Loading...
HomeMy WebLinkAbout100206 Contract Award Main St Archway Sign at BroadwayREQUESTFOR COUNCIL /AGENCY ACTION MEETING DATE: OCTOBER 2, 2006 CLERK OF COUNCIL USE ONLY: 2Nd : iiltEz✓ez APPROVED 7•0 29 As Recommended CONTRACT AWARD FOR MAIN STREET ❑ As Amended ARCHWAY SIGN AT BROADWAY PLACE ❑ Ordinance on 1st Reading (PROJECT NO. 9209) ❑ Ordinance on 2nd Reading ❑ Implementing Resolution ❑ Set Public Hearing For CONTINUED TO FILE NUMBER CITY MANAGER EXECUTIVE DdkECTOR RECOMMENDED ACTION 1. Award a contract to LNI Custom Manufacturing, Inc., the lowest responsible bidder, in accordance with unit bid prices in the estimated amount of $220,100 for manufacturing and installation of the Main Street archway sign. 2. Approve a Funding Analysis with a total estimated construction cost of $308,105. 3. Direct the City Attorney to prepare and authorize the City Manager and the Clerk of the Council to execute a Cooperative Agreement between the City of Santa Ana and the Community Redevelopment Agency for the manufacturing and installation of the Main Street archway sign. COMMUNITY REDEVELOPMENT AGENCY ACTION Direct the Agency General Counsel to prepare and authorize the City Manager and the Clerk of the Council to execute a Cooperative Agreement between the City of Santa Ana and the Community Redevelopment Agency for the manufacturing and installation of the Main Street archway sign. 4 -1 Contract Award for Main Street Archway Sign at Broadway Place (Project No. 9209) October 2, 2006 Page 2 DISCUSSION On February 21, 2006, The Agency awarded Graphic Solutions a contract to design the archway sign spanning over Main Street north of Broadway Place (Exhibit 1) . The sign is a replica of the old historic sign that once stood across Main Street. The archway sign spans 87 feet across the street and will provide a maximum clearance of 18 feet above the roadway surface. The archway sign will enhance the appearance of the Main Street corridor. The Notice Inviting Bids was advertised on June 30 and July 3, 2006, and bids were opened on September 12, 2006. A summary of the bid invitations mailed, the bids received, and the bid results follows. Santa Ana Contractors receiving notices: 1 Contractors requesting bidding documents: 6 Bids received: 2 Bids received from Santa Ana Contractors: 0 NAME OF BIDDER CITY BID AMOUNT 1. LNI Custom Manufacturing, Inc. Hawthorne $ 220,100.00 2. Superior Electrical Advertisings Long Beach $ 274,999.60 A total of two bids were received and both were responsive. LNI Custom Manufacturing, Inc. advised City staff that Bid Item #4 unit price was incorrect as the product of their unit price multiplied by the quantity is inaccurate. However, the bid amount is correct and the clerical error does not change the total amount of the bid. After reviewing both bid proposals, staff noted that Superior Electrical Advertisings made the same mistake. Staff has found sufficient grounds to accept this clerical error and recommends that LNI Custom Manufacturing, Inc.'s request be granted. The lowest bid was submitted by LNI Custom Manufacturing, Inc. for $220,100, which is below the Engineer's estimate of $369,500. 4 -2 Contract Award for Main Street Archway Sign at Broadway Place (Project No. 9209) October 2, 2006 Page 3 ENVIRONMENTAL IMPACT An Environmental Review (No. 2006 -020) has been completed and a Categorical Exemption has been filed for the project pursuant to the California Environmental Quality Act. FISCAL IMPACT The Funding Analysis shows a total estimated construction cost of $308,105 for the project (Exhibit 2). Due to the anticipated potential underground utility conflict, the contingency of this project is 25% of the contract amount. Funds are available in the South Main Corridor Fund (account no. 553- 936- 6631). P�'� es G'. Ross cutive Director lic Works Agency 11'�041 a Nancy T Edwards Assistant Director Community Development Agency JGR /SGH /mlr APPROVED AS TO FUNDS AND ACCOUNTS: �Francisco Gutierrez IV Executive Director �� Finance & Mgt. Services Agency 4 -3 s � u ST. ANDREW PL. F-: Z Q ST. GERTRUDE PL. WARNER AVE. EXHIBIT 1 SANTA ANA Title W —AA,� DATE MAIN STREET ARCHWAY SIGN AT BROADWAY Pr OCT. 2, 2006 (PROJECT NO. 920 )E IGN EXHIBIT 2 FUNDING ANALYSIS PROJECT 9209 MAIN STREET ARCHWAY SIGN AT BROADWAY PLACE Construction Contract $220,100 Contract Administration 9,480 Inspection and Testing 16,500 Survey 7,000 Contingencies 55,025 TOTAL ESTIMATED CONSTRUCTION COSTS 5308,105 EXHIBIT 2 4 -5