HomeMy WebLinkAbout23A - PROJ - BRISTOL ST WATER MAIN01 0- a di I CITY COUNCIL MEETING DATE: OCTOBER 6, 2015 TITLE: r ka s : • CLERK OF COUNCIL USE ONLY: ❑ As Recommended ❑ As Amended ❑ Ordinance on I" Reading ❑ Ordinance on 2 °v Reading ❑ Implementing Resolution ❑ Set Public Hearing For CONTINUED TO FILE NUMBER 1, Award a contract to Vido Artukovich & Son, Inc„ the lowest responsible bidder, for the construction of the Bristol Street water main Improvements, Alton Parkway to Warner Avenue, In accordance with the base bid in the amount of $2,504,460 subject to nonsubstantive changes approved by the City Manager and City Attorney. 2. Approve the Cost Analysis for a total estimated project delivery cost of $3,255,800, which includes the contract base amount, administration, Inspection, testing, and a 15 percent contractual contingency of $376,673 subject to nonsubstantive changes approved by the City Manager and City Attorney. DISCUSSION The existing 16- inch - diameter ductile iron water main on Bristol Street between Alton Parkway and Warner Avenue (Exhibit 1) was installed in the 1980s, and has begun to experience a number of breaks and leaks. Staff monitors the condition of water main pipelines by assessing critical factors such as history of breaks, size, location, and system redundancy to determine the priority of replacement needs. Based on an analysis of these factors and the corrosive properties of the soil, the water main along this segment has been identified as one of the highest priorities for replacement, due to Its high probability of failure and significant consequences to vital facilities (such as Orange Coast Hospital as well as other medical offices and businesses), should a failure occur. A Notice Inviting Bids was advertised on August 11 and 12, 2015, and bids were opened on September 17, 2015. The following is a summary of the bid Invitations mailed and received, and the bid results, - ` � r RSICTi1 Santa Ana contractors receiving notices 6 Contractors requesting bidding documents 22 [aids received 6 Bids received from Santa Ana contractors 0 23A -1 Contract Award for Bristol Street Water Main Improvements October 6, 2015 Page 2 Bid Results Summary RANK BIDDER'S NAME LOCATION BID 1 Vido Artukovich & Son, Inc. South El Monte $2,504,490 2 Minako America Corporation Gardena $2,587,640 3 GRFCO, Inc. Brea $2,776,000 4 Sully - Miller Contracting Company Brea $2,828,779 5 Ferreira Construction Company Chino $2,8771000 6 Downing Construction, Inc. Redlands $3,587,890 Six bids were received and considered responsive, with Vido Artukovich & Son, Inc., submitting the lowest responsive bid. The bid amount of $2,504,490 is comparable to the Engineer's Estimate of $2,300,000 and is incorporated into the Construction Contract (Exhibit 2). Based on the bids received, staff recommends award of this contract to Vido Artukovich & Son, Inc. STRATEGIC PLAN ALIGNMENT Approval of this item supports the City's efforts to meet Goal #6 Community Facilities & Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City assets), Strategy C (invest resources to extend the service life of existing infrastructure to protect the City's investment and support a high quality of life standard). ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER #2015 -8 will be filed for this project. In addition, a Certification of Categorical Exemption and Statutory Worksheet have been prepared in accordance with the National Environmental Policy Act. FISCAL IMPACT The estimated total delivery cost of this project is $3,255,800, which includes construction, contract administration, inspection, testing, surveying, and contingencies (Exhibit 3). Funding is available in the Water Capital Projects Fund (Account No. 06617647- 66301) for Fiscal Year 2015 -2016. R ed Mousavipour ecutive Director Public Works Agency FM /EWG /ET Exhibits: 1, Vicinity Map 2. Construction Contract with Bid 3. Cost Analysis APPROVED AS TO FUNDS & ACCOUNTS: Francisco Gutierrez Executive Director Finance & Management Services Agency 23A -2 VICINITY MAP m Exhibit 1 23A -3 23A -4 CITY OF SANTA ANA CONTRACT PROJECT NO. 14 -6439 BRISTOL. STREET WATER MAIN REPLACEMENT This CONSTRUCTION CONTRACT is made and entered into this 6th day of October, 2015, by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California, hereinafter referred to as "CITY" and Vido Artukovich & Son, Inc., hereinafter referred to as "CONTRACTOR ". WITNESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Bristol Street Water Main Replacement ( "Work of Improvement ") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents," which include the following: •... Notice Inviting Bids •... Information to Bidders •... Bid Proposal Bid Bond •... Contract Form • ... Contract Bonds • ... Special Provisions •...Technical Provisions • ... Project Plans •... Appendix In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment for this Work of Improvement the sum total amount of $2,504,490.00, as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A." The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual Cnmrac� 12-20H EoAtSz CITY OF SANTA ANA CONTRACT PROJECT NO. 14 -6439 BRISTOL STREET WATER MAIN REPLACEMENT amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. Accordingly, this contract is subject to a 15% contingency amount, to be expended only at the written direction of the Executive Director of Public Works or his designee for additional services required due to unforeseen circumstances. 4. CONTRACTOR agrees to complete the Work of Improvement within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A ") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the Work of Improvement a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100 %) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100 %) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond equal to at least ten (10 %) percent of the final Contract price or $1,000, whichever is greater (Warranty Bond). Sample bonds are attached hereto and incorporated herein as Exhibit "B." Cm, mm 12-$014 23A-6 CITY OF SANTA ANA CONTRACT PROJECT NO. 14 -6439 BRISTOL STREET WATER MAIN REPLACEMENT IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: MARIA D. HUIZAR Clerk of the Council APPROVED AS TO FORM: SONIA R, CARVA City Attorney--' CITY OF SANTA ANA DAVID CAVAZOS City Manager RECOMMENDED FOR APPROVAL: andoval Fred Mousavipour, P.E. Assistant City Attorney Executive Director, Public Works Agency CONTRACTOR: Vido Artukovich & Son, Inc. /Vidmar, Inc. AJV By: / Title: VICLO Artu co is managing a. ner Cm. , ia� 2mn C -I c 23A -7 CITY OF SANTA ANA PROPOSAL PROJECT NO, 14 -6439 BRISTOL STREET WATER MAIN REPLACEMENT BID PROPOSAL TO; CITY COUNCIL, OF THE CITY OF SANTA ANA FRONT: Vido Artrukovich 6 Son, Inc. /Vidmar, Inc. A JV REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents Including the Plans and Specifications, read the Notice Inviting Bids, and reviewed the Summary of Bid Proposal Documents, List of Contract: Documents, and Information to Bidders for Proposal Submission, and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump SLIM(S) set forth In the following schedule: Item Bid Item _Quantity Price Amount 1 Mobilization, Demobilization & Cleanup 1 LS $j•d5000•� $ _ $ /moex� 2 Project Construction Signs 15 EA 3 Excavation Safety Measures, including Dewatering 1 _ LS $ Zou"`` $ zUt1,t10� 4 Contractor Staking, Verification of Utility Locations and Field Dimensions LS $75;aoa,° $ 7s,croo. 5 . _PVC Traffic Control 1 LS _ .,or�N.'^ —o' Water Main _ 6" C900 (DR 14) 10 - LF $ goo. =` $ Z, 000 • 6 8" C900 (DR 14) i 305 LF $ l5or, ` $ c(5, 750 • -- 10" C900 (DR 14) 40 LF $ za& =` $ 8/000. 16" C905 (DR 14) 4080 LF $ Zr(. °� $/ jL(,9 -zq.5 7 18" Ductile Iron Water Main (Class 350) 320 LF 7�70 P -la N'tWO ..0 Ivaponi M22- 20H.A.. 23A -8 CITY OF SANTA ANA PROPOSAL PRoicc'r NO, 14.6439 BRisToL STREIT WATER MAIN REPLACEMENT 8 8 Resilient Wedge Gate Valve 3 EA i Butterfly Valve 9 1fi" 7 EA $ S,,' 700. $ 1 EA $6i ea' $ b/ Zoo, 10 Fire Hydrant 19 EA c'J 5, 0 70. ` Remove and Replace Existing Domestic Service Remove 3 /A ", Replace with 1" v 1 EA $Zovo. $ Z,(,,am Remove and Replace 1" 13 EA $ Z, 0m). °4 $76 Opa, ds' Remove 11/2 ", Replace with 2" g EA ao,° Remove and Replace 2" 10 EA Z 5ce, w Remove and Replace Unknown SizeService 4 EA $ 3,0ao•" $ )Z 000, C= Re- Connect Existing Domestic Service 12 3 -^ 1 $ 3000, 411 6 !EA Re- Connect Existing Fire Service 4 "` - -� 1 EA $Y,5Cd1: "S na 13 611 H 2 EA $ If 010, ` $ 006. ° e 10 1 EA $ cf, Sw, °- $ q, Unknown Size Service 1 EA $ 7,,00.x' $ -7OtzC, 14 Remove & Replace Existing Fire Detector Check 1 EA 15 Construct 60" Valve Manhole�� 1— EA P -(b SueAnn ] � x tlrarytlml °9ZL201 A.(bu 23A -9 CITY OF SANTA ANA PROPOSAL PROJECT N0, 14 -6439 BRISTOL STREET WATER MAIN REPLACEMENT 16 Cut and Cap Existing Waterline 21 EA $ 6oO, ` $ f'Z 6OM 17 Remove Existing Fire Hydrant 19 EA $ 76'0, 'S $ 18 Abandon Existing Valve 37 EA $ ,` i. °4 $ f 3 56a r 19 Remove and Dispose of Existing Valve 11 EA $ 6WY "" $ 6 00 20 Abandon Existing Main in Place 1 LS $ 2 gee, n $ 2Sj 000v = 21 _ 2" Combination Air Vacuum Release Assembly 5 EA $3SU6. $ /7 v�. �s 22 4" Blow Off Assembly 8 EA $ L /5� `s $ 3b, 000, 23 Connect New Pipeline to Existing 18 EA $ ?,0 c•s $ 5z/, 0<yo'° -°, 24 Connect to Existing Concrete Cylinder Pipe 1 EA $ Z 000. $ -(� 00CX• nr 25 Replace Traffic Detector Loops 76 EA ky xn, == $ 38, (oo. a4 26 Signing and Striping 1 LS $1s;aCe" $ ZS,(ve. 27 As -Built Drawings 1 LS $30,000 $30,000 28 OPTIONAL Vertical Offset 4 EA $ 5 (Jcx3 $ V, Ocp q �u TOTAL BASE BID ITEMS 1 -28 — $ Z, 5o (, /W The lowest responsible bidder shall be selected based on the BASE BID Amount. The City reserves the right to award the Base Bid, and any, all or none of the alternate Bid Items. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete said work within one hundred (100) working days after the commencement date stated in the Notice to Proceed. The bidder also proposes to commence construction of the Work within thirty (30) calendar days after issuance of a Notice To Proceed, and to continue in a diligent and workman -like manner without interruption, and to complete the construction thereof within the time specified above. The liquidated damages amount, in lieu of that specified in Subsection 6 -9 of the Standard Specifications, shall be $1000 per calendar day. P-1 c' Scolinn 3 - n Pmpoe1109- 1S�SOIA dnep 23A -10 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14 -6439 BRISTOL STREET WATER MAIN REPLACEMENT The undersigned bidder acknowledges receipt of the following addenda issued for the above project. If no addenda have.been received, write "none," List of Addenda Received: 1,2 BIDDER Finn: Vido Artukovich & Son, Inc. /Vidmar, Inc. A JV Address: 11155 Rush Street, South El Monte, CA 91733 Telephone: 626 499 -4286 _ Signature: Vido Artukovich -:"Managing Partner The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable by the Engineer. All bids will be compared on the basis of the Engineer's estimated quantities of work. The bidder agrees that in case of not executing the required contract with necessary bonds within ten (10) calendar days, not including Sundays, after having received notice that the contract is ready for signature, the proceeds of the check or bond accompanying his bid shall become the property of the City of Santa Ana. The bidder also certifies that the bid Is a balanced bid. In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing Is true and correct. It is understood and agreed that: (1.)After the bid has been accepted, the designated contractor shall attend a pre -job conference. The contractor shall be Informed of said time and location. (2,)No verbal agreement or conversation with any officer, agent or employee of the City, either before or after the execution of the Agreement shall affect or modify any of the terms or obligations of this Proposal, (3.)The City will not be responsible for any errors or omissions on the part of the undersigned in making up their bid, nor will bidder be released on account of errors. P -Id Seclinu f -w Pmpnxnl 09422111 M1.Am:x 23A -11 CITY OF SANTA ANA PROPOSAL PROJECT NO. 14 -6439 BRISTOL STREET WATER MAIN REPLACEMENT CONTRACTOR'S LICENSING STATEMENT The undersigned contractor, or corporate officer, declares under penalty of perjury that the following is true and correct. Contractor's Name: Vido Artukovich & Son, Inc. /Vidmar, Inc. A JV Business Address: 11155 Rush Street, South E1 Monte, CA 91733 Telephone: 626 444 -4286 State Contractor's License No, and Class: 726231 A Expiratio Signed: Title: Managing Partner P -1 e &er.Aon 3 � n �mpnoxl On- 2J- 2tll9tlucr 23A -12 i / CITY OF SANTA ANA PROPOSAL OWNERSHIP AFFIDAVIT STATE Or CAU PORN IA ) COUNTY OF ORANGE } SS: CITY OF SANTA ANA ) Vido .Artukovieh ,being duly sworn, deposes and says: [I INDIVIDUAL That lie/ she is the party rnaldngtheforegoing proposal: []PARTNERSHIP PARTNERSHIP That he /she is a member of the co- partnershfp firm designated as': and who has been and is duly vested with the authority to make and execute Instruments for the copartnership by: who constitute the other members of the eo- partnershlp, - O CORPORATION That he Is oh, e corporation which 1, making the foregoing proposal: (JOINT VENTURE That he is oh __ — - - - ` one of the parties making the foregoing proposal es a Joint venture, and the ha /she has been and is duly vested with the authority to execute-instruments for an on behalf of the partiesmeking.said bid who are: Vido Artukovich & Son, Inc. /Vidmar, Inc. A JV that such a bid Is genuine and not collusive or sham; and has not in any manner sought by collusion to secure any advantage against the City of Santa Ana or any person interested in the proposed contract, for himself orally other person. Signature of Bidder CALIFORNIA JURAT WITH AFFIANT STATEMENT GOVERNMENT CODE 8202 A notary public or other officer completing this certificate verifies only the Identity of the Individual who signed the document to which tills certificate is attached and not the truthfulness accuracy, or validity of that document. State of California County of Los Angeles Subscribed and sworn to (or affirmed) before me an this 16th of September, 2015 by Vido Anukovich, proved to me on the basis of satisfactory evidence to be the person who appeared before me. y r 9fAgtlN ANTU 212104 N 292191 CatrrYaafon 9 r✓ NuParyPa9Me- C91111orms Signature �= Loa Mpak1 County � 1R i mrtt. a 9rn dW 31 299 23A -13 CITY OF SANTA ANA PROPOSAL KNOW ALL MEN BY THESE PRESENTS that, Vido Artukovich & Son Inc /Vidmar Inc a JV of Bristol Street Water Main Replacement from Acton Ave, to Warner Ave. , as BIDDER, and as SURETY, are held and firmly bound unto the CITY OF SANTAoANt as T br GgNCY, in the penal sum of en percent of total amount bid Dollars ($ 10% o Eota ), which Is ken percent (10 %) of the total amount bid by BIDDER to AGENCY for the above- stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above- stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER In the manner and time specified, then this obligation .shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this 2nd day of September 2015 BIDDER* Vido Artukovich & Son Inc /Vidmar Inc a JV, 11155 Rush St., So. El Monte, CA 91733 By: Vido Artukovich — Managing Partner SURETY* Fidelity and Deposit Company of Maryland, 777 So. Figueroa 5t., #3900, Los Angeles, CA 90017 Subscribed and sworn to before me see attached this �� day of 20 Signature; Notary Public in and for the County of , State of *Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative. �eauwit rPnOrziu�ll9,]1!UlJ tluu, F-.F 23A -14 CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT Civil Code § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. State of California ) y ss County of Los Angeles } FP 0 2 2015 On ,before me, Natalie K. Trofimoff, Notary Public, personally appeared Noemi ouiroz , who proved tome on the basis of satisfactory evidence to be the persons whose nameko isAare subscribed to the within instrument and acknowledged to me that FiefsheAJtey executed the same in 4WI� Ierf*eie authorized capacity4s4, and that by WgherAr& signaturejr,} on the instrument the persons }, or the entity upon behalf of which the persons) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. ...... ... .... ,.. �' <•. NATALIE K. TRONIMOPF k�w,.T •„ Commission No 1957481 z U rr"1 _. NOTARY PURU &CALIFORNIA p LOS ANGELES COUNTY My Comm. Explros OCTGRER 22, 7016 (Seal) 1 i i �.' ^V�n ) Signature:_ r l (u> Natalie K. Trofimoff, Notary Publi 23A -15 ZURICH AMERICAN INSURANCE COMPANY POWER OF ATTORNEY KNOW ALL [MEN BY THESE PRESEN'T'S. that the ZURICH AMERICAN INSURANCE COMPANY, n corporation created by and existing under the Incas ol'the State of New York do0s hereby notninate, cmamianc and appoint C. 1C, NAKAMURA, Lisa L. THORNTON, E. S. ALBRECHT ,ltd., Marla PENA and Noeml QUIROZ, all of Los Angeles, California, EACH its u'ue and lawful Attorneys -In -Fact with power told authority horsily comforted to sign• seal. and execute in Its behalf, during the period beginning willadllc date 01' issunnre of this power, : any and fill bonds and underhddngs, recognizances or other written obligations in tjl • rigakotherk', and to hind ZURICH AMERICAN INSURANCE COMPANY thcrchy. and till of the lots of sod Atfmncylsl In fncf jayrut�r9t Yi1 IGcye pro. ?cots are botchy ratified and confirmed . This Power of Attorney is made and executed pwsuanl to and [imll'e mrtl�prll� &1` hU 1t�llobvfti`g�"f4jr Law duly adopted by the Board of Directors of the Company which By -Law has not been nrnen ledgi�I li, 1pldal ,1; I, „I, Article VI. Section 5. ...... rho President or It Vice Presitjt.rlC�ytlwtLtV inel'fuoic�lt;at {yslc{1 by'f!,�crdtvy or an Assistant Secretary may appoint any Pelson Autancy -hr-Fuel with- uutUartf9t,l'�S.�.x dot sLrcl - hpdsoa I,nj;WWf•or "the Company and other fornrtil underwriting conhmcis in reference therua tact teinsur Utcual1, Ill tYa � fAl%&ina`palfees and bonds of of kinds mad touch the cot panne seal Any such officers ntpLius ol�e;Qm ptrwors "rkirltad It y ome.y in Fact." This Power of Attorney is siy.pUit shot, gynle�i�hy�,'�'9¢alLioikrdn<ler and by the authority of Llw following Resolution adapted by the Eourd of Directors of to ZURICH AN1F.L�IC.AN- (NSUI PANY by unanimous ttesent in lieu of 9 special meeting dated Decemher 15, ” RESOLVED. that the signatuue of the ['resident or a Vice President and the nuesting signature of it Secretary or an Assistant Secretary and the soul at' rite Company may be affixed by fnesinadb; on any power or Attorney pucsu9nt to Article Vt, Section 5 of the Hy -Laws. and the Signature of a 5ocrelnry or till Assistant Secretary and the soul of the Company may be affixed by hilishnil0 to any ceitiricme of' tiny such power. Any such power or any certificate thereof with such fucshnile signature mad seal shall Lie valid and binding on the Company. FLlrtllermel8, such power so executed, sualod and clarified by certificate so executed and scaled shelf• with respect to any bond or undertaking to which it is attached, shelf continue to be valid and binding on the Company." IN WITNESS WHEREOF. the ZURICH AMERICAN INSURANCE COMPANY has caused these presents In ho executed in its more and on its behalf and its Corporate Seal to be h0oXmto affixed and attested by its officers thereunto duly nuthurizecl. this 15th day of Nuvembur, A.D. 201 L This power of attorney revokes (fiat issued on behalf of C. KC NAKAMURA, Lisa L. THORNTON, E. S. ALBRECHT JR_ Maria PENA, dated Juno 24, 2011. a„omnoqn„ a'P`cp n•a..... ZURICH AMERICAN INSURANCE COMPANY S9'ATE OF MARYLAND SS Sy: a' : - CITY OF {3ALTIM012E Eric D. Barnes 5ecrenu.c (i-nnk E. Nlnrlln Jr: I'ic•a President On [lie 15th clay of November, A.D. 2011, before the subscriber, a Noway Public or the State of Maryland, duly commissioned and qualified, come the shove named Vice President and Secretary of ZURICH AMERICAN INSURANCE COMPANY. to ore personally known to he the ardividjais and officers deseribud in and who executed the preceding instrument and they each acknowledged the uaecution Of the same and heing by me duly sworn, they severally and each for himself deposed and said that they respectively hold the offices in said Cogloralion as indicated. that the Seal affixed to the preceding Instrument is the Corporate Seal orsaid Corporation, and that the said Corporate Sent. and their ruslrective sbgncuure as Such WrCOrs, woe duly affixed and subscribed to the said instrmrcrot pursuant to ell 11110 corporate authorization. IN WfTNLSS WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year fhyl above. 111 �.rC)'l.G�.rV' ✓.?. ,1111,• Nolao— Poblir iV v Commission Esphes: ,hdc 14.2015 This Power of Attorney limits Ilse lots of those maned therein to the bonds and undertaking specifically named therein, and they have na authorfty 10 hind the Company except In the manner and to the extent herein stated. CERTIFICATE 1. the undersigned. a Socrcituy of the ZURICH AMERICAN INSURANCE COMPANY, do hereby cerify that the foregoing Power of Attorney is still In full force and e1'fCCL.9nd further certify that Article VI. Section 5 of the 6y -Lows of the Company and the Resolution of the Board of Directors set forth in said Power of Auorncy are still fn force. IN I FS- I'IMONY WHEREOF I have hereto subscribed my name and ai'tixad file seal of said Company sip us : =t the day of— ''y'67•, .... .. �h: Gerald T". Halev S'erretarc "''r... ° *„ ;r`'• POA -Z ZA 012 -01150 Serial Number.TH2O11November15ZA 06 -11 ZA06 -I1 ZA I1 -11 ZA 012.DI15C 23A -16 CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT Civil Code 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate Is attached, and not the truthfulness, accuracy of validity of that dOCUment. State of California ) )ss County of Los Angeles ) On September 16, 2015 before me, Sharon Artukovich, Notary Public, personally appeared Vido Artukovich, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the Instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY FOF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct, WITNESS my hand and official seal WARCN ARIUKCVICN C®UadfiM N 4121018 Notuy fubk - CYHorela lot AWN County it (Seal) Sigriratu[ __ .15 ��"� 1'�U�i w . Sharon Artukovich, Notary Public 23A -17 23A -18 COST ANALYSIS CONSTRUCTION OF THE BRISTOL STREET WATER MAIN IMPROVEMENTS ALTON AVENUE TO WARNER AVENUE Construction Contract Contract Administration Inspection and Testing Construction Survey Staking Contingencies (15 %) TOTAL ESTIMATED DELIVERY COSTS Exhibit 3 23A -19 $2,504,490 $137,746 $187,802 $50,089 $375,673 $3,255,800 23A -20