HomeMy WebLinkAbout19C - RFP - STREETLIGHT UPGRADES
REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY:
JUNE 17, 2013
TITLE: APPROVED
REQUEST FOR PROPOSALS TO ? As Recommended
DESIGN-BUILD STREETLIGHT ? As Amended
UPGRADES TO REPLACE OBSOLETE El Ordinance on 1" Reading
? Ordinance on 2"d Reading
HIGH VOLTAGE STREETLIGHTS ? Implementing Resolution
SYSTEM ? Set Public Hearing For
CONTINUED TO
lrzl--7 FILE NUMBER
C AGER
RECOMMENDED ACTION
Authorize the Public Works Agency to publish a Request for Proposals and invite qualified firms
to submit proposals for the design and construction of streetlight upgrades at various city
locations where there are obsolete high voltage lighting systems.
DISCUSSION
The City's street lighting network includes areas where the high-voltage circuits and low
amperage systems are antiquated and obsolete. Those systems use a single wire in series that
has been a constant source of maintenance problems. Additionally, the unique incandescent
lamps used in those fixtures are very energy inefficient have a very short life, requiring annual
replacement.
In 2010, Philips Corporation, the only remaining manufacturer of the incandescent lamps,
stopped producing these lamps. These lamps are no longer available on the market and the
City's supply of replacement lamps has been depleted. This creates an urgent need to install
modern street light fixtures.
In April 2011, staff began using conversion kits enabling the use of conventional lamps. The kits
reduce the high voltage to conventional levels at each street light. Now, unfortunately, the only
manufacturer of the conversion kit has gone out of business, forcing the City to accelerate
upgrading the streetlight system.
To install modern streetlight fixtures in the existing antique poles, the system needs to be
rewired to enable a multiple wire 240-volt system. The intent is to remove the single high voltage
wire from the existing conduit, install three new wires into the existing conduit, and install new
metal halide fixtures with an option for energy efficient light-emitting diode (LED) lights. New
19C-1
Request for Proposals to Design-Build Streetlight Upgrades
June 17, 2013
Page 2
service connection points to Southern California Edison will be needed with a service
pedestal/cabinet for each streetlight circuit.
Residents have indicated in past surveys that they prefer to keep the antique style streetlight
poles, due to their historical value. Fortunately, there are new fixtures that are historically
accurate. This RFP will include provisions to provide and demonstrate sample energy efficient
LED lamps to residents of the neighborhood for their comments.
ENVIRONMENTAL IMPACT
Replacing the existing incandescent lamps with metal halide lamps will result in a savings of
98,000 Kilo Watt hours (kWh), effectively removing about 69 metric tons of carbon dioxide from
the environment, which is the equivalent to removing 14.4 cars from the roads. The LED option
would result in a savings of 149,000 kWh, which removes 105 metric tons of carbon dioxide
from the environment, and is equivalent to removing 21.9 cars from the roads.
FISCAL IMPACT
There is no fiscal impact associated with this action. Upon completion of the project there will
be an annual savings to the General Fund of approximately $12,500 in reduced energy costs if
metal halide fixtures are used, or about $19,000 in savings using the LED option.
Raul Godinez If,--
.
Executive Director
Public Works Agency
RG/KW
19C-2
~awtiaN ~~R
REQUEST FOR PROPOSALS
DESIGN-BUILD OF STREETLIGHT UPGRADES
TO REPLACE OBSOLETE HIGH VOLTAGE STREETLIGHTS SYSTEM
AT VARIOUS CITYWIDE LOCATIONS
RFP NO.
h
_v.
KEY RFP DATES:
Issue Date:
Proposal Due Date:
Project Coordinator: Kurt Wiemann, Projects Manager
EXHIBIT 1
1
19C-3
REQUEST FOR PROPOSAL
Notice is hereby given that sealed proposals will be accepted for providing street light repair and
cable replacement at various locations as per the attached specifications (Exhibit A), at the
Public Works Agency, Ross Annex, 4`h Floor Administration Offices, 20 Civic Center Plaza,
Santa Ana, California, until 12:00 Noon, 2013. If further information is
required, please contact Kurt Weimann, via email at kwiemann@santa-ana.org or phone at (714)
647-5088.
Mailed proposals should be addressed as follows:
Office of the Executive Director
Public Works Agency
City of Santa Ana
Ross Annex, M-21
20 Civic Center Plaza
Santa Ana, CA 92701
or delivered by hand or courier to:
Office of the Executive Director'
City of Santa Ana
Ross Annex, M-21
4`h Floor, Ross Annex
Santa Ana, CA 92701
It is the responsibility of the proposer to see that any proposal submitted shall have sufficient
time to be received by the Administrative Services Division prior to proposal due date and time.
Late proposals will be returned to the contractor unopened. The receiving time in the
Administrative Services Division will be the governing time for acceptability proposals.
Telegraphic, telephonic and facsimile proposals will not be accepted.
2
19C-4
I. PURPOSE
The purpose of this Request for Proposal (RFP) is to obtain a prime contractor to enter
into an agreement with the City to perform an assessment of the current street lighting
system at various locations as designated by the City where high voltage street lighting
systems operate, and begin a three phase process for the removal and replacement of
existing conduit, rewiring of each street light pole, the installation of new service points
and the installation of new globes.
II. REQUEST FOR PROPOSAL TERMS
1. PROPOSAL SUBMISSIONS
Proposals must be submitted to the Administrative Services Division in a sealed envelope
showing on the outside, the name of the bidder, and the proposal due date and time. An
authorized representative of the contractor must sign the proposal.
2. PROPOSAL WITHDRAWAL
Proposals may be withdrawn by written request received before the hour set for the
opening. After that time, the contractor may not withdraw proposals for a period of ninety
(90) days from the date of the opening.
3. LATE PROPOSALS
It is the responsibility of the contractor to see that any proposal submitted shall have
sufficient time to be received by the Administrative Services Division prior to the
proposal due date and time. The City of Santa Ana Public Works Agency shall not be
responsible for proposals lost or delayed in the mail. Late proposals will be returned to
the contractor unopened.
4. REQUIRED DOCUMENTS
Contractor must return the following completed documents with their proposal:
• Detailed proposal of services in accordance with the specifications detailed in
Exhibit A. Proposal should take into consideration the evaluation criteria included in
Section II and should not exceed 20 pages.
• Proposals should include job qualifications of key contract staff including lead
service personnel, superintendents, supervisors and managers. Personnel shall have
at least one year of experience maintaining and troubleshooting street lighting
systems.
• Completed Contractor's References form (Section III);
• Signed Proposal Form (Section IV);
• Signed Certification of Non-Discrimination by Contractors (Section V);
• Completed Contract Pricing Sheets (Section VI);
• Exhibit C is for reference only, but will be required when the contract is awarded to
the successful contractor.
3
19C-5
Contractor must submit one original and eight (8) photocopies of each proposal
offered.
5. RIGHTS RESERVED
The right is reserved by the City of Santa Ana to reject any or all proposals or to waive
any informality or technical defect in a proposal.
6. AGREEMENT
Successful contractor(s) will be required to enter into an agreement with the City of Santa
Ana. The City reserves the right to enter into an agreement with any, all, or none of the
contractors for a three-year period with the option of extending the agreement for one
additional one-year term.
7. SELL OR ASSIGN
The successful contractor shall not have the right to sell, assign, or transfer any
obligations resulting from this proposal without the specific written consent of the City.
8. LOCAL SALES TAX CONSIDERATION
In accordance with the Santa Ana Municipal Code, a one percent (I%) preference will be
applied to all proposals for taxable goods submitted by suppliers located within the City
limits of Santa Ana.
9. RECEIVING TIME
The receiving time in the Administrative Services Division will be the governing time for
acceptability of proposals. Telegraphic, telephonic and facsimile proposals will not be
accepted.
10. COMPLIANCE WITH LAWS
All proposals shall comply with current federal, state, and other laws relative thereto.
Contractor further agrees that the services proposed comply with all applicable Federal
and State Occupational Safety and Health laws, standards for regulations, and that
contractor will indemnify and hold the City harmless for any failure to so conform.
11. REFERENCE TO SUCCESSFUL CONTRACTOR
The terms vendor, supplier, or contractor may be used interchangeably in these
specifications and shall refer exclusively to the contractor(s) with whom the City enters
into contract as a result of this request for proposal.
12. INQUIRIES
Refer inquiries in writing via email to Mary Gonzales at mgonzales@santa-ana.org.
13. RIGHTS RESERVED
The City reserves the right to contract with any, all, or none of the contractors who
submit base proposals and/or alternate proposals.
14. E-MAIL COMMUNICATIONS
To facilitate the RFP process, contractors are required to monitor and respond to e-mail
requests on a daily basis.
4
19C-6
15. PRE-PROPOSAL CONFERENCE AND JOB WALK
There will be a pre-proposal conference and job walk. A detailed map and a work
location are provided in EXHIBIT of this Request for Proposal. Staff will be
available to meet or visit any of the sites during the week of , Monday
through Thursday, between the hours of 8:00-11:00 a.m. Questions regarding job
locations and work sites listed in this contract can be submitted to Jerry Jeffries at (714)
647-5015 or via e-mail to jjeffries@santa-ana.org. Contractors will be responsible for
visiting the sites and reviewing all areas of work before submitting proposals.
16. PRE-QUALIFICATION PROCESS
In addition to submitting all documentation required in this RFP specification, bidders
may also be required to demonstrate their ability to successfully perform the type of
maintenance work contemplated by this RFP specification, including but not limited to
providing an adequate number of staff, suitable equipment and materials as determined
by the Director.
17. SURETY BONDS
Each bid must be accompanied by a bid bond or a cashier's or certified check payable to
the City of Santa Ana, in an amount not less than ten percent (10%) of the aggregate of
the bid, as a guarantee that the bidder will enter into the proposed contract if the same is
awarded to him. The successful bidder will also be required to submit to the City a
payment bond for not less than ten percent (10%) of the contract price.
18. REVIEW OF JOB SITE
The Contractor shall be held responsible for carefully reviewing the site and verifying all
areas of work, prior to bid submittal.
III. EVALUATION OF PROPOSALS
The response to this Request for Proposal should contain documentation of Contractor's
credentials and expertise in this field. Substantial consideration will be given to contractors with
demonstrable and documented experience in similar work. Responses will be evaluated on the
basis of the qualifications, abilities, and responsiveness of the proposing contractors.
An evaluation committee appointed by the Executive Director of the Public Works Agency will
review the responses received. All proposals received will be fully reviewed and rated by the
evaluation committee. The successful proposal will be based upon both technical merit and cost
competitiveness. The committee will evaluate all proposals based on the following criteria:
Capability and Experience of Contractor
50%
1. Ability of contractor to obtain the staff and equipment necessary to perform
specifications.
2. Training and safety precautions taken to perform specifications.
3. Contractor's financial ability to provide uninterrupted technical services throughout the
term of the agreement.
5
19C-7
4. Experience of staff assigned to the contract.
5. Experience of supervisory and management staff assigned to the contract.
Past Performance
25%
1. Past record of performance on contracts with other cities, governmental agencies or
public bodies, including such factors as reliability, adherence to specifications and
compliance with contract terms and conditions.
2. Acceptable, verifiable references and site reviews.
Cost of Proposal
25%
1. Cost of base proposal
2. Cost of add-on services
3. Cost of specialized services
FOLLOW-UP OF EVALUATION PROCESS BY CONTRACTOR
Contractors may follow up on the evaluation of the proposals by contacting Kurt Wiemann via
email at kwiemann(&santa-ana.org or by phone at (714) 647-5088.
6
19C-8
IV. CONTRACTOR'S REFERENCES
This sheet must be completed in full and returned with contractor's proposal.
List and describe fully six contracts performed by your company, which demonstrate your ability
to provide services in accordance with the specifications in Exhibit A. Attach additional pages if
necessary. The City reserves the right to contact each of the references listed for additional
information regarding your company's qualifications.
Reference No. 1
Customer Name: Contact Individual:
Address: Phone Number:
Contract Amount: Year:
Description of equipment and services provided:
Reference No. 2
Customer Name: Contact Individual:
Address: Phone Number:
Contract Amount: Year:
Description of equipment and services provided:
Reference No. 3
Customer Name: Contact Individual:
Address: Phone Number:
Contract Amount: Year:
Description of equipment and services provided:
7
19C-9
CONTRACTOR'S REFERENCES (PAGE 2)
Reference No. 4
Customer Name: Contact Individual:
Address: Phone Number:
Contract Amount: Year:
Description of equipment and services provided:
Reference No. 5
Customer Name: Contact Individual:
Address: Phone Number:
Contract Amount: Year:
Description of equipment and services provided:
Reference No. 6
Customer Name: Contact Individual:
Address: Phone Number:
Contract Amount: Year:
Description of equipment and services provided:
8
19C-10
V. PROPOSAL FORM
Responses to this Request for Proposal are due at 12:00 p.m. Thursday, The
undersigned contractor agrees to provide street light cable replacement of the high voltage
systems locations designated by the City in accordance with the specifications. Uwe have stated
herein the services and fees that Uwe will furnish and deliver as specified. Award shall be based
upon the evaluation criteria included in Section IL Where there is a discrepancy between words
and figures, words shall govern.
The City of Santa Ana reserves the right to cancel any agreement in the event that terms of
this agreement are violated.
Name of Contractor Signature of Authorized Rep.
(Person, Firm, Corp.)
Address Name and Title (Please Print)
Address Date
Telephone Number Fax Number
9
19C-11
VI. CERTIFICATION OF NON-DISCRIMINATION BY CONTRACTORS
As suppliers of goods or services to the City of Santa Ana, the company listed below certifies
that it does not discriminate in its employment with regard to race, color, religion, sex, or
national origin; that it is in compliance with all Federal, State and local directives and executive
orders regarding non-discrimination in employment; and that it agrees to demonstrate positively
and aggressively the principle of equal opportunity in employment.
WE AGREE SPECIFICALLY:
1. To take affirmative steps to hire minority employees with the company.
2. To establish or observe employment policies within affirmative promotion opportunities
for minority persons at all job levels.
3. To communicate this policy to all persons concerned, including all company employees,
outside recruiting services, especially those servicing minority communities, and to the
minority communities at large.
COMPANY
TITLE OF PERSON SIGNING
SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment
programs now in effect within your company.
10
19C-12
VII. CONTRACT PRICING
Contractor to provide all labor, equipment and materials necessary for completion of this
project in accordance with the specifications and special provisions herein.
1. MATERIALS COST Cost/Linear Foot
Materials - Provide a list of materials and pricing. (Contractor's cost from supplier)
1. $
2. $
3. $
4. $
5. $
2. LABOR COSTS Straight Time Overtime
A. Labor- Contractor's rates (including all fringe benefits, markup, overhead, etc.) for
the following job classifications:
1. Maintenance Technician $ $
2. Systems Technician $ $
3. Field Maintenance Technician $ $
4. Utility Leadman $ $
5. Utility Supervisor $ $
VIII. SUBCONTRACTORS
A. Portion of work to be performed:
B. Name of Subcontractor:
11
19C-13
C. Portion of work to be performed:
D. Name of Subcontractor:
Attach sheet with additional subcontractors if necessary.
IX. REQUIRED REPORTS
The successful Contractor will be required to submit the following reports as part of this
agreement:
1. Weekly Progress Report.
2. Map of neighborhood showing areas of completion.
3. Monthly status report on total project.
12
19C-14
EXHIBIT A
STREET LIGHT REPAIR SPECIFICATIONS
Contractors must provide costs for each of the service categories described in the specifications
outlined in EXHIBIT A. Contractors must also list all deviations from specifications, if any. At
the discretion of the Director, one or more optional add-on locations and specialized services
may or may not be included in the agreement with contractor. In addition, the City at the
discretion of the Director, reserves the right to decrease the scope of work during the duration of
the agreement.
L SCOPE OF WORK
The Request for Proposal calls for the removal and replacement of the existing street light
cable in the high voltage system locations designated by the City due to age and
deterioration. This project will require replacing all the cable in the entire circuit with
neoprene wire (new high voltage wire) which includes the North Park circuit, North
Residential circuit and Broadway circuit.
The high voltage systems were installed in the early 1920's. The neighborhood has
witnessed numerous power outages which are becoming more frequent. The system
repairs have been "piccemealed" over the years and it is unknown how much of the
existing conduit must be replaced. A photo showing an example of the deterioration is
attached to this proposal. (See EXHIBIT B).
The circuits has approximately 57,000 linear feet of cable:
• North Park Circuit - 22, 000 feet
• North Residential Circuit 30,000 feet
• Broadway Circuit - 5,000 feet
Scope of work includes the following:
• Re-cable using existing conduit
• Replace any deteriorated conduit only if it is more cost effective to replace than to
work with existing conduit
• Remove potheads from street light poles
• Remove all pull boxes except for required boxes
• Install new globes
The City is aware of the complexity of this project, the scope of work requested and any
unforeseen work that may be required during the scope of the project. A map showing
13
19C-15
street light locations and service points is attached to this proposal (EXHIBIT
Funding will be allocated over a three-year period until the work is completed.
The Contractor shall provide at his own risk and cost all labor, materials, tools,
equipment, traffic control and miscellaneous devices, transportation, hauling, dumping,
and recycling of construction and demolition material as part of this project.
II. FUNCTIONS AND RESPONSIBILITIES
A. DIRECTOR
The Director shall have the authority to accept/reject materials, workmanship and to
make minor changes in work or schedule. When the performance of the work or
completion per schedule is determined to be sub-standard, he may (1) recommend
that all or a portion of payment be withheld, and/or forfeiture for delay be assessed;
(2) direct the work be accomplished by a separate contractor, in order to complete
the necessary work as close to schedule as possible, and withhold the resulting
costs. Payment to be withheld shall be deducted from the next monthly payment
due the Contractor, or if the amount is insufficient to cover payment, the Contractor
shall be liable and will be billed accordingly.
The Director, or his authorized representative shall decide all questions, which
may arise as to the manner of performance and completion per schedule,
acceptable fulfillment of the contract by the Contractor, interpretation of the
specifications, and compensation to include completion of work by alternate
sources.
B. CONTRACTOR
(1) Local Office
The Contractor shall maintain a local office with a competent
representative who can be reached during normal working hours and
authorized to discuss matters pertaining to this contract with the Director.
A local office is one that can be reached by telephone without it being a
toll call. Contractor will not be allowed to store equipment or materials at
any contracted area.
(2) Submittals
The Contractor shall submit to the Director at the beginning of work, 1) a
detailed job schedule, 2) time sheet, 3) names and titles of all persons
working on the project, and 4) materials to be used on the project for
approval. All submittals shall be periodically updated as necessary. The
Director shall be immediately notified of any deviation from schedule or
material usage.
14
19C-16
(3) Uniforms/Identification
The Contractor shall provide to all field personnel a standard uniform with
company identification. All vehicles and equipment on the project site shall
also be properly marked with company identification.
(4) Licenses and Permits
The Contractor shall, prior to award of contract and without additional
expenses to the City, possess all licenses and permits required for the
performance of the work required by this contract, including but not
limited to State License C-27 and a City of Santa Ana Business License,
and a C-10 Electrical License.
(5) Compliance with the Law
The Contractor agrees that its performance under the contract shall comply
with all applicable laws of the United States of America, the State of
California, the County of Orange, the City of Santa Ana, and any other body
having jurisdiction over the activities of the Contractor.
(6) Work Force
a.. The Contractor shall insure that all work under this agreement is
supervised by Contractor employed supervisory personnel who are
technically qualified and possess management skills required to
implement modern methods and newly developed procedures
b. The Contractor shall insure that all work under this agreement is
performed by fully qualified, experienced personnel, directly
employed by the Contractor.
C. The Contractor shall be responsible for the skills, methods,
appearance and action of Contractor's employees and for all work
done. The Contractor's employees shall be U.S. Citizens and/or
legal residents.
d. The Contractor shall perform the work provided for in this contract
under the direction of the Director. The Director may make
inspections at any time and may request that the Contractor
perform additional work or services to bring Contractor's
performance to the level required by this agreement.
15
19C-17
(7) Material
The Contractor shall submit a list to the Director all materials that the
Contractor proposes to use in the execution of this work. Said list shall be
submitted before use of any product, pursuant to the provisions of this
agreement. All materials used or submitted shall be in full compliance
with all Federal, State, County, and local agency laws, guidelines and
requirements.
(8) Recycling
All waste (including greenwaste and construction and demolition
materials) resulting from work performed under this contract shall be
recycled. A recycling work plan shall be submitted to the project
manager prior to receiving the notice to proceed with the project.
(9) General Maintenance and Clean-Up
All trash and debris shall be removed from all worksites at the end of
each day. The Contractor shall keep sidewalks and all paved areas in the
parkway swept and cleaned of any debris, dirt or soil.
(10) Emergency Service
The Contractor shall be able to receive and respond to the City's call for
emergency service twenty-four hours per day, seven days per week
Response time shall be immediate but not less than two hours to remove
or eliminate a public safety hazard. Contractor shall provide the City with
a local telephone number where contractor can be contacted twenty-four
hours per day, seven days per week.
(11). Penalties and Fines
Failure to comply with requests from the Director and/or creating,
unnecessary delays, as determined by the Director, may be cause for fines
and penalties in the amount of $200.00 per occurrence per day until said
request(s) is completed. This shall be deducted from routine monthly
maintenance payments.
EXHIBIT B
16
19C-18
II.
•
1-4
17
19C-19
v
~.2
F '
~kl
1
h:
Q y9°`
T it
s, .
18
19C-20