Loading...
HomeMy WebLinkAbout25A - AGMT - LANDSCAPE MAINTENANCEREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JULY 15, 2013 TITLE: AGREEMENT WITH AZTECA LANDSCAPE FOR LANDSCAPE MAINTENANCE SERVICES IN DISTRICT FOUR PARK SITES 4?TFYIIMANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ? As Recommended ? As Amended ? Ordinance on 151 Reading ? Ordinance on 2?d Reading ? Implementing Resolution ? Set Public Hearing For_ CONTINUED TO FILE NUMBER Authorize the City Manager and Clerk of the Council to execute an agreement with Azteca Landscape to provide landscape maintenance services in District Four for an 18-month term with four one-year renewal options in an amount of $1,174,926.06, with a 10% contingency for unanticipated work for a total amount not to exceed $1,292,418.67, subject to non-substantive changes approved by the City Manager and City Attorney. DISCUSSION The Parks, Recreation and Community Services Agency (PRCSA) is currently divided into four park maintenance districts and the Civic Center district. The landscape maintenance contract in District Four has expired. On May 14, 2013, PRCSA issued request for proposals (RFP #13-010 PRCSA) to 13 landscape maintenance vendors. On May 23, 2013 a pre-proposal conference was conducted and on June 6, 2013 the City received proposals from five firms: Azteca Landscape, Mariposa Landscape, Inc., Midori Gardens, Parkwood Landscape Maintenance Services and Vista Del Verde. Vista Del Verde's proposal was received after the deadline and was returned unopened. An evaluation committee consisting of representatives from PRCSA Park Services, PRCSA Administration, and the City of Anaheim reviewed and rated the four proposals. The proposals were evaluated according to Capability and Experience of Contractor (25%), Past Performance (25%), and Cost of Proposal (50%), as listed in the RFP. The highest rated contractor is being recommended for this contract. 25A-1 Agreement with Azteca Landscape For Landscape Maintenance Services in District Four July 15, 2013 Page #2 The results of the RFP evaluation are as follows: Vendor Location Cost Score Azteca Landscape Ontario, CA $1,174,926.06 342 Mariposa Landscape, Inc. Irwindale, CA $1,241,352.00 338 Parkwood Landscape Maintenance Services Van Nuys, CA $1,332,642.00 283 Midori Gardens Santa Ana, CA $1,226,810.00 273 400 point max The City proposes to enter into an 18-month agreement with Azteca Landscape, with four one- year renewal options, for the maintenance of District Four. District Four is located in the southwest quadrant of the City and includes landscape maintenance of 16 city properties (nine park sites, five bike trails, the City Yard and McFadden Technology & Learning Center). See Exhibit 1. The 18 month base contract cost is $1,174,926.06. An additional 10% contingency of $117,492.61 is included for unanticipated work, resulting in a total contract amount of $1,292,418.67. Azteca Landscape is new to PRCSA and has been performing well in other southern California cities. FISCAL IMPACT Funds for this agreement will be included in FY 2013-14 and FY 2014-15 Park Services Maintenance and Repair Buildings and Grounds account (no. 01113250 62320) and Criminal Activities Fund - Department of Justice account (no. 02614450 62300 12480901102). APPROVED AS TO FUNDS AND ACCOUNT: Gerardo Mouet, Executive Director Parks, c. and Com. Svcs. Carlos Rojas, Interim Police Chief Police Department Francisco Gutierrez, Executive Director Finance and Mgt. Svcs. Agency GM/SC/SC Exhibit: Map 25A-2 P + E N TA LLARA AV. bx?r r^ . ? .,.. J CO L• _ 7lA VERNE AV., Q EDINGER AV. U d O / / :' ®j innnuv '> w ./ .. w Z ? ST GERIAUDE P'L. r _ WAR R AV. V - CO UNTY Z z A DAMS AV. ? SEGERSTROM +^ - ? x _ ? .w Y LL 0? . MACARTH R BLVD. ALTO AV. BIKE TRAIL J MACARTHUR BL. e Q 2 G W" SANTA A d 29 Adams 38 Thornton 30 Centennial 39 Windsor 31 City Yard • Bear St. Bike Trail 32 Friendship • Greenville Bike Trail 33 Heritage • Gertrude-St. Andrew Bike Trail 34 Jerome • MacArthur Bike Trail Entrance 35 SAPAAL Facility • Raitt Bike Trail 36 McFadden Triangle 37 Santa Anita N 1 2 6*4't 1 25A-4 LANDSCAPE MAINTENANCE AGREEMENT THIS AGREEMENT, made and entered into this 15th day of July, 2015 by Azteca Landscape, Inc., a California corporation (hereinafter "Contractor"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "City"). RECITALS A. The City desires to retain a Contractor having special skill and knowledge in the provision of park landscape maintenance services comparable with "high-level" industry practice. B. Contractor represents that Contractor is able and willing to provide such services to the City. C. In undertaking the performance of this Agreement, Contractor represents that it is knowledgeable in its field and that any services performed by Contractor under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: 1. SCOPE OF SERVICES Contractor shall perform landscape maintenance services for Santa Ana Parks, District 4, as set forth in the Specification for Routine Maintenance, attached hereto as Exhibit A, attached hereto, in conformance with City's Request for Proposal 13-010 (RFP), dated May 14, 2013 on file at the Parks, Recreation and Community Services administrative offices and the maps included therein, and Contractor's Proposal dated June 6, 2013, attached hereto as Exhibit B. All referenced documents are incorporated in this Agreeement by reference. The Executive Director of Parks, Recreation and Community Services Agency may order additional services, as set forth in Section 3.e., below, for unanticipated but necessary services required during the term of this Agreement. 2. CITY INSPECTION The Executive Director of the Santa Ana Parks, Recreation and Community Services Agency, or his designee, shall regularly inspect the parks, playgrounds, fields and other City property subject to this Agreement. If said inspection results in discovery of work that is not performed in the agreed manner, and to the professional degree set forth in the Specifications, Contractor agrees that the City shall deduct from Contractor's next monthly payment, the City's actual or estimated costs of performing the work to bring the property into conformance with the Specifications. Additionally, City shall impose liquidated damages of up to $300.00 per inspection, per day, per Park not meeting the Specifications during any such inspection. 3. COMPENSATION a. City agrees to pay and contractor agrees to accept as total payment for its services, 25A-5 the rates and charges set forth in Contractor's proposal, attached hereto as Exhibit C and incorporated by reference. The amount to be expended for services shall not exceed One Million, One Hundred Seventy-Four Thousand, Nine Hundred Twenty-Six and 06/100 Dollars ($1,174,926.06), plus a ten percent contingency for unanticipated work required during the 18 month term of this agreement. b. Invoices. 1. The contractor shall submit a monthly invoice by the fifteenth of the month to the City for the services rendered in the prior month. 2. All invoices for work performed under this contract shall be submitted in a format approved by the City. Invoices shall include the following information at a minimum: i. Contractor's invoice number ii. Beginning and ending dates for services iii. City project number and/or name (if applicable) iv. Work site address/location (if applicable) v. Unit cost, subtotals and total for invoice c. Payment by City shall be made within sixty (60) days following receipt of proper invoice, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance of a professional parking control enforcement services. d. Extra Work. No new work of any kind shall be considered an extra unless a separate estimate is given for said work and the estimate is approved by the City in writing before the work is commenced. The contractor will be required to provide detailed information of such extra work. Documentation of contract compliance may be required on some occasions. Work performed prior to obtaining written approval of the City shall not be included within the Scope of Work and may not be paid. 4. TERM This Agreement shall commence on August 1, 2013 and terminate on January 31, 2015, unless terminated earlier in accordance with Section 13, below. The City may terminate this Agreement if the Santa Ana City Council fails to approve funding for the Agreement for any fiscal year covered herein. This Agreement may be renewed for up to four additional one-year terms on the mutual agreement of the parties. 5. INDEPENDENT CONTRACTOR Contractor shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Contractor performs the services which are the subject matter of this Agreement; however, the services to be provided by Contractor shall be provided in a manner consistent with all applicable standards and regulations governing such services. Contractor shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 2 25A-6 6. INSURANCE Prior to undertaking performance of work under this Agreement, Contractor shall maintain and shall require its subcontractors, if any, to obtain and maintain insurance as described below: a. Commercial General Liability Insurance. Consultant shall maintain commercial general liability insurance which shall include, but not be limited to protection against claims arising from bodily and personal injury, including death resulting therefrom and damage to property, resulting from any act or occurrence arising out of Consultant's operations in the performance of this Agreement, including, without limitation, acts involving vehicles. The amounts of insurance shall be not less than the following: single limit coverage applying to bodily and personal injury, including death resulting therefrom, and property damage, in the total amount of $1,000,000 per occurrence. Such insurance shall (a) name the City, its officers, employees, agents, volunteers and representatives as additional insured(s); (b) be primary and not-contributory with respect to insurance or self-insurance programs maintained by the City; and (c) contain standard separation of insureds provisions. b. Business automobile liability insurance, or equivalent form, with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include coverage for owned, hired and non-owned automobiles. c. Worker's Compensation Insurance. In accordance with the provisions of Section 3300 of the Labor Code, Contractor, if Contractor has any employees, is required to be insured against liability for worker's compensation or to undertake self-insurance. Prior to commencing the performance of the work under this Agreement, Contractor agrees to obtain and maintain any employer's liability insurance with limits not less than $1,000,000 per accident. d. The following requirements apply to the insurance to be provided by Contractor pursuant to this section: (i) Contractor shall maintain all insurance required above in full force and effect for the entire period covered by this Agreement. (ii) Certificates of insurance shall be furnished to the City upon execution of this Agreement and shall be approved in form by the City Attorney. (iii) Certificates and policies shall state that the policies shall not be canceled or reduced in coverage or changed in any other material aspect without thirty (30) days prior written notice to the City. e. If Contractor fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the City with required proof that insurance has been procured and is in force and paid for, the City shall have the right, at the City's election, to forthwith terminate this Agreement. Such termination shall not effect Contractor's right to be paid for its time and materials expended prior to notification of termination. Contractor waives the right to receive compensation and agrees to indemnify the City for any work performed prior to approval of insurance by the City. 25A-7 7. INDEMNIFICATION To the fullest extent permitted by law, Contractor shall indemnify, defend and hold harmless the City, its officers, agents and employees (collectively, the "indemnified parties") from and against any and all claims for bodily injury, death or damage to property, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever, which may arise from or in any manner relate to, directly or indirectly, work performed or services provided pursuant to this Agreement, including without limitation, defects in workmanship and/or materials, or Contractor's presence or activities conducted performing the work (including the negligent or willful acts or omissions of Contractor, its principals, officers, agents, employees, vendors, suppliers, contractors and subcontractors). Notwithstanding the foregoing, nothing herein shall be construed to require Contractor to indemnify the indemnified parties from any claim arising from the sole negligence or willful misconduct of the indemnified parties. Nothing in this indemnity shall be construed as authorizing any award of attorney's fees in any action on or to enforce the terms of this Agreement. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation on the amount of indemnification to be provided by the contractor. CONFIDENTIALITY If Contractor receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Contractor agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Contractor without reference to information disclosed by the City. 9. CONFLICT OF INTEREST CLAUSE Contractor covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. 10. NOTICE Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by telefacsimile or other telegraphic communication in the manner provided in this Section, to the following persons: To City: Clerk of the City Council 4 25A-8 City of Santa Ana 20 Civic Center Plaza (M-30) P.O. Box 1988 Santa Ana, CA 92702-1988 Fax 714-647-6956 With courtesy copies to: Executive Director of Parks, Recreation and Community Services City of Santa Ana 26 Civic Center Plaza (M-75) P.O. Box 1988 Santa Ana, California 92702 Fax 714-571-4211 and City Attorney City of Santa Ana 20 Civic Center Plaza (M-29) P.O. Box 1988 Santa Ana, California 92702 Fax 714-647-6515 To Contractor: Azteca Landscape, Inc. Attn: Noe Farias 1027 E. Acacia Street Ontario, California 92716 Fax 909-673-9192 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by telefacsimile, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. 11. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Contractor, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any Exhibits or Attachments hereto, the terms of this Agreement shall prevail, followed by the provisions of Exhibit A. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Contractor. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Contractor nor the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein. 5 25A-9 12. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Contractor, Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Contractors retained by City. 13. TERMINATION AND DAMAGES This Agreement may be terminated by either party upon ninety (90) days written notice of termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor compensation for all services performed by Contractor prior to receipt of such notice of termination, subject to the following conditions: a. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement and the Specifications set forth in Exhibit A. b. Material Breach: If the Executive Director determines the Contractor has failed in the performance of its duties and/or schedule as provided, the Executive Director may consider the Contractor in material breach. City may exercise all remedies in law or equity including but not limited to: 1) withholding all or a portion of payment owed relative to any such failure to perform or for any delay in performance, and 2) directing the work be accomplished by either City employees or another contractor at Contractor's expense, as determined by the Executive Director. Contractor shall be responsible for all costs resulting from breach, including incidental and consequential damages. In the event of a material breach, which remains uncured after five (5) days notice to Contractor, City may terminate this Agreement upon thirty (30) days written notice of termination. 14. EMPLOYMENT OPPORTUNITIES FOR SANTA ANA RESIDENTS Contractor shall solicit and advertise employment opportunities to Santa Ana residents. The City shall inform the contractor of areas to publicize recruitment opportunities, such as work centers and community centers. Such effort and procedure will be provided to the City for review. 15. DISCRIMINATION Contractor shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, training, utilization, promotion, termination or other employment related activities. Contractor affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 16. JURISDICTION - VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further 6 25A-10 agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 17. PROFESSIONAL LICENSES Contractor shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and in writing of her inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 18. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: CITY OF SANTA ANA MARIA D. HUIZAR Clerk of the Council APPROVED AS TO FORM: KEVIN O'ROURKE Acting City Manager AZTECA LANDSCAPE, INC. SONIA R. CARVALHO City Attorney By: Laura Sheedy Assistant City Attorney NOE FARIAS Vice-President 25A-11 EXHIBIT A SPECIFICATION FOR ROUTINE MAINTENANCE 25A-12 EXHIBIT A SPECIFICATION FOR ROUTINE MAINTENANCE L GENERAL CONDITIONS A. FUNCTIONS AND RESPONSIBILITIES 1. City - Director's Authority The Director is the only person authorized to direct changes in any of the requirements under the Agreement and, not withstanding any provisions contained elsewhere in the Agreement, and said authority remains solely in the Director. In the event that the Contractor effects any such changes at the direction of any person other than the Director, the changes will be considered to have been made without authority and solely at the risk of the Contractor. In addition, the Director shall have the authority to accept/reject materials, workmanship and to make changes in work or schedule, when the City determines that no extra costs are involved. The intent of these specifications is known by the City of Santa Ana. Any questions relating to the interpretation of these specifications must be addressed, in writing, prior to the start of work. When the performance of the work or completion per schedule is determined to be sub-standard, the director may recommend that all or a portion of payment be withheld. Payment to be withheld shall be deducted from the next monthly payment due, or if the amount is insufficient to cover payment, the Contractor shall be liable for said deficiency and will be billed accordingly. The Director, or his authorized representative shall decide all questions, which may arise as to the manner of performance and completion per schedule, acceptable fulfillment of the Agreement by the Contractor, interpretation of the specifications, and compensation, including completion of work by alternate sources. 2. Contractor a) Local Office The Contractor shall maintain a physical office within the 714 area code (local office). The local office shall be open Monday through Friday 8:00 a.m. to 5:00 p.m. with a company representative present at all times. Answering services or mobile telephones will not be considered a local office. 25A-13 b) Submittals Prior to contract commencement, and by the first of every month thereafter, Contractor shall submit to the Director for approval: 1) a detailed annual, monthly and weekly work schedule consistent with task frequencies in Exhibit A; 2) time sheets of employees assigned to the contract areas; 3) names and titles of all persons working on the project and their qualifications; and 4) equipment, materials and/or chemicals to be used on the project. The information contained in the above referenced documents shall be updated with any new information as changes occur. The Director shall be immediately notified of any changes to the above information. c) Uniforms and Vehicle Identification The Contractor shall provide to all field personnel a standard uniform including but not limited to uniform company hats, collared work shirts, pants, jackets, vests and ANSI approved safety shoes. All uniforms will be marked with some form of company logo or other form of identification. All vehicles and equipment on the project site shall be in operable and working condition, clean appearance without visible damage, dirt graffiti etc. In addition, all vehicles shall have the company's name clearly identified on the right and left side doors. B. SAFETY REQUIREMENTS All work performed under this contract shall be completed with maximum safety as the priority above all other requirements. In the event unsafe work is observed by City staff or otherwise reported, the Director may at his discretion order Contractor to stop performing and pay all costs and or damages resulting from the delay. C. SAFETY NOTIFICATION If Contractor identifies a potential safety issue, Contractor shall: 1. Notify the public that potentially unsafe conditions exist by installing yellow "Caution Tape" and "A" frame barricades or equal substitute around the condition. 2. Notify the Director of the condition first by phone and then in writing (e-mail is acceptable) including digital photographs of the potential safety concern. Once the Contractor has notified the City and the public of the condition, as specified above, Contractor shall have no further responsibility regarding the condition. 25A-14 D. UNDERGROUND ALERT SYSTEMS Underground Alert Systems (telephone number 1-800-422-4133) must be notified 48- hours in advance prior to any excavation work. E. PROPERTY DAMAGE Any damage to private property caused by Contractor shall be immediately reported to the property owner. Contractors shall pay for any damage caused to private property in performing this agreement. F. ACCESS TO PRIVATE PROPERTY Prior to any work involving private property, the Contractor shall notify the City of the proposed work and obtain all necessary permits and/or consent required from City and/or property owner. G. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS The Contractor shall protect City and/or private property adjacent to work areas including sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, walls, sidewalks, street paving, etc., located on either public or private property. Contractor shall, at its expense, replace any property that is removed or damaged, other than property pre-approved for removal. Contractor shall abide by the City's "Policy for Driving on Park Property" (See Attachment 6). H. TRAFFIC CONTROL The Contractor will not interrupt traffic flow on City streets. In situations where it is necessary to restrict traffic flow, the Contractor will contact the appropriate City department and obtain all necessary permits and/or consent from the responsible public agency. L MONTHLY REPORTS Prior to the first day of each month the Contractor shall submit the following reports: 1) employees daily work schedule by location and crew/task(s); 2) pesticide use report that was forwarded to the Agricultural Commissioner's Office; 3) irrigation report; and, 4) "green waste" recycling report. J. WATER COST 25A-15 City will pay for water used by Contractor pursuant to this agreement up to a specified amount detailed in a monthly Estimated Applied Water (EAW) report. Should the amount of water applied exceed the monthly EAW then the Contractor shall pay the cost of the excess water. II. GROUNDS/LANDSCAPE MAINTENANCE SPECIFICATIONS A. DEFINITIONS 1. "Director" shall mean the Executive Director of Parks, Recreation and Community Services or designated representative. 2. "Pruning" shall mean the practice of removing lateral shrub or tree branches and may also be referred to as "trimming." 3. "Weed" shall mean any undesirable or misplaced plant. B. SCOPE OF WORK It is the intent of this agreement to continually improve the quality of the facilities. The Contractor shall provide all labor, training, materials, tools, equipment, transportation, hauling, dumping, fertilizers, pesticides, chemicals and other items needed to perform high quality grounds/landscape maintenance pursuant to the terms defined herein. The Contractor shall provide all grounds/landscape maintenance at work sites listed herein, including, but not limited to pruning/trimming, shaping and training of trees, shrubs, and ground cover plants, removing and controlling weeds, controlling plant diseases and pests; mowing turf, edging turf and ground cover; irrigating plant material; maintaining and repairing irrigation systems; removing trash and debris; ball diamond maintenance; picnic area maintenance; tot-lot maintenance; and, other services required to maintain the work sites in a safe, attractive and useable condition. The Contractor shall maintain all plant material in a healthy and beautiful condition using the best industry/ horticultural accepted standards for growth, color, and appearance as determined by the Director. Contractor understands that it is assuming maintenance responsibility of the parks/locations "as is" and is responsible for improving all aspects of the parks, irrigation system, hardscape, turf, ground cover, plants and all other areas to the quality described in these specifications. C. EXTRA WORK It is the City's intent to keep parks and other public recreational sites in a beautiful and exceptionally well maintained condition. This specification is designed to continuously improve parks and public recreational sites. It is with this intent in 25A-16 mind that the Director may consider authorizing extra work. Extra work will not be initiated without written authorization. In emergency situations, a not to exceed price may be submitted by contractor via e-mail for review/approval by City. The Director may request that the Contractor submit proposals for extra work in order to improve the grounds-landscape in the contract sites. The Contractor shall submit proposals using the City's Proposal for Extra Work Spreadsheet (see Exhibit E). The Contractor shall complete the spreadsheet in its entirety using his/her proposed extra work pricing (that is a part of this agreement) in order for the proposal to be considered. City reserves the right to request materials/equipment receipts with invoices. All labor shall be quoted on a "not to exceed" basis and City will only pay for labor actually incurred. D. OUTSIDE OF SCOPE Damage or malfunction to plant material or irrigation system equipment (from valve to water meter), with the exception of irrigation heads and lateral lines, by any of the following may be considered outside the scope of this Agreement: (1) Acts of God (2) Civil Disorder (3) Vehicle Collision (excluding Contractor and its employees and subs) (4) Excavation or re-surfacing of the street (5) Power failures (6) Underground wiring damage Contractor will not be considered responsible for replacement. Contractor must prove to the satisfaction of Director that one of the above occurred in order to be excused from performing under the Agreement. 1. Scheduling of Work - Routine Maintenance a) The Contractor shall provide landscape maintenance between the hours of 6:00 a.m. and 6:00 p.m., Monday through Sunday. The schedule may be modified only with the Director's consent. Landscape maintenance that generates excess noise cannot begin before 8:00 a.m. b) The Contractor shall establish schedules of "routine work" to be followed in the performance of this contract. Schedules listing the name and size of specific crews performing daily, weekly, monthly, annual and periodic maintenance shall be submitted to the Director each month. A copy of these schedules shall be provided to the Director prior the performance, and any changes in scheduling shall be reported in writing and subject to the approval of the Director. The schedule shall include days of the week and what person/crew will be performing specific work in accordance with the specification. Each person/crew will be identified and list the 25A-17 number of employees by job classification. Once the initial schedule of "routine work" is completed the Contractor shall notify the Director in writing before any changes are made. c) The Contractor shall establish a schedule of renovations, pruning/trimming and other infrequent operations. A copy of this schedule shall be provided to the Director prior to performance, and any changes in scheduling shall be reported in writing and subject to the approval of the Director. Contractor may be required to use schedule template provided by City. Once the initial schedule is completed the Contractor shall notify the Director in writing before any changes are made. 2. Work Force a) Contractor's supervisory personnel (Supervisors) shall have a combination of five years experience or education in Ornamental Horticulture, Landscape Architecture, Irrigation Technology or related science. Supervisors shall also possess landscape/grounds management skills required to implement modern methods and newly developed horticultural and arboriculture procedures and/or practices. Supervisors shall accompany the Director on weekly inspection tours of the contract sites. During the tour the Supervisor shall indicate the work completed the previous week, any changes that were made or are being contemplated and the work scheduled for the upcoming week and month. b) The Contractor shall provide a Certified Irrigation Specialists in each district who possess, at minimum, the qualifications described in Section II.E.7. Irrigation Techs shall manage each site's irrigation controller programming, performance and maintenance including, but not limited to, performing all irrigation checks/report writing and performing repairs and/or, modifications to the irrigation system. Your proposal will be evaluated on the qualifications of this individual and the amount of FTE's you assign to each district. Copy of certificate is required with proposal submittal. c) Director may require Contractor to remove any employee from work sites at his or her discretion. 3. Materials a) The Contractor shall submit to the Director a list of all materials and/or chemicals that may be used pursuant to the terms of this Agreement. The list shall include Material Safety Data Sheets and chemical analysis where applicable, recommended usage and any other manufacturers data that may be pertinent. The list must be submitted before any materials/chemicals are used pursuant to this Agreement. 25A-18 b) The materials and chemicals utilized in furtherance of this Agreement shall comply with the following standards: (1) All fertilizers shall be complete, furnishing the required percentage of nitrogen, phosphoric acid and potash to keep lawns, trees, shrubs and other plants in a healthy and vigorous growing condition. (2) Pesticides including but not limited to: Insecticides, fungicides, herbicides, algaecides, aviacides, and rodenticides shall be of the best quality obtainable and available on the market, properly labeled with guaranteed analysis, and brought to the job site in the manufacturer's original container. (3) Tree stakes, tree ties and guy wires shall be of materials matching those existing at the work site or as specified by the Director. 4. Trash Disposal and Recycling All organic waste (including leaves, grass clippings, brush, branches, and tree parts) resulting from work performed under this contract shall be disposed of pursuant to the requirements of the Santa Ana Municipal Code (SAMC) Chapter 16. Organic waste cannot be taken to a landfill. Every month, the Contractor shall submit receipts from licensed composters/green waste recycling facilities, to the Director listing the tons of organic waste recycled and the names and addresses of the composting or processing companies. As an alternative, the City will allow Contractor to dispose of green waste and trash in bins provided by the City. The City will determine the amount of green waste and trash allowed to be dumped in these bins based on historical amounts. Any additional disposal fees must be paid by Contractor. At no time will the contractor be allowed to dispose of trash or green waste that was not collected as part of this contract. If the City finds that the contractor is disposing of trash from other contracts, the City will discontinue this service for the contractor and the contractor will be required to pay for their own trash service. E. ROUTINE MAINTENANCE Routine maintenance shall include but not be limited to the following services performed at the Work Sites listed in Exhibit F. Turf Care Turf care shall be differentiated by the two types of turf - "Casual Turf' and "Sport/Priority Turf (see site maps in Attachment 5 that identify the areas for each type of turf). The Contractor shall maintain mowers that provide a smooth, even cut 25A-19 without ridges or depressions and without tearing of the leaf blades (caused by unsharpened mower blades). Mowing shall be performed at the speed the mowers manufacturer specifies to maximize quality of cut. Mowing shall be performed with straight and flowing patterns approved by the Director's Representative. The emphasis will be on quality mowing vs. speed and unprofessional patterns. From time to time the Director will direct the Contractor to change mowing pattern to minimize rutting and compaction. a) Casual Turf Mowing All "casual" turf (non-sport/priority turf) shall be mowed: 1) weekly May 1 through October 31 and, 2) every other week November 1 through April 30 . The Contractor shall use a tractor powered reverse flail mower for the larger open turf areas, a 52" mower and a small walk behind mower for areas between trees and other park amenities. The Director shall determine height of cut. String trimmers are not allowed for mowing turf. Any visible clippings shall be collected and disposed of pursuant to SAMC Chapter 16. b) Priority Turf Mowing All "sport/priority" turf as described in Attachment No. 5 shall be mowed once a week all year. Any visible clippings shall be collected and disposed of pursuant to SAMC Chapter 16. The Contractor shall mow the sport/priority turf areas at 3/4" to 1" using a power driven fairway reel mower and a walk behind reel mower along skinned infield brickdust areas, turf infields, turf infield foul areas, soccer/football fields, soccer/football out of bound areas. The Director's Representative shall direct the Contractor to mow the sport/priority turf lower than 3/4" to 1" if necessary. Note that the ball diamond infield maintenance sub-contractor shall be responsible for mowing turf infields and other designated ball diamond turf areas. (see Attachment 1). c) Edging and Detailing All edging shall be performed with the use of a McClain's edger or approved substitute. Stick edgers are not allowed. Contractor shall edge all turf adjacent to all improved hard surfaces such as concrete, decomposed granite, asphalted concrete paved areas. Edging/detailing shall be performed at the same time mowing occurs. Chemical detailing of turf may occur with the Director's approval. If chemical detailing is performed, the Contractor shall use the string trimmer to remove the treated turf within one (1) week after symptoms of phytotoxicity become recognizable. (1) The Contractor shall use the McClain's edger, or approved substitute, to edge straight lines along fences, walls, or long flowing arcs. The Director's Representative may require the 25A-20 Contractor to use string lines to edge straight lines if the Contractor's staff fails to achieve this quality without this method. (2) The Contractor shall detail around trees, along walls/fences and other park amenities first using a sharpened shovel cut to establish a concentric round circle around trees, poles, etc. Once the initial detailed circle is established a string trimmer may be used to maintain the circle. Should the circle begin to deform the Director shall direct the Contractor to repeat the detail process. (3) The Contractor shall detail turf not greater than 10" away from walls or fences. Detail lines shall be made straight and shall be maintained straight. The Contractor shall, at his own cost, supply top soil and an approved turf seed to reduce any existing bare soil areas along walls/fences that are greater than 10". d) Fertilization (1) Casual Turf - Contractor shall apply fertilizer twice per year (first week of January and July) per the City's agronomic plan (see Attachment 4). (2) Sport/Priority Turf - Contractor shall apply fertilizer four times per year (first week of January, April, October and with annual renovation) per the City's Agronomic Plan" (see Attachment 4). If no summer renovation occurs, the application shall be applied as determined by the Director. e) Irrigation-all turf (1) Contractor shall ensure irrigation schedules are continually monitored to provide adequate moisture in the soil for healthy turf, and avoid excess wet conditions. (2) Contractor shall not schedule irrigation of sports fields at least 24 hours prior to the mowing process. During cooler periods of the year avoid irrigating 48 hours prior to the mow procedures to ensure a quality cut of the turf. (3) Under normal conditions the contractor shall not schedule irrigation on Friday and Saturday nights to avoid wet conditions during weekend usage. Prior approval will be required to irrigate during weekends to coordinate with reservations. (4) Turf areas shall be watered as required by weather conditions to provide adequate moisture for optimum growth. At no time shall turf areas show a lack of green color or a loss of resilience 25A-21 due to lack of water. If Contractor estimates additional water above and beyond the monthly Estimated Applied Water (EAW) may be needed, he/she shall request approval from Park Services prior to exceeding the monthly irrigation budget as detailed in the Monthly Water Conservation Report Estimated Applied Water (EAW) requirements. Failure to get approval from Park Services prior to exceeding the monthly irrigation budget will result in the Contractor paying for the excess water. (5) When an irrigation system does not adequately provide water to the turf area in which it is installed, due to any reason including but not limited to controller failure, valve failure, broken heads, poor system design, etc., the Contractor shall provide supplemental irrigation at no extra cost to the City. The Contractor may use any reasonable means necessary to uniformly irrigate turf areas. Contractor may also submit AEWs with engineered drawings to improve these areas of the system. (6) Automatic irrigation shall be conducted between the hours of 10:00 p.m. and 4:00 a.m. and shall be programmed not to exceed the EAW. In the event that Contractors water consumption exceeds the EAW City may deduct said overages from the Contractor's monthly invoice. (7) Contractor shall ensure that all staff working on irrigation possess one of the following certifications: a. Fullerton College Certificate of Proficiency in Landscape Irrigation b. UC Riverside Certificate in Landscape Irrigation c. Irrigator Tech Certificate Program (must possess all of the following): i. Certified Irrigation Repair Technician (CIRT) ii. Certified Irrigation Auditor (CIA) iii. Smart Water Certified (SWC) iv. Certified Irrigation Installer (CII) (8) From time to time City staff will advise contractor of special events occurring in contract areas and contractor will be required to adjust irrigation scheduling to avoid negatively impacting the event. Should the contractor fail to properly adjust irrigation or otherwise prepare the area for the special event, a failure to perform in the amount of $916 will be assessed for liquidated damages. 25A-22 f) Weed Control-all turf The Contractor shall keep all turf, casual and sport/priority turf, free of all turf type weeds, especially Dallis Grass, Goose Grass, Poa Annua, Neddle Grass and broadleaf weeds at all times. The Contractor shall, along with the monthly Pesticide Use report, submit a written schedule for weed abatement in turf specifying the method, day and location where weed abatement will be performed. The Director's Representative will review and approve written schedule taking into consideration the park's use. (1) Contractor shall apply approved pre-emergent herbicides to all turf areas in order to control the germination of noxious weeds i.e. Dallis Grass, Goose Grass, Crab Grass, Nutsedge, Plantain, Oxalis, etc. (2) Should turf type or broadleaf weeds germinate, the Contractor shall control the weeds immediately upon recognition by way of selective and/or broad-spectrum post emergent herbicides approved by the Director. g) Replanting-all turf (1) Should turf begin to stress for any reason, Contractor shall begin applying supplemental water and shall overseed these turf areas using Stovers Seed Company Bermuda Dunes (spring/summer) or Stover Seed Grand Slam perennial rye (fall/winter) seed at the manufacturer's recommended rate and process. (2) Should turf die back to the point where soil is visible, Contractor shall sod these turf areas using Greg Norman 1 hybrid Bermuda. (3) The Contractor understands and accepts that at the beginning of the agreement there may be existing turf areas that are thin or bare. The Contractor, by entering into the agreement, shall routinely and at no extra cost to the City, repair thin or bare turf areas by overseeding or sodding with approved seed or sod until a thick healthy stand of turf is established. (4) Contractor also understands and accepts that Santa Ana is a very heavily used park system, including increased foot traffic, athletic play, and other uses. h) Aeration The Contractor shall aerate all turf areas, casual and sport/priority turf four (4) times per year in March, June, September, and December. An aerator that will remove soil plugs and deposit the cores on the surface of the turf shall perform aeration. Cores shall be pulled to a depth of 6". 25A-23 i) Sport/Priority (1) Renovation: Once (1) per year during the spring/summer or the fall/winter (as determined by the Director) the Contractor shall renovate sport/priority turf using: (a) spring/summer - Stovers Seed Company Bermuda Dunes seed at six (6) pounds per 1,000 square feet in bare areas and four pounds per 1,000 square feet where turf exists; (b) fall/winter - Stover Seed Company Grand Slam seed at eight pounds per 1,000 square feet This shall be accomplished by mowing the existing turf down to `/4" followed by verticutting (straight blades) to remove thatch. Prior to seeding, the contractor shall eradicate all weeds and have the irrigation system functioning properly and have a plan to provide supplemental irrigation as necessary to germinate the seed to 100%. The field shall be top dressed prior to seeding to provide a 100% flat playing surface. The Contractor shall guarantee 100% uniform germination within 10 weeks from the time the first application of seed or will sod any thin or bare areas with Pacific Sod Greg Norman 1 Hybrid Bermuda sod or Pacific Sod Greg Norman 1 Hybrid Bermuda Sod that has been "cropped over" with perennial rye grass. Renovation must be completed within three months of field closure. Director shall determine sod based on availability/season. (2) Overseeding: Once per month the Contractor shall overseed sport fields at a rate of one (1) pound per 1,000 square feet by mowing the existing turf down to 3/4" followed by verticutting (straight blades) to remove thatch. This overseeding occurs on all priority sport turf regardless of whether or not a renovation was completed. 2. Ground Cover Care a) Edging and Detailing (1) Ground cover beds shall be maintained within their intended bounds and edged and/or detailed the first week of every month to keep the beds looking manicured at all times. 25A-24 (2) Ground cover shall not encroach into lawns, shrubs, adjacent desirable bare areas, curbs, wall fixtures, furniture, beneath and/or into other plants, etc. All sites shall be cleaned following each edging/detailing, including streets. b) Mulching of Bare Areas In all groundcover areas where bare soil is visible or where the groundcover is thin so the soil is visible, the Contractor shall apply AG Organics, Inc. AG203 Nutri Mulch 2"- 3" minus or approved equal, '/z" thick minimum quarterly (every third week of January, April, July, and October) and as necessary to maintain uniform and complete coverage. Mulch is to be removed and completely replaced with fresh mulch every July. c) Fertilization The Contractor shall fertilize all groundcover areas once per year (first week in April) per the City's agronomic plan (Attachment 4). d) Replanting The Contractor shall be responsible for the complete removal and replacement of ground cover lost due to normal attrition or due to Contractor's failure to perform under the terms of this Agreement. City is responsible for cost of replacing plants lost to vandalism; however, Contractor must prove that it was vandalism that killed the plant. The plants shall be planted at appropriate spacing so as to achieve complete coverage once the plant is 2/3rds mature. Any plants planted by City/others must be maintained by contractor. Contractor must notify City within 30 days if plants planted by City/others begin to decline. 3. Shrub Care a) Pruning/trimming All shrubs growing in the work areas shall be pruned such that the plants remain in a healthy growing condition. Plant growth shall be maintained to prevent overgrowth into passageways, walks, streets, view of signs or in any manner deemed objectionable by the Director. Dead or damaged limbs shall be removed so that no projections or stubs remain. Pruning/trimming shall be done by hand shears or loppers in a manner to permit plants to grow naturally in accordance with their normal growth characteristics. "Box hedging" may be required on some shrubs, as set designated by the Director. Shear hedging or severe pruning/trimming of plants, unless authorized by the Director, is not permitted. Topping of 25A-25 plants whose natural growth stems from the base of the plant is not permitted. Should the Contractor top, shear hedge or severely prune plants and disfigure or damage the plants, the Contractor shall be responsible for replacing those plants with like kind and size, subject to approval by the Director. The Contractor may be requested from time to time to raise the bottom of the shrubs for security reasons. b) Replanting The Contractor shall be responsible for the complete removal and replacement of shrubs lost due to normal attrition or due to Contractor's failure to perform under the terms of this Agreement. City is responsible for cost of replacing plants lost to vandalism; however, Contractor must prove that it was vandalism that killed the plant. The plans shall be planted at appropriate spacing so as to achieve complete coverage once the plant is 2/3rds mature. Any plants planted by City/others must be maintained by contractor. Contractor must notify City within 30 days if plants planted by City/others begin to decline. c) Mulching of Bare Areas In all groundcover areas where bare soil is visible or where the groundcover is thin so the soil is visible, the Contractor shall apply AG Organics, Inc. AG203 Nutri Mulch 2"-3" or approved equal, '/2" thick minimum quarterly (every third week of January, April, July, and October) and as necessary to maintain uniform and complete coverage. Mulch is to be removed and completely replaced with fresh mulch every July. d) Fertilization The Contractor shall fertilize all shrub areas once per year (first week in April) per the City's agronomic plan (Attachment 4). 4. Tree Care a) Height/Quality of Pruning In the first week of August of each year the Contractor shall routinely Class 1 prune all trees up to a height of fifteen (15) feet. All trees within the scope of work shall be maintained to keep the natural integrity and shapes of the trees. Pruning shall be accomplished in a manner that will ensure that each individual tree is Class I pruned as set forth in the City of Santa Ana Tree Pruning/trimming and Stump Removal Specifications (see 25A-26 Attachment 3). In addition, the Director may require the Contractor to remove or prevent encroachment of trees into the public right of way where the tree blocks vision or is considered undesirable. Low branches overhanging sidewalks shall be trimmed to a height of nine (9) feet above finish grade. Young trees needing pruning/trimming, training, and shaping to develop caliper and a strong structural framework may have low branching laterals and or appropriate sucker growth. Contractor shall remove hangers under 15" and fallen limbs 80 lbs. or less. b) Staking, Tying and Guying All trees requiring staking shall be securely staked at all times with stakes and rubber cinch ties approved by the Director. Rubber hoses and wire are not permitted ties. All stakes shall be set perpendicular to prevailing winds unless designated otherwise by the Director. Tree stakes shall also be set a consistent distance away from the trunk of the tree (minimum six (6) inches) to reduce abrasion and cell elongation. The tops of all tree stakes shall be removed approximately three (3) inches above the highest tie to reduce abrasion of main or lateral branches of the tree. c) Mulching of Bare Areas In designated tree ring areas where bare soil is visible the Contractor shall apply AG Organics, Inc. AG203 Nutri Mulch 2"-3"or approved equal ''/2" thick minimum quarterly (every third week of January, April, July, and October) and as necessary to maintain uniform and complete coverage. Mulch is to be removed and completely replaced with fresh mulch every July. d) Hazardous Tree Reporting In the event the Contractor detects any tree displaying roots heaving or girdling (either by roots or a foreign material), leaning, broken or hanging limbs, or if Contractor determines that potential safety hazard may exist Contractor shall notify the Director by phone within twenty-four (24) hours. e) Loss of Trees The Contractor shall be responsible for the complete removal and replacement of any and all trees lost due to the Contractor's failure to perform under this agreement. Failure to perform includes but is not limited to, girdling trees with string trimmers or tree ties, improper planting of new trees, improper pruning/trimming techniques which 25A-27 disfigure or destroy the trees natural integrity and shape, or failure to detect and prevent treatable diseases and insect infestations. All trees that exhibit the signs of disease or pests, or any other signs of distress shall be inspected by a Certified Arborist approved by the Director. Contractor shall provide an exact location and separate evaluation/report for each tree in decline. Contractor shall treat any tree in decline at no additional cost to City. Should the Certified Arborist determine that the tree had a terminal disease that the Contractor could not have treated or prevented, the Contractor shall not be responsible to replace the tree. However, should the Certified Arborist determine that the tree's unhealthy condition or death could have been prevented had the Contractor treated the tree then Contractor shall be responsible for the cost of treatment to restore the tree to a healthy condition or replace the tree. The latest American Shade Tree Conference guidelines for value determination will determine the value of the trees lost. By entering into agreement with the City the Contractor acknowledges that they accept the condition of each tree and should a tree go into decline or expire the Contractor agrees to replace the tree with like species and size or agree that the City shall withhold payment equal to the value of the tree. 5. Vine Planting, Establishment and Maintenance a) Planting Contractor shall continuously plant throughout the year at its own expense 1 gallon Parthenocissus tricuspidata (Boston Ivy) vines at 15' on center along property walls, building walls, and any other park owned walls until the vines mature and cover the walls. Note that the Contractor shall irrigate the vines and fertilize as necessary to promote healthy and vigorous growth. The Contractor will immediately replace any vine at the Contractor's expense that is lost for any reason including but not limited to lack of water, vandalism, accidental post emergent spraying, etc. Planting of vines shall not exceed 200 per year per district. b) Contractor shall trim the vine once it reaches the top of the wall or at a specific height on the wall, as determined by the Director. The Contractor shall keep vines off telephone poles or other non-wall surfaces at all times 6. Weeds, Disease and Pest Control a) Weed Control 25A-28 All hardscape and landscape areas shall be kept free of weeds at all times. Weeds shall be removed by hand and/or approved mechanical or chemical methods. Director may dispatch City staff to remove weeds that reach two (2) inches or greater and are not removed immediately. In such instance, the cost will be deducted from the Contractor's monthly invoice. b) Disease and Pest Control (1) The Contractor shall inspect on a daily continuous basis all landscaped areas (turf, trees, shrubs, ground cover, and annual color) for presence of disease, insect, rodent infestation or any other pests. If any pests, such as but not limited to, disease, insect, algae, birds, animals, such as rabbits, squirrels, or rodent infestation (rodents including rats, gophers, moles, voles, etc.) is discovered, it shall immediately be controlled by the Contractor at his/her expense using the safest and most expedient method. (2) The Contractor is responsible for inspecting all plant material on a continuous basis and, as necessary, treating plant material to maintain optimum health of the plants. If any plant material (turf, groundcover, shrubs, trees) dies without the Contractor diagnosing the plant and implementing efforts to restore the plant to a healthy and attractive appearance, the City will assume the Contractor caused the plant death. Contractor will be required to replace the plant with like species and size at no extra cost to the City. City is responsible for cost of replacing plants lost to vandalism; however, Contractor must prove that it was vandalism that killed the plant. In the case where turf is lost due to pest damage, the Contractors shall replace the area of turf lost with Pacific Sod Greg Norman 1 Hybrid Bermuda (during spring/summer) and Pacific Sod Greg Norman 1 Hybrid Bermuda that has been cropped over with Perennial Rye grass (during fall/winter). 7. Irrigation System Maintenance a) General Responsibilities (1) Contractor's Certified Irrigation Specialist shall use automatic or mechanical irrigation systems to irrigate all landscape areas detailed in this Agreement. In the event the existing irrigation system fails to provide full and proper coverage, the Contractor shall provide alternate irrigation with full and proper coverage to all areas in the work site at no extra cost to the City. 25A-29 (2) Newly planted trees, shrubs, ground cover and turf shall receive adequate water to promote normal healthy growth. Proper berms or basins shall be maintained during plant establishment period. b) Operation of Automatic Irrigation Controllers Where the operation of automatic irrigation controllers is required, the Contractor shall: (1) Not duplicate any coded City key furnished by the Parks, Recreation and Community Services Agency for access and operation of the controller. (2) Surrender all keys furnished by the Parks, Recreation and Community Services Agency at the end of the contract period or at any time deemed necessary by the Director to prevent serious loss to the City of Santa Ana. (3) Protect the security of City property by keeping controller cabinet and building doors locked at all times. (4) Refrain from using locked premises for storage of materials, supplies or tools, except as approved by the Director. (5) Program normal irrigation between the hours of 10:00 p.m. and 4:00 a.m. unless alternative hours are approved by City. c) Water Conservation (1) The Contractors Certified Irrigation Specialist shall meet once a month with Park Services to review the City's Monthly Water Conservation Report to discuss water conservation strategies. These discussions may include, but not be limited to, the Contractor turning off irrigation systems during periods of rainfall and times when suspension of irrigation is desirable to conserve water while remaining within the guidelines of the EAW. (2) When Park Services determines that plant material (turf, groundcover, shrubs, and trees) must be irrigated, all controllers shall be activated within twenty-four (24) hours. d) Inspection and Resorting (1) The Contractor shall physically inspect the operation of all irrigation systems once a month and prepare a written report specifying park name, controller location/name, start times, run times, program 25A-30 name, station number, and repairs needed. The Contractor shall maintain all sprinkler systems using City standard irrigation products and details. All repairs shall be to City specifications and details. Repairs to irrigation heads shall be with matching precipitation nozzles. Contractor shall ensure that excessive over spray/runoff into street right-of-ways or other areas not intended to receive irrigation is controlled. The Contractor shall repair at his own expense any irrigation head and lateral line rendered inoperable or malfunctioning due to attrition, vandalism, etc. (2) Contractor shall perform a visual inspection of all irrigated areas once per week. All areas receiving marginal coverage shall receive supplemental irrigation by being irrigated by a portable irrigation method. The contractor shall furnish all portable hoses, nozzles, sprinklers, etc., necessary to accomplish this additional irrigation. Care shall be exercised to prevent a waste of water, erosion, and/or detrimental seepage into existing underground improvements or structures. e) Repairs The Contractor shall be responsible for repairs to all irrigation heads, swing joints and lateral lines as a part of this agreement. The Director will be responsible for repairs to the irrigation system from the valve to the water meter. 8. Hardscape Maintenance a) All paved areas, including but not limited to paved parking lots, curb gutters, pool decks, stamped or other enriched hard surface areas, shall be thoroughly cleaned once every other week between Monday and Friday. Vacuums, blowers, sweepers or other approved equipment may be used to clean hardscape areas. Debris shall not be blown or swept onto adjacent planters, streets or property. All debris must be picked up by the Contractor and removed from the site. Debris and litter that shall be cleaned includes, but is not limited to, leaves, twigs, branches, and trash. The City shall approve any equipment that is to be used for cleaning hardscape. Large trash items in excess of five inches length or width, a muddle of smaller items, spills, and any material (including tree/plant material) that creates a safety hazard shall be picked up daily. b) Picnic facilities and park benches, including but not limited to picnic tables, barbecues, benches, concrete pads and shelters shall be continuously maintained in a safe and clean condition. 25A-31 c) Pavement pressure washing - Contractor shall perform pressure washing quarterly (second week of January, April, July and October) to remove dirt, stains, gum, tar, etc. from all paved pedestrian surfaces including sport courts, sidewalks, picnic pads, and paved areas around buildings. d) Site amenity cleaning - Contractor shall perform pressure washing of site amenities, such as but not limited to, picnic tables, park benches, skate park, walls, planters, raised curbing, railing, exterior of buildings, overhead shelters, etc. (1) All picnic amenities (picnic tables, b.b.q.s, picnic shelters, etc.) and park benches shall be wiped clean every day Monday through Sunday to assure that all trash, stains, spills, debris, glass, staples, nails, tape, wire, etc. is removed. (2) All picnic concrete paved areas and b.b.q.'s, park bench areas, patio areas, and areas adjacent building entrances shall be cleaned once a month using high pressure cleaning equipment. (3) All barbecues shall have ashes, charcoal or any other materials removed once a week. Contractor shall paint the exterior of the b.b.q.'s and the post with heat and rust resistant flat black paint whenever rust appears. e) All parks with flagpoles shall have an American flag displayed at all times. The Contractor shall visually inspect the flag every day to assure it is in good condition. Should, in the opinion of the Director, the flag not be in good condition (faded, discolored, torn and/or having holes) Contractor shall immediately request from the Director a new flag. Contractor shall raise the new flag immediately upon receipt from the Director. f) Drinking fountains shall be cleaned, sanitized and unplugged on a continuous basis. The Contractor shall use approved germicidal cleaner and products to assure that drinking fountains are clean and polished. The Contractor shall remove all mineral build up, algae, stains, etc. The Contractor shall achieve this level of quality using a combination of cleansers, metal polish product, hand and/or power tools. Should the drinking fountain be so plugged that dismantling the fountain is required the Contractor shall notify the Director immediately so City staff can make the repair. 9. Playground/Tot-Lot Areas a) The Contractor shall provide maintenance of all playground/tot-lot sand and rubberized areas once a week. Maintenance shall include, but not 25A-32 limited to, loosening of compacted areas, re-grading sand/wood chips areas to level condition (eliminating ruts, depressions, build up areas, etc.), sifting of sand/wood chips to assure that debris and any other foreign objects are removed, removal of weeds, removing sand/wood chips on sidewalks surrounding the playground/tot-lot, eliminating berms (including pre-existing) in the turf surrounding the playground/tot-lots (high pressure water blasting or sod cutting, leveling and re-sodding are approved methods), and trash and other undesirable material. Rubberized fall areas shall be cleaned of sand/wood chips and debris daily. Any sand/wood chips that accumulate on the rubberized surface shall be reused. Sand/wood chips and debris on the playground equipment shall be removed. b) The City shall be responsible for all playground equipment and tot-lot area safety inspections. 10. Ball Diamond Maintenance The Contractor shall retain a sub-contractor to provide ball diamond infield maintenance as set forth in Attachment 1. a) Baseball Perimeter Maintenance Ball diamond perimeter maintenance shall be performed daily. Ball diamond perimeter maintenance shall be defined as all areas outside the field of play and sideline/dugout areas where coaches, players and others associated with the game gather. Ball diamond perimeter maintenance areas shall include but is not limited to grandstands, areas around concession stands, fence lines, warm-up areas, etc. The work that shall be performed on a daily basis shall include picking up trash and debris, blowing off areas/hosing down areas using a high pressure nozzle to remove brick dust, stains and/or all other foreign material, such as sunflower seeds or peanut shells, so that all areas, including pavement and landscape areas, are 100% free and clean. b) Daily Outfield Maintenance (1) Irrigation checks and repairs to assure that irrigation heads are at the proper grade to avoid injury to players who may fall on them and that no "slippery" areas exist. (2) Fill in of divots and depressions and all uneven areas with #20 white silica sand, organic compost mixed with Stovers Bermuda Dunes grass seed during the spring/summer and Stover Grand Slam perennial rye grass seed during the fall winter to re-establish the areas. 25A-33 (3) Level fence line areas using a rock or leveling rake. (4) Level and drag warning track areas using nail drag followed by finishing drag mats. Contractor shall apply new brick dust to fence lines and warning tracks as necessary to maintain consistent ''/2" layer of brick dust in these areas. c) Weekly Maintenance (1) Contractor will then edge the fence lines and warning track to achieve crisp straight lines and a smooth crisp arc where the brickdust warning track meets the sport turf. d) Annual Maintenance (1) Top dress outfield turf using Santa Ana mix or approved product. Apply with an approved top dressing machine that will achieve a level playing surface. (The "Santa Ana Mix" is sold by AG Organic, Riverside. The specification is: AG Organic Company Organigro Seed Topdress premixed w/California Organic Fertilizer, Inc. Phyta Boost Plant Food 7-1-2 (33cy of Organigro Seed Topdress +700#'s 7-1-2 Phyta Boost per Acre)). e) Non-recurring maintenance: (1) During inclement weather the Contractor shall work to reopen baseball fields as soon as possible. The Contractor shall use Diamond Dry or an approved equal to warning tracts and fence lines. In addition, the Contractor shall use hand pumps or any other reasonable method necessary to drain water off the field. 11. Soccer /Football Field Maintenance a) All soccer/football fields shall be inspected every day, Monday through Friday. Contractor shall look for divots, depressions, debris, and other turf marring conditions. If discovered, the Contractor shall fill in divots and depressions with #20 white silica sand mixed with Stovers Bermuda Dunes grass seed during the spring/summer and Stovers Grand Slam perennial rye grass seed during the fall winter to re-establish the areas. b) Areas of the field where turf has been worn away due to play shall be raked, dragged and leveled each day to provide a level-playing surface free of divots, depressions and uneven surfaces. The Contractor shall add approved topsoil to these areas as necessary to keep the areas level and safe. 25A-34 c) Annually, the Contractor shall top dress outfield turf using Santa Ana mix or approved product. Apply with an approved top dressing machine that will achieve a level playing surface. 12. Sport Court Maintenance a) All sport courts shall be blown off weekly. Courts and fence lines shall be completely free of dirt, debris, etc. b) All tennis courts shall be washed down every other week to remove dust, gum and stains. The courts shall have water removed immediately following the washing down. c) All basketball and volleyball courts shall be washed down monthly to remove dust, gum and stains. The courts shall have water removed immediately following the washing down. d) Contractor shall replace tennis and basketball nets when they become worn. The City shall furnish nets. 13. General Maintenance and Clean-Up For All Parks and Contracted Sites a) All trash and debris on the ground or in trash receptacles shall be removed from all worksites each day Monday through Sunday before 12:00 p.m. This includes all parking lots, landscape areas, paved areas, street curb gutters, flood control channels, etc. Trash shall consist of all items 80 lbs. or less. All trash receptacles and lids shall be wiped clean continuously as stains appear. b) The contractor shall rake, hand remove, or vacuum leaves that are not absorbed by planting. This shall be done as often as required to maintain a neat appearance. c) After heavy windstorms or other inclement weather that impacts sites under this agreement, the Contractor shall bring in extra staff to clean all parks areas within two (2) days at no cost to the City. Debris (80 lbs. or less), such as but not limited to, litter, fallen branches, trash, limbs, branches, soil erosion, etc., shall be removed from the worksites. d) The Contractor shall keep sidewalks and all other paved areas swept and free of any debris, dirt, glass, weeds, leaves, etc. at all times. e) Drain inlets shall be checked and if necessary cleaned once per day to avoid flooding of areas during inclement weather. 14. Other Requirements a) Work Not Scheduled 25A-35 The Director may delete a portion of or the entire work site from contractual maintenance during a construction period or any period where the Director determines that work cannot be scheduled. The deletion of this portion of work will be reflected as a reduction in the monthly payment to the Contractor. The amount of reduction will be based on the percentage of area involved and will be determined by the City. 15. Special Maintenance In addition to the standard Grounds-Landscape Specification the following special maintenance shall be performed. a) P.E. Bike Trail (Chestnut to Bristol). In addition to the standard Grounds-Landscape Specification the following special maintenance shall be performed. (1) Adams to Bristol - The contractor shall keep the unimproved areas immediately adjacent the improved bike trail free of weeds, debris, and otherwise any objectionable item a minimum of 4' from fence lines and/or to the wall of adjacent buildings. (2) Warner Ave. to Occidental - The unimproved land immediately adjacent (east) of the improved bike trail is a part of this agreement. The Contractor shall maintain all plant material and keep unimproved areas free of weeds, trash and debris. (3) Flower west toward Bristol - This portion of the bike trail has an unimproved portion of property from Flower St. running west along the bike trail. This property shall continuously be maintained free of weeds, trash and debris. 16. City Inspection a) The Director or his designated representative shall regularly inspect the parks, playgrounds, fields and all other City property subject to this Agreement. If said inspection results in discovery of work that is not performed in the manner, and to the professional degree set forth in the Specifications, Contractor agrees that the City shall deduct from Contractor's next monthly payment, the City's actual or estimated cost of performing the work to bring the property into conformance with the specifications. Additionally, City shall impose liquidated damages of up to $300.00 per inspection, per park, per day not meeting the specifications during any such inspection. 25A-36 ATTACHMENT NO. 1 SUB-CONTRACTOR BALL DIAMOND IN-FIELD MAINTENANCE 1.0 Scope of Work 1.1 State of California Licensed C-27 Contractor specializing in Ball Diamond In- Field Maintenance shall provide in-field brickdust maintenance for thirty two (32) Baseball/Softball Diamonds per the specifications and conditions listed below: 2.0 Ball Diamond Locations and Quantities/Types of Diamonds at Each Site 2.1 Delhi Park 2.1.1 2.2 Madison Park 2.2.1 2.2.2 One (1) 60' base path Little League diamond with skinned brickdust infield. One (1) 60' base path Major Little League diamond with skinned brickdust infield. One (1) T-Ball diamond with skinned brickdust infield. 2.3 Memorial Park 2.3.1 One (1) 80'/90' base path Little League Junior/Senior diamond with skinned brickdust infield. 2.3.2 One (1) 60' base path Little League diamond with combination turf/brickdust infield. 2.3.3 Two (2) 60' base path Little League diamonds with skinned brickdust infields. 2.3.4 3.0 Schedule of Work to be Completed 3.1 Delhi Park: 1 day per wk Year round Madison Park: 5 Days per wk , Feb 1 St to July 15th 3 Day per wk, July 16th to Jan 31St 25A-37 Memorial Park: 5 Days per wk, Feb 1St to July 15th 1 Day per wk July 16th to Jan 31st 4.0 Field Composition Mix (Brickdust) To Be Used When Maintaining In-fields. 4.1 Field In General 4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana ball field, the specific type of material to be used is: Pro Gold Infield Mix with stabilizer from Gail Materials (951) 279-1095. 4.2 Pitchers Mound/Home Plate/Basepath Areas When adding a mix with a higher clay composition material to any pitcher's mound/home plate/base-path area, the specific type of material to be used is: Hill Topper Home Plate and Mound Mix. 5.0 Equipment The contractor shall provide and have "on hand" at all times during the brickdust maintenance operation the following equipment. 5.1 Utility Vehicle Small tight turn radios (13') vehicle designed especially for this type of work. This vehicle shall have the capability to make circle and figure eight patterns completely within the skinned brickdust infield area and not trespass onto adjacent turf areas. Vehicles manufactured by John Deere, Ryan, Toro and Daihatsu may be acceptable. 5.2 Drags 5.2.1 Scarifying Drag: Used to scratch up or loosen up the skinned area. The drag shall be made of heavy-duty steel capable of carrying additional weight (`s). Digging teeth shall be hardened and pointed and be t/2" in diameter. Pull chain shall be included. 5.2.2 Cutting and Leveling rag: Used to level and backfill low spots in the skinned area. The leveling drag and cutting blades shall be made of galvanized steel. This drag shall feature cutting blades that are adjustable and capable of cutting down dirt build-up (high spots) and depositing dirt into holes (low spots) creating a smooth and level playing surface. Pull chain shall be included. 25A-38 5.2.3 Grooming or Finish Drag: Used to complete dragging procedure on a daily basis and lighter/gentle movement of brickdust. This drag shall be galvanized metal "door-mat" link. Pull chain shall be included. Drag shall be 6' in length by 6' in width. 5.3 Other Equipment 5.3.1 Hand Tamp: 20 lb. variety with 48" min. handle. Used to compact worn areas around bases, home plate and pitching mound. 5.3.2 Plastic Sheeting and Duct Tape: Used to wrap hand tamp head and help prevent wet clay from sticking. 5.3.3 Grade or Grooming Rake- Used to rake and fine level areas. Shall be made of aluminum, 36" wide and a 6' handle. 5.3.4 Heavy Duty Shovels: Used to move material. Round/Square Point and Scoop shovels. 5.3.5 Heavy Duty Hose: Used to water down skinned area. Shall be 3/4" to 1" top quality construction with 225-psi working pressure. Leaks of any kind are not permitted. Contractor shall have a minimum of 175' of hose on hand at all times. 5.3.6 High Pressure Nozzle: Attached to hose. Use to spray down brickdust and push excess brickdust off turf edges. 5.3.7 Industrial Push Broom: Used to remove excess brickdust from turf edges. Shall be 24" min. wide with heavy-duty dual weight bristles. 5.4 Wet Conditions Equipment" (Add to equipment above) During periods of inclement weather or when the areas are wet the contractor shall have "on-hand" during all brickdust maintenance operations the following items: 5.4.1 Squeegee: Used to push/squeeze water off wet areas or into dry areas or drains. Shall be 24" to 36" wide with neoprene blade and magnesium/aluminum head. 5.4.2 "Super Sopper": Used to collect standing water in brickdust areas. Shall be drum type with exterior sponge and arm holding drum. 25A-39 5.4.3 Diamond or Beckson Pump: Used to remove standing water in brickdust areas. Shall be plastic with flexible piston and value. 5.4.4 Infield Sopper with Wringer and Bucket: Used to collect standing water in brickdust areas. Sopper shall be geotextile-covered sponge typical for absorbing chemical spills. 6.0 Meetings 6.1 Contractor shall provide City of Santa Ana staff with a contact person and a phone number to reach the contact person from the hours of 6:30am - 5:00pm, Monday - Saturday. 6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor". This site supervisor shall meet with staff as requested at time and place agreed upon by both parties for as long as the contract is in effect to discuss any problems/concerns that may arise and any goals for the week. 6.3 In November of each year for as long as the contract is in effect, Contractor shall personally meet with staff, along with the designated site supervisor, to discuss and outline schedules for "Annual Renovations" (listed in Section 10.0). 7.0 Daily Infield Maintenance 7.1 General 7.1.1 Contractor shall remove all litter, broken glass and hazardous debris from infield and dugout areas. 7.1.2 Contractor shall keep brickdust and dugout areas in a weed free condition. 7.1.3 Contractor shall hose and/or sweep and hose out all dugouts so they are 100% free of brickdust or any other debris. 7.2 Maintenance Procedure 7.2.1 Retain smooth and level playing surface, using the following daily procedure. The contractor shall remove all bases before beginning any work on in-field and re-install after all work on in-field is completed. 7.2.2 After removing all bases, the contractor shall scrape/wire brush all base post anchors and base inserts. This will help facilitate the base removal and installation. 25A-40 7.2.3 The Contractor shall rake/shovel loose material from high spots back into low spots/worn areas on running paths, sliding zones, and any other low spots/worn areas appearing on the field before any watering or dragging shall take place 7.3 Home Plate Area/Batters Box Area Holes 7.3.1 Sweep/Rake away all loose brickdust. 7.3.2 Wet area until moist. 7.3.3 Scarify area (`s) [batters box hole(`s)] with shovel. This will help the mix bind better. 7.3.4 In a 5 gallon bucket mix "mound mix" with water to desired consistency. Do not use infield mix for this purpose. 7.3.5 Backfill "mound-mix" material into hole(`s). 7.3.6 Tamp the area firmly with steel tamp. Note: The tamp will be most effective if you cover the bottom with plastic. Tape the plastic to the tamp handle. The plastic keeps the clay from sticking to the tamp's bottom. 7.3.7 After tamping and compacting the "mound mix" covers areas with infield brick dust. 7.4 Pitcher's Mound 7.4.1 Follow same procedure for repair of home plate/batters box area utilizing dry "mound mix" for this purpose. Do not cover with infield mix. 7.4.2 Add to the above the following: Rake all loose material from bottom to top and cover with "Mound Mix". 7.5 General Brickdust Skinned Infield Areas 7.5.1 After raking/shoveling loose material from high spots back into low spots/worn areas on running paths, sliding zones, and any other low spots/worn areas appearing on the field, the Contractor shall fill all remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust from stock and make level. 25A-41 7.5.2 The contractor shall clean all excess brickdust beneath or next to the backstop, dugout chain link fencing and/or infield chain link fence lines so that the infield brickdust is level with the dugout pavement and pavement outside the infield. 7.5.3 Lightly water entire infield before dragging. Note: Watering shall penetrate brickdust to a minimum depth of 1/8" deep min. This process is crucial to keeping brickdust in place and not going air borne. 7.5.4 Drag infield utilizing small utility vehicle as specified with "grooming or finishing drag". Circular or figure eight drag patterns shall be used (see details 1-A & 1-B). Alternate drag patterns or reverse direction of drag patterns daily to avoid ruts and high/low areas. Speed of drag procedure shall not exceed 7 mph. 7.5.5 When dragging the skinned infield, the contractor shall stay away from all turf edges a minimum of 18". This will help in avoiding lips at brickdust/turf edges. This 18' gap shall also apply to all backstops and chain link fence areas. 7.5.6 Contractor shall hand rake all base paths on combination turf/brickdust infields. 7.5.7 When the dragging process is complete, the contractor shall stop the drag in a different location daily. This will stop the accumulation of brickdust in focused areas. At this time roll-up the drag, place it on the vehicle and remove all debris accumulated in the drag at this spot and rake out material emptied from drag. 7.5.8 After dragging, hand rake the 18" edges using the "grade or grooming rake". The rake shall be held at an angle as to not push brickdust onto/into turf areas. 7.5.9 After raking the 18" edges, the contractor shall clean all excess brickdust on the turf edges utilizing a high pressure water nozzle or heavy duty broom. NO brickdust shall be permitted on the turf edges at any time.If in the determination of City staff, an unsafe lip situation exists (an unsafe lip is 1/2" or greater) in any turf/brickdust border area infield to brickdust, base-paths or brickdust to outfield), contractor will be required to remove or level the soil build-up with a sod cutter and re-establish the in-field boundaries with a string line or suitable method and re-sod up to the border to remedy the situation at contractors expense. Pre-existing conditions shall be corrected during contract start-up. 25A-42 7.6 Final Watering 7.6.1 This is the most time consuminy, and a very important element of the procedure. 7.6.2 The contractor shall final water the skinned brickdust to a depth of '/4" minimum. 8.0 Rainy Weather/Wet Field Procedure 8.1 On the next scheduled working day after a rainfall, the following procedure, in the order listed, shall be adhered to: 8.1.1 Remove all standing water from low spots either by skimming off excess water and spreading it out to dry areas or using a pump/sopper system. 8.1.2 Rake out (scarify) wet areas. 8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials from stock to all Wet Areas and Rake Out. 9.0 Work to be Completed "BI-MONTHLY" 9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag built up amounts of materials at high spots and cut and level drag the scarified material to low spots. The Contractor shall fill any remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust from stock and make level. Note: Staff shall identify areas to scarify/cut and level drag to the contractor at weekly meetings with contractors appointed site supervisor (as per section 6.2 of contract). 9.2 Heavy water scarified and cut and leveled areas to a '/2" min. depth and allow settling in before play on field. Note: Due to heavy watering and its need to settle before play, staff shall provide a schedule of bi-monthly scarify/cut and level drag dates to contractor. 25A-43 10.0 Work to be Completed "ANNUALLY" 10.1 Each year, the following renovation is to be done on all fields in conjunction with the City's Annual Sports Turf Renovation Schedule. Fields renovated may change from year to year. 10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify drag built up amounts of materials at high spots and cut and level drag the scarified material to low spots. The Contractor shall fill any remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust from stock and make level. Note: Staff shall identify areas to scarify/cut and level drag at the November meeting with contractor's owner (as per section 6.3 of contract). 10.1.2 Contractor shall verify all base distances, pitching rubber distances and pitching mound heights per the Little League, Pony/Colt League specifications for each specific field. Contractor shall repair any specifications not being met on any field. 10.1.3 In addition, contractor shall install 1/2" new Gail Materials "Pro- gold with Stabilizer" (brickdust) to in-fields at all diamonds (minimum 26 tons per Girls Softball/Major Little League Field and minimum 40 tons per Junior/Senior Little League Field). Also, the contractor shall install a minimum of 1 ton of Turface calcite clay per Girls Softball/Major Little League Field and 2 tons of Turface calcite clay to Junior/Senior Little League Fields Responsibility for and purchase of necessary materials shall be at contractor's expense. Note: The City has the right to move brickdust and Turface materials to other infields under this agreement should they decide that an infield or infields do not require additional materials a particular year. 11.0 Work To Be Completed "AS DIRECTED" 11.1 Replace Base ANCHORS as directed. Note: City of Santa Ana use's the Roger's Breakaway base anchoring system. Contractor shall install base anchors into the ground per manufacturer's standards. Top of stake shall be approximately 2" 25A-44 below the surface grade so that the base sits level and flush against the surface on all sides. 11.2 Replace Bases as directed. Note: City of Santa Ana shall be responsible for supplying all necessary base anchors and/or bases to the contractor as needed. 11.3 Replace or Remove/Level/Re-Install home plates as directed. 11.4 Replace or Remove/Level/Re-Install pitching rubbers as directed. Note: City of Santa Ana shall be responsible for supplying all necessary home plates and/or pitching rubbers to the contractor as needed. 11.5 When given direction to complete "as directed" work, contractor shall complete the directed work on the next working day. 12.0 Infield Turf Maintenance 12.1 Infield turf shall mean all sport turf in the infield, the foul territory of the infield and 36" beyond the infield brickdust skin line/arc. Infield turf shall be mowed two (2) times per week on Monday and Friday. 12.1.1 Contractor shall use a "greens" reel mower to provide "putting green" quality finish cut. 12.1.2 Infield turf shall be cut between 1/2" and 3/4" per staff s direction. 12.1.3 All turf clippings shall be collected and disposed of. 12.1.4 Edging of infield arc shall be performed by infield sub. 12.2 Infield turf shall be irrigated to maximize healthy growth of the turf while conserving water. Over watering will not be acceptable. 12.2.1 Contractor shall check and program the automatic irrigation controller minimum one time per week. 12.2.2 Contractor shall provide any areas of the turf supplemental watering using a garden hose on an as needed basis to assure a high quality turf infield. 25A-45 12.2.3 Infield turf shall be fertilized two (2) times per year in the first week of January and April per the agronomic plan. 12.2.4 Contractor shall distribute the fertilizer evenly using a mechanical broadcaster. No hand distribution will be allowed. 12.2.5 Immediately following fertilization the Contractor shall water in the fertilizer to avoid chemically "burning" the turf. 12.3 Infield turf shall be aerated using a walk behind piston type aerator as often as deemed necessary by Staff. 12.4 Infield turf shall be kept weed free at all times. 12.4.1 Any grasses other than the original hybrid Bermuda installed in the infield shall be eradicated immediately upon notice. The Contractor may choose the method of eradication, however, may not damage the turf. 12.4.2 Any broadleaf weeds shall be eradicated immediately upon notice. The Contractor may choose the method of eradication, however, may not damage the turf. 12.5 Infield turf shall be kept free of disease and rodents at all times. 12.5.1 The Contractor shall be responsible for identifying and treating any diseases or rodents immediately upon notice. 12.6 Infield turf annual renovation 12.6.1 Each year the infield turf shall be renovated: 1) verticut using the greens reel mowers straight blade reels; 2) mowed to 1/4" high immediately following verticutting; 3) overseeded with Stovers Seed Company Sahara Dunes at a rate of 8 pounds of seed per 1,000 square feet; and, 4) top dressed immediately following seeding by Materials using "Santa Ana Top Dress Mix." 13.0 General Contract Provisions 13.1 Contractor shall provide and is responsible for all equipment necessary to carry out the work outlined in the contract. There will be no available storage for equipment. Contractor will be responsible for bringing in and then removing all equipment necessary to carry out the work outlined in the contract. 25A-46 ATTACHMENT 2 ANNUAL COLOR PLANTING AND MAINTENANCE SPECIFICATION Before each annual planting the area should be tilled 8 to 16 inches deep. Organic matter in the form of nitrified redwood must be incorporated to a depth of 8" of the top soil. The contract administrator may adjust this if adequate organic matter is already present in the soil but the successful bidder must be prepared to incorporate this organic matter at every color rotation. Organic matter must comprise 25% of the soil volume where the roots will be. This requires 2" of nitrified redwood tilled to an 8" depth. Apply 1.5 pounds of nitrogen per 1000 sq. ft. as a complete low nitrogen material with a ratio of 1:2:1, l:l:l, 1:2:2 or similar. Do not use a higher rate of nitrogen as this may result in excessive vegetative growth and a suppression of flowering. After establishment, fertilize as necessary to maintain a robust appearance and maximum flowering. After incorporating organic material and other supplements, the beds must be raked smooth and slightly mounded. Sticks clods and other material must be removed from the bed. During planting gently crush the root mass with the fingers to stimulate root growth in the surrounding soil. Begin planting in the center of the bed and keep traffic in the worked soil to a minimum. Make the hole slightly larger than the root ball and set the plant at the same depth or slightly higher than it was growing in the container. Smooth out the soil around the plants after planting, including footprints. Water plants to a depth of 5 inches immediately after planting for 4" plant material (deeper for larger pots). Plants are to be rotated four times a year and are to be kept disease free and healthy on a consistent basis. There must be no dead or missing plants at any time and the beds must be kept in a weed free condition. Plants will be in 4" pots and will be planted in an 8" triangular spacing pattern. Rows must be in a straight alignment at the time of planting. Plant species that may be planted at different times of the year may include, but not be limited, to the following annual bedding plants as approved by the Director: • Spring/Summer - April through October 1 Alyssum, Lobelia, Salvia, Marigold, Gloriosa daisy, Penstemon, Cosmos, Dahlia, Impatiens, Begonias, Double Impatiens, Petunia, Verbena, Vinca rosea (periwinkle) Zinnias • Fall/Winter Iceland poppies, Pansies, Viola, Stock, Snapdragons, Primroses, Ranunculus Vandalism Contractor shall check annual color beds daily (Monday through Friday). If plants are missing or vandalized, the Contractor shall provide the City's representative with a proposal to replace missing/damaged plants. After the City's Representative signs the proposal, the Contractor shall then replant/replace missing/damaged plants within 48 hours. 25A-47 The City's contract administrator shall be the sole judge of whether the above specifications are met. The contract administrator shall also approve the types and combinations of color bedding plants prior to installation. 25A-48 ATTACHMENT 3 TREE PRUNING SPECIFICATIONS 1.0 INTRODUCTION Trees and other woody plants respond in specific and predictable ways to pruning and other maintenance practices. Careful study of these responses, has led to pruning practices, which best preserve and enhance the beauty, structural integrity, and functional values of trees. In an effort to promote practices, which encourage the preservation of tree structure and health, the following policies have been established. These specifications are presented as working guidelines, recognizing that trees are individually unique in form and structure, and that their pruning needs may not always fit strict rules. 1.01 OVERVIEW OF SPECIFICATIONS Any tree work performed in the City of Santa Ana Park and Recreation Facilities (SAPRF) must be done according to the SAPRF specifications. There are different criteria for pruning depending on the purpose for the pruning. a. Complete Prune Specifications are used when circumstances deem the entire tree needs to be fully pruned. b. Safety Prune Specifications require less pruning and are used when specific, possibly hazardous (dead/dying) limbs need removal to eliminate all safety concerns. Safety pruning may be recommended in some circumstances instead of a complete prune. Safety pruning specifications are used for "as needed" pruning as outlined above and address only safety concerns. Safety pruning includes only the basic requirements and does not include the fine pruning detail work outlined in a complete prune. c. Power Line Clearance Prune (PLC) Specifications are used for private tree power line clearance work and for street tree (PLC) pruning when the tree is pruned between its periodic complete pruning cycles. d. Palm Pruning Specifications are used when pruning any type of palm. All specifications are based on International Society of Arboriculture, National Arborist Association and American National Standards Institute criteria. This guarantees that SAPRF trees receive the best possible care. 1.02 GENERAL REQUIREMENTS The following requirements shall be used during any pruning work to be performed on SAPRF trees: a. Proper disposal of all tree debris generated. 25A-49 b. Assuring good traffic control and minimize disruption of the public. c. Assuring adequate safety of employees and the public. Prior to starting any tree work on an SAPRF tree, the Contractor must contact an authorized SAPRF representative. Contact Mike Lopez, Sr. Park Services Supervisor at (714)571-4212 Office or (714) 231-6112 cell phone. 1.03 CERTIFIED ARBORIST The Contractor shall employee a full-time, permanently certified arborist, as accredited by the International Society of Arboriculture. This person is responsible for ensuring that the Contractor's crews are performing work according to SAPRF specifications. 1.04 SPECIFIC TREE PRUNING SPECIFICATIONS a. All persons performing tree work on SAPRF trees must be trained according to tree care standards accepted by the International Society of Arboriculture. b. All persons performing tree work on SAPRF trees in or around primary electrical lines must be trained to do so according to the "Electrical Safety Orders" of the State of California, including all amendments and revisions. c. When tree pruning cuts are made to a side limb, such remaining limb must possess a basal thickness of at least one third (1/3) of the diameter of the wound so affected. Such cuts shall be considered proper only when such remaining limb is vigorous enough to maintain adequate foliage to produce wood growth capable of callusing the pruning cut so affected within a reasonable amount of time. d. All final tree pruning cuts shall be made in such a manner so as to favor the earliest possible covering of the wound by natural callus growth. Flush cuts, which produce large wounds or weaken the tree at the cut, shall not be made. The branch collar shall not be removed. e. Tree limbs shall be removed and controlled in such a manner as to cause no damage to other parts of the tree, or to other plants or property. f. All tools used on a tree known to contain an infectious tree disease shall be properly disinfected immediately before and after completing work on such tree. All major diseases and/or pest problems shall be promptly reported to an authorized SAPRF representative. g. All cutting tools and saws used in tree pruning shall be kept sharpened to result in final cuts with smooth wood surface and secure bark remaining intact. All trees six (6) inches in diameter or less shall be pruned with hand tools only. Chain saws will not be permitted on any trees six (6) inches in diameter or less. This is to prevent any unnecessary abrasions to cambial tissue that may predispose a tree to insect and/or disease problems. 25A-50 h. Whenever pruning cuts are to be made, while removing limbs too large to hold securely in one hand during the cutting operation, the limbs shall be cut off first, one (1) to two (2) feet beyond the intended final cut. Then the final cut shall be made in a manner to prevent unnecessary tearing back of the bark and wood. Such cutting back shall not include the removal of any live, healthy limbs in excess of six (6) inches in diameter without prior approval from an authorized SAPRF representative. No more than twenty five (25) percent of the live wood may be removed from the crown of any tree, without approval of an authorized SAPRF representative, excepting live oaks, which are limited to no more than ten (10) percent. Resulting in keeping as much of the crown of the tree as possible. j. Any extraneous metal, wire, rubber or other material (i.e. stakes, ties) interfering with tree growth shall be removed immediately. k. Any defective or weakened trees shall be reported to an authorized SAPRF representative. Specifically, any structural weakness of a tree, decayed trunk or branches, shall be reported in writing, noting the location of the tree by street address and a description of the hazard found in the tree. 1. The use of climbing spurs or spike shoes in the act of pruning trees is prohibited, except palms that are more than sixty-five (65) feet in height. in. Beneficial animal, bird nests, nesting cavities or other wildlife habitat shall be preserved and protected whenever feasible, unless doing so would create a hazard. 1.05 COMPLETE TREE PRUNING SPECIFICATIONS Complete tree pruning shall consist of the total removal of dead or living branches that may threaten the future health, strength and attractiveness of trees. Specifically, trees shall be pruned in such a manner as to: a. Prevent branch and foliage interference with requirements of safe public passage. Over street clearance shall be kept to a minimum of sixteen (16) feet above the paved surface of the street, fifteen (15) feet above the curb and eight (8) feet above the surface of a public sidewalk or pedestrian way. Exceptions are allowed for young trees, which would be irreparably damaged by such pruning action. b. Remove all dead and dying branches and branch stubs that are one half (1/2) inch diameter or larger. c. Remove all broken or loose branches. d. Remove any live branches, which interfere with the tree's structural strength, and healthful development, which will include the following: 25A-51 1) Branches of weak structure, which are not important to the framework of the tree. 2) Branches, which if allowed to grow, would wedge apart the junction of more important branches. 3) Branches forming multiple leaders in a single leader type tree. 4) Branches near the end of a limb, which will produce more weight or offer more resistance to wind than the limbs are likely to support. 5) Selective removal of undesirable sucker and sprout growth paying specific attention not to nick or damage the sprout "burl". 6) Selective removal of one or more developing leaders where multiple branch growth exists near the end of broken or stubbed limbs. 7) Selective removal of limbs obstructing buildings or other structures or traffic signs. Generally, limbs closer than five (5) feet to a building or other structure should be removed unless doing so would severely damage a tree. 8) Removal of branches, which project too far outward beyond an otherwise symmetrical form. e. Cut back ends of branches and reduce weight where excessive overburden appears likely to result in breakage of supporting limbs. f. Clear trees of sprout or sucker growth to a minimum height of eight (8) feet above ground level. Exceptions are allowed for young trees, which would be irreparably damaged by such pruning action. g. Obtain a balanced appearance when viewed from the opposite side of the street immediately opposite the tree, unless authorized by an SAPRF representative to do otherwise. h. Remove all vines entwined in trees and on tree trunks. Vine tendrils shall be removed without injury to said trees. i. Clear all branches and foliage within ten (10) feet of primary electrical lines and three (3) to five (5) feet of secondary electrical lines. j. Clear all branches that interfere with telephone, cable and other utility lines within one (1) foot of lines, wherever feasible. 1.06 SAFETY TREE PRUNING SPECIFICATIONS Safety tree pruning shall consist of the total removal of dead or living branches that may menace the future health, strength and attractiveness of trees. Specifically, trees shall be pruned in such a manner to: a. Prevent branch and foliage interference with requirements of safe public passage. Over street clearance shall be kept to a minimum of sixteen (16) feet above the paved surface of the street, fifteen (15) feet above the curb and eight (8) feet above 25A-52 the surface of a public sidewalk or pedestrian way. Exceptions are allowed for young trees, which would be irreparably damaged by such pruning action. b. Remove dead and dying branches and branch stubs that are two (2) inches in diameter or more. c. Remove all broken or loose branches. d. Removing any live branches, which interfere with the tree's structural strength and healthful development, will include the following: 1) Limbs of weak structure or otherwise hazardous. 2) Selective removal of limbs obstructing buildings or other structures or traffic signs. Generally, limbs closer than five (5) feet to a building or other structure should be removed unless doing so would severely damage a tree. 3) Clear trees of sprout or sucker growth to a minimum height of eight (8) feet above ground level. Exceptions are allowed for young trees, which would be irreparably damaged by such pruning action. 1.07 POWER LINE CLEARANCE (PLC) PRUNING SPECIFICATIONS When trees are in the proximity of overhead energized lines and equipment, reliability of service, safety, and governmental standards require a reasonable amount of tree pruning to avoid conductor contacts and grounding of circuits through the trees. Power line clearance pruning, therefore, shall consist of the removal of tree branches for proper electric line clearance in order to minimize the likelihood of power outages and improve safety. Specifically, trees shall be pruned in such a manner as to: a. Clear all branches and foliage within ten (10) feet of primary electrical lines. b. Clear all branches that interfere with secondary electric lines within three (3) to five (5) feet. c. Protect current tree health, condition and symmetry using Dr. Alex Shigo's book, Pruning Trees Near Electric Utility Lines as a guide. During the tree pruning process, all safe minimum working distances for energized conductors shall be observed. These clearances are defined under ANSI Z133.1-1994. Current ANSI specifications will supersede these requirements when they take effect. Any contact with energized lines shall be promptly reported to an authorized SAPRF representative. Access to backyards must be closely coordinated with the property owner, whenever feasible. Spikes may be used for PLC pruning on palms or other trees only when needed for proper safety reasons. 25A-53 1.08 PALM PRUNING SPECIFICATIONS Palm pruning shall include, but not be limited to, the pruning of the following palms (Syagrus romanzoffianum (queen palm), Archontophoenix cunninghamiana (king palm), Phoenix Canariensis (Canary Island date palm), Phoenix Dactylifera (date palm), Washingtonia filifera (California fan palm); and Washingtonia Robusta (Mexican fan palm) per these specifications. a. The removal of all dead fronds and other dead plant parts from the trunk. All loose frond sheaths shall be removed along the entire length of the palm trunk. b. The removal of all flowers and fruit parts whether dead or alive. c. The use of climbing spurs or spike shoes in the act of pruning trees is prohibited, excepting palms that are more than sixty-five (65) feet in height. d. Canary Island date palm (Phoenix Canariensis) trunks shall be cleaned of any weed species. The immediate area below the green fronds shall be trimmed to a symmetrical (pineapple) appearance. The shape shall not exceed a minimum of forty- eight (48) inches or a maximum of sixty- (60) inches length below the green fronds. The trunk when pruning operations are complete shall be left in a clean, unscathed appearance throughout the entire length of the palm trunk. Canary Island date palms shall be pruned using a sterilized handsaw. The handsaw must be cleaned and sterilized before and after pruning each tree. All volunteer palm seedlings must be removed that are growing within the streets, parkways, or setback dedicated areas. 1.09 UNACCEPTABLE PRUNING The following procedures, or others that will result in tree decline, are not allowed (storm damage and other extenuating circumstances exempted): a. Severe cutting back of all growing tips usually referred to as topping, pollarding, or hat racking. b. Flush cutting where a cut is made even with the surface of the trunk or limb, removing the branch collar and branch bark ridge. Stub cutting where branch removal results in the base of branch removed protruding more than approximately one fourth (1/4) inch beyond the zone of branch collar and branch bark ridge. d. Removal of a healthy main leader, for reasons other than power line clearance. e. Excessive cutting or lifting that exceeds the International Society of Arboriculture or SAPRF standards. 25A-54 1.10 DAMAGE TO PUBLIC OR PRIVATE PROPERTY Should any structure or property be damaged during the tree pruning operations, the persons conducting the work shall immediately notify the proper owners and an authorized SAPRF representative. Repairs to property damaged by the responsible party shall be made within forty-eight (48) hours, except utility lines, which shall be repaired the same working day. Repairs on private property shall be made in accordance with the appropriate building code under permits issued by the City of Santa Ana. Any damage caused by the Contractors employees shall be repaired or restored by them at their expense to a condition similar or equal to that existing before such damage or injury, or they shall repair such damage in a manner acceptable to the City of Santa Ana and/or SAPRF. Special attention is drawn to sprinkler systems in City landscapes and the need to avoid damage. All damage to irrigation systems shall be repaired as soon as possible at Contractors expense. 1.11 WORK PERFORMED ON PRIVATE PROPERTY No SAPRF contracted tree worker shall perform work upon private property without the written consent of the property owner and an authorized SAPRF representative. 1.12 PUBLIC SAFETY AND COOPERATION All tree work shall be conducted in a manner as to cause the least possible interference with, or annoyance to others. Pedestrian and vehicular traffic shall be allowed to pass through the work areas only under conditions of safety and with as little inconvenience and delay as possible. Unless the work area is totally barricaded or otherwise kept safe, at least one worker shall serve to coordinate safe operations on the ground at all times when work operations are in progress. a. Whenever larger tree sections are being cut in a treetop, which may endanger persons or property, such sections shall be secured by ropes and lowered safely to the ground in a controlled manner. b. All fire hydrants, meter vaults, water and gas shut off valves, backflow devices, irrigation field controllers and similar facilities must remain accessible during the course of work. c. Noise levels, resulting from tree work operations, must be kept to a minimum at all times. All tree work operations are subject to compliance with all local Noise Restrictions. Operation of tree work equipment shall not take place between the hours of 9:00 p.m. and 7:00 a.m. weekdays, or between 9:00 pm and 8:00 am on weekends (Saturday and Sunday). Emergencies are exempt from any time restrictions. d. All tree work done to SAPRF trees must comply with all tree related safety requirements as stated in the safety standards ANSI Z133.1-1994 of the American National Standards Institute, Inc. 1430 Broadway, New York, NY 10018. 25A-55 1.13 SITE CLEANUP Cleanup of any debris resulting from any tree pruning operations shall be promptly and properly accomplished. The work area shall be kept safe at all times until all operations are completed. Under no circumstances shall the accumulation of debris be allowed in such a manner as to result in a hazard to the public. All debris from tree operations shall be cleaned up each day before the work crew leaves the site, unless permission is given by an authorized SAPRF representative to do otherwise. All lawn areas, parkways, streets and sidewalks shall be raked and/or blown clean, and all brush, branches, or other debris shall be removed from the site. Areas are to be left in a condition equal to or better than that which existed prior to the commencement of tree pruning operations. All cuttings, branches, wood chips and other debris shall be cleared from the site and disposed of by the Contractor. The Contractor shall obtain permits required for this purpose. Disposal expenses will be the Contractor's responsibility. Debris, such as wood chips, shall be left on property only at the direct and specific request of the owner and an authorized SAPRF representative. Firewood four (4) inches diameter or larger will be left at the work location in a safe manner, unless the wood is not usable as firewood. All firewood to be removed (wood four (4) inches of diameter or larger) must be authorized by an SAPRF representative. 1.14 TIME FOR COMPLETION If awarded this project, the Contractor agrees to complete the work within the time parameters jointly agreed upon by the City, SAPRF, and the Contractor prior to work commencement, unless specific time deadlines are specified elsewhere in these specifications. Once the work has commenced, the Contractor shall diligently prosecute the same to completion. 1.15 SUBCONTRACTORS Subcontractors used in the performance of this project shall be listed in the Contractors Bid Proposal. Subcontractors shall be properly licensed by the State of California as a contractor to perform work of this specialty and hold a valid business permit and certificate of insurance with the City of Santa Ana. Should any subcontractor fail to perform the work undertaken by him to the satisfaction of the SAPRF, said subcontractor shall be removed immediately from the project upon the request of the SAPRF and shall not again be employed on the project. The Contractor shall be held liable for the correction of any deficient work. 1.16 ADDITIONS AND/OR DELETIONS OF WORK The SAPRF representative reserves the right to add and/or delete tree work on this project as deemed necessary and in the best interest of the SAPRF. Additions and/or deletions shall be made at the unit price accepted by SAPRF upon award of contract. 1.17 INSPECTIONS An authorized SAPRF representative will inspect the work performed by the contractor to insure completion of the pruning in accordance with SAPRF Pruning specifications. 25A-56 Should more than two (2) inspections be required on trees needing additional work, the contractor will be billed for SAPRF staff time. 1. 18 BILLING Contractor shall submit a fully itemized bill listing each tree noting: a. Address (each tree). b. Type of tree. c. Date completed. d. Person completing the job. e. Location of tree (front, side right, side left, rear) 2.00 CONTRACTOR QUALIFICATIONS All contractors are required to have a valid appropriate state contractor's license, current City of Santa Ana business license, City Attorney approved certificate of insurance and be knowledgeable in tree pruning and tree care prior to the commencement of any and all work. 2.01 STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION The current edition of the "Green Book", Standard Specifications for Public Works Construction and it's updates, supplements and local addendums, shall be included as part of these specifications, unless otherwise directed in these specifications. 2.02 PROTECTION OF EXISTING FACILITIES AND STRUCTURES The Contractor shall exercise due care in protecting from damage all existing facilities, structures, and utilities, both above surface and underground on the City's property. Any damage to City, SAPRF, or private property caused by the Contractor's neglect shall be corrected and paid for by the Contractor at no cost to the City of Santa Ana or SAPRF. The City of Santa Ana and/or SAPRF shall make the determination of fault. The SAPRF representative reserves the right to issue a Stop Work Notice if the Contractor does not promptly repair any damage, within twenty-four (24) hours of the damage incurred. If the SAPRF representative requests or directs the Contractor to perform work in a given area, it will be the Contractor's responsibility to verify and locate any underground systems (i.e. utility lines) and take responsibility for taking reasonable precaution when working in these areas. Contractor shall call Underground Alert (800) 422-4133) at least two working days prior to digging for line locations. Any damage or problems shall be reported immediately to the SAPRF representative and the City of Santa Ana. If the Contractor discovers something unexpected or a unique problem occurs, he should stop work and immediately contact an authorized SAPRF representative for a timely resolution of the problem. 2.03 CONTRACTOR'S STAFF 25A-57 The Contractor shall provide sufficient personnel to perform all work in accordance with the specifications set forth herein. A qualified, English speaking supervisor in the employ of the Contractor shall supervise all of the Contractor's personnel. The supervisor shall be available at all times to the SAPRF representative during work operations. The responsibility for all work performed will remain with the full-time certified arborist. The Contractor shall furnish the necessary competent and key personnel to properly supervise and direct the work of fully equipped, competent and experienced crews as well as all safety equipment, including but not limited to, all equipment and work procedures required by ANSI Z133.1-1994. The Contractor shall secure all timekeeping, bookkeeping and other necessary clerical and office work required in the performance of the contract. The Contractor shall be responsible for the supervision of all of his crews. He shall check all of his crews regularly for proper quantity and quality of work, proper maintenance of tools and equipment, and safety. 2.04 SUBSTITUTIONS Whenever a specific type of material is specified, no substitutions shall be allowed without written consent of the SAPRF representative. 2.05 CERTIFICATION OF MATERIALS All materials shall be delivered on the site in original containers. Materials shall be subject to inspection by the ARMD representative. The SAPRF representative will not approve materials not meeting the SAPRF standards, and Contractor shall return any such non-satisfactory items at his/her cost. 2.06 CONTRACTOR NEGLECT Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined to be due to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa Ana or the SAPRF. 2.07 HOURS OF OPERATION The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday. No work shall be performed on weekends or on City recognized holidays without written SAPRF approval. 2.08 SPECIFICATIONS AND PLANS The work performed shall be done in accordance with the Standard Specifications for Public Works Construction, latest edition, hereinafter referred to as Standard Specifications. In case of conflict between the Standard Specifications and this Specification, this Specification shall take precedence over and be used in lieu of such conflicting portions. 25A-58 Where the plans or specifications describe portions of work in general terms, but not complete detail, it is understood that workmanship of the finest quality is to be used. Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, equipment and incidentals and do all the work involved in executing the contract. 2.09 CONSTRUCTION EQUIPMENT The Contractor shall take all necessary precautions for safe operation of his equipment and the protection of the public from injury and damage from such equipment. 2.10 SOUND CONTROL REQUIREMENTS The Contractor shall comply with all local sound control and noise level rules, regulations and ordinances that apply to any work performed pursuant to the Contract. Each internal combustion engine used for any purpose on the job or related to the job shall be equipped with a muffler of a type recommended by the manufacturer of such equipment. No internal combustion engine shall be operated on the project without said muffler. Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore. Sounds, such as loud music, that are not related to the project, shall be kept at levels so as to not disturb the general public. 2.11 TRAFFIC CONTROL The Contractor shall notify the SAPRF representative of intent to begin the contract work at least five (5) days before work is begun. The Contractor shall cooperate with local authorities relative to handling traffic through the areas and shall make arrangements relative to keeping the working area safe and clear of vehicles. When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, shall in all cases yield to public traffic. All traffic delineation and work area protection shall conform to the Work Area Traffic Control Handbook (W.A.T.C.H.) 2000 Edition. The Contractor shall make every effort to keep commercial driveways open during working hours. Should this not be possible, Contractor shall coordinate with the property owners affected to insure that designated times of ingress and egress is available. After working hours, all driveways shall be accessible with smooth and safe crossings through any construction area (State of California Traffic Manual). 2.12 INQUIRIES AND COMPLAINTS The Contractor shall maintain an office at some fixed place and shall maintain a telephone thereat, listed in the telephone directory in his own name or in the firm name by which he is most commonly known. Furthermore, the Contractor shall, at all times, have some responsible person(s), employed by the Contractor, to take the necessary action regarding all inquiries and complaints that may be received from the City of Santa Ana, SAPRF, and/or private citizens during normal working hours. 25A-59 Whenever immediate action is required to prevent impending injury, death or property damage to the facilities being maintained, the SAPRF representative may, after reasonable attempt to notify the Contractor cause such action to be taken by the SAPRF work force. All costs of any such action shall be charged against the Contractor, or the SAPRF may deduct such cost from any amount due to Contractor from SAPRF. All complaints shall be abated as soon as possible after notification, to the satisfaction of the City of Santa Ana and/or SAPRF. If any complaint is not abated within a reasonable time, the SAPRF representative shall be notified immediately of the reason for not abating the complaint followed by a written report to the SAPRF representative within five (5) days. If the complaints are not abated within the time specified or to the satisfaction of the SAPRF representative , the SAPRF representative may correct the specific complaint and the total cost incurred by the SAPRF will be deducted and forfeit from the payments owing to the Contractor from the SAPRF. Such cost shall include all SAPRF staff time required to resolve the problem and appropriate overhead charges. 2.13 NOTIFICATION OF LOCATIONS OF WORK The Contractor shall notify the SAPRF representative when the contractor's crews will be working within the SAPRF. Said notifications will be made on a daily basis by telephone, cell phone, fax, or by weekly written schedules which specify the entire weeks work locations. 25A-60 ATTACHMENT 4 AGRONOMIC PLAN FERTILIZATION PROGRAM Priority Application dates Maintenance Description (unit of Material Units/Measure Turf measure) 1 January Fertilize turf-use CA Organic 7-1-2 Phyta Boost Plant Food 16#/1,000s.£ Phyta Boost Plant Food 7-1-2 (33c +700#'s/Ac) 2 April Fertilize priotity turf using one Lesco 39-0-0 I#N/1,000 s.f. pount nitrogen per 1,000 s.f. with Lesco 39-0-0 3 W/Annual Turf Renovate turf-use AG Organic- AG Organic 'Santa Ana' Seed 16#/1,000s.f. Renovation Organigro Seed Topdress+CA Topdress Mix Organic Phyta Boost Plant Food 7- 1-2 (33c +700#'s/Ac) 4 October Fertilize priotity turf using one Nitro King 19-4-4 1#N/1,000 s.f. pound nitrogen per 1,000 s.f. with Nitro Kin 19-4-4 Casual Application dates Maintenance Description (unit of Material Units/Measure Turf measure) 1 January CA Organic Phyta Boost Plant 7-1-2 Phyta Boost Plant Food 16#/1,000s.f. Food 7-1-2 (33c +700#'s/Ac) 2 July CA Organic Phyta Boost Plant 7-1-2 Phyta Boost Plant Food 16#/1,000s.£ Food 7-1-2 33c +700#'s/Ac) GC/S Application dates Maintenance Description (unit of Material Units/Measure measure I April Fertilize groundcover/shrub/color 8-3-6 Sanctuary Horticulture 12.5 areas using Santuary 8-3-6 Application (12.5#/1,000s.f.) Color Application dates 1 At color change Fertilization of seasonal color 19-6-12 Osmocote 25#/1,000s.f. 25A-61 ATTACHMENT 5 MAPS 25A-62 ATTACHMENT 6 City of Santa Ana Parks, Recreation, and Community Services Agency Policy for Driving on Park Property Purpose: The purpose of this document is to establish a policy for when it is appropriate for City employees, contractors, and other organization employees to drive on park turf, paved areas and other surfaces. Policy: Driving on park turf is allowed only when necessary to perform an official City maintenance or business function, and under the following circumstances: A. When delivering over 30 lbs. of equipment or supplies to a job site B. When there is no improved surface within 40 yards of the worksite C. When emergency personnel are responding to an emergency, or performing other City business When driving on park turf, employees and contractors must, to the best of their ability, avoid damage to sprinkler heads, valve boxes, other irrigation systems components, trees, ground cover and other park amenities. D. Vehicles weighing in excess of 8,000 lbs. are not allowed on park turf without prior approval of the Park Services Supervisor. If approved, the Park Services Supervisor or his designee will meet with the employee or contractor and designate the path in and out of the park that will be the least likely to cause damage. E. Employees and contractors must avoid driving on turf any time damage is likely. This includes periods after rain and heavy watering. F. Driving on designated DG pathways and other improved pathways is acceptable when performing visual inspection of park, park projects, and amenities. Driving on turf is not acceptable in these situations. 25A-63 EXHIBIT B CONTRACTOR'S PROPOSAL JUNE 6, 2013 25A-64 CITY OF SANTA-ANA REQUEST FOR PROPOSALS For Providing Park Landscape Maintenance Services In District 4 # 13-010 PRCSA PROPOSAL DUE: June, 6 2013 @ 4:00 PM SUBMITTED BY: I&BU LANDSCAPE 1027 E. ACACIA ST., ONTARIO, CA 91761 (800) 794-0063 FAX (909) 673-9192 www.aztecalandscape.com EXHIBIT B 25A-65 - go A 2-eYHCA LANDSCAPE CL #417003 June 6, 2013 City of Santa Ana 26 Civic Center Plaza Santa Ana, Ca 92701 Attn: Ron Ono, Administrative Manager RFP # 13-010 Dear Ron Ono, Please accept our proposal for RFP #13-010 PRCSA - For Providing Park Landscape Maintenance Service In District 4. We have carefully reviewed the Request for Proposal and the site locations. We are confident that we are qualified for the project. Our company has been in business since 1978, and we have approximately 25 landscape contracts in the counties of Los Angeles, San Bernardino, Riverside, Orange and Ventura, many of comparable size and service. A brief list of our current services include: landscape maintenance, large and small scale mowing services, turf renovation, irrigation adjustment and repair, pest control, and park janitorial services. We understand the terms and conditions of this project and are willing to enter into a contract with the City of Santa Ana. Sincerely, Noe Farias Vice-President/Secretary NF 1027 E. Acacia Street Ontario, California 91761 909-673-0889 800-794-0063 Fax: 909-673-9192 www.aztecalandscape.com 25A-66 Organization: The Company is structured as follows: President - Aurora Farias Vice-President - Finance - Rosa M. Lopez Vice-President-Operations (Account Manager - Ventura, Los Angeles County - South Agency Parks) - Noe Farias Account Managers • Juan P. Lopez - Beaches • Roberto Ramirez- Inland Empire • Raul Farias - Los Angeles Office Staff • Contract Administrator - Brian Eddy • Human Resources - Yesenia Ramirez • Accounting Clerk - Julia Vasquez • Administrative Assistant - Rebecca Hernandez For this project the hierarchy would be as follows: • Crew and Crew Leader, reporting to supervisor • The Vice-President-Operations (Noe Farias) • Management Team (Aurora Farias, Rosa Lopez, Noe Farias } 25A-67 Quality of Experience: Azteca provides a wide range of landscape maintenance services which include: • Large-scale mowing of parks and large turf areas • Complete landscape maintenance of parks including janitorial services • Maintenance of landscape maintenance districts, medians, parkways, and slopes • Full service pest control within the landscape • Full new landscaping installation • New irrigation installation • Irrigation system repair and troubleshooting • Complete maintenance of commercial properties and shopping centers • Weed abatement of small to medium sized lots • Trash removal and disposal • Fertilizer application to turf, shrubs, ground covers, and trees • Steam and high pressure washing of hardscape • Ground cover, shrubs, and tree planting • Baseball and softball field maintenance • Superior maintenance of high priority and highly visible areas • Landscape upgrades • Manual watering with the use of a water truck or trailer • Pond and lake maintenance and treatment Staff Experience: Our field staff is experienced in the many facets of city maintenance projects including public parks, medians, and parkways. This hands-on field experience coupled with the high standards set forth by our company's maintenance supervisors, foremen crew leaders, and administrative staff, assures a superior level of service and reliability. Aurora Farias, President: Ms. Farias' presidency began in 1998. Since that time, she has developed a team of highly qualified, competent personnel to help her achieve the company goals. Rosa M. Lopez, Vice-President/CFO: Ms. Lopez holds a bachelor's degree in Business Administration from Cal State Fullerton and a Master of Management from the University of Phoenix. Rosa has 20 years of experience in financial analysis and has worked in the landscape industry for over 16 years. She currently oversees all the accounting procedures, budgeting, bidding, and administration of the overall business. With her education and managerial background, she has developed new strategies to improve work performance and improve efficiency. Rosa is currently the Responsible Managing Officer for the company's C-27 contractor's license. Noe Farias VP-O erations/Secreta : Mr. Farias has a bachelor's degree in Business Administration from Cal Poly Pomona. Noe has certification in irrigation which consists of repair, install, audit, backflow testing, and smart water. Noe has been with the company since 2005. During that time, he has taken advantage of every learning opportunity within the business. Currently, his responsibilities include managing resources, filling a vacant position of Account Manager in Ventura, and implementing various best practices programs to improve efficiency and streamline costs. 25A-68 To Be Determined, Account Manager (Maintenance Supervisor): This person has not been identified to date. Marco A. Ortiz, QAL - Pesticide Technician: Mr. Ortiz has been with our company since 1996. He is responsible for all pesticide applications. He works closely with our pesticide vendor to train personnel and obtain recommendations. Further, Marco is responsible for initiating notices of intent, purchasing chemicals, complying with agriculture commissioner requirements, and any other duties related to pesticide applications. Mr. Ortiz holds a Pest Control Qualified Applicator License with categories ABCDF Brian Eddy, Contract Administrator/Safety Manager: Mr. Eddy has 20 years of combined experience in customer service and business management. Brian came to the company in 2008 in the capacity of Contract Administrator. Since then, he has completed a certificate program in Horticultural Science through the University of Riverside becoming a Certified Turfgrass Manager. Additionally, he is certified in irrigation design and installation through Hunter University. Further, he has taken on the responsibility of Safety Manager. His strengths in business management, customer service, and education have enabled him to successfully manage many of our field projects. Yesenia F. Ramirez. Human Resources Manager: Ms. Ramirez has been with our company since 1993 and currently manages all payroll, personnel, risk management, and workers compensation matters for the company. Yesenia holds an Associate of Science Degree in Business Administration from Mt. San Jacinto College and a human resources certification from Chaffey College. 25A-69 Implementation Plan Azteca Landscape would like to offer the following plan which details how our company will achieve and fulfill the expectations of this Request for Proposal for the Median Landscape Maintenance Service in the City of Santa Ana. In working on other projects of similar scope and size, we believe that we will meet the City's expectations. We propose the following. • Assigned staff members will report to the job site at 7:00 am and end their day at 3:30 pm, daily. The crew members will leave from a yard located in the City with all required equipment needed to perform their duties. • Those assigned to this project are: o (1) Manager (Noe Farias) will be on site to oversee the project. He will prepare work orders and proposal. He will meet with the city monitors and discuss any issues that might arise. o (1 ) Supervisor (Roberto Gorge) - will work forty (40) hours a week and will prepare reports, schedules, and manage day-to-day operations. Further, he will meet with the City Inspector to discuss work schedule, give recommendations, etc. o (3) Crew Leaders - will work forty (40) hours a week. They will be in charge of directing their two to four member crews, providing materials and supplies necessary to complete daily task in addition to performing maintenance tasks. o (2) Irrigation Technicians - will work forty (40) hours a week. These employees will inspect, troubleshoot, and repair irrigation systems. Furthermore, they will complete weekly and monthly reports. o (1) Pesticide Technician - will work eight (8) hours a month. He will perform all pre- emergent, pest, and rodent control. o (3) Mower Operators - will work forty (40) hours a week. This team will perform all mowing operations for the City. o (3) Maintenance Gardeners - will work forty (40) hours a week. These crews will perform all daily landscape maintenance tasks. All hours proposed are estimates. If unexpected events occur, additional hours will be added to meet the specifications. Equipment • (1) 72" Exmark mower • (1) 60" Exmark mower • (1) Jacobsen 12 foot reel mower • (1) Jacobsen 12 foot HR 9016 rotary mower • (3) Backpack blowers • (3) line trimmer 25A-70 • (3) hedge trimmer • (2) edger • (2) pole trimmer • (1) Shattertine Aerator • (1) Top Dresser • (1) Turf Slit Seeder If any piece of equipment is broken or damaged and cannot complete the day's work. A replacement will be given to the project temporarily until the machine is fixed. The down time on a piece of equipment is about one week. The machine is taken to our mechanic shop in Pomona California and there our mechanic will inspect the unit and fix any issue it might have. After, the unit is fixed it is then transported back to the project and put back into use. Trucks • (3) Chevy Colorados • (1) Chevy 1500 Silverados • (2) Chevy 3500 Silverados A vehicle that is broken or needs service will be taken care of by Azteca mobile mechanic. He will service and repair the truck at the project site. If the truck needs to be taken to our mechanic yard a temporary vehicle will be provided until the one assigned is brought back. Orientation First week • Potential employees fill out applications • Those most qualified are then interviewed by the supervisor (Roberto Gorge) and the manager (Noe Farlas) • Employees then watch all of Azteca Landscape safety/training videos. • Drivers also watch a driving with trailer video and take a physical test afterwards • The final day of week the employees are ready to be moved into the field Second week • The employees will be given powered equipment and trained • Employees will familiarize themselves with the project Retraining • Every three months evaluation are conducted • If needed retraining will be given to those that do not use the equipment properly 25A-71 0 Azteca Landscape has yearly training If an employee's quits or is let go the supervisor and manager will interview potential candidates and have them go through our orientation program which takes two weeks. Best Practices Azteca Landscape implements best practices. By adopting Best Practices enables us to provide the best Quality Control in the industry. We achieve this by training all of our employees. Our Supervisors are encouraged to mentor employees that he demonstrate the necessary tools to aspire to become a supervisor themselves. Our Irrigation Technicians also mentor their assistants who are interested in the trade. In-house training and mentoring program enables us to promote and provide qualified employees to new projects that might be awarded to us. A second practice that Azteca has in place is employee identification. Therefore, we have implemented a strict uniform policy. The uniform consists of a ball cap, shirt, and identification badge. All are imprinted with our company logo . Chemical usage - only on an as needed basis, and only by a trained applicator. If any hazardous chemical is required to be applied our Qualified Applicator will be present at the time of application or spraying the product himself. All chemicals will be applied with a backpack sprayer or by our truck mounted sprayer. The City will be provided with a 24-Notice of Intent followed by monthly reports of all pesticides applied . Azteca Landscape has an effective IIPP. Our Safety Administrator conducts on-site inspections, no less than once a month. Furthermore, he oversees all that all employees attend bi-weekly tailgate meeting and strictly enforces safety rules. Finally, Azteca supports road safety and follows the WATCH program. Our supervisors will strongly enforce a safe work environment for its employees on the road and monitor the sites to make sure that signs, cones, and arrow boards are present at all time while working in the streets. Equipment training programs are implemented for all new hires. Once a year for any other employees that handle powered equipment. New hires will be observed by the supervisor, after three month the supervisor will determine if employee is comfortable with the equipment. If any injury does occur the employee will be retrained and monitored. All paperwork will be completed by the supervisor and turned into the main office for keeping. Lastly, Azteca Landscape has established an effective management group. Our management team employees only supervisors that believe in providing quality control and have a high level of integrity and responsibility toward our customers for over 30 years. 25A-72 State Of California CONTRACTORS STATE LICENSE BOARD Connimmer ACTIVE LICENSE Affal rt .. ?...?.., 4.17003 E-, CORP aw...w . AZTECA LANDSCAPE Cxatcaeors, C27 r,...on.01/31/2015 www.cslb.ca.gov This license is nottransferrable, and shall be returned to the Registrar upon demand when suspended, revoked, or invalidated for any reason. This pocket card Is valid through the expiration data only. ff found, drop in any mailbox. Postage guaranteed by. Contractors State License Board p .°a. 2600. Sacramento CA 05826 Licensee Signature 25A-73 iRNIA DEPARTMENT OF PESTICIDE _ `- 100.14EET _- SA1FORNLA_ BI?iT -- PEST C NmL BUSINESS MAIN Mailing Address 1 I AKIO, CA 91761 ry 0 POST THIS LICENSE THIS LICENSE IS NOT TRANSFERABLE -A1 m LICENSE if insurance and/or qualified perso (isj apse be] P/V - o: 0A Y IN All LANDSCAPE, INC. ytty44 . ,,. p r, I V1 - '71 25A-74 DEPARTII[BNT OFP887ICm6RYGflI.ATION dpr QUALUMMAMICA,WRL1CEiM DATE W 159M Wm THROucm 00112012 12414013 GAL 102487 ABCDF MARCO A ORTIZ 4073 MENNES AVE RIVERSIDE CA 92609 SIONArtm n ?av+ftda.pgy«¦WWAmft.pgoWenap.eldduwawme o?Irone,aw,eeraar»rrooar,a?rln,?al aoa.rne»owao?w. r,aoawd ana?. & ?d ? mnbol wdo?raotwawiaarypnmtowippslorhr.fnw P? GdWyQNw*IbrMQPwowm .C ruN nwbodwmio&V npromgrtlYSolbrblueoWarpm & Isatp naruponfo*fa Lbwmwq A.PbddwNAkd+a61a4andkr?lolial y6AnlnalA9doubro CR. lMph q Ktb %Rdded aa?h D.PYMAQAdrlaa LMkadP?wanafen LFamd AquWc K .RoalGbnhol ??? d Q.AAakAnwBaNwnr 25A-75 Entomological Society of America Certification Corporation BOARD CERTIFIED ENTOMOLOGIST PROGRAM Lopez, Humberto Valid for the Year412 BCE #: 82483 Joined: 11/2/1998 SPecializing in (codes on back): V DEPARTMENTOPPESTICIDEREGULATION pr LICENSING/CERTIFICATION PROGRAM 1 4 AGRICULTURAL PEST CONTROL ADVISER LICENSE DATE OF ISSUE VALID THROUGH 01/0112013 PCA 74265 HUMBERTO M LOPEZ 56 REDROCK LN PHILLIPS RANCH CA 91766 low. 12/31/2014 ABCDE DEPARTMENT OF PESTICIDE REGULATION CLICENSING/CERTIFICATION PROGRAM i QUALIFIED APPLICATOR LICENSE International ! DATE OF ISSUE VALID THROUGH Society 01101/2013 12/3112014 of Arboriculture ! QAL 103853 B i HUMBERTO M LOPEZ 56 REDROCK LN CERTIFIED ARBORIET j; PHILLIPS RANCH CA 91766 ,i nber?o M. Lopez MIMI certificate Number: WE=8545A i. / E iration Date: Dec 31, 201d >? 2Of2 C?{embe~t Humberto Lopez 186119 t structural `Vest Control icard r -- 4 _ r-, nay ? 2005 EVERGREEN STREET. SUITE ]500 I SACRAMENTO, CA 958.15-3831 14161 561- 6704 Q„ FIELD REP13ESENTATIVE I + tiCENSE NO. FR 16765GeReW St EXPIRATION 06/30/14 HUMBERTO MANUEL LOPEZ 12903 SUNDOWN LANE CHINO HILLS CA 91709 Signnure RECEIPT NO. 11650006 L` t 25A-76 Gertmed Irrigator Repair Technician fiIOR ?Titli Aztimi L W, .l EApitles 103/1.3 Irrigator Technical Trains School Ph" (866) "755 www. tom Certified Backflow Too - illoe: ,erica Azk".i AM- V.- el [60kw4 $/16 irrigator TecfiNpi Training SOW Phi>ne (Bbi9-?7' ++?1w,fni?t4tsidhc?an? frfio??wvm i 1 i i Certified Irrigation Installer Noefades # 8380 AX" Landscape Expires 04/11/14 Irrigator Technical Training School - Phone (866) 6141755 www.iriigatortechmm info®imgatDtech.com Cettifled Irrigation Auditor Noe aFatias Asteci Landscape Wines 3/2/14 Irrigator Technical Trainirn}pg.? School Phons.'(860):61?M1785 www.irrlgaWfteM,caom into@lrrigatotech.com . Smart Water iCerdf! 25A-77 ftcias &&.w LaodiAi E4 IM 03 14 Irrigator TediMcill Training PfWne (866).614 www infgatorLCh. info . Wrrlgatol ech.ooM p¦o 7m? • PON 0 - i ?Z) 0 r^ W f pmq r? I y s.. 4 0 ti is w ? a . o ? o 0 PEN U A4 U U h y C(f •ti U U F z w w z H a ?Ij w p .u a 0 N z 0 I u D Z Cn j O ? F y N Q1 > ? v g z z J V 0 x Z ce r RFP No. 13-010 Addendum No. 2 Page 1 of 1 June 4, 2013 ADDENDUM NO.2 REQUEST FOR PROPOSAL FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES FOR DISTRICT 4 RFP REFERENCE NO: 13-010 DATE DUE: JUNE 6, 2013, 4:00p.m. Notice is hereby given that the City of Santa Ana, Parks, Recreation and Community Services Agency has made certain modifications, additions, and/or deletions, in the specifications to RFP NO: 13-OIOFOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES FOR DISTRICT 4. This addendum shall become a part of the original Request for Proposal due by 4:00 p.m. on June 6, 2013. This RFP addendum provides clarifications to specific sections and answers to questions received at and subsequent to the pre-proposal conference conducted on May 23, 2013. Section Specific Clarification / General Questions & Answers In an effort to foster the best possible response to the RFP, specific sections have been modified to clarify language by adding or deleting specific text. Added text is underlined (i.e., add and deleted text is striked-through (i.e., delete). Specific sections are as follows: CORRECTION: Addendum 1, Q31-10 TONS Q31: Can you please provide the quantity of warning track mix you will require per field or per year for all of the fields in District 4? A: 1) Section 4.1 of Attachment No. I (on page 30) states, 4.1 Field In General 4. 1.1 When adding field composition mix (brickdust) to any City of Santa Ana ball field, the specific type of material to be used is: ''/a" of new Stabilizer Solutions Stabilizer Warning Track Mix (with stabilizer). A minimum of 6-5 10 TONS OF MATERIAL per warning track. New 1) The correction on Exhibit C deletes "Aamal Cost" and adds "11 Elhibit C: month Cost" for each column heading for each location. Certification and Cost 2) In addition, under "Specialized Services" please see new line 9, Proposal requiring "Renovation Cost Mr Acre". Renovation cost should not be included in the General Maintenance annual cost. The revised Exhibit C is attached. Should you have any question, or require additional information, you may reach Ron Ono by email at rono(a)santa-ana.org or voicemail at 714.571.4220. 25A-79 EXHIBIT D CITY OF SANTA ANA REQUEST FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES IN DISTRICT 4 REFERENCES List and describe fully the contracts performed by your firm which demonstrate your ability to provide the supplies, equipment or services included in the scope of the proposal specifications. Attach additional pages if required. The City reserves the right to contact each of the references listed for additional information regarding your firm's qualifications. Reference CustomerNamer-ity of Thousand Oaks Address: 1993 Rancho Conejo Blvd Newberry Park, CA 91319 Contract Amount: 9 6 9, 0 5 4. 6 0 Contact Individual: Sandie McKnight Phone Number: 805-449-2499 Facsimile Number: 805-498-4941 Year: 2008-2013 Description of supplies, equipment, or services provided: Landscape maintenance of median & parkways Reference Customer Name:City of Long Beach Address: 2760 Studebaker Long Beach, CA 90812 Contract Amount: 1, 64 7, 219 .12 Description of supplies, equipment, or services provided: Year: 2008-2013 Landscape maintenance fore medians. parkways, and parks Reference Customer Name:City of Rialto Address:150 South Palm Ave Rialto, CA 92376 Contract Amount: 4 58 , 02 0 .4 4 Contact Individual: Sam S. Phone Number: 909-820-2525 Facsimile Number: 909-820-2698 Year: 2007-2013 Description of supplies, equipment, or services provided: LMD and grounds landscape maintenance and park mowing THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. District 4 Park Landscape RFP Page 62 Contact Individual: Ramon Arevalo Phone Number: 562-570-1535 Facsimile Number: 562-570-1535 25A-80 EXHIBIT E CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES IN DISTRICT 4 PROPOSER'S STATEMENT Proposer understands and agrees that this written RFP (or any part thereof specifically designated and accepted by the City of Santa Ana, hereinafter City) shall constitute the entire agreement between proposer and the City only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Executive Director or his duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to proposer or deposited with the United States Postal Service properly addressed to the proposer with the correct postage affixed thereto. Proposer further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish City all required bonds and certificate of liability insurance within ten (10) days (excluding Saturdays, Sundays and City's legal holidays), or the funds, check, draft, or proposer's bond substituted in lieu thereof accompanying this proposal shall become the property of the City and shall be considered as payment of damages due to the delay and other causes suffered by City because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered by City is difficult to ascertain: otherwise said funds, check drafts, or proposer's bond substituted in lieu thereof shall be returned to the undersigned. Proposer understands that a proposal is required for the entire work, that the estimated quantities set forth in the RFP schedule are solely for the purpose of comparing proposals, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. All terms contained in the specifications, the certification of nondiscrimination by contractors, and the required insurance certificates are to be incorporated by reference into this agreement and are made specifically as part of this RFP. Firm Azteca Landscape Signed and Printed Name: Noe Farias A4,ftto Title Secretary Date 6/6/13 THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. District 4 Park Landscape RFP Page 63 25A-81 EXHIBIT F CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES IN DISTRICT 4 CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows: The contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The contractor shall send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further government contracts or federally assisted construction/services contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965,and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. The contractor shall include the portion of the sentence immediately preceding paragraph 1 and the provisions of paragraphs 1 through 7 in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the contractor becomes involved in, or is threatened with, litigation by a subcontractor or vendor as a result of such direction by the administering agency, the contractor may request that the United States enter Into such litigation to protect the interests of the United District 4 Park Landscape RFP Page 64 25A-82 States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1039, and as amended, no discrimination shall be made in the employment of persons because of race, religious creed, color national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor violating this section is subject to all the penalties imposed for a violation of the chapter. Firm Azteca Landscape Signed and Printed Name:Noe Farias Title Secretary Date 6/6/13 THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. District 4 Park Landscape RFP Page 65 25A-83 EXHIBIT G CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES IN DISTRICT 4 RESPONSIBLE PROPOSER - SUPPLEMENTAL QUESTIONNAIRE 1. How many years has your organization been in business in California as a contractor under your present business name and license number? Name 18y ears License 32 years If you performed same business under a different business name with same ownership and operation management and changed name due to, but not limited to, bankruptcy, loss, or license, please complete an additional and separate questionnaire. 2. What is your firm's average gross revenue for the last three years? $8 million 3. Is your firm currently the debtor in a bankruptcy case? ? Yes x? No If "yes," indicate the case number, bankruptcy court, and the date on which the petition was filed. Case Number Bankruptcy Court Date Filed 4. Was your firm in bankruptcy any time during the last five years? (This question refers only to a bankruptcy action that was not described in answer to Question 2, above.) ? Yes El No If "yes," indicate the case number, bankruptcy court, and the date on which the petition was filed. Case Number Bankruptcy Court Date Filed 5. Has any California State License Board license held by your firm or its responsible managing employee or responsible managing officer been suspended within the last five years? ? Yes ® No 6. At any time in the last five years, has your firm been assessed and paid liquidated damages after completion of a project, under a services contract with either a public or private owner? Yes ?x No 7. Has your firm ever defaulted on a contract? ? Yes ?x No If "yes," explain on a separate page. 8. In the last five years has your firm, or any firm with which any of your company's owners, officers or partners was associated, been debarred, disqualified, removed, or otherwise prevented from bidding on, or completing, any government agency project for any reason? ? Yes ® No If "yes," explain on a separate page. State the name of the organization debarred, the year of the event, the owner of the project, and the basis for the action. 9. In the past five years, has any claim against your firm concerning your firm's work on a project, been filed in court or arbitration? ? Yes Mx No If "yes," on a separate page identify the claim(s) by providing the project name, date of the claim, name of District 4 Park Landscape RFP Page 66 25A-84 the claimant, the name of the entity the claim was filed against, a brief description of the nature of the claim, the court and case number, and a brief description of the status of the claim (pending or, if resolved, a brief description of the resolution.) 10. In the past five years, has your firm made any claim against a project owner concerning work on a project or payment for a contract, and filed that claim in court or arbitration? ? Yes ?x No If "yes," on a separate page identify the claim(s) by providing the project name, date of the claim, name of the claimant, the name of the entity the claim was filed against, a brief description of the nature of the claim, the court and case number, and a brief description of the status of the claim (pending or, if resolved, a brief description of the resolution.) 11. At any time during the past five years, has any surety company made any payments on your firm's behalf as a result of a default, to satisfy any claims made against a performance or payment bond issued on your firm's behalf in connection with a project, either public or private? ? Yes ?x No 12. In the last five years, has any insurance carrier, for any form of insurance, refused to renew the insurance policy for your firm? ?x Yes ? No 13. Has your firm or any of its owners, officers, or partners ever been liable in a civil suit, or found guilty in a criminal action, for making any false claim or material misrepresentation to any public agency or entity? ? Yes ? No 14. Has your firm or any of its owners, officers or partners ever been convicted of a federal or state crime of fraud, theft, or any other act of dishonesty? ? Yes ? No If "yes," identify on a separate page, the person or persons convicted, the court case and number, the crimes and the year convicted. 15. If your firm was required to pay a premium of more than one percent for a performance and payment bond on any project(s) on which your firm worked at any time during the last three years, state the percentage that your firm was required to pay. You may provide an explanation for a percentage rate higher than one percent, if you wish to do so. % 16. During the last five years, has your firm ever been denied bond credit by a surety company, or has there ever been a period of time when your firm had no surety bond in place during a project when one was required? ? Yes x? No 17. Has Cal-OSHA cited and assessed penalties against the contractor or its associates for any "serious," "willful" or "repeat" violations of its safety or health regulations in the past five years? ? Yes 0 No (Note: If you have filed an appeal of a citation, and the Occupational Safety and Health Appeals Board has not yet ruled on your appeal, you need not include information about it.) If "yes," on a separate page describe the citations, the party against whom the citation was made, date of citation, nature of the violation, project on which the citation was issued, owner of the project, and the amount of penalty paid, if any. State the case number and the date of any OSHAB decision. 18. Has the Federal Occupational Safety and Health Administration cited and assessed penalties against the contractor or its associates in the past five years? ? Yes ® No (Note: If an appeal of the citation has been filed and the Appeals Board has not yet ruled, or there is a court appeal pending, you need not include information about the citation.) District 4 Park Landscape RFP Page 67 25A-85 If "yes," on a separate page describe the citation, the party against whom the citation was made, date of citation, nature of the violation, project on which the citation was issued, owner of project, and the amount of penalty paid, if any. State the case number and date of any decision. 19. During the last five years, has there been more than one occasion in which the General contractor or its associates have been penalized or required to pay back wages for failure to comply with the federal Davis-Bacon prevailing wage requirements? ? Yes ? No If "yes," on a separate page, describe the violator, nature of each violation, name of the project, date of its completion, the public agency for which it was constructed, the number of employees who were initially underpaid and the amount of back wages and penalties that were assessed. THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. District 4 Park Landscape RFP Page 68 25A-86 EXHIBIT H CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES IN DISTRICT 4 NONCOLLUSION AFFIDAVIT NON-COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) To the CITY OF SANTA ANA In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the proposer declares that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from bidding; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham proposal. Note: The above noncollusion affidavit is part of the proposal. Signing this proposal on the signature portion thereof shall also constitute signature of this noncollusion affidavit. Proposers are cautioned that making a false certification may subject the certifier to criminal prosecution. Signed State of California, County of San Bernardino Subscribed and sworn to (or affirmed) before me on this 04 day of June , 2013 , by Yesenia Farias Ramirez, proved tome on the basis of satisfactory evidence to be the person(s) who appeared before me. I! U- VESINIA WIN W=- COMM. #193b935 0 Notary Public • California San Bernardino County Lamm. Expires June 13, 2016 Notary Public Seal THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. District 4 Park Landscape RFP Page 69 25A-87 THE AMERICAN INSTITUTE OF ARCHITECTS l I A!A DocumentA310 Bid Bond Bond Number: AZTLA-18 KNOW ALL MEN BY THESE PRESENTS. that we Azteca Landscape 1027 E. Acacia Street Ontario , CA 91761 as Principal, hereinafter called the Principal. and The Ohio Casualty Insurance Company 790 The City Drive South, Suite 200 Orange , CA 92868 a corporation duly organized under the laws of the State of New Hampshire as Surety, hereinafter called the Surety, are held and finely bound unto City of Santa Ana 26 Civic Center Plaza, Santa Ana, CA 92701 as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount Bid Dollars ($ 5% of Amount Bid for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for: Providing Park Landscape Maintenance Services in District 4 - RFP13-010 PRCSA NOW, WHEREFORE, if the Obligee shalt accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, If the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 3rd day of June, 2013 (ter Ss) Azteca Landscape 741 (Principal) (Seat) SeGr?. ry " (Title) The Ohio Casualty I0Mxaace_CQmQWy (witness) AIA DOCUMENT A310 • BID BOND • AIA S • FEBRUARY 1970 ED • THE AMERICAN INSTITIrrE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON. D.C. 20006 1 Ayala 25A-88 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT STATE OF CALIFORNIA County of Riverside On 6/3/13 before me, Andrew Waterbury. Notary Public Date Here Insert Name and Title of the Officer personally appeared Arturo Ayala Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(g) whose name(* is/ate subscribed to the within instrument and acknowledged to me that hehOw t ey executed the same in hisftn R*kr authorized capacity(iei), and that by his/bexfAnk signature(s) on the instrument the person(s), or the entity upon behalf of which the person(a) acted, executed the instrument. ANpM W WAI! 141111i7 4 s?• ccihsm trliiht 7fi2 I certify under PENALTY OF PERJURY under the laws of 11 ?3:? Nt,t,,r1 I'tt' °tt c:. itt°rr , rr the State of California that the foregoing paragraph is true 0i1AW.i cltuNly and correct. I xper.r. Dcc 31. 201`i 2 Witness my han nd cial s Signature Place Notary Seal Above Sig re of Notary Public Andrew waterb OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Bid Bond Document Date: 6/3/13 Number of Pages: One Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Arturo Ayala ? Individual ? Corporate Officer - Title(s): ? Partner --- ? Limited ? General 64 Attorney in Fact ? Trustee M 9:1:1 ? Guardian or Conservator Top of thumb here ? Other: Signer Is Representing: Signer's Name: ? Individual ? Corporate Officer - Title(s): ? Partner - ? Limited ? General ? Attorney in Fact ? Trustee OF SIGNER ? Guardian or Conservator I Top of th-u-m-blh-ere7 ? Other: Signer Is Representing: ® 2007 National Notary Association • 9350 De Soto Ave., P.O. Box 2402 • Chatsworth, CA 91313-2402 • www.NationalNotary.org Item 115907 Reorder: Call Toll-Free 1-800-876-8827 25A-89 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 5903217 American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the lows of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the 'Companies'), pursuant to and by authority herein set forth, does hereby name, constitute Daniel Huckaba Arturo Ayala Dwight Reilly Andrew Waterbury i d t , , , an n appo , all of the city of Orange slate of CA each individually if there be more than one named, its true and lawful altomey-inn-fact to make, execute, seat, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duty signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 191h day of December 1 2012 American Fire and Casualty Company = The Ohio Casualty Insurance Company Liberly Mutual Insurance Company 0 " West American Insurance Company 3 y O = 0a By: p C STATE OF WASHINGTON ss Gregory .Davenport, Assistant Secretary C s E M COUNTY OF KING A C On this 19th day of December 2012 , before me personally appeared Gregory W. Davenport, who acknowledged himself to be the Assistant Secretary of American to FO- v 0 2 Fire and Casualty Company, Liberty fuhltuat Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, f fn j . execute the oregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. O > n IN WITNESS WHEREOF, t have hereunto subscribed my name and affixed my notarial seal at Seattle, Washington, on the day and year first above written. `O a ?; aM C W By: NULL ?f 6.4 ? E KD Riley, Not44 Public - 0 c OE This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of American Fire and Casually Company, The Ohio Casualty Insurance to o y Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as folbws: O 7fy .a L ARTICLE IV-OFFICERS- Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject "o'i O C a; to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, 7 C acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seed of the Corporation. When so '- m E executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact under > -0 the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. _ 4D ARTICLE Xttt - Execution of Contracts - SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, 100 i and subject to such limitations as the chairman or the president may prescribe, shalt appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, Ij 3 seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in thatr = t1Q Z 0 respective powersof attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so o executed such instruments shall be as binding as if signed by the president and attested by the secretary. O V- v Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Gregory W. Davenport, Assistant Secretary to appoint such ~ ahomeys-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deNuer as surety any and all undertakings, bonds, recogndzances and other surety obligaltons. Authorization - By unanimous consent of the Companes Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, David M. Carey, the undersigned, Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and oorrectcopy of the PowerofAttomey executed by said Companies. is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 3rd day of June 20 13 By: David M. Carey, Assistant Secretary LMS_ 12873092012 IAA-an 21 of 251 State of California County of San Bernardino On June 4. 2013 before me, Yesenia Farias Ramirez, Notary Publi (Insert name and title of the officer) personally appeared Noe Farias----------- who proved to me on the basis of satisfactory evidence to be the p son(`?whose name is e scribed to the within instrument and aclrnowlVier/their to me thaL:J-he/they executed the same in is er/their authorized capacity(y?s , and that by signature0} on the instrument the person(, or the entity upon behalf of which the person( acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS r Signature r.?? . rES MfA FAR A? RARII EI • k `? COMM. 01936935 er V1MvCWdLW M ary fthe - California o <. San Bernardino County rces .Iunet3.201s (Seal) Description of Attached Document Title or Type of Document: Bid Bond Document Date: June 3, 2013 Number of Pages: Signer Other Than Named Above: Arturo Ayala Capacitiy(ies) Claimed by Signer Signers Name: Individual x Corporate Officer (Title): Secretary Partner _ Limited _ General Attorney-in-Fact Trustee Guardian or Conservator Other: Signer is Representing: Azteca Landscape 3 25A-91 RFP No. 13-010 Addendum No. 1 Page 1 of 6 May 31, 2013 ADDENDUM NO.1 REQUEST FOR PROPOSAL FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES FOR DISTRICT 4 RFP REFERENCE NO: 13-010 DATE DUE: JUNE 6, 2013, 4:OOp.m. Notice is hereby given that the City of Santa Ana, Parks, Recreation and Community Services Agency has made certain modifications, additions, and/or deletions, in the specifications to RFP NO: 13-OIOFOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES FOR DISTRICT 4. This addendum shall become a part of the original Request for Proposal due by 4:00 p.m. on June 6, 2013. This RFP addendum provides clarifications to specific sections and answers to questions received at and subsequent to the pre-proposal conference conducted on May 23, 2013. Section Specific Clarification In an effort to foster the best possible response to the RFP, specific sections have been modified to clarify language by adding or deleting specific text. Added text is underlined (i.e., ad) and deleted text is striked-through (i.e., delete). Specific sections are as follows: 1) Section 4.1 of Attachment No. 1 (on page 30) states, 4.1 Field In General 4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana ball field, the specific type of material to be used is: '/z" of new Stabilizer Solutions Stabilizer Warning Track Mix (with stabilizer). Use a minimum of 65 tons per warnin track. 2) 7.5 General Brickdust Skinned Infield Areas & Warning rack 7.5.1 After raking/shoveling loose material from high spots back into low spots/worn areas on running paths, sliding zones, and any other low spots/worn areas appearing on the field, the Contractor shall fill all remaining low spots with new Stabilizer Solutions Stabilizer Gold Infield Mix (with stabilizer) and Stabilizer Solutions Stabilizer Warning Track Mix on warning tracks from stock and make level. 7.5.2 The contractor shall clean all excess brickdust beneath or next to the backstop, dugout chain link fencing, outfield fencing and/or infield chain link fence lines so that the infield brickdust is level with the dugout pavement and pavement outside the infield. 25A-92 RFP No. 13-010 Addendum No. Page 2of6 New Disease Centennial Park Eucalyptus Trees have been diagnosed with Lerp Psyllid Info: and Tortoise Beetle. The cost to treat this forest represents a significant cost therefore the City elects to waive the pest and disease treatment for these Eucalyptus trees. The City will treat the Eucalyptus trees outside the scope of this agreement. Contractor does not have to treat these Eucalyptus trees as part of base agreement. However, importantly, the tree specification remains in force for all other trees within the scope of the agreement. General Questions & Answers Q1: Is the contract for a year or 19 months? A: The City is trying to change the landscaping services cycle and move contract negotiations to February. The contract is really for 18 months with four one year extensions. Q2: How many renovations, two? A: Potentially two renovations within the first 18 month period (see 2013-2014 Sport/Priority Turf Renovation Schedule). Then one renovation during each one year extension. Note that the contractor should refer to the Renovation Schedule for any "short" term closures at which time the contractor will continue applying the appropriate seed at the rate of one pound per thousand square feet. Q3: What is the turf seed specified? A: Primary sport turf is Bermuda. Stovers Bermuda Dunes Improved Common Bermuda seed is specified for warm season months and Stovers Grand Slam Perennial Rye seed is specified for cool season months. Q4: What will the formal proposal require for original and copies? A: Original (1), Copies (6), and CD-ROM/DVD (1) or Flash Drive, PDF format Q5: Must Irrigation Technician have certification qualification prior to bid? A: No, however City will only allow 6 months to reach certification. Irrigation Technician must be available on-site for locations and perform all work related to the irrigation system, including but not limited to: weekly/monthly inspections and report writing; programming of irrigation systems; repairs to lateral irrigation lines and heads; and, repairs to all other parts of the irrigation system. If contractor fails to employ a qualified Irrigation Technician within the 6 month grace period they must hire a qualified irrigation technician sub-contractor through available list. 2 25A-93 RFP No. 13-010 Addendum No. Page 3 of 6 Q6: Is the winner always lowest bidder? A: No, it is the most responsible and responsive bidder. Q7: How do you calculate deductions for non-performance? A: The bidder proposal extra work dollar figures are used to deduct failure to perform based upon the Director's Representatives professional opinion on the amount of time necessary to perform the failed work plus materials and any equipment costs. Q8: This RFP looks different from previous year for mowing and re- seeding? A: This particular specification has been reduced in scope in several areas of the specification. Contractors should read the specifications carefully to understand the new overall scope of work. The mowing specification remains the same with exception of the equipment required to perform the mowing. The seed variety and frequency is the same. Qg: Must we use pre-mixed fertilizer? A: No, however the formula by our vendors is specifically mixed for Santa Ana. The Contractor could, if they choose, mix the fertilizer with the compost themselves in the presence of the Director's Representative. Q10: What is the renovation schedule for Adams Park? A: Adams Park sport turf renovation is scheduled to begin on Monday, June 24th. The current contractor will stay with this schedule due to the short window to renovate this field (between the end of Little League Season and the beginning of Pop Warner Football season). Regretfully there will be some overlap between the existing agreement term and the new agreement tern that is proposed to start August 1, 2013. However, it cannot be avoided. Q11: When we put down mulch, do we have to give a sample to you? A: The City retains right to test any soil or material used by contractor. Q12: How long does contractor have to provide an Irrigation Technician? A: Six months from the beginning of the agreement. At which time if the contractor does not have a qualified Irrigation Technician they must sub- contract with a qualified Irrigation Technician. Q13: What is minimum or maximum fencing to meet the fencing requirement if need be, how often is it generally needed? A: Use Google Earth to measure facilities. Past practice has been to run the temporary fencing along the boundaries of the turf being renovated. The 25A-94 RFP No. 13-010 Addendum No. 1 Page 4 of 6 City agrees to pay 50% of the contractor's price (not retail and no mark-ups) to rent the fence. In addition, the City retains the right to contact rental fence companies to get the best price possible. Q14: What about aeration? A: The specification calls for the aeration of the turf four times per year. This is being changed to aeration of the casual turf two times per year and the sport/priority turf four times per year. Q15: What is the compaction relief? A: Compacted soil occurs by people or equipment in higher than average use areas, such as but not limited to sport fields. The Director's Representative may direct the contractor to perform multiple passes with the aerator in heavier than normal compacted areas. Q16: What if fields do not germinate? A: Contractor is responsible for 100% germination within the scheduled renovation period. If the contractor fails to achieve 100% germination within two weeks of the end of the scheduled renovation period then the Director's Representative will direct the contractor to sod the poorly germinated areas using thick cut sod at the contractors expense. Q17: Overseeding, can you explain? A: The contractor is required to follow the specification; this includes overseeding for annual renovation and the monthly overseeding. Q18: Must rental fencing be in place from the beginning to the end of the renovation period? A: Yes. Q19: Mulching, two (2) times per year? A: Yes, two (2) times; used to be 4. Q20: Removal of mulch, how often? A: Mulch no longer needs to be completely removed; however the new mulch must cover the entire area to achieve a consistent appearance of complete coverage. Q21: Tree care expertise? A: The contractor must retain a Certified Arborist to inspect and manage trees. Q22: What are agricultural pests? A: Gophers, moles, voles, rats, rabbits, squirrels, etc. are agricultural pests. 4 25A-95 RFP No. 13-010 Addendum No. 1 Page 5 of 6 Q23: What are the expectations on pressure washing? A: The contractor shall use the appropriate pressure/hot water washing equipment to remove all stains and foreign materials to achieve a clean pavement around community centers and to the parking lot. Q24: For waste water capture, what do you require? A: National Pollutant Discharge Elimination System (NPDES) requires that no runoff enter the storm drain system. This should not be a major concern since most of the work occurs inside the park. Q25: What is priority hardscape? A: Tennis and basketball courts are separate. Around building concession and picnic shelters. Q26: Is there any specific value for equipment inspections? A: The City's focus is on work performed, and not on the maintenance of the equipment. Note however if the equipment is not providing a quality result the contractor will be asked to begin providing a quality result to avoid any failures to perform. Q27: If vendor currently has a contract for another City landscaping District, will the vendor have to give that up if awarded District 4? A: Yes. Q28: When adding field composition mix to ball diamond warning tracks the specified type of material to be used is: Stabilizer Solutions Stabilizer Warning Track Mix. Why different composition mix for the ball diamonds? A: Infield mix is different than Warning Track mix for a reason. The Warning Track mix is designed to "warn" the athlete that they are approaching the home run fence. The product normally has a "crunch" to it so that the athlete not only feels the material but may even hear it beneath him. Q29: Are there any expected annual color in District 4? A: No. Q30: Can you explain how the fields renovated may change from year to year? A: All fields will be renovated each year. The "schedule" of when the renovation occurs may change year to year. 25A-96 RFP No. 13-010 Addendum No. 1 Page 6 of 6 Q31: Can you please provide the quantity of warning track mix you will require per field or per year for all of the fields in District 4? A: 1) Section 4.1 of Attachment No. 1 (on page 30) states, 4.1 Field In General 4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana ball field, the specific type of material to be used is: %2" of new Stabilizer Solutions Stabilizer Warning Track Mix (with stabilizer). A minimum of 65 tons per warning track. Should you have any question, or require additional information, you may reach Ron Ono by email at rono ,santa-ana.org or voicemail at 714.571.4220. $47 3 6 25A-97 EXHIBIT C FEE SCHEDULE 25A-98 EXHIBIT C CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR PROVIDING PARK LANDSCAPE MAINTENANCE SERVICES IN DISTRICT 4 PROPOSERS CERTIFICATION AND COST PROPOSAL Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services (Exhibit A) and am familiar with the scope of work locations. I am familiar with all the existing conditions and limitation that may impact work requests. I understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposal Item Price - Provide costs for maintaining each of the locations and service categories listed below at the level of quality described in the detailed specifications (Exhibit A and all attachments). Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel. Any special materials will be purchased by the contractor only after discussed and authorized by the City projects manager or designee in writing. Location 18 month Cost Routine Maintenance 18 month Cost Ball Diamond Maintenance Total 18 month Cost 1 Adams 97, 10 440.00 07 440.00 2 Bear St. bike trail b/w Segerstrom and MacArthur 40 000.00 0.00 40 000.00 3 Centennial 20 000.00 23 832.00 143,832.00 4 City Yard 11 000.00 00 11, 000.00 5 Friendship 80,000.00 0.00 so I OQO. 00 6 Gertrude/St. Andrew Bike b/w Forest & Rene 33 000.00 0-00 33,000.00 7 Greenville bike trail b/w Warner and S rstrom 32, QOO , 00 0.00 32 000.00 8 Heritage 90,00 0 7 110.0 0 7 110.0 0 9 Jerome LQ1.,722,06 38 556.00 140.27?&6 10 MacArthur bike trail entrance 25,000.00 0.00 25,000.00 11 McFadden Center 38,000.00 0.00 0 12 McFadden Triangle Park - 37,000,00 0.00 37f000-00 13 Raitt St. bike trail b/w Segerstom and Alton 35 000.00 0.00 35,000 00 14 Santa Anita 78,000.00 0.00 . 78, 15 Thornton 115 000.0 55 080.00 170 080.00 16 Windsor 95 000.00 12 .00 107,186.00 Total All Locations 1 174, 926 . 06 sPEC iALIZED SERWCES Hourly wage 1 Landscape Maintenance Worker 25 2 Landscape Lead Worker 35 3 Tree Trimmer 35 District 4 Park Landscape RFP Dane 60 EX12IW-?8 4 Lead Tree Trimmer 45 5 Irrigation Assistant 35 6 Irrigation Spedaliest (as specified) 45 7 Pesticide Assistant Operator 45 8 QAC Pesticide Operator 65 9 RfbjNQWION COST PER ACRE 84 *** RENOVATION COST SHOULD NOT BE INCLUDED IN THE GENERAL MAINTENANCE ANNUAL COST. Azteca Landscape 909-673--0889/909-673_9192 LEGAL NAME OF COMPANY PHONE AND FAX NUMBERS 1027 E. Acacia Street Ontario CA 91761 BUSINESS ADDRESS Noe Farias Secretary PR D NA OF AUTHORIZED AGENT TITLE - 06/06/13 noe@aztecalandscar)e.com 95-367580 C-27 417003 FEDERAL ID NUMBER (IF APPLICABLE) CONTRACTOR LICENSE NUMBER (IF APPLICABLE) sum District 4 Paris Landscape RFP Pape 61 EAvtSWrlq)o