Loading...
HomeMy WebLinkAbout65A - SURPLUS ALLOCATION PLANREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: OCTOBER 20, 2015 CLERK OF COUNCIL USE ONLY: TITLE: APPROVED ❑ As Recommended REVIEW AND ADOPT THE FY 2014 -15 ❑ Amended El O Or rdinance on 1� Reading SURPLUS ALLOCATION PLAN, AND ❑ Ordinance on 2" Reading APPROVE APPROPRIATION ❑ Implementing Resolution ADJUSTMENT ❑ Set Public Hearing For {STRATEGIC PLAN NO. 4, 1; 6, 1, 2} CONTINUED TO _/ a Z FILE NUMBER CITY MANAG ' R Recommended Action 1. Review recommendations and adopt a Fiscal Year 2014 -15 Surplus Allocation "List of Projects" for consensus approval by Mayor and City Council: Options • Review options and direct staff to make adjustments to the Fiscal Year 2014 -2015 Surplus Allocation Plan at the discretion of the Mayor and City Council. Approve a combination of surplus eligible projects from the 'List of Projects" and direct staff to appropriate funds in the amounts identified by the Mayor and Council. • Review and approve identified projects that are CDBG eligible according to the discretion of the Mayor and City Council funded by the sale of Bristol Street Remnant Parcels in the amount of $2,000,000. • Review and approve Santa Ana Regional Transportation Center's 'maintenance and improvements' in the amount of $3,800,000 pending completion of city -wide credit analysis indicating the use of the Economic Investment funds would have no adverse impact on the City's credit rating. Approve the establishment of the Council Special Projects Fund (fund 50) and the appropriation adjustment recognizing $11,250,000 from the Fiscal Year 2014 -15 General Fund Balance and appropriating the same to the Council Special Projects Fund expenditure and reserve accounts as outlined in the Surplus Allocation Plan. DISCUSSION During the Fiscal Year 2015 -16 budget approval process, the staff identified a substantial General Fund surplus due to increased revenue and decreased expenditures across the City. It was 65A -1 Budget Surplus Allocation Plan October 20, 2015 Page 2 estimated that the surplus would be at least $10 million in one -time funds. The City's Charter requires that the City Manager present a Fiscal Year Budget. Any available and unappropriated funds after the adoption of the budget are reviewed with input from the Mayor and City Council for use and allocation of these funds. Staff first met with the City Council individually and summarized those comments and priorities at the August 18, 2015 City Council Retreat. Staff also presented on the City's various funding needs that included parks deferred maintenance, safety and security needs, strategic investments, facility and asset repair /replacement, and technology upgrades that accumulated to nearly $60 million. The City Manager and Finance and Management Director began meeting with the Mayor and City Council to discuss the priorities and receive additional feedback. A revised budget surplus allocation proposal was presented at the September 15, 2015 City Council Meeting as a Work Study Session item. During this meeting, general consensus priority items were presented and staff was given direction to finalize the Surplus Allocation Plan and to continue receiving feedback from the Mayor and City Council. Direction was also given to identify additional funding sources to complete high priority projects that would otherwise not be completed, by utilizing the City's Economic Uncertainty Reserve Account, as well as the potential revenue from the sale of a CDBG surplus property (Attachment 4). Staff continued to meet with the Mayor and City Council, in addition to numerous community groups and residents. Attachment 1 represents the proposed Surplus Allocation Plan as best synthesized from the input of the Mayor and City Council. The Fiscal Year 2014 -15 budget surplus is $11,250,000. STRATEGIC PLAN ALIGNMENT Approval of this item allows the City to meet Goal #4 City Financial Stability, Objective #1 (Maintain a stable, efficient and transparent financial environment.) Goal #6 Community Facilities & Infrastructure, Objective #1 (Establish and maintain a Community Investment Plan for all City assets.) Objective #2 (Address deferred maintenance on City buildings and equipment.) FISCAL IMPACT The appropriation adjustment will recognize and carry forward from Fiscal Year 2014 -15 an available General Fund balance (account no. 01102002 - 50001) of $11,250,000. This amount will be allocated to a new Council Special Projects Fund (account no. 05002002 - 59000 -011) and appropriated to various departments for projects over the next three fiscal years (Attachment 1): Fiscal Year Allocation Amount 2015 -16 (Current Year) $6,511,816 FY 2016 -17 $4,226,520 FY 2017 -18 $511,66 4 Total $11,250,000 65A -2 Budget Surplus Allocation Plan October 20, 2015 Page 3 Fiscal Year 2015 -16's appropriation will be distributed as follows: $6,511,816 to project expenditures and the remaining $4,738,184 to reserve appropriations. The reserve amount will then be reassigned per the Surplus Allocation Plan to various projects as part of the Fiscal Year 2016 -17 and Fiscal Year 2017 -18 budget process. APPROVED AS TO FUNDS AND ACCOUNTS: Francisco Gutierrez S� Executive Director Finance and Management Services Agency Attachment 1: List of Projects - Surplus Allocation Matrix Attachment 2: Surplus Allocation Description Attachment 3: Public Letters & City Response Attachment 4: SARTC & Expressed Interest Items - Matrix 65A -3 65A -4 $Q W J Z W 6 U Q 2 0 O N .-1 65A -5 ry 0. 0 �o 0 N � m � r d I•. 47 N1 lP 5° p ui p t° O Cs N O � .yam ou iLLV y M !M1 U1 !R Y1 U3 f» ff3 Vp3 M fA vp3 N pp O pW O O N o O Op o S O pM N O O q VJ ry � M de' flR H PR 69 Vi Vl Efi ER Vi 49 64 V} » o µE9 W ° b E O w E c+ o E m $ o � � - - a�aa�aaaeee � e � �• � �• � e � q e �e UL e e 7 °o in a 53 CB a m m w' w n �n ti v3 in �n yr LL LL w LL LL LL LL w C7 U' CD U' CD 0 U' C7 S N p Y. .9 r h� A tR Ns fsi M :R ET W Vi W !9 bl Vi fn Ff3 64 lq e} `m n `m `m v m `m to .62 g s .� U m m d m m a v v a v vv 'vo a •f°o °° U U U U CS U J 0 O v EL •0.y m a E a v m a M m U � m m ri`i' r°i o � °c"f c� ,� �' L• ? � ;D :�' ,'.u_^ df 4�± •� � .� c '_° c' o :� � m ,{�5 N N a N C/] Cn fn x° —U' z U �' .Pa3 E d U V dP Z �- o_ a o o n 0. — c oc . o. V r. m 4 65A -5 ry 0. 65A -6 w h b r N F � Y V V vl f9 to Vl O � W N N y r J Q O Q N ~ r4 � Ili N b f- In N N Y N N W 4. N a r'o 0 N � Y N pp = yi 4N fR O a E � U ° K u3 y y rn w m e 6 6 �y l7 LL LL LL LL LL k LL LL w LL _ a � o y c O1 o g S S O O O g C u0'i pO N N d' VS r N o O H 69 bT bi Vi (Pl F%yi 6? fR Yl Vy bA y, io N w li lL Il lL li W LL L2 lL N c c � m LE U NNL. o v w > � P, a : pE ro Q E All - � O o ' Ea a. Lz: LL IS U U 65A -6 w h b r N F � Y V V vl f9 to Vl O � W N N y r J Q O Q N ~ r4 � Ili N b f- In N N Y N N W 4. N a Exhibit 2 SURPLUS ALLOCATION DESCRIPTION • ANGEL RESTROOM RENOVATION ($50,000) o Angel Park restroom was installed approximately 40 years ago. The restroom is heavily used and vandalized. Complete renovation is needed. Work will Included fixture replacement, re- roofing, patching, vandal resistant doors, painting, etc. • RIVERVIEW COURT AND PARKING LOT RENOVATION (96,200) o The existing basketball court has large cracks, game lines are faded and court needs complete resurfacing to avoid any potential injury. Similar situation is evident in the parking lot. Project will include renovating both the parking lot and basketball court. • SANTIAGO BIKE TRAIL RESURFACING PROJECT ($70,000) o Tree roots have lifted various sections of the existing bike trail through Santiago Park. Project will include section removal, root pruning and resurfacing to the bike trail. • SANTIAGO PLAYGROUND EQUIPMENT REPLACEMENT ($230,000) o Replacement parts are no longer available for the existing play equipment. As sections of the play equipment wears out or gets vandalized, the area is blocked off or modified with other parts. The play equipment will be replaced as part of this project. • BOMO KORAL SIDEWALK /WALKWAY RENOVATION ($160,000) o The existing concrete walkway and picnic area are lifting and cracking due to tree roots and soil condition. Sections of the walkway and the entire picnic area will be removed and replaced as part of this project. • DAN YOUNG SOCCER FIELD #2 SYNTHETIC TURF REPLACEMENT ($640,000) o The synthetic turf warranty on field #2 has expired. The field shows signs of extreme wear. Sections of the synthetic turf have been patched several times and the GMAX rating is below is below average. Project will include removal of the existing turf carpet and replaced with a new carpet and additional rubber material. • CABRILLO TENNIS COURT RENOVATION ($75,000) o The existing tennis court on the east side of Cabrillo Park is not playable. Tree roots have lifted sections of the court to make it unsafe to use. Project will include removal of the court section and tree, new concrete surface, color coating, fence repair, and nets. • WINDSOR TENNIS COURT ($140,000) o The existing tennis court at Windsor Park is not playable. Tree roots have lifted sections of the court to make it unsafe to use, Project will include removal of the court section and tree, new concrete surface, color coating, fence repair, and nets. • CIVIC CENTER JOINT POWERS AUTHORITY RENOVATION ($419,000) o The Civic Center budget includes several projects that are managed by the County and /or the City. The Civic Center Budget that was approved by the City Council required the City and County to provide $820,000 each to balance the budget request. Funding is needed for the city's share of the match. Projects include Renovation of Civic Center Storm water lift stations, repair of lifted sidewalks, re- caulking to Plaza of the Fountains and Plaza of the Flags, ADA Improvements by City Hall Council Chambers, Courthouse /Library Parking Structure (Elevator modernization, generator replacement, 65A -7 and structural assessment), and Stadium Parking structure elevator modernization plans. • BODY CAMERAS ($350,000) o The body -worn camera program will outfit 200 officers with body -warn camera. The program will include the cameras, hardware, accessories, docking stations, and monthly service fees for data storage /management. The program will be coordinated by a new special projects Sergeant and Police Evidence and Supply Specialists. • SECURITY LIGHTING: WINDSOR, SANTA ANITA, LILLIE KING, MADISON, FISHER. SANTIAGO, BOMO KORAL AND HERITAGE PARKS ($540,000) o The existing security lighting at Windsor, Santa Anita, Lillie King, Madison, Fisher, Santiago, Bomo Koral, and Heritage Parks were installed as wooden or metal poles with High Pressure sodium or Metal Halide fixtures 30 to 20 years ago. The wooden and metal poles have deteriorated and are a safety concern. The project replacement with concrete security lighting poles and energy efficient LED fixtures /lamps. • HOMELESS ($400,000) • GIS SYSTEM DEVELOPMENT ($125,000) o For a city the size of Santa Ana, GIS technology is not being used to its potential. The goal of this project is to enhance the existing GIS program to provide spatial analysis of citywide date, including infrastructure /ROW data, City facilities, census data, zoning information, and permit work. A robust GIS system will provide a solid foundation for integration with the future Asset Management System, which is identified in the City's Strategic Plan. • NETWORK, DATA CENTERS AND SERVERS /SOFTWARE, COMMUNICATIONS UPGRADE ($1,065,000) o The recommended allocation invests in infrastructure upgrades in order to increase system reliability while providing the necessary infrastructure to advance and take advantage of new technologies. Initial projects will focus on datacenter development and relocation, critical network component upgrades, critical software upgrades, and new functionality / integration of the current phone system and computing systems (unified messaging). • IT EQUIPMENT UPGRADES- COMPUTERS /LAPTOPS, MOBILE TECHNOLOGY, PHONES ($273,600) o IT equipment upgrades, specifically computers /laptops, mobile technologies such as smartphones and tablets are vital to the efficiency and productivity of City staff. Investing in the upgrade of IT equipment will help take advantage of improved desktop and mobile communications technologies and provide the necessary platform and computational resources needed to access City related information such as email, data files and folders, mobile applications, and multimedia files like audio and video. Upgrades to IT equipment will also provide access to essential City computing systems such as printing, Wi -r-i access, server -based and desktop -based applications, and online resources such as the Internet, cloud -based technologies, and web - enabled applications. 65A -8 • FINANCIAL BUDGETING APPLICATION ($400,000) o The System functionality includes reporting tools such as weekly, quarterly, or monthly budget reports. It would have the ability to integrate with our payroll software to populate personnel costs (salary distribution, positions, Medical, PERS costs, etcetera), prepopulate monthly cross charges to provide a base budget. The System would also have the ability to provide fund projections, run various budget and capital scenarios, and provide standardization of the budget document. Furthermore, the System will have the ability to integrate with the financial system (Lawson /Infor) to upload the approved budget. There are additional features as well, but I provided a brief synopsis of the recommendations. • PLANNING & BUILDING PERMITTING APPLICATION ($300,000) o The Planning and Building Agency has been assigned the Strategic Plan objective of evaluating our existing enterprise zoning and permitting system. This effort would allow for an assessment of our technology inventory and online services, and would recommend technology infrastructure and possible commercial products that could potentially be customized. • STRATEGIC COMMUNICATION ($140,000) o Funding requested to enhance communication tools and strategies, including translation services, public relations and communications related consulting services, explore and expand new technologies, and equipment needed for outreach activities (projectors, mobile screens, laptop computers, podiums, microphones and cameras). Funding request also includes marketing and advertising for promotional placement, collateral, and other equipment such as stand up banners and canopies. • PUBLIC WORKS CIP, ASSET MANAGEMENT, AND PROJECT MANAGEMENT APPLICATION ($300,000) o Enterprise Funds to Contribute. This project will identify the software and licensing specifications, hardware costs, and implementation schedule. • SANTA ANA CITY -WIDE BRANDING STUDY ($200,000) o The key to an effective branding effort is the consistent use of language and graphics that convey a unified strategic theme. Over time, the City of Santa Ana has used a variety of logos and graphic visuals to communicate its brand in advertising, brochures, outreach efforts, special events, public relations and even emails. These branding tools now are outdated and are part of a diluted approach to convey our message. In order to undertake such an effort, the City is seeking a qualified consultant to develop a new marketing and branding plan that will support the City's communications efforts while conveying this important new theme and tagline to the business and development community. • GENERAL PLAN UPDATE ($1,000,000) o A General Plan is the City's long -term blueprint for the community's vision of future growth. It is the long -range constitution that sets forth all of the goals, policies and programs for the City to ensure successful accomplishment of the City's vision. 65A -9 • METRO EAST ZONE EXPANSION ($100,000) o Amend the Metro East Zoning Ordinance and prepare required technical studies to allow for expansion of Residential and Mixed Use development opportunities west of the Santa Ana Freeway, along the First Street corridor. The Metro East Zoning Update will facilitate additional housing opportunities to meet local and regional needs, within nearby access to transit at the Santa Ana Regional Transportation Center (SARTC). • PENSION STABILITY FUND ($500,000) • PLACEMAKING CITY -WIDE ($100,000) o Public space is at the heart of a community's social fabric. It is where residents, employees and visitors come together to share ideas, develop lasting relationships, celebrate diversity and enjoy all that a city has to offer. The City of Santa Ana, the fourth - densest city in the United States, would benefit not only from more abundant, more accessible public space, but from better designed public spaces - this includes making improvements to existing, underutilized public space assets. A "placemaking" strategy could be used to improve the gathering places within the community —its streets, sidewalks, parks, buildings, and other public spaces —so they invite greater interaction between people and foster healthier, more social, and economically viable communities. • SARTC Deferred Maintenance- HVAC Replacement ($850,000) o Rebuild 29 complex air handlers with difficult access. • CORBIN CENTER IMPROVEMENTS- RESTROOM RENOVATION & FACILITY IMPROVEMENTS ($50,000) o Replacement of domestic commode with commercial commodes; paint exterior and interior of Center. • CORPORATE YARD: ROOF RESTORATION & FACILITY RENOVATIONS ($850,000) • GRAND CENTRAL: CHILLER REPLACEMENT — CAL STAE FULLERTON 2a0 ST. PROMENADE ($450,000) • POLICE DEPARTMENT JAIL: FACILITY RENOVATIONS ($150,000) • CITY HALL FACILITY AND SAFETY RENOVATIONS ($155,000) o City Hall rebuild original (1972) 9 -HVAC Air Handlers; Annex 1st floor failed carpet replacement; Elevator smoke measures to contain smoke in shafts in case of fire (mandated by OCFA). • NEWHOPE LIBRARY -HVAC PROJECT ($40,000) o Rebuild Air Handlers that distributes air in the library. • JEROME CENTER GYM & SOUTHWEST SENIOR CENTER — FACILITY RENOVATIONS ($50,000) • EL SALVADOR CENTER- UPGRADE EXTERIOR HVAC SECURITY ENCLOSURES ($15,000) c Modification of the HVAC security enclosures, as they are a weight hazard for maintenance. • FLEET ($1,300,000) o Slightly reduced. Replacement of City vehicles that are 15 years old and have excessive mileage. There currently is no funding available to replace vehicles that were purchased 65A -10 after 2012. This allocation will provide funding to replace 42 vehicles that were purchased 10+ years ago and have excessive mileage and repair costs, The older vehicles are expensive to maintain and expose the City to potential liability hazards. • CALLE CUATRO STREET SIGNS AND PLAZA CALLE CUATRO SIGNAGE ($25,000) o Complete the design, fabrication, and installation of signage related to Calle Cuatro. • SARTC Strategic Investment- Maintenance, Safety /Liability, Tenant space, signage ($3,800,000) o Completion of essential deferred maintenance to attract and retain quality businesses and transform SARTC into a destination location for travelers and the community. City staff will begin to contract work for the critical areas as soon as funding is available. Future projects will be coordinated by the on -site property management firm, once the agreement is finalized. • BIRCH PARK RESTROOM AND FENCING ($140,000) o The only restroom available at Birch Park is in the Senior Center, Patrons of the park only have access to the restroom when the center is open. Continual use of the restroom also disrupts senior programs. A park restroom Is needed to service the public and to minimize disruption in the senior center. A fence along the north and west side of the park is proposed in order to close the park at night and be designed to enhance the historical image of the park. Birch Park is the first and oldest park in the City of Santa Ana. • JOINT USE- GODINEZ FIELD AND TRACK ($500,000) o Centennial /Godinez Fields are part of an existing Joint use agreement. The existing sports field and track is of natural turf, decompose granite surface with sports lighting. To improve programming and expand use of the Godinez football /soccer field and track, both agencies are proposing to share the cost to install synthetic turf and rubberized running track, Additional funding is needed to fund the city share of this project. • SKATE PARK ($800,000) o The community has been requesting a 2nd Skate Park in the City of Santa Ana. The first skate park at Centennial Park is heavily used on a daily basis by skaters. The location of the 2nd skate park should be placed at another section in the city, in a park that has the space, and parking, and enough buffer to deal with the noise from the skaters. • THORNTON PARKING LOT RENOVATION ($270,000) o The asphalt on the existing parking lot is breaking down, turning to loose gravel and parking stall lines are fading. Renovation is needed to preserve the parking lot. Work will include removal, replacement, striping and ADA improvements. • WALKWAY /SIDEWALK IMPROVEMENTS: CENTENNIAL, LILLIE KING & MEMORIAL ($590,000) o The existing concrete walkway and asphalt walks are lifting and cracking due to tree roots and soil condition, Sections of the walkway will be removed and replaced as part of this project. • CABRILLO TC CLAY COURT INSTALLATION ($400,000) 65A -11 o The clay court installed on the southwest corner of Cabrillo Tennis Center is reserved on a regular basis. Space is available to install 2 additional clay courts on the south portion of Cabrillo Tennis Center. Project will include grading, clay courts, sports lighting, fencing and nets. • SECURITY LIGHTS: CENTENNIAL & KIWANIS BARRIER FREE PARK ($500,000) • The existing security and parking lot lighting at Centennial Park was constructed with wooden poles and high pressure sodium lighting. The poles are rotting at the base and are a potential liability concern. The project will include replacing the wooden poles with concrete poles and upgrading the lighting to energy efficient LED fixtures and lamps. • Kiwanis Barrier Free Park was constructed in Phases and the security lighting phase still needs to be implemented. The park is heavily used during the day and early evening. Security lighting is needed to provide safety to our park patrons during the evening and to allow additional programming /use of the park by disadvantage children. • SANTA ANA SENIOR CENTER 3RD ST- HVAC, LIGHTING, ELECTRICAL REPAIRS ($80,000) o HVAC upgrade system; install Lighting controls to reduce kwh; upgrade obsolete electric panel • MAIN LIBRARY- HVAC REPLACEMENT ($55,000) o Rebuild original (1958) air handlers that distribute air in library. • GIS System Development (an additional $100k from Enterprise) o Development of GIS System to increase functionality and software improvements. 65A -12 rl,lyb EL C NT RO Exhibit 3 CULTURAL DE MEXICO 319 N. BWh Street Santa Ana, Ca. 92701 September 22, 2015 To the City of Santa Ana Council Members, Mayor, and Staff: It is with great pleasure that we write to you with information regarding el Centro Cultural de Mexico's Building Acquisition Project. The Centro Cultural de Mexico has grown tremendously over the past twenty years, playing an important role in the cultural landscape of the City of Santa Ana. Today we find ourselves with a unique opportunity to give this treasured community asset a proper and permanent home in this great city. Furthermore, this project fits nicely into the City's Strategic Plan, fostering economic development that makes downtown Santa Ana a thriving, culturally diverse and entertainment destination. Regarding this year's budget surplus, we hope you consider the following important points. The California Endowment has granted $800,000 for the Centro Cultural de Mexico's building acquisition project. • This amount leaves us just past halfway, One prospective building, at 820 N Parton St. is listed at $1.4, Million. This amount does not include minor renovations to the building, which we have estimated will cost up to $200,000. • The Orange County Community Housing Corporation, a non - profit developer of 87 years in the County, has partnered with the Centro to offer their expertise in building management and development. • The UCl School of Law, The Kennedy Commission, and Santa Ana Building Healthy Communities are among the many Community Partners who are committed to use the space for diverse programming, service, and meeting needs. • Aside from the Centro's own EducArte weekly workshops and classes — 20 different community based, volunteer- driven workshops on dance, music, and art— the Centro's building will be a space for artistic collaborations and production, including multi -media production in video, graphic design, and audio production. • The building will house Radio Santa Ana, Santa Ana's first Low Power FM Community Radio, putting Santa Ana's local voices, news, and music on the air. "Cuando la cultura muere, la genie muere,,." vuww.else.nlrncu,ituraldorncx co.org 65A -13 The Santa Ana Building Healthy CommLmities Initiative has submitted a list of recommendations for the use of this $10 Million+ surplus. The Centro wholeheartedly supports this set of community proposals, and has included our building project in this list under "Community Spaces" funding. We thank you in advance for your attention and support, and herein request to meet with each of you, at your earliest convenience, before the October 61h vote on this matter, to answer any questions you might have. Please feel free to contact me at ] u; ;gi(aJelcentroculturalderracx co.ur or (714) 425 -5562. Respectfully, Luis A. Sarmiento Centro Cultural de Mexico 65A -14 Page 2 Santa Ana Healthy Neighborhoods Alliance ,1,t T October 1, 2015 C IIT Y r r; TO: Mayor MiguelPulido, MayorProTern VincentSarmiento, Councilmembers— MicheleVaRnez,Angelica Amezcua, Roman Reyna, David Benavides, Sal Tinajero, and City Manager Mr. CavazYSS,. RE: City Surplus Funds — Requests for Lights on the Pacific Electric Trail Dear Esteemed elected officials and Mr. Cavazos, City Manager The Santa Ana Flealthy Neighborhoods Alliance enthusiastically requests the approval for funds to install lampposts/ lights along the Pacific Electric Trail from Chestnut to South Main. Residents from six surrounding neighborhoods - Madison Park, Eastside, Heninger Park, Wilshire Square, Delhi and Memorial Park, totaling 53,000, and others throughout the city, consistently walk the bike trail either early in the morning or after work. During the early morning hours it is still dark when residents can be seen walking in groups with baseball bats and sticks for protection. Lights along the bike trail that function during dark hours are much needed for basic safety. From Sunset to daybreak, the trail becomes a no man's land riddled with gang activity, muggings and assaults. A well —lit trail is a win -win for all of us Involved. Walkers will feel safer and encouraged to walk more. The city would send a strong message— reinforcing wellness, exercise and promoting healthy behaviors. The lighting will demonstrate that we all care about safety on our bike trail, and very importantly: that residents continue to work in partnership with our elected officials and city manager for a healthier Santa Ana. Our community commitment and work for a better Santa Ana is strong and continues to be very present in our events and community engagement. Madison Park neighborhood has been working on the bike trail for the past 10 years, such as planting of trees, numerous clean ups and community events to promote health and exercise. Most recently the successful Walk a Than and Resource Fair on September 26, 2015 promoted the use of the bike trail by 500+ youth and adult residents. The Santa Ana Healthy Neighborhoods Alliance ( SAHNA) was Founded in 2012 and brings together Madison Park, Eastside, Heninger Park and Wilshire Square neighborhoods to work on Health, Education and Safety for a better Santa Ana. We have partnerships with schools, churches, businesses, the South Main Merchants Association, other neighborhood associations and community groups. SAHNA is actively engaged in residents taking ownership for fostering and building a safer, healthy and productive environment. We recognize the power of the community to be actively engaged in leadership roles, creating solutions, impacting policy and working in partnership with our elected officials and city government. Approving safety lights on the bike trail will benefit thousands and everyone wins. Together we can light tip the city with a beautiful and safer bike trail. Thank you for your consideration of this funding request as you make very important decisions on the application of the city surplus monies. mdest Reg c "s,� ~ o5 Cndval, Irma P.laur ,l Healthy Neighborhoods Alliance 65A -15 rj {f�ti14I ++ j 75:11�Fk Li�i u Building healthy C nities , 'SCknfxal S�M1Ya ��� October 12, 2015 Santa Ana Building Healthy Communities 1505 E 17`h St, Suite 111, Santa Ana, CA 92705 PHONE: (714)597 -6630 1 FAX: (714)647 -0901 1 www.sa- bhc.org Re: Condensed City Budget Surplus Recommendations Item Who Amount Fund to provide incentives to local micro- enterprises that Community $250,000 promote local health, arts, and culture. (e.g. worker cooperatives, Development in the establishment of a mercadito as a market place for locally collaboration with prudced artisanal goods, and the establishment of a community- Community Orgs. run micro - farm). Extend City Council Special Event Sponsorship program to fund Community $400,000 community -led programming that promotes health, arts, culture Development in among underserved populations (e.g., low- income, refugee and collaboration with immigrant youth and families), such as the recently approved. Community Orgs. Funding for Community - Building Infrastructure: Community $2', Million Grants /incentives to support capital investment projects Development in (community buildings /properties) by non - profit organizations collaboration with that serve a public benefit through promoting health, wellness, Community Orgs. arts, and culture programming such as establishment of Non - Profit Community Clinics, El Centro Cultural de Mexico building, Familias Corazones Verdes Park, The LGBT Center OC, the KidWorks Youth Center expansion, and The Cambodian Family. One -year expansion of youth internship program to certify them Cmty Development $250,000 as health enrollers & navigators to enroll Santa Ana residents in in collaboration ACA & Medi -Cal and expose them to careers in the health field. with Community Orgs Additional funding for the check -in center pilot program for the Cmty Development $100,000 homeless community, to cover improved storage and sanitation in collaboration services, and allow for the center to be open during times that with community accommodate for homeless peoples' schedules. orgs TOTAL $3,000,000 65A -16 City Response to SASHC Funding Proposal 65A -17 Pop -up market places can be created through the special event permitting process. This is currently done with the monthly Art Walk, weekly Farmers' Market, and other special events with local vendors, The process can Fund to incentivlze local micro - enterprises that promote currently be pursued by members of a worker's co- local health, arts, and culture. (e.g. worker cooperatives, operative operating a mercadito. The City also operates a the establishment of a mercadito as a market place for Community Development Small Business Incentive Program that Is designed to locally prudced artisanal goods, and the establishment In collaboration with encourage local entrepreneurs. Qualifying local businesses of a community -run micro-farm). _ Community Orgs. $ 1,000,000.00 are relmbursed up to $5,000 of thier start -up costs. The Arts and Culture commission Is currently funding grant projects across the City. The latest round included Fund RFP or city sponsorships for community -led $50,000 In funding for 10 artists, The City has also programming that promotes health, arts, culture, such Community Development developed a process to provide the City Council with as the recently approved mini -grant donation program In collaboration with $70,000 In discretionary funds to support community to community groups, Community Orgs. $ 500,000.00 events. The 2015 -2016 CDBG grant process budgeted $340,000 to local non - profits including KldWorll America On track, Council on Aging - OrangeCounty, WISE Place, Human Options, OC Fair Housing Council, The Cambodian Family, Community Spaces: Grants for community centers Public Law Center, Boys & Girls Club of Santa Ana, Orange providing health, wellness, arts, culture programming County Children's Therapeutic Arts Center. An additional to support Infrastructure, new services and providers $80,000 was provided to Goodwill Industries and the for Non - Profit Community Clinics, El Centro Cultural de Illumination Foundation was also provided by City Council Mexico, Families Corazones Verdes Park, The LGBT Community Development approval. The City of Santa Ana has recently provided Center OC, the Kk Works youth Center expansion, and in collaboration with $200,000 in support of the ADA renovations of the Delhi The Cambodian Families. Community Orgs, $ 2,500,000.00 Center. The feasibility of Public Restrooms at Plaza Calle Cuatro and other key locations in the downtown are being evaluated as part of the Downtown Modernization and Public Restroom & drinking fountain at Plaza Calle Parking Enhancement Project. An option forcleveloping access to the the restrooms in the downtown parking Cuatro. Parks Rae $ 500,000.00 garages are also being evaluated. A comprehensive way finding plan for the Downtown is currently being Implemented by the Community Development Agency. The City was also recently awarded Wellness Corridor signage /wayfinding along 5 routes to $11 million in active streets grants, a portion of which will promote walking and biking and Improve connectivity to include a major expansion of downtown bike lanes from the business district. _ Public Works $ 250,000.00 SARTC into the business district. _ _ The Santa Ana Police Department recognizes the Importance of mitigating the risk factors that create the potential for physical risk within neighborhoods. The Re- Entry Services for Employment programs aim to educate and establish collaborative working relationships with Funding for Community Violence Intervention Worker residents to promote public safety within the community. Certification Program to train, educate and empower The Santa Ana Work Center along with partners such as community members with tools to mitigate risk factors the OC Re.-Entry Partnership, the Network for Behavloral that contilbute to violence, In addition to serving the re- Health, and South Coast Counseling Services will continue entry population. Training Is administered by the to work to empower local community members with the Professional Community Intervention Institute, resources that they need to reduce the levels of violence University of Southern California, and University of SAPD in collaboration with In their communities. California, Irvine. Project Kinship $ 60,000.00 65A -17 City Response to SABHC Funding Proposal 65A -18 The Santa Ana Police Department Is currently an active partner with the Orange County Re -Entry Partnership.' This existing rehabllltatlon program is headed by the Funding for a Community Intervention Worker Orange County Sheriff's and Probation Department, These Community- Based Violence Intervention and Re -entry efforts are geared to reducing the overall 3 year recidivism Service to provide crisis intervention, re -entry services, rate from 75% down to 25% for those that remain trauma care, family support, and long term case enrolled In the projects support services. There are managed services to youth and families affected by SAPID in collaboration with currently 56 local partner organizations involved In these violence, gangs, and Incarceration. Community Orgs $ 100,000.00 efforts. _ The City currently utilizes $708,255 In CDBG funding for after school youth programs. New Investments In joint use facilities with SAUSD Including the $5 million Roosevelt - SAPD In collaboration with Walker facility is set to open during the 2015 -2016 school Diversion program for ellglble youth Project kinship $ 100,000.00 year. _ _ _ _ _ _ In accordance with the Sunshine Ordinance, the City has Increased the requirements for community outreach for new developments, during changes to key City planning documents, and continued to support community SAPD In collaboration with involvement through Neighborhood Association Community Conferencing Community Orgs $ 100,000.00 gatherings, The Public Works Agency was recently awarded $11 million worth of bike Improvement projects by the State of California. These programs will provide protected bike lanes along Santa Ana Blvd, 5th Street, and Edinger Bike infrastructure Improvements and extension of the Avenue. A Civic Center Bike Blvd. will also be added to Maple bike trail, including improved signage, lighting, help provide Safe Routes to School for the residents of etc. Public Works or Parks $ 500,000.00 Santa Ana. City staff has met with community representatives to find publicly available land meeting the required zoning, size, and availability requirements set out by the Wellness Strategy Resolution adopted by the city council on 6 -2 -15. An area meeting these requirements has not been Cmty Development in currently Identified by interested parties. City staff will Funding to cover costs for leasing public land for a collaboration with continue to work on developing City -wide guidelines on pilot community -run micro -farm Community Orgs $ 750,000.00 the leasing of public property to private entitles. , _. The 3 homes on 6th and Lacy are already pending conversion to open space perthe terms of the Station District Settlement Agreement. An additional block of open land at Lacy and Vance has also been identified by Council and City staff as a location forfuture open space near the Lacy neighborhood. Staff remains open to Funding to purchase boarded up houses & convert to an Identlfying potential locations across the City for open space In the Lacy neighborhoods, Parks and Recreation $ 50.0,000.00 additional open space. _ The Carfield Community Center currently operates the center for 87.5 hours per week at an annual cost of Expand Lacy Community Center hours and clays for $215,000 Any additional hours has a cost of $2,457 /hour community use. .._ Parks and Recreation $ 200,000.00 to operate on an annual basis. 65A -18 City Response to SABHC Funding Proposal 65A -19 The City has previously partnered with local non - profits to expand participation In the Affordable Care Act and Mack- Cal programs. Outreach centers were created during the open enrollment period at various community centers and at City sponsored events. Funding was provided by Funding for RFP to sub - contract health enrollers & Cmty Development In Federal and State outreach programs such as Covered navigators to enroll Santa Ana residents In ACA & Medi- collaboration with California. The City remains open to continuing these Cal. Community Orgs _ $ 200,000,00 partnerships with the area's based health enrollers. The City of Santa Ana has hired 21 Interns since July 2014 Expansion of youth Internship program, Including to after the policy was adopted as part of the 5 -year strategic connect students with community -based health careers Cmty Development in plan. The City Is currently recruiting 11 more interns for (to address shortage of health care providers in Santa collaboration with the 2015 -2016 school year. These Interns serve Ana) _ _ Community Orgs $ 100,000.00 throughout every Department In the City. In March of 2014 the City Council voted to work with Mental health and wellness services forvulnerable Taller San Jose and Saint Joseph's Community Hospital to communities, Including a Youth Wellness Program for renovate the historic YMCA as a 19,000 sq ft, fitness and low Income families /refugee and immigrant families Craty Development In wellness center. Staff members are currently working with that Include physical activity, healthy eating, arts and collaboration with these community partners to ensure the success of this crafts, music and scholarship programs._ community orgs $ 500,000.00 proposed $18 million wellness facility, Funding for the Check -in Center Identified and authorized by the City pending the approval of a site location, The Additional funding for the check -in renter pilot program City's currently proposed location would require the for the homeless community, to cover Improved storage approval ofthe Orange County Board of Supervisors, and sanitation services, and allowfor the centerto be Cmty Development In Alternative site proposals are being reviewed and City open during times that accommodate for homeless collaboration with staff welcomes additional stakeholder participation in peoples schedules. _ _ _commu nityorgs $ 100,000.00 addressing the needs of the City's homeless community. 7,960,000.00 65A -19 65A -20 K W v `v v a c U N � e �o- E .g a 3 h b 3 � m d 5 W c g, � LL M mM N } N c 8 � N Y � o 3 5� y � N U y r u d 5 W 65A -21 a' c 8 � o r � s U b � LL z18 z z z z z z z z° s z U SLL gg s a F N c L' o U N Ll 11 W E N Fz $ CJ U U U 4 N � Z U m V_ LT V = yEy u R a SE E9 �� flea .�w b ttdd ¢¢ IM `J x D m m w c' y u u 3 � 65A -21 65A -22 Mitre - Ramirez, Norma From: Huizar, Maria Sent: Tuesday, October 20, 2015 9:44 AM To: Mitre - Ramirez, Norma; Trujillo, Rose Ann; Orozco, Norma Subject: FW: Slight Change in One of the Projects Being Considered (Agenda Item 65A) at Tonight's Council Meeting Importance: High Please add to packet for Agenda Item 65A. Thank you. From: Mouet, Gerardo Sent: Tuesday, October 20, 2015 9:13 AM To: Cavazos, David Cc: Cortez, Robert; Ono, Ron; Carvalho, Sonia R.; Huizar, Maria Subject: Slight Change in One of the Projects Being Considered (Agenda Item 65A) at Tonight's Council Meeting Importance: High Dear Mayor and Council: The City and the School District have been having successful discussion on joint use matters and our partnership efforts is progressing very nicely. At a meeting yesterday, the Superintendent informed the City Manager that the concept we have been considering in adding $500,000 to the project cost of converting the Sport Field and Track to Synthetic Field and Rubberized Track for Godinez High School will be better served as a joint use project to focus instead to the Sport Field and Track at Segerstrom High School. There are benefits of focusing first on Segerstrom. 1) The School District is closer to implementing the Segerstrom project. 2) The need for a joint use football /soccer field and track at this part of town will better serve the community since Centennial Park already has many recreational options for the community. If the City Council decides to prioritize this project at tonight's meeting, please keep in mind that it is best not to specify Godinez at this point but to say that the monies would be focused on a joint use project either at Godinez or Segerstrom pending further discussions with the School District as to what location would best serve the public. The field in either of these options will serve youth football, youth soccer, and adult soccer needs in the community. Let me know if you have any questions. Gerardo Mouet Executive Director Parks, Recreation, and Community Services Agency (714) 571 -4204 Learn Have Fun Get Fit Be Respectful 65d -23 65A -24