Loading...
HomeMy WebLinkAbout25F - AGMT - WATER MODELING SRVSREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: 3� RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ❑ As Recommended ❑ As Amended ❑ Ordinance on 1't Reading ❑ Ordinance on 2nd Reading ❑ Implementing Resolution ❑ Set Public Hearing For CONTINUED TO FILE NUMBER Authorize the City Manager and Clerk of the Council to execute an agreement with IDModeling Inc., subject to nonsubstantive changes approved by the City Manager and City Attorney, to provide computer water modeling services for a three -year period expiring October 8, 2018, in an amount not to exceed $150,000 annually, for a total not to exceed amount of $450,000. Approval of this recommended action will allow for the continued evaluation and analysis of the City's water system for reliability, system hydraulic operations, and future development - driven needs. The City's Water Enterprise provides water to all of Santa Ana's residents and businesses, and it is imperative that water system management activities incorporate industry best practices. One of these vital best practices is to create and sustain a water system hydraulic computer model that utilizes technology to assist in the optimization of daily operations. This model will additionally identify hydraulically deficient areas where the water system would benefit from future capital improvements. On February 113, 2014, at the conclusion of a Request for Proposal (RFP) process, City Council awarded an agreement for the preparation of a comprehensive computerized water system model. IDModeling, Inc., the successful proposer, is a leading expert in the field of water modeling and has a proven record of successful water system computer modeling services nationwide. The RFP Scope of Work was to proceed in phases and included the creation of a comprehensive computerized water model, performing various analyses and water system evaluations, as well as sustaining the model over time. The initial agreement awarded by Council provided for the first phase, the creation and calibration of a water model along with some preliminary analysis. At the conclusion of the initial agreement staff would analyze the consultant's performance on the initial model- creation phase prior to proceeding with additional services and agreement terms. 25F -1 Agreement with IDModeling, Inc., for Computer Water Modeling Services October 6, 2015 Page 2 Staff recommends entering into an agreement with IDModeling, Inc., to proceed with the remaining phases of water system evaluations and related modeling services. Through this agreement IDModeling will be performing a range of hydraulic model evaluations and related services including a City -wide water quality testing and source trace analysis, power outage analysis, pressure zone analysis, energy management optimization, water master plan coordination and CIP validation, development of a uni- directional flushing program and additional development driven water system model evaluations. IDModeling, Inc., has performed exceptionally well, has delivered a comprehensive water model, and continues to meet all of the City's requirements. Through the initial agreement phase, the consultant has acquired and demonstrated a unique knowledge of the City's water system. Retaining their services for the remaining phases of work would maximize the City's return on investment in the initial phase. Additionally, IDModeling, Inc., has recently worked with the Cities of Indio, Lakewood, Arcadia, and Anaheim, successfully constructing water system computer models and providing updates to existing models. STRATEGIC PLAN ALIGNMENT Approval of this item supports the City's efforts to meet Goal #6 Community Facilities & Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City assets), Strategy C (invest resources and technology to extend the service life of existing infrastructure to protect the City's investment and support a high quality of life standard). ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. FISCAL IMPACT Funds in the amount of $150,000 are budgeted in the Water Administration and Engineering account (06017645- 62300) for expenditure in FY 2015 -16. Annual allocations of $150,000 will also be budgeted in FY 2016 -17 and FY 2017 -18. Public Works Agency FMMS /RR Exhibit 1: Agreement APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez f Executive Director Finance & Management Services Agency 25F -2 CONSULTANT AGREEMENT THIS AGREEMENT, is made and entered into this 6`" day of October 2015 by and between IDModeling, Inc., a Delaware corporation ( "Consultant ") and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California ( "City "). RECITALS A. The City desires to retain a consultant having special skill and knowledge in the field of water system computer modeling services. B. Consultant represents that Consultant is able and willing to provide such services to the City. C. Consultant is currently providing evaluation and analysis of the City's water system for reliability, system hydraulic operations, and future development. The City desires to continue these services with Consultant. D. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follow: 1. SCOPE OF SERVICES Consultant shall perform those services as set forth in Exhibit A attached hereto and incorporated by reference to this Agreement. 2. OWNERSHIP OF MATERIALS This Agreement creates a non - exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ( "Documents & Data "). Consultant shall require all subcontractors to agree in writing that City is granted a non - exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data Pagel of 8 Exhibit 1. 25F -3 which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any tune, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. Nothing herein shall grant City rights in or to the Sedaru software. 3. COMPENSATION a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Exhibit A, attached hereto and incorporated by reference. The total sum to be expended by City under this Agreement shall not exceed $150,000.00 annually during the term of this Agreement. b. Payment by City shall be made within thirty (30) days following receipt of proper invoice evidencing work performed, subject to the City's accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by the City. 4. TERM This Agreement shall commence on October 6, 2015 and terminate on October 8, 2018, unless terminated earlier in accordance with Section 14, below. 5. INDEPENDENT CONTRACTOR Consultant shall, during the entire tern of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer- employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 6. INSURANCE Prior to undertaking performance of work under this Agreement, Consultant shall maintain and shall require its subcontractors, if any, to obtain and maintain insurance as described below: a. Commercial General Liability Insurance. Consultant shall maintain commercial general liability insurance which shall include, but not be limited to protection against claims arising from bodily and personal injury, including death resulting therefrom and damage to property, resulting from any act or occurrence arising out of Consultant's operations in the performance of this Agreement, including, without Page 2 of 8 25F -4 limitation, acts involving vehicles. The amounts of insurance shall be not less than the following: single limit coverage applying to bodily and personal injury, including death resulting therefrom, and property damage, in the total amount of $1,000,000 per occurrence and $2,000,000 in the aggregate. Such insurance shall (a) name the City, its officers, employees, agents, volunteers and representatives as additional insured(s); (b) be primary and not contributory with respect to insurance or self - insurance programs maintained by the City; and (c) contain standard separation of insured provisions. b. Worker's Compensation Insurance. In accordance with California State law, Consultant, if Consultant has any employees, is required to be insured against liability for worker's compensation or to undertake self - insurance. Prior to commencing the performance of the work under this Agreement, Consultant agrees to obtain and maintain any employer's liability insurance with limits not less than $1,000,000 per accident. c. If Consultant is or employs a licensed professional such as an architect or engineer: Professional liability (errors and omissions) insurance, with a combined single limit of not less than $1,000,000 per claim with $2,000,000 in the aggregate. d. The following requirements apply to the insurance to be provided by Consultant pursuant to this section: (i) Consultant shall maintain all insurance required above in full force and effect for the entire period covered by this Agreement. Certificates of insurance shall be furnished to the City upon execution of this Agreement and shall be approved in form by the City. (ii) Certificates and policies shall state that the policies shall not be canceled or reduced in coverage or changed in any other material aspect without thirty (30) days prior written notice to the City. e. If Consultant fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the City with required proof that insurance has been procured and is in force and paid for, the City shall have the right, at the City's election, to terminate this Agreement. Such termination shall not affect Consultant's right to be paid for its time and materials expended prior to notification of termination. Consultant waives the right to receive compensation and agrees to indemnify the City for any work performed prior to approval of insurance by the City. INDEMNIFICATION Consultant agrees to and shall indemnify, defend and hold harmless the City, its officers, agents, employees, consultants, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant or its contractors, subcontractors, agents, employees, or other persons acting on their behalf Page 3 of 8 25F -5 which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement, to the extent that the injury, damages, just compensation, restitution, judicial or equitable relief is caused by the negligence of the Consultant. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. In no case will Consultant be required to indemnify or hold harmless the City from injury, damages, just compensation, restitution, judicial or equitable relief caused by the negligence of the City. 8. LAWS AND REGULATIONS Consultant shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the services and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with services. If the Consultant performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Consultant shall be solely responsible for all costs arising wherefrom. Consultant shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. 9. CONFIDENTIALITY If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and /or agent of the other party is covered by this Agreement. The foregoing obligations of non -use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City. Page 4 of 8 25F -6 10. CONFLICT OF INTEREST CLAUSE Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. 11. NOTICE Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by telefacsimile or other telegraphic communication in the manner provided in this Section, to the following persons: To City: Clerk of the City Council City of Santa Ana 20 Civic Center Plaza (M -30) P.O. Box 1988 Santa Ana, CA 92702 -1988 Fax 714 - 647 -6956 courtesy copy: Executive Director of Public Works City of Santa Ana Attn: Design Engineering 20 Civic Center Plaza (M -36) P.O. Box 1988 Santa Ana, California 92702 Fax 714 - 647 -5635 To Consultant: IDModeling, Inc. 55 E. Huntington Drive, Suite 130 Arcadia, CA 91005 Fax 626 - 244 -0702 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by telefacsimile, communication shall be effective or deemed to have been given twenty -four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. Page 5 of 8 25F -7 12. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the authorized representatives of the parties. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein. 13. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultants retained by City. 14. TERMINATION This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions: a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. 15. NON - DISCRIMINATION Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, training, utilization, promotion, tennination or other employment related activities or in connection with any Page 6 of 8 25F -8 activities under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 16. JURISDICTION — VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. The parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 17. PROFESSIONAL LICENSES Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 18. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: CITY OF SANTA ANA MARIA D. HUIZAR Clerk of the Council Page 7 of 8 25F -9 DAVID CAVAZOS City Manager SONIA R. CARVALHO City Attorney By: fO SANDOVAL C ' f Assistant City Attorney RECOMMENDED FOR APPROVAL: IDMODELING, INC. FRED MOUSAVIPOUR By: Executive Director Title: Public Works Agency Page 8 of 8 25F -10 C,IDMODELINGM We can be more, together August 13, 2015 Mr. Rudy Rosas, P.E. Senior Civil Engineer City of Santa Ana 220 S. Daisy Ave. M -85 Santa Ana, CA 92703 55 BastMuntingt0iI Drive. so Ito 130, Arcadia. CA 91006 www.Idmodeling.corri "r6262440700 1 626 244 0762 EInfo @IdIoodeling.com Subject: Proposal to Provide Water System Computer Model Solutions for Fiscal Years: 2015 -18 Dear Mr. Rosas, IDModeling, Inc. (IDM) is pleased to submit this proposal to the City of Santa Ana (City) to provide follow -on water system computer model solutions for fiscal years (FY) 2015 -18, based on the calibrated all -pipes water model delivered by IDM as part of the Water System Computer Modeling Project, completed in August 2015. This proposal includes 6 primary tasks that serve to support the City's future water system analysis, master planning, and operational efforts to maximize resources and make the most impactful decisions possible with available resources and data. The following tasks will be performed within the scope and term of this project: Task l — Hydraulic Model Evaluations and Support (FY 2015 -16) Under this task IDM will perform the following model evaluations for City staff. 1. City -wide Water Quality Testing and Source Trace Analysis: Perform a multi- source trace analysis under two demand conditions (high demand & low demand) to determine the influence on a particular location from various supply sources. Results tables and figures will be developed to display the results of the source trace analysis and assist the City with gaining approval from CDPH for use of the model to reduce the number of water quality samples when positive results are encountered. 2. Fuller Site Analysis: Analyze the benefits of two new groundwater wells or one well /reservoir /pump station combination at the Fuller Site which is a vacant parcel across from the Santa Ana train station. A brief summary technical memorandum will be developed detailing the model results with associated results tables and figures and recommendations for improvements at the Fuller site. 3. John Garthe to Walnut Station Transmission Main Analysis: Analyze the need /impact of a new transmission main from John Garthe Station to Walnut Station and assess the benefits of being able to move a large quantity of water from Garthe to Walnut under two (2) different operating conditions. A brief summary technical memorandum will be developed detailing the model results with associated results tables and figures and recommendations for improvements. 4. EOCWD Water Purchase Analysis; Analyze the ability /benefits to purchasing water from the East Orange County Water District and the impacts to system operations under two (2) different operating conditions. A brief summary technical memorandum will be developed 25F -11 Mr. Rudy Rasas Page 2 August 13, 2015 detailing the model results with associated results tables and figures and recommendations for improvements. S. Pressure Zone Analysis: Analyze the feasibility and benefit of dividing the City's low pressure zone into two separate zones. This will essentially split the City into 3 zones Instead of the existing 2. A brief summary technical memorandum will be developed detailing the model results with associated results tables and figures and recommendations for improvements. 6. Power Outage Analysis: Analyze system resiliency and impacts in the event of a full and prolonged power outage. This analysis will include all groundwater well and booster pump stations off, with only MWD import connections on. A brief summary technical memorandum will be developed detailing the model results with associated results tables and figures and recommendations for improvements. 7. As- Needed Support: IDM will provide support to City staff for GIS, hydraulic modeling, analysis, planning, application development, and training services on an as- needed basis and may include, but are not limited to the following: • Services including but not limited to: Energy management, Operational Planning, Water Quality, CIP Prioritization, Asset Management, Criticality, etc. • Hydraulic model construction and updates • Software and application, implementation and Integration • GIS Application Development re: data collection, model /GIS communications, flushing, water quality, energy management, vulnerability, CIP prioritization, etc. • Systems integrations including GIS, CMMS, Asset Management,SCADA, etc. • Model calibration for Master Planning, Energy Management, Water Quality, System Vulnerability, Fire flows, Operational Planning • Development of future scenarios (pump upgrading, tank replacement, etc.), • Standardized and Customized Training Task1— Sedaru Smart CIP Software & Implementation (FY2015 -16) IDM will deliver Sedaru Smart CIP to the City to support the City's future Water Master Plan effort, and subsequent City water system planning efforts. The deliverable will consist of a dynamic capital planning tool that leverages Sedaru (and Sedaru integrated) data to produce capital planning project recommendations. Sedaru Smart CIP will allow the City to consistently prioritize capital projects as operations, budgets, input data, and decision making parameters change over time. The following tasks will be performed to successfully deliver the Smart GIP software: 1. Master Plan Consultant Coordination and CIP "Validation ": IDM will work with the City and the City's engineering consultant to configure Sedaru Smart CIP to match an agreed upon prioritization methodology and set of decision criteria. The engineering consultant will deliver a list of near -term and future replacement projects, as developed with the City and applying engineering judgment. IDM will then validate the Sedaru Smart CIP planning tool against this list of projects, and perform a comparison of software output with a representative set of CIP projects from the engineering consultant and the City, with the goal of maintaining a balance between automating the CIP development process. IDM will provide the City's engineering consultant with a GIS database schema to exchange master plan project data with Sedaru. 25F -12 Mr. Rudy Rosas Page 3 August 13, 2015 Once validated, Sedaru Smart. CIP will leverage the City's all -pipes water model, with the latest asset condition and performance data from the City's O&M information systems, with key decision making criteria across distribution system assets, to deliver a repeatable, automated list of prioritized replacement projects. The City can revisit the priority of a project, as- needed, with the confidence that the latest data and decision making parameters are being used. It is estimated that the future cost and effort of water master planning will be reduced significantly with the Sedaru Smart CIP, while metrics to justify projects and return on capital investments will Increase the same. 2. Configure Likelihood of Failure: Configure the likelihood of failure for each facility based on asset performance - Includes history of existing pipes (age, material, no. of breaks), hydrants, valves, etc. 3. Configure Consequence of Failure: Configure the consequence of failure including pipeline criticality, impact on critical customers (hospitals, nursing homes, etc.), number of customers affected, hydrant flows, and system pressures. 4. Configure Constructability: Configure the constructability of each recommended system improvement considering paving schedule coordination, traffic impact, easements, railroad or ditch crossings, etc. S. Configure Capital Action plan: Configure City's capital action plan for water master plan support, using weighted /prioritized likelihood of failure, consequence of failure, and constructability criteria to generate a dynamic CIP list. 6. Integration: IDM will integrate the Smart CIP software with Santa Ana's existing systems including the City's current Sedaru Command Center, mobile data collection applications, hydraulic model, and GIS database. 7. Training & Software: A workshop will be scheduled upon Implementing Sedaru Smart CIP to train City staff on utilizing the software to Its full capabilities. Software will be rolled out to up to 10 City staff, applied for City water master planning, and ongoing staff planning to use the latest set of asset and operational data to make the best possible decision each time system status changes. Recurring annual costs for software support and maintenance of Sedaru Smart CIP is $25,000, This includes costs to support up to 10 City users and stakeholders of the system input and output, operating costs to maintain data and system integrations, and ongoing periodic updating of parameters to support latest planning criteria and methodology. Task 3 — Hydraulic Model Evaluations and Support (FY 2016 -17) IDM will provide support to City staff for GIS, hydraulic modeling, analysis, planning, application development, and training services on an as- needed basis and may Include but are not limited to the following: • Services including but not limited to: Energy management, Operational Planning, Water Quality, CIP Prioritization, Asset Management, Criticality, etc. • Hydraulic model construction and updates • Software and application, implementation and integration • GIS Application Development re: data collection, model /GIS communications, flushing, water quality, energy management, vulnerability, CIP prioritization, etc. • Systems Integrations including GIS, CMMS, Asset Management, SCADA, etc. 25F -13 Mr. Rudy Rosas Page 4 August 13, 2015 • Model calibration for Master Planning, Energy Management, Water Quality, System Vulnerability, Fire flows, Operational Planning • Development of future scenarios (pump upgrading, tank replacement, etc.), • Standardized and Customized Training Task 4 — Sedaru Smart Ops Software & Implementation (FY2016 -17) The City operates a pressurized water system, with limited gravity storage facilities, and a combination of variable frequency drive and solid state pumps. This hydraulic profile Induces frequent in- fighting between pumps and pump controls, causing pumps to over -cycle and over - pump, which results in high operational costs associated with pumping energy. The City would like to increase its operational awareness, and understanding of how better to manage pump operations to reduce pump energy costs. 1. Program Operational Schema: IDM will work with the City to understand City operator's current operating strategies, as well as the equipment, SCADA logic, set points, and typical operating conditions associated with the City's system, wells and pumping plants. 2. Update Computer Modeling with Automations: IDM will utilize the hydraulic computer model delivered in the Water System Computer Modeling project to add functionality to the system, which may Include: real -time hydraulic modeling, monitoring of existing water system facilities, automating alerts and notifications associated with predefined system demand and /or operating thresholds which may be associated with inefficient pumping or high energy costs, and providing pumping recommendations to water system operators which may serve to balance, reduce, or dampen system operations associated with water pumps over - cycling, over - pumping, or operating at inefficient points on theirsystem curves. 3. Develop Automated Operator Recommendations: Recommendations will be automated in accordance to criteria developed with City operators and engineering staff to consider best operating practices, required customer service levels, and methods of operation to maintain water quality standards. Parameters will include pump operating costs, efficiencies, varying levels of water demand, including but not limited to maximum demand, minimum demand, conservation demand, and other operational conditions. Benefits: IDM estimates conservatively, that the City will experience 10 -20% reduction in pump energy expenses after the deployment of this energy reduction technology, Recurring annual costs for software support and maintenance of Sedaru Smart Ops is $25,000, This includes costs to support up to 10 City users (engineers, operators, and management), and stakeholders of the system input and output, operating costs to maintain data and system integrations, and ongoing periodic updating of parameters to support latest operational criteria, system and facility costs to operate, efficiencies, and operating methodology. Task 5— Hydraulic Model Evaluations and Support (FY 2017 -18) IDM will provide support to City staff for GIS, hydraulic modeling, analysis, planning, application development, and training services on an as- needed basis and may include but are not limited to the following: • Services including but not limited to: Energy management, Operational Planning, Water Quality, CIP Prioritization, Asset Management, Criticality, etc. • Hydraulic model construction and updates • Software and application, implementation and integration 25F -14 Mr. Rudy Roses Page 5 August 13, 2015 • GIS Application Development re: data collection, model /GIS communications, flushing, water quality, energy management, vulnerability, CIP prioritization, etc. • Systems integrations Including GIS, CMMS, Asset Management, SCADA, etc. • Model calibration for Master Planning, Energy Management, Water Quality, System Vulnerability, Fire flows, Operational Planning • Development of future scenarios (pump upgrading, tank replacement, etc.), • Standardized and Customized Training Task 6— Sedaru Smart Quality Software & Implementation (FY2017.18) The City Fire Department currently tests and flows fire hydrants within the City limits utilizing either fire department staff or an outside contractor. These flowing these hydrants are conducted on an as- needed basis, with anywhere from 16 to 44 hydrant tests conducted in a year. The City currently does not have flushing program for water quality purposes. Flushing is a critical maintenance activity that allows the water system to purge older, less - circulated water out of the system, in -place of newer, fresher, higher quality water for potable delivery. Developing flushing routes for maintenance crews will help maintain the quality of water within the distribution system. 1, Program Uni- directional Flushing Criteria: IDM will work with the City to understand City operator's current flushing and water quality strategies, as well as the typical areas of lesser quality, system parameters that may impact quality and good /poor locations to flush, and recommended flushing outlets (storm drain catch basins, sewer manholes, etc.). 2. Update Sedaru Smart Quality with Flushing- specific Automations: Uni - directional flushing sequences will be automated based on results and output from the City's hydraulic computer model, GIS, and CMMS, including customer complaints, history of water quality samples and asset maintenance to optimize flushing sequences and maximize the benefits of flushing for water quality and customer service, while minimizing stress to the system, and water lost during flushing events. 3. Develop Automated Flushing Recommendations: Recommended sequences from the uni- directional flushing program will be mobile, map- driven, and Interactive with real -time, departmental communication to enable support and response to flushing tasks, and potential impacts to customers. Flushing sequences will be issued with routing applied to optimize field crew drive -time and traffic impacts. Benefits: This real -time, automated Uni - directional Flushing Program will enable the City to sustain acceptable levels of water quality, while maximizing staffing resources and minimizing water loss and stress to the system to avoid pipe breaks, leakage, and customer complaints. This solution will enable the City to utilize its own resources and /or deploy City fire department resources to perform flushing within a transparent, connected, and monitored environment to avoid surprises and be prepared for operational response. Recurring annual costs for software support and maintenance of Sedaru Smart Quality Is $20,000. This includes costs to support up to 8 City users, and stakeholders of the system input and output, operating costs to maintain data and system integrations, and ongoing periodic updating of parameters to support latest water quality and flushing criteria and methodology. 25F -15 Mr, Rudy Rosas Page 6 August 13, 2015 Proposed Budget and Term: Budget Year 1(2015 -16): The estimated not -to- exceed fee is summarized by main task below: Task 1— Hydraulic Model Evaluations & Support $75,000.00 Task 2— Sedaru Smart CIP Software & Implementation $75,000.00 TOTAL 20.15 -16 $150,000.00 Budget Year 2 (2016 -17): The estimated not -to- exceed fee is summarized by main task below: Task 1— Hydraulic Model Evaluations & Support $100,000m Task 2— Sedaru Smart Ops Software & Implementation $50,000.00 TOTAL 2016 -17 $150,000.00 Budget Year 3 (2017 -18): The estimated not -to- exceed fee is summarized by main task below: Task 1— Hydraulic Model Evaluations & Support $100,000.00 Task 2— Sedaru Smart Quality Software & Implementation 550,000.00 TOTAL 2017 -18 $150,000.00 Thank you for considering IDModeling. We look forward to continuing our relationship with City staff. Please feel free to contact me at (626) 244 -0700 with any questions you may have. Sincerely, Paul Hauffen Principal IDModeling, Inc. 25F -16 Exhibit A City of Santa Ana Water System Computer Model Solutions Labor Hours & Budget Estimate �CIDMODELING We can be more, together. 25F -17 co a op U ti C a 0 Task Project Task or Subtask Description d m a° ' A J `m d w 0 v. City -wide Water Quality Testing and Source Trace Analysis: - Perform multi- source trace analysis under two demand conditions (high demand & low demand) to determine the Influence on a particular location from various supply A sources 14 45 59 $9,150 $200 $9,350 - Develop results tables and figures to display the results of the source trace analysis and assist the City with gaining approval from CDPH for use of the model to reduce the number of water quality samples when positive results are encountered Fuller Site Analysis: - Analyze the benefits of two new groundwater wells or one well /reservoir /pump 6 station combination at the Fuller Site which Is a vacant parcel across from the Santa 8 36 44 $6,700 $6'700 Ana train station - Provide brief summary technical memorandum detailing the model results with associated results tables and figures and recommendations for improvements John Garthe to Walnut Station Transmission Main Analysis: - Analyze the need /impact of a new transmission main from John Garthe Station to C Walnut Station and assess the benefits of being able to move a large quantity of $ 36 44 $6,700 $6,700 water from Garthe to Walnut under two (2) different operating conditions - Provide brief summary technical memorandum detailing the model results with associated results tables and figures and recommendations for improvements EOCW D Water Purchase Analysis: - Analyze the ability /benefits to purchasing water from the East Orange County D Water District and the impacts to system operations under two (Z) different 6 32 38 $5,750 $5,750 operating conditions - Provide brief summary technical memorandum detailing the model results with associated results tables and figures and recommendations for Improvements Pressure Zone Analysis: - Analyze the feasibility and benefit of dividing the City's low pressure zone into two E separate zones. This will essentially split the City into 3 zones instead of the existing 6 32 38 $5,750 $5,750 - Provide brief summary technical memorandum detailing the model results with associated results tables and figures and recommendations for improvements Power Outage Analysis: - Analyze system resiliency and Impacts In the event of a full and prolonged power F outage. This analysis will include all groundwater well and booster pump stations 6 32 38 $5,750 $5,750 off, with only MWD import connections on. - Provide brief summary technical memorandum detailing the model results with associated results tables and figures and recommendations for improvements G Provide support to City staff for GIS, hydraulic modeling, analysis, planning, 60 160 220 $34,300 $34,300 application development, and training services on an as- needed basis 25F -17 Exhibit A City of Santa Ana Water System Computer Model Solutions Labor Hours & Budget Estimate � IDM DELING We can be more, together. 25F -18 0 n Task Project Task or Subtask Description C W y° `0 9 m m u a v ro O D v o i" x 0 h � ,. ,S t'`� p YL aq e`,�® tjo,, d f 4J R - ?,��,.... ", �?}�9,G4r� A � � Y a Master Plan Consultant Coordination - IDM will coordinate with the City's master plan consultant to configure Sedaru Smart CIP to match an agreed upon prioritization methodology. IDM will facilitate the import of project data into Sedate 12 40 52 $8,020 $8,020 A and use this list to "calibrate" the Sedaru Smart CIP planning tool and perform a comparison of .software output with a representative set of recommended CIP projects. Configuring likelihood of failure based on asset performance - includes history of 8 56 64 $9,600 $9,600 B existing pipes (age, material, no. of breaks), hydrants, valves, etc. C Configuring consequence of failure including pipeline criticality, impact on critical 8 40 48 $7,280 $7,280 customers (hospitals), # of customers affected, etc. D Configuring constructability of each recommended system Improvement considering 8 40 48 $7,2IIq $7,2$0 paving schedule coordination, traffic impact, easements, RR or ditch crossings, etc, Configuring automated capital action plan using the weighted /prioritized likelihood E of failure, consequence of failure, and constructabillty criteria to generate a dynamic 8 40 48 $7,280 $7,280 CIP list Integrating - IDM will integrate the Smart CIP software with City's existing systems F including the City's current Sedate Command Center, mobile data collection 8 40 48 $7,280 $7,280 applications, hydraulic model, and GIS database Software & Training - upon Smart CIP software Implementation and calibration, IDM G will coordinate a workshop to train City staff to utilize the software to Its full 0 20 20 $2,900 $25,000 $27,900 capabilities Wti>fns Model.... A Provide support to City staff for GIS, hydraulic modeling, analysis, planning, 1.00 560 660 $99,7D0 $99,70D application development, and training services on an as- needed basis $ &'IrimplemerlttipY1'(iQ16 ii)., ry..'$Q5,u4ii ,4 ,, Sedaru mark, CepsSaftWare „sue.. .�.;., y,6 t 12n „ >. }60$24,641 �8 ,.ail, Program Operational Schema: IDM will work with the City to understand City 4 12 16 $2,480 $2,480 A operator's current operating strategies. Update computer modeling with automations: IDM will utilize the hydraulic computer model to add functionality to the system, which may Include: real -time B hydraulic modeling, monitoring of existing water system facilities, automating alerts 16 64 80 $12,240 $12,240 and notifications associated with predefined system demand and /or operating thresholds which may be associated with inefficient pumping or high energy costs. Develop Operator Recommendations: Recommendations will be automated in C accordance with criteria developed with City operators and engineering staff to 16 48 64 $9,920 $25,000 $34,920 consider best operating practices, required customer service levels, and methods of operation to maintain water quality standards. 25F -18 Exhibit A City of Santa Ana Water System Computer Model Solutions Labor Hours & Budget Estimate IDMODELIN ' We can he more, together, A Provide support to City staff for GIs, hydraulic modeling, analysis, planning, 100 560 660 $99,700 application development, and training services on an as- needed basis $89'700 Program Uni- dlrectional Flushing Criteria: IDM will work with the City to understand City operator's current flushing and water quality strategies, as well as the typical A areas of lesser quality, system parameters that may Impact quality and good /poor 12 28 40 $6,280 $6,280 locations to flush, and recommended flushing outlets (storm drain catch basins, sewer manholes, etc.). Update Sedaru Smart Quality with Flushing - specific Automations: Uni- directional flushing sequences will be automated based an results and output from the City's B hydraulic computer model, GIS, and CMMS, including: customer complaints, history 16 56 72 $11,080 $11,D84 of water quality samples and asset maintenance to optimize flushing sequences and maximize the benefits of Flushing for water quality and customer service, while minimizing stress to the system, and water lost during flushing events. Develop Automated Flushing Recommendations: Recommended sequences from C the uni- directional flushing program will be mobile, map - driven, and Interactive with 16 64 80 $12,24tl real -time, departmental communication to enable support and response to flushing $20,000 $32,240 tasks, and potential impacts to customers. 25F -19 L O C, m V h 0 Task Project Task or$ubtask Description Cr W T W u M v a M ut A Provide support to City staff for GIs, hydraulic modeling, analysis, planning, 100 560 660 $99,700 application development, and training services on an as- needed basis $89'700 Program Uni- dlrectional Flushing Criteria: IDM will work with the City to understand City operator's current flushing and water quality strategies, as well as the typical A areas of lesser quality, system parameters that may Impact quality and good /poor 12 28 40 $6,280 $6,280 locations to flush, and recommended flushing outlets (storm drain catch basins, sewer manholes, etc.). Update Sedaru Smart Quality with Flushing - specific Automations: Uni- directional flushing sequences will be automated based an results and output from the City's B hydraulic computer model, GIS, and CMMS, including: customer complaints, history 16 56 72 $11,080 $11,D84 of water quality samples and asset maintenance to optimize flushing sequences and maximize the benefits of Flushing for water quality and customer service, while minimizing stress to the system, and water lost during flushing events. Develop Automated Flushing Recommendations: Recommended sequences from C the uni- directional flushing program will be mobile, map - driven, and Interactive with 16 64 80 $12,24tl real -time, departmental communication to enable support and response to flushing $20,000 $32,240 tasks, and potential impacts to customers. 25F -19 25F -20