HomeMy WebLinkAboutCORRESPONDENCE - 75AMitre-Ramirez, Norma
From: Huizar, Maria
Sent: Monday, September 16, 2013 11:58 AM
To: Trevino, Jay; Sonia R. Carvalho - SA Office ; O'Rourke, Kevin
Cc: Kurita, Debbie; Mitre-Ramirez, Norma (NMitre-Ramirez@santa-ana.org); Norma Orozco;
Trujillo, Rose Ann
Subject: AGENDA ITEM 75A - 250 N. Golden Circle & 1901 E 1 st Street
Communication received on Agenda item 75A that will be entered into the record
From: Magallon, Becky
Sent: Monday, September 16, 2013 10:10 AM
To: Huizar, Maria
Subject: FW: 250 N. Golden Circle & 1901 E 1st Street
Communication regarding an agenda item.
Becky
.--? From: Dereck Blackman jmaiIto: dereck.@blackmanlawyers. com]
Sent: Friday, September 13, 2013 4:35 PM
To: Tinajero, Sal; Pulido, Miguel; Amezcua, Angelica; Benavides, David; Martinez, Michele; Reyna, Roman;
Sarmiento, Vince; Fregoso, Vince
Subject: 250 N. Golden Circle & 1901 E 1st Street
Dear Mayor and Council Members:
Please put in an CMU (Concrete Masonry Unit) for our protection with the difference in elevation between the two
properties (250 N. Golden Circle & 1901 E 1st Street).
Thank you."
Dereck Blackman
Office Manager
THE BLACKMAN LAW FIRM
250 North Golden Circle Drive
Suite 110
Santa Ana, CA 92705
714-569-3000
Fax:714-569-3001
CM 09/16/13
Public Correspondence.
75A
Mitre-Ramirez, Norma
From: Huizar, Maria
Sent: Monday, September 16, 2013 1:56 PM
To: Trevino, Jay; Carvalho, Sonia R.; O'Rourke, Kevin
Cc: Kurita, Debbie; Mitre-Ramirez, Norma; Orozco, Norma; Trujillo, Rose Ann
Subject: AGENDA ITEM 75A - Amendment to development agreement
Attachments: Amendment to development agrreent.pdf
The following communication has been received on Agenda Item 75A for your consideration.
-- From: jackie kim [mailto:jbd9306(abyahoo coml
Sent: Friday, September 13, 2013 1:01 PM
To: mpulidoCcbsanta-na.org; stinaj_ero(absanta-ang.org; Amezcua, Angelica; Benavides, David; Martinez, Michele;
Reyna, Roman; Sarmiento, Vince
Subject: Fw: Amendment to development agreement
Hello
Amendment to development agreement No. 2007-01....
Daniel Oh property Manager of SA Plaza LLC city of Santa Ana, Ca.
Attached is the Amendment to development agreement
----- Forwarded Message -----
From: jackie kim <jbd9306 aayahoo.com>
To: "mupulido(c1santa-ang.org" <mupulido@santa-ana.orq>; "stinajeronsanta-anq.org" <stinajero .santa-ang.org>;
"AAmezcua(c-)santa-ana.org" <AAmezcua(a)_santa-ana.orq>; "d ben avides(cDsanta-ang.org" <dbenavidesno.santa-
ana.orq>; "mmartinez@santa-ana.org" <mmartinez(d_)santa-ana.org>; "rreyna santa-ana.org" <rreyna(a.santa-
ana.orq>; "
" <vsarmientoasanta-ana.org>
Sent: Friday, September 13, 2013 11:37 AM
Subject: Amendment to development agreement
Hello
endment to development agreement No. 2007-01....
Daniel Oh property Manager of SA Plaza LLC city of
Attached is the Am Santa Ana
9/16/2013 4:08 PM
4:08 PM
September 11, 2013
The Honorable Miguel A. Pulido
Mayor Pro Tern Sal Tinajero
Councilperson Angelica Amezcua
Councilperson P. David Benavides
Councilperson Michele Martinez
Councilperson Roman Reyna
Councilperson Vincent E. Sarmiento
City of Santa Ana
20 Civic Center Plaza
Santa Ana, California 92701
Re: Amendment to Development Agreement No. 2007-01, Vesting Tentative Tract Map No.
2013-04 and Site Plan Review No. 2013-03 for a New Multi-family Residential
Development at 1901 East First Street, ("Project")
Dear Mr. Pulido and Councilmembers:
I am the owner of the office complex directly east of the Project within the Metro East Mixed
Use Overlay. I have reviewed the proposed project. I have had many questions and concerns
about the Project and especially the interface of the Project with my property. One of the
primary objectives of the Metro East Mixed Use Overlay is to achieve a harmonious integration
of the new with the existing. Regarding this integration objective one significant issue remains
that I request the City Council resolve.
I am concerned with the townhomes that line the parking structure and face into the office
complex parking lot and trash enclosure, I am concerned with safety, noise and visual impact
between our properties. I have suggested trees be planted along that boundary line, but I am
told that the edge of the Fire Lane is right at the property line, causing an unsafe condition. In
addition there is a significant grade difference for part of the applicant's east property line
making an even more dangerous situation.
We request that the City Council add a condition of approval to require a landscaped eight-foot
masonry wall located the entire length of the eastern edge of the Project site. We believe this
will provide a more harmonious integration between the proposed Project and the existing
office complex and address the safety, noise and visual impacts.
If you have any questions or would like to meet with me, please feel free to contact me.
Thank you for your consideration of our request.
ke r le y ,
L
Mitre-Ramirez, Norma
From: Huizar, Maria
Sent: Monday, September 16, 2013 1:53 PM
To: Trevino, Jay; Carvalho, Sonia R.; O'Rourke, Kevin
Cc: Kurita, Debbie; Trujillo, Rose Ann; Orozco, Norma; Mitre-Ramirez, Norma
Subject: AGENDA ITEM 75A - Submissions for Tonight's Council Meeting: 1901 E. First Street
Attachments: #5648323_ v1_ Lyon - Santa Ana - Suggested Supplemental Findings - Ordinance
091613.docx; #5648327 v1_Lyon - Santa Ana - Suggested Supplemental Findings for
Resolution - 091613-2.docx
City Council and Staff,
The following has been submitted by applicant for your review and consideration.
Please contact Kevin or Jay if you have any questions.
From: Paone, Tim [maiIto: tpaone(cbcoxcastle.coml
Sent: Monday, September 16, 2013 12:13 PM
To: Hodge, Ryan
Cc: Huizar, Maria
Subject: Submissions for Tonight's Council Meeting: Agenda Item 75A - 1901 E. First Street
Ryan, pursuant to our discussion last week, we are submitting suggested supplemental findings for both the
Ordinance and the Resolution for the 1901 E. First Street project. Ideally, if staff views these supplemental findings
as helpful and appropriate, the Council would consider and adopt these findings tonight. By copy of this email, I am
also delivering this to the City Clerk to assure that it is in the record. Please call if you have any questions. Thanks.
COX CASTLE & NICHOLSON LLP
TIM PAONE Orange County m Los Angeles ® San Francisco
Professional Profile 19800 MacArthur Boulevard. Suite 500, Irvine, CA 92612
Proiect Experience 949-260-4655 (Direct Line)
Cox Castle Website tpaonefcoxcastle.com
Assistant & Paralegal: Sudha Subramanian ® 949-829-4720
PLEASE CONSIDER THE ENVIRGiL'NI MF BEFORE MINTING THIS E-MAIL
9/16/2013 4:05 PM
4:05 PM
SUPPLEMENTAL FINDINGS
TO
ORDINANCE NO. NS-XXX
THE CITY COUNCIL OF THE CITY OF SANTA MAKES THE FOLLOWING
SUPPLEMENTAL FINDINGS, DETERMINATIONS, AND DECLARATIONS WITH
RESPECT TO ORDINANCE NO. APPROVING AN AMENDMENT
TO THE DEVELOPMENT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND
LYON HOUSING (FIRST STREET) XLVIII, LLC:
1. Entering into this First Amendment to Development Agreement would provide the
City with extraordinary and significant benefits that are of regional significance,
relate to existing deficiencies in public facilities, require the owner of 1901 East First
Street to contribute a greater percentage of benefits than would otherwise be
required, and represent benefits which would not otherwise be required as part of
the development process. Specifically:
a. This Agreement is intended to assure adequate public facilities at the time of
development.
b. This Agreement is intended to assure development in accordance with City's
General Plan, applicable Specific Plans and the Metro East Mixed-Use
Overlay Zone.
c. Owner is required by existing City regulations to provide mitigation for certain
identified impacts and pay certain regulatory fees as conditions of approvals
through the regulatory process, including substantial contribution per dwelling
unit for development of affordable housing and in lieu park development fee.
d. This Agreement will allow the City to realize extraordinary and significant
public infrastructure facilities and other supplemental benefits in addition to
those available through the existing regulatory process by funding a
Communities Facilities District for area infrastructure improvements.
2. The proposed project is consistent with the Land Use Element of the General Plan
as follows:
Goal 1: Promote a balance of land uses to address basic community needs.
Policy 1.2: Support high density residential development within the City's
District Centers as a part of a mixed use development.
The proposed Project is being developed at a gross residential density of
approximately 50 dwelling units per acre which is within both the density
range and maximum allowable density of 90 dwelling units per acre for the
District Center and Metro East District designations. This residential use
will complement the signature land uses (commercial, office, and
recreational) in the District Center areas by providing patrons and
employees who will be residents of the Project's dwelling units in an urban
village type setting.
Policy 1.5: Maintain and foster a variety of residential land uses in the City.
The proposed Project will provide higher density residential development
in the City's urban core areas added to existing lower density residential
uses along the eastern and northern areas of the City.
Goal 2: Promote land uses which enhance the City's economic and
fiscal viability.
Policy 2.7: Support projects that contribute to the redevelopment and
revitalization of the central City urban areas.
Both the District Center and East Metro District allow for uses which will
generate new growth and an enhanced tax base for the City which will
revitalize the City's urban core areas. Redevelopment of an existing
property with a new residential use will be a component of revitalizing an
area planned for compatible mixed uses.
Policy 2.10: Support new development which is harmonious in scale and
character with existing development in the area.
Both the District Center and the East Metro District envision the type of
higher density residential use proposed by the Project which would be at
the same scale and character as future high intensity urban core
commercial, office, and recreational uses.
Goal 5: Ensure that the impacts of development are mitigated.
Policy 5.1: Promote development which has a net community benefit, and
enhances the quality of life.
Policy 5.4: Support land uses which are consistent with the Land Use Plan
of the Land Use Element.
The proposed Project consists of higher density residential units as
envisioned by the Land Use Element for the City's District Center and East
Metro District areas. By providing a land use which is consistent with both
land use designations, the proposed Project would provide a community
benefit, thereby enhancing the area's quality of life.
Policy 5.5: Encourage development which is compatible with, and
supportive of surrounding land uses.
Policy 5.9: Encourage development which provides a clean and safe
environment for the City's residents, workers, and visitors.
As one of the key land uses in the District Center and East Metro District,
the proposed Project's multiple family and townhome dwelling units will
complement proposed commercial, office, and recreation uses in an urban
village type setting with new development revitalizing older and
underutilized properties to create a clean and safe environment for
residents, workers and visitors alike.
3
SUPPLEMENTAL FINDINGS
TO
RESOLUTION NO. 2013-
THE CITY COUNCIL OF THE CITY OF SANTA MAKES THE FOLLOWING SUPPLEMENTAL
FINDINGS, DETERMINATIONS, AND DECLARATIONS WITH RESPECT TO APPROVAL OF
THE ADDENDUM TO THE FINAL ENVIRONMENTAL IMPACT REPORT NO. 2006-01 AND
MITIGATION MONITORING AND REPORTING PROGRAM, VESTING TENTATIVE TRACT
MAP NO. 2013-04 AS CONDITIONED, AND SITE PLAN REVIEW NO. 2013-03 AS
CONDITIONED FOR THE PROPERTY LOCATED AT 1901 EAST FIRST STREET
1. An Addendum Provides the Appropriate Evaluation of the Project under CEQA
The Addendum prepared for this project was appropriate because none of the conditions
described in Section15162 of the CEQA Guidelines have occurred which would call for the
preparation of a Subsequent EIR. Further, the proposed project is a reduced development
compared to the project that was approved for the site in March 2007. The proposed project
will not cause any impacts greater than already considered in the previously-certified EIR.
2. The project site is physically suitable for the type and density of the proposed
project.
The proposed site consists of approximately five acres of land within the Metro East Mixed
Use Overlay Zone. This acreage meets all general plan and zoning requirements for the
type and density of the proposed residential use. Access to the site will occur on First Street
and Cabrillo Park Drive, each of which are appropriate access points for a residential
development of this type. No physical constraints on the site have been identified which
would hinder the proposed use.
3. The Project Complies with All Applicable Development Standards Outlined within the
MEMU Overlay Zone.
a. Is the proposed development plan consistent with and will further the objectives
outlined in Section 1.2 for the MEMU Overlay Zone?
Yes, the following project design features, among others, further those objectives
through:
i. The incorporation of contemporary design styles and solutions in sustainable
buildings and the use of sustainable landscaping;
ii. Streetscapes with landscaping and hardscape features which help move the
project toward its own special and distinct identity;
iii. The incorporation of public and private pedestrian accessways to provide
connectivity between residential and recreational amenities;
iv. The provision of a mix of housing opportunities with the availability of both
multiple family and townhome dwelling units; and
v. Exceptional site planning, architecture, and high quality building exteriors and
interiors, as well as appropriate high quality public improvements.
Additionally:
vi. The proposed project will be a mixed use project that will bring residents into
the immediate area where there will be opportunities to work and shop,
particularly as the area is recycled to generate a broader mix of uses. This
residential component is critically needed to create local consumers to attract
additional retail and commercial development to achieve the broader mixed
use vision for the overlay zone.
vii. The project will include an enhanced pedestrian-oriented 33,881 square foot
public plaza and park that will be located on the west side of the site,
encouraging active street life on the project's ground floor. Adjacent to this
plaza area will be a 2,424-square foot retail amenity, which will incorporate an
exterior seating area into its design. Along First Street and the East Fire
Lane, the project calls for ground floor live/work units, allowing residents in
these units to live and work in the same place and adding to the active use of
the project's ground floor. The project will also incorporate an outdoor area
between the main five-story buildings, featuring an open courtyard with
decorative landscaping, hardscaping, seating areas and potential water
element.
viii. The project is designed to seamlessly integrate with the existing fabric of the
mid-rise and high-rise office environment. It will also provide a mix of one to
three bedroom housing in order to encourage a continuum of living and a
variety of household types with all residents enjoying a range of indoor and
outdoor amenities.
ix. The transition of the MEMU Overlay Zone to its ultimate mixed use character
will involve a gradual recycling of existing development. The project is in
close proximity to several mid-rise buildings in the area and has been
designed to complement these developments. The project is designed with a
high degree of pedestrian accessibility. Further, the project incorporates a
variety of high-quality architectural materials and features a unified and
integrated design theme.
b. Is the proposed development plan consistent with the development standards
specified in Section 4 of the MEMU Overlay Zone?
Yes, the plan is consistent with those development standards for, among others, the
following reasons:
Building Height. The Project consists of 5 story and 3 story buildings which
meet or exceed the minimum height requirement of 3 stories, with some units
having internal space which effectively adds the height of a sixth floor.
ii. Development Site Area: The Project Site consists of 5.18 acres which
exceeds the minimum site area of 1 acre.
iii. Publicly Accessible Open Space: The provision of publicly available open
space generally complies with the 15% of total lot area requirement in the
form of a %-acre park area with a seating and lawn area. The publicly
accessible open space is well designed and accessible through the main
street facing entry of the Project.
iv. Private/Common Open Space: Private open space includes patios, terraces,
and rooftop decks. The Project complies with building height to open space-
width ratios to ensure adequate sunlight for these areas. With 40,470 square
feet of private/common open space being provided, the requirement is
exceeded by approximately 2800 square feet.
v. Building Setbacks: The Project meets or exceeds the setback range
requirement for the front at 20 feet or less, a side setback of 10 feet or less,
and a rear setback of 10 feet or less. Setbacks adjacent to public areas are
landscaped with lawns, trees, shrubs, or other plant material and/or
decorated as a hard surface expansion of the sidewalk. Hardscape can
include brick, stone, pavers, textured concrete, and patterned concrete.
vi. Parking: The number of parking spaces complies with the 2.0-2.25 spaces
per unit requirement of the Santa Ana Municipal Code. Guest parking is
provided at a rate of 10% of the total required parking spaces. A total of 559
parking spaces are provided, exceeding the requirement of 508 parking
spaces (2 parking spaces per dwelling unit), fully satisfying the parking
requirement on the Project site. Driveways have a maximum width of 24 feet
and curb cuts are limited to enhance the pedestrian experience.
vii. Building Frontages: The Project frontage includes a forecourt with a portion
of the fagade close to the frontage line and the center portion set back to
allow for vehicle drop-offs and/or required open space areas.
c. Is the proposed development plan designed to be compatible with adjacent
development in terms of similarity of scale, height, and site configuration and
otherwise achieves the objectives of the Design Principles specified in Section 5 of
the MEMU Overlay Zone?
Yes, through, among others, the following design features:
i. Integrated Design: Building and landscape design features provide a unified
and integrated theme through the use of a consistent style of contemporary
architecture.
ii. Architectural Quality: The Project's architectural details and components
convey a sense of endurance and quality through the use of high quality
materials and finishes.
iii. Architectural Variety: The Project uses varied massing and heights and a
diverse palette of high quality materials.
3
iv. Massing: Project building massing is divided into discrete building elements,
with building breaks and components that reinforce a continuous street-facing
urban pattern.
v. Fagades: Building fagades are architecturally enhanced through building
articulation, arcades, colonnades, recessed entrances, and varying window
types and colors.
vi. Community Connections: The Project includes community connections and
linkages between developments within this part of the Zone with an emphasis
on pedestrian and sidewalk-oriented buildings, including pedestrian-oriented
sidewalks and streetscapes.
vii. Landscape Buffers: The Project includes landscape buffers and other
screening techniques to soften views of trash collection areas and the parking
structure.
viii. Energy Conservation-Shade and Shadow: Energy-conserving techniques
are applied where feasible, including solar access, south-facing windows with
eave coverage, double glazed windows, shade trees, and good ventilation
with orientation of units to include a minimum of 2 hours of direct sunlight per
unit, as feasible.
ix. Residential Unit Size: The Project complies with average unit size guideline
of 1200 square feet with the majority of units being either two or three
bedroom.
Have the land use uses, site design, and operational considerations in the proposed
development plan been planned in a manner that will result in a compatible and
harmonious operation as specified in Section 7 of the MEMU Overlay Zone?
Yes, for the following reasons:
Security: Residential units and buildings are designed to ensure the security
through the use of secured entrances and exits which are directly accessible
to the parking garage.
ii. Loading and Unloading: Adequate space is provided for the loading and
unloading of vehicles, including moving vans, trash trucks, and delivery
vehicles.
iii. Windows: Residential windows are offset to maximize privacy.
Mitre-Ramirez, Norma
From: Huizar, Maria
Sent: Monday, September 16, 2013 2:16 PM
To: Trevino, Jay; O'Rourke, Kevin; Carvalho, Sonia R.
Cc: Kurita, Debbie; Trujillo, Rose Ann; Mitre-Ramirez, Norma; Orozco, Norma
Subject: AGENDA ITEM 75A - Additional Info for 1901 E. First Street
Attachments: DC2606125. pdf
Another letter received for your consideration.
From: Peter Zak [mailto:peterzak(a Lyon 1.comI
Sent: Monday, September 16, 2013 2:13 PM
To: Huizar, Maria
Cc: Fregoso, Vince; Haluza, Karen; Cynthia Eppeldauer
Subject: Additional Info for 1901 E. First Street
Dear City Clerk: Please accept the attached document as additional evidence for the record of the 1901 E. First
Street project. Please confirm receipt. Thank you.
Peter D. Zak
Senior Vice President
Community Development & Capital Ventures
LYON COMMUNITIES
4901 Birch Street • Newport Beach CA 92660
949-838-1244 • 949-252-9202 fax • 949-633-7383 cell
peterzak (o)lyonl.com • LyonCommunities. corn
CAPITA.. VENTURES a COMMUNITY DEVELOPMENT - PROPERTY MANAGEMENT
Confidentiality Statement
This email and any files transmitted with it may contain confidential information and trade secrets of Lyon Communities and / or its subsidiaries
and affiliates. It is intended solely for the use of the individual or entity to whom it is addressed. If you are not the intended recipient, or a person
responsible for delivering it to the intended recipient, you are hereby notified that any disclosure, copying, dissemination, distribution, or use of any
of the information contained in or attached to this transmission is STRICTLY PROHIBITED. If you are not the intended recipient, please notify the
sender by replying to this message and then delete it from your system.
9/16/2013 4:09 PM
4:09 PM
uilo,l? 2 2ivaPark (949) 851-5 367
'ZO70 ;949) 8Sl .5179
P1rzadeh S30 E1
Irvine, CA 92614 4726 wwwprzaden.com
September 16, 2013
Ms. Cynthia Eppeldauer
Vice President, Development
Lyon Capital Ventures
4901 Birch Street
Newport Beach, CA 92660
Subject: First Street Apartments Traffic Analysis
Dear Cynthia:
The scope of work for the traffic analysis prepared for the subject project was reviewed and
approved by the City of Santa Ana Transportation Engineering staff. Based on our
discussions with staff it was determined that the traffic volume projections presented in the
Katz, Okitsu & Associates analysis conducted in December 2006 were still valid as the
basis of impact analysis for the proposed project. The projections in that study considered
Year 2010 and 2030 horizon years. Due to the economic conditions over the last several
years the overall area-wide traffic volumes have decreased when compared to previous
projections (i.e., the regional County Traffic Model OCTAM data indicates traffic volume
reductions of up to 15 percent compared to projections published in 2005-2007) and no new
projects have been approved in the vicinity of the proposed project. Therefore, today's
traffic volumes around the project sites are lower than the previously projected Year 2010
with-project volumes. Finally, the proposed project has a significantly lower trip generation
when compared to the previously approved project.
Please call me if you have any questions regarding the information presented in our traffic
analysis or this letter.
Sincerely,
l
Peter K. Pirzadeh, P.E.
Principal
P.1V 14316(2)-PirstStreetApts-09162013 •CEppeldauer-Trafficanalysis- Itr.pkp
Mitre-Ramirez, Norma
From: Huizar, Maria
Sent: Monday, September 16, 2013 2:18 PM
To: Trevino, Jay; O'Rourke, Kevin; Sonia R. Carvalho - SA Office
Cc: Hodge, Ryan; Trujillo, Rose Ann; Mitre-Ramirez, Norma (NMitre-Ramirez@santa-
ana.org); Norma Orozco; Kurita, Debbie
Subject: AGENDA ITEM 75A - E. First Street
Attachments: Parking Structure Operational Emissions 9.16.13.pdf; Parking Structure Operational
Emissions to On-Site Residents 9.16.13.pdf
Importance: High
Attached please find additional documents received from Phil Martin & Associates for your review and
consideration.
From: Peter Zak fmailto:peterzakCa Lyon Lcoml
Sent: Monday, September 16, 2013 2:16 PM
To: Huizar, Maria
Cc: Fregoso, Vince; Haluza, Karen; Cynthia Eppeldauer
Subject: FW: E. First Street
Importance: High
Dear City Clerk: In addition to my previous email to you, please also accept the email below and the two
attachments to this email as additional evidence for the record of 1901 E. First Street. Please confirm
receipt. Thank you. Pete
From: Phil Martin [mailto:pmartin@philmartinassociates.coml
Sent: Monday, September 16, 2013 1:35 PM
To: Peter Zak; 'Paone, Tim'
Subject: E. First Street
Importance: High
Pete/Tim,
Attached are two air emission calculations. One shows the level of air emissions to the closest homes, which are
approximately 200 meters from the site. As shown, the CO and NOx emissions are 1.6% and 3.2% of the
thresholds. The second calculations are for on-site project residents and again the emissions are well below the
thresholds, 7.1% and 4.5%, respectively.
Phil
Phil Martin & Associates, Inc.
3002 Dow Avenue
Suite 122
Tustin, CA 92780
Phone - 949-454-1800
Fax - 949-454-1801
Cell - 949-637-4373
Email - pmartin(d)philmartinassociates.com
9/16/2013 4:10 PM
4:10 PM
PARKING STRUCTURE OPERATIONAL IMPACTS
The proposed project would increase the number of parking spaces in proximity to off-site
residents from a 220 space surface parking lot to a 531 space parking structure. As a worst-case
for a local air quality impact analysis, it was assumed that every space was occupied and that
every vehicle arrives and departs in a single hour on a cold, damp, winter evening. The air
pollution exposure for the closest residents was evaluated in terms of CO and NOx using the
modeling output for LST analyses for the Central Orange County Source-Receptor Area (SRA).
At an average distance of 200 meters from the parking structure to the nearest homes, the
SCAQMDs LST guidance predicts a possible violation of CO or NO, standards for the following
hourly emission rates:
CO - 263.6 lb/hour may cause an exceedance
NO2 - 15.4 lbs/hour may cause an exceedance
The CO and NOx emitted by 531 cars arriving or departing within the same hour was calculated
by combining the travel distance within each level of the structure with the emission factor for a
travel speed of 5 mph. The travel distance was determined as follows:
Level # of Cars including Travel Distance Travel Miles
handicap spaces
One 114 325' 7
Two 163 650' 20
Three 160 975' 30
Four 94 1,300' 23
Total (Arrive or Depart) 80
Total Arrive and Depart 160 miles
The EMFAC2011 (http://www.arb.ca.gov/nisei/niodeIin,.htm) computer model for California
automobiles in 2014 states that tailpipe emissions for light duty autos are as follows for running
and moving activities (output attached):
CO 2.65 grams/mile gas powered vehicle
0.93 grams/rnile diesel powered vehicle
NOx 0.19 grams/mile gas powered vehicle
0.77 grams/mile diesel powered vehicle
Although EMFAC2011 provides running emissions for light duty vehicles, idling emissions are
only calculated for medium and heavy duty trucks. However, the ARB provides the following
guidance for calculating idling emissions for light duty vehicles:
Calculate the by model year LDV idling emission rates by multiplying the 5 MPH Running
emission rates by 5 (g/mile x mile/hr = g/hr).
Therefore emissions are multiplied by a factor of 5 to account for possible idling activities.
For 160 miles of in-structure travel, the automotive exhaust pollutants compare to the threshold
as follows assuming 90% of vehicles are gas powered and 10% are diesel powered:
Pollutant In Structure Emissions Emissions of Concern Impact vs. Threshold
CO 4.3 lb/hour 263.6 lb/hour 1.6%
NOx 0. 5 lb/hour 15.4 lb/hour 3.2%
The worst-case CO or NO-) exposure to any resident close to the proposed structure is negligible
even under the unlikely worst case assumption that 531 vehicles arrive and 531 vehicles depart
in a single hour.
EMFAC201 1 Ouptut
Light Duty Auto, Gas and Diesel Emissions
EMFAC2011 Emission Rates
Region Type: Air Basin
Region: South Coast
Calendar Year: 2014
Season: Winter
Vehicle Classification: EMFAC2011 Categories
Region CalYr Season Veh Class Fuel
Md1Yr
South Coast 2014 Winter LDA GAS Aggregated
South Coast 2014 Winter LDA DSL Aggregated
Speed VMT
(miles/hr) (miles/day)
5 477114.6
5 1556.427
ROG_RUNEX CO_RUNEX NOX_RUNEX
(gms/mile) (gms/mile) (gms/mile)
0.197799 2.651665 0.190565
0.142257 0.929103 0.769017
PARKING STRUCTURE OPERATIONAL IMPACTS
The proposed project would increase the number of parking spaces in proximity to off-site
residents from a 220 space surface parking lot to a 531 space parking structure. As a worst-case
for a local air quality impact analysis, it was assumed that every space was occupied and that
every vehicle arrives and departs in a single hour on a cold, damp, winter evening. The air
pollution exposure for the closest residents was evaluated in terms of CO and NOx using the
modeling output for LST analyses for the Central Orange County Source-Receptor Area (SRA).
At an average distance of 200 meters from the parking structure to the nearest homes, the
SCAQMDs LST guidance predicts a possible violation of CO or NOS standards for the following
hourly emission rates:
CO - 263.6 lb/hour may cause an exceedance
NO2 - 15.4 lbs/hour may cause an exceedance
The CO and NOx emitted by 531 cars arriving or departing within the same hour was calculated
by combining the travel distance within each level of the structure with the emission factor for a
travel speed of 5 mph. The travel distance was determined as follows:
Level # of Cars including
handicap spaces Travel Distance Travel Miles
One 114 325' 7
Two 163 650' 20
Three 160 975' 30
Four 94 1,300' 23
Total (Arrive or Depart) SO
Total Arrive and Depart 160 miles
The EMFAC2011 (littp://ww-w.arb.ca.2ov/nisei/modelint.htm) computer model for California
automobiles in 2014 states that tailpipe emissions for light duty autos are as follows for running
and moving activities (output attached):
CO 2.65 grams/mile gas powered vehicle
0.93 grams/mile diesel powered vehicle
NOx 0.19 grams/mile gas powered vehicle
0.77 grams/mile diesel powered vehicle
Although EMFAC2011 provides running emissions for light duty vehicles, idling emissions are
only calculated for medium and heavy duty trucks. However, the ARB provides the following
guidance for calculating idling emissions for light duty vehicles:
Calculate the by model year LDV idling emission rates by multiplying the 5 MPH Running
emission rates by 5 (glinile x mile/hr = g/hr).
Therefore emissions are multiplied by a factor of 5 to account for possible idling activities.
For 160 miles of in-structure travel, the automotive exhaust pollutants compare to the threshold
as follows assuming 90% of vehicles are gas powered and 10% are diesel powered:
Pollutant In Structure Emissions Emissions of Concern Impact vs. Threshold
At Closest Existing
Sensitive Use
CO 4.3 lb/hour 263.6 lb/hour 1.6%
NOx 0. 5 lb/hour 15.4 lb/hour 3.2%
For information, emissions were also compared to the LST standards for a receptor at the closest
possible distance from the source and could be indicative of on-site residential exposure as
follows:
Pollutant In Structure Emissions Emissions of Concern Impact vs. Threshold
For On-Site Sensitive
Use
CO 4.3 lb/hour 60.6 lb/hour 7.1%
NOx 0. 5 lb/hour 11.1 lb/hour 4.5%
The worst-case CO or N02 exposure to any resident close to the proposed structure is negligible
even under the most extreme worst case situation whereby 531 vehicles arrive and 531 vehicles
depart in a single hour. Possible peak hour usages rates and associated emissions impact will be
much lower.
EMFAC2011 Ouptut
Light Duty Auto, Gas and Diesel Emissions
EMFAC2011 Emission Rates
Region Type: Air Basin
Region: South Coast
Calendar Year: 2014
Season: Winter
Vehicle Classification: EMFAC2011 Categories
Region CalYr Season Veh_Class
South Coast 2014 Winter LDA
South Coast 2014 Winter LDA
Fuel MdlYr Speed
(miles/hr)
GAS Aggregated 5
DSL Aggregated S
VMT ROG_RUNEX CO_RUNEX NOX_RUNEX
(miles/day) (gms/mile) (gms/mile) (gms/mile)
477114.6 0.197799 2.651665 0.190565
1556.427 0.142257 0.929103 0.769017
Mitre-Ramirez, Norma
From: Huizar, Maria
Sent: Monday, September 16, 2013 3:35 PM
To: Trevino, Jay; O'Rourke, Kevin; Carvalho, Sonia R.
Cc: Kurita, Debbie; Trujillo, Rose Ann; Mitre-Ramirez, Norma; Orozco, Norma; Hodge, Ryan
Subject: AGENDA ITEM 75A: Comments on 815 N. Harbor
Attachments: Ltr_SA CC 815 N Harbor_13.9.16.pdf
Comments received from Kennedy Commission on Agenda Item 75A for your consideration.
From: linda tang Lmailto:kencomlt33Ca)gmail.com]
Sent: Monday, September 16, 2013 3:17 PM
To: Huizar, Maria
Cc: Todd Cottle; Cesar Covarrubias; Scott Bering; ohdcorpC?aol.com
Subject: RE: Comments on 815 N. Harbor
Dear City Clerk Huizar,
Please find attached the Kennedy Commission's comments regarding tonight's City Council Hearing
regarding Agenda Item #80A - Substantial Amendments to Neighborhood Stabilization Programs 2 & 3
and Loan Agreement with 815 N. Harbor.
Thank you for your time and if you have any questions.. please feel free to contact us.
Sincerely,
Linda Tang
The Kennedy Commission
17701 Cowan Ave., Suite 200
Irvine, CA 92614
p: (949) 250-0909
f: (949) 263-0647
www.kennedycommission.org
9/16/2013 4:13 PM
4:13 PM
September 16, 2013
The Honorable Mayor Miguel Pulido, Mayor of Santa Ana
and Members of the Santa Ana City Council
City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
RE: Support for Affordable Homes- 815 N. Harbor
Dear Mayor Pulido and Members of the City Council:
,u-'"nnedy
• •
www, kennedycommission.org
17701 Cowan Ave., Suite 200
Irvine, CA 92614
949 250 0909
Fax 949 263 0647
The Kennedy Commission (the Commission) is a broad based coalition of residents and
community organizations that advocates for the production of homes affordable for families
earning less than $20,000 annually in Orange County. Formed in 2001, the Commission has been
successful in partnering and working with jurisdictions in Orange County to create strategic and
effective housing policies that has led to the new construction of homes affordable to lower
income work-force families.
The Commission would like to acknowledge and commend the City for its leadership in
encouraging and facilitating the development of homes affordable to lower income families. By
the end of this year, the City will have completed 191 new affordable rental apartment homes:
• Terraces at Santiago: 36 family apartment homes
• Santa Ana WBBB: 15 family apartment homes
• Triada Court and Triada Garden apartments: 99 family apartment homes
• Vista Del Rio: 41 special needs apartment homes
In addition, the City has an affordable mixed-use residential development in the pipeline- the
Depot at Santiago. The development of these quality homes will not only provide safer and
healthier homes but it will also significantly improve the quality of life for many lower income
working families in the City. The Commission urges the City to continue its great efforts in
addressing the City's housing needs for lower income families and recommends the City to
support the 815 N. Harbor development.
The Commission looks forward to continuing our partnership with the City to increase affordable
home opportunities for lower income working families. If there are any questions, please feel
free to contact me at (949) 250-0909 or cesarc@kennedycommission.org.
Sincerely,
Cesar Covarrubias
Executive Director
UP 16 N-11 3- 5 1
r=` ANA
September 13, 2013
Dear Mayor and City Council Members:
I, John Rix, am a licensed architect and have been doing business in the building next to the
proposed development at 1901 E 1St Street for almost a decade. As of now, I can see the
neighboring multi-level garage from my window and have the following concerns with the
proposed plans:
1. There is a difference in elevation along the eastern property line between the
Georgetown Building and the projected site of about four feet. This is a safety
hazard and there should be at least an 8-foot cement block wall to protect office
tenants and future residential tenants.
2. The plan to seal off an existing multi-level naturally vented parking structure may
have a potentially dangerous ventilation problem that can lead to harmful carbon
monoxide accumulation. Carbon monoxide can cause headaches, illness and in
extreme cases even death when inhaled. While this parking structure was originally
intended to be naturally ventilated by open air all sides, the proposed project will
seal the garage off with multifamily buildings on one side (west) and townhouses on
two sides (east side and on the south side on East 1St street). This will create an
enclosure filled with deadly Carbon monoxide. This should be addressed before site
approval because it may be difficult to install venting with the low ceiling of the
parking garage.
3. It would be harmful to vent the auto exhaust upwards because the roof area is
designed to be a pool and recreation area. Where are they venting the exhaust?
The aforementioned points are not to be taken likely and should be resolved before
approving the proposed plans.