HomeMy WebLinkAbout23B - PROJ - PARTON ST SEWER IMPROVEMENTS
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY:
APRIL 1, 2013
TITLE: APPROVED
CONTRACT AWARD FOR PARTON ? As Recommended
STREET SEWER MAIN ? As Amended
IMPROVEMENTS PROJECT NO. El Ordinance on Reading
( El Ordinance on 2 2"d Reading
126418) ? Implementing Resolution
? Set Public Hearing For
CONTINUED TO
FILE NUMBER
CITY MANAGER
RECOMMENDED ACTION
1. Award a contract to the lowest responsible bidder, Atlas-Allied, Inc., in accordance with the
Base Bid in the amount of $258,760 for the construction of Parton Street sewer main
improvements.
2. Approve the Cost Analysis for a total estimated project delivery cost of $323,400 as shown in
Exhibit 1.
DISCUSSION
This project consists of replacing the old, deteriorated, and undersized sewer main located under
Parton Street between 10th Street and Washington Avenue as shown in Exhibit 2. The
improvements include installing a new sewer main, sewer laterals, manholes, and appurtenances.
Once completed, the sewer main breaks and blockages associated with older and deteriorated
systems will be eliminated, and the flow capacity will be increased, which would significantly
reduce the chance of future sewer overflows.
A Notice Inviting Bids was advertised on January 11 and 14, 2013, and bids were opened on
January 29, 2013. The following is a summary of the bid invitations mailed, bids received, and bid
results:
CONTRACTOR PARTICIPATION DATA
Santa Ana contractors receiving notices: 12
Contractors requesting bidding documents: 21
Bids received: 7
Bids received from Santa Ana contractors: 0
23B-1
Contract Award for Parton Street
Sewer Main Improvements
April 1, 2013
Page 2
BID RESULTS SUMMARY
RANK BIDDER'S NAME LOCATION BASE BID
1 Atlas-Allied, Inc. Anaheim $258,760
2 GRFO, Inc. Moreno Valley $274,170
3 SND Construction, Inc. Arcadia $287,070
4 Palp, Inc. dba Excel Paving Company Long Beach $323,991
5 G. Hurtado Construction, Inc. Riverside $339,930
6 Bali Construction El Monte $341,644
7 SRD Engineering, Inc. Anaheim $368,066
A total of 7 bids were received and all were deemed responsive. The bid results and the lowest
responsive bid by Atlas-Allied, Inc., in the amount of $258,760 is significantly lower than the
Engineer's Estimate of $339,500. Therefore staff recommends awarding the contract and
proceeding with construction.
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the proposed project is exempt from
further review. Categorical Exemption Environmental Review No. 2012-56 has been filed for this
project.
FISCAL IMPACT
A project cost analysis shown in Exhibit 1 determines that the total funds needed to deliver the
project, which includes construction administration, inspection, testing, and contingencies, is
approximately $323,400. Funding is available to cover those costs in the Sewer Services Capital
Project account (No. 05617640-66220), Project No. 126418.
APPROVED AS TO FUNDS AND ACCOUNTS:
Raul Godinez 11 Francisco Gutierrez
Executive Director' Executive Director
Public Works Agency Finance & Management Services Agency
RG/TC
Exhibit 1: Cost Analysis
2: Project Location Map
23B-2
COST ANALYSIS
PROJECT NO. 126418
PARTON STREET SEWER MAIN IMPROVEMENTS
Construction Contract $258,760
Contract Administration $14,300
Inspection and Testing $19,100
Survey Staking $5,364
Contingencies $25,876
TOTAL ESTIMATED CONSTRUCTION COSTS 323 400
Exhibit 1
23B-3
23B-4
WASHUGTO,V STREET
E,
L9 PROJECT LIME STREET
LOCATION
w
Q
LOTH STREET
w
~ ~
w W
cc Go
C4 0 E0.4.
z ~o;
O z
O z a >
O
a
CIVIC CEATTER DRIVE STREET'
EXH13T 2
VICINITY MAP
NOT TO SCALE
SANTA DNA ray, , Tltkp
`sir PARTON STREET Agenda Date SEWER MAIN IMPROVEMENTS (REBID) W
. 4-1-13 PROJECT NO, 12-6418
23B-5