HomeMy WebLinkAbout23A - PROJ - HARBOR TRAFFIC SIGNAL IMPROVEREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
APRIL 19, 2016
TITLE:
AWARD CONTRACT TO ASPLUNDH
CONSTRUCTION CORP. FOR HARBOR
BOULEVARD CORRIDOR TRAFFIC SIGNAL
IMPROVEMENTS (PROJECT NO. 15 -6828)
(STRATEGIC PLAN NO. 6, 1G)
CITY V GER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
❑
As Recommended
❑
As Amended
❑
Ordinance on 16' Reading
❑
Ordinance on 2ntl Reading
❑
Implementing Resolution
❑
Set Public Hearing For
CONTINUED TO
FILE NUMBER
1. Authorize the City Manager and Clerk of the Council to award and execute a construction
contract to Asplundh Construction Corp., the lowest responsible bidder, in accordance with
the base bid plus Alternates I, II, III, IV, and V, in the amount of $1,170,984, for the term
beginning upon execution of the contract and ending upon project completion, for the Harbor
Boulevard Traffic Signal Improvements project, subject to nonsubstantive changes approved
by the City Manager and City Attorney.
2. Approve the Project Cost Analysis for a total estimated project delivery cost of $1,358,200,
which includes the contract base plus additive Alternates I, II, III, IV and V; administration;
inspection; testing; and an authorized contingency of $116,896.
DISCUSSION
The proposed project supports the City's collaborative efforts with the cities of Garden Grove,
Fountain Valley, and Costa Mesa to implement traffic signal improvements along the Harbor
Boulevard Corridor (Exhibit 1). This project will reduce traffic congestion during peak hours,
while maintaining vehicle platoons at the speed limit at nonpeak hours. The traffic signal
improvements will include communication conduits, fiber optic cables, and hardware; traffic signal
cabinet and controller upgrades; ADA- compliant pedestrian push buttons and countdown
indications; and field monitoring equipment, such as vehicle detectors and CCTV cameras, to
support and maintain the new synchronization plan. Once completed, these improvements will
enhance traffic signal operations, improve traffic signal synchronization, and reduce traffic
congestion.
A Notice Inviting Bids was advertised on February 8 & 15, 2016, and bids were opened on March
1, 2016. The following is a summary of the bid invitations made and the bids received:
23A -1
Contract Award For Harbor Boulevard Corridor
Traffic Signal Improvements
April 19, 2016
Page 2
Contractor Participation Data
Santa Ana contractors receiving notices
1
Contractors requesting bidding documents
15
Bids received
5
Bids received from Santa Ana contractors
0
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
BASE BID +
ALL
ALTERNATES
1
Asplundh Construction Corp.
Anaheim
$988,727.00
$1,170,984.00
2
Crosstown Electrical & Data, Inc.
Irwindale
$1,070,540.50
$1,282,019.50
3
DBX Inc.
Temecula
$1,192,964.75
$1,423,596.75
4
High -Light Electric, Inc.
Riverside
$1,338,480.00
$1,536,200.00
5
KDC Inc, dba Dynalectric
Los Alamitos
$1,422,331.00
$1,635,368.00
The advertised bid document was divided into a base bid and several alternates. The base bid
was used to identify the low bidder, and the alternates would be used in any combination to
maximize the use of the available project grant funds. Five bids were received and all five were
considered responsive. Asplundh Construction Corp. submitted the lowest responsive bid, with a
base bid of $988,727, plus a combined bid of $182,257 for all additive Alternates (I, II, III, IV, and
V), for a total project bid of $1,170,984 (Exhibit 2).
Since there are sufficient grants funds to complete the entire project, staff recommends awarding
a contract to Asplundh Construction Corp. in the amount of $1,170,984 (Exhibit 3). The
recommended scope of work and contract amount is comparable to the engineer's estimate. As
indicated in the Project Cost Analysis (Exhibit 4), the total estimated delivery cost of this project,
including construction, contract administration, inspection, testing, and contingencies, is
$1,358,200.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), and Strategy G (develop and implement the City's Capital Improvement Program in
coordination with the Community Investment Plan (e.g., neighborhood streets, traffic
improvements, park facilities, bike master plan, etc.).
23A -2
Contract Award For Harbor Boulevard Corridor
Traffic Signal Improvements
April 19, 2016
Page 3
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the proposed project is exempt from
further review. Categorical Exemption ER No. 2014 -82 will be filed for this project.
FISCAL IMPACT
The Project Cost Analysis estimates project expenditures of $1,358,200, which include the
construction contract, contract administration, inspection, and contingencies. Funds in the
amount of $124,210 are budgeted in the Measure M2 Street Construction Fund (Account No.
03217662 - 66220). Funds in the amount of $1,233,990 are budgeted in the Measure M2 Street
Construction Fund (Account No 03217663 - 66220). The funds will be expended according
budgeted funds in the current fiscal year and next fiscal year as shown in the table below:
Period Fiscal Year Account No Amount
FY 2015/16 03217662 -66220 $24,842.00
03217663 -66220 $246,798.00
FY 2015/16 $271,640.00
FY 2016/17 03217662 -66220 $99,368.00
03217663 -66220 $987,192.00
FY 2016/17 $1,086,560.00
TOTAL:
Fred Mousavipou
Executive Director
Public Works Agency
FM /EWG /TC /MO
Exhibits: 1. Location Map
2. Bid
3. Construction Contract
4. Cost Analysis
$1,358,200.00
APPROVED AS TO FUNDS AND ACCOUNTS:
�Izs� .
Francisco Gutierrez
Executive Director
Finance & Management Services Agency
23A -3
23A -4
1
i GUNTAN VAL_EYi p
' • ' p SAN TA ANA
r • 1 1
' • 1 ' I
• p
GARXN GRDVF, i
1
1 1
p LEGEND ® i
1
Agency I i
1 ,
1 I '
I �
�COSTIOESAi
SANTpANA p rox�
1 � 1
1 ,
p 1
1 '
PROJECT
' p r__ -_____ LIMITS
It
It
i 1
1 1 1
j
sI
FOUNTAIN VAI E*
Vm
1 I
w L - -- ® -
KFTA AM
� City Council Project No. 15 -6828: Harbor Boulevard Corridor Traffic �
P� Agenda Date Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization
April 19. 2016 Project)
Exhibit 1
23A -5
23A -6
EXHIBIT �
CITY OF SANTA ANA ���������X� ��
PROPOSAL
PROJECT NO. 15^a828
Harbor Boulevard ConidorYraff|c Signal Improvements
(as part vf Harbor Blvd Traffic Signal Synchronization Project)
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
The undersigned bidder declares that they have carefully examined the location of the
proposed work, that they have examined the Contract Documents in its entirety and hereby
proposes to furnish all material and do all the work required to complete the said work in
accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set
forth in the following schedule:
�Itom�De_scrlptlon
�����Abiount
City of
Santa Ana
Traffic Signal Mad ification at Harbor Blvd
1
LS
2
Install Type 334 Communication Cabinet
I
LS
41(40."
Assembly
3
Install 2" PVC Conduit
530
LF
to
$
4
Install 3" PVC Conduit
3200
LF
a-
5
Install 4" PVC Conduit
so
LF
$
a
Install Type E Loop Detector
28
CA
$ Ob:
5,
9
Install Detector Lead-in Cable
16120
LF
10
Replace Pedestrian Head Assembly with
12
EA
Countdown Head
RP^|
�����
����
�K
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
City
Unit
Unit Price
Amount
Install Audible Pedestrian Signal (APS)
I
IS
ul
t0
$
System
12
Install CCTV System
3
EA
0—
13
Replace Wireless System
2
EA
10b,
43'r
14
Install 48 Strand SMFO Cable
Sao
LF
15
Install 24 Strand SMFO Cable
5000
LF
50,
16
Install 12 Strand SMFO Cable
700
LF
to
17
Install CArSe (Outdoor Rated) Cable
500
LF
,fir^
L0
18
Fusion Splice 1 Strand Single Mode Fiber
336
EA
$
g �k
Optic Cable
19
Install Fiber Optic Splice Closure
4
IS
20
Install IP Communication System at Harbor
I
EA
Blvd and Hazard Ave
21
instail IF Communication 5ystern at harbor
I
EA
Blvd and Sth5t
22
Install IF Communication System at Harbor
I
EA
$
Blvd and 1st St
23
Install IP Communication System at Harbor
I
EA
Blvd and McFadden Ave
24
Install IP Communication S ystem at Harbor
i
EA
$
11A0 La-
Blvd and Warner Ave
25
Instal[ IP Communication System at Harbor
i
EA
Blvd and Segerstrom Ave
26
Install IP Communication System at Harbor
I
EA
$ 9600
Blvd and Garry Ave
27
Install IP Communication System at Harbor
I
Blvd and MacArthur Blvd
28
Remove Wireless System
2
EA I
$
B P-2
23A-8
CITE' OF SANTA ANA
PROPOSAL
PROJECT NO. 15 -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
Qty
Unit
Unit Price
Amount
29
Remove Video Detection System at Harbor
1
$"�
{ W
$ 1 � `
Blvd and Warner Ave
30
Pothole For Utility Not Shawn on plan
10
EA
$ "/U v
$j�
TOTAL SANTA ANA BID
$
City of warden Grove
31
Cabinet Upgrade
1
EA
$ q1A,
$
..........
32
Furnish and Install EVP Unit
17
EA
$ "'
$ 40, 66K-0
33
Furnish and Install EVP Phase Selector
8
EA
$f W
$-
34
Furnish and Install EVP Cable
2745
LF
$w
35
Furnish and Install Pedestrian Push - Button
50
EA
tJ�
Assembly
[ 1�1b •
36
Furnish and Install Pedestrian Countdown
10
CA
$
$ 4
Module'
,5&0'
37
Furnish and Install Vldac Detection 5�st2m
6
EA
P�
$�
q CI
$ i /i
(VDS)
7
TOTAL GARDEN GROVE BID
S
City of Costa Mesa
38
Remove and salvage existing traffic signal
1
EA
/
$o�
$ / _
(7G(},
cabinet. Remove foundation complete.
ptt•e"
�%1 `v
39
Remove and salvage existing traffic signal
$
EA
$ 1, 5�T p;p
$ �}, boo Lp
cabinet
44
Remove and salvage existing UPS cabinet
4
EA
�r�
$ .
$
and assembly
41
Furnish and install Type P cabinet on new
1
EA
$!f
foundation
OtSa.�
42
Furnish and install Type P cabinet on
foundation
5
EA
$f„
$ `, :° u
1 T
existing
ww
RP -3
23A -9
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. IS-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
City
Unit
Unit Price
Amount
43
Furnish and install UPS Cabinet and UPS
4
EA
$sf
$ 10
assembly
44
Relocate existing traffic signal controller
6
CA
$ , 00
assembly to new controller cabinet
45
Furnish and Install new CCTV camera
10
EA
$ 61 WD,'
<41 "o
system
1
46
Remove and salvage existing CCTV camera
I
EA
Or
$
47
Furnish and Install new pedestrian push
76
EA
$ to
$
button assembly
48
Furnish and Install new pedestrian
58
EA
$
countdown module
I
49F
Remove existing pull box and Furnish and
I
EA
M
Install E Pull pax
V_w
so
Remove existing pull box and Furnish and
2
EA
7c�
Install #5 Pull Box
51
Furnish and Instal[ 46E Puil-Box
5
EA
14, 1377�,
52
Furnish and Install 45 Pull•Box
3
EA
53
Furnish and Install new 3" Conduit
1175
I LF
S -4
54
Remove existing SIC Cable
I 5090
LF
$
$ "5 U15,
55
Furnish and Install 12 Strand SMFC, Cable
785
LF
10,
56
Furnish and Install 24 Strand SMFO Cable
4110
LF
$ �'50
1t J
$
57
Furnish and Install Splice Enclosure in HE
pull box, Fusion splice and terminate all
a
EA
3
fibers erfibarschematic.
58
Fusion splice and terminate new fibers in
canister fiber schematic
2
EA
$ OU
existing splice per
59
Terminate fiber drop cable in fiber patch
3
EA
$ rt_z
panel
60
Terminate fiber distribution cable In fiber
I
EA
$
patch panel
EIP-4
23A -10
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Item
Description
Qty
Unit
Unit Price
Amount
61
Furnish and Install new fiber patch panel.
All fibers are to be terminated per fiber
7
EA
to
$/
I
EA
CA
schematic.
$ 5W
J�,J=I
TOTAL ALTERNATE 8ID#1
Alternate Bid #2 — Cardinal Circle at Harbor Blvd Video Detection — City of Garden Grove
62
Furnish and Install 410 trace wire
5505
LF
$0
$
63
Re-pull distribution cable from controller
5
EA
Jp
TOTAL ALTERNATE BID#2 #Z
cabinet to #6E Pull Box
Alternate Bid #3 — Merrimac Way at Harbor Blvd Traffic Signal Upgrade — City of Costa Mesa
Item
Description
Qty
TOTAL COSTA MESA BID
Unit Price
TOTAL BASE BID
bo
$
ANA+GARDEN GROVE+COSTA MESA)
I
Alternate Bid Items
Alternate Bid #1— Harbor Place at Harbor Blvd Video Detection — City of Garden Grove
Item
Description
Qty
"y
Unit
U it
Unit Price
Amount
Amount
I
Furnish and Install Video Detection System
I
EA
CA
$gs sm
$ 5W
J�,J=I
TOTAL ALTERNATE 8ID#1
Alternate Bid #2 — Cardinal Circle at Harbor Blvd Video Detection — City of Garden Grove
Item
Description
MY
Unit
Unit Price
Amount
I
System
Furnish and Install Video Detection System
I
EA
Jp
TOTAL ALTERNATE BID#2 #Z
$
Alternate Bid #3 — Merrimac Way at Harbor Blvd Traffic Signal Upgrade — City of Costa Mesa
Item
Description
Qty
Unit
Unit Price
Amount
Remove and salvage existing traffic signal
I
EA
pp
rp
cabinet. Remove foundation complete.
Remove and salvage existing UPS cabinet
I
EA
$ Igo. Lo
assembly
Furnish and Install Type P cabinet on new
foundation
I
EA
$ �?Jboo,�—tsklobo,
Vol
'1
Iffm
23A -11
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15.6828
Harbor Boulevard Corridor Traffic signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
4
5
Furnish and Install UPS Cabinet and UPS
assembly Relocate existing traffic signal controller
assembly to new controller cabinet
I
1
EA
EA
$ sm • 00
$
Vo
$
6
Rewire Intersection
i
LS
s
00
/00, --
7
Remove existing pull box
I
EA
$
$ i6b,
a
Furnish and Install No, 6V Pull Box
2
EA
$
9
Furnish and Install new 2" conduit
20
LF
$
co-
10
Furnish and Install new 3" conduit
220
LF
$
q,,' q� ,R
11
Furnish and Install new 4" conduit
40
LF
$
0 J'0' 1-13
12
Terminate fiber drop cable In fiber patch
I
EA
$
/1 4,
Panel
�emblto new controller cabinet
I
—
13
Furnish and Install 010 Trace Wire
260
LF
$
$
14
�u
1
EA
$
cabinet to 46E Pull -Box
ox
_a:
1:
TOTAL
ALTERNATE
BID#3
Altemate
51.4 ri4 -- W!5on Streit at Harbor Blvd
Cabinat Upgradas
- Cit 'Y of CoSta
Mesa
Item
Description
Qty
Unit
Unit Price
Amount
1
Remove and salvage existing traffic signal
1
EA
$ 600,
$ goo
cabinet.
2
Furnish and Install Type P cabinet on
1
EA
$
q5o
existing foundation
—Controller
3
Relocate existing traffic signal
1
EA
$
SP A
�emblto new controller cabinet
TOTAL
ALTERNATE
BID#4
$
jQ 00
MW
23A -12
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
Z Furnish and Install Type P cabinet on new EA $ s�� ��� �
foundation. J
Furnish and Install UPS cabinet and UPS t EA $ C $ i LV
Assembly i2
4 Relocate existing traffic signal controller 1 EA
assembly to new controller cabinet
TOTAL ALTERNATE BID #5 $ ('0190 0-0
TOTAL Base Bid plus Alternate 1,2,3,4LIM�
plus all Alternate Bid Items.
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25!" limit as stated in Section 3 -2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves
the right to Increase or decrease the quantity of this Item accordingly.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDAT @D DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total contract base bid
amount shown above, within eighty (80) working days after the commencement date stated in
the Notice to Proceed.
If Alternate Bid91rs awarded, five (5) working days will be added to the working days assigned
to complete the contract base bid items.
If Alternate Bid #2 is awarded, five (5) working days will be added to the working days assigned
to complete the contract base bid items.
If Alternate Bid #3 is awarded, twenty (20) working days will be added to the working days
assigned to complete the contract base bid items.
if Alternate Bid #4 is awarded, ten (10) working days will be added to the working days assigned
to complete the contract base bid items.
BP -7
23A -13
CITY OF SANTA ANA
PROPOSAL
PROJECT 1\10, 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
If Alternate Bid #5 is awarded, twenty (20) working days will be added to the working days
assigned to complete the contract base bid items.
The liquidated damages amount in lieu of the amount specified in Subsection 6 -9 of the
Standard Specificatj'�ns shall be $ ,000 per calendar day. 0 �ry
Nam a of i lrm V I <'Pl 4 () t� Sri 0 --n0JJ L6 a .
Signature of BIDDER
Title
(if an individual, so state)
W. Holman, Vice President
HE
23A -14
CiTY OF SANTA ANA
PROPOSAL
PROJECT NCO. 156826
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and
the AGENCY only after It has been accepted by the City Council, endorsed by the Clerk of the
Council with her signature and official seal noting hereon the action of approval of the Council,
signed by the Public Works Agency Executive Director or his /her duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its
execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited
with the united States Postal Service properly addressed to the BIDDER with the correct
postage affixed thereto,
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he /she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered Is difficult to ascertain; otherwise said funds, check, drafts, or
BIDDER'S bond substituted in lieu thereof shall he returned to the undersigned,
BIDDER understands that a bid is required for the entire work, the estimated quantities set
forth in the bid schedule are solely for the purpose of comparing bids, and that final
compensation under the contract will be based upon the actual quantities of work satisfactorily
completed. The BIRDER also certifies that the bid is a balanced bid.
in accordance with Section 7028AS of the California Business and professions Cade, the
undersigned certifies under penalty of perjury that the foregoing Is true and correct.
Name of Firm F-Us
Signature of BIDDER
Title
(if an individual, so state)
Holman, ViCe President
(if a firm or co- partnership, state the firm name and give the names of all individual co- partners
composing the firm. If a corporation, state legal name of corporation, and names of President,
Secretary, Treasurer and Manager, thereof.)
BP-9
23A -15
CITY OF SANTA AIWA
PROPOSAL
PROJECT N4. 15 -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
CONTRACTOR'S LICENSING and REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he /she
and all his /her subcontractors are registered with the State of California Department of
Industrial Relations (DIR), and that the following is true and correct.
Contractor's Name:
Business Address:
Business E -Mail
Address:
Telephone: gam, - Gal0, L' J
State Contractor's License No, and Class: 'MO LL0 _ 0,°10 / T
License )/ 1
Expiration Date: df i e
State Dept, of industrial Relations (DIR)
Registration No.: w oboo 1 ' `-. %
State Dept. of Industrial Relations (DIR)
Registration Expiratiop Date:
Signed:
..
Title: Greg W. Holman, Vice President
11 P
23A -16
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd "traffic Signal Synchronization Project)
PREVAILING WAGE COMPLIANCE. AND MONITORING STATEMENT
Contractor Is aware of the requirements of California Labor Code Section 1720, et seq., as well
as California Code of Regulations, Title 8, Section 16,000, et seq., ( "Prevailing Wage Laws "),
which require the payment of prevailing wage rates and the performance of other
requirements on "public works" and "maintenance" projects. Since the services are being
performed as part of an applicable "public works" or "maintenance" project, as defined by the
Prevailing Wage Laws, and since the total compensation is $9„000 or more, Contractor agrees
to fully comply with such Prevailing Wage Laws,
City shall provide Contractor with a copy of the prevailing rates of per them wages in effect at
the commencement of this Agreement. Contractor shall make copies of the prevailing rates of
per diem wages for each craft, classification or type of worker needed to execute the services
available to interested parties upon request, and shall post copies at the Contractor's principal
place of business and at the project site,
Contractor shall defend, Indemnify and hold the City, Its elected officials, officers, employees
and agents free and harmless from any claim or liability arising out of any failure or alleged
failure to comply with the Prevailing Wage Laws,
The undersigned certifies that the foregoing is true and correct.
Name of Firm
Signature of BIC
Title _
(if an individual, so state)
BP -1 t
23A -17
M, Am
PROJECT NO. 15 -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
OWNERSHIP AFFIDAVIT
STATEOFWXtf=K% Pennsylvania
COUNTY OF RWW Montgorneh5¢
CITY OF SANTA ANA }
Gregory W. I- Iolman, being duly sworn, deposes and says:
❑INDIVIDUAL That he/she Is the patty making the foregoing proposal:
Q PARTNERSHIP That he /she is a member of the co•parmersh)p firm designated as
and who has been and is duly vested with the authority to make and execute
instruments for the co- partnership by:
who constitute the other members of the copartnership,
[CORPORATION That he is of:
j - Vice President
a corporation which is making the foregoing proposal:
[3JOINTVENTURE That he is of:
one of the parties making the foregoing proposal as a joint venture, and the he /she has
been and is duly vested with the authority to execute instruments for an on behalf of
the parties making said Did who are;
that such a bid is genuine and not collusive or sham, and has not in any manner sought by
collusion to secure any advantage against the City of Santa Ana or any person interested In the
proposed ""tract, for himss or any other person.
Signature of BI Gregory Hol vice President
j1u15rib d and sworn to before me this day ofR-lo 20
Signature wer Ad 's erl t " a blic)
COMMONWEALTH OF PENNSYLVANIA
NOTARIAL SEAL
KIMBERLY S. WILEY, Notary Pttblk
N My Commt�sstonPExP 1 41 JM
23A -18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
.►:• r
KNOW ALL PRESENT that,
_As lund� h Construction Corp , as BIDDER, and
Travelers Casualty and Surety Company of America , as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of
Ten Percent (10 %) of Amount Bid Dollars ($ , which is ten percent (10%)
of the total amount bid by BIDDER to AGENCY for the above - stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a
bid to AGENCY for the above - stated project, if said bid is rejected, or if said bid is accepted and
a contract is awarded and entered into by BIDDER in the manner and time specified, then this
obligation shall be null and void, otherwise it shall remain in full force and effect in favor of
AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
_I nn day of _February 2016.
�cvige u. t,.tu�.t non �. acct et,aty
SURETY*
Travelers Casualty and Surety Company of America
Myisha
Subscribed and 5 r to before me nlanmi HnrriG this 22nd day of
February �} , 2016,
Signature.
Notary Public in and for the County of Harris , State of Texas
*Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address,
and telephone number of authorized representative.
My NAOMIHARRIS BP -13
Notary Public
STATE OF TEXAS
Commission fths July A 2010
23A -19
AW POWER OF ATTORNEY
TRAVELS' `(,� S J Farmington Casualty Company
St. Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company
Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc.
Travelers Casualty and Surety Company ofAmerica
St. Paul Fire and Marine Insurance Company
United States Fidelity unit Guaranty Company
St, Paul Guardian Insurance Company
Attorney -lu Fact No,
Certificate No. 006436949
230387
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the
Imes of the State of Wisconsin (herein collectively called the "Companies "), and that the Companies do hereby make, constitute and appoint
Michael L Hemod, Wendy W. Stuckey, Lisa A. Ward, Donna L. Williams, Anoop Chawla Adlakha, Lope Tyler, Nancy Thomas; Vanessa Dominguez,
and Myisha Jefferson
of the City of HowEal , state of TeXas , their true and lawful Arommy(s) -in -Fact,
each in theirseparate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recoguizauees, conditional undertakings and
other writings obligntory in the nature thereof on behalf of the Companies in their business of guaranmeing the fidelity of persons, guaranteeing [he performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 21St
day of January
Farmington Casualty Cumpnny
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
SL, Paul Fire and Marine insurance Company
St. Paul Guardian Insuttmce Company
St. Pour Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
Called States Fidelity and Guaranty Company
C,ASllff �f,FE 41 \XG R1 ,NSVpO 0,. \Y AM4 1�ey�,JPP
D PPP M:t U .t u L
1 0 / 1
3GP,, �6 D � INCMPaa9tFng r. �.3 � ()/1 .. t'f° w � oxeoRnte � z NPatFOgD. �ft/n''fl"rr"-0tn. �. � �sCPoRo
%y}'.c*"H<° 97� 1951 of N.A�c'r 1.,aESEXL,s+; SRRL a{ rCONN. �CPVY. (� Y�n1896
A t R y41: AN r Au
State of Connecticut
City of Hanford ss.
Robert L. Raney, senior Vice President
On this the 21st day of January 2016 , before me personally appeared Robert L. Raney, who acknowledged himself to
be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul
Fire and Marine Insurance Company, St, Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers
Casualty and Surety Company of America, nod United States Fidelity and Guar:mry Company, and that he, as such, being authorized so to do, executed the foregoing
instrument for the purposes tltemin contained by signing on behalf of true corporations by himself as a duly authorized officer.
p.TlJ
In Witness Whereof, I hereunto set my hand and official seal.
My Commission expires the 30th day of June, 2016. b jRU6lVG tlr
yN CS'F'�
58440 -8 -12 Printed in U.S.A.
Matic C. Tatreaull. Notary Public
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
HARTFORD,CONNECTICUT 08183
FINANCIAL STATEMENTAS OF DECEMBER 31.2014
CAPITAL STOCK$ 0,480,000
'ASH AND INVESTED CASH
$ 121,187,283
UNEARNED PREMIUMS
$ 865,349,712
IONDS
3,411,486,037
LOSSES
660,966,443
ITOCKS
326,961,870
LOSS ADJUSTMENT EXPENSES
356,911,923
NVESTWNT INCOME DUE AND ACCRUED
46,277,103
COMMISSIONS
34,142,046
)7HER INVESTED ASSETS
4,010,410
TAXES, LICENSES AND FEES
11,534,866
'REMIUM EALANCES
209,082,904
OTHER EXPENSES
40,097,406
IET DEFERRED TAX ASSET"
82,639,844
CURRENT FEDERAL AND FOREIGN INCOME TAXES
24,133,069
0NSURANCE RECOVERABLE
17,397,751
REMITTANCES AND ITEMS NOT ALLOCATED
11,062,682
iECURITIES LENDING REINVESTED COLLATERAL ASSETS
6,22094
AMOUNTS WITHHELD/ RETAINED BY COMPANY FOR OTHERS
49,744,996
IECEIVABLES FROM PARENT, SUBSIDIAWES AND AFFILATES
9,057,199
RETROACTIVE REINSURANCE RESERVE ASSUMED
863,430
)THER ASSETS
3,078,655
POLICYHOLDER DIVIDENDS
7,370,690
PROVISION FOR REINSURANCE
3,4161806
ADVANCE PREMIUM
1,327,119
PAYABLE FOR SECURI'T'IES
4,590,766
PAYABLE FOR SECURITIES LENDING
8,224,694
CEDED REINSURANCE NET PREMIUMS PAYABLE
28,084,142
ESCHEAT LABILITY
1,136,046
OTHER ACCRUED EXPENSES AND LIABILITIES
421,167
TOTAL LIABILITIES
$ 2,190.576.190
CARTALSTOCK $ 6,480,000
PAID IN SURPLUS 433,803,750
OTHER SURPLUS 1,674,373,715
TOTAL SURPLUS TO POLICYHOLDERS $ 2,114.657,475
OTALASSETS $ 4,225,233805 1 TOTAL. LIABILITIES & SURPLUS $ 4 225 233 888
TATE OF CONNECTICUT )
;OUNTY OF HARTFORD )SS,
ATY OF HARTFORD I
BICHAEL J. DOODY, BEING DULY SWORN, SAYS THAT HE IS SECOND VICE PRESIDENT, OF7RAVELERS CASUALTYAND SURETYCOMPANY OFAMENCA,
NO THAT TO THE BEST OF HIS KNOWLEDGE AND BELIEF, THE FOREGOING IS A TRUE AND CORRECT STATEMENT OF TFIE FINANCIAL CONDITION OF SAID
)OMPANY AS OF THE 31ST DAY OF DECEMBER, 2014,
IUBSCRIBED AND SWORN TO BEFORE ME THIS
9TH DAY OF MARCH, 2015
QTA)�
UB}1
r �Ia
SECOND VICE PRESIDE 1r,&/
SUSAN M. WLISSI ZI)PR
INolar}y pub1fo
My Con'mWton Expire &November 30, 2017
23A -21
EM
STATE OF PENNSYLVANIA.
COUNTY OF MONTGOMERY
On this 23rd day of February, 2016, before me came George D. Licci to me
known, who, being by me duly sworn, did depose and say that he resides in Jamison, PA
that be is Asst. Secretary of Asphmdh Constniction Corp. The corporation described in
and which executed the forgoing instrument as principal; that he knows the seal of said
corporation; that the seal affixed to said instrument is such corporate seal; that it was so
axed by order of the Board of Directors of said corporation and the he signed his name
thereto by like order
Subscribed and sworn to me before this 23rd day of February, 2016 A.D.
Notary : re
Not Publi or K. Fuller
a g y
My commission expires: 1/29/17
Wz IMAM F1 DU
t �
23A -22
No. 6616
$'rATE' OF CAi.1F011NIA
SAN FRANCISCO
Amended
Certificate of'Authority
THIS IS TO CERTIFY, 'That, pursuant to dre hrsunmee Code of timState of 0diforeda,
Travelers Casualty atal Surety CmrtprUty of ?Inrertca
of 11urrter�l, Coauecdclit, arganY_ad under the lams of Connorti nit, sabiect to its ^brides of facorporation or
ether finultutanutl or;k >uni ^nttona( lineaments, Is hereby, authorized to transact within this Stone, subject to all
prmiisioms of this Certtficaw, the fallowing chrsses of hisurmtco.
Fire, tl9arine, Surety, Disability, Plate Glass, Liability, Workers' Compensation,
Common Carrier Liability, Boller and Machinery, Burglary, Credit, Sprinkler,
Team and Vehicle, Automobile, Aircraft, and Miscellaneous
os sarh classes arc now or mov hereafter be defined in the hisrrrance Lairs of the,Strrre nfCofiro>rnia,
THIS CF.R?1hiCATF is erprassip canditioned upon the holder hereofaow and horeafter being m full
comphonce with ail, and not in violation of any, of the applicable lolls and lawful reryniremanr maele under
nuthorim of the lain' ofthe S'kae of Califarula as dorg as such lams or regalreu enis are in effect and apnlicahie,
Mid as saeh hn, s mid requirements now are, or nt,m herelffar be changed or amended,
IN WITNESS WHEREOF, eflective as oj`ehe 1st day of Jtdy, 199 ?, l have
hereunto set urr hand (11111 caused op' gdlianl saint as ba a„J+ iced dos 16th
rigvof✓tnte, 1947,
Fee 5912.00 Chuck Quackenbush
➢$IICJItCt CrtmntiSSinnuc
Roe. No,
Filed 5.,28,'97 BY Fitsoria S. S'idharr
Lrretrrcu
Certification
1. the undersigned bmwance Commissioner ofthe State of Calijarnia, aia hemh). certify that I hare
rot¢m'ed the above Coln of Certificate gt'Awhorlry with the tlrplicrae ,forigmal now onfile in r:;p gljire, aril
that the same is a frdl, ante, and carretrt tnarsaript thereof: and of the whole gfsaid duplicate, mad said
C'ex'tiricatte of antlrwiq is tow tit ftd(forca and eiCect.
IN IiTi NESS WHEREOF, 1h(we heratarto set for hand and caused my ni7acial
scut to be a>J%lsed thin 3 /sr rfa } pf7Jacemher, 20117.
,Steve pohner
Gmu'an�> C'ao,arissM�io'
tt" C�c>d.s,G.r. D h1i.�a
Pauline D. ImIrea
23A -23
CITY OF SANTA ANA
PROPOSAL
PROJECT NO,15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
LIST OF SUB - CONTRACTORS
Section 4100 et. seq. of the Public Contract Cade requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount;
o Streets, highways including bridge projects: Mo of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: %% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIRT.
BIDDER proposes to subcontract certain portions of the wont to the firms listed below
"i
Name �q
.i0 W n( 6j: y- t
r L�(am N me
License # /Exp.
`"1-3 S.a i
Mc nse# /Exp.
DIR Reg. # /Exp,
o®o Ig!g
DIR g. # /Exp.
Lo €ation
Saga r�a.s°x -. sr.
T¢wr,,iidA..Locatio
Phone U.
*ZC���
Phone
Type Of Work
G rrZ S c`
Type Of W k
Amount $
��,Obb'
Amount .$
Name SL (�In�ttte,u.i� l liuv
License # /Exp. -r—�
DIR Reg. # /ExP. DIR Reg. # /Exp.
Location 044� 4rl.,,u Oa,GO (2a, Location
Phone 7J t ak4 0 ° 1,5,5 cr �° 4o Pho roe _
Type Of Work �AN k. _l�R 4wh type Of Work
Amount $ c2/,000— � Amount$
Name
License #/ERGS.
Signaaure of Bidder
TAP -14
Name
License
M
Location N
Phone
Type Of Work
Amount $
23A -24
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which BIDDER has performed similar work within the past three years.
Q
and Address of Owner,
Name
Contract Amount
Narne and Address of owner,
Name and Telepf
Contract Arnount
3.
person familiar with project,
Tvoe of Work
e Number of person
Name and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Date Completed
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties
from whom BIDDER Intends to procure Insurance and bonds.
BP -15
23A -25
23A -26
M
P�
s.m
CFO'
W
In n
Po
TJ
UO
z
w
::o
a N
•p
0'a w
cr
p
w m
�,
ru
w
Ln
�•
m
a
m
n
a
W
07
"mi
�
D
W
C7
O1
Co
O
O
C7
O
0
O
O
O
�
O
n•
m
m
m
ro
o a o_
m
^v
a
0
3
0
0
•" 0
3
m
�
m
re
Q
3
�
ro
a
2
C
a
pay.
r
pp N
n
Ott
d
w
m
N
n
n
N
n
h
a
s—°
d
_y
P1
m
C
�Gn
7
b O
O m v
S
@ n
m
n'
m
n
O
Y
re
in H
io w
m
23A -26
M
P�
s.m
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
DDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIp jaR �� has performed Traffic Signal and Intelligent Transportation
System (ITS) installation and /or modification in the past 5 yearn
Name
�fOwner.
Name and Teleph . uxnbar of person familiar with project.
C.A:
�
Contract Amount Type of Work
pate Completed
2,
Name and Address of owner.
Name and Telephone Number of person familiar wit ,project.
Contract Amount Type of Work
prate Completed
3.
Name and Address of owner.
Name and Telephone Number of person familiar with project,
Contract Amount Type of Work
pate Completed
The following are the names, addresses, and telephone: numbers
of all brokers and suretles
from whom BIDDER intends to procure insurance and bonds.
RP -16
23A -27
ASPLUN DH TEE EXPERT' CO.
708 Blair Mill Road
Willow Grove, PA 10000••1784
'rho above corporate headquartoro address should not he used for billing purposno. All Invoices andlor statements ehould to forwanled to
the Individual regional offices who conducted buslauss With the vendor.
CREDIT INFORMATION
ORIGINATED: August, 1928 FEDERAL ID NUMBER: 23- 1277550
INCORPORATED: Deoember 26, 1945 DUNS NUMBER: 00- 791.1753
OFFICERS: George E. Graham, Jr., President
Joseph P. Dwyer, Secretarylrreasurer
TYPE OF BUSINESS: Vegetation management and right -of -way clearing for utility companies
BANK REFERENCE:
PNC Bank
Credit Reference Department
MS F6- F166.04 -9
4th Floor
8800 Tinicum Boulevard
Philadelphia, PA '19153
TRADE REFERENCES:
Sauthco Industries Inc,
Atin.: Credit Dept- / Carolyn Grant
1840 East Dixon Boulevard
Shelby, NC 28152
voice (800) 331 -7655
fax (704) 482 -1460
Altaic Industries, Inc.
210 Inverness Center Drive
Birmingham, AL 35242
contact: Scott Reed
voice (205) 980 -6878
fax II 408-8083
W.W, Grainger Inc.
phone (847) 647 -2060
account# 865856645
MISCELLANEOUS:
TOTAL EMPLOYEES: 33,000+
FAX NUMBER: (215) 749 -6191
EMAIL: pnc_credit_ investigations @pnc.com
ACCOUNT MANAGER: Eric Hersom
Relationship Manager
Corporate Banking
Husgvnrna Forest & Garden Co.
8335 Harris Comers Parkway
Charlotte, NC 28269
voice (704) 597 -5000
fax (704) 599 -4307
Terax South Dakota Inc.
Attri.: Sarah Corey
500 Oakwood Road
Watertown, SD 57201
voice (605) 8843830 (Sarah C,)
fax (605) 882 -5573
Dow AgroSciences LLC
Indianapolis, IN
httos : / /creditreference dow qqN.
Customer Code: 00029267
Standard Register
Arlene Avers, Supervisor
Credit Services Team
600 Albany Street
Dayton, CH, 45417
voice (937) 221 -1000
41 Years at Blair Mill Road location
23A -28
7P27/2015
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
NMCOLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)
in accordance with Title 23 United States Cade Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine
and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any
other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other
BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or Indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Non - collusion Affidavit is part of the Proposal. Signing this Proposal on
the signature portion thereof shall also constitute signature of this Non - collusion Affidavit.
BIDDERS are cautioned that making a false certification may subject the certifier to criminal
prosecution. 9 1
:ib°3{i:LV
State of 6 &M09RIPc Per.
County of M... ontgomery
5 bscribed anV¢ sworn to (or affirmed) before me on this 2L day of 20Af,' by
Hvlrr ezrn proved to me on the basis of satisfactory evidence to be the
persons) o appeared before me
23A -29
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
NON-g15 ;RIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract,
certifies as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national ,origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such
action shall include, but not be limited to, the following: employment, upgrading,
demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates
of pay or other forms of compensation; and selection for training, including apprenticeship.
The Contractor agrees to post In conspicuous places, available to employees and applicants
for employment, notices to be provided setting forth the provisions of this
nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees plated by or on
behalf of the Contractor; state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin,
3, The Contractor shall send to each labor union or representative of workers with which
he /she has a collective bargaining agreement or other contract or understanding, a notice
to be provided advising the said labor union rr workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
S. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the secretary of Labor, or
pursuant thereto, and will permit access to his /her books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance with such rules, regulations, and orders.
6, in the event of the Contractors non - compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared Ineligible
for further Government contracts or federally assisted construction contracts in accordance
with procedures authorized in Execution Order 11246 of September 24, 1965, and such
BP -18
23A -30
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15-6 828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
other sanctions may be Imposed and remedies invoked as provided In Executive Order
11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or
as otherwise provided by law,
The Contractor shall include the portion of the sentence immediately preceding paragraph
(1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase carder
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant
to Section 204 of Executive Order 12246 of September 24, 1965, so that such provisions will
be binding upon each s+.ibcontract or purchase order as the administering agency may direct
as means of enforcing such provisions, including sanctions for noncompliance; provided,
however, that In the event the Contractor becomes involved In, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter Into such litigation to
protect the interests of the United States.
6. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats, 1939, and
as amended,
No discrimination shall be made in the employment of persons upon public works because of
race, religious creed, color, national origin, ancestry, physical handicaps, mental condition,
marital status, or sex of such persons, except as provided in Section 1420, and any contractor of
public works violating this Section is subject to all the penalties imposed for a violation of the
Chapter.
Signed;
Gre or I.IO1n�an
Tide; Vice iident
Firm; Asplundh Construction Corp.
Date; February 22, 2016
BP -I9
23A -31
CITY OF SANTA ANA
PROPOSAL
PROJECT Nei. 15.6928
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGAR7ING APPRENTICESHIP RECXIJIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship commlttee administering the apprenticeship standards
of the craft or trade in the area of the site of the public work for a certificate approving the
contractor under the apprenticeship standards for the employment and training of apprentices
in the area or industry affected.
2, Employ the number of apprentices or the ratio of apprentices to journeymen stipulated
in the apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs
journeymen or apprentice, on the public work, in the some amount or upon the same basis and
in the same manner as the other contractors, except contractors not signatory to the trust
agreement shall pay a like amount to the California Apprenticeship Council.
Signed;
Grego y Holman
Title: Vice esident
Firm: Asplundh Construction Corp.
Date: February 22, 2016
mil
23A -32
CITE' OF SANTA ANA
PROPOSAL
PROJECT N0.15.5828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGARDING "ANTI- KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by
these bid documents, agrees to comply with the Copeland "Anti- Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (25 CFR, part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation
to which he /she Is otherwise entitled.
Signed:®
G ego o man
Title: Vice silent
Firm: Asplundh Construction Corp.
Date: February 22, 2016
13P-21
23A -33
CITY OF SANTA ANA
PROPOSAL
PROJECT NO, 15 -6828
Harbor Boulevard Corridor Traffic signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
PUBLIC CONTRACT CODE SECTION 10162 CIUESTIONAIRE
In conformance with Public Contract Code Section 1 0162, the BIDDER shall complete, tinder
penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented
from bldding on, or completing a federal, state, or local government project because of a
violation of law or a safety regulation?
Yes � � No
If the answer is yes, explain the circumstances in the fallowing space.
BP -22
23A -34
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15.6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
INTENT OF PROPOSAL
The purpose of this Proposal is to identify a Prime Contractor to enter into a contract with the
City of Santa Ana, referred to as AGENCY, to complete the Work shown on the Contract
Documents,
PR P
The Proposal shall be submitted in accordance with the Notice Inviting Bids and shall be
accompanied by the following documents:
1. Bid Proposal
2, Bidder's Statement
8, Contractor's Licensing and Registration Statement
4, Prevailing Wage Compliance and Monitoring Statement
5, Ownership Affidavit
6. Bid Bond
7, List of Subcontractors
8, References
9. Additional References
10, Non - Collusion Affidavit
11, Non•0iscrimination Certlficote
11 Statement Regarding Apprenticeship Requirements
11 Statement Regarding "Anti - Kickback " Requirements
14. Public Contract Code Section 101652 Questionnaire
The Proposal may be considered non - responsive if any of these documents or forms is not
....................
included. The bid package shall be submitted as instructed in the Notice Inviting Bids, It is the
BIDDER'S responsibility to ensure delivery of the Proposal to the location and prior to the bid
opening hour stipulated in the Notice inviting Bids, Late Proposals will not be considered,
CALIFORNIA STATE LABOR CODE
As outlined In the Notice Inviting Bids, this project is subject to compliance monitoring and
enforcement by the State of California Department of Industrial Relations, per Section
1771.4.a.1. BIDDERS are required to Inform themselves fully of the conditions relating to
construction and labor under which the work will be performed. Any contract entered into
pursuant to this notice will incorporate the provisions of the California State Labor Code, per
Section 171.4,a.2, Contractors are required to post job site notices, as prescribed by regulation.
av
23A -35
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15-6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
EXAMINATION CIF CONTRACTIDOCUMENTS AND PRQJECT SITE
BIDDERS shall satisfy themselves by personal examination of the work site, Contract Documents
ncluding the Plans and Specifications (and by any other means as they believe necessary) as to
the actual physical conditions, requirements, and difficulties under which work must be
performed.
DISCREPANCIES AND MISUNDERSTANDINGa
No BIDDER shall at any time after submission of a proposal make any claim or assertion that
there was any misunderstanding or lack of information regarding the nature or amount of work
necessary for the satisfactory completion of the Job. Any errors, emissions, or discrepancies
found in the Contract Documents including the Plans and Specifications shall be culled to the
attention of the AGENCY as a Request for Clarification and addressed prior to the submission of
bid proposals.
REQUESTS FOR INTERPRETATION OF CONTRACT DOCUMENTS
Requests for interpretation must be received at least five (5) working days prior to the bid
opening date, The person submitting the request will be responsible for its prompt delivery.
Any Interpretation or correction of the documents will be made only by an Addendum.
DDEND
All addenda issued during open bid advertisement period will be posted on the City of Santa
Ana webslte and shall become part of the Contract Documents. Before submitting a Proposal,
each BIDDER Is responsible to become self- informed as to whether or not addenda have been
issued. It is the BIDDER's responsibility to notify the AGENCY regarding receipt of addenda.
WITH DRA.WA1,_CSF PROPOSAL
A Proposal may be withdrawn by submitting a written request signed by the BIDDER. Such
requests must be delivered to the AGENCY'S Public Works Agency Executive Director prior to
the bid- opening hour stipulated In the Notice Inviting Bids.
Proposals may not be withdrawn after said hour without forfeiture of the proposal guarantee
which shall remain in effect for 60 days after opening bids. The withdrawal of the bid proposal
will not prejudice the right of the BIDDER to submit a new bid proposal, providing there is time
to do so, or to submit a new bid proposal if the is a rebidding of the same project.
BID PROTEST
Any bid protest must be submitted in writing to Executive Director of Public. Works Agency, City
of Santa Ana, 20 Civic Center Plaza M -21, Santa Ana, CA 92701 before 5;00 p.m. of the 5th
business day following bid opening.. Bid protests sent via mail or overnight carrier must be
received by the AGENCY by 5 :00 pm of the 5th business day following bid opening In order to
v
23A -36
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO. 15 -6828
Harbor Boulevard Corridor Traffic Signal improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
be deemed timely, Hand delivered protests must be provided to the receptionist in the City
Hall Annex /Public Works Counter on the first floor of the City Hall Annex.
a, The initial protest document shall contain a complete statement of the basis for the
protest.
b. The protest shall refer to the specific portion of the Contract Document which forms the
basis for the protest.
c. The protest shall include the name, address, and telephone number of the person
representing the protesting party.
d. The party filing the protest shall concurrently transmit a copy of the Initial protest
document and any attached documentation to all other parties with a direct financial
interest, which may be adversely affected by the outcome of the protest, Such parties
shall include all other BIDDERS or proposers who appear to have a reasonable prospect
of receiving an award depending upon the outcome of the protest. If staff Is aware a
protest has been filed prior to the opening of bids, the AGENCY shall announce at bid
opening who such parties shall be.
e. Should a written bid protest be filed in a timely fashion, a protest hearing shall be held
before the Executive Director of Public Works or designee by the 10th business day from
receipt of protest. All interested parties may appear and offer testimony at this bid
protest hearing. Formal rules of evidence shall not apply at this hearing, nor shall
testimony under oath be required. The burden of proof shall be on the party submitting
the protest to demonstrate that the staff's determination of proposed low BIDDER is
arbitrary and capricious, or unsuppot ted by substantial evidence in the record.
f, All BIDDERS are advised that if you challenge the AGENCY "s award of contract in court,
you may be limited to raising only those issues you or someone else raised at the public
_ . hearing described above, or in written correspondence delivered to the Executive
Director of Public Works at or prior to the public hearing.
g. The Executive Director of Public Works or designee will issue a written decision to the
City Council on the protest, which shall also be promptly provided to all interested
parties. if the Executive Director of Public Works or designee determines that a protest
is frivolous, the party originating the protest may be determined to be irresponsible and
that party may be determined to be Ineligible for future contract awards,
h. The procedure and time limits set forth In this paragraph are mandatory and are the
BIDDER's sole and exclusive remedy in the event of bid protest, and failure to comply
with these procedures shall constitute a waiver of any right to further pursue the bid
protest, Including filing a Government Code Claim or legal proceedings,
vi
23A -37
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO, 15 -5878
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
BID PROPOSAL
The definitions for Bit! Items that are identified in the Bid Proposal farm are provided in
Appendix A.
The AGENCY will check each bid Item unit price and amount for all the bids submitted. In case
of a discrepancy between the correct product of the quantity muitipiled by the unit price and
the subtotal amount entered by the BIDDER, the correct unit price shall prevail and the product
will be correctly accordingly.
In case of a discrepancy between the correct sum of the individual subtotal amounts and the
total bid amount entered by the BIDDER, the correct sum shall prevail, if a unit price is not
legible or is missing, the amount for that contract bid item shall be divided by the quantity to
arrive at the unit price. The bid total shall be corrected and the results shall be considered as
representing the bidder's intention. Proposals in which the prices are obviously unbalanced
may be rejected..
If a Bid contains discrepancies that make it difficult or impassible to determine the bidder's
intention, then such Bid may be considered unresponsive, in which case the bid may be
rejected,
Tirne far Gorn�l tion Of Improvements and Li zrridated gamap5
The throe for completion of this project, and the liquidated damages amount when /if the tirne
for completion is exceeded, is Included In the Bid Proposal Section of these Contract
Documents.
BIDDERS STATEMENT
In accordance with Section 7028.15(e) of the Business and Professions Code, a licensed
contractor shall not submit a bid to the public agency unless his or her contractor's license
number appears clearly on the bid, the license expiration date is stated, and the bid contains a
statement that representations made therein are made under penalty of perjury. Any bid not
containing this Information or a bid containing information, which is subsequently false, .shall be
considered non - responsive and shall be rejected by the public agency. Format for these
statements are included In the Bid Proposal section of these Contract Documents.
In accordance with the Section 3300 of the California Public Contract Code, the Agency has
determined that the BIDDER shall possess a license in the classification specified in the Notice
Inviting Bids.
vii
23A -38
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO, 15 -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
OWNERSHIP AFFIDAVIT
An Ownership Affidavit is required to be completed and submitted with the Bid Proposal, A
form is provided in the Bid Proposal section of these Contract Documents.
Pj;OPP�AL GUARANTY IBID BONDI
Each bid shall be accompanied by a Proposal Guaranty as instructed In the Notice Inviting Bids.
A sample Bid Bond is Included in the Bid proposal Section of these Contract Documents,
LIST OF 59B- CONTRACTORS
The State of California Public Contract Code requires listing of all subcontractors who intend to
perform work which is Y, % of the bid or $10,000 (streets, highways and bridge projects),
whichever is greater, or Y2 % of the bid (buildings, parks, or other projects). A form for this
information Is provided in the Bid Proposal section of these Contract Documents.
UFLuI ,5 /�1DiJi1 °ZONAL REFEftENCES
BIDDER shall Include a list of three public agencies for which BIDDER has performed similar
work within past three (3) years, and three public agencies for which BIDDER and /or his
Subcontractor has performed similar work within the past five (5) years, A form for this
information is provided in the Bid Proposal section of these Contract Documents.
NQN- CQLLU5ION AFFIDAVIT
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106, the
AGENCY shall require all bidders to execute and submit a non - collusion affidavit with the Bid
Proposal. A copy of the Non - Collusion Affidavit is provided In the Bid Proposal section of these
Contract Documents,
NON-DISCRIMINATION CERTIFICATE
Attention is directed to Section 1735 of the California Labor Code, as added by Chapter 643,.
Statutes of 1939, which reads as follows:
"No discrimination shall be made In the employment of persons upon public works because of
the race, religious creed, color, national origin, ancestry, physical handicap, medical condition,
marital status, or sex of such persons except as provided in Section 1420, and every contractor
for Public Works violating this Section Is subject to all penalties Imposed for a violation of the
Chapter."
A copy of the Certification of Nondiscrimination by Contractors Is provided in the Bid Proposal
section of these Contract Documents.
wait
23A -39
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO, 15 -6828
Harbor Boulevard Corridor "traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
STATEMENT REGARDING APPRbNTiCE51iIP RECIUIREMENTS
Bidders shall be familiar with the requirements of Section 1777.5 of the California State Labor
Code regarding employment of apprentices and shall submit a Statement Regarding
Apprenticeship Requirements with the Bid Proposal. A copy of the Statement Is provided in the
Bid Proposal section of these Contract Documents,
STATEMENT REGARDING "ANTI- KICK - BACK" �ENTS
Bidders shall be familiar with, and shall agree to comply with, the Copeland "Anti- Kickback" Act
(18 USC 74) as supplemented In the Department of Labor regulations (29 CFR, Part 3), and shall
submit a Statement Regarding "Anti- Kickback" Requirements with the Bid Proposal. A copy of
the Statement is provided in the Bid Proposal section of these Contract Documents.
CONSTRUCTION CONTRACT AGREEMENT, BONDS & INJQ ANCE
The Construction Contract Agreement is included in the project Contract Documents as
Appendix B, Sample Bonds are included as Appendix C, and Insurance Requirements are
included as Appendix D,
Following authorization by City Council to award a Construction Contract, written notification
will be given by the AGENCY to the successful BIDDER who will, within ten (10) business days,
submit to the Agency the completed and signed Construction Contract Agreement, a Faithful
Performance Bond, a Materlals and Labor Bond, and evidence of Worker's Compensation
Insurance,
Failure to execute a contract and submission of acceptable bonds and insurance as provided
herein within the time limit above may be just cause for the annulment of contract award and
the forfeiture of the bid proposal guarantee.
No contract shall be binding upon the AGENCY until it has been completely executed by the
Contractor, approved by the City Attorney, and executed by the AGENCY.
After the AGENCY executes the Contract and approves the bonds and certificates of liability
insurance, the AGENCY will send the successful BIDDER a copy of the fully executed
Construction Contract Agreement,
RETURN OF PROPOSAL GUARANTIES
Within ten (10) days after the award of the contract, the AGENCY will return the proposal
guaranties, other than Bid Bonds, except any guaranties that have been forfeited.
in
23A -40
W0
z
It
O
m
N fC
�W h
ti n
U I:
„ o
E 4 -
U
0
23A -41
C5°
Q
4.• -rR�.- U
is
J
I
4�
�,a
23A -42
CITY OF SANTA ANA EXHIBIT 3
APPENDIX B: Construction Contract
PROJECT NO, 15 -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
This CONSTRUCTION CONTRACT is made and entered into this 19th day of April, 2016,
by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and
municipal corporation organized and existing tinder the Constitution and laws of the State of
California, hereinafter referred to as "CITY" and Asplundh Construction Corp,, hereinafter
referred to as "CONTRACTOR ".
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree
as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own
cost and expense necessary to construct and complete in a good and workmanlike manner
and to the satisfaction of the City Engineer of the CITY, the Project No.15-6828, Harbor
Boulevard Corridor Traffic Signal Improvements (as part of Harbor Blvd Traffic Signal
Synchronization Project), hereinafter referred to as the "Work of Improvement ", identified
in and in accordance with the Contract Documents prepared by the City's Public Works
Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents," as defined, by
the Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
+ Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
« Contract Bonds
• General Provisions
• Special Provisions
• Project Plans
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be
as established in the Standard Specifications for Public Works Construction.
3, CITY agrees to pay and CONTRACTOR agrees to accept in Rill payment to complete
the Work of Improvement the sum total amount not to exceed $1,170,984, as set forth
and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as
Exhibit "A ". The BID PROPOSAL contains a schedule of unit price(s) or lump
sum(s) based on approximate quantities only, and the City does not expressly or by
implication agree that the actual amount of work will correspond therewith, but reserves the
right to increase or decrease the amotmt of any class or portion of the wort, or to omit
portions of the work as may be deemed necessary or advisable.
Page 1 of 3
23A -43
CITY OF SANTA ANA
APPENDIX B: Construction Contract
PROJECT NO, 15 -6828
Harbor Boulevard, Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
4. CONTRACTOR agrees to complete the Work of Improvement within the time specified in
the Time for Completion of Improvements section of the BILL PROPOSAL (Exhibit "A ")
including commencing construction within the timeframe therein specified after issuance of a
Notice to Proceed.
5, The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on
the Work of Improvement a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance
with applicable State and Federal law.
6. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the
CITY, one in the amount of One Hundred Percent (100 %) of the Contract price, to guarantee
the faithful performance of the work (Performance Bond), and one in the amount of One
Hundred Percent (100 %) of the Contract price to guarantee payment of all claims for labor and
materials fitrnished (Payment Bond). This Contract shall not become effective until such
bonds are supplied to and approved by the CITY. .
7. CONTRACTOR shall, prior to the release of the performance and payment bonds or the
retention payment, furnish a warranty performance and payment bond (Warranty Bond).
Said Warranty Bond shall also be required as a condition of project acceptance, For projects
tip to $500,000, the Warranty Bond amount shall be the greater of $10,000 or 20% of the
final contract price. For project above $500,000, the Warranty Bond amount shall be the
greater of $100,000 or 10% of the final contract price. .
s. CONTRACTOR, shall, after award of this Contract, furnish Certificates of Liability
Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be
approved by the CITY, //
Page 2 of 3
23A -44
CITY OF SANTA ANA
APPENDIX B: Construction Contract
PROJECT NO. 15 -6828
Harbor Boulevard Corridor Traffic Signal Improvements
(as part of Harbor Blvd Traffic Signal Synchronization Project)
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the
day and year first above written.
ATTEST:
MARIA D. HUIZAR
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Atto ey
BY
se Sandoval
1 'ef Assistant City Attorney
CITY OF SANTA ANA:
DAVID CAVAZOS Clerk of the Council
City Manager
RECOMMENDED FOR APPROVAL:
Fred Mousavipour
Executive Director, Public Works Agency
CONTRACTOR:
Asplundh Constriction Corp.
By
Title
Page 3 of 3
23A -45
23A -46
COST ANALYSIS
PROJECT NO. 15 -6828: HARBOR BOULEVARD CORRIDOR TRAFFIC SIGNAL
IMPROVEMENTS (AS PART OF HARBOR BLVD TRAFFIC SIGNAL SYNCHRONIZATION
PROJECT)
Construction Contract
$1,170,984
Contract Administration
$25,378
Inspection and Testing
$44,942
Contingencies
$116,896
TOTAL ESTIMATED CONSTRUCTION COSTS
$1,358,200