Loading...
HomeMy WebLinkAboutTUSTIN, CITY OF (MCFADDEN IMPROVEMENTS)-2013A-2012-231 AGREEMENT BETWEEN THE CITY OF TUSTIN AND THE CITY OF SANTA ANA FOR THE PAVEMENT REHABILITATION OF MCFADDEN AVENUE BETWEEN MANTLE LANE AND PASADENA AVENUE This agreement ("Agreement"), made and entered into this A (y day of UL?? 2013, by and between the CITY OF TUSTIN a municipal corporation ("TUSTIN"), and the CITY OF SANTA ANA, a municipal corporation ("SANTA ANA"). RECITALS: A. WHEREAS, TUSTIN and SANTA ANA desire to enter into an Agreement to reconstruct and resurface the roadway pavement on McFadden Avenue between Mantle Lane and Pasadena Avenue. Related work on the project will include signing and striping; sidewalk and curb/gutter repair; replacement of curb ramps to be in compliance with current federal Americans with Disabilities requirements; and adjustment of manholes and water valves to grade. This work will hereinafter be referred to in this Agreement as the "PROJECT"; and B. WHEREAS, the PROJECT is included in TUSTIN plans titled McFadden Avenue Pavement Rehabilitation Project between Mantle Lane and Pasadena Avenue (CIP No. 70213); and C. WHEREAS, the PROJECT lies partly within the corporate and jurisdictional limits of SANTA ANA and partly within the corporate and jurisdictional limits of TUSTIN; and D. WHEREAS, SANTA ANA and TUSTIN are each empowered by law to expend public monies to improve McFadden Avenue; and E. WHEREAS, SANTA ANA and TUSTIN desire to accomplish all of the needed work as described herein by a single public works project in which TUSTIN will act as the Lead Agency, and SANTA ANA will reimburse TUSTIN for SANTA ANA's portion of the design and construction costs; and F. WHEREAS, TUSTIN is in the process of completing the design plans, and SANTA ANA will review and approve the design plans upon completion; and G. WHEREAS, the total PROJECT construction cost is estimated at $497,000 as shown in Exhibit "A", attached hereto and incorporated herein. The total estimated PROJECT design and construction costs will be divided between the parties as follows: TUSTIN SANTA ANA Total Design cost $35,000 $15,000 $50,000 Construction cost $350,000 $147,000 $497,000 1 H. WHEREAS, State-Local Partnership Program (SLPP) Formula Grant funds have been programmed for the project through the Orange County Transportation Authority (OCTA) in the amount of $175,000 for TUSTIN's share and $73,500 for SANTA ANA's share, totaling $248,500; and 1. WHEREAS, the PROJECT is declared categorically exempt from CEQA (Section 15301, Class 1 (c)); NOW, THEREFORE, the parties agree as follows: TUSTIN Rights and Duties: 1. TUSTIN shall be the lead agency for the work and shall provide all construction management. TUSTIN shall be solely responsible for the preparation and award of the contract pursuant to public bid requirements for the construction of the PROJECT, including the portion of the PROJECT that is in SANTA ANA. TUSTIN shall be responsible for the preparation of all legal documents, including the Notice Inviting Bids, Instruction to Bidders, and the related construction contract, surety bonds and insurance certificates. TUSTIN shall be solely responsible for the administration and performance of the contract awarded to the contractor for the construction of the PROJECT. 2. Tustin shall pay its proportionate share of all PROJECT design and construction costs, materials testing, site survey, construction engineering, and construction management, as estimated in Recital G and Exhibit "A" of this Agreement. 3. TUSTIN shall invoice the California Department of Transportation (Caltrans) for reimbursement of SLPP Formula Grant funds, described in Recital H of this Agreement, including SANTA ANA's share, which shall be paid directly to TUSTIN by Caltrans. 4. In the event the sealed bids submitted by the lowest responsive/responsible bidder for the construction of the PROJECT show that SANTA ANA's portion of the PROJECT costs will exceed the estimated cost by ten percent (10%), TUSTIN shall not award such contract and shall not bind SANTA ANA hereunder without the prior written consent of SANTA ANA. 5. TUSTIN shall notify SANTA ANA in writing of any changes, increased costs, and pertinent meetings (i.e., pre-construction, site, and final walk through), associated with TUSTIN's lead agency responsibilities for the PROJECT. 6. Change orders for work within SANTA ANA must receive the written approval of the Executive Director of the Public Works Agency of SANTA ANA prior to implementation, which approval shall not be unreasonably withheld. SANTA ANA shall have a minimum of five (5) working days to review and approve change orders. SANTA ANA shall have inspection authority within SANTA ANA jurisdictional boundaries and shall be notified of the progress of the 2 PROJECT for such purposes. SANTA ANA shall also have the right to enter and inspect within TUSTIN boundaries at all times for the purposes of overseeing TUSTIN lead agency functions. 7. TUSTIN shall have the exclusive right of approval of all plans, specifications and cost estimates prepared by consultants for the portion of the PROJECT within the jurisdictional boundaries of TUSTIN. 8. TUSTIN shall advertise and award the contract for the PROJECT in accordance with federal, state and local laws. 9. TUSTIN shall cause all hired consultants on the PROJECT to obtain general liability and motor vehicle liability insurance. For any consultant contract on the PROJECT entered into after the date of "Agreement", TUSTIN shall also cause SANTA ANA to be named as additionally insured, and include primary and not-contributory language and standard separation of insureds provisions, on insurance certificates and separate endorsements for all consultant contracts related to the PROJECT. Copies of such certificates and endorsements shall be provided to SANTA ANA prior to consultants proceeding with work on the PROJECT. 10. TUSTIN shall, in advance, notify SANTA ANA as to the official advertising dates, bid opening date, and construction start date, and request SANTA ANA to attend all pertinent meetings (i.e., pre-construction, site, and final walk through). 11. TUSTIN shall provide SANTA ANA final Record Drawings for the PROJECT within 60 days of the completion and acceptance of construction. SANTA ANA Rights and Duties: SANTA ANA will provide review and comment on Project plans, specifications and cost estimates during the design/contract bidding process and prior to award of contract. 2. SANTA ANA shall have the exclusive right of approval of all plans, specifications and cost estimates prepared by consultants for the portion of the PROJECT within the jurisdictional boundaries of SANTA ANA. 3. SANTA ANA shall issue a no fee permit for work within SANTA ANA. Contractor shall be required to obtain a SANTA ANA business license prior to starting work. 4. Subject to Item 4 above, SANTA ANA shall pay its proportionate share of design and construction costs, as estimated in Recital G and Exhibit "A" of 3 this Agreement, within thirty (30) days after receipt of an invoice from TUSTIN. Joint Rights and Duties: In the event that expended costs for the PROJECT exceed funds listed in Exhibit "A", SANTA ANA shall be solely responsible for obtaining the additional funding for the increased costs occurring within the jurisdictional boundary of SANTA ANA and TUSTIN shall be solely responsible for obtaining additional funding for the increased costs occurring within the jurisdictional boundary of TUSTIN. 2. Mutual Indemnity Provision: a. Upon completion of the PROJECT, SANTA ANA shall accept maintenance responsibility for the portion of the PROJECT within SANTA ANA jurisdictional limits, and TUSTIN shall accept maintenance responsibility for the portion of the PROJECT within TUSTIN jurisdictional limits. b. Pursuant to Section 8546.7 of the California Government Code, in the event that this Agreement involves expenditures of State funds aggregating in excess of Ten Thousand Dollars ($10,000), both parties shall be subject to the examination and audit of the Auditor General of the State of California for a period of three (3) years after final payment under this Agreement. c. Neither SANTA ANA nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by TUSTIN under or in connection with any work, authority, or duties delegated to TUSTIN under this Agreement. It is also understood and agreed that, pursuant to Government Code Section 895.4, TUSTIN shall fully indemnify, defend and hold SANTA ANA harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by TUSTIN under or in connection with any work, authority, or duties delegated to TUSTIN under this Agreement. d. Neither TUSTIN nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by SANTA ANA under or in connection with any work, authority, or duties delegated to SANTA ANA under this Agreement. It is also understood and agreed that pursuant to Government Code Section 895.4, SANTA ANA shall fully indemnify, defend and hold TUSTIN harmless from any liability imposed for injury (as defined by Government Code Section 810.8) occurring by reason of anything done or omitted to 4 be done by SANTA ANA in connection with any work, authority, or duties delegated to SANTA ANA under this Agreement. // // // // // // // // // // // // // // // 5 IN WITNESS WHEREOF, TUSTIN has caused this agreement to be executed by its Mayor and attested by its Clerk, and SANTA ANA has caused this Agreement to be executed by its City Manager and attested by its Clerk, all thereunto duly authorized by the TUSTIN City Council and the SANTA ANA City Council, respectively. CITY OF SANTA ANA, a municipal corporation of the State of California CITY OF TUSTIN, a municipal corporation of the State of California By: Paul M. Walters City Manager ATTEST: Maria D. Huizar Clerk of the Council APPROVED AS TO FORM: V-1) -5 Sonia R. Carvalho City Attorney RECOMMENDED FOR APPROVAL Raul Godinez II Executive Director Public Works Agency By: ATTES City Clerk ne,V RM: (,,e o ,cam J . /--i DNid E. Ken City Attorney RECOMMENDED FOR APPROVAL: 'Stack Public Works/City Engineer 6 a W X W J.+ O U V L N C O d .Q O L a 0 0 C .Q to C Q c ca V) 4- 0 Q o C3 0 H 0 O? N 0 0 0 O O O O? O C) U") CD U 4` N / T = Q ?? N N O N T •a O W O LL Z (D U a d U ? U D N N C 0 m ? O M CD 0 O p p (n co O I- O M eh O W) H () O EA H O Z; O V,, ? 6q EA 60" Eff tp 6., E O m M T 1A m M 00 m C A EA ER 69 'a+ N 7 H O a? C O O LO (f) N O to O O (0 co ( 0 p R m co co r .- N ? U a M O N O M O 0 0 0 0 0 LO 0 Q 0 p CD C o p p U O 06 M r- M O (0 r,: W O O 6,- r- Lo R Como M 00 ^ 1n N R F- LO EA U9, EA EA EA EA EA T _ EA T T ER r a Q 69 69 64 R N _ O O O O O O O O R O r- Lo •- (o O Ln F- = T M ,- d M U u n u n n F- (n H J (n W J W W W 'F ' U d U U U C = C y c a •' V V= d V W O O C) a) m L U 0 a .r O (r) O O O O O O O O w° R N d a o O O ° O O O O o 0 = o c T? R a+ _ FR EA EA O M O ? In O Lf) ? U U O a) O CA • d ba L R ` R o o c c a Oa r o U 3 O N cr U a) W ? -moo C? w cu Q U co (D ll? a) O (D O E a) 06 co U ° 00 cq U co E T N N a) 0 N f4 2 0 > O CD 0? LL > c0 (0 c c c 6 C .0. ca a -- C = m m m ca co ?- •` ? Q > > > cr, > > U 0 ) C) -a O N O N O N C L, Z? =3 Z5 J a ) U Q p _I O Q' 2' (n 'O Q D Q N Q' y O Z ±' _ N M 't In (0 r? 00 Q) O