Loading...
HomeMy WebLinkAboutCOSTA MESA, CITY OF (5)-20140 c� CJ A -2014 -132 FIRST AMENDMENT TO COOPERATIVE AGREEMENT BETWEEN THE CITY OF SANTA ANA AND THE CITY OF COSTA MESA FOR THE PAVEMENT REHABILITATION OF SUNFLOWER AVENUE FROM AVENUE OF THE ARTS TO MAIN STREET This First Amendment to Cooperative Agreement is made and entered into this day of 2014, by and between the CITY OF COSTA MESA, a municipal corporation ( "COSTA MESA "), and the CITY OF SANTA ANA, a municipal corporation ("SANTA ANA "). RECITALS: A. The parties entered into Cooperative Agreement A- 2014 -086 on April 1, 2014 ( "Agreement "), in the maximum amount of $35,000 to resurface the roadway pavement on Sunflower Avenue from Avenue of the Arts to Main Street. B. During construction and while coldmilling the top two (2) inches of asphalt pavement, the contractor encountered poor base material that is not suitable for overlay. To ensure the integrity of the new pavement, an additional two (2) inches of sub -grade material needs to be removed. This process requires additional excavation, asphalt, and pavement fabric, which is greater than the amount specified in the Agreement. C. In accordance with the terms and conditions of said Agreement, the parties wish to amend the project construction cost and increase the amount of the Agreement in an amount not -to- exceed $16,000, for a total not -to- exceed amount of $51,000, to allow the contractor to continue paving the specified portion of Sunflower Avenue. NOW, THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions of said Agreement, except as herein modified, the parties agree as follows: 1. Section (13)(3) of the Agreement shall be amended to increase total construction costs for SANTA ANA in an amount not -to- exceed $16,000, for a total not -to- exceed amount of $51,000. Specifically, Exhibit B of the Agreement shall be amended to reflect the new SANTA ANA construction costs that are detailed in Exhibit 1 attached herewith and incorporated herein by this reference. 2. Except as hereinabove amended, all terms and conditions of said Agreement shall remain in full force and effect. 1 A- 2014 -132 FIRST AMENDMENT TO COOPERATIVE AGREEMENT BETWEEN THE CITY OF SANTA ANA AND THE CITY OF COSTA MESA FOR THE PAVEMENT REHABILITATION OF SUNFLOWER AVENUE FROM AVENUE OF THE ARTS TO MAIN STREET This Firsx..Amendment to Cooperative Agreement is made and entered into this e day of �,1U Li 201X, by and between the CITY OF COSTA MESA, a municipal corporation ( "COSTA MESA "), and the CITY OF SANTA ANA, a municipal corporation ( "SANTA ANA "). RECITALS: A. The parties entered into Cooperative Agreement A- 2014 -086 on April 1, 2014 ( "Agreement'), in the maximum amount of $35,000 to resurface the roadway pavement on Sunflower Avenue from Avenue of the Arts to Main Street. B. During construction and while coldmilling the top two (2) inches of asphalt pavement, the contractor encountered poor base material that is not suitable for overlay. To ensure the integrity of the new pavement, an additional two (2) inches of sub -grade material needs to be removed. This process requires additional excavation, asphalt, and pavement fabric, which is greater than the amount specified in the Agreement. C. In accordance with the terms and conditions of said Agreement, the parties wish to amend the project construction cost and increase the amount of the Agreement in an amount not -to- exceed $16,000, for a total not -to- exceed amount of $51,000, to allow the contractor to continue paving the specified portion of Sunflower Avenue. NOW, THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions of said Agreement, except as herein modified, the parties agree as follows: 1. Section (13)(3) of the Agreement shall be amended to increase total construction costs for SANTA ANA in an amount not -to- exceed $16,000, for a total not -to- exceed amount of $51,000. Specifically, Exhibit B of the Agreement shall be amended to reflect the new SANTA ANA construction costs that are detailed in Exhibit 1 attached herewith and incorporated herein by this reference. 2. Except as hereinabove amended, all terms and conditions of said Agreement shall remain in full force and effect. 1 IN WITNESS WHEREOF, COSTA MESA has caused this First Amendment to Cooperative Agreement to be executed by its Mayor and attested by its Clerk, and SANTA ANA has caused this First Amendment to Cooperative Agreement to be executed by its City Manager and attested by its Clerk, all thereunto duly authorized by the COSTA MESA City Council and the SANTA ANA City Council, respectively. CITY OF SANTA ANA, a Municipal corporation of the State of California By: David Cavazos City Manager ATTEST: �ja �1 0 2014 Maria D. Huizar Clerk of the Council AS TO FORM: Son City RECOMMENDED F-O PPROVAL: C_ Edwin "William" Galy z, P.E. Interim Executive Director Public Works Agency 2 CITY OF COSTA MESA, a municipal corporation of the State of California 9Y T+�oiiLaS R. Hatch Chief Executive Officer ATTEST: ��C�Ca �.•w `I -25-15 Brenda Gree City Clerk City Attorney RECOMMENDED FOR APPROVAL: Ernesto Mu Public Sery TITLE: ARTERIAL STREETS REHABILITATION PROJECT-SUNFLOWER, SANTA ANA TOTAL $50,794.53 Rounded $51,000.00 EXHIBIT 1 RJ NOBLE ITEM BID QUANTITY DESCRIPTION UNIT PRICE AMOUNT 1 1 LS MOBILIZATION $34,000.00 $890.00 2 37,125 SF COLD M ILL (2" DEPTH) $0.15 $5,568.75 2A 10,000 SF Pavement Fabric $0.20 $2,000.0 2B 1 LS Time and Material for Repair Grinder $5,177.53 $5,177.53 3 SF COLD MILL (3" DEPTH) $0.15 4 CY Uncl Ex (road only for partial digout up to 8 ") $34.00 5 295 1 TON ASPHALT RUBBER HOT MIX (AHRM) SURFACE COURSE $80.00 $23,617.08 6 127 TON ASPHALT CONCRETE (AC) LEVELING COURSE $78.00 $9,920.14 7 TON 6" THICK A.C, BASE COURSE ATVARIOUS LOCATIONS $67,00 8 1 EA ADJUST MANHOLE FRAME AND COVER TO GRADE $550.00 $550.00 9 ET ADJUST WATER VALVE CAN AND COVER TO GRADE $525.00 10 1 FA PROJECT MANAGEMENT $75,000.00 $2,596.00 11 1 LS TRAFFIC CONTROL $18,000.00 $475.00 12 EA BLUDE "FIRE HYDRANT" RAISED PAVEMENT MARKERS $11.00 13 LS STRIPING /MARKING $35,000.00 14 I I EA 1INSTALLTRAFFIC LOOP DETECTORS $200.00 TOTAL $50,794.53 Rounded $51,000.00 EXHIBIT 1