 -1* 69. Remove Existing 54" Brick and Mortar EA 1 $ (O� $ 1ppy- Plug 70. 36" Double Row Brick and Mortar Plug EA 2 $ 1 l�x� _ $ �- "z-oo= - 71. Palm 25' BTH (Type per Plan) EA 50 $ 3��`- $ ��{3�0- 72. 24" Box Tree (Type per Plan) EA 60 $ 23t' $ 13g.Qc- 73. 36" Box Tree (Type per Plan) EA 50 $ SZ!-{� - $ �ip"Z�� 74. 1 Gal. Shrub (Type per Plan) EA 2,000 $ � _2� $ 1 �- (-�cs� - 75. 5 Gal. Shrub (Type per Plan) EA 1,000 $ �C�— $ �Sb� "� 76. Decomposed Granite with Weed Control TN 85 $ � -(-3Z- $ '3�,,2s�- Fabric and Aluminum Edging 77. Flexible Porous Pavement (turf block, SF 2,000 $ �p.Z9 $ �o�go"' Grasspave2 or approved equal) _ 7�] 000 78. Landscaping LS 1 - - - -- $ TO BE INCLUDED IN BID PACKAGE BP 5 of 20 TO BE INCLUDED IN BID PACKAGE BP 6 of 20 PROJ. NO. 08 -1700, 12 -6421 8z 12 -6422 ADDENDUM No. ONE CITY OF SANTA ANA November 1, 2012 PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL c4c CONTRACT AGREEMENT BID PROPOSAL, continued Item # Bid Item Unit Quantity Unit Price Amount 79. Irrigation System LS 1 - - - -- $ "'Zp,00a�� =� 80. 60 Working Days Landscape 8z Irrigation LS 1 - - - -- $ �,_�oo- Maintenance Period 81 . Striping. Marking (using paint and LS 1 - - - -- $ �SOOO thermoplastic), RPMs, and Signs 82. SWPPP for Risk Level 2 Project -�- LS 1 - - - -- $ �p�lo� \O�a - �o�{�- 83. Temporary Construction Sign EA 10 $- k6O' -E'o� $ �Sa•a�es -fit 84. Greenroads Certification Fee EA 1 $ 4,500 $ 4,500 85. Greenroads Requirements LS 1 - - - -- $ s� -k�pb - 86. Concrete K -Rail Monthly Lease at 7 "' St. EA 5 $500 $ 2,500 o� Project No. 08 -1700 Subtotal -------------------------------------------------- - - - - -- $ �3�k- ►OSi�� Project 12 -6421 (Water Mainl Schedule A (Contractor or Subcontractor shall be subject to the qualifications as set forth in section 12.02 and 1.21) 87. 12" Class 200, AWWA C900, P.V.C. LF 3,200 $ l 0-1 $ 3�3�4�� Water Main gg_ 8" Class 200, AWWA C900, P.V.C. LF 680 $ l�$� $ �Z44" -1� Water Main g9_ Construct 1" Water Service and Meter EA 19 $ Z�c3$�- $ S� -F,2o- per C.S.A. Std. Plan No. 1401 90 Construct 2" Water Service per C.S.A. EA - 4 $ c(-2oo $ \��oy Std. Plan No. 1402 91. Construct 4" Water Service per C.S.A. EA 1 $ �1��_ $ 3lso�� Std. Plan No. 1403A TO BE INCLUDED IN BID PACKAGE BP 6 of 20 PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 ADDENDUM No. ONE CITY OF SANTA ANA November 1, 2012 PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL 8r CONTRACT AGREEMENT BID PROPOSAL, continued Item # Bid Item Unit Quantity Unit Price Amount 92. 6" Fire Line Connection Including 6" Project No. 12 -6422 Schedule B Subtotal TO BE INCLUDED IN BID PACKAGE BP 7 of 20 RWGV (Resilient Wedge Gate Valve) and EA 1 $ 1 -1-70 $ l-li�- 6" Single Check Detector Valve Assembly per plan. 93. 6" Fire Line Connection Including 6" EA 1 $ �o��_ $ `ao3o^ RWGV (Resilient Wedge Gate Valve) 94. Construct 8" Gate Valve EA 4 $ X5-'13 $ i �2�'i 2-- 95. Construct 12" Gate Valve EA 11 $ 4-190 $ 4-�h�� 96. Construct Steel Casing EA 1 $ 8��� $ 43`u5a - 97 Construct Fire Hydrant per C.S.A. Std. EA 10 $ \Qd�� - $ ldc��- Plan No. 1405 Project No. 12 -6421 Schedule ASubtotal ---------------------------------- - - - - -- $ '7ZZ �l2 "�" Proiect 12 -6422 (Sewer) Schedule B 98. Abandon Existing Sewer Manhole EA 5 $ '�.c3.d --i � $ l �3"Z -o- 99. Construct New Manhole Per C.S.A. Std. EA 5 $ ���� $"Z33m- Plan No. 1201 100. Construct 4" Sewer Lateral per C.S.A. EA 2 $ —j out - $ (� Oo`l - Std. Plan No. 1204 1 O 1 . Abandon Existing Sewer Lateral EA 44 $ � -7 2 $ 3'3aj �$ Project No. 12 -6422 Schedule B Subtotal TO BE INCLUDED IN BID PACKAGE BP 7 of 20 PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 ADDENDUM No. ONE CITY OF SANTA ANA November 1, 2012 PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL 8i CONTRACT AGREEMENT BID PROPOSAL, continued Projects 08 -1700 and 12 -6421 8z 12- 6422(Schedule A 8c B) GRAND TOTAL BID--------------------------------------------------------- - - - - -- $ �p 1 bg2.�\o - 00 * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25 %" limit as stated in Section 3 -2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. j' This bid item is considered a Specialty Item per Section 2 -3.2 of the Standard Specifications. PROJECT NO. 08 -1700 Bristol Street Widening from Second Street to Tenth Street PROJECT NO. 12 -6421 Bristol Street Water Main Improvements from Third St. to Tenth St. PROJECT NO. 12 -6422 Bristol Street Sewer Main Improvements from Third St. to Tenth St. BIDDER Firm AllAfxk°Iri c�z1� S� �Ll} Address Phones) _���� - 7310 --7 p0 Bidder Signature ����� -�� Rol�1r+ Q1�Zd1E�f � V►CP r�°S�id>�f TO BE INCLUDED 1N BID PACKAGE BP 8 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700: BRISTOL STREET WIDENING FROM SECOND STREET TO TENTH STREET PROJECT NO. 12 -6421: BRISTOL STREET WATER MAIN IMPROVEMENTS FROM THIRD ST. TO TENTH ST. PROJECT NO. 12 -6422: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM THIRD ST. TO TENTH ST. PROPOSAL AND CONTRACT AGREEMENT LIST OF SUB - CONTRACTORS Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount: - Streets, highways including bridge projects; '' /z% of the bid or $10,000, whichever is greater - Buildings, parks, or other projects: ' /z% of the bid BIDDER proposes to subcontract certain portions of the work to the firms listed below: NAME �_}-o LCLv�dSc�p -G NAME LOCATION �boH }Q;,, tea\ \¢.a Cfq LOCATION PHONE "ll� -(- gto3 y-lP \S PHONE TYPE OF WORK l.�{,.d3acc�/ $ S`i�SS50- °" TYPE OF WORK $ w:slallo,� NAME (_'y'r_ \��_ �r.�t,�� NAME LOCATION \ a ���,. -F� C -�a LOCATION PHONE �Zb $lo 133Y3 PHONE TYPE OF WORK �1tct-r��o -P $ S°�`a�'� --� -aa TYPE OF WORK $ NAME S'�-`� 1 a'�^� tc v: ►. a� LOCATION �d..t I,,,e i ,,,,_ CJA. PHONE " -1!' -t 130 ?s-I `3u TYPE OF WORK �,,,,_- yQ,,,, $ IS��3o �-� NAME C'— � ✓['�v�s�'ro�.- y�,lctsd. -....� LOCATION - roe -�-� �e< (��i PHONE ��0 3z-7 �� Z-7 TYPE OF WORK r.,.ct�o.,,�„ $ 4�- 1- [`l2'b° wo��� NAME C Et. I - Sri �c_ LOCATION �`A \'tar, ('.1�! PHONE Gag `a8�} -j y--I o TYPE OF WORK s�.,r�,�� �.�,$ S�.S -7� �'' Name o it Submit � g Bid .��� v� Spi ature of BIDDER h/_iri� LOCATION PHONE TYPE OF WORK $ NAME LOCATION PHONE TYPE OF WORK $ NAME LOCATION PHONE TYPE OF WORK $ BP 9 of 20 TO BE INCLUDED IN BID PACKAGE CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL 8z CONTRACT AGREEMENT BIDDER'S STATEMENT BIDDER understands and agrees that this written proposal (or any part thereof specifically designated and accepted by the City of Santa Ana, hereinafter AGENCY) shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto. BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he /she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) days (excluding Saturdays, Sundays and AGENCY'S legal holidays), or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. All terms contained in the Specifications, the Certification of Non - Discrimination by Contractors, and the Workers' Compensation Insurance Certificate are to be incorporated by reference into this Agreement and are made specifically as part of this bid. Name of Firm � `` ,n,prl �.���� �`.�- Signature of BIDDER Ro r+ '�ecd1� Title V �C e �ire,Si c�,v�/1 (if an individual, so state) TO BE INCLUDED IN B1D PACKAGE BP 1 O of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT BIDDER'S STATEMENT continued (If a firm or co- partnership, state the firm name and give the names of all individual co- partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) A � � � rv�i e�z✓i �b�l -F Car�?rcCtl ov-1 %��Ja/t � r� �,o I�P Pr��i� s�YN- Awarded to ��� %�ir�rv. i��� ( /.ov,�i� on the basis of lowest responsible and re ponsive bidder in the amount of $ �� /Gi 9� o�J�� ATTEST: �� CLERK OF THE COUNCIL APPROVED AS TO FORM: ITY ATTORNEY ACTION OF COUNCIL: Date �y����,.u� � � ` 20 �.3 C-�r , CEPTED FOR THE CITY OF SANTA ANA: i E ECUTIVE DIREC P L1C WORKS AG CY BP 1 1 of 20 TO BE INCLUDED IN BID PACKAGE CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows: 1. The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment wi*hciut, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Contractor shall send to each labor union or representative of workers with which he /she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Contractor shall comply with all provisions of Executive Order 1 1246 of September 24, l 965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Contractor shall furnish all information and reports required by Executive Order 1 1246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Contractor's non - compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 1 1246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1 965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. TO BE INCLUDED IN BID PACKAGE BP 12 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT CERTIFICATION _OF NONDISCRIMINATION BY CONTRACTOR (continued 7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 1 1246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter. ��Ro`(czwt P r�l e y -- Title �/IG� PreSid,�+ Firm �ill.Am�vic�xvt .�}s�hv Date r! or Prn�,r \ Tc`�C�I �- TO BE INCLUDED IN BID PACKAGE BP 13 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT WORKERS' COMPENSATION INSURANCE CERTIFICATION As required by California Labor Code Section 1860 and 1861, the Contractor certifies as follows: I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for worker's compensation or to undertake self - insurance in accordance with the provisions of the Code, and I will comply with such provisions before commencing the performance of the work of this contract. If I, as the Contractor, now or at any time during the course of this agreement, qualify as an employer under California Labor Code Section 3300, unless the hired employees) is (are) persons excluded by said Labor Code, I shall furnish the City of Santa Ana with an insurance certificate from my workers' compensation insurance carrier certifying that I carry such insurance and that the policy shall not be canceled nor the coverage reduced except upon thirty (30) days prior written notice to the City of Santa Ana. Signe ������ ,�_ { /�yJ m t '� rzidl,e y Title � i C t Pf�SI c��VYf- Firm .�i11 Av►nPVI nnr� At�,ln.y1..1- I� . - I ilk ..s. __ � , TO BE INCLUDED IN BID PACKAGE BP 14 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT REFERENCES The following are the names, addresses, and telephone numbers for THREE public agencies for which BIDDER has performed similar work within the past three years. 1. Sr°� .� -tac�d Pa�eS- Name and Address of Owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 2. Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 3. Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds. �i'cl�.l i�# i rvi 1`7r �Jni -f- lirno� in��� (bc7 �� � 4 � 1 � "� S �i �, � I io,r n �-i BHP-}- � i �'-} � 3 9 E10i l.o� ,/a�...�1>0 � C'A R��(�e'�, /�G�� Lai3) a"�O- )o[�n� LS . -�tr�) M i 11evlin � u rv, �'nro�rc� -hP �nl r� -i-i /�yisi �-,�i ?� -Tr-i� k�' ci'i� %< � � �'w�vl>°� �A oJai�an t ply. ��vg) �-� -71 ys L�rol�e� -� E�ci ��,�ra�,e� ivL5wr4nd,�P G�✓lker, b�n.p C��-y B \��_, 5ti� +-r -� oo, �,�,� e, c� G a s to K , 'PY� �. �� � �> a3� �a� o , �� SL,,r C�rn�!> TO BE INCLUDED IN BID PACKAGE BP 15 of 20 "2010" PAST WORK REFERENCES City of Santa Ana 20 Civic Center Plaza Santa Ana, CA 92701 Contact: Edward Torres, (714) 647 -5018 City of Chino 13220 Central Avenue Chino, CA 91790 Contact: Emani Naghmeh, (909) 464 -8367 City of Costa Mesa 77 Fair Drive Costa Mesa, CA 92628-1200 Contact: Thomas Banks, (714) 754 -5222 City of Westminster 8200 Westminster Boulevard Westminster, CA 92683 Contact: Tuan Pham, (714) 898-3311 ext. 209 City of Paramount 16400 Colorado Avenue Paramount, CA 90723 -5012 Contact: Ed Cox, (562) 908 -6205 City of Cerritos 18125 Bloomfield Avenue Cerritos, CA 90703 -3130 Contact: Rash Syed, (562) 916 -1221 City of Anaheim 200 South Anaheim Boulevard Anaheim, CA 92805 Contact: Sean Ramsey, (714) 765 -5059 City of Garden Grove 11222 Acacia Parkway Garden Grove, CA 92842 Contact: (714) 741 -5180 Segerstrom Avenue Rehabilitation Contract Amount: $2,094,618.00 Start: 1 1 /2009 Completed: 3/30/201 O Street Rehabilitation Project FY 08/09 Contract Amount: $2,127,501.00 Start: 11/2009 Completed: 5/31/2010 Rehabilitation of Vanguard Way Contract Amount: $517,646.00 Start: 12/2009 Completed: 2/30/2010 City -wide Overlay 09 -10 St. Improvement Project Contract Amount: $1,171,416.00 Start: 2/1/2010 Completed: 5/30/2010 Resurfacing in Rosecrans Avenue Contract Amount: $572,209.00 Start: 10/1/2009 Completed: 5/30/2010 Bloomfield Avenue Improvements Contract Amount: $1,103,000.00 Start: 3/1/2010 Completed: 6/20/2010 Magnolia Avenue Street Improvements Contract Amount: $868,000.00 Start: 4/1/2010 Completed: 7/20/2010 Harbor Boulevard Street Rehabilitation Contract Amount: $919,000.00 Start: 3/1/2010 Completed: 6/30/2010 "2011" PAST WORK REFERENCES City of Compton 205 South Willowbrook Avenue Compton, CA 90220 Contact: Loujuana Mitchell, (310) 761 -1437 County of San Bernardino 825 E. Third Street San Bernardino, CA 92415 Contact: Franklin Lund, (909) 387 -7920 County of Riverside 2950 Washington Street Riverside, CA 92504 Contact: David Hylkema, (951) 850 -6075 City of Stanton 7800 Katella Avenue Stanton, CA 90680 -3162 Contact: Quang Le, (714) 890 -4234 City of Long Beach 333 West Ocean Blvd., 10`h Floor Long Beach, CA 90802 Contact: Chuck Ramey, (562) 570 -6634 City of Paramount 16400 Colorado Boulevard Paramount, CA 90723 -5012 Contact: Len Gorecki, (562) 220 -2111 City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 Contact: Dave Verone, (714) 375 -8471 Department of Transportation 464 W. Fourth Street San Bernardino, CA 92410 -1400 Contact: Imad Abugharbieh, (951) 277 -8579 Northwood Avenue Reconstruction Contract Amount: $1,180,000.00 Start: 10/18/201 O Completed: 5/4/201 1 Cajon Blvd. Contract Amount: $565,000.00 Start: 3/11/201 1 Completed: 4/8/201 1 De Luz Road Rehabilitation Contract Amount: $740,000.00 Start: 4/25/201 1 Completed: 5/23/201 1 2010/2011 Citywide Reconstruction Contract Amount: $322,322.00 Start: 3/1/2011 Completed: 4/30/201 1 Annual Contract Street Reconstruction Contract Amount: $3,433,415.00 Start: 5/1/201 O Completed: Still On -Going Neighborhood Street Resurfacing Contract Amount: $899,909.00 Start: 1 1 /1 /201 O Completed: 3/30/201 1 Slater Avenue Improvements Contract Amount: $1,926,341.00 Start: 8/2/201 O Completed: 2/30/201 1 Route 91 Project Contract Amount: $5,732,812.00 Start: 3/1/201 O Completed: 3/30/201 1 LL^�Ol �9f PAST WORK REFERENCES City of Beverly Hills 345 Foothill Road Beverly Hills, CA 9021 O Contact: Juan Martinez, (31 O) 285 -2521 City of Costa Mesa 77 Fair Drive Costa Mesa, CA 92628 Contact: Thomas Banks, (714) 754 -5222 City of Perris 170 Wilkerson Avenue, Ste. D Perris, CA 92570 Contact: Chris Sunde , (951) 943 -5604 City of Dana Point 33282 Golden Lantern Dana Point, CA 92629 Contact: Matt Sinacori, (949) 248 -3574 City of Long Beach 333 W. Ocean Blvd., 10 "' Floor Long Beach, CA 90802 Contact: Chuck Ramey, (562) 570 -6634 City of Santa Ana 20 Civic Center Plaza Santa Ana, CA 92701 Contact: Edward Torres, (714) 647 -5018 City of Fountain Valley 10200 Slater Avenue Fountain Valley, CA 92708 Contact: Alex Salazar, (714) 593 -4516 2010 -2011 Street Resurfacing Project Contract Amount: $2,800,000.00 Start: 6/1/201 1 Completed: 4/30/2012 2010 -2011 Citywide Street Rehabilitation Contract Amount: $2,778,000.00 Start: 7/ 1 /201 1 Completed: 2/29/2012 Foss Field Parking Expansion Contract Amount: $190,000.00 Start: 1 / 1 /2012 Completed: 2/29/2012 Pacific Coast Highway 8r Niguel Shores Contract Amount: $676,676.00 Start: 12/1 /201 1 Completed: 5/30/2012 Willow Street Improvements Contract Amount: $661,661.00 Start: 12/1 /201 1 Completed: 6/30/2012 Bristol Street Widening Contract Amount: $8,315,754.00 Start: 5/ 1 /2009 Completed: 3/16/2012 Edinger Avenue Improvements Contract Amount: $422,422.00 Start: 5/1/2012 Completed: 8/1/2012 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT ADDITIONAL REFERENCES- FOR WORK ON_PROJECT NO. 12 -6421: BRISTOL STREET WATER MAIN IMPROVEMENTS The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed placement of water main construction in the past 5 years. 1. �2-r�� �.- +zc�.S� 5 �c �c,.t dam' �a.wn.lf� Name and Address of Owner_ Name and Telephone Number ofperso famrlrar with project. Contract Amount Type off' Work Date Completed 2. a ` ` ii-'LT L9k J S /Y' / V <+J i�ame �a]n��d[[ QAddress of owner. � �% Name and Telephone Number of person f�ttultar with project. Z 2i9 O � ao J �� � = 6-c . o ! � Contract Amount � Type of Work Date Completed 3 _ � -C - �ly = �S -J-= ti �-- a- --' � Name and AddFEs� of owner. c.J���,� �,�Pss�c — 9i.cy — 36.5 — '7a5 `� Name and Telephone umber of person fam OO�J � O�J (�RT�.L 1 Contract Amount T.,nv gect. Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom!{' %�B(I�DDER intends to procure insurance and bonds. 1 VJ �� , ��SJ,r -A...L �,CES -i- rJSJ LA �JC� _ �i�l -sag �- � 1 � TO BE INCLUDED I1V BID PACKAGE BP 16 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT BIDDER'S STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall: 1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. 2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards. 3. Contribute to the fund or funds in each craft or trade in which he /she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to the California Apprenticeship Council. Signed �'����_ Y�olca�t 13rctd1�5/ Title V i i.o r,i�7 rl,an Firm (� 1 � Am�a� i n2✓� S �L>al -t- Date 1�J,�r�rn lov✓ ► 3, a,� � � TO BE INCLUDED IN BID PACKAGE BP 17 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT NON - COLLUSION AFFIDAVIT (Title 23 United States Code Section 1 12 and Public Contract Code Section 7106) To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non - collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non - collusion Affidavit. BIDDERS are cautioned that making a false certification may subject the certifier to criminal prosecution. _ A /� Signed '�f'S�D�Y -F- �JI'QGi1t°L/l�%IG�t State of California County of Riy:°r5c,�� Subscribed and sworn to (or affirmed) before me on this l �h day of �rnlct°,• 20�, by �aboyt����°u ,proved to me on the basis of satisfactory evidence to be the persol� who appeared beforeTme Qz�Gc1%�.s ')'Y7crt�.oiv Notary Public Signature -•_ DEBBIE MATSEN -� �•�; Commission # 1958174 z = --^� � Notary Public - California z � ��' � Riverside County > M Comm. Expires Nov 22, 2015 Notary Public Seal BP 18 of 20 TO BE INCLUDED IN BID PACKAGE CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT BIDDER'S STATEMENT REGARDING "ANTI- KICKBACK" REQUIREMENTS The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland "Anti- Kickback" Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he /she is otherwise entitled_ Sign Title Firm RII Ll�'l�ovicon �z.�1�d1 -1- Date �3Or�o��E2t�� T�l� 1 � TO BE INCLUDED IN BID PACKAGE BP 19 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT CONTRACTOR'S LICENSING STATEMENT The undersigned contractor, or corporate officer, declares under penalty of perjury that the following is true and correct. Contractor's Name: All AmvVil`O✓1 ASnlwyJi- Business Address: P. Q _ PjpX a a a� G �A �� 87 R-a o�0'?9 Telephone: �c15i '�?���� State Contractor's License No_ and Class: �a � -?023 ,� .�J c -�a Expiration S T TO BE INCLUDED IN BID PACKAGE BP 20 of 20 CITY OF SANTA ANA PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 PROPOSAL AND CONTRACT AGREEMENT PUBLIC CONTRACT CODE SECTION 10162 OUESTIONAIRE In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire: Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No If the answer is yes, explain the circumstances in the following space. TO BE INCLUDED IN BID PACKAGE BP 21 of 20 o � Fidelity and Deposit Company of Maryland �( Home Office: P.O. Box 1227. Baltimore. MD 21203 -1227 ,�""`O� BID BOND KNOW ALL MEN BV THESE PRESENTS: That we, ALL AMERICAN ASPHALT BOND NO. 085 97 423 as Principal, (hereinafter called [he "Principal "), and FIDELITY AND DEPOSIT COMPANY OF MARYLAND P.O. Box 1227, Baltimore, Maryland 21203, a corporation duly organized under the laws of the State of Maryland, as Surety, (hereinafter called the "Surety "), are held and firmly bound unto City of Santa Ana as Obligee, (hereinafter called the "Obligee "), in the sum of TEN PERCENT OF THE TOTAL BID PRICE IN-- - - - - -- Dollars ($ 1 O% OF TOTAL BID PRICE ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for PROJECT NO. OS -1700: BRISTOL STREET WIDENING FROM SECOND STREET TO TENTH STREET PROJECT NO. 12 -6421: BRISTOL STREET WATER MAIN IMPROVEMENTS FROM THIRD ST. TO TENTH ST. PROJECT NO. 12 -6422: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM THIRD ST. TO TENTH ST. Bid Date: November 15, 2012 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding or contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt payment of labor and material furnished in the prosecution [hereof, or in the event of the failure of the Principal [o enter into such contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 6th Witness r ��' l.�S.00�QO�Q�� A. Wilkison, Notary Public Witness day of November ALL AMERICAN ASPHALT A.D., 2012 (SEAL) Pri cipa! FIDELITY AND DEPOSLT COMPANY OF MARYLAND Surety By �Za(�D IE"►f>D Lit1�o�-»!� (SEAL) Rebecca Haas -Bates ,Attorney -in -Fact Printed in cooperation with the American Institute of Architects (AIA) by Fidelity and Deposit Company of Maryland . Fidelity and Deposit Comparty oC Maryland vouches that the language in the document conforms exactly to the language used in AIA Document A -310, February 1970 Edition. BID70000ZZ0701C CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT State of California County of Orange On 11/06/2012 before me, A. Wilkison, Notary Public Data Here Insert Name antl Title of the Offirer personally appeared Rebecca Haas -Bates . � A. WILKISON / � a�,,,�_ Commission # 1866283 z z � ��le Notary Public - California zn z Orange County �` My C ^.mm. Expires Sep 25. 7.013, Placo Notary Scal Above who proved to me on the basis of satisfactory evidence to be the persons) whose names) is/isfe subscribed to the within instrument and acknowledged to me that ire /she /ik�y+ executed the same in +fie/her /cheer authorized capacity(ies), and that by kris /herftk�aif signature(rr} on the instrument the person(}, or the entity upon behalf of which the persons} acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my/h�and and official seal. Signature_ -i,�t • LLd,.e��lri Signature of Notary Public OPT /ONAL Though the inlormation below is not required by law, it may prove va /uab /e fo persons relying on the document and cvu/d prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: _B -id -Bond Document Date: 11/06/2012 Signers) Other Than Named Above: _All American Asphalt Capacity(ies) Claimed by Signers) Number of Pages: One Signer's Name: __ Rebecca,Haas_Bates Signer's Name: i -J Individual –•. Individual -= Corporate Officer - -- Title(s): _______.__. _- - r�� Corporate Officer — Title(s): ___ __1 Partner - ��_' Limited '. I General =� Partner — � Limited �`� General p Attorney in Fact - C! Attorney in Fact _ __: Trustee Top o1 thumb here ._:1 Trustee ToF of thumb here '. -.- Guardian or Conservator _- Guardian or Conservator "- Other. __ - _ _' Other. Signer Is Representing: _ -_ __ - ____._ Signer Is Representing: Fitlellty antl Deposit Company of Marylantl -.._ ._ � _.__ __ -- —__ ... L- iJ2W� Navon:�l Notary Acsrxiatirin • 9350 De SOLO Ave.. PO. DOx 2402 •Chatsworth, GA 91313- 2402- www.NalionelNOtary.org Item x5307 Reorder: CaII TOII -Free 1800- 6]6 -6a2� CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT State of California County of Riverside On November 13. 2012 before me, Debbie Matsen. Notary Public Date Here Insert name antl Title of the ONCer personally appeared Robert Bradley Name�9J of Signerspr� who proved to me on the basis of satisfactory evidence to be the person(, whose name( isfare subscribed to the within instrument and acknowledged to me that he /sh�,'theq executed the same in his:r,� 'r,�:r authorized capacity(�ies�, and that by his:;-,e:- n,,e:;= �_ DEBBIE MATSEN sig nature( on the instrument the person�sj or the entity upon behalf Commission At 1958174 of which the person(s'jacted, executed the instrument. i -ai Notary Public - California i � � ' Riverside County a I certify under PENALTY OF PERJURY under the laws of the State of M Comm. Expires Nov 22. 2015 Califomia that the forgoing paragraph is true and correct. WITNESS my hand and official seal. Signature rte /�/ i �/� %�� GX�,(,/A � Pleca Notary Seal Above �� Signature of Notary Publle OPTIONAL Though the information below is not required by law, it may prove valuable to person relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document Bid Bond_ Citv of Santa Ana Document Date: November 6. 2012 Number of Pages: 1 Paee Signersa'f Other Than Named Above: Fidelity and Deposit Company of Maryland Capacity(iesj Claimed by Signer SignePS Name: Robert Bradley o Individual Corporate Officer — Title(,s'j: Vice President o Partner — o Limited o General o Attorney in Fact o Trustee o Other: Signer is Representing: All American Asphalt Top of thumb here Signer's Name: o Individual o Corporate Officer — Title(s): o Partner — o Limited o General o Attorney in Fact o Trustee o Other: Signer is Representing: Top of thumb here EXTRACT FROM BY -LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice - President, or any of the Senior Vice - Presidents or Vice-Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the. Secretary or any one of the Assistant Secretaries, to appoint Resident Vice - Presidents, Assistant Vice - Presidents and Attorneys -in -Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,... and to affix the seal of the Company thereto." CERTIFICATE I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that the Vice - President who executed the said Power of Attorney was one of the additional Vice- Presidents specially authorized by [he Board of Directors to appoint any Attorney -in -Fact as provided in Article VI, Section 2, of the By -Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND. This Power of Attorney and Certificate may he signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 1 Oth day oY' May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of [he company and facsimile or mechanically reproduced signature of any Vice- President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed." IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this 6th day of November 2012 , �J Assiswn[ Secretory Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant Secretary, in pursuance of authority granted by Article Vl, Section 2, of the By -Laws of said {��ny, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the da 1 IQ. @mss- hereby nominate, constitute and appoint William SYRKIN, Rebecca HAAS - BATES, Se - ADAIR and P_ BAUER, all of Glendale, California, EACH its true and la ne - 1:, ,execute, seal and deliver, for, and on its behalf as surety, and as its ac ° n ertakings, and the execution of such bonds or undertakings in pursuance hal e i di said Company, as fully and amply, to all intents and purposes, as if the �ecut 1 by the regularly elected officers of the Company at its office in Baltim tlt n ° power of attorney revokes that issued on behalf of Richard ADAIR, P. BAUER e rt(3�0 The said Assistant es e eby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2, of the By -L s said Company, and is now in force. IN WITNESS WHEREOF, the said Vice - President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 27th day of June, A.D. 2011. ATTEST: ',moo oevof�� a ° �� : ttns i 4 ....,.. State of Maryland City of Baltimore ss: FIDELITY AND DEPOSIT COMPANY OF MARYLAND � - -- By: Erlc D. Barnes Assistant Secretary Frurrk E. Martin Jr. Vice President On this 27th day of June, A.D. 2011, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came FRANK E. MARTIN JR., Vice President, and ERIC D. BARNES, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally Ano+vn to he the individuals and officers described in and who executed the preceding instrument, and [hey each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and with, that they arc the .aid ol'1 icers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Contpan�. and that [he said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the saiel insttutttent by the: authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my UI'ticial Seal the day and year first above written. .:. POA -F Ott -0033D Constarx�c• il. Orrrur Notary Public My Cununission Expires: July 14, 2015 Company Profile Company Profile Company Search Company Search Results Company Information Old Company Names Agent for Service Reference Information NAIC Group List Lines of Business Workers' Compensation Complaint and Request for Action /Appeals Contact Information Financial Statements PDF's Annual Statements Quarterly Statements Company Complaint Company Performance 8� Comparison Data Company Enforcement Action Composite Complaints Studies Additional Info Find A Company Representative In Your Area View Financial Disclaimer COMPANY PROFILE Company Information FIDELITY AND DEPOSIT COMPANY OF MARYLAND 1400 AMERICAN LANE, 19TH FLOOR SCH UAM BURG, IL 60196 -1056 800 -382 -2150 Old Company Names Effective Date Agent For Service KAREN HARRIS C/O CORPORATION SERVICE COMPANY 2710 GATEWAY OAKS DRIVE, SUITE 150N SACRAMENTO CA 95833 -3505 Reference Information NAIC #: 39306 California Company ID #: 2479 -4 Date Authorized in California: 01/01/1982 License Status: UNLIMITED- NORMAL Company Type: Property &Casualty State of Domicile: MARYLAND bacK to top NAIC Group List NAIC Group #: 0212 ZURICH INS GRP Lines Of Business The company is authorized to transact business within these lines of insurance. For an explanation of any of these terms, please refer to the glossary. AIRCRAFT AUTOMOBILE BOILER AND MACHINERY BURGLARY CREDIT FIRE LIABILITY MARINE MISCELLANEOUS PLATE GLASS SPRINKLER SURETY TEAM AND VEHICLE Page 1 of 2 http: / /interactive.web.insurance.ca. gov /companyprofile /companyprofile ?event= company... 12/ 10/2012 MAYOR Miguel A. Pulido MAYOR PRO TEM Claudia C. Alvarez COUNCILMEMBERS David Benavitles Carlos Bustamante Michele Martinez Vincent F. Sarmlento Sat Tinajero November 1, 2012 ADDENDUM No_ ONE CITY OF SANTA ANA PUBLIC WORKS AGENCY P.O. Box '1988, M -36 Santa Ana, California 92702 INTERIM CITY MANAGER Paul Walters CITY ATTORNEY Sonia R. Carvalho CLERK OF THE COUNCIL Maria D.HUizar SUBJECT: PROJECT NO. 08 -1700: BRISTOL STREET WIDENING FROM SECOND ST. TO TENTH ST. PROJECT NO. 12 -6421: BRISTOL STREET WATER MAIN IMPROVEMENTS FROM THIRD ST. TO TENTH ST. PROJECT NO. 12 -6422: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM THIRD ST. TO TENTH ST. The following changes have been made to Specifications for the subject project: Specifications 1 . Page vii, NOTICE INVITING BIDS, paragraph 1: Replace with the following: NOTICE IS HEREBY GIVEN that the City of Santa Ana, California will receive at City Hall -Ross Annex, (M -22), 20 Civic Center Plaza, Santa Ana, California 92701, the Public Works Asiencv Third Floor Receptionist, (see attached map), on or before the hour of 2:00 p.m. on Thursday, November 15, 2012 sealed bids and /or proposals for... 2. Page BP -1 of 20 through BP -08 of 20, bid items: Replace with the attached page BP -1 of 20 through BP -08 of 20. All other terms and conditions remain the same. FOR THE CITY�Fj.�NTA ANA _'� Edwin "William" Galvez, P.E. City Engineer 101DGO��7 7m ►���11�1ui Kevin O'Rourke To: Interim City Manager William Galvez, Acting Executive Director From: Public Works Agency (?1h Date: July 24, z % 4L 3 3 AM € .- S4 Project Nos. 08 -1700, 12 -6421, 12 -6422 Bristol Street Widening From 2nd Street to 10th Street Subject: Change Order No. 1 Contractor: All American Asphalt PO BOX 2229 Corona, CA 92878 pNA Project Description: 08 -1700; Bristol Street Widening from 2nd Street To 10th Street, 12- 6421;Bristol Street Water Main Improvements from 3rd Street to 10th Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd Street to 10th Street. Change Order Number: Change Order Total: $ 79,333 Accounting Unit - Account - Activity Number: 05917661- 66220 - 08170001028 03217662 - 66220 - 08170002028 03017660 - 66220 - 08170003028 05617640 - 66220 - 12642201028 06617647 - 66220 - 12642101028 JUSTIFICATION The plans call to construct a new soundwall along the property line between the private properties and the City owned lots on the west side of Bristol between 7th & 8th Streets, The APWA standard shown on plan shows the height of the wall based upon the top of footing. A revised plan was issued showing the height of wall to be based upon finish elevations which were not shown on the original plan, requiring an extra course of block to be constructed along 257 LF of soundwall. (PCO #06) A prior approval was granted for this work on July 15, 2013. AGREED. COST $ 1,698 2. While potholing utilities for the new 12" and 8" water mains, an AT &T duct bank was encountered in the trench line at two locations. The duct bank is 84" to the bottom, with the top being 36" from the proposed finished surface. These elevations do not permit the new 12" water main to be installed over the top of the duct bank and therefore must be installed under it. Due to the proximity of a Metropolitan Water District 36" water line, a vertical offset must be constructed at each location to enable the installation of the proposed water mains under the AT &T duct bank.(PCO #08) A prior approval was granted for this work on June 18, 2013. AGREED COST $ 56,700 Project 08 -1700 Request for Approval of Change Order No. 1 July 24, 2013 Page 2 of 4 3. The plans call to construct a new soundwall along the property line between the private properties and the City owned lots on the west side of Bristol between 9th & 10th Streets. At this location there is an existing 104 LF boundary fence that consists of block wall, wrought iron and wooden fences. As this fence conflicts with the proposed soundwall, the contractor was directed to remove and dispose of the fence and footings. (PCO #09) A prior approval was granted for this work on July 15, 2013. AGREED COST $ 7,100 4. After potholing utilities for the new traffic signal poles, as required by the contract, significant conflicts were discovered with existing underground utilities preventing the installation of the traffic signal pole in the proposed location behind curb, at the southwest corner of Santa Ana Boulevard and Bristol Street. Due to the conflict with the underground utilities, the traffic signal pole location was moved to the back of walk which necessitated increasing the length of the mast arm, the size of the pole, and the depth of the foundation. The cost is the difference between the cost of the original traffic signal pole, mast arm, and foundation and the cost of proposed larger pole, longer mast arm, and larger foundation. (PCO #02) A prior approval was granted for this work on May 15, 2013. AGREED COST $ 1,928 5. During excavation for the planting of the palm trees, concrete foundations were encountered in four of the planting sites. The contractor was directed to remove the interfering portions of the concrete foundations to enable planting of the date palms. Additionally, the irrigation for the palm trees was modified, adding an additional 2 surface bubblers at each of five locations. (PCO #03) This work was done on a time and materials basis. A prior approval was granted for this work on April 23, 2013. FINAL COST $ 9,175 6. Prior to the start of construction, buildings on the east side of Bristol, north of Sixth Street were demolished to make room for the street widening. This demolition work left the area without a sidewalk forcing pedestrians to use the west side of the street. Once the excavation started for the street improvements on the west side of Bristol, pedestrians were forced to use the east side. Therefore, the contractor was directed to construct a temporary asphalt sidewalk to provide a safe walkway for pedestrians. (PCO #05) This work was done on a time and materials basis. A prior approval was granted for this work on May 29, 2013. FINAL COST $ 2,732 Project 08 -1700 Request for Approval of Change Order No. 1 July 24, 2013 Page 3 of 4 ACCOUNTING UNIT COST ANALYSIS CCO Item Number Accounting Unit Accounting Unit Costs Total Amount 1 05917661 - 66220 - 08170001028 $424.50 $1,698.00 03217662- 66220- 08170002028 $636.75 03017660 - 66220 - 08170003028 $636.75 2 06617647- 66220 - 12642101028 $56,700.00 $56,700.00 3 05917661- 66220 - 08170001028 $1,775.00 $7,100.00 03217662- 66220 - 08170002028 $2,662.50 03017660- 66220 - 08170003028 $2,662.50 4 05917661 - 66220 - 08170001028 $482.00 $1,928.00 03217662 - 66220 - 08170002028 $723.00 03017660 - 66220 - 08170003028 $723.00 5 05917661 - 66220 - 08170001028 $2,293.75 $9,175.00 03217662- 66220 - 08170002028 $3,440.63 03017660- 66220 - 08170003028 $3,440.63 6 05917661 - 66220- 08170001028 $683.00 $2,732.00 03217662- 66220- 08170002028 $1,024.50 03017660 - 66220 - 08170003028 $1,024.50 Total $79,333.00 CONTRACT COST SUMMARY Original Contract Total $6,169,256.00 % of Contract Previous Chai Change Order 1 $79,333.00 Increase 1.29% Total CCO to date $79,333.00 Increase 1.29% Adjusted Contract Total $6,248,589.00 Project 08 -1700 Request for Approval of Change Order No. 1 July 24, 2013 Page 4 of 4 SCHEDULEIMPACT Increase contract time by 30 working days. ' ry William Galvez, AgtKg Executive Director Public Works Agency APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez, Executive Director Finance & Management Services Agency CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To loth St. Change Order Number 1 To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise staled, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by EXTRA WORK AT AGREED PRICES PUBLIC WORKS AGENCY 1. Increase the height of 257 LF of soundwall located on the west side of Bristol between 7th & 8th Streets as shown on revised plan sheet SW -03 dated 5/1/2013. (PCO #06) AGREED PRICE $ 1,698 2. Construct one ductile iron vertical offset in the 8" water main located on 5th Street and one ductile iron vertical offset in the 12" water main located on Santa Ana Blvd. as directed in response to RFI #04 dated 5/2/2013. (PCO #08) AGREED PRICE $ 56,700 3. Remove boundary fence and wall located on the west side of Bristol between 9th & 10th Streets as directed in PCO #09 dated 5/8/2013. AGREED PRICE $ 7,100 4. Install type 24 -4 -100 traffic signal pole with a 35' mast arm in lieu of the proposed 19 -4- 100 with a 30' mast arm on the southwest corner of Santa Ana Blvd. and Bristol as shown on revised plan sheet XA -01 dated 4/10/2013. (PCO #02) AGREED PRICE $ 1,928 5. Remove PCC foundations encountered in the planting pits for palm trees on the east side of Bristol and modify irrigation to add 2 additional bubblers for palm trees at 5 locations as directed in PCO #03 4/17/2013. This work was done on a time and materials basis. FINAL COST = $ 9,175 6. Install a temporary asphalt sidewalk on the west side of Bristol north of 6th Street as directed in PCO #05 dated 5/2/2013. This work was done on a time and materials basis. FINAL COST = $ 2,732 Page 1 of 2 CITY OF SANTA ANA PUBLIC WORKS AGENCY f r CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number _ To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise slated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this project. TOTAL COST THIS CHANGE ORDER: DECREASE $ - - - - - INCREASE $ 79,333 By reason of this order the CONTRACT TIME completion will be adjusted as follows: 30 Days We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full payment therefor the prices shown above. Date 7116/13 Contractor ALL AMERICAN ASPHALT, INC. By` I i' 111 /"L,Thle ,,-- TANjIF¢ M. recommended by Approved by PUBLIC WORKS AGENCY CITYMANAGER Page 2 of 2 Date Date �7 MEMORANDUM To: Kevin O'Rourke Interim City Manager William Galvez, Interim Executive Director From: Public Works Agency Date: September 17, 2013 C...�'..7�1� °:min Project Nos. 08 -1700, 12 -6421, 12-6422 c,:; 1t, Bristol Street Widening From 2"d Street to 10th Street Subject: Change Order No. 2 Contractor: All American Asphalt ; PO Box 2229 c "-" >1 Corona, CA 92878 Project Description: 08 -1700; Bristol Street Widening from 2"d Street To 10th Street, 12- 6421;Bristol Street Water Main Improvements from 3rd Street to 10th Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd Street to 10th Street. Change Order Number: 2 Change Order Amount: $ 30,240.00 Accounting Unit - Account- Activity Number: 05917661- 66220 - 08170001028 03217662 - 66220 - 08170002028 03017660 - 66220 - 08170003028 05617640- 66220 - 12642201028 06617647 - 66220 - 12642101028 JUSTIFICATION The contract documents state that the Agency will provide construction staking for this project. For the first phase of the project the City provided construction survey services through an internal agreement with Coast Survey, Incorporated. Currently, their agreement is close to expending the contracted authorized funds. Consequently, City staff investigated having the contractor provide the remaining survey needed to complete the work and, to the City's benefit, the quote came in lower than what was projected for the remaining work. Therefore, to prevent delays of the project, it is recommended to direct the contractor to provide construction survey services for the remainder of the project and reimburse them for the costs. ESTIMATED COST = $30,240 Project 08 -1700 Request for Approval of Change Order No. 2 September 17, 2013 Page 2 of 2 ACCOUNTING UNIT COST ANALYSIS Accounting Unit Accounting Unit Costs Total Amount 05917661 - 66220 - 08170001028 $6,300.00 $30,240.00 03217662- 66220 - 08170002028 $9,450.00 03017660- 66220 - 08170003028 $9,450.00 06617647- 66220 - 12642101028 $5,040.00 CONTRACT COST SUMMARY Amount % of Contract Original Contract Total $ 6,169,256.00 Previous Change Orders $ 79,333.00 Increase 1.29% Change Order #2 $ 30,240.00 Increase 0.49% Total Change Orders to Date $ 109,573.00 Increase 1.78% Adjusted Contract Total $ 6,278,829.00 SCHEDULEIMPACT There is no schedule impact. APPROVED AS TO FUNDS AND ,4Rr'.rll INTC- William Galvez, Interi Executive Director Public Works Agency Francisco Gutierrez, Executive Director Finance & Management Services Agency CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 2 To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER, Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by Pi IRI In WnRKG Anr =NrY / / / / / / EXTRA WORK AT AGREED PRICES 1. Provide construction survey services to complete the project as directed in PCO #11 dated July 22, 2013 and as detailed in "Exhibit A" dated August 16, 2013. Page 1 of 2 AGREED PRICE $ 30,240 CITY OF SANTA ANA PUBLIC WORKS AGENCY 0 CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 2 To All American Asohalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this project. TOTAL COST THIS CHANGE ORDER'. DECREASE $ _ _ _ -- INCREASE $ 30,240.00 By reason of this order the CONTRACT TIME completion will be adjusted as follows: 0 days We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full payment therefor the prices shown above. Acc t , Date .� (� f3 Contractor ALL AMERICAN ASPHALT, INC. By �l Title ?n - Pf T a Approv 1 recommended by Date ,D /7 PUBLICI IiR�CS AGEV YEXF,CUTI RECTOR Approved by Date /0 CITYMANAGER Page 2 of 2 MEMORANDUM To: From: David Cavazos City Manager William Galvez, Interim Executive Director Public Works Agency Date: January 27, 2014 Project Nos. 08 -1700, 12 -6421, 12 -6422 Bristol Street Widening From 2nd Street to 10th Street Subject: Change Order No. 3 CONTRACTOR : All American Asphalt 8 PO Box 2229 Corona, CA 92878, PROJECT DESCRIPTION: 08 -1700; Bristol Street Widening from 2nd Street To 1119ih:Straet, 12- 6421;Bristol Street Water Main Improvements from +' St�det to 10th Street, 12 -6422; Bristol Street Sewer Main Improvements from 3`d Street to 10th Street. CHANGE ORDER NUMBER: 3 CHANGE ORDER AMOUNT: $ 104,294.60 ACCOUNTING UNIT-ACCOUNT- ACTIVITY NUMBER: 05917661- 66220 - 08170001028 03217662- 66220- 08170002028 03017660 - 66220 - 08170003028 06617647- 66220 - 12642101028 JUSTIFICATION EXTRA WORK AT TIME & MATERIALS 1. After the start of construction, revised storm drain plans for the laterals at 3rd Street were issued. The revisions changed the alignment of the 18" Reinforced Concrete Pipe (RCP) laterals designated on the plans as "B" & "C ", relocated the junction structure 50' north and added a transition structure where the new 36" RCP joins the existing 54" RCP. This work was done on a time and materials basis. FINAL COST $ 13,070.56 2. The contract documents require the native soil be used for backfill for the storm drain pipe. During excavation for the 36" RCP storm drain on the east side of Bristol, the native soil that was encountered was unsuitable for backfill. This soil needs to be removed and suitable soil brought in. This work was done on a time and materials basis. (PCO #22) FINAL COST $ 19,796.65 Project 08 -1700 Request for Approval of Change Order No. 3 January 27, 2013 Page 2 of 4 3. During excavation for the 18" storm drain lateral "HH ", a 12" water main siphon was encountered that was not shown on the plans. While excavating adjacent to the siphon, which was constructed using large concrete thrust blocks, the weight of the thrust blocks caused the trench wall to collapse. The contractor needed to support the pipe with a steel beam, re- excavate the trench, and install additional shoring. This work was done on a time and materials basis. (PCO #28) FINAL COST $ 13,968.58 EXTRA WORK AT AGREED PRICE 4. The contract documents specify new 30' tall, type 61 traffic signal poles and new 30' tall type 15 traffic signal poles on the northeast corners of Bristol & Santa Ana Blvd. and Bristol & Civic Center Drive. These poles have luminaire arms to which the safety lights are mounted. After the specified poles were ordered, Southern California Edison (SCE) completed installing the high - voltage transmission lines over the pole locations. Once the contractor erected the poles it was discovered that the power lines are too close to the type 61 poles to install the standard luminaire arms; therefore straight luminaire arms need to be installed in lieu of the standard arms. (PCO #24) The power lines are too close to the type 15 poles to install any luminaires arms; therefore the poles need to be shortened to 25' and the luminaires mounted at the lower elevation. (PCO #16) AGREED PRICE = $5092.50 5. After the start of construction, revised plans for the north east corner of Bristol and Civic Center were issued. The revisions call for moving the location for the proposed traffic signal pole east five feet which will necessitate installing a longer mast arm. Given the long lead time for traffic signal pole products, usually 10 -12 weeks, the original mast arm will need to be installed to enable the contractor to continue with the scheduled phasing of the work. When the new mast arm is received, it will be installed; the original mast arm will be removed and salvaged. (PCO #21) AGREED PRICE = $21,228 6. In an effort to increase motorist and pedestrian safety within the project limits, Traffic Engineering has requested that two Fortel® VCalm® radar speed limit signs be installed along Bristol Street. This cost includes the signs, installation, software and wireless controlling device. AGREED PRICE $31,138.31 Project 08 -1700 Request for Approval of Change Order No. 3 January 27, 2013 Page 3 of 4 ACCOUNTING UNIT COST ANALYSIS CCO Item Number Accounting Unit Accounting Unit Costs Total Amount 1 05917661 - 66220 - 08170001028 $3,267.64 03217662 - 66220- 08170002028 $4,901.46 $13,070.56 03017660 - 66220- 08170003028 $4,901.46 2 05917661- 66220 - 08170001028 $4,949.16 03217662- 66220 - 08170002028 $7,423.74 $19,796.65 03017660- 66220 - 08170003028 $7,423.74 3 05917661 - 66220- 08170001028 $3,492.15 03217662- 66220- 08170002028 $5,238.22 $13,968.58 03017660 - 66220 - 08170003028 $5,238.22 4 05917661- 66220- 08170001028 $1,273.13 03217662 - 66220- 08170002028 $1,909.69 $5,092.50 03017660- 66220- 08170003028 $1,909.69 5 05917661- 66220 - 08170001028 $5,307.00 03217662 - 66220- 08170002028 $7,960.50 $21,228.00 03017660- 66220 - 08170003028 $7,960.50 6 05917661- 66220 - 08170001028 $7,784.58 03217662- 66220 - 08170002028 $11,676.87 $31,138.31 03017660 - 66220- 08170003028 $11,676.87 Total $104,294.60 CONTRACT COST SUMMARY Amount % of Contract Original Contract Total $ 6,169,256.00 Previous Change Orders $ 109,573.00 Increase 1.78% Change Order #3 $104,294.60 Increase 1.69% Total Change Orders to Date $ 213,867.60 Increase 3.47% Adjusted Contract Total $ 6,383,123.60 Project 08 -1700 Request for Approval of Change Order No. 3 January 27, 2013 Page 4 of 4 SCHEDULE IMPACT Increase contract time by 30 working days. APPROVED AS TO FUNDS AND ACCOUNTS: Ck William Galvez, I terim Executive Director Francisco Gutierrez, Executive Directo Public Works Agency Finance & Management Services Agency CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 3 To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle lime. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT TIME & MATERIALS Construct junction chamber as shown on revised plan SD -01 & SD -05 dated 5/7/2013. (PCO #07) FINAL COST $ 13,070.56 Remove unsuitable soil from 36" storm drain trench and backfill with suitable soil. (PCO #22) FINAL COST $ 19,796.65 Excavate failed trench walls, install shoring and support for existing waterline, trench by hand and backfill. (PCO #28) FINAL COST $ 13,968.58 EXTRA WORK AT AGREED PRICE Install two straight luminaire arms in lieu of the specified curved arms (PCO #24) and modify two type 15 poles as directed in PCO #16 to avoid overhead high - voltage power lines. AGREED PRICE = $5092.50 Remove previously installed 60' mast arm and provide and install a 65' mast arm per revised plan XA -03 dated 10/29/13 (PCO #21) AGREED PRICE = $21,228 Install 2 Forte[® VCalm® radar speed limit signs and controlling devices and software as directed in PCO #25 dated 11/1/2014 AGREED PRICE $31,138.31 Page 1 of 2 CITY OF SANTA ANA PUBLIC WORKS AGENCY W rr CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this project. TOTAL COST THIS CHANGE ORDER: DECREASE $ - - _ _ _ INCREASE $ 104,294.60 By reason of this order the CONTRACT TIME completion will be adjusted as follows: 30 working days We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full payment therefor the prices shown above. Acc to , Date 1 23114 Contractor ALL AMERICAN ASPHALT, INC. BkL Title - aAHF_5 Mr'-GEB.. PKAT. MLfz . Approvarcommended by G(i(i(/ Date PUBLIC WORKS AGENCY E) CUTIVE DIRECTOR 1 � Approved by G" Date CITYMANAGER - Page 2 of 2 MEMORANDUM David Cavazos To: City Manager Date: April 25, 2014 William Galvez, Interim Executive Director From: Public Works Agency Project Nos. 08 -1700, 12 -6421, 12 -6422 Bristol Street Widening From 2nd Street to 10th Street; Avalon & Ponderosa Emergency Work Subject: Change Order No. 4 CONTRACTOR All American Asphalt PO Box 2229 Corona, CA 92878 PROJECT DESCRIPTION: 08 -1700; Bristol Street Widening from 2nd Street To 10th Street, 12-6421; Bristol Street Water Main Improvements from 3rd Street to 10th Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd Street to 10th Street. Avalon & Ponderosa Emergency Work CHANGE ORDER NUMBER: 4 ACCOUNTING UNIT - ACCOUNT - ACTIVITY NUMBER: JUSTIFICATION EXTRA WORK AT TIME & MATERIALS CHANGE ORDER AMOUNT: $ 47,956.12 05917661 - 66220 - 08170001028 03217662- 66220 - 08170002028 03017660 - 66220 - 08170003028 05617640- 66220 - 12642201028 06617647- 66220 - 12642101028 05717640 -62300 This project has been submitted for Greenroads Certification which requires a significant amount of daily documentation for both the contractor and the City field staff. Due to the size and complexity of the project as well as the additional Greenroads documentation, City staff and the contractor concluded that a field office was warranted on this project and to share the costs. The contractor will provide the office, furniture, and facilities; the City will provide electrical power. This cost is to furnish and install a temporary power pole and wiring to the field office and maintain electrical service to the site for the duration of the project. FINAL COST = $3,238.92 The City recently installed two Fortel® radar speed signs on Southern California Edison (SCE) streetlight poles. SCE has requested that the signs be removed from their poles. This compensates the contractor to install two 16' type 1 -A poles with new foundations and relocate the signs. (PCO #25.1) Project 08 -1700 Request for Approval of Change Order No. 4 March 17, 2014 Page 2 of 4 FINAL COST = $6,950.19 3. During excavation for the 36" storm drain, an 18" sewer main was encountered that was not shown on the plans. The sewer main runs diagonally across the trench, this caused the contractor ineffiencies, required additional shoring, pipe supports and hand excavation. (PCO #29) FINAL COST = $8,156.02 4. During excavation for the 12" PVC water main an AT &T duct bank was encountered in the trench line. The duct bank is 84" to the bottom, with the top being 36" from the proposed finished surface. These elevations do not permit the new 12" water main to be installed over the top of the duct bank and therefore must be installed under it. A vertical offset must be constructed to enable the installation of the proposed water mains under the AT &T duct bank. (PCO #31) FINAL COST $2,410.13 5. To establish the connection between the new 8" PVC water main and the existing water system on Santa Ana Blvd. west of Bristol, the water supply to the adjacent medical clinic needed to be turned off. To accomplish this without disrupting the clinic's activities, the work needed to be done at night. This compensates the contractor for the added payroll premium for night work. (PCO #34) FINAL COST $2,997.22 EXTRA WORK AT AGREED PRICE 6. After the start of construction, revised plans for the north east corner of Bristol and Civic Center were issued. The revisions call for the relocation of an existing pole mounted area light on private property which will necessitate trenching, intercepting the existing conduit, removing the old foundation and placing a new foundation. (PCO #26) AGREED PRICE $3,949.41 7. After the start of construction, revised irrigation and landscaping plans for the east side of Bristol between Santa Ana Blvd. and Civic Center Dr. were issued. The revisions call for reducing the irrigation and landscaping in two areas, for which a credit was issued, and adding irrigation and landscaping in third for which an additional cost was incurred. This cost represents the difference between the credit and the additional costs. (PCO #33 & 35) AGREED PRICE = $4,302.11 EMERGENCY WORK 8. During a heavy rain storm on February 28, 2014, staff responded to several resident concerns about excessive flooding in the intersection of Avalon Avenue and Ponderosa Street. Staff investigated the concerns and determined that a street culvert was blocked by tree roots. Several unsuccessful attempts were made to Project 08 -1700 Request for Approval of Change Order No. 4 March 17, 2014 Page 3 of 4 dislodge the roots using mechanical pipe cleaning equipment. Crews and equipment were then mobilized to excavate and expose the culvert, break out the concrete culvert, remove the tree roots, and re- establish the culvert and affected improvements. This work was done on a time & materials basis. FINAL COST = $15,952.12 ACCOUNTING UNIT COST ANALYSIS CCO Item Number Accounting Unit Accounting Unit Costs TotalAmount 05917661- 66220 - 08170001028 $809.73 1 03217662- 66220 - 08170002028 $1,214.60 $3,238.92 03017660- 66220 - 08170003028 $1,214.60 05917661 - 66220 - 08170001028 $1,737.55 2 03217662- 66220- 08170002028 $2,606.32 $6,950.19 03017660- 66220 - 08170003028 $2,606.32 05917661 - 66220- 08170001028 $2,039.01 3 03217662- 66220 - 08170002028 $3,058.51 $8,156.02 03017660- 66220 - 08170003028 $3,058.51 4 06617647- 66220- 12642101028 $2,410.13 $2,410.13 5 06617647- 66220- 12642101028 $2,997.22 $2,997.22 05917661- 66220- 08170001028 $987.35 6 03217662- 66220 - 08170002028 $1,481.03 $3,949.41 03017660 - 66220 - 08170003028 $1,481.03 05917661- 66220 - 08170001028 $1,075.53 7 03217662- 66220 - 08170002028 $1,613.29 $4,302.11 03017660 - 66220- 08170003028 $1,613.29 8 05717640 -62300 $15,952.12 $15,952.12 Total $47,956.12 Project 08 -1700 Request for Approval of Change Order No. 4 March 17, 2014 Page 4 of 4 CONTRACT COST SUMMARY Original Contract Total Previous Change orders Change Order #4 Total Change Orders to Date Adjusted Contract Total SCHEDULEIMPACT Increase contract time by 35 working days. V1 William Galvez, Interim Ex cutive Director Public Works Agency Amount % of Contract $6,169,256.00 $213,867.60 Increase 3.47% $47,956.71 /Increase 0.78% $261,824.31 Increase 4.24% $6,431,080.31 APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez, Executive Director Finance & Management Services Agency Cl"' OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 4 To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT TIME & MATERIALS 1. Provide electrical power for field office. (PCO #1) FINAL COST = $3,238.92 2. Relocate two Fortel® radar speed signs from SCE streetlight poles to 1 -A poles with new foundations. (PCO 25.1) FINAL COST $6,950.19 3. Install shoring, pipe supports and trench by hand due to storm drain conflict with existing sewer @ Civic Center Drive (PCO #29) FINAL COST $8,156.02 4. Construct a vertical offset in the 12" PVC main to mitigate conflict with AT &T duct bank @ STA 62 +42. (PCO #31) FINAL COST $ 2,410.13 5. Construct waterline tie -in at night to accommodate business hours of medical clinic. (PCO #34) FINAL COST $2,997.22 EXTRA WORK AT AGREED PRICE 6. Relocate area light on private property @ STA 73 +65 as shown on revised plan sheet DE -05 dated 11/22/13. (PCO #26) AGREED PRICE $3,949.41 7. Modify irrigation and landscaping as shown on revised plan sheets DE -02, IR -02, IR- 03, LA- 02, LA -03, & LA- 04 dated 1/23/14. (PCO #33 & 35) AGREED PRICE $4,302.11 EMERGENCY WORK 8. Clear obstruction in and repair culvert per field direction given 4/1/2014. (PCO #36) FINAL COST = $15,952.12 Pane 'I of 9 CITY OF SANTA ANA PUBLIC WORKS AGENCY c"� Y� CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 4 To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this project. TOTAL COST THIS CHANGE ORDER: DECREASE $ - - - - - INCREASE $ 47,956A2 By reason of this order the CONTRACT TIME completion will be adjusted as follows: 35 working days We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full payment therefor the prices shown above. Date 4125/14 Contractor ALL AMERICAN ASPHALT, INC. By ' WL / l- Title ryES MccreE, PIZC7I �f Approvvyl recommended by Approved by WORKS CITYMANAGER Page 2 of 2 Date Date MEMORANDUM To From: David Cavazos City Manager William Galvez, Interim Executive Director Public Works Agency Date: June 17, 2014 Project Nos. 08 -1700, 12 -6421, 12 -6422 Bristol Street Widening From 2nd Street to 10th Street; Avalon & Ponderosa Emergency Work; Residential Concrete Street Repair Subject: Change Order No. 5 CONTRACTOR All American Asphalt PO Box 2229 Corona, CA 92878 PROJECT DESCRIPTION: 08-1700; Bristol Street Widening from 2nd Street To 10th Street, 12- 6421;Bristol Street Water Main Improvements from 3rd Street to 10th Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd Street to 10th Street. Residential Concrete Street Repair CHANGE ORDER NUMBER: 5 ACCOUNTING UNIT - ACCOUNT - ACTIVITY NUMBER JUSTIFICATION EXTRA WORK AT AGREED PRICES CHANGE ORDER AMOUNT: $ 730,476.75 05917661 - 66220 - 08170001028 03217662 - 66220- 08170002028 03017660- 66220 - 08170003028 05617640 - 66220 - 12642201028 06617647 - 66220 - 12642101028 05717640 -62300 1. After the traffic loop detectors were installed, the traffic engineering section requested that two additional type Q modified bike lane loop detectors be installed within the limits of the project. This compensates the contractor for costs to remobilize a crew to return to the project site and install the additional loops AGREED PRICE = $1,650 2. After the start of construction, revised striping plans were issued which included modifications to the bike lanes and a deceleration lane @ Civic Center Drive. AGREED PRICE = $3,732.75 EXTRA WORK AT AGREED UNIT PRICES This Change Order allows the City to commit the remaining balance of Residential Street Repair bond funds principal before its expiration at the end of Fiscal Year 2013 -14. By Project 08 -1700 Request for Approval of Change Order No. 4 March 17, 2014 Page 2 of 3 issuing a change order to the existing contract, the City can meet the bond issuance commitment deadline and will benefit from low unit pricing for the residential street improvements. In December 2007, the City leveraged gas tax revenues as debt service for a $68 million bond. The funds were restricted for the purposes of rehabilitating local streets. Over the initial five years of the Residential Street Repair Bond Program project, streets were rehabilitated at much lower costs. Lower unit pricing from a favorable bid climate, economies of scale associated with large bid quantities, and advanced construction techniques enabled the City to perform more street rehabilitation work than anticipated. As a result, after each phase of construction, a balance remained unexpended. The bond terms require that all proceeds be committed before the end of Fiscal Year 2013 -14. Staff has identified the streets in Exhibit 1 as the next highest priority residential streets eligible for using these bond funds. The recommended streets were constructed with concrete pavement and have deteriorated due to weather, age, and heavy usage. In response to the time constraint, staff recommended modifying the current All American Asphalt, Inc., contract to maximize economies of scale and favorable unit prices received in the open bid process for the procurement of the Bristol Street Improvements and Widening Project, The City Council approved adding this work to the existing contract at its regular meeting on 5/20/2014. ACCOUNTING UNIT COST ANALYSIS CCO Rem Number Accounting Unit Accounting Unit Costs Total Amount 05917661 - 66220 - 08170001028 $412.50 1 03217662- 66220 - 08170002028 $618.75 $1,650.00 03017660 - 66220 - 08170003028 $618.75 05917661 - 66220 - 08170001028 $933.19 2 03217662- 66220- 08170002028 $1,399.78 $3,732.75 03017660 - 66220- 08170003028 $1,399.78 3 05817661- 66220 - 14682201028 $725,094.00 $725,094.00 Total 1 $730,476.75 Project 08 -1700 Request for Approval of Change Order No. 4 March 17, 2014 Page 3 of 3 CONTRACT COST SUMMARY Original Contract Total Amount % of Contract $6,169,256.00 Previous Change orders $261,824.31 Increase 4.24% Change Order # $730,476.75 Increase 11.84% Total Change Orders to Date $992,301.06 Increase 16.08% Adjusted Contract Total SCHEDULEIMPACT Increase contract time by 45 working days. William Galvez, Interi Executive Director Public Works Agency $7,161,557.06 APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez, Executive Director Finance & Management Services Agency Project No. 08 -1700 Bristol Street Widening Contract Funding Authorization /Expenditures summary Council Authorization Construction Contract $ 6,169,256.00 Construction Contingency $ 616,926.00 Increased Contingency by RFCA $ 1,000,000.00 Total $ 7,786,182.00 Staff Authorized Expenditures Construction Contract $ 6,169,256.00 Adjusted Contract Quantities $ 300,21100 Change Order #1 $ 79,33100 Change Order #2 $ 30,240.00 Change Order #3 $ 104,294.60 Change Order #4 $ 47,956.13 Change Order #5 $ 730,476.75 Total $ 7,461,769.48 Actual Expenditures Progress Payment 1 $ 309,978.90 Progress Payment 2 $ 393,533.84 Progress Payment 3 $ 390,198.01. Progress Payment 4 $ 325,266.33 Progress Payment 5 $ 1,033,431.47 Progress Payment 6 $ 172,246.10 Progress Payment 7 $ 118,130.05 Progress Payment 8 $ 214,074.58 Progress Payment 9 $ 291,200.20 Progress Payment 10 $ 372,380.11 Progress Payment 11 $ 478,225.51 Progress Payment 12 $ 454,256.71 Progress Payment 13 $ 597,043.24 Progress Payment 14 $ 530,054.05 Progress Payment 15 $ 732,733.73 Estimated Progress Payment #16 $ 300,000.00 Change Order #5 $ 730,476.75 Total $ 7,443,229.58 Project No. 08 -1700 Bristol Street Widening Contract Funding Authorization /Expenditures Summary Council Authorization Construction Contract $ 6,169,256.00 Construction Contingency $ 616,926.00 Increased Contingency by RFCA $ 1,000,000.00 Total $ 7,786,182.00 Staff Authorized Expenditures Construction Contract $ 6,169,256.00 Adjusted Contract Quantities $ 300,213.00 Change Order #1 $ 79,333.00 Change Order #2 $ 30,240.00 Change Order #3 $ 104,294.60 Change Order #4 $ 47,956.13 Change Order #5 $ 730,476.75 Total $ 7,461,769.48 Actual Expenditures Progress Payment 1 $ 309,978.90 Progress Payment 2 $ 393,533.84 Progress Payment 3 $ 390,198.01 Progress Payment 4 $ 325,266.33 Progress Payment 5 $ 1,033,431.47 Progress Payment 6 $ 172,246.10 Progress Payment 7 $ 118,130.05 Progress Payment 8 $ 214,074.58 Progress Payment 9 $ 291,200.20 Progress Payment 10 $ 372,380.11 Progress Payment 11 $ 478,225.51 Progress Payment 12 $ 454,256.71 Progress Payment 13 $ 597,043.24 Progress Payment 14 $ 530,054.05 Progress Payment 15 $ 732,733.73 Estimated Progress Payment #16 $ 300,000.00 Change Order #5 $ 730,476.75 Total $ 7,443,229.58 1110 7,o) CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 5 To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included In the plans and specifications on this contract, NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise slated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT AGREED PRICE 1. Mobilization costs to install additional type Q modified bike lane loop detectors. (PCO #38) AGREED PRICE $1,650.00 2. Install traffic striping per revised plan CH -01 & CH -02 dated 10/30/2013. (PCO #27) AGREED PRICE $3,732.75 EXTRA WORK AT AGREED UNIT PRICES The following new bid items will apply to the contract: Item # Bid Item Unit Preliminary Quantity Unit Price Estimated Amount 102 Unclassified Excavation of local streets CY 100 $48.00 $4,800.00 103 Remove PCC Pavement of local streets CY 2,500 $70.00 $175,000.00 104 Crushed Miscellaneous Base (CMB) TN 100 $18.00 $1,800.00 105 AC Pavement TN 2,500 $73.00 $182,500.00 106 Mirafi 600 SY 14,800 $1.50 $22,200.00 $25,000.0 107 Mobilize CTB plant LS 1 0 $25,000.00 108 Mix and provide CTB TN 4,675 $32.20 $150,535.00 109 Place & Grade CTB SF 133,000 $0.19 $25,270.00 110 Remove and Replace PCC Curb Ramp SF 3,000 $12.89 $38,670.00 111 Remove and Replace PCC Driveway SF 1,000 $13.00 $13,000.00 Page 1 of 3 CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 5 To All American Asphalt, Inc Contractor 112 Remove and Replace PCC Sidewalk SF 1,000 $9.10 $9,100.00 Remove and Replace PCC Cross 113 Gutter(8 °) SF 1,100 $16.79 $18,469.00 Remove and Replace PCC Curb and 114 Gutter (A -2 -6) SF 100 $64.00 $6,400.00 115 Remove and Replace PCC Curb (B -1) LF 300 $40.00 $12,000.00 116 Grind PCC* LF 50 $24.00 $1,200.00 Adjust Manhole Frame and Cover to 117 Grade* EA 20 $770.00 $15,400.00 Furnish & Install Water Valve Frame & 118 Cover to Grade EA 25 $530.00 $13,250.00 119 Signing and Striping for local streets LS 1 $7,900.00 $7,900.00 Storm Water Pollution Prevention Plan 120 (SWPPP) LS 1 $2,600.00 $2,600.00 Page 2 of 3 CITY OF SANTA ANA You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE, THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this project. TOTAL COST THIS CHANGE ORDER', DECREASE $ _ _ _ _ _ INCREASE $ $730,476.75 By reason of this order the CONTRACT TIME completion will be adjusted as follows: 45 working days We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accep d, ate�✓g� (0-1 1- 14 Contractor ALL AMERICAN ASPHALT, INC. By Title S P /ji Approval recommended by Date PUBLIC WORKS AGENCY EXECUTIVE DIRECTOR v Approved by J Date CITY MANA Page 3 of 3 0" -C'7. Mina To: From: Subject: David Cavazos City Manager Fred Mousavipour, Executive Director Public Works Agency Date: September 24, 2014 Project Nos. 08 -1700, 12 -6421, 12 -6422 Bristol Street Widening From 2 "d Street to 10th Street; Change Order No. 6 CONTRACTOR All American Asphalt PO Box 2229 Corona, CA 92878 PROJECT DESCRIPTION: 08 -1700; Bristol Street Widening from 2nd Street To 10th Street, 12- 6421;Bristol Street Water Main Improvements from 3rd Street to 10th Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd Street to 10th Street. Residential Concrete Street Repair CHANGE ORDER NUMBER: 6 ACCOUNTING UNIT - ACCOUNT- ACTIVITY NUMBER: JUSTIFICATION EXTRA WORK AT AGREED PRICES CHANGE ORDER AMOUNT: $ 65, 492.24 05917661 - 66220 - 08170001028 03217662- 66220 - 08170002028 03017660 - 6622_0- 08170003028 05617640- 66220 - 12642201028 06617647 - 66220 - 12642101028 05817661 - 66220 - 14682201028 After the specified 25' Phoenix dactylifera palm trees were planted, Southern California Edison requested that two trees be relocated due to potential future conflicts with overhead power lines. This price includes all costs to including crane costs, traffic control, irrigation repair, and landscaping restoration. (PCO #39) AGREED PRICE $12,469.40 2. The plans indicated the proposed sound wall located on east side of Bristol n/o 6th Street to be 108 LF, after the wall was constructed it was determined that there was a four foot gap between the end of the wall and the existing boundary wall. This change order will extend the sound wall 4 LF to join the existing wall. This price accounts for all costs including excavation, disposal and construction of the foundation and wall. (PCO #41) AGREED PRICE $4,969.40 Project 08 -1700 Request for Approval of Change Order No. 6 September 24, 2014 Page 2 of 4 3. After construction was completed it became evident that motorists were making unsafe turns across the painted median. Traffic Engineering issued revised plan sheets TA -01 & TA -02 dated 7/29/2014. These revisions call to install signs, striping, and Paxco® curb system to prevent the unsafe turning movements. (PCO #42 & #43) AGREED PRICE $15,562.84 EXTRA WORK AT AGREED UNIT PRICES Preliminary Estimated Item # Item Unit Quantity Unit Price Amount 121 Root Grind EA 80 237.00 $18,960.00 In Change Order # 5 additional unit prices were added to the contract to perform work under the Residential Street Repair Bond Program. After the start of construction on this work, while excavating sidewalk sections for replacement, it was determined that root pruning was necessary to properly perform the work. This work will be done to City Standards and this cost reflects all costs associated with this work. The quantity shown is estimated and the unit cost is comparable to that received in open bidding. Preliminary Unit Estimated Item # Item Unit Quantity Price Amount Rubberized Emulsion Aggregate 122 Slurry (REAS) Seal Type 2 TN 50 520.00 $26,000 The contract documents require the contractor to remove the existing thin mil thermoplastic striping prior installing the new striping which includes new bike lanes and the realignment of existing lane lines. The process used to remove the striping leaves scars on the existing pavement surface which produces an unaesthetic appearance to the street. Installing rubberized emulsion aggregate slurry (REAS) in these areas will not only repair the aesthetics of the street, but also extend the life of the pavement. The quantity shown is estimated and the unit cost is based on bid costs for an existing contract with this contractor. Project 08 -1700 Request for Approval of Change Order No. 6 September 24, 2014 Page 3 of 4 ACCOUNTING UNIT COST ANALYSIS CCO Rem Number Accounting Unit Accounting Unit Costs Total Amount Added Scope (Co #5 Inc. adj. qtys.) 05917661 - 66220- 08170001028 $3,117.35 1 03217662- 66220 - 08170002028 $4,676.03 $12,469.40 Previous Approved COs (1 -4 Inc. adj. qtys.) 03017660- 66220 - 08170003028 $4,676.03 5.41% Change Order #6 05917661- 66220- 08170001028 $1,242.35 0.91% 2 03217662- 66220 - 08170002028 $1,863.53 $4,969.40 Adjusted Contract Total 03017660- 66220 - 08170003028 $1,863.53 05917661 - 66220 - 08170001028 $3,890.71 3 03217662 - 66220- 08170002028 $5,836.07 $15,562.84 03017660- 66220- 08170003028 $5,836.07 121 05817661 - 66220 - 14682201028 $18,960.00 $18,960.00 05917661 - 66220 - 08170001028 $6,500.00 122 03217662- 66220- 08170002028 $9,750.00 $26,000.00 03017660- 66220- 08170003028 $9,750.00 E- Total $65,492.24 CONTRACT COST SUMMARY Revised Amount Authorized by City Council Amount $ 7,169,256.00 Original Contract $ 6,169,256.00 Added Scope (Co #5 Inc. adj. qtys.) $ 905,000.00 Revised Contract $ 7,074,256.00 Previous Approved COs (1 -4 Inc. adj. qtys.) $ 387,513.48 Increase 5.41% Change Order #6 $ 65,492.24 Increase 0.91% Total Change Orders to Date $ 453,005.72 Increase 6.32% Adjusted Contract Total $ 7,527,261.72 Project 08 -1700 Request for Approval of Change Order No, 6 September 24, 2014 Page 4 of 4 SCHEDULEIMPACT Increase contract time by 44 working days. Fre Mousavipour, Executive Director Pub is Works Agency APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez, Executive Director Finance & Management Services Agency Project Number 08 -1700: Bristol Street To All American Asphalt, Inc. CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER From 2nd St. To 10th St. Change Order Number 6 Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included In the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTILAPPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for Idle time. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT AGREED PRICE 1. Relocate two (2) 25' date palm trees. (1 #39) AGREED PRICE $12,469.40 2. Extend sound wall located on east side of Bristol n/o 6th Street to join existing east/west boundary wall at 611 N. Bristol. (1 #41) AGREED PRICE $4,969.40 3. Install signs, striping, and Paxco° curb system per revised plan sheets TA -01 & TA -02 dated 7/29/2014. (PCO #42 & #43) EXTRA WORK AT AGREED UNIT PRICES The following new bid items will apply to the contract: I +er 4 Item 121 Root Pruning Rubberized Emulsion Aggregate Slurry 122 (REAS) Seal Type 2 AGREED PRICE $15,562.84 Preliminary Estimated Unit Quantitv Unit Price Amount EA 80 237.00 $18,960.00 TN 50 520.00 $26,000 Page 1 of 2 CITY OF SANTA ANA PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change order Number To All American Asphalt, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle lime. Change requested by PUBLIC WORKS AGENCY The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed on this project, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoeverto file any further claim related to this project. TOTAL COST THIS CHANGE ORDER: DECREASE $ - - - - - INCREASE $ 65,49224 By reason of this order the CONTRACT TIME completion will be adjusted as follows: 44 working days We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept as full payment therefor the prices shown above, Date Approval recommended by Approved by 14 Contractor ALL AMERICAN ASPHALT, INC. (Title EXECUTIVE DIRECTOR Page 2 of 2 BRUT. 1"1G1?.. Date 4 Date 6�