Loading...
HomeMy WebLinkAbout23A - PROJ - WESTMINSTER AVE SEWER REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JUNE 17, 2013 TITLE: APPROVED CONTRACT AWARD FOR ? As Recommended WESTMINSTER AVENUE SEWER ? As Amended IMPROVEMENTS PROJECT 126605 ? Ordinance on 1St Reading ( ) ? Ordinance on 2nd Reading ? Implementing Resolution ? Set Public Hearing For CONTINUED TO FILE NUMBER CITY NAGER RECOMMENDED ACTION 1. Award a contract to the lowest responsible bidder, Vasilj, Inc., in accordance with the Base Bid, totaling $1,006,281.50 for the construction of Westminster Avenue Sewer Improvements Project. 2. Approve the Cost Analysis, as shown in Exhibit 1, for a total estimated project delivery cost of $1,286,219.50. 3. Approve the Westminster Avenue Sewer Project Construction and Reimbursement Agreement with the Garden Grove Sanitary District (Exhibit 2), subject to non-substantive changes approved by the City Manager and City Attorney. DISCUSSION This project consists of replacing approximately 3,300 linear feet of sewer main on Westminster Avenue between Harbor Boulevard and Roxy Road (Exhibit 3). The scope of work consists of replacing the existing, undersized 12" vitrified clay pipe (VCP) with a new 15" VCP. The City of Santa Ana and the Garden Grove Sanitary District jointly use the sewer main. Both agencies have determined that a larger sewer main is needed to provide adequate peak sewer flow capacity and prevent the risk of sanitary sewer overflows. In addition, Santa Ana and the Garden Grove Sanitary District have determined that a new cooperative agreement is necessary to determine each party's share of the construction costs. As detailed in the agreement, the City of Santa Ana will be responsible for approximately 32% of final construction costs and the Garden Grove Sanitary District will be responsible for the remainder. Staff recommends approvals of the agreement to continue the City's partnership with the Garden Grove Sanitary District and confirm the construction financing. 23A-1 Contract Award for Westminster Avenue Sewer Improvements June 17, 2013 Page 2 The Notice Inviting Bids was advertised on March 24 & 26, 2013, and bids were opened on May 14, 2013. The following is a summary of the bid invitations mailed and received, and the bid results: Contractor Participation Data Santa Ana Contractors receiving notices 6 Contractors requesting bidding documents 21 Bids received 8 Bids received from Santa Ana Contractors 0 Bid Results Summary RANK BIDDERS NAME LOCATION BASE BID 1 Vasilj, Inc. Irwindale $1,006,281.50 2 Paulus Engineering, Inc. Anaheim $1,047,155.00 3 Kana Pipeline, Inc. Placentia $1,083,000.00 4 Ramona, Inc. Arcadia $1,229,988.00 5 Andrew Papac and Sons South El Monte $1,264,455.00 6 Dominguez General Engineering, Inc. Rosemead $1,465,112.00 7 KEC Engineering Corona $1,466,466.50 8 Mike Ruffalo Co, Inc. Baldwin Park $2,080,475.00 A total of 8 bids were received and deemed responsive. Vasilj, Inc., submitted the lowest responsive bid. Their $1,006,281.50 bid is 27 percent under the Engineer's Estimate of $1,390,182. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemptions Environmental Review No. 2013-8 was filed for this project. In addition, a Certification of Categorical Exemption and a Statutory Worksheet have been prepared in accordance with the National Environmental Policy Act. 23A-2 Contract Award for Westminster Avenue Sewer Improvements June 17, 2013 Page 3 FISCAL IMPACT The estimated total construction cost of this project is $1,286,219.50, which includes construction administration, inspection, testing, survey, and contingencies (Exhibit 1). Funding is available to cover costs in the Sewer Connection Project Fund (account 05517660-66220). APPROVED AS TO FUNDS AND ACCOUNTS: G~? GCb it A57i ~c(~S`M~.1~C Raul Godinez .E. Francisco Gutierrez Executive Director Executive Director Public Works Agency Finance & Management Services Agenc RG/TC Exhibits 1. Cost Analysis 2. Westminster Avenue Sewer Project Construction and Reimbursement Agreement with Garden Grove Sanitary District 3. Project Location Map - Westminster Avenue Sewer Improvements 23A-3 23A-4 Contract Award for Westminster Avenue Sewer Improvements June 17, 2013 COST ANALYSIS PROJECT 126605 WESTMINSTER AVENUE SEWER IMPROVEMENTS Construction Contract $1,006,282.50 Contract Administration $28,595.00 Inspection and Testing $91,322.00 Survey Staking $20,020.00 Contingencies $140,000.00 TOTAL ESTIMATED CONSTRUCTION COSTS $1,286,219.50 Exhibit 1 23A-5 23A-6 ATTACHMENT Contract Award for Westminster Avenue Sewer Improvements June 17, 2013 Exhibit 2 WESTMINSTER AVENUE SEWER PROJECT CONSTRUCTION AND REIMBURSEMENT AGREEMENT This WESTMINSTER AVENUE SEWER PROJECT CONSTRUCTION AND REIMBURSEMENT AGREEMENT (this "Agreement") is made and entered into by and between the Garden Grove Sanitary District, a subsidiary district of the City of Garden Grove ("District"), and the City of Santa Ana, a municipal corporation ("City"). District and City are sometimes individually referred to as each "Party" and collectively referred to as the "Parties" RECITALS A. City and District jointly use and share capacity rights in certain sewerage facilities located in Westminster Avenue, which shared sewerage facilities are owned, operated and maintained by each Party within its respective territorial jurisdiction, all in accordance with that certain Agreement for Joint Use of Sewerage Facilities in effect between the Parties. B. In order to mitigate the risk of sanitary sewer overflows and to provide adequate peak flow capacity in these shared sewers, the Parties have determined that it is necessary to construct new sewerage facilities in Westminster Avenue between Harbor Boulevard and Nancy Lane to transport wastewater at the estimated ultimate capacity of both the City and District. The design and construction of these new shared sewerage facilities is referred to in this Agreement as the "Westminster Avenue Sewer Project." C. The new shared sewerage facilities to be constructed pursuant to the Westminster Avenue Sewer Project will be located in portions of both City's and District's territorial jurisdictions. Notwithstanding the provisions of the for Joint Use of Sewerage Facilities providing for each Party to be responsible for the design and construction of new and replacement shared sewer facilities within each Party's respective jurisdiction, City and District have determined it is in the best interests of both parties for City to design and construct the entire Westminster Avenue Sewer Project and for District to reimburse City for District's fair share proportionate cost of such design and construction. D. City has prepared, and District has reviewed and approved, the plans and specifications for construction of the Westminster Avenue Sewer Project (referred to internally by City as "Project No. 12-6605 Westminster Avenue Sewer Main Improvements"), which plans and specifications incorporated into this Agreement by reference ("the Plans and Specifications"). E. The Parties' respective fair share proportion of the cost of the Westminster Avenue Sewer Project is based on the Parties' respective estimated ultimate average flows from the areas tributary to the segments of the shared sewers to be constructed as part of the Westminster Avenue Sewer Project, which tributary areas are depicted on Exhibit "A" attached hereto, and which flows are prorated as calculated and shown on Exhibit "B" attached hereto. F. The estimated total final cost of the Westminster Avenue Sewer Project, including engineering and construction costs is One Million Five Hundred Twenty Thousand l 912756.1 Exhibit 2 23A-7 Dollars and 00/100 cents ($I,520,000.00) (the "Estimated Project Cost"). City's fair share proportion of the Estimated Project Cost is Four Hundred Ninety Thousand Twenty Seven Dollars and 00/100 cents ($490,027.00). District's fair share proportion of the Estimated Project Cost is One Million Twenty Nine Thousand Nine Hundred Seventy Three Dollars and 00/100 cents ($1,029,973.00). The calculation of the Estimated Project Cost and City's and District's respective fair share proportion of the Estimated Project Cost is set forth in Exhibit "C," attached hereto and incorporated herein by reference. G. The Parties desire to enter into this Agreement to specify the terms pursuant to which City will construct, and District will reimburse City for District's fair share proportionate cost of, the Westminster Avenue Sewer Project. NOW, THEREFORE, in consideration of the mutual covenants, conditions and promises herein contained, it is hereby agreed by and between the City and the District, as follows: AGREEMENT 1. Project Construction. 1.1. City shall be responsible, at City's sole cost and expense, for bidding, awarding, and administering a contract for the construction of the Westminster Avenue Sewer Project, in conformance with the Plans and Specifications approved by the District and in accordance with all applicable laws governing construction of public works by either City and/or District, including, but not limited to, laws governing public bidding and the payment of prevailing wages. District shall be responsible for its own Project administration costs, including review of contract change orders, District inspection of the Project and District project coordinator activities. The contractor selected by City to construct the Westminster Avenue Sewer Project shall be hereafter referred to in this Agreement as the "Project Contractor," and the contract between City and the Project Contractor shall hereafter be referred to as the "Project Construction Contract." In the event the projected actual cost of the Westminster Avenue Sewer Project, as reflected in the bid of the lowest responsible bidder to which City intends to award the Project Construction Contract, exceeds the Estimated Project Cost by twenty percent (20%), City shall not award the Project Construction Contract without prior approval of District's Board of Directors. 1.2. City shall ensure that the Project Construction Contract requires the Project Contractor to provide insurance acceptable to District, to name District and the City of Garden Grove as additional insureds, and to indemnify, defend, and hold harmless District and the City of Garden Grove in a manner approved in writing by District prior to award of the Project Construction Contract. City shall not permit construction of any portion of the Westminster Avenue Sewer Project to commence until evidence of the required insurance and additional insured endorsements have been provided to and approved by District. 2 9127%.1 23A-8 1.3. City shall be responsible for ensuring that the Project Contractor constructs the Westminster Avenue Sewer Project in a timely manner, The estimated schedule of construction of the Westminster Avenue Sewer Project is attached hereto at Exhibit "D." 1.4.City shall be responsible for processing all contract change orders ("CCOs") that are necessary for the completion of the Westminster Avenue Sewer Project and shall obtain District's approval for those CCOs affecting District sewerage facilities and/or District's fair share proportion of the Actual Final Project Cost (as defined in Section 2.2) in accordance with this Section prior to instructing the Project Contractor to proceed in accordance with a CCO. District shall provide either concurrence with or comments on CCOs within five (5) business days of City's submittal of CCOs to District. Should District fail to provide either timely comments on or concurrence with any CCO submitted by City within five (5) business days of such submittal, such CCO shall be deemed approved by District. Delay costs resulting from District's review of change orders shall be charged to District. 1.4.I.District shall designate a project coordinator to facilitate District inspection and approvals. Said project coordinator shall have authority to approve change orders required I.S. City shall require and ensure that the Project Contractor warrants and guarantees all work related to the Westminster Avenue Sewer Project, and all parts thereof, including that performed and constructed by subcontractors, sub subcontractors, and others employed directly or indirectly on and for such work, against faulty or defective materials, equipment, or workmanship for a period of at least one year from the date of the City's written final acceptance of the work or such longer period of time as may be prescribed by law or by the terms of any special guarantee or warranty required by the Project Construction Contract. City shall and hereby does assign to District all contractor and manufacturer warranties and guarantees required by the Project Construction Contract or otherwise for those sewerage facilities and appurtenances which will belong to District. 1.6. District shall be entitled to inspect all portions of the Westminster Avenue Sewer Project within District's territorial jurisdiction, and City shall not approve a Notice of Completion for any sewerage facilities and related improvements that will be owned and maintained by District until such facilities and improvements are approved and accepted by District. Notwithstanding the foregoing, District's failure to approve and accept, or provide written notice to City of unaccepted work, within thirty (30) days of notice by City, shall constitute District's approval of the Project and a waiver of District's objections. 2. District's Reimbursement to Citv. 2.1. Following award of the Project Construction Contract, City and District shall meet and confer to determine the actual anticipated total cost of the Westminster Avenue Sewer 3 I 912756.1 23A-9 Project based on the Project Contractor's bid (the "Actual Projected Project Cost") and each Party's respective fair share proportion of the Actual Project Cost in accordance with the Exhibits "C-1" and "C-2," respectively. Prior the commencement of construction of the Westminster Avenue Sewer Project, City shall invoice District for, and District shall pay City one-half (1/2) of District's fair share proportion of the Actual Projected Project Cost. 2.2. Following completion of the Westminster Avenue Sewer Project, City and District shall determine the actual final total cost of the Westminster Avenue Sewer Project, including any additional costs attributable to approved CCOs, (tile "Actual Final Project Cost") and each Party's respective fair share proportion of the Actual Final Project Cost in accordance with Exhibit "C." Upon the later to occur of (i) one year from the date of District's first payment to City pursuant to Section 2. 1, or (ii) thirty (30) days following approval of a Notice of Completion for the Westminster Avenue Sewer Project, City shall invoice District for, and District shall pay City, the difference between District's fair share proportion of the Actual Final Project Cost and the amount of District's first payment made pursuant to Section 2.1. 3. Ownership and Future Maintenance of Facilities Following Completion of Project. The ownership and responsibility for future operation and maintenance of the share sewerage facilities constructed pursuant to the Westminster Avenue Sewer Project shall be governed by the Agreement for Joint Use of Sewerage Facilities in effect between the Parties. Any and all improvements within the territorial jurisdiction of the District and designated as District owned improvements pursuant to the Agreement for Joint Use of Sewerage Facilities shall become the sole property of the District when finally approved and accepted by District. Any and all improvements within the territorial jurisdiction of the City and designated as City owned improvements pursuant to the Agreement for Joint Use of Sewerage Facilities shall become the sole property of the City when finally approved and accepted by City. 4. Indemnity. Each Party hereby agrees to indemnify, defend, protect and hold harmless the other Party, and its elected and appointed officials, officers, employees, representatives, volunteers, and agents from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, workers' compensation benefits, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses of any kind or nature, arising from the activities of the indemnitor or its officers, agents, or employees on the Project, or any breach of contract, negligent acts, omissions or breach of law, or willful misconduct of the indemnitor, or its officers, agents, or employees arising out of the performance of, or failure to perform, any provisions of this Agreement. Neither Party assumes liability for the acts or omissions of persons other than each Party's respective officers, agents, or employees. In the event judgment is entered against both Parties because of joint or concurrent negligence of both Parties, or their officers, agents, or employees, an apportionment of liability to pay such judgment shall be made by a court of competent jurisdiction. The respective obligations of 4 912756.1 23A-10 the Parties pursuant to this Section shall survive expiration or earlier termination of this Agreement. 5. Alteration of Terns. This Agreement fully expresses all understanding of the City and District with respect to the subject matter of this Agreement, and shall constitute the total Agreement between the parties for these purposes. No addition to, or alteration of, the terms of this Agreement, whether written or verbal, shall be valid unless made in writing and formally approved and executed by the parties. 6. Notices. Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by telefacsimile or other telegraphic communication in the manner provided in this Section, to the following persons: CITY: City of Santa Ana Clerk of the Council 20 Civic Center Plaza (M-30) P.O. Box 1988 Santa Ana, CA 92702 Fax No.: 714-647-6956 With courtesy copy to: Santa Ana Public Works Agency Water Resources Division 220 South Daisy Ave., Bldg A Santa Ana, CA 92703 Fax No.: 714-647-3345 DISTRICT: Garden Grove Sanitary District Attention: General Manager 11222 Acacia Parkway P. O. Box 3070 Garden Grove, CA 92842 Fax No.: (714) 741-5044 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmuted to the new address. If sent by mall, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by telefacsimile, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. 7. Term of Agreement. This Agreement shall become effective upon filll execution by both City and District and shall continue in filll force and effect until all obligations of the District 5 912756.1 23A-11 to the City are satisfied in full accordance with the terms of this Agreement. The provisions of Section 3 ("Ownership and Future Maintenance of Facilities Following Completion of Project") of this Agreement shall continue to remain in fill force and effect following expiration or earlier termination of this Agreement 8. Severabilitv. If any term, provision, covenant, or condition set forth in this Agreement is held by the final judgment of a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions, covenants, and conditions shall continue in full force and effect to the extent that the basic intent of the Parties as expressed herein can be accomplished. In addition, in such event the Parties shall cooperate in good faith in an effort to amend or modify this Agreement in a manner such that the purpose of the invalidated or voided provision, covenant, and condition can be accomplished to the maximum extent legally permissible; provided, however, that in no event shall either party be required to agree to an amendment or modification of this Agreement that materially adversely impacts its rights or materially increases its obligations or risks as set forth herein. 9. Waiver of Default or Breach. Waiver of any default by either party shall not be considered a waiver of any subsequent default. Waiver of any breach by either party of any provision of this Agreement shall not be considered a waiver of any subsequent breach. Waiver of any default or any breach by either party shall not be considered a modification of the terms of this Agreement. 10. No Third-Party Beneficiaries. Nothing in this Agreement is intended to create any third-party beneficiaries to the Agreement, and no person or entity other than the City and District, and the permitted successors and assigns of either of them, shall be authorized to enforce the provisions of this Agreement. 11. Assignment. The District may not assign its interest in this Agreement without the prior written consent of City, which consent will not be unreasonably withheld. 12. Further Assurances. District and the City agree to execute, acknowledge and deliver any and all additional papers, documents and other assurances and to perform any and all acts and things reasonably necessary in connection with the performance of the obligations hereunder and to carry out the intent of the Parties. 13. Agreement Negotiated. The text of this Agreement is the product of negotiation among the parties and their counsel and is not to be construed as having been prepared by one party or the other. 14. Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of California. 15. Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed an original and all of which shall constitute but one and the same instrument. 6 912756.1 23A-12 16. Recitals. The Recitals above are hereby incorporated into this section as though fully set forth herein and each Party acknowledges and agrees that such Party is bound, for purposes of this Agreement, by the same. IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by their duly authorized officers as of the dates set forth below. GARDEN GROVE CITY OF SANTA ANA SANITARY DISTRICT Kevin O'Rourke Ma~ J. Fertai Interim City Manager General Manager Date: Date: 13 ATTEST: ATTEST: Maria D. Huizar Kat leer Bailor Clerk of the Council Board Secretary APPROVED AS TO FORM: APPROVED AS TO FORM: Laura Sheedy omas F. Nixon Assistant City Attorney Attorney for District 7 912756.1 23A-13 EXHIBIT "A" TRIBUTARY AREAS TO WESTMINSTER AVENUE SHARED SEWER SEGMENTS 912756. I 23A-14 C j d Q +Lr L O ~~I C CL O E m v y d ~Y DZ a a m ~ r G s 4 ma G °7 O _ m L V1 m GI a~ ~ •L 14 le, 9 N d C P G m ~ to 0 a O °O t/J tq 4J to [4 (9 Z^ m q L 1 ® O ° ° O 7TT C7 VLi VL! U O U i- N N (n b i l q L ~ -77f ~11 w ~ m aptl mZ? 4< I to 3.. ~ m~M 1 m s a K y~ q q~< ROY a Z ~ N~ a a G C o3i wzy E ° O u O 1 N a c v itl E e E n q I ~ w aZ< ~ ~ a U O v V G L m to e~ • g to p e u 0 if ° ° x I 7 L) w~ m?w S? .Vi 2 2 O y e9.s et i m-i m a I f0 ~ I d t I ago jtl^ s` pp i ° v ^m2~- N2m mV { E I Ill m Ell 23A-15 EXHIBIT "B" PROPORTIONATE FLOWS FROM TRIBUTARY AREAS TO WESTMINSTER AVENUE SHARED SEWER SEGMENTS 912756.1 23A-16 sf • ~ b ALI bf Ll ell life g g a x a s `c e 4 a b ~ w Q x~ p y i p~yg 0 e~«~~««+ J« ~~~~I Cvo~« -~d +J ~ m & ~ ~~«w« r I 75 D PP A9A« NPPo oo,,eYpoPPo1a P o PA IPPeO PPa PPPPP PPo pe Pp PPPpPPI!p g Pe 35 wYtE&~~ 6 «a u~ I~ioE N UI I I I! N11 _1111 I of 11 11 I I ~S~ i x g p ~gq g y~ y a y w N - N o - P A P P ~ P a P A a N o~ a S r A o g A P o 0 o p o p o p p p p « $ « 8 « I AL x x x x x x x x x x x a g b x e g r; r v o $ i L ~ N Y z u 8~~ o y 0 23A-17 EXHIBIT "C-1" ESTIMATED PROPORTIONATE SHARE OF PROJECT DESIGN COSTS 912756.1 23A-18 17885 Yon Karma., Suaa 508, puns, CA 92614 N TETRA TECH Tat 949,809.5000 Fax 949.109.6010 Client: City ofSenta Ana Sheet No. I of I Project: WestminsterAveScwerMain tmplovements JobNo.:134•P00597-0086.04 Cost Share of Design Computed by: MBJ Checked by: M%VB Date: 2142013 TABLE A - Cost Share of Design '%:ttvj4ctCott F1 14"t - GGPamat ;SA Can ~Ca>!p yg . °SVt®tx+r :'.''c".tiK; _ Bieaiduwv ar' Eaii`7;CniA Fici Rcis1: 'r t2ark~-~~. # Reach N1 340 1O-A $ 12000.00 39% 61% S 4680.00 S 7,32090 Reach N2 348 11% $ 13,200.00 37% 63% $ 4,884,00 S 8,316.00 Reach N3 320 10% s 12,000.00 28% 72% S 3,360.00 S 8,640.00 Reach #4 296 91A s 10800.00 27% 73% $ 2.916.00 S 7,884.00 Reach 95 200 61% $ 7,200.00 30% 70% S 21160.00 S 5,040.00 Reach N6 326 10% S 12,000.00 32% 68% S 3,840.00 S 8,160.00 Reach N7 366 1 l % S 13,200.00 32% 68% S 4.224.00 S 8,976.00 Reach 98 373 11% S 13.200.00 31% 69% S 4,092.00 S 9,109.00 Reach 99 371 11% S 13,200.00 31% 69% S 4,092.00 S 9,108.00 Reach 910 379 11% S 13~00.00 32% 68% S 4.22490 S 8,976.00 Total 3319 100% is 120,000.00 S 38 472.00 S 81,52890 PUtlO5Rf0a861FnpnoainpVl.('m1 EsnnmaKo9Share .!Dais. 23A-19 EXHIBIT "C-2" ESTIMATED PROPORTIONATE SHARE OF PROJECT CONSTRUCTION COSTS 912756.1 23A-20 17995 Von Kannan, Suite 900, Irvine, CA 92614 N TETRA TECH Tat 949.909.5000 Fax: 949.609.5010 Client: City of Santa Ana Sheet No. I of l Project: Westminster Ave Sewer Main Improvements Job No. 134-P00597-0086-04 Cost Sharing Cost Estimate Computed by: MBJ Checked by: MWB Date: 214/2013 Asremptions. 1. Percentage of cost assigned to Santa Ana and Garden Grove equals the percentage of flow each City contributes between each manhole. See attached spreadsheet for percentages. 2. Percentage of lump sum items in each reach is calculated as the percentage ofpipeline constructed in each reach divided by the total amount of pipeline. See Table A below. TABLE A -Percents a of La Sum Bid Items n=ttt 1A Nsb5 ~1mt otgtvject '§i .illlnhole' 'Resc.4 P Reach #1 9618.5 9278.4 340 10% Reach #2 9278.4 8926.3 348 11% Reach #3 89263 8603.2 320 10% Reach #4 8603.2 8303.3 296 9"/u Reach 95 8303.3 8099.7 200 6% Reach #6 8099.7 7769.6 326 10;; Reach #7 7769.6 7399.9 366 11% Reach #8 7399.9 70223 373 11% Reach #9 7022.7 6648.2 371 11% Reach 910 6648.2 6263.7 379 1 FK TABLE B - Cost Sharing Cost Estimate 'Total, Descri 'Prkefria i I LS Sheetin Shoring and Trench Protection $2,000 $2,000 2 340 LF Construct 15" VCPSewer Main S220 574,800 3 9 LF Construct 8" VCP Sewer Main 5300 52,700 4 2 EA Construct Concrete Manhole S8,000 516,000 5 1 EA Moth Existing Sewer Manhole at Harbor and Rox 55,000 55,000 6 3 EA Construct 6" Sewer laterals and Cleanouts 510,000 530,000 8 300 SF Remove and Replace Concrete Driveways S20 56,000 Reach 01 10 349 LF CCTV Inspection of New Sewer Main $2 $1,000 96+18.5 to 92+78,4 11 3 EA CCTV Inspection of New Sewer laterals 5100 $300 12 12 CY Excavation of Unsuitable Materials and Installation of Rock Stabilization S30 $360 13 30 CY Excavation of Unsuitable Materials and Import Trench Backfill S50 51,500 14 1 LS Abandon Existing 12" and 8" Sewer Main S2,800 52,800 17 6 EA Replace Damaged Traffic Loo s, Detectors and Witin 51,500 $9,000 Is I LS Traffic Control. Striping and Pavemem Markin 59.860 59,860 SUBTOTAL SANTA ANA 39'5 ' 562 913: GARDEN GROVE 61% 598 465 P:WW59Ma8T,F 3veeeuraGJ1('an t]anukslCmr EeinateCon 3M1.vi"r . 23A-21 17885 Van Kaman, Suite 500, Irvine, CA 92614 TETRA TECH Tel: 949.809.5000 Fax: 949.809.5010 1 1 IS Sheeting, Shoring and Trench Protection $2,000 $2,000 2 348 LF Construct 15" VCP Sewer Main $220 S76,560 4 1 EA Construct Concrete Manhole $8,000 58,000 6 4 EA Construct 6" Sewer Laterals and Ckanouts 510,000 540,000 8 600 SF Remove and Repine Concrete Driveways S20 $12,000 10 346 LF CCTV Inspection of New Sewer Main S2 S1,000 Rtach #2 11 4 EA CCTV 1 don of New Sewer Laterals 5100 $400 92+78.4 to 89+26.3 12 12 CY Excavation of Unsuitable Materials and Installation of Rock Stabilization S30 5360 13 30 CY Excavation ofUnsuitable Materials and Import Trench Backfill $50 $1,500 14 1 LS Abandon Existing 12" and 6" Sewer Main S2,800 $2,800 15 1 EA Abandon Existi Mubole 54,000 $4,000 18 I IS Traiic Control. Shi ' and Pavement Mark' 59,860 59.860 3...''r x .,,,y• SUfrVMA 1? pSlSt?4E0 .SANTA''AN '.r,•r'y~.` ys.., GARDENGROVE 635 iS99 1 I LS Sheeting, Shoring and Trench Protection $2,000 52,000 2 320 LF Construct IS"VCP Sewer Main S220 570,400 3 IS LF Construct 8" VCP Sewer Main S300 55,400 4 1 EA Construct Concrete Manhole 58,000 $8,000 6 2 EA Construct 6" Sewer Laterals and Cleanouts $10,000 520,000 8 300 SF Remove and Replace Concrete Driveways $20 $6,000 10 338 LF CCTV Inspection ofNew Sewer Main S2 $1,000 Reach #3 11 2 EA CCTV Inspection ofNew Sewer Laterals S100 5200 89+26.3 to 86+03.2 12 12 CY Excavation of Unsuitable Materials and Installation of Rock Stabilization $30 5360 13 30 CY Excavation of Unsuitable Materials and Import Trench Backfill S50 $1,500 14 I LS Abandon Ehdstin 12" and 8" Sewer Main 52,800 52,800 16 1 LS Remove and Dispose Existing Manhole at Clinton 55,000 55,000 17 6 EA Replace Damaged Traffic Loops, Detectors and Wiring S1,500 59,000 1s I LS Traffic ConoW, Sri 'ngand Pavement Makin 59,660 S9.860 77 r.: ' r. i - _»L°',,.i..:nb.::' <".~`-u . c.,.... ...SUBTOTAL :::iSUI r v. s m a( t. 2 3;; E! SANTA AN&I Ss117 <St9.~6`' R GARDEN GROVE 72% SIOIA% P.VW3Q``a036Wnain.mmg'0RC"n Esri-=C-Enimw-ro Sinring 23A-22 17885 Von Kannon, Suite 600, Who, CA 92614 TETRA TECH Tat 949.609.5000 Fax 949.608.5010 1 1 LS Sheetin Shoring and Trench Protection 51,800 $L800 2 2% LF Construct IS" VCP Sewer Main $220 S65,120 4 1 EA Construct Concrete Manhole S8,000 S8,000 6 1 EA Construct 6" Sewer Laterals and Cleanouts $10,000 S10,000 10 296 LF CCTV Inspection of New Sewer Main $2 51,000 I1 I EA CCTV Inspection ofNew Sewer Laterals SI00 $100 Reach #4 12 12 CY Excavation ofUasuitable Materials and tnsWiuion of Rock Stabilization S30 $360 86+03.2 to 83+013 13 30 CY Excavation ofUasuitable Materials and ton rtTreneh Backfill $50 51,500 14 1 LS Abandon Existing 12" and 8" ScwcrMain 52,520 $2,520 15 1 EA Abate Existing Manhole $4,000 54,000 t8 I LS Traffic Control, Striping and Pavement Markin $8,860 $8.860 - SUBTOTAL 03 %ANTAANA ' IFt2T GARDILNGROVE +':f?73•G :.r 1 I IS Sheeting, Shoring and Trench Protection $1,200 S1,200 2 200 LF Construct 15" VCP Sewer Main $220 $44,000 4 1 EA Construct Concrete Manhole S8,000 $8,000 6 2 EA Construct 6" Sewer Laterals and Cleanouts $10,000 520,000 9 320 SF Remove and Replace Concrete Curb Return $25 $8,000 10 200 LF CCTV Inspection of New Sewer Main $2 S1,000 Reach #S I1 2 EA CCTV Inspection of New Sewer Laterals SI00 5200 83+03.3 to 80+99.7 12 12 CY Excavation of Unsuitable Materials and Installation of Rode Stabilization S30 5360 13 30 CY Excavation of Unsuitable Materials old Import Trench Backfill SS0 SI,500 14 1 1.S Abandon Exim" 12" and 8" Sewer Main $1,680 S1,680 15 1 EA Abandon Existing Manhole S7,000 S4.000 18 1 LS Traffic Control. Ssr{ ' and Pavement Markings $5,860 S5,860 t~ ifs d i pS~UvB~TOTA v' „31~28:f40' o . . ,_.GARDEN GROVE 1 1 LS Sheeting. Shoring and Trench Protection S2,000 52,000 2 326 LF Construct IS" VCP Sewer Main $220 571,720 4 1 EA Construct Concrete Manhole 58,000 $8,000 6 3 EA Construct 6" Sewcr Laterals and Cleanouts $10,000 530,000 8 300 SF Remove and Replace Concrete Driveways S20 56,000 10 326 LF CCTV Ms tion of New Sewer Main $2 S1.000 Reach #6 11 3 EA CCTV Inspection of New Sewer Laterals S100 $300 80+99.7 to 77+69.6 12 12 CY Excavation of Unsuitable Materials and Installation of Rock Stabifization S30 5360 13 30 CY Excavation of Unsuitable Materials and finporl Trench Backfill $50 $1,500 14 1 LS Abandon Exjsft 12" and 8" Sewer Main 52,800 $2,800 Is 1 EA Abandon Existing Manhole 54,000 54,000 18 1 LS Traffic Comrol. Striping and Pavement Markin $9,860 $9,860 t k,. SUBTOTAL Sf37S40 SANTA ANA 32% S4W3 r GARDEN GROVE 6M 3!3;527 1 1 LS Sheetin , Shoring and Trench Protection S2,200 52,200 2 366 LF Construct 15" VCP Sewer Main 5220 580,520 4 1 EA Construct Concrete Manhole 58,000 S8,000 6 2 EA Construct 6" Sewer Laterals and Cleanouts $10,000 $20,000 8 300 SF Remove and Replace Concrete Drivewa s S20 56,000 10 366 LF CCTV Inspection of New Sewer Main S2 S1.000 Reads #7 11 2 EA CCTV Inspection of New Sewer Laterals $100 $200 77+69.6 to 73+99.9 12 12 CY Excavation of Unsuitable Materials and Installation of Rock Stabilization S30 5360 13 30 CY Excavation of Unsuitable Materials and Ion ort Trench Backfill $50 $1,500 14 1 LS Abandon Existing 12" and 8" Sewer Main S3,080 53,080 15 2 EA Abandon Exisun Manhole $4,000 $8,000 IS I LS Traffic Control, Striping and Pavement Markings 510,860 510.860 SUBTOTAL ,A SANTA ANA GARDEN GROVE '68*A'" . <S96,179 , P:UV0591Y1984Uinginaeein~'O7lCon Fsm,u,aMon E.rum«loa SW.g 23A-23 TETRATECH 171195 von Karmen. Suite SK Irvine. a5 4 Tat 94 948.809 .904.6000 Fax 949.909.5010 1 I LS Sheeting, Shoriand Trench Protection $2,200 52,200 2 373 LF Construct IS" VCP Sewer Main 5220 582,060 4 1 EA Construct Concrete Manhole 58,000 SS,000 6 3 EA Construct 6" Sewer Laterals and Clear uts S 10,000 $30,000 8 300 SF Remove and Replace Concrete Drivewwy3 $20 56,000 10 373 LF CCTV Inspection of New Sewer Main S2 S1,000 Reach f8 11 3 EA CCTV Inspection of New Sewer Laterals $100 5300 73+99.9 to 70+22.7 12 12 CY Excavation of Unsuitable Materials and Installation of Rock Stabilization $30 5360 13 30 CY Excavation of Unsuitable Materials and Import Trench Backfill S50 $1,500 14 1 LS Abandon E)dsting 12" and 8" Sewer Main 53,080 $3,080 is I EA Abandon Ustim Manhole S4,000 54,000 IS t 15 Tra!cControl,,S ' and Pavement Markin $10,860 510,860 SUBTOTAL c5U9 L r, aai~t s', SAlYfiAiAl1A iY31'I. i 731 GARDh'iYGRBYE S103,058 L I LS Sheeting, Shoring and Trench Protection S2,200 $2,200 2 371 LF Construct 15" VCP Sewer Main 5220 581,620 4 1 EA Construct Concrete Manhole $8,000 S8,000 6 2 EA Construct 6" Sewer Laterals and Cleanouts $10,000 520,000 8 300 SF Remove and Replace Concrete Driveways S20 $6,000 10 37I CF CCTV Inspection of New Sewer Main $2 51,000 Reach H9 11 2 EA CCTV IIt coon ofNew Sewer Laterals SIN 5200 70+22.7 to 66+48.2 12 12 CY Excavation of Unsuitable Materials and installation of Rocs: Stabilization $30 $360 13 30 CY Excavation of Unsuitable Materials and Import Trench Backfill S50 51,500 14 1 LS Abandon Existing 12" and 8"Sewer Main $3,080 53,080 15 2 EA Abandon Existing Manhole 54,000 58,000 18 t IS TnfficControl S and ParcnmttMarkin $10,860 SI0,860 ..k -..K.. ,~x.d..:iF?'. SUB'T'OTAL ~iS1 aGARDIiN GROVE &f~C . 1 I LS Sheeting, Shoring and Trench Protection 52200 52,200 2 379 LF Construct 15" VCP Sewer Main 5220 583,380 4 2 EA Construct Concrete Manhole 58,000 516,000 5 1 EA Modify Existing Sewer Manhole at Harbor and Roxe 55,000 S5,000 6 3 EA Construct6"Sewer Laterals and Cleanouts SI0,000 $30,000 7 1050 SF Remove and Replace Concrete Btu Pad $10 510,500 Reach #10 10 379 LF CCTV Inspection of New Sewer Main $2 51,000 66+48.2 to 62+63.7 11 3 EA CCTV Inspection of New Sewer Laterals SI00 $300 l2 12 CY Excavation of Unsuitable Materials and Installation of Rock Stabilization 530 $360 13 30 CY Excavation of Unsuitable Materials and Import Trench Backfill S50 $1,500 14 1 IS Abandon Existing 12" and 8" Sewer Main S3,080 53,080 15 1 EA Abandon Existing Manhole $4,000 54,000 I8 I IS Traffic Control, Striping and Pavement Markings $10,860 510,860 SUBTOTAL , . SI68 180, r : SANTA Al'tA15G' : ` : S53'8I8 GARDEN GROVE 6855 $114,L42 SUBTOTAL OFALL REACKES 5IA00X0 " SANTA ANA SUBTOTAL __s2x 45l" GARDY.N GROVE SUBTOTAL tin SW,445 p;UW S4TD08G~Enaeo«m,g»1!Cmt £nimuwSCwt F':tinur<C.1 Shur 23A-24 EXHIBIT "D" ESTIMATED SCHEDULE OF PROJECT CONSTRUCTION 912756.1 23A-25 TETRA TECH MEMORANDUM TO: Rudy Rosas, P.E., City of Santa Ana FROM: Mark Bush, P.E., Tetra Tech JOB TITLE: Westminster Avenue Sewer Improvement Project PROJECT NO: 134-P00597-0086-04 (300) SUBJECT: Estimated Schedule for Construction DATE: February 19, 2013 The Estimated Schedule for Construction is based on Tetra Tech's experience with similar projects of nature, size, and knowledge of the City's existing system. The following permits are to be obtained by the Contractor prior to construction: • City of Santa Ana Encroachment Permit • City of Garden Grove Engineering Permit In order to obtain these permits, the Contractor is responsible to prepare traffic control plans and submit to the agencies listed above and obtain approval. Traffic control plans shall be submitted to the City for approval no later than four (4) weeks after the award of the contract. The Contractor's activities shall be confined to the following hours: I . From 9:00 a.m. to 3:00 p.m., Monday through Friday, except as otherwise noted. 2. Construction activities within the intersection of Harbor Boulevard and Westminster Avenue shall be performed from 9 p.m. to 5 a.m., Monday through Friday. 3. All direct tap lateral connections to the existing sewer laterals, including installation of clean-outs, shall be performed from 9 p.m. to 5 a.m., Monday through Friday. 4. The work at the intersection of Clinton that requires the upstream manhole (South Clinton) to be plugged in order to install the new 8-inch sewer pipe shall be performed from 9 p.m. to 5 a.m., Monday through Friday. The aforementioned hours impact when the work can be performed and the Contractor's production rates. The Contractor will also be responsible to obtain the following permits, but these are not believed to be critical path items: 1. Business License. Each Prime Contractor and Subcontractor shall obtain and pay for a Santa Ana Business License and a City of Garden Grove Business License. Detailed information concerning business license may be obtained from the Finance and Management Services Agency, (714) 647-5447, City Hall. P:\P00597\0086\WordPro\04\Correspondence\mo02-2013-02-19-rev.doc (300) 23A-26 MEMORANDUM February 19, 2013 Page 2 2. Construction Water Permit. Each Prime Contractor or Subcontractor which desires to obtain water from AGENCY-owned fire hydrants for construction or any other purpose shall first obtain and pay for a permit from the Corporate Yard of the City of Santa Ana at 220 South Daisy Avenue. Information concerning costs and conditions may be obtained from the AGENCY by calling (714) 647-3320. Use of private water from a hose bib is not allowed. 3. Disposal Permit. In accordance with the procedures of the Orange County General Services Administration (GSA), the cost for the disposal of all materials at County landfill sites shall be borne by the Contractor. 4. OSHA Excavation Permit. Contractor shall obtain an OSHA excavation permit, including an inquiry number from "Underground Service Alert". Summarized herein is suggested phasing for construction activities: 1. Submit shop drawings and obtain permits; 2. Phase L Construct 15-inch and 8-inch sewer main and manholes from connection at Harbor Boulevard to Roxey Drive and test main and manholes. Do not divert flow into new main. Construct new manholes over existing 8-inch laterals and maintain lateral through manhole. Construct service laterals partially across the street to the limits of the traffic control. Install inflatable plugs and temporary caps in service laterals at Sta. 92+20, Sta. 93+67, Sta. 94+32, and Sta. 95+68. 3. Phase IL• Starting from Harbor Boulevard and working east to Sta. 88+50, continue constructing service laterals and clean-outs and connect new service lateral to existing service lateral. Break and remove the existing laterals constructed through manholes, divert flow into new 15-inch sewer main, and construct a brick and mortar plug in the outlet no longer being used. 4. Phase X. Break and remove the existing lateral constructed through new manhole Sta. 89+26.3 (Sta. 9+86.5 Clinton) and divert flow into new 15-inch sewer main. Maintain flow from South Clinton into existing 12-inch sewer. Construct new 8-inch sewer to the south within limits of the traffic control. 5. Phase IV: Break and remove the existing lateral constructed through manhole Sta. 92+78.4, divert flow into new 15-inch sewer main, and construct a brick and mortar plug in the outlet no longer being used. Break and remove the existing lateral constructed through manhole Sta. 96+18.5 (Sta. 9+86.5 Roxey) and divert flow into new 15-inch sewer main, and construct a brick and mortar plug in the outlet no longer being used. Re-channel the manhole base at existing manhole Sta. 96+18.5 and divert upstream flow at Roxey Drive into new 15-inch sewer, and construct a brick and mortar plug in the outlet no longer being used. 6. Phase V Working east to west from Sta. 96+18.5, construct laterals and clean-outs and connect new service laterals to existing service laterals at Sta. 92+20, Sta. 93+67, Sta. 94+32, and Sta. 95+68 (Type B laterals) and connect new service laterals to existing service laterals. 7. Phase VI: After all flows upstream of existing manhole at Sta. 9+71.8 (Clinton) have been transferred to the new 15-inch sewer, make final connection of 8-inch sewer picking up flows from South Clinton. Temporarily plug upstream manhole on 8-inch sewer, remove manhole, and make final connection. P:V'0059710086\WordPro\04\Correspondence1mo02-2013-02-19-rev.doc (300) 23A-27 MEMORANDUM February 19, 2013 Page 3 8. Phase VII: Abandon existing 12-inch and 8-inch sewer mains and manholes. 9. Phase VIII: Construct grind and cap. This is only an estimated schedule; the actual schedule and phasing may vary due to field conditions and performance/production rates of the Contractor. Notwithstanding, the Contractor shall complete all work under the contract within 140 working days from the date of the Notice to Proceed issued by the City of Santa Ana. Construction on the project shall begin within one (1) month from the award of the contract. Once work has begun on the project, the Contractor shall work continuously on the project until work is substantially complete. MWB/mn P:\P00597\0086\WordPro\04\Correspondence\mo02-2013-02-19-rev.doc (300) 23A-28 23A-29 Contract Award for Westminster Avenue Sewer Improvements June 17, 2013 TRASK AVENUE W y HUCKLEBERRY RD STRAWBERRY LW VENUE TER a PROJECT 116TH ST LOCATION O WASHNGTON AVE 4 1 ~ t 1 11TH ST, HAZARD A VE VICINITY MAP 1 NOT TO SCALE SANTA ANA Tdlo GA+70ry e WESTMINSTER AVENUE P,V A ~i SEWER MAIN IMPROVEMENTS r PROJECT NO, 12-6645 Exhibit 3 23A-30