Loading...
HomeMy WebLinkAbout23B - PROJ - MAPLE ST BIKE TRAIL STORM DRAIN REQUEST FOR COUNCIL ACTION '-4 . Do CITY COUNCIL MEETING DATE: CLERK OF COUNCIL USE ONLY: JUNE 17, 2013 TITLE: APPROVED CONTRACT AWARD FOR MAPLE ? As Recommended STREET BIKE TRAIL STORM DRAIN ? As Amended CDS PROJECT PROJECT NO. 136793 El Ordinance on 1St Reading ? Ordinance on 2"d Reading ? Implementing Resolution ? Set Public Hearing For CONTINUED TO FILE NUMBER CIT NAGER RECOMMENDED ACTION 1. Award a contract to the lowest responsible bidder, Fleming Environmental, Inc., in accordance with the base bid totaling $153,940 for the construction of the Maple Street Bike Trail Storm Drain CDS Project. 2. Approve the Cost Analysis, as shown in Exhibit 1, for a total estimated project delivery cost of $200,122. DISCUSSION The Public Works Agency received funding from the Orange County Transportation Authority (OCTA) under the Measure M2 Environmental Cleanup Program (ECP) to construct a trash reduction project. The purpose of the program is to protect Orange County beaches and waterways from transportation-generated pollution (urban runof), and improve overall water quality. This project consists of installing an off-line Continuous Deflective Separation (CDS) unit in the storm drain system to remove trash and debris, and prevent sediment, oil, and grease from entering the Santa Ana Delhi Channel, which drains into Newport Bay, as shown in Exhibit 2. The proposed device is a precast concrete unit and it will be installed underground. The CDS unit will capture trash and debris, and will need to be periodically cleaned out to remove the intercepted waste. 23B-1 Contract Award for Maple Street Bike Trail Storm Drain CDS Project June 17, 2013 Page 2 A Notice Inviting Bids was advertised on May 5 & 7, 2013, and bids were opened on May 22, 2013. The following is a summary of the bid invitations mailed and received, and the bid results: Contractor Participation Data Santa Ana contractors receiving notices 12 Contractors requesting bidding documents 12 Bids received 8 Bids received from Santa Ana contractors 0 Bid Results Summary RANK BIDDERS NAME LOCATION BASE BID 1 Fleming Environmental, Inc. Fullerton $153,940.00 2 Excel Paving Company Long Beach $154,961.00 3 GRFCO, Inc. Moreno Valley $155,900.00 4 Paulus Engineering, Inc. Anaheim $161,469.98 5 GCI Construction, Inc. Costa Mesa $213,080.00 6 Bali Construction, Inc. S. El Monte $216,720.00 7 Atlas-Allied, Inc. Anaheim $224,000.00 8 John T. Malloy, Inc. Los Angeles $255,760.00 A total of eight bids were received and deemed responsive, with Fleming Environmental, Inc., submitting the lowest responsive bid. Their $153,940 bid is 71 percent over the $90,000 Engineer's Estimate. The Engineer's Estimate, however, did not include the cost of structural design and installation of heavy duty shoring that is required and necessary to work at a depth of up to 21 feet. ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended action is exempt from further review. Categorical Exemptions Environmental Review No. 2013-45 (Project 136793) was filed for this project. In addition, a Certification of Categorical Exemption and a Statutory Worksheet have been prepared in accordance with the National Environmental Policy Act. 23B-2 Contract Award for Maple Street Bike Trail Storm Drain CDS Project June 17, 2013 Page 3 FISCAL IMPACT The project Cost Analysis identified a total project delivery cost of $200,122, including construction administration, inspection, testing, survey, and contingencies. Funding is available to cover those costs in the Measure M2 - Street Construction Fund (Account 03217662-66220) in the amount of $100,000 and from the Federal Clean Water Protection Fund (Account 05717640-66220) for the balance. APPROVED AS TO FUNDS AND ACCOUNTS AL-t 1 6-4 OAti- J1 A kl;~~ V- S' ) ~ , ul Godinez II,~ .E. Francisco Gutierrez /J Executive Director Executive Director / Public Works Agency Finance & Management Services Agency RG/TC Exhibits : 1. Cost Analysis 2. Location Map 23B-3 23B-4 COST ANALYSIS PROJECT 136793 - MAPLE STREET BIKE TRAIL STORM DRAIN CDS PROJECT Construction Contract $153,940 Contract Administration $7,697 Inspection and Testing $12,315 Survey Staking $3,079 Contingencies $23,091 TOTAL ESTIMATED CONSTRUCTION COSTS $200,122 EXHIBIT 1 23B-5 23B-6 2225 2227 2226 2231 J 2231 2230 1-= 2235 2235 2234 D 2239 tr 2239 2238 2243 2243 2242 2245 2247 2246 WARNER AVE. 2397 wECT LXT i EXHIBTT r° r SANTA Alit CONTRACT AWARD FOR MAPLE STREET BIKE TRAIL. STORM 17.2013 DRAIN COS PROJECT (PROJECT NO. 136793) PAM I OF 23B-7 23B-8