Loading...
HomeMy WebLinkAboutSTATES LINK CONSTRUCTION, INC. Recording Raquestec. y, Recorded in Orricial Records, Orange County And When Recorded Mail To: Tom Daly, Clerk-Recorder Clerk of the Council,City of Santa Ana IIIIII III III IIII IIII II IIIA II I IIII(IIII VIII III I I 101 NO FEE 20 Civic Center Plaza,P.O.Box 1988 Santa Ana,CA 92702 2007000515391 03:59pm 08/17107 116200N12I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 THIS SPACE FOR COUNTY RECORDERS USE ONLY ���iil�� 1., NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN that the undersigned City of Santa Ma, California, a municipal corporation, with the address of City Hall, 20 Civic Center Plaza, Santa Ana, California, 92701, is the owner of the property hereinafter described, that said owner has caused construction of EL SALVADOR CENTER RENOVATION under contract entered into on June 5, 2006 , with States Link Construction, Inc. , on which contract Mt. Hawley Insurance (..77 o Co. is surety. The property on which such work improvement was placed is in the City of Santa Ma, County of Orange, State of California, and described as Project No. 04-6375 located at: u c El Salvador Park. The work improvement on said property was accepted as completed on p.4 u August 10, 2007 . E-, z °z a CITY OF SANTA ANA,A MIINICORPORATION 8 b Dated: 8/17/0 7 y City Engineer W E" TITLE VERIFICATION I, the undersigned, say: I am the City Engineer of the City of Santa Ma, California; I executed the foregoing Notice of Completion acting on behalf of the owner of the property therein described; I make this verification on behalf of said corporation by authorization of the City Council of the City of Santa Ma; I have read said notice and know the contents thereof; and I declare under penalty of perjury that the facts therein stated are true. 8/17/07 Executed on ,at Santa Ana,California (Signature of individual swearing that the contents of Notice of Completion are true.) THIS NOTICE OF COMPLETION MUST BE RECORDED WITHIN TEN(10)DAYS AFTER COMPLETION MAY-0E3-2.006 '13:52 F.01 ttN ,t el 11 j STATES LINK CONSTRUCTION, INC i CONTRACTORS.KNCINefR! May 8, 2006 This letter was foxed to:(714)-647-5058 CITY OF SANTA ANA PUBLIC WORKS AGENCY CONSTRUCTION SECTION P.O. BOX: 1988 20 Civic Center Plaza(M-22) Santa Ana,CA 92702 Attention: Mr.Mike Erik Subject: Clerical Error on Bid Items. T. Bid Proposal for EI SelvadorCenter-Renovation. Dear-Mr..Ju is: it wu:, brought to our attention that the amount of the items break down of our-bidpiupusal on the above reffered project were switch around. This letter is to confirm our bidproposaltotal is: $1,299,000:00, Item # 1 is: $1,057,000.00, and item#2 is: $242,000.00: We apologize for this clericalerrorthat=tired during-the-submitalof our bidproposal. Sincerely, r /g;r VU?ssoun Alabed President. 18600 Main Street,Suite 260,Huntington Beach,CA 92648 6 Tel: (714)848-4899•Fax:(714)848- $1)48 MAY-08-2006 13;52 P.02 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL& CONTRACT AGREEMENT BIT? PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM; e>1 n "e 5 - - Ce-,heA REQUIREMENT; The undersigned declares that he/she has carefully examined the location of the proposed work, that he/she has examined-the-Plans and Speci-Eications and read ttie accompanying instruction to BIDDERS,. and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with-said-plans-(if any), specifications and special-provisions, for the-unit price(s) or lump. sum(s)set forth in the following schedule: hem# Bid Item Unit Quantity- Unit Price Anto,mt i. El Salvador Center Renovation LS ---- •--- $1.057,000.00 2. El Salvador Park Improvements LS ---- $ 242.000.00 TOTAL 3}07 - _ -- -- - - - - --- S 1,299,000.00 PROJECT NOS. 04-6375-,04-7709&05-7506 BIDDER El Salvador Center Renovation Firm El Salvador Park Improvements- STATES-LINK CONSTRUC7IO11,INC. 18600 Main Street,Suite 260 Address Huntington Egad),CA 92549 Phone(s) Bidder Si? . _e _ All A TO BE INCLUDED IN BID PACKAGE BP I of2S TOTAL P.02 E CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation . , Project No. 05-7806 El Salvador Park Improvements ' PROPOSAL& CONTRACT AGREEMENT BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA ] -Y I ', FROM: ST' Lnk COLJ' 1 'C REQUIREMENT: / The undersigned declares that he/she has carefully examined the location of the proposed work, that he/she has examined the Plans and Specifications and read the accompanying instruction to BIDDERS, and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any), specifications and special provisions, for the unit price(s) or lump ' sum(s) set forth in the following schedule: Item# Bid Item Unit Quantity Unit Price Amount. 1. El Salvador Center Renovation LS ---- ---- $ 2 42.. (200 2. El Salvador Park Improvements LS ---- ---- "t-C2-5--1.0 0 TOTAL BID -- = z/i s21 I .a__ L k n¢!_ r_er_.iuin_> tv in 0 -$ I/ 2g9anor✓ 0vsa,.� ci --------- PROJECT NOS. 04-6375,04-7709 & 05-7806 BIDDER El Salvador Center Renovation Finn El Salvador Park Improvements STATES LINK CONSTRUCTION,INC, 18600 Main Street,Suite 260 Address Huntington Beach,CA 92648 s, Phone(s) 714_848 _ 48 99 Bidder Signa e ,9 /f..... / TO BE INCLUDED IN BID PACKAGE BP 1 of 28, THE AN,_RICAN INSTITUTE OF ARCF, , ECTS , 1119110 J"y+rb1.y.� ze AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS,that we STATES LINK CONSTRUCTION, INC., 18600 MAIN STREET SUITE 260, HUNTINGTON BEACH, CA 92648, as Principal, hereinafter called the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, PO BOX 1840, GLENDALE, CA 91209-1840, a corporation duly organized under the laws of the State of CONNECTICUT, as Surety,,hereinafter called the Surety, are held and firmly bound unto CITY OF SANTA ANA as Obligee, hereinafter called the Obligee, in the sum of TEN PERCENT (10%) OF THE TOTAL BID AMOUNT DOLLARS($ ----), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for EL SALVADOR CENTER RENOVATION NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 26TH day of APRIL, 20 06. STAT S LI K CONSTRUCTION, INC. (Principal) (Seal) difi;a � - -- —.'� /' it ess) _ '� (Title) y Tr. if- Casualty and Surety Company of America t--t /Le ii, Surety) (Seal) (Witness) J I B. LEONARD (Title) ATTORNEY IN FACT _ AIA DOCUMENT A310•BID BOND•AIA®•FEBRUARY 1970 ED•THE AMERICA 1 TIT OF ARCHITECTS,1735 N.Y.AVE.,N.W.,WASHINGTON,D.C. 20006 1 CALIFORNIA ALL-PURPOS ACKNOWLEDGMENT w>cAte.,ai�"sa cam.. awcitt.oit SCCy aeaC�'at;- tg3.55yre els Yea S.oaf-ta'•f.-vers..t.t/-.a. SA S togic4tiasS! 'K ty, t J State of C CC qCounty�of -.. 7 / (� • zi On N v L�� oZ t 207.510 before me /1 D 0 c� rJen� [ �{A. 4.4:,, S u Date ii Name and Title of Officer(e.g.,lane Doe,Notary personally appeared �- f e• Name(s)of Signer(s) t LXpersonally known to me e• ❑ proved to me on the basis of satisfactory evidence A g I , DIANA G.TGHMEH ,k to be the person(s)) whose name(S)Sare subscribed to the i «,+�..; Comm.M 1634431 N'-ci-,1^ L•-NOTARY PNAUC•CAUFCNNIA N within instrument and acknowledged to me that he/th9y j g }`'-gr ' ct : executed the, me in cher/their authorized capacity(ic/s), ; y`� i NF Camra.ExPreNcn.9O,2oo1 I and that by his/her/their signature(s`) on the instrument the g� g person(s'l, or the entity upon behalf of which the person(g) 'z.' g acted, executed the instrument. WITNESS my hand and official seal. 4 1 Leg Signature of Notary Public I OPTIONAL R lS Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent 1 qfraudulent removal and reattachment of this form to another document. k) qDescription of Attached Document A gTitle or Type of Document: 0 Document Date: Number of Pages: v� gSigner(s) Other Than Named Above: qCapacity(ies) Claimed by Signer(s) A g Signer's Name: Signer's Name: 0.4 gg D Individual ❑ Individual � ❑ Corporate Officer ❑ Corporate Officer 1, gTitle(s): Title(s): 0. g D Partner—❑ Limited ❑ General ❑ Partner—D Limited D General 0 g ❑ Attorney-in-Fact D Attorney-in-Fact g ❑ Trustee ❑ Trustee A D Guardian or Conservator RIGHTTHUNEPRINT RIGHTTHUre PRINT" A OF SIGNER ❑ Guardian or Conservator OF SIGNER kkyy0 ❑ Other: Top of thumb here ❑ Other: Top of thumb here 4 1 1 Signer Is Representing: Signer Is Representing: St t. MCeal���y4',^ rce,i�2WNQcr " -Kr2dW6W 4(4vngz tIVAL*C1M± v 4KWACtW4 Cv��6vbc$bcJ% ©1996 National Notary Association•8236 Remmet Ave.,P.O.Box 7184•Canoga Park,CA 91309-7184 Prod.No.5907 Reorder:Cat Toll-Free 1-800-876-6827 S CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT State of California County of Riverside On APR 2 6 2006 before me, Danna K. Baker, Notary Public , Name and Title of Officer(e.g.,"Jane Doe,Notary Public") personally appeared Julia B. Leonard,Attorney in Fact , Name(s)of Signer(s) ❑ personally known to me -OR- E proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in L, his/her/their authorized capacity(ies), and that by his/her/their '' e rY."-, • K. BAKER signature(s) on the instrument the person(s), or the entity upon t 4 � 7OiViM. #1386368 behalf of which the person(s) acted, executed the instrument. t ' RIV6FgRIDE'CdUNTYORNIq� •'. kb'COMM LxphosNov,zz zoos ` WITNESS my hand and official seal CM -001/1/fieL- Ail ,,, ,,a4 Signatur 8otary Public OPTIONAL Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Individual ❑ Individual ❑ Corporate Officer ❑ Corporate Officer ❑ Titles(s): ❑ Title(s): ❑ Partner- ❑ Limited ❑ General ❑ Partner- ❑ Limited ❑ General ❑ Attorney-in-Fact ❑ Attorney-in-Fact ❑ Trustee RIGHT THUMBPRINT ❑ Trustee RIGHT THUMBPRINT ❑ Guardian or Conservator or SIGNER ❑ Guardian or Conservator OF SIGNER ❑ Other: Top of Thumb here ❑ Other: Top of Thumb here Signer Is Representing: Signer Is Representing: BD-1133 09/00 WARNING.'`HIS POWER OF ATTORNEY IS INVALID WITHOUT THE REP"ORDER ST PAUL POWER OF ATTORNEY TRAVELERS Farmington Casualty Company St.Paul Guardian Insurance Company Fidelity and Guaranty Insurance Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company Seaboard Surety Company Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company Attorney-In Fact No. 714651 Certificate No. 0 0 014 8 6 4 3 KNOW ALL MEN BY THESE PRESENTS:That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York,that St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company and St.Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota,that Farmington Casualty Company,Travelers Casualty and Surety Company,and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut,that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland,that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwriters,Inc.is a corporation duly organized under the laws of the State of Wisconsin(herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Kenneth A. Coate, Mark N. Gladding, and Julia B. Leonard of the City of Riverside ,State of California ,their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permUtted'in any-notions or pfoceedings allowed by law. 20th IN WITNESS WHEREOF,the Companies have caused this instrument to be sapped and thou corporate seals to be hereto affixed,this February 2006 day of , Farmington Casualty Company St.Paul Guardian Insurance Company Fidelity and Guaranty lhsurancb Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insura`liee Underwriters,Inc. Travelers Casualty and Surety Company Seaboard Surety Company Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company S TY% ,tncc oi�n!l..N�qC1re� xs> �t WI 04i W`� c�• eeqEP6 l S , \ • kgMCarar . ¢ NE" tWROfl4J r " 9 !u ,02 1977 r6 1927 -c r - HARTFORD a�aOFNaa " . 0.�rto 1951 ma, 1866< f8AR �r •-`/ 'oEW 1:. N ai JuNr- a', State of Connecticut By: -- City of Hartford ss. U'.rge W jompson,Self f President 20th February 2006 On this the day of ,before me personally appeared George W.Thompson,who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters, Inc.,Seaboard Surety Company,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers - Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. tp.TIO In Witness Whereof,I hereunto set my hand and official seal. •Wi — --� ta.h. ' ±.fr ue./Y My Commission expires the 30th day of June,2006. * ammo * Marie C.Tetreault,Notary Public 58440-9-05 Printed in U.S.A. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER WARN004:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE"'r0 BORDER I This Power of Attorney is granted under and by h._authority of the following resolutions adopted by the Boards J.Directors of Farmington Casualty Company,Fidelity 1Y+ and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance,or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I,Kori M.Johanson,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St.Paul Guardian Insurance Company, St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Cgmpanry,or-Americq,-and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power"torney :utedbytsaid1Companies,which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and of xed the seals of saidb-Campanies this 26th day of April 20 06 Kori M.Iohans Assistant Secretary pNS'.U,rN6 0. / MPT, E3 A 4ry�wW^yq7:01"%,� 1Y•W2PON Oa'Gt 1 * Y teiti � �tincoeFOP4iEn' C We •a evenNuP uas\, W 19+L8 1977 1951 a 2] ySCANorCNe D mVr � ! ,r a 40 Am To verify the authenticity of this Power of Attorney,call 1-800-421-3880 or contact us at www.stpatulravelersbond.com.Please refer to the Attorney-In-Fact number, the above-named individuals and the details of the bond to which the power is attached. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER l . CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT LIST OF SUB-CONTRACTORS Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount: - Streets,highways including bridge projects; %2% of the bid or$10,000, whichever is greater • I - Buildings,parks, or other projects: V2% of the bid BIDDER proposes to subcontract certain portions of the work to the films listed below: NAME � � �1i 1 NAME . • ► 1 Ftss, €3 wG-til'ft'a Sep- r 3'- . _ r; -7 cC �. _.g,1"l LOCATION uP ta,,,, ()/ CA LOCATION tot, a,-c. e / PHONE (�09) 9p31 - 9 `764 PHONE X51j 27,?-51A4TYPE OF WORK Elect-pica) $_1i /i ° TYPE OF WORK'Re4l sLea $ 72, con NAME Luis e,V,Ie.c Ccisas , NAME Tsrres .. 1 rlc LOCATION Bpll (''zcarciem LOCATION Talo; n.wth, PHONE (562)92ezi .9494 PHONE gig -/g 'F, _ g90,3 TYPE OFWORK I%. $ no/wc,n TYPE OF WORK1 $ 85, vov 19 Lk)all 5 ernI ske1 NAME,�`0 er+r� Cal:-I.orn•.i ek (�Or.1 .n NAME r. LOCATION Br 11.11n,„) s �� LOCATION -.Res r o PHONE (5t2) Fi6.6 - 8858 PHONE t5C9 436 - 345® TYPE OF WORK Corn0P-4.4-e $ 55/000 TYPE OF WORK cI.ui„ 1,4* $ I C,�6v o NAME 7)a `ir, :v4cok,"c NAME Sat) 1`t2_bAry ASS eye , LOCATION _RI Ntr,,.,A-L, LOCATION y(kr,. e3 0 PHONE CG=°c) 5 77 464 PHONE SSR-:a 6,5 - 2:77B TYPE OF WORK L sulw\tor. $ 8/000 TYPE OF WORK 61-4.3e. Csrtan$ Pi Alc o NAME A i"r . a Keir s aro. c • NAME Rd ,S MU a`A� it c „ � �1 LOCATION c1. .t,s LOCATION q r, n 01/4 PHONE 949 644 - 1 Tf tS PHONE 90,9- 594 a:o 90 TYPE OFWORK 1-1-v. A-c_' $85,non TYPE OF WORK p� I_. $ 7, ,coo et,Se e* 1 f°+v,1� C rtr,Y. 101 01/Tac . N of Firm Submitting Bid i ature of Bidder TO BE INCLUDED IN BID PACKAGE BP2of28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT LIST OF SUB-CONTRACTORS Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount: - Streets, highways including bridge projects; %z% of the bid or$10,000, whichever is greater -Buildings, parks, or other projects: 1/2% of the bid BIDDER proposes to subcontract certain portions of the work to the firms listed below: NAME PThe 3.. Lon, c) cC.n p e NAME 6., P rc ?hN. , 01'.,.s, LOCATION A. ci \,e_k`. LOCATION r c„,poo_ - %et, (1 PHONE 7/4 -.. 476 -• 3 00 4 PHONE 949 -5A6--c)363 TYPE OF WORK La tvicr1,Y $25 l° TYPE OF WORK Olw,,,lo, $ 'S act, NAME fuse wo r1C Trk &Val � torn NAME L%Mlvcr svt\ k r,�e. .� LOCATION Le. ?ue, �f LOCATION 1.0% knjeIeS PHONE PHONE .23 _ 632 - 2 3 5 o TYPE OF WORK Ca Sets.) k $ 14, coo TYPE OF WORK Ask,- $ ,5/ c car NAME AAvccNlitc,`o , C NAME LOCATION re, ,,. LOCATION PHONE 909 -355 - l9 A 3 PHONE TYPE OF WORKw +Y„, easi E,.—$4gioan TYPE OF WORK 10-a tin $ NAME C ,-e e.,. 1 e.ec P,na cU rl— NAME LOCATION 14„ i +, Niru c'1 LOCATION PHONE 7!4 - 8a-- 76, 55 PHONE TYPE OF WORK Dex,as i $ .9_5”ao o TYPE OF WORK $ GI�Ch w0C� 1 NAME A}ao�/r F� 6eyou,.a ck:bocim.61 NAME LOCATION 1 LOCATION PHONE =, 62 5 Z-4tal PHONE T1YP1E OF WORKT't e. E.FinK $ t( r,00 TYPE OF WORK $ e of Firm Submitting Bid gi ature of Bidder TO BE INCLUDED IN BID PACKAGE BP 2 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL & CONTRACT AGREEMENT BIDDER'S STATEMENT BIDDER understands and agrees that this written proposal (or any part thereof specifically designated and accepted by the City of Santa Ana, hereinafter AGENCY) shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency.Executive Director r or his duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto. BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten(10) days (excluding Saturdays, Sundays and AGENCY'S legal holidays), or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. All terms contained in the Specifications, the Certification of Non-Discrimination by Contractors, and the Workers' Compensation Insurance Certificate are to be incorporated by reference into this Agreement and are made specifically as part of this bid. Name of Firm nit-, Link' csv.1...0 -1,0,4, Signature of Bidder4.14 Title (if an individual, so state) TO BE INCLUDED IN BID PACKAGE BP3of28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT BIDDER'S STATEMENT continued (If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) shnts LenV Czyn �, � ;nti, „ . ALINISF trtcsPJ1emk- 117- n.f.tare✓� EL)lases 11/4 —CO 14.tik FO / Se ra. 52- Maly j er r (g4/41(5 Lm2Alr � ACTION OF COUNCIL: Awarded toiewi on the basis of lowest responsible and responsive bidder in the amount of Date NE Jr� 20 06 ATTEST: //`�irr CLERK OF THE COUNCI I APPROVED AS TO FORM: ACCE rTED FOR ' TY OF SANTA ANA: U C,TY ITTORN E CUTIVE D P CTOR P i :LIC WORKS AGENCY TO BE INCLUDED IN BID PACKAGE BP4of28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements (THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THIS PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART OF THIS PROPOSAL) EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION I I The bidder Stc��tes. Len K c inn g}•� at l eve Tn c_ . , proposed subcontractor , hereby certifies that he has r,/, has not_,participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee ori Equal Employment Opportunity, all reports due under the applicable filling requirements. Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor(41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of$10,000 or under are exempt.) Currently, Standard Form 100(EEO-1) is the only report required by the Executive Orders or their implementing regulations. Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1)prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. TO BE INCLUDED IN BID PACKAGE BP5of28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR The undersigned contractor or corporate officer, during the performance of this contract, certifies as ` follows: 1. The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment,upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Contractor shall send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. TO BE INCLUDED IN BID PACKAGE BP 6 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT CERTIFICATION OF NONDISCRIMINATION BY CONTRACTOR(continued) 7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter. Signedr' ", '{h "�__ Title Asa' Pati Firm S'Lit.a 4 ink Cnml S"t"n.-ic-FL©va ?ri G• Date 4 /a/n6 TO BE INCLUDED IN BID PACKAGE BP7of28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT WORKERS' COMPENSATION INSURANCE CERTIFICATION As required by California Labor Code Section 1860 and 1861, the Contractor certifies as follows: I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of the Code, and I will comply with such provisions before commencing the performance of the work of this contract. If I, as the Contractor, now or at any time during the course of this agreement, qualify as an employer under California Labor Code Section 3300, unless the hired employee(s) is (are) persons excluded by said Labor Code, I shall furnish the City of Santa Ana with an insurance certificate from my workers' compensation insurance carrier certifying that I carry such insurance and that the policy shall not be canceled nor the coverage reduced except upon thirty (30) days prior written notice to the City of Santa Ana. Signe g I __ Title "j nr s��dan k Firm LCj�rx Ls. �inK \ lr�v SR1zu Vitroo "I,ra • Date tr,/cs/o6 TO BE INCLUDED IN BID PACKAGE BP 8 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT REFERENCES The following are the names, addresses, and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two years. -f fix. [` tirl lA e- Name and Address of Owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 2. Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed 3. Name and Address of owner. Name and Telephone Number of person familiar with project. Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds. � ` II I R he - 2 • yersi. G aI 4100 (980 788 —8581 S — O uon,eary. a A lar% Sran/ileto F , 4,[rrnbprI y.51e. 215/ Atte 64 ..92L1) (7/90257- s".641 TO BE INCLUDED IN BID PACKAGE BP 9 of 28 yd a- 443 STATES LINK CONSTRUCTION, INC CONTRACTORS.ENGINEERS REFERENCES: -City of Long Beach,Department of Public Works,333 W.Ocean Blvd.,Long Beach,CA 90802 • Contact: Alex F. Ordonez,Project Coordinator, Tel. (562)570-6459 • Management:CBM Consulting,Inc.,Alan Braatvedt Tel. (310)329-0102 • Proiect: Admiral Kidd Park—Teen Center • Completed: Current Amount: $1,963,548 • Architect: Ron Yeo,FAIA ARCHITECT,500 Jasmine Avenue,Corona Del Mar,CA 92625 • Contact: Ron Yeo Tel. (949)644-8111 • Bonded By: Travelers Casualty and Surety Company of America -Huntington Beach Union High school District, 10251 Yorktown Ave.,Huntington Beach,CA 92646 • Contact: Susi McLane Tel. (714)964-3339 • Proiect: Huntington Beach High School Modernization—Contract 2 • Completed: Completed July 1st,2005 Amount:$1,388,786 • Architect: Y'DEEN/ASSOCIATES,ARCHITECTS,3350 East Bich Street,Suite 201,Brea,CA 92821 • Contact: Tom Pezzuti Tel. (714)524-6396 • Bonded By: Travelers Casualty and Surety Company of America -Fontana Unified School District,9680 Citrus Ave.,Fontana,CA 92334 • Contact: Domenick Santilli Tel. (909)538-3544 • Project: Live Oak&Redwood Elementary Schools—Kitchen Remodel and Storage • Completed: December 10,2004 Amount: $480,000 • Architect: HMC Group,3270 Inland Empire Blvd.,Ontario,CA 91764 • Contact: William H.Fergus Tel. (909)989-9979 • Bonded By: Travelers Casualty and Surety Company of America • DSA Inspector: Sk Inspection Service,Sonny Kyi(909)553-3584 -Fullerton School District, 1401 west Valencia Drive,Fullerton,CA 92833 • Contact: Kelvin Okino,Construction Management,Bernards Bros.,714-446-0673 • Proiect: Maple,Richman&Woodcrest E.S.,Wave 4,Group 1 Maint.Upgrades • Completed: October 12,2004 Amount: $1,241,033 • Architect: PRIM Architects,647 Camino De Los Mares Suite 201,San Clemente,CA 92673 • Contact: PatricaNeely Tel. (949)496-6191 • Bonded By: Travelers Casualty and Surety Company of America • DSA Inspector:Kelly Inspection Service,Kelly(714)949-395-2910 -Norwalk-La Mirada Unified School District, 12820 Pioneer Blvd.,Norwalk,CA 90650-2894 • Contact: Vince Marchetti Tel. (562)868-0431 ext.2187 • Project: Iluerta Multipurpose Room Addition. • Completed: May,2003 Amount:$1,202,916• Architect: L P A,Inc., 17848 Skypark Circle,Irvine,CA 92614 • Contact: Marc Pange Tel. (949)261-1001 • Bonded By: Travelers Casualty and Surety Company of America • DSA Inspector:PC Associates,Robert J. Candy(714)730-0933 -Lennox School District, 10319 Firmona Ave.,Lennox,CA 90304 • Contact: Ken Knott Tel. (310)330-4950 • Proiect: Buford Elementary Addition. • Completed: July,2002 Amount: $2,194,437 • Architect: Ralph&Allen Partners Architects,520 N.Main,Ste.200, Santa Ana,CA 92701 • Contact: Warren Sampson. Tel. (714)547-7059 • Bonded By: United Pacific Insurance Company • DSA Inspector:Joyce Inspection,Ted Martin(310)671-6958 18600 Main Street, Suite 260,Huntington Beach, CA 92648 • Tel: (714) 848-4899 • Fax: (714) 848-5048 -City Of Burbank,275 East Olive Ave.,P.O. Box:6459,Burbank,CA 91510-6459 • Contact: Don LaBrado Tel. (818)238-5334 • Project: Performance Arts Center. • Completed: To he completed late May,2000 Amount:$1,513,796. • Architect: Stoutenborough Inc.,Architects&Planners,3300 Irvine Ave.,Newport Beach,CA 92660 • Contact: Joe,A.I.A. Tel. (714)955-3991 • Bonded By: Nobel Insurance Company -Long Beach Unified School District,2425 Webster Ave., Long Beach, CA 90810 • Contact: Kevin Barre Tel. (562)595-9574 • Project: Horace Mann Elementary School Modernization. • Completed: July, 1998 Amount: $1,503,000. • Architect: Richard L.&James L.Poper Architects, P.O.Box 7977,Long Beach, CA 90807 • Contact: Jim Poper,A.I.A. Tel. (562)421-5285 • Bonded By: Nobel Insurance Company • DSA Inspector:Joyce Inspection,Jim Price (310)671-6958 -Irvine Unified School District 14600 Sand Canyon Ave.,Irvine, CA 92618 • Contact: Tim March Tel. (949)559-1936 • Project: Refurbishment of Culverdale Elementary School. • Completed: November, 1997 Amount:$268,500 • Architect: Knowles Associates Architect, 14772 Plaza Drive,Suite 201,Tustin,CA 92680 • Contact: Peter Ultsch,A.I.A.Tel. (949)730-5055 • Bonded By: Nobel Insurance Company -County of Orange-John Wayne Airport Authority 3160 Airway Ave.,Costa Meas, CA 92626 • Contact: Carl R.Braatz Tel. (714)252-5125 • Project: Acoustical Insulation Program. • Completed: December, 1997 Amount: $240,880. • Architect: Wayle Laboratories,Inc., 123 Maryland Street,El Segundo,CA 990245-4100 • Contact: John Kaytor Tel. (562)421-5285 • Bonded By: Nobel htsurance Company -City of South Gate 8650 California Ave., South Gate, CA 90280-Tel. (213)565-9579 • Contact: do J.C.&Associates 253 E.Gladstone, San Dimas,CA 91773 Jim Church Tel. (626)732-3775 Or (562)406-8571 • Project: Park Playground Equipment&Rehabilitation of Public Facilities. • Completed: June, 1996 Amount: $1,101,249 • Architect: Meyer and Associates 23265 S.Pointe Dr.# 102 Laguna Hills CA 92653 • Contact: Randall K.Meyer Tel. (949)380- 1151 • Bonded By: T.LG.Premier Insurance Company -Palos Verdes Library District 650 Deep Valley Dr. Palos Verdes Peninsula,CA 90274 • Contact: Linda P.Elliot, Tel.(310)544-3800 • Project: Malaga Cove Library • Completed: August, 1995 Amount: $250,000 • Architect: Edward Carson Beall&Associates 23727 Hawthorne Blvd.Torrance CA 90505 • Contract: Miles Pritzkat, Tel.(310)378-1280 -Bellflower Unified School District 16703 S. Clark Ave.Bellflower,CA 90706 • Contact: Dr.Gary Burgner, Tel.(562)866-9011,Ext.3164 • Protect : Ramona Elem. School • Completed: Nov. ,1994 Amount:$552,563 • Architect: N.T.D. 1550 W.Colorado Blvd.Pasadena CA 91105 • Contract: Rudy Freeman, Tel.(213)255-1401 • Bonded By: Gulf Insurance Company 18600 Main Street, Suite 260,Huntington Beach, CA 92648 •Tel: (714) 848-4899 • Fax: (714) 848-5048 Page 2 of 2 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT BIDDER'S STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS The undersigned Bidder is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall: 1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. 2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards. 3. Contribute to the fund or funds in each craft or trade in which he employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to the Califo , Apprenticeship Council. Signed Title US Firm ,S) es Gi PC.(r)YeSC time-l-I OA —TY‘C,. . • Date L5/0/o TO BE INCLUDED IN BID PACKAGE BP 10 of28 CITY OF SANTA ANA Project Nos. 04-6375,04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT NON-COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the bidder declares that the bid is not made in the interest of, or on behalf of; any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded,conspired, connived or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding;that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid: Note: The above Non-collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non-collusion Affidavit. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. ' I qq Signe — 14k °oil AA eab ! Apr-e ,1Jer,-\- ' Subscribed and sworn to before me this VCIday of /11,, A , 20634, Signed: ✓� d illNotary Public Notary Seal: DIANA G.TOHMEH :� '- Comm.II1534431 N -{'jy,•it°NOTARY 1UBuIC•CAUcOANIA M �r,.�,,i f longe Cooly NBI Y Co ,Expires Jan.10,1101.1 TO BE INCLUDED IN BID PACKAGE BP 11 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT BIDDER'S STATEMENT REGARDING"ANTI-KICKBACK"REQUIREMENTS The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland "Anti-Kickback" Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he/she is otherwise entitled. Signed . Title "1�ne.11 "�z7,"�' 11 Firm �S' -k�e,s ;� 'I� C'r� srae-LOQ —K ,. c , , Date .9/ �/0 4 . i TO BE INCLUDED IN BID PACKAGE BP 12 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT CONTRACTOR'S LICENSING STATEMENT The undersigned contractor, or corporate officer, declares under penalty of perjury that the following is true and correct. Contractor's Name: STATES LINK CONSTRUCTION, INC. 18600 Main Street, Suite 26n Business Address: k. Huntington Beach,CA 92648 Telephone: 7/4_8448 _ 4,399 State Contractor's License No. and Class: 415.) / A d PP Expiration Date: 7 Signed: Title: Thr,,e_So rle + . I TO BE INCLUDED IN BID PACKAGE BP 13 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT CLAUSES SECTION 3 -CONTRACT CLAUSES A. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing. B. The parties to this contract agree to comply with HUD's regulations in 24 CFR Part 135, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the part 135 regulations. C. The contractor agrees to send to each labor organization or representative of workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or workers' representative of the contractor's commitments under this Section 3 clause, and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin. D. The contractor agrees to include the Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR Part 135, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the subcontractor is in violation of the regulations in 24 CFR Part 135. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge of that the subcontractor has been found in violation of the regulations in 24 CFR Part 135. TO BE INCLUDED IN BID PACKAGE BP 14 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT SECTION 3 -CONTRACT CLAUSE continued E. The Contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected, but before the contract is executed, and(2)with persons other than those to whom the regulations of 24 CFR Part 135 require employment opportunities to be directed, were not filled to circumvent the contractor's obligations under 24 CFR Part 135. F. Noncompliance with HUD's regulations in 24 CFR part 35 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts. G. With respect to work performed in connection with Section 3 covered Indian housing assistance, Section (7) b of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e) also applies to the work to be performed under this contract. Section 7(b) requires that to the greatest extent feasible (I) preference and opportunities for training and employment subcontracts shall be given to Indians, and (ii) preference in the award of contracts and subcontracts shall be given to Indian organizations and Indian-owned Economic Enterprises. Parties to this contract that are subject to the provisions of Section 3 and Section 7 (b) agree to comply with Section 3 to the maximum extent feasible, but not in derogation of compliance with Section 7(b). For the purpose of training and employment the primary Section 3 covered project area is the area in closest proximity to the actual construction work site within the U.S. Census Tract in which the project is located. It is understood that priority for employment opportunity is to be given to residents residing within the primary Section 3 area as defined. A Section 3 area resident is any lower income individual residing within the Section 3 area, whose total family income does not exceed 80% of the median income of the metropolitan statistical area in which the project is located (Orange County). A public housing resident is defined by regulations as Section 3 resident, regardless of income. The contractor and each subcontractor certifies that they will provide, to the greatest extent feasible, opportunities for employment to lower income residents (local residents) and job opportunities in connection with projects in their neighborhoods. For fiscal year 1996-97, • minimum goal for each project is 30%. TO BE INCLUDED IN BID PACKAGE i , BP 15 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT SECTION 3 - CONTRACT CLAUSE continued The Contractor/Sub-contractor/Service Provider by the signature affixed hereto declares under penalty of perjury: Contractor/Sub-contractor/Service Provider has read Section 3 requirements and accepts all its requirements contained therein for all of his/her operations within the City of Santa Ana. i 11 // 1111 Tl l�?s oU71 Ale,l2e_r) tip Ar sidPin'-I' ignature Print Name and Title Signature Print Name and Title Signature Print Name and Title .,/3/o 4 Date TO BE INCLUDED IN BID PACKAGE BP 16 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT FEDERAL REQUIREMENTS FOR FEDERAL-AID CONSTRUCTION PROJECTS GENERAL—The work lgeiupul dfnncednwlteotprtwith (This form need not befilled inifall joint venture firms are minority FetalInds,and therefore aloftheslahileSr>lesanlregulatiosproniilgfatedby owned.) fie Fetal Govennnent and applicable to wok fimmed in tie or in pact with ' Federal funds wit apply tosuch wak The'Required ConhactProvisirnIFederal- 1.Name ofjointventure Aid Construction Contacts,Tam FHWA 1213,are irrinkd in this Section 14. Wherever in said requited ooliltact provisions references ate made to "SHA Contracting ollicer,""SHA resident engin,"or 'authorized retive of the 2.Address ofjoin venture SHA,"such references shalbeconstrued to bran"Engineer"as defus dnSection 1-1.18 Dote Studad SpecifSors. PERFORMANCE OF PREVIOUS CONTRACT - In addition to the 3.Phone number of joint venture provisions in Section II, Nor," and Section VII, 'Subletting or Assigning the Camtract,"of the requited`newt provisie s,the tnhect r shalt anplywithlhe foIlowing 4.Identify the firms which comprise the joint venture. (The DBE partner must complete Schedule A) The bidder shall execute the CERTIFICATION WITH REGARD TO THE PERFORMANCE OF PREVIOUS CONTRACTS OR SUBCONIRACIS SUBJECT TO THE EQUAL OPPORTUNITY CLAUSE AND THE FILING OF REQUIRED REPORTS located in the a.Describe the role of the DBE firm in this joint venture. pmpo al.No request for subletting a assigning any portion of the contract in excess of$10,000 wilbecorsttedundert eprovisianofSectionVTlof4e required contract provisions unless such request is acoanparried by the CERTIFICATION refined to above, executed by the proposed b. Describe very briefly the experience and business qualifications of subattactor. each non-MBE joint venture: NON COLLUSION PROVISIONS - The lnovisias in this section are applicable toail contracts except cam`rctsforFedecalAdSecordanylxolecls 5. Nature of the joint venture's business Title 23,United States Code,Section 112,regimes as a condition precedent to approval by the Federal Highway Achinistatorofthe contract ft this wain that each bidder file a scam statement executed by,or on behalf of the prosaic,limn; association or coporafion to when such ccntract is to be awaxkd,certifying that 6.Provide a copy of the joint venture agreement such person,firm,assaciatice,or mrporatiar has not,eider directly o indirectly, entered into any agreement,participated in any collusion or otherwise Wren any 7. What is the claimed percentage of DBE ownership? • I xkominresfauntoffrecan}eddvebiddnmgmcanecdanwidhtlesubmtltedbid A fora to remake the naxnll sion affidavit statement required by Section 112 as a cadficadonurderpashyofpetjuryraflerthanasasvwarsfate n l as paintedby 28,USC See 1746,is included lathejtipmal. 8. Ownership of joint venture:(This need not be filled in if described in PARTICIPATION BY DISADVANTAGED BUSINESS mejointventureagreementprovdedbyquestion(6). ENTERPRISES IN TR SUBCONACTING - Part 26,Title 49, Code of a.Profit and loss sharing Fetal Regulations supplies to this Fcdaal aid project PatSnt sections of said b.Capital contributions, Code are iucopo dinpatorinitscatiretywidmrtsectosof4merespecial including cable ent lxov s as c,Other applicable ownership interests Schedule B-Iofonrntirmfr ratrnuimlgJohVentrueEligbilky. • i Attachment ExhrbitA-FRI 8-0747 I . TO BE INCLUDED IN BID PACKAGE BP 17 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT 9.Control ofand particitlioninthiscontract Idedifybyutile,race, sex,and"fmri'free individuals(and their tides)who are responsble for day-re-daynamagemintardpolicydocisionnalmrg,mc),rling,but NaarofFimn NanrofFinn m tl mitedto,fnsewilhpumereslnrmbilityfor•. a Financial decisions Signature Sigmtre Nana Name b.Maragamnt decisions,swims: Tide Tide I.Estimating Date Date 2.Madcefingan-hales Date Slate of 3.AunngardSongofr anagernat Cormtyof 4.Purchasing ofnajor rentorsupplies On this day of 20_, before ur appeared (name) to are persaallylmown who,being duly sworn,did execute the foregoing cSupervision offieldopaatiais affidavit and did state that Jr or she was properly authorized by (Name of fir) to exe aatefr affidavitand didso as his orherfree adand deed Note: If afterlir_thus Schedule B and before the completion of the NotazyPubbe jonrtva�¢e'swonc�ondrecontact coveedbythis regulation,thew is Cormissionexpnes any significant change in the unfomation submittal,the joint venture mstn mute grntee,either directly orthrougbdreprimecontractor [Sell if hejouawntne is asubcont ache.. Date Affidavit SaEof Countyof 'Ther undersigned swear that the foregoing statements are trued and include all material information necessary to i leutify and explain On this _ clay of 20_ befrne ere awed the tans and operation of our join venture and fir intended (Nacre) to me personally known,who being sworn, did execute the participation by each joint venturer in the nnlettaldng. Ftrfln,fire rrdasigedcovenantadagree mdxovivetoguilty crmart,oxrciee foregoing affidavit and did state drat Jr or she was prolixly authorized by(Name of firm) and acanate infomntion regarding actual joint venture work and the toexecurfir affidavit anddidso as his orl erdeeactanddeed. payment finale are'azrypropeeed dianges inanyofdejointvertre audugarnJs and m permit the audit and exaninaton of the books, NotaryPubhc records,and files of the joint ventre,by authorized representatives of Oma issiocrac fires fir graruz or de Federal finding agency. Airy material nvse}x r will be gnarls fie'terminating any contract winch lel any be awSed and for initiating action not Mesal or Stale laws canning Attachmt EidrbitA FR2 &0757 TO BE INCLUDED IN BID PACKAGE BP 18 of 28 ii CITY OF SANTA ANA • PROPOSAL AND CONTRACT AGREEMENT Project No. 04-7711 Elder Avenue Improvements: Sullivan to Center Project No. 04-7712 La Verne Avenue Improvements: Sullivan to Center&Center Storm Drain Project No. 04-7713 Borchard Avenue Improvements: Sullivan to Center TITLE 49, CODE OF FEDERAL REGULATIONS,PART 29 DEBARMENT AND SUSPENSION CERTIFICATION The bidder under penalty of perjury, certifies that except as noted below, he/she or any person associated therewith in the capacity of owner,partner, director, officer,manager: is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency; has not suspended, debarred, voluntarily excluded, or determined ineligible by any federal agency within past three years; has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years. If there are any exceptions to this certification, insert the exceptions in the following space. Exceptions will not necessarily result in denial of award, but will be considered in determining bidders responsibility. For any exception noted above,indicate below to whom it applies,initialing agency, and dates of action. Note: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal, Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification. Name of Bidder K cap,s fru e 'io„ Signature of Bidd aria Date ,5///cr-G FED.8-22-88 TO BE INCLUDED IN BID PACKAGE BP 19 of 28 LOCAL AGENCY BIDDER-DBE INFORMATION CO./RTE./P.M.: BIDDER'S NAME: $TATFS I INK CONSTRUCTION.INC. CONTRACT NO.: ADDRES818600 Main Street,Suite 260 Huntington Beach.CA 92648 ,; BID AMOUNT: BID OPENING DATE /o6 DBE GOAL FROM CONTRACT AMOUNT OF: $ 137,750 ITEM OF WORK AND DESCRIPTION NAME OF DBE** DOLLAR CONTRACT OF WORK OR SERVICES TO BE (Name of DBEs,Certification Number, AMOUNT ITEM NO. SUBCONTRACTED OR MATERIALS and Telephone Number) *** TO BE PROVIDED ® 9 PO DBE F;01/41„;,..a._ 4. mea\\ sys ewt r u s G. tolook Com wc 'on I l o,, POO Ale/ 5b2-%27-eP2,S 85,. orro kir viol Ke_re `�Lk1•v . A cl T'laKe v t,, , 1 J Cb.. . 13 • ) co I�I8847 (0:1Gene-rctt Con-Ynccctoe� S c t-es L—B"» V--(.o'etstkvocA ion 90 coo y 7714-848-46W^ D&S *oo350 rr� Total Claimed Participation $ * If 100%of item is not to be performed or furnished by DBE,describe exact portion,including planned location of work to be performed,of item to be performed or furnished by DBE ** - Credit for a DBE supplier,who is not a manufacturer is limited to 60%of the amount paid to the supplier. (See Section "Disadvantaged Business"(DBE)of the special provisions) IMPORTANT: Names of DBE subcontractors and their respective item(s) of work listed above should be consistent with the name and items of work in the "List of Subcontractors"submitted with your bid pursuant to the Subcontractors Listing Law. a-- ?/4 1 S-, Sign ture of Bidder Date (Area Code)tel. No. JA s='a o LW Ole, her Person to Contact (Please type or print) Distribution for NHS Projects: (1)Original-Caltrans DLAE for NI-IS Projects,(2)Copy-Local Agency project file Distribution for non-NHS Projects: (1)Original Local Agency project file DEPT.OF TRANSPORTATION (FED DBE)MODIFIED DC-OE-19(REV 09-18-95) • BP 20 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT NONLOBBYING CER VIP'CATION FOR FEDERAL AID CONTRACTS The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influence or attempting to influence an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriate funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities,"in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub-recipients shall certify and disclose"accordingly. Bidder's Signature S u. e s L,"m ♦ l irawc s'k-'Auc-k 00 4,,,, Firm kilo 4; Date • Standard Form LLL may be obtained from Caltrans and FHWA offices. TO BE INCLUDED IN BID PACKAGE BP 21 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT DISCLOSURE OF LOBBYING ACTIVITIES Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 1.Type of Federal Action 2.Status of Federal Action 3.Report Type: 0 a.Contract 0 a.Bid/offer/application ❑ a.initial b.Grant b.initial award b.material change c.Corporate Agreement - c,post-award d.Ban For Material Change only: e.Loan Guarantee Year quarter f.Loan Insurance date of last report 4.Name and Address of Reporting Entity 5.If Reporting Entity in No.4 is Subawardee, Enter Name and. Address of Prime:. , 0 Prime ❑Subwardee Tier ,If known Congressional District,if known Congressional District,ifknown ' 6.Federal Department/Agency: 7.Federal Program Name/Description (JFDA Number,If applicable 8.Federal Action Number,Vknown 9.Award Amount,(known ' ` 10.a.Name and Address of Lobbying Entity b.Individual Performing Services(brim/Mg adcb-ess fd enentfvmNo. grinthiabstnaNfigM9 10a) 9astnamefn M9 (attach Continuation Sheet(s)if necessary) 11.Amount of Payment(check all that apply): 13.Type of Payment(check all that apply) $ ❑Actual ❑Planned ❑a.retainer 0 b.one-time fee 12.Form of Payment(check all that apply): 0 c.commission 0 a.cash ❑d.contingent fee 0 b.in-Idnd;specify:nature ❑e.deferred value 0 f.other,specify ' 14.Brief Description of Services Performed or to be performed and Date(s)of Service,including officer(s),employee(s),or member(s)contacted, for Payment indicated in item 11: (attach Continuation Sheet(s)ifnecessary) 15.Continuation Sheet(s)attached: 0 Yes ❑No 16.Infamtrnrequest:ddnai thsfinnisauflntizedbyTilte31USCSection ' 1352.This disclosure ofldmbyingactivities isanntetialrepie tiouoffctupon Signature whichteliatnewas pl dbythetieraboveweenthetruaactionwasnude centered into.This disclosure is requitedpcusuantto3lUS.01352.This inbanatiouwtAbe Print Name • repmkchnifeCongesssmi-anmBllyardwffibeavalablethrpublicinspection Anypersonw &ilshmfietheteqttmecldisclosutesha11besubjecttoacivlpetmllyof Title IIII witless than$10,000andnotnnrethan$100,000fareachsuchfarlinn Telephone No. Date ' FedetalUse Only: Authorized for Local Reproduction. Standard Forth—LLL TO BE INCLUDED IN BID PACKAGE BP 22 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT BIDDER'S STATEMENT REGARDING REQUIRED FEDERAL CONTRACT PROVISIONS (Form FHWA-1273) The undersigned, is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the required Federal Contract Provision (Form FHWA-1273) as shown in the appendix of the special provisions of this project. 7. Signedt_ 4 r Title • a Firm ,c--, e 4s ItrS C' ter, -:.`i Fnu e\c i n r , in C. Date <'i/d'/n TO BE INCLUDED IN BID PACKAGE BP 23 of 28 CITY OF SANTA ANA Project Nos. 04-6375,04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT CERTIFICATION FOR FEDERAL AID CONTRACTS • The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief; that: (1) No Federal appropriated funds have been paid or will be paid,'by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal Agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of an Federal contract, grant, loan, or cooperative agreement. (2) If any funds other Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL*, "Disclosure of Lobbying Activities" in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than$100,000 for each such failure. The prospective participant also agrees by submitting his or her proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all sub-recipients shall certify and disclose accordingly. itisiC ididerlSignatur1e L.Sl n_+t c 1 L,"' . CPSin Vr etc\--;0 n C. Firm 5/1 io Date *Standard Form LLL may be obtained from Caltrans or FHWA offices. TO BE INCLUDED IN BID PACKAGE BP 24 of 28 i . , CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT BIDDER'S CERTIFICATE OF COMPLIANCE REGARDING "BUY AMERICA" REQUIREMENTS FOR STEEL OR MANUFACTURED PRODUCTS The undersigned, is submitting this proposal for performing by contract the work required by these bid documents, certify to comply with the " Buy America" requirements of Section 165 of the Surface Transportatio• ^ -.i lance Act of 1982 and asshown in the special provisions of this project. Signed A dins wr , I I Titlehec c`cFr Firm i-eAte.s \ .i'X Corn 5k-R a r k titm e Date �''��ta 4 • I li TO BE INCLUDED IN BID PACKAGE BP 25 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has_ , has not t✓ ve- been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy,or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a check mark after"has" or"has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Signed f = _ _ Title Firm ,Skr.,\-e s 1 1C Cer.vntsVMAX Date moi/3 TO BE INCLUDED IN BID PACKAGE BP 26 of 28 CITY OF SANTA ANA Project No. 04-7711 Elder Avenue Improvements: Sullivan to Center Project No. 04-7712 La Verne Avenue Improvements: Sullivan to Center& Center Storm Drain Project No. 04-7713 Borchard Avenue Improvements: Sullivan to Center PROPOSAL AND CONTRACT AGREEMENT PUBLIC CONTRACT CODE SECTION 10162 OUESTIONAIRE In conformance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed,or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No If the answer is yes, explain the circumstances in the following space. TO BE INCLUDED IN BID PACKAGE BP 27 of 28 CITY OF SANTA ANA Project Nos. 04-6375, 04-7709 El Salvador Center Renovation Project No. 05-7806 El Salvador Park Improvements PROPOSAL AND CONTRACT AGREEMENT PUBLIC CONTRACT CODE SECTION 10232 STATEMENT In conformance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board. Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Signed °I< Title T ,;Jc„,' . Firm � \— ' imh Co0 Ili c Date ,c_Vg /o 4 TO BE INCLUDED IN BID PACKAGE BP 28 of 28 02W l < - 2 § \ k § ` + 3 ) * ) \ N ) 22z o ( a-- 8 \ 0 y/.. \ / 0 bo ° � Co ° k J g- > 0 w ¥ ILI � % ± 2 Ili 0 ] _ 1:4 2 0 Q Ce \ 0 l $ kJ W th } ~ 73 Ed 0 ,0 G ) \ § \ c \ O tQl § % Jk ^ � m « ± y # + { e § \ § co ( ) § ) / § F- w 2 ` \ 2 ( { 0 0 Ill O. - o CIL0 0 0 k \ m f 1 p� Miguel A. Polido CITY MANAGER MAYOR PRO TEM David N. Ream Patricia A.McGuigan (a, CITY ATTORNEY COUNCILMfMBERS - Joseph W. Fletcher .''Claudia C.Alvarez ` Y,ducatioq 1st - . - CLERK OF THE COUNCIL Lisa Bist - Patricia E. Healy Alberta D.Christy Brett Franklin FILED FILED CITY OF SANTA ANA POSTED Jose Solorio 1� PLANNING&BUILDING AGENCY APR 2 4 20 Civic Center Plaza (M-20) p 2002 P.O. BOX 1988 •• Santa Ana,California 92702 APR 14 22tC2 • Fax(714)973-1461 • DAfaLENEJ. RIM CLERK-RECORDER - DABLENEJ.BL By DEPUTY g y "DEPUTY NOTICE OF EXEMPTION From the Requirements of the California Environmental Quality Act(CEQA) TO: COUNTY CLERK/County of Orange FROM: City of Santa Ana P.O. Box 238 Planning & Building Agency Santa Ana, CA 92702 20 Civic Center Plaza Santa Ana, CA 92702 PROJECT TITLE: El Savador Park Recreation Center Renovation Project Date of Decision: April 15, 2002 PROJECT NUMBER(S): ER NUMBER: 2002-163 PROJECT LOCATION: 1825 W. Civic Center Drive City: Santa Ma County: Orange Description of the Project: Renovation of existing recreation center Name & Address of Applicant: City of Santa Ana, 20 Civic Center Plaza Name of Public Agency Approving Project: City Council Exempt Status.: Recorded in Official Records, County of Oranc ❑ Ministerial (Sec. 15268) Darlene Bloom, Interim Clerk-Recorder o Declared Emergency(Sec. 15269 (a) ) 11111111111111101111111111VIII VIII VIII IIIIIIIIIIIIIIINOFEE ❑ Emergency Project (Sec. 15269(a)&(b) ) 20028500043104:12pm.04124102 ❑ General Rule (Sec. 15061(b)(3) ) 170 52 Z01 Statutory Exemption: State Code number_ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 )K1' Categorical Exemption: State class and section number: Section 15302 (c) • Reason(s) why project is exempt from CEQA: Propose project involves renovation of existing recreation center without no substantial increase in capacity. City Contact Person:_Dan Bott Telephone No: (714) 667-2719 • y $i� • Signature: i Z �- , Date: 11 7f.Jo Title: Environmental Coordinator • ri; • Cs.6% ., ..�.., r P _r 0 r . — % . N -� o- y d o ; M- V >. a> 1,-,- f. O C U , C . - t`W v U) (1LLC� NCOc O 6 6 i� •� — '� w Ol i 'ar-o„� ra ZOG6 28 'e �, 286LXouy8 'O'da;ueg EV-IN ezeld�a�ua0 oinp pZ AONBOV SNM "1fl C VNV V±NVS218dOOIAl8lid ORANGE COUNTY REPORTER Tms space for filing stamp only SINCE 1921 600 W SANTA ANA BLVD,SANTA ANA,CA 92701 Telephone(714)543-2027 /Fax (714)542-6841 Jay Ponce CITY OF SANTA ANA/PUBLIC WORKS OR if:950281 PO BOX 1988 NOTICE INVITING BIDS There is an $80.95 charge (non- SANTAANA, CA - 92702 NOTICE IS HEREBY GIVEN that the City Specifications,)or plus)ha and SANTAe s$12.08 of Santa Ana,California will receive at the additional fee if mailed. Make checks City Hall-Ross Annex, (M-43), 20 Civic payable to the City of Santa Ana. Center Plaza, Santa Ana, California 4/5,4/7/06 92701,the Public Works Agenc Fourth OR-950281e Floor Receptionist,on or before the hour of 2:00 p.m. on Wednesday, April 26, PROOF OF PUBLICATION 2006sealedNos. 4-637nd/or prcposals for: Project Nos. 5,04-7709 El Salvador Center Renovation Project No.05-7806 El Salvador Park (2015.5 C.C.P.) Improvements Notice is hereby given bidders that this State of California ) project is funded with CDBG money,and that the rate of wages for each craft or County of ORANGE )55 type of work or mechanic employed under this contract shall be as specified under the current determinations of the Notice Type: BID-NOTICE INVITING BIDS Department of Labor as required under the Davis-Bacon Act. Where a discrepancy exists between Federal and State prevailing wage rate,the higher of Ad Description: Notice Inviting Bids the two prevailing wage rates shoo apply. Each bid shall be accompanied by cash,a cashier's or certified check payable to the City of Santa Ana,or bid bond issued by a corporate surety,for an amount not loss than ten percent(10%)of the aggregate of the bid,as a guarantee that the bidder will enter into the proposed contract if the I am a citizen of the United States and a resident of the State of California;I am same is awarded to him.The signature of the Bidder on the bid bond must be over the age of eighteen years,and not a party to or interested in the above notarized. entitled matter.I am the principal clerk of the printer and publisher of the The City Council reserves the right to ORANGE COUNTY REPORTER,a newspaper published in the English reject any or all bids. language in the city of SANTA ANA,county of ORANGE,and adjudged a The successful Bidder must possess or newspaper of general circulation as defined by the laws of the State of obtain a valid California Class B California bythe Superior Court of the Countyof ORANGE,State of California, Contractor's this prior t.the scheduled award P Codatnratos cpnor 10 under date 06/20/1922,Case No. 13421. That the notice,of which the There will be a MANDATORY PRE-BID annexed is a printed copy,has been published in each regular and entire issue JOB WALK at the project site on of said newspaper and not in any supplement thereof on the following dates, Thursday,April 13,2006 at 10:00am. to-wit: The DBE goal for this project is$137,750 which is 14.5%of the Federal Funds in the project. This information may be submitted with your bid proposal. If it Is not,and you are the apparent low bidder 04/05/2006,04/07/2006 or the second or third low bidder,it must be submitted and received by the administering agency no later than the time specified in the federal requirement attached in Appendix G. The lime for completion of this contract is 120 working days.Liquidated damages of $250 per working day shall begin following the completion of the first 120 Executed on: working days after Notice to Proceed is 04/07/2006 issued. At Los Angeles,California Substitution of securities for any monies withheld by the City of Santa Ana to I certify (or declare) under penalty of perjury that the foregoing is true and ensure performance is allowed in Correct. accordance with the Public Contract Code. Complete sets of the Plans and • • Specifications will be furnished upon application to the Public Works Money First Floor Ross Annex Complex 20 Civic Center Plaza M-93 Santa Ana Ar California 92701 phone 1714t 647-5680. igna ure ® ` r- CIT' " OF SANTA ANA _ts : PUBLIC WORKS AGENCY * I CONTRACT CHANGE ORDER rY,,a Project Number PROJECT NOS. 04-6375, 04-7709, 05-7806; EL Change Order Number 1 SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS To States Link Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY \ \ \ The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order.The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this change order. TOTAL COST THIS CHANGE ORDER: DECREASE $ -0- INCREASE $102,499.00 By reason of this order the CONTRACT TIME completion will be adjusted as follows: Add 15 working days. We the undersigned contractor have given careful consideration to the change proposed and hereby agree,if this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above,and perform all service necessary for the work above specified,and will accept as full payment therefor the prices shown above. Acce •• Date KJri Contractor Stat- . Link Construction, Inc. B inj + ; -�.v.—_ .. Title `, ,..A• / J at Approval r• ommended b A.' ; ,JAI Date a/ / a/c1 ' F PUL C WOR AGENCY EXE FIVE DIRECTOR [�//�, Approved by W ��Aul At 4. f 1 Date 61 I'ff o l- CITYMANAGER Ill 66 Page 3 of 3 MEMORANDUM w> David N. Ream To: City Manager Date: March 30, 2007 James G. Ross, Executive Director From: Public Works Agency Subject: PROJECT NOS. 04-6375, 04-7709, 05-7806; EL SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS CHANGE ORDER NO. 1 Contractor: States Link Construction, Inc. 18600 Main Street, Ste. 260 Huntington Beach, CA 92648 Project Description: EL SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS Change Order Number: 1 Amount: $127,386 Account Number 301-232-6631 Work Order 83188 Original Contract Cost: $1,299,000 of Original Amount of The Change Order: $127,386 10% Previously Approved - 0 - - 0 Change Orders: Total Change Orders: $127,386 10% REASON FOR CHANGES Item 1. Building Safety reviewed the contract documents and determined the drive approach to the courtyard could not be used for disabled access. Therefore to accommodate this requirement a disabled ramp needs to be installed. Prior approval was granted on November 13, 2006. (PCO No. 1) AGREED PRICE = $ 13,091 Item 2. Parks, Recreation and Community Services Agency had requested to remove the existing landscaping because they have had security and Project 04-6375 Request for Approval of Change Order No. 1 March 30, 2007 Page 2 vandalism issues at their facility. Therefore it was recommended to remove the existing shrubs and trees located at the front of the building and parking lot. Prior approval was granted on November 13, 2006. (PCO No. 2) AGREED PRICE = $648 Item 3. During the start of the selective demolition it was discovered that the building was infested with termites. It was recommended that the building be immediately fumigated. Prior approval was granted on November 1, 2006 (PCO No. 3) AGREED PRICE = $4,432 Item 4. During the selective demolition at the facility it was discovered that several exhaust fans and heaters were not shown to be removed and the exterior joists have excessive weather damage. Therefore to renovate the facility as designed it was recommended to remove exhaust fans and heaters and trim the deteriorated joists as required and install sheet metal caps over the joists. Prior approval was granted on November 13, 2006. (PCO No. 4) AGREED PRICE =$9,507 Item 5. The contract documents show installing the HVAC units above the new ceiling. After further review, it was determined that these units would not fit. The new ceiling is at seven feet and could not be lowered any further; therefore, requiring the relocation of the units. Prior approval was granted on November 14, 2006. (PCO No. 5) AGREED PRICE _ $13,346 Item 6. Parks, Recreation and Community Services Agency had requested to have the existing exposed conduit and wires within the building relocated to within the walls and the roof. Additionally they had requested to have new conduit installed for their new telephone/data system. Prior approval was granted on November 14, 2006. (PCO No. 6) AGREED PRICE = $18,794 Item 7. While surveying the building to conceal the new utilities and conduits within the building it was discovered that the contract roofing system was not conducive for this type of installation. The new utilities and conduits could only be installed exposed on the roof or exposed in the building. Parks, Recreation and Community Services Agency requested to change the roofing system to a system that would allow the conduits to be installed within the roofing system. Therefore it was recommended to change the contract roofing system from a modified bitumen membrane to a Project 04-6375 Request for Approval of Change Order No. 1 March 30, 2007 Page 3 thermoplastic polyolefin membrane roof system. Prior approval was granted on November 2, 2006. (PCO No. 7) AGREED PRICE = $20,177 Item 8. While doing the selective demolition Parks, Recreation and Community Services Agency had requested to modify the exterior columns and walls to accommodate the building use. Prior approval was granted on November 14, 2006. (PCO No. 9) AGREED PRICE = $2,534 Item 9. The contractor was advised by SCE that the point of connection for the power was incorrect and was only available from the northeast corner of the building not the southwest west corner, as shown on the plans. To mitigate the cost to new conduit and wire from the opposite side of the facility, Parks, Recreation and Community Services Agency agreed to relocate the switchgear to the courtyard. Prior approval was granted on November 14, 2006. (PCO No. 10) AGREED PRICE = $18,883 Item 10. Parks, Recreation and Community Services Agency had requested to have conduit installed for its future security system. Installing the conduit during the construction will allow the conduit to be concealed within the walls and the roof. Prior approval was granted on November 14, 2006. (PCO No. 11) AGREED PRICE = $18,832 Item 11.The new door to room 121 would not fit within the existing opening as shown on the contract drawings. Parks, Recreation and Community Services Agency had requested to modify the wall to accommodate the new door and replace the glass in that room and the adjacent room 120. Additionally, the new plumbing in the restroom will not fit within the existing walls; therefore, requiring the walls to be furred. Prior approval was granted on November 14, 2006. (PCO No. 13) AGREED PRICE = $7,142 Item 12.The contract document inaccurately dimensioned the restrooms and the utility room; consequently, the drinking fountains and the water heater would not fit within the designed spaces. Parks, Recreation and Community Services Agency had requested to eliminate the drinking fountains and replace the existing water heater with a tankless model. Additionally, Parks, Recreation and Community Services Agency had requested to extend the new gas line to accommodate future construction. Prior approval was granted on November 14, 2006. (PCO No. 15) AGREED PRICE = $ -0- Project 04-6375 Request for Approval of Change Order No. 1 March 30, 2007 Page 4 Item 13. Parks, Recreation and Community Services Agency had recommended modifying the steel 'C' channels located at the entry ways to enhance the appearance of the facility. (PCO No. 17) AGREED PRICE = $ -0- Item 14. During the installation of the exterior columns foundation the contractor damaged an existing water line that was in conflict with the footing. It was recommended to relocate the water line outside the new footing. (PCO No. 19) AGREED PRICE = $ -0- Item 15. Parks, Recreation and Community Services Agency had requested to change the acoustic panels within the Performance Hall and at the office area to a more durable wall panel because of the potential of being vandalize. (PCO No. 20) AGREED PRICE = $ -0- APPROVED AS TO FUNDS AND ACCOUNTS: JA J-mes . Ross Francisco Gutierrez —� xecutive Director Executive Director Public Works Agency Finance and Management Services Agency c: Stephen G. Harding, Deputy City Manager for Development Services JCR/DI/MG/04-6375 RFA CO#1 t Clr ' OF SANTA ANA T'4 PUBLIC WORKS AGENCY G i CONTRACT CHANGE ORDER 'u l Project Number PROJECT NOS. 04-6375, 04-7709, 05-7806; EL Change Order Number 1 SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS To States Link Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT AGREED LUMP SUM PRICE 1. Modify the existing concrete drive approach and adjacent concrete walkways per City of Santa Ana letter dated June 12, 2006 and as directed in the field. (PCO No. 1) AGREED PRICE = 13,091 2. Modify the existing landscaping at the front of the facility per City of Santa Ana letter dated October 16, 2006 and as directed in the field. (PCO No. 2) AGREED PRICE = $648 3. Exterminate the facility for termites per City of Santa Ana letter dated November 1, 2006. (PCO No. 3) AGREED PRICE = $4,432 4. Modify the demolition plans per City of Santa Ana letter dated October 16, 2006 and as directed in the field. (PCO No. 4) AGREED PRICE = $9,507 5. Modify the HVAC system per the approved shop drawings and as directed in the field. (PCO No. 5) AGREED PRICE = $13,346 6. Provide and install data conduits and relocate exposed conduits per City of Santa Ana letter dated October 25, 2006 and as directed in the field. (PCO No. 6) AGREED PRICE = $18,794 7. Modify the roofing system per City of Santa Ana letter dated November 2, 2006 and as directed in the field. (PCO No. 7) AGREED PRICE = $20,177 Page 1 of 3 CIT ' OF SANTA ANA PUBLIC WORKS AGENCY * T C * CONTRACT CHANGE ORDER Project Number PROJECT NOS. 04-6375, 04-7709, 05-7806; EL Change Order Number 1 SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS To States Link Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY 8. Modify the building columns and exterior walls, restroom exhaust fans, performance stage area, and HVAC utility closet per City of Santa Ana letter dated January 9, 2007 and as directed in the field. (PCO No. 9) AGREED PRICE = $2,534 9. Provide and install new switchgear and modify the location per City of Santa Ana letter dated January 29, 2007, 2007 and as directed in the field. (PCO No. 10) AGREED PRICE = $18,883 10.Provide and install security conduit, performance hall lights, and exterior lights per City of Santa Ana letter dated November 20, 2006 and as directed in the field. (PCO No. 11) AGREED PRICE = $18,832 11.Modify the classroom cabinets, walls, windows, and doors per the City of Santa Ana letter dated November 8, 2006 and as directed in the field. (PCO No. 13) AGREED PRICE _ $7,142 12.Modify the drinking fountain, gas line and water heater per City of Santa Ana letter dated January 22, 2007 and as directed in the field. (PCO No. 15) AGREED PRICE = $ -0- 13.Modify the steel 'C' channels per City of Santa Ana letter dated November 20, 2006 and as directed in the field. (PCO No. 17) AGREED PRICE = $ -0 14.Repair the water line located at the front columns as directed in the field. (PCO No. 19) AGREED PRICE = $ -0- Page 2 of 3 -maw i CI" ' OF SANTA ANA isfV, PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER r -:erP - Project Number PROJECT NOS. 04-6375, 04-7709, 05-7806; EL Change Order Number 1 SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS To States Link Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY 15.Modify the tack board fabric and acoustical wall panels per approved submittal and as directed in the field. (PCO No. 22) AGREED PRICE = $ -0- The compensation both time and cost set forth in this change order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, including impact on unchanged work. By signing this change order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation includes payment for all work contained in this change order, plus all payment for interruption of schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of this change order constitutes full mutual accord and satisfaction for all changes and work performed, and that the time and cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order, The Contractor on behalf of himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation of any whatsoever to file any further claim related to this change order. TOTAL COST THIS CHANGE ORDER: DECREASE $ -0- INCREASE $127,386.00 By reason of this order the CONTRACT TIME completion will be adjusted as follows: Add 45 working days. We the undersigned contractor have given careful consideration to the change proposed and hereby agree,if this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above,and perform all service necessary for the work above specified,and will accept as full payment therefor the prices shown above. Accepted,Date .,^ / _ Contractor S . ;s Link Construction, Inc. ,4/ By de-� i� /Title p - Approval recommended by Date Y7 21 Q 7 Y�PUUB �OR • INCYEXECUT r' DIRECTO; e Approved by ,i � Date Z//x 1/./, 7 CITY MA Page 3 of 3 V CIT - OF SANTA ANA T4s? it PUBLIC WORKS AGENCY I *` CONTRACT CHANGE ORDER i r.�,n "ti Project Number PROJECT NOS. 04-6375, 04-7709, 05-7806; EL Change Order Number 2 SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS To States Link Construction, Inc, Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY EXTRA WORK AT AGREED LUMP SUM PRICE 1. Prime and Paint the existing classrooms and modify miscellaneous architectural items per City of Santa Ana letter dated November 20, 2006 and as directed in the field. (PCO No. 8) AGREED PRICE = 16,673 2. Repair the pool room building roof per City of Santa Ana letter dated December 21, 2006 and as directed in the field. (PCO No. 12) AGREED PRICE = $11,271 3. Patch and repair the existing classroom drywall and ceiling T&G and modify the duct and HVAC finish, and revise the Performance Hall window treatment as directed in the field. (PCO No. 16) AGREED PRICE = $3,370 4. Remove and install new VCT per City of Santa Ana letter dated November 20, 2006 and as directed in the field. (PCO No. 18) AGREED PRICE = $24,831 5. Provide and install new casework in the lobby and the snack area per City of Santa Ana letter January 22, 2007 and as directed in the field. (PCO No. 20) AGREED PRICE = $18,920 6. Modify the existing landscaping per City of Santa Ana letter dated January 22, 2007 and as directed in the field. (PCO No. 21) AGREED PRICE = $25,911 7. Modify the stage curtains per City of Santa Ana letter dated January 22, 2007 and as directed in the field. (PCO No. 22) AGREED PRICE = $3,098 Page 1 of 3 CIT r OF SANTA ANA r PUBLIC WORKS AGENCY CONTRACT CHANGE ORDER f I:.. Project Number PROJECT NOS. 04-6375, 04-7709, 05-7806; EL Change Order Number 2 SALVADOR CENTER RENOVATION AND PARK IMPROVEMENTS To States Link Construction, Inc. Contractor You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by PUBLIC WORKS AGENCY 8. Provide and install new doors as directed in the field. (PCO No. 23) AGREED PRICE = $5,425 DELETED WORK AT AGREED CREDIT 9. Modify the HVAC enclosures and wrought iron fence per City of Santa Ana letter dated November 8, 2006 and as directed in the field. (PCO No. 14) AGREED CREDIT = $7,000 Page 2 of 3