FISCAL YEAR 2016-2017
PROPOSED BUDGET
WORK-STUDY SESSION
PRESENTED BY: DAVID CAVAZOS, CITY MANAGER
May 17, 2016
Topics that will be covered
1)City Manager’s Budget Message
2)Fiscal Year 2015 –16 Review of Trends and Current Year
budget
3)Fiscal Year 2016-17 General Fund Forecast
4)Fiscal Year 2016-17 General Fund Proposed Budget and
Assigned Programs
5)Fiscal Year 2016-17 Capital Improvement Program
6)Budget Schedule and Next Steps
1
1
City Manager’s
Budget Message
Thank You!!!
Thank you Mayor &
•
“
Councilmembers for
your faith and
confidence in the
City’s management
team & city
employees
Thank you to all of our
•
residents & business
community
SANTA ANA CITY COUNCIL
2
CITY MANAGER’S BUDGET MESSAGE
City Manager’s Budget Message
Continue to provide a structurally balanced budget
Successfully negotiated 2-year labor agreements
Achievement of 20% Reserve Levels
Consistent & sustainable forecast
Funding millions of dollars to new programs and services such
as the Strategic Plan and added over 100 positions
Promoted a culture of innovation and efficiency
Achieved a “AA” Credit Rating from Standard & Poor’s
3
CITY MANAGER’S BUDGET MESSAGE
2
Fiscal Year 2015-16 Review of
Trends and Current Year Budget
FY 15-16
Projected Year-End Surplus
Total General Fund
(as of March 2016)
Projected Surplus for FY 15-16 of approx. $1.5M-$3.5M!
4
FISCAL YEAR 2015-16 REVIEW OF TRENDS AND CURRENT YEAR BUDGET
FY 15-16 Preliminary Projected
Year-End Results ()
as of March 2016
FY 2015-16FY 2015-16
REVENUE SOURCEVARIANCE
ADOPTEDPROJECTED
BUDGETYEAR-END
Sales Tax
$45,500,000 $45,588,928 $88,928
Property Tax
$31,600,000 $32,198,104 $598,104
Property Tax In-Lieu of
$28,800,000 $28,869,469 $69,469
VLF
UUT
$27,780,000$25,284,435($2,495,565)
Business License
$11,490,000$11,543,414$53,414
Hotel Visitor's Tax
$8,800,000$9,190,599$390,599
5
FISCAL YEAR 2015-16 REVIEW OF TRENDS AND CURRENT YEAR BUDGET
3
Fiscal Year 2016-17
General Fund Forecast
FY 16-17 Forecast Assumptions
Incorporates achievement of 20% General Fund reserve level of
$41.5M and Economic Uncertainty Reserve of $3.8M
Another conservative Sales Tax projection of 2.2%
“…it would be short-sighted in the extreme to now embark upon a host of new
spending only to see massive cuts when the next recession hits\[….\]fiscal
restraint must be the order of the day.”
-Governor Brown, January 7, 2016
Total Property Tax moderate growth of 4.5% (outlook: stable)
Utility User’s Tax will reflect water conservation efforts and decrease
in the price of natural gas as well as the expansion of
Telecommunications (outlook: stable)
Business License increase of 1.5%
Hotel Visitors Tax moderate increase of 2.5%
Ongoing innovation and efficiency savings of $2.1M
6
FY 2016-17 GENERAL FUND FORECAST
FY 16-17 Forecast Assumptions (Cont’d)
Reflects Pension Rate increases for FY 16-17:
-Safety -54.438% (increase of nearly 8% from FY 15-16)
-Miscellaneous –31.0% (increase of nearly 2.5% from FY 15-16)
-Includes Projections through FY 20-21
-Safety –73.6% (FY 20-21)
-Miscellaneous –40.4% (FY 20-21)
Orange County Fire Authority growth of 3.75%(increase of approx. $1.4M)
mandated by agreement
Includes negotiated Salary Increases of 2.5% (approx. $2.7M)
Health Insurance Increases of approx. 8% ($1.1M)
Includes funding for the Strategic Plan of $2.5M annually
Includes funding for 800MHz (approx. $600k)
NO REDUCTION IN PROGRAMS AND SERVICES
7
FY 2016-17 GENERAL FUND FORECAST
FY 16-17 Forecast & Four-Year Projections
General Fund Forecast (April 2016)
Mil.
RevenuesExpenditures
248.7
$250
248.5
244.9
244.9
240.5
$240
235.9
239.3
230.1
233.4
$230
228.4
$220
16/1717/1818/1919/2020/21
* Consistent and sustainable forecast allows for maintaining current
service levels and Trial Budget Supplemental Requests
8
FY 2016-17 GENERAL FUND FORECAST
4
Fiscal Year 2016-17
General Fund Proposed Budget &
Assigned Programs
City Charter Requirement
(Santa Ana City Charter)
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
9
FY 2016 –17
General Fund 11 Revenue Sources
Estimated Revenues: $228,970,000
Use of Money & Property
$17,018,300 (7.4%)
Other Taxes
$11,548,160 (5.1%)
Sales Tax
Miscellaneous
$46,504,000 (20.3%)
$10,331,856 (4.5%)
Charges for Services & Fees
$10,244,709 (4.5%)
Intergovernmental
$8,521,802 (3.7%)
Fines
Property Tax
$4,877,456 (2.1%)
$33,022,000 (14.4%)
Licensesand Permits
$4,654,774 (2.0%)
Franchise Fees
$3,308,620 (1.5%)
Hotel Visitor’s Tax
$9,430,000 (4.1%)
Business Tax
$11,632,323 (5.1%)
Property Tax In LieuVLF
Utility Users Tax
$30,096,000 (13.2%)
$27,780,000 (12.1%)
10
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
FY 2016-17 General Fund 11 Appropriations
$ 228,970,000
Non-Departmental $1,890,085 (0.8%)
Legislative Affairs $377,515 (0.2%)
Fire Department
Community Development $465,675 (0.2%)
$42,200,273 (18.4%)
Clerk of the Council $901,761 (0.4%)
Police Department
$120,257,118 (52.5%)
Personnel $1,405,042 (0.6%)
Bower’s Museum $1,475,890 (0.6%)
All Others
$14,297,128 (6.2%)
City Attorney’s Office $2,878,925 (1.3%)
Parks, Recreation, &
Finance & Mgmt. Services
Com. Services
$4,870,614 (2.1%)
$19,366,804 (8.5%)
Information Services $2,632,230 (1.1%)
Debt Service
Public Works
$12,578,065 (5.5%)
$5,908,755 (2.6%)
Planning & Building
$9,491,243(4.2%)
City Manager’s Office $2,270,005 (1.0%)
*Includes best practice of budgeting for attrition savings
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
11
FY 2016-17 General Fund 11 Appropriations
$ 228,970,000
60.0%
*Includes best practice of budgeting for attrition savings
52.5%
50.0%
40.0%
30.0%
18.4%
20.0%
8.5%
10.0%
6.2%
5.5%
4.2%
2.6%
2.1%
0.0%
PoliceFire DepartmentParks,Other*Debt ServicePlanningPublic WorksFinance
DepartmentRecreation &
Library
* Includes City Manager’s Office, Information Services, City Attorney’s Office, Bower’s Museum, Personnel, Clerk of the
Council, Community Development, Legislative Affairs, and Non-Departmental
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
12
Budget Alignment
Strategic Plan Goals
1)Community Safety (Pedestrian Mobility Safety)..…………………………. $3.3M
2) Youth, Education, Recreation…………………………………………………………………… $1.1M
3) Economic Development……………………………………………………………………………… $3.0M
4)City Financial Stability…………………………………………………………………………… $2.5-4.5M
5)Community Health, Livability, Engagement & Sustainability…. $600K
6)Community Facilities & Infrastructure……………………………………………….. $250K
7)Team Santa Ana……………………………………………………………………………………………. $240K
TOTAL GENERAL FUND PROPOSED BUDGET
$11.0-13.0M
ASSIGNED PROGRAMS & SUPPLEMENTALS*
Capital Improvement Program …………………………………………………………………………………….$45.3M
*Proposed assignment of fund balance or other funding sources will be designated with an asterisk in the succeeding pages
13
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Community and
Pedestrian Mobility Safety ($3.3M)
Matching funds associated with COPS grant ($1.5M) –
▪
10 Police Officers
Additional resources for Community Policing and
▪
Prevention Programs ($1.0M) –6 Police Officers
Proposed funding for Orange County Animal Shelter
($550k)*
Funding for Safe Mobility Santa Ana (SMSA) ($250K)
14
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Sworn Staffing Levels
FY 2012-13 to FY 2015-16
430
+13%
410
390
403
-18%
370
373
367
350
330
344
329
310
290
270
250
FY 12-13FY 13-14FY 14-15FY 15-16FY 16-17
AdoptedAdoptedRevisedRevisedProposed
* Reflects COPS Grant for 10 Police Officer Positions
15
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Sworn Staffing Levels
FY 2012-13 to FY 2015-16
FY 13-14:
74 Positions eliminated
•
FY 14-15 Added:
1 MMD Sergeant
•
5 MMD Police Officers
•
10 COPs Grant Officer
•
FY 15-16 Added:
1 Police Lieutenant
•
7 Patrol Study Officers
•
1 Special Projects Sergeant
•
4 Downtown Officers
•
10 COPs Grant Officer
•
16
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Recruitment Activity for Police Recruits and Laterals
Number of Applications Received
5,000
10,000
4,500
4,575
9,000
4,000
8,000
3,500
7,000
3,000
3,119
6,000
2,692
2,500
5,000
2,000
4,000
1,500
3,000
1,000
1,043
2,000
500
1,000
0
2012-132013-142014-152015-16 Projection
17
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Sworn Hiring and Separations
Calendar Year 2013 through 2016 YTD
70
60
60
50
40
34
33
30
30
22
20
17
20
8
10
0
2013201420152016 Projection
HiredSeparated
18
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Youth, Education, Recreation ($1.1M)
Park Systems Enhancements ($465K)
Water-Wise Management
Park Monitoring (Enhance Customer Service & Emergency Response)
Tree-Trimming
Funding for a development of Santiago Park Cultural Amphitheater to
create cultural and educational programs.* ($400K)
Security enhancements and other programs ($150k)
Youth programs to enhance literacy, computer usage, & Summer
Programs ($70k)
Provide nutritious meals to the Senior community ($15k)
19
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Economic Development ($3.0M)
Incorporates $2.0M for City branding proposed priorities, and various Economic
Development & Infrastructure Projects*:
South Main -$400K • Harbor Boulevard Corridor -$400K
•
Downtown -$400K • Seventeenth St Business
•
Corridor -$400K
Santa Ana Regional Transportation
•
Center (SARTC) -$400k
Includes $1.0M in funding for Economic Development (Public/Private
Partnership)*:
Partner with stakeholders to enhance City Economic Development efforts
•
Develop an incentive program to provide increased sales tax and economic
•
activity
Implementation of a branding & marketing campaign
•
Enhance business attraction and retention efforts
•
20
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
City Financial Stability ($2.5M -$4.5M)
Augment the Economic Uncertainty Reserve from
Fund Balance* ($1.0M –$3.0M)
Establish a Jail Revenue Stability Fund* ($1.0M)
Additional allocation to the Pension Stability Fund*
($500K)
21
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Community Health, Livability,
Engagement & Sustainability ($600K)
Allocation of funds for Community Engagement
•
and Partnership for Safety & Greater Prosperity*
($500K)
Non-Profit Organizations
–
Community Partnerships
–
Educational Partnerships
–
Education, Prevention, and Projects
–
Funding for a voter outreach, citizenship, and
•
community engagement program ($100K)
22
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Community Facilities & Infrastructure
Funding for deferred maintenance needs at the
Santa Ana Regional Transportation Center
(SARTC). ($250K)
Year 1 and 2 allocation of surplus for investing
in the City’s infrastructure improvements ($6.0M)
Capital Improvement Program ($45.3M)
23
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Team Santa Ana ($240K)
GENERAL FUND
Addition of a Paralegal and Personnel
Technician ($170k)
Funding for Job Classification Study ($70k)
24
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Community Budget Meetings
1)Morrison Park Neighborhood
April 21, 2016
–
2)NewhopeLibrary
April 26, 2016
–
3)ComlinkMeeting
April 28, 2016
–
4)Madison Elementary School
May 5, 2016
–
290+
5)McFadden Intermediate
School
Attendees!
May 10, 2016
–
25
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Community Budget Meetings &
Public Input
Continued public input through Community Budget Meetings
(April –May)
Conducted 5 Budget Meetings
•
Approximately 290+ attendees
–
Main comments expressed
–
Park Improvements and Safety
•
Public Safety/Youth and Gang Prevention Programs
•
Pedestrian/Traffic Improvements
•
Homelessness
•
Code Enforcement
•
26
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
FY 16-17 Additional Adjustments
WE LISTENED!
Additional community safety and protection of park
•
resources ($170k) –2 FT Park Rangers (replacing 2 PT
Park Rangers)
Extended hours for 2 community centers to facilitate
•
mentorship support for youth participants and various
recreational programs and activities ($150k)
Additional resources to enhance security services at Main
•
Library ($214k)
27
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
FY 16-17 Additional Adjustments
WE LISTENED!
Additional resources to ensure community livability
•
(funding pending fee rate study) –2 Code Enforcement
Officers
Develop an asset management program to manage all
•
city infrastructure capital assets and minimize capital
costs through the addition of 1 Asset Manager ($150k)
28
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
Additional funding: CDBG Proposed Project List
$2 Million –Bristol Property Sale (Anticipated July 2016)
Joint Use: Segerstrom High School ($500k)
•
Convert two baseball diamonds at SegerstromHigh School to joint use by investing in sport field lights
–
and other field improvements
Security Lights ($450k)
•
Replace existing wooden poles with concrete poles
–
Upgrade lighting to energy efficient LED fixtures and lamps
–
Centennial Park Walkway/Sidewalk Improvements ($430k)
•
Remove and replace sections of cracked walkway and asphalt
–
Skate Facility ($300k)
•
Construct a 2skate park at CDBG eligible location
–nd
Thornton Parking Lot Renovation ($220k)
•
Renovations to preserve parking lot including: removing loose gravel, replacement of asphalt, striping of
–
faded parking stall lines, ADA improvements
Birch Park Fence ($60k)
•
Design fence along the north and west side of the park for night closure
–
Purchase of equipment for the establishment of a ‘moviesin the park’ program
–
Santa Ana Senior Center (3 rd St.) –HVAC ($40k)
•
HVAC Upgrades
–
29
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
FY 16-17 Departmental
Requests -Not in Proposed Budget
Addition of a Deputy Clerk of the Council
($80k)
Reallocate Sr. Deputy Clerk of the Council
to Assistant Clerk ($30k)
Modernization of Equipment & Furnishings
($50k)-City Attorney’s Office
30
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
FY 16-17 Departmental
Requests -Not in Proposed Budget
Police Dept: Mobile Digital Computers ($1.0M)
•
Allows for the utilization of new technology to
–
improve security, communication, usability, and
efficiency
Streetlight Purchases ($500k)
•
Negotiating a purchase of approximately 11,400
–
streetlights for LED technology upgrades
Potential savings of $1 million/year in energy costs
–
Additional Funding for Street Light Pole
•
Replacement Contract ($40k)
31
FISCAL YEAR 2016-17 GENERAL FUND PROPOSED BUDGET AND ASSIGNED PROGRAMS
5
Fiscal Year 2016-17
Capital Improvement Program
CITY OF SANTA ANA
FY 2016/ 2017
CAPITAL IMPROVEMENT PROGRAM
Maple Bike Trail Bulb-OutZoo –Ocelot Exhibit
Morrison Park LID ImprovementsGrand Avenue Improvements
32
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT PROGRAM
16/17 CAPITAL IMPROVEMENT
PROGRAM (CIP)
$45,309,512
Utility /
Drainage /
Street City Facility
Traffic
Lighting
Improvements
Improvements Improvements
$8,559,030
$20,999,218
$5,403,400$10,347,864
Street Improvements
23%
Traffic Improvements
46%
Utility / Drainage /
19%
Lighting Improvements
12%
City Facilities
33
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT PROGRAM
STREET
IMPROVEMENTS
$20,999,218
Planning
Roadway ImprovementsSidewalk/Streetscape
3 –Projects
8 –Projects1 –Project
$517,130
$20,282,088$200,000
Pavement ManagementPavement Management
••
Alley ImprovementsAlley Improvements
••
Omnibus ConcreteOmnibus Concrete
••
Project DevelopmentProject Development
••
Local Local Preventative MaintenancePreventative Maintenance
••
RightRight--ofof--Way ManagementWay Management
••
Residential Street Residential Street RepairRepair
••
Bristol St and Memory Ln Bristol St and Memory Ln
••
Intersection WideningIntersection Widening
Bristol St Widening and Bristol St Widening and
••
Improvements from Civic Center Improvements from Civic Center
to Washingtonto Washington
Bristol St Widening and Bristol St Widening and
••
Improvements from Warner to St. Improvements from Warner to St.
AndrewAndrew
Warner Avenue Improvements Warner Avenue Improvements
••
and Widening from Main to Oakand Widening from Main to Oak
FISCAL YEAR 2016-17 CAPITAL
34
WIC Roadway WIC Roadway ImprovementsImprovements
••
IMPROVEMENT PROGRAM
TRAFFIC
IMPROVEMENTS
$5,403,400
PlanningTraffic SignalMobility/Safety
OC Street Car
3 –Projects4 –Projects9 –Projects
$150,000$1,246,000$3,007,400$1,000,000
Bike Lane Project Bike Lane Project
••
Fairview St Traffic Signal Fairview St Traffic Signal Citywide Safe Routes to Citywide Safe Routes to Continue partnership with Continue partnership with
••••
••
DevelopmentDevelopment
SynchronizationSynchronizationSchoolSchoolOCTAOCTA
Traffic Traffic Management PlansManagement Plans
••
Traffic Signal Hardware Traffic Signal Hardware Sepulveda Safe routes to Sepulveda Safe routes to Design OversightDesign Oversight
••••
••
Traffic Safety Project Traffic Safety Project
••
UpgradeUpgradeSchoolSchool
DevelopmentDevelopment
thth
Westminster Ave/17Westminster Ave/17St St Civic Center Drive Bike Civic Center Drive Bike
••
••
Corridor Traffic Signal Corridor Traffic Signal BoulevardBoulevard
Synchronization Synchronization EdingerEdingerAve, Santa Ana Ave, Santa Ana
••
thth
Euclid St and Hazard Euclid St and Hazard Blvd, and 5Blvd, and 5St Protected St Protected
••
Ave Signal ModificationAve Signal ModificationBike LanesBike Lanes
Warner and Flower Warner and Flower Crosswalk Upgrades Crosswalk Upgrades --PhPhIIII
••
••
Intersection ImprovementIntersection ImprovementFlower Street Safety Flower Street Safety
••
enhancementsenhancements
Lincoln Pedestrian TrailLincoln Pedestrian Trail
••
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT
35
SMSA ImprovementsSMSA Improvements
PROGRAM
••
PUBLIC UTILITY /
DRAINAGE
IMPROVEMENTS
$8,559,030
Sewer Water Facility /
Street Light
Improvements ImprovementsDrainage
Improvement
2 –Projects 4 –Projects5 –Projects
1 –Project
$2,129,500$3,549,530$2,680,000
$200,000
Citywide Sewer Citywide Sewer
••Water Main Water Main SegerstromSegerstrom(San (San Street Light ReStreet Light Re--
••••••
Main ImprovementsMain Improvements
ImprovementsImprovementsLorenzo) Sewer Lift Lorenzo) Sewer Lift wiring and Repairswiring and Repairs
Warner Industrial Warner Industrial thth
••1717Street Street ––Station ReconstructionStation Reconstruction
−−
Community Park Community Park
Phase 2Phase 2South Station Perimeter South Station Perimeter
••
Sewer Main Sewer Main
Saint Gertrude & Saint Gertrude & WallWall
−−
ImprovementsImprovements
GrandGrandWalnut Pump StationWalnut Pump Station
••
South BristolSouth BristolCivic Center Civic Center StormwaterStormwater
••
−−
Warner Industrial Warner Industrial Lift StationsLift Stations
−−
Community ParkCommunity ParkWell 29 ImprovementsWell 29 Improvements
••
Storm Drain Master PlanStorm Drain Master Plan
••
36
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT PROGRAM
CITY
FACILITIES
$10,347,864
Recreation
Building /Transit
Improvements
Park / Zoo FacilitiesImprovements
5 –Projects
11 –Projects4 –Projects
$2,018,000
$3,879,864$4,450,000
Center Street Urban Greening Center Street Urban Greening Angel Park Restroom RenovationAngel Park Restroom Renovation
••••
Downtown Parking Downtown Parking
••
ProjectProjectCivic Center ReCivic Center Re--caulking Plaza’s and ADA caulking Plaza’s and ADA
••
Structure Improvements:Structure Improvements:
Dan Young Soccer Complex Dan Young Soccer Complex ImprovementsImprovements
••
rdrd
33/Birch/Birch
••
Field 2 Synthetic TurfField 2 Synthetic TurfRoosevelt / Walker Park ImprovementsRoosevelt / Walker Park Improvements
••
rdrd
33/Broadway/Broadway
••
Riverview / Cabrillo / Windsor Riverview / Cabrillo / Windsor Santa Ana Stadium Concrete RepairSanta Ana Stadium Concrete Repair
••••
thth
55/Spurgeon/Spurgeon
••
ResurfacingResurfacingSecurity CamerasSecurity Cameras
••
thth
55/Main/Main
••
Santiago Bike Trail / Santiago Bike Trail / BomoBomoChepa’sChepa’sParkPark
••••
SARTC Deferred SARTC Deferred
••
KoralKoralSidewalk & Walkway Sidewalk & Walkway Memorial ParkMemorial Park
••
MaintenanceMaintenance
RenovationRenovationSanta Anita ParkSanta Anita Park
••
Santiago Park Playground Santiago Park Playground Madison ParkMadison Park
••••
EquipmentEquipmentSecurity Lighting at Various ParksSecurity Lighting at Various Parks
••
Santiago Park Gas HouseSantiago Park Gas House
••
Santa Ana Zoo Care & Quarantine FacilitySanta Ana Zoo Care & Quarantine Facility
••
FISCAL YEAR 2016-17 CAPITAL
37
IMPROVEMENT PROGRAM
FEATURED
PROGRAMS
Street Light LED
SMaRTFiber Optics
ConversionATP/HSIP
$80,000,000$TBD
$10,000,000$3,674,900
Efficiency /
Drought Tolerant
Technology
SMSA Program
Median Conversion
$TBD
$40,000,000
$1,000,000
38
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT PROGRAM
IMPROVING SERVICES
16/17
97 miles3 miles6 miles7 locations
Roadway ResurfacingWater/Sewer PipelineBike Lanes / RoutesSignal Modification
39
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT PROGRAM
TOTAL CAPITAL
IMPROVEMENT PROGRAM
(CIP)
$222,741,110
Utility /
Drainage /
Street City Facility
Traffic
Lighting
Improvements
Improvements Improvements
$45,945,377
$116,111,180
$31,770,300$28,914,253
Street Improvements
13%
Traffic Improvements
21%
52%
Utility / Drainage /
Lighting Improvements
14%
City Facilities
40
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT PROGRAM
CIP
PROJECT
TRACKING
41
FISCAL YEAR 2016-17 CAPITAL IMPROVEMENT PROGRAM
6
Budget Schedule &
Next Steps
FY 16-17
Adopted Budget
Calendar
December 1, 2015
May 5, 2016 at 5:30PM
Community Budget Meeting
Adopted FY 16-17 Budget Calendar
Madison Elementary School
February 16, 2016
CIP Update & Outreach Presentation
May 10, 2016 at 6:00PM
Community Budget Meeting
March 29, 2016
McFadden Intermediate School
Sunshine Ordinance Budget Outreach
Meeting
May 2, 2016 –May 16, 2016
April 11, 2016
City Council one-on-one Meetings
Preliminary 7-Year CIP presentation to the
02
Planning Commission
May 17, 2016
April 19, 2016
City Manager’s Proposed FY 16-17 Budget
GF 1-Year Forecast & 4-Year Projections
Work-Study Session
GF Trial Budget Presentation
Text Title
03
April 21, 2016 at 7:00PM
Place your own text
June 7, 2016
here
Community Budget Meeting
Tentative Budget/CIP Adoption
Morrison Park Neighborhood
April 26, 2016 at 6:30PM
June21, 2016
Tet Title
04
Community Budget Meeting
Final Budget/CIP Ordinance Adoption
Place your own text
Newhope Library
here
April 28, 2016 at 7:00PM
July 1, 2016
Community Budget Meeting
Start of the New Fiscal Year
Comlink Meeting –Police Community Room
42
Budget Schedule & Next Steps
Thank You!!!