Loading...
HomeMy WebLinkAbout20140512_2014-15_923NSantiagoStROH — 05/12/14 RESOLUTION NO. 2014 -15 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SANTA ANA APPROVING SITE PLAN REVIEW NO. 2014 -01 AS CONDITIONED AND APPROVING TENTATIVE PARCEL MAP NO. 2014 -01 AS CONDITIONED FOR THE PROPERTY LOCATED AT 923 NORTH SANTIAGO STREET BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA ANA AS FOLLOWS: Section 1. The Planning Commission of the City of Santa Ana hereby finds, determines and declares as follows: A. The Applicant is requesting approval of a site plan review and a tentative parcel map to allow the construction of The Depot at Santiago mixed -use development, including 70 residential units and commercial and related non- residential space, at 923 North Santiago Street. B. Site Plan Review No. 2014 -01 and Tentative Parcel Map No. 2014 -01 came before the Planning Commission of the City of Santa Ana for a duly noticed public hearing on May 12, 2014. C. Applicant has requested approval of Site Plan Review No. 2014 -01 as conditioned. 1. Section 41- 593.5(c) of the Santa Ana Municipal Code requires the Planning Commission to review all plans within a Specific Development zoning district to ensure the project is in conformance with the approved SD. In addition, Section 41 -2004 of the Santa Ana Municipal Code requires that projects within an Overlay Zone be referred to the Planning Commission for review and approval. 2. Based on the following review, the project is in compliance with all applicable development standards outlined for an Industrial Overlay Zone (I -OZ) within the Transit Zoning Code Specific Development No. 84 (SD -84) and the Urban Neighborhood 2 designation. D. For Tentative Parcel Map No. 2014 -01, the Planning Commission of the City of Santa Ana determines that the following findings have been established: 1. The proposed project, as conditioned, and its design and improvements are consistent with the Urban Neighborhood (UN) Resolution No. 2014 -15 Page 1 of 6 designation of the General Plan and are otherwise consistent with all other elements of the General Plan. Tentative Parcel Map No. 2014 -01 will have no adverse effect on the land uses as prescribed by the General Plan. The project will serve to create new air space condominiums and will continue to function as one integrated development. The Depot at Santiago will be managed and developed in a single phase and operate as one integrated development site. Once completed, the project will create consistency with the General Plan. 2. The proposed project, as conditioned, conforms to all applicable requirements of the zoning and subdivision codes as well as other applicable City ordinances. Tentative Parcel Map No. 2014 -01 is in keeping with the provisions of Site Plan Review and Chapters 34 and 41 of the Santa Ana Municipal Code. These provisions pertain to the subdivision of land and development standards for the site. Additionally, the project will be in compliance with the recently adopted Specific Development No. 84 also known as the Transit Zoning Code as well as all applicable building codes related to the project. 3. The project site is physically suitable for the type and density of the proposed project. Tentative Parcel Map No. 2014 -01 will not create a condition that makes the subdivision physically unsuitable for the site. This proposed project is for air space subdivision purposes only and does not alter the overall density or development of the project as a whole. 4. The design and improvements of the proposed project will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. The parcel map will not cause any environmental damage nor injure fish or wildlife as no fish or wildlife. The originally certified Environmental Impact Report were analyzed in light of the proposed project and it was determined that there are no new significant impacts resulting from the proposed project. 5. The design or improvements of the proposed project will not cause serious public health problems. Resolution No. 2014 -15 Page 2 of 6 No alterations are proposed to the development project that will lead to serious damage or create public health problems. The project was analyzed through the environmental review process to ensure that no environmental or health problems will be created. As a result, approval of the tentative parcel map will not affect the health or safety of persons residing in the vicinity. 6. The design or improvements of the proposed project will not conflict with the easements acquired by the public at large for access through or use of property within the proposed project. Approval of the tentative parcel map will not create any conflicts with existing easements found on the site. As a condition of approval of the parcel map, conditions, covenants and restrictions (CC &Rs) will need to be recorded for this project. These CC &Rs will ensure that access, egress, and other necessary easements are maintained over the three parcels. Section 2. In accordance with the California Environmental Quality Act (CEQA), the recommended actions have been determined to be adequately evaluated in the previously certified EIR No. 06 -02 as per Section 15162 of the CEQA guidelines. All mitigation measures in EIR No. 06 -02 and associated Mitigation Monitoring and Reporting Program (MMRP) requirements have been enforced and continue to apply to the proposed project. As required by the MMPR, a circulation and air quality analysis were performed to analyze any potential changes in either traffic or air quality as a result of the proposed development. The studies concluded that no additional significant impacts that would trigger the requirement for additional environmental review. Section 3. The Planning Commission of the City of Santa Ana after conducting the public hearing hereby approves: A. Site Plan Review No. 2014 -01 as conditioned in Exhibit "A" attached hereto and incorporated herein for the project located at 923 North Santiago Street. B. Tentative Parcel Map No. 2014 -01 as conditioned in Exhibit "B" attached hereto and incorporated herein for the project located at 923 North Santiago Street. These decisions are based upon the evidence submitted at the abovesaid hearing, which includes, but is not limited to: the Request for Planning Commission Action dated May 12, 2014, and exhibits attached thereto; and, the public testimony, written and oral, all of which are incorporated herein by this reference. Resolution No. 2014 -15 Page 3 of 6 ADOPTED this 12th day of May, 2014. AYES: Commissioners: Alderete, Gartner, Mill, Nalle, Yrarrazaval (5) NOES: Commissioners: Bacerra, Bauer (2) ABSENT: Commissioners: None (0) ABSTENTIONS: Commissioners: None (0) C L, Eric Alderete Chairman APPROVED AS TO FORM: Sonia R.,C�rvalho, City Attorney By:� Ryan O.I Assistant CERTIFICATE OF ATTESTATION AND ORIGINALITY I, ROSA BARELA, Acting Recording Secretary of the Planning Commission, do hereby attest to and certify the attached Resolution No. 2014 -15 to be the original resolution adopted by the Planning Commission of the City of Santa Ana on May 12, 2014. Date: 5/x`1 -i% Acting Recording Secretary of the Planning Commission City of Santa Ana Resolution No. 2014 -15 Page 4 of 6 Conditions of Approval for Site Plan Review No. 2014 -01 Should the Planning Commission approve Site Plan Review No. 2014 -01, the approval is subject to compliance, to the reasonable satisfaction of the Planning Manager, with all applicable sections of the Santa Ana Municipal Code, the California Administrative Code, the California Building Standards Code and all other applicable regulations. The applicant must comply in full with each and every condition listed below rip or to exercising the rights conferred by this Site Plan Review. The applicant must remain in compliance with all conditions listed below throughout the life of the Site Plan Review. Failure to comply with each and every condition may result in the revocation of the site plan review. A. Planning Division 1. All proposed improvements must conform to the Site Plan Review approval of DP No. 2013 -40 and staff report exhibits. 2. The project shall remain in compliance with Environmental Impact Report No. 06 -02, including Mitigation Monitoring Plan. 3. Landscaping shall be maintained per the approved landscape plan. After project occupancy, landscaping is to be maintained to include the required plant materials installed at the time of occupancy and per the approved plan. 4. A Parking Management Plan documenting how the tandem parking stalls will function must be submitted prior to submittal into building plan check. 5. All signs for the proposed project shall comply Section 41 -2050 of the Transit Zoning Code and be submitted the case planner for review and approval. 6. Covenants, Conditions and Restrictions (CC &Rs) shall be provided for the project. At a minimum, the CC &Rs shall include provisions pertaining to owner occupancy, restrictions on home -based businesses, the prohibition of storage on balconies, and a restriction on truck delivery hours to non -peak periods shall be submitted prior to building plan check. 7. Prior to submittal into building plan check, provide a detailed mock -up with proposed window type, inset and trim surround. The mock -up should include the proposed 20/30 stucco finish, brick veneer and siding to be used. Exhibit A Resolution No. 2014 -15 Page 5 of 6 Conditions for Approval for Tentative Parcel Map No. 2014 -01 Should the Planning Commission approve Tentative Parcel Map No. 2014 -01, the approval is subject to compliance, to the reasonable satisfaction of the Planning Manager, with all applicable sections of the Santa Ana Municipal Code, the California Administrative Code, the California Building Standards Code and all other applicable regulations. The applicant must comply in full with each and every condition listed below rip or to exercising the rights conferred by this parcel map. The applicant must remain in compliance with all conditions listed below throughout the life of the parcel map. Failure to comply with each and every condition may result in the revocation of the parcel map. A. Planning Division 1. The Final Map is required to be recorded within two years of the date of approval of the tentative map by the City Council. 2. Two copies of the recorded Final Map and CC &Rs need to be submitted each to the Planning Division and Public Works Agency within 10 days of recordation. 3. All development within the area of the map is subject to development and permit fees in effect at the time of permit issuance. 4. All development within the area of the map is subject to all design and development standards in effect at the time of permit issuance. 5. The tentative map, final map, and all improvements required to be made or installed by the subdivider will be in accordance with the design standards and specifications of the Santa Ana Municipal Code and the requirements of the State Subdivision Map Act. 6. Conditions, Covenants and Restrictions (CC &Rs) will need to be recorded in conjunction with the recordation of the Final Map. The CC &Rs will need to include provisions for shared parking, access and egress, landscaping and site maintenance. 7. All proposed site improvements must conform to the Site Plan Review approval of DP No. 2013 -40. Exhibit B Resolution No. 2014 -15 Page 6 of 6