HomeMy WebLinkAboutCOSTA MESA, CITY OF (SUNFLOWER AVE REHAB)-2014A- 2014 -086
IT R 17 2014
COOPERATIVE AGREEMENT BETWEEN THE CITY OF
SANTA ANA AND THE CITY OF COSTA MESA FOR THE
PAVEMENT REHABILITATION OF SUNFLOWER AVENUE
FROM AVENUE OF THE ARTS TO MAIN STREET
0°
This cooperative agreement ( "Agreement ") is made and entered into this day
Of 1 2014, by and between the CITY OF COSTA MESA, a municipal
corporation ( "COSTA MESA "), and the CITY OF SANTA ANA, a municipal corporation
( "SANTA ANA ").
RECITALS:
° A. WHEREAS, COSTA MESA and SANTA ANA desire to enter into an
C� agreement to resurface and stripe the roadway pavement on Sunflower Avenue from
Avenue of the Arts to Main Street (the "PROJECT "); and,
B. WHEREAS, the PROJECT is included in COSTA MESA plans titled
Arterial Streets Rehabilitation Project -Costa Mesa, Contract No. 13 -08, as shown on
Exhibit "A ", attached hereto and incorporated herein; and,
C. WHEREAS, the PROJECT has been advertised and awarded to R.J.
Noble to perform the construction work; and,
D. WHEREAS, the PROJECT lies partly within the corporate and
jurisdictional limits of SANTA ANA and partly within the corporate and jurisdictional
limits of COSTA MESA; and,
E. WHEREAS, SANTA ANA and COSTA MESA are each empowered by law
to expend public monies to improve Sunflower Avenue; and,
F. WHEREAS, SANTA ANA and COSTA MESA desire to accomplish all of
the needed work as described herein by a single public works project in which COSTA
MESA will act as the lead agency, and SANTA ANA will reimburse COSTA MESA for
SANTA ANA's portion of the construction costs; and,
G. WHEREAS, the total PROJECT construction cost is estimated at
$933,305 as shown in Exhibit "B ", attached hereto and incorporated herein. The total
estimated PROJECT construction cost will be divided between the parties as follows:
COSTA MESA SANTA ANA Total
Construction cost $904,754 $28,551 $933,305
Contingency (20 %) $ 5,710
A-2014 -086
COOPERATIVE AGREEMENT BETWEf1iEITY bFtl
SANTA ANA AND THE CITY OF COSTA MESA FOR THE
PAVEMENT REHABILITATION OF SUI'P$t :0AERFAVEfiJU ''.
FROM AVENUE OF THE ARTS TO LR$TREET"'
This oo erative agreement ( "Agreement ") is made and entered into this �� day
of , 2014, by and between the CITY OF COSTA MESA, a municipal
corporation ( "COSTA MESA "), and the CITY OF SANTA ANA, a municipal corporation
( "SANTA ANA ").
RECITALS:
A. WHEREAS, COSTA MESA and SANTA ANA desire to enter into an
agreement to resurface and stripe the roadway pavement on Sunflower Avenue from
Avenue of the Arts to Main Street (the "PROJECT "); and,
B, WHEREAS, the PROJECT is included in COSTA MESA plans titled
Arterial Streets Rehabilitation Project -Costa Mesa, Contract No. 13 -08, as shown on
Exhibit "A ", attached hereto and incorporated herein; and,
C. WHEREAS, the PROJECT has been advertised and awarded to R.J.
Noble to perform the construction work; and,
D. WHEREAS, the PROJECT lies partly within the corporate and
jurisdictional limits of SANTA ANA and partly within the corporate and jurisdictional
limits of COSTA MESA; and,
E. WHEREAS, SANTA ANA and COSTA MESA are each empowered by law
to expend public monies to improve Sunflower Avenue; and,
F. WHEREAS, SANTA ANA and COSTA MESA desire to accomplish all of
the needed work as described herein by a single public works project in which COSTA
MESA will act as the lead agency, and SANTA ANA will reimburse COSTA MESA for
SANTA ANA's portion of the construction costs; and,
G. WHEREAS, the total PROJECT construction cost is estimated at
$933,305 as shown in Exhibit "B ", attached hereto and incorporated herein. The total
estimated PROJECT construction cost will be divided between the parties as follows:
COSTA MESA SANTA ANA Total
Construction cost $904,754 $28,551 $933,305
Contingency (20 %) $ 5,710
H. WHEREAS, the total PROJECT construction cost plus contingency for
SANTA ANA does not exceed the total amount of $35,000 (rounded); and,
I. WHEREAS, the PROJECT is declared categorically exempt from CEQA
(Section 15301, Class 1 (c)).
NOW. THEREFORE, the parties agree as follows:
A. COSTA MESA Rights and Duties:
COSTA MESA shall be the lead agency for the design and construction work
and shall provide all construction management. COSTA MESA shall be
solely responsible for the administration and performance of the contract
awarded to the contractor for the construction of the PROJECT.
2. COSTA MESA shall pay for all PROJECT design, materials testing, site
survey, construction engineering and construction management.
3. COSTA MESA shall pay its proportionate share of construction cost, which is
estimated in Exhibit "B" of this Agreement.
4. COSTA MESA shall notify SANTA ANA in writing of any changes, increased
costs, and meetings associated with COSTA MESA's lead agency
responsibilities for the PROJECT.
5. Change orders for work within SANTA ANA must receive the written approval
of the Executive Director of the Public Works Agency of SANTA ANA prior to
implementation, which approval shall not be unreasonably withheld. SANTA
ANA shall have a minimum of five (5) working days to review and approve
change orders. SANTA ANA shall have inspection authority within SANTA
ANA jurisdictional boundaries and shall be notified of the progress of the
PROJECT for such purposes. SANTA ANA shall also have the right to enter
and inspect within COSTA MESA boundaries at all times for the purposes of
overseeing COSTA MESA lead agency functions.
6. COSTA MESA shall provide SANTA ANA final record drawings for the
PROJECT within 60 days of the completion and acceptance of construction.
SANTA ANA Rights and Duties:
SANTA ANA shall issue a no fee permit for work within SANTA ANA.
Contractor shall be required to obtain a SANTA ANA business license prior to
starting work.
2. All progress payments for the PROJECT shall be reviewed by SANTA ANA.
If SANTA ANA contests the progress payment, SANTA ANA shall request
withholding of the payment within five (5) business days of receipt of such
2
C.
payment request. SANTA ANA will provide information necessary to
substantiate that the required progress has not been met.
3. SANTA ANA shall pay its proportionate share of construction cost, which is
estimated in Exhibit "B" of this Agreement, within thirty (30) days after receipt
of an invoice from COSTA MESA.
JOINT RIGHTS AND DUTIES:
In the event that expended costs for the PROJECT exceed funds listed in
Exhibit "B ", SANTA ANA shall be solely responsible for obtaining the
additional funding for the increased costs occurring within the jurisdictional
boundary of SANTA ANA and COSTA MESA shall be solely responsible for
obtaining additional funding for the increased costs occurring within the
jurisdictional boundary of COSTA MESA.
2. Responsibilities, Obligations and Mutual Indemnity:
a. Upon completion of the PROJECT, SANTA ANA shall accept
maintenance responsibility for the portion of the PROJECT within SANTA
ANA jurisdictional limits, and COSTA MESA shall accept maintenance
responsibility for the portion of the PROJECT within COSTA MESA
jurisdictional limits.
b. Pursuant to Section 8546.7 of the California Government Code, in the
event that this Agreement involves expenditures of State funds
aggregating in excess of Ten Thousand Dollars ($10,000), both parties
shall be subject to the examination and audit of the Auditor General of the
State of California for a period of three (3) years after final payment under
this Agreement.
c. Neither SANTA ANA nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything
done or omitted to be done by COSTA MESA under or in connection with
any work, authority, or duties delegated to COSTA MESA under this
Agreement. It is also understood and agreed that, pursuant to
Government Code Section 895.4, COSTA MESA shall fully indemnify,
defend and hold SANTA ANA harmless from any liability imposed for
injury (as defined by Government Code Section 810.8), occurring by
reason of anything done or omitted to be done by COSTA MESA under or
in connection with any work, authority, or duties delegated to COSTA
MESA under this Agreement.
d. Neither COSTA MESA nor any officer or employee thereof shall be
responsible for any damage or liability occurring by reason of anything
done or omitted to be done by SANTA ANA under or in connection with
any work, authority, or duties delegated to SANTA ANA under this
Agreement. It is also understood and agreed that pursuant to
Government Code Section 895.4, SANTA ANA shall fully indemnify,
defend and hold COSTA MESA harmless from any liability imposed for
injury (as defined by Government Code Section 810.8) occurring by
reason of anything done or omitted to be done by SANTA ANA in
connection with any work, authority, or duties delegated to SANTA ANA
under this Agreement.
IN WITNESS WHEREOF, COSTA MESA has caused this Agreement to be
executed by its Mayor and attested by its Clerk, and SANTA ANA has caused this
Agreement to be executed by its City Manager and attested by Its Clerk, all thereunto
duly authorized by the COSTA MESA City Council and the SANTA ANA City Council,
respectively.
CITY OF SANTA ANA, a
Municipal corporation of the
State of California
By:
David Cavazos
City Manager
ATTEST:
Maria D. Hulzar
Clerk of the Council
RECOMMI ENDE OR APPROVAL:
dwin "William' vez, P.E.
Interim Executive Director
Public Works Agency
0
CITY OF COSTA MESA, a
municipal corporation of the
State of California
By: Aft e�
Tom atch
Chief Executive Officer
EST:
renda Green
City Clerk
APPRO E TO FORM:
r
1
Tom Duarte
City Attorney
RECOMMENDED FOR APPROVAL:
N OR
R9A O)5E
s roNE eR,
'IRINIn 018.
'BRISTO. UT,
LILI�'c_.1 RRISTAL BT. >
.PAkK
[OOINOTQN 9T' 'n "�C ni
Ul
.. AY$NUF RFWE ARTS ,V, m
I1T
N n >0
h
0 0 4
q W > >
0 —�
OD 0
r ��
Rs
LRQ
��R F}y e F PhTERKWf10
EXHIBIT"All TIMBER
IMHIN �� FVu
O�1Y4
R.J. Noble
Costa Mass
u
�Hfn
9nun}jlM1�
aP,
�
CITY OF COSTA MESA
P.Q, OOX 1200 • 77 FAIR DRIVE • CALIFORNIA 92623.9200
FROM THE D6PARTMGNT OF PU13LIC 9ERVIMIJIENGINEMING DIVIeION
TITLE; ARTERIAL STREETS REHA80.RATION PROJECJ 00.5TA MESA
CONTRACT NO.: 1S•08
PRolea COSR $033,305.04
PROJECT MANAPER: PATRICK RAVER
TOTAL 534.261
RDUNOED 035000
EXHIBIT 111311
PHONE: ('714)76-0 -0386 FAX: (714)IM•602D TOO: (714) 7649244
www.wstnmesoca.gov
R.J. Noble
Costa Mass
5smta Ana
ITEM
RID
CtUANTITY
DESCRIPTION
UNIT
'PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT'
PRICE
AMOUNT
1
2.
L3
M0811,071ON
34pD0
54 09
0.974
psauo
OnR5
890
2
69 200
SF
COLD MILL (2" DEPTH4
'$0.45
10 a0
4f3 200
9,230'
21000
$3,15U
.S
3611717t}
SF
COLD MILL 3" DEPTHI
.$0.15
$54,150
361,000
54150
0
4
230
CY
UNCLAMFIED EXCAVATION (ROADWAY ONLY
MR PARTIAL 0IGDUT3 UP TO a ")
54
$9,520
260
$9,520
p
SO
5
5,650
MN
ASPHALTRURRER; HOT MIX (AHRM) SURFACE
I COURSE
PIO
$452)(10C
1 5.982
1 14=,560
259
821A40
6
2,200
TON
ASPHALTCONCRETE AC LEVELING COURSE
7$
171600
2,206
$171,600
0
IJO
7
450
TON
6 "THfCK A.C. SASE COURSE A7 VARIOUS
LOCATIONS FOR PARTIAL DIGOUTS AS DJRECI'ED
BY ENGINEER
$57
$30,150
450
$50,sa
0
.$D
3
21
FA
ADJUST MANHOLE FRAME ANOCOVER TO
GRADE
$,550
$11,5m
21
`1k 660
0
9
37
EA
ADJUST WATER VALVE OAN AND COVER TO
GRADE
,$,525
$19A2!;
37
%EARS
D
10
1
EA
PROJECT MANAGEMENT
$75,Odd
$75,000
0965
$72,4C4
0.035
$2,596
11
1
LS
TRAFHC CONTROL
18,000
12,000
tl.974
$17,625
4.026
475
12
SO
EA
ELUDE "FIRE HYDRANT" RAISED PAVEMENT
MARKERS
11
. 330
_
30
,533'0-
0
Sc
LS
Y
LS
LANE MARKING$, LANESTRIPES, PAVEMENT
LEGENDS AND RAISED PAVEMENT MARKERS
35,000
$35,000
1
$35000
0
M
61
FA
INSTALLTRAFFIC LOUPOE.TECTORS
$200
12,200
61
12,200
0
$0
T DIAL
I s9m,305 1 $904,754
$.2,$553
241% Cunt
.5710
TOTAL 534.261
RDUNOED 035000
EXHIBIT 111311
PHONE: ('714)76-0 -0386 FAX: (714)IM•602D TOO: (714) 7649244