HomeMy WebLinkAbout25A - AGMT - UTILITY CABINET PILOT SCHOOLSREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
MARCH 7, 2017
TITLE:
UTILITY CABINET PILOT ART PROJECT
PHASE THREE- ELEMENTARY SCHOOL
DESIGNS
(STRATEGIC PLAN NO. 5, 513)
r 4,/
CITY AANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
p0•C• _o
❑ As Recommended
❑ As Amended
❑ Ordinance on Ian Reading
❑ Ordinance on 2 °d Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Authorize the City Manager and the Clerk of the Council to execute an agreement with the Santa
Ana Unified School District for Phase Three of the Utility Cabinet Pilot Art Project in an amount
not to exceed $1, 200.00, subject to non - substantive changes approved by the City Manager and
City Attorney.
ARTS AND CULTURE COMMISSION ACTION
At its regular meeting on February 16, 2017 by a vote of 6:0 (Cribb, Absent), the Arts and Culture
Commission recommended that City Council authorize the City Manager and the Clerk of the
Council to execute agreements with the Santa Ana Unified School District representing six
elementary schools participating in Phase 3 of the Utility Cabinet Pilot Art Program.
DISCUSSION
On November 4, 2013, City Council authorized the Utility Cabinet Pilot Art Program. The goal of
the program is to enhance the city and provide opportunities for the community to connect with art
in nonconventional spaces.
The Utility Cabinet Pilot Art Project has successfully completed Phases One and Two with Santa
Ana local artists. The purpose of Phase Three is to include elementary schools in Santa Ana so
that students may participate in painting a utility cabinet.
Six elementary schools have submitted their design templates (Exhibit 1). The location of the
utility box for each school has been identified and verified by the Public Works Agency (Exhibit 2).
With the approval of the designs by the City Council, the next steps would be for staff to meet
with the Santa Ana Unified School District (SAUSD) authorized representative to sign the
Agreement and Release of Liability (Exhibit 3), and work with the Public Works Agency to
conduct a pre - installation meeting with the teachers from each school. Each participating school
25A -1
Utility Cabinet Pilot Art Program Phase Three
March 7, 2017
Page 2
will receive $200 for paint and supplies. Painting is projected to begin in April 2017 and
completed in June 2017.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal 5- Community Health, Livability,
Engagement & Sustainability, Objective 5 (Promote a strong arts and culture infrastructure),
Strategy B (Generate public and private support and resources to strengthen, expand and
stabilize funding for the arts).
ARTS AND CULTURE MASTER PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal 5- Support existing and create new
opportunities for youth to engage in artistic and creative activities and career pathways, Strategy
5.2 (Support arts education in the schools by identifying and implementing partnerships and
collaborations between the community (arts organizations, creative businesses, etc.) and the
District that strengthen its progress towards goal achievement), and Strategy 5.3 (Develop
collaborative programs between major institutions, arts organizations, SAUSD, Santa Ana
College, and creative businesses, to develop career pathways).
FISCAL IMPACT
Funds in the amount of $1,200 are available in the Community Development Agency's Strategic
Plan Projects, Contract Services account no. (05218018- 62300) for expenditure in FY 2016/17.
Robert C. C ez
Deputy City
City Manager's Office
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez
Executive Director
Finance and Management Services Agency
Exhibits: 1) Elementary School Designs
2) Map with Utility Cabinet Locations
3) Draft School Agreement /List of Schools /Release of Liability
25A -2
g
Emma
PPt dGAi IC1N wlyor sane
Please noW that appddcants gust diva, Work or study In Santa l�na tq apply«
Vlnyl Wrap$ are anceuraged butnot required.
Exhibit I
25A -3
A
Via( A c fl�
A4,:�JPKWLY
I
Nota: TN dbm"on3 of the tomptate may not accurately faW all WMYWYM., pmposad designs must W a4lustoble.
25A-4
Utility Cabinet PIIot:Art Program Phe" "roo Appotation
MY of saota*w
11
12 - -03V
4
Sk4ol- bo�*,�uq 4,kt-�,-vk 4. 16C
0 A Co IA ll'f A.- 100 i
At theAMAR: rendering 'represevit your school and/or Santa �Ana?
S ar. A► A Gift uAoLo* 4*may. rr b., 4iv br4ti i
#01 S-4kirowOr PnNt- iqi+ ktv
Page 2 O 3
25A-5
UOIRYObillet PllotArt Program Phase Thraa:Ap
Oty of $Onta Ant
pop z qa
25A-7
Utlilty Cabinet Pilot Art Program Phase T*ee Application
MY of Banta Ana
0
25A -8
I
25A-9
S,% \--I .A
lot
Utility Cabinet Pilot Art Program Pha$e Three Apptitettson
City of Santa
Dina
pue z o
25A -11
t
No-to: The dimensions of the template may not aCwratelyrefied oO utility boxes: Proposeddesions must be a4pelo le
25A -12
NYRY4llVVI Gil r] P'N Slate ZIp, i -..
" r* Number � Mail
greuuw- :Name Of Atil81 Prtenta! --
preC6eerr4 *- %arilrtmuvl(fsPx?Ol0Z 04 04 05 ire 3r QreQptararanee.
A�p "picanPephN4srtPhY�flPUbilcatt ?r�S+Y g.publaart fllpdrta
it the Litt'
�tti %t
1d w rose p MdOrling {a Mpreaent:5anla Anal '
25A -13
® 1st & Downtown Plaza
® Main & Washington
® Raitt & MacArther
UTILITY CABINET LOCATIONS
0 Flower & Bishop
® Greenville & Alton
OFlower & Washington
Exhibit 2
25A -15
25A -16
+. M
4
Agreement between the City of Santa Ana and the Santa Ana unified
$ichool District
This agreement is made and entered Into as of 2017, by and between
the City of Santa Ana., a charter city and municipal corporation (hereinafter "lty"), and
the Sonta Ana Unlfled $chop] Clistrlc# (hereinafter "SAUSIX) reprosentirig the schools
;lidlz oted to participate in the Utility Box Arf PI(oi Project (hereinafter "Sr hcoi(s }" listed
on Exhibit A attached herewith and incorporated herein by this reference.,
in'' =;consideration of the promises coat lrred herein, the receipt and •adequacy of which is
hereby acknowledged, the parties heretg agree as follows
A. Preparation
I. A representative from each School shall attend a mandatory pr<e- installation
meeting with the City prior to starting work_ During this meeting City staff will
identify any electro nics, equip.mont, and other facilities on the exterior of the utility
box which shali net be printed; including,
ai Official plaques stickers, or identification numbers
b'A Keyholes, orkeyhole covers
c; Vents orvlawperts
S. Materiels
1. The Schools shall use the following paint type and paint products recommended
by the City,
, Paint Type: Prerniurn high solids 100% acrylic latex waterborne eXterior
wall and trim paint; low sheen, eggshell or satin fihlshi minirnum 1,5 mil
dry thickness'per coat.
b. Paint
h
IL
iii.
iv.
Exhibit 13
25A -17
2. SAUSD will purchase the needed paint and supplies, including paintbrushes,
paint rollers, rolling pans, drop cloth, masking tape, latex gloves, and cups for
blending /mixing pain. SAUSD must provide its own additional supplies if needed.
C. Project
1, Each School will paint the utility box assigned to it by the City, and nothing more.
Schools can commence work after the effective date of the contract. Painting of
the box must be completed by June 9 , 2017. Painting may only
occur during the hours of 7 a.m, to 7 p.m. A minimum sidewalk clearance of four
feet must be adhered to at all times,
2. Artwork must include all visible sides of the utility box including the top.
3, Each School shall provide for City maintenance, operations, and emergency
access to its respective utility box at all times.
4. Reserved.
5. Artwork may not contain advertising, religious art, sexual content, negative or
violent imagery, convey political partisanship or include any hidden, subliminal or
camouflaged messages or statements of any kind or nature.
6. Artwork may not include any breach of intellectual property, trademarks, brands,
images of Illegal activity or involve the attachment of any objects to the box.
7. The Schools shall ensure that any areas utilized for the project are maintained
and restored to a well- maintained, safe, sanitary, and clean condition, and kept
free of any hazardous waste at all times. All equipment associated with the
installation of the artwork, trash and debris shall be removed and cleaned up on
a daily basis. The Schools shall place a drop cloth or similar barrier on the
ground below the artwork while installation is underway, which barrier shall be
removed each day upon completion of an installation session.
D. Property Rights
SAUSD hereby waives any legal rights under Federal, State, local, and /or
Administrative law to maintain the artwork upon City property, The completed
work will be the property of the City, which retains the sole and absolute right and
discretion to remove, modify, or replace the utility box, components of the utility
box, or the artwork if necessary without compensation or notice to the SAUSD.
2. SAUSD grants the City the right to use any images, photographs or video of the
artwork and the Installation process for publicity or promotional purposes and
agrees that the results of such activity shall remain the sole property of the City.
2
25A -18
E, Payment
The City agrees to pay, and SAUSD agrees to accept as total payment for all
paint and paint supplies necessary for the Project, a total sum not to exceed two -
hundred dollars ($200.00) for each School participating in the project. Pursuant
to Exhibit A, there are six Schools participating in the project, which equates to a
total payment of $1,200.00 to SAUSD, The City will send payment to SAUSD
after an Agreement and Release from Liability forms, as attached hereto as
Exhibit B and incorporated herein by reference, has been fully executed by a
representative for SAUSD and a representative for each participating School.
Completion of the artwork by each School will serve to verify that payment was
used for the purpose of the project. Receipts will not be required. However, if a
School is unable to complete the artwork for the assigned utility box by the
completion date, then funds allocated for the School shall be returned to the City
within a reasonable time.
F. Indemnity and Release of Liability
SAUSD shall defend, indemnify, protect and hold harmless the City, or its
elected and appointed officers, employees, members or agents from and against
all claims for damages, liability, cost and expense (including, without limitation,
attorney's fees) arising out of or alleged by third parties as a result of the
negligent acts, errors or omissions or the willful misconduct of any School, or
School's employees, subcontractors or other persons, agencies or firms for
whom SAUSD is legally responsible in connection with the execution of the work
covered by this agreement. SAUSD shall have no duty to indemnify or hold
harmless the City if claims, damages, liability, costs, expenses (including, without
limitation, attorney's fees) arise from the sole negligence or sole willful
misconduct of the City subsequent declaration by the School. The SAUSD's
obligations shall survive the termination of this Agreement.
SAUSD agrees to hereby fully release and forever discharge the City from any
and all claims, demands, damages, losses, and liabilities (hereinafter collectively
referred to as "claims "), which are or may be related to or in any way connected
with the negligence or willful misconduct of Its officers, officials, employees, or
agents in connection with the creation, painting or installation of the artwork.
3. To protect the City, a representative from SAUSD and a representative from
each participating School shall execute a Release of Liability form before
participating in the Utility Box Art Pilot Project. A true and correct copy of the
Release of Liability form is attached hereto as Exhibit B and incorporated herein
by this reference. All terms and requirements of the Release of Liability shall be
enforceable in addition to all terms and requirements of this Agreement.
25A -19
G. Repairs
If any component of the City's traffic signal system is damaged as a result of any
School's work, the SAUSD shall arrange for a licensed contractor to repair the
damage at the SAUSD's sole expense.
2. The SAUSD has the first option to repair artwork if damaged, The City may
repair, remove or modify damaged artwork if SAUSD is unavailable.
H. Termination
The City may terminate this Agreement at any time for any reason. SAUSD
hereby expressly waives any and all claims for damages or compensation arising
under this Agreement,
1. General Terms
SAUSD is, and any of the SAUSD's agents, employees or representatives are,
for all purposes under this agreement, an independent contractor and shall not
be deemed to be an employee of the City, and none of them shall be entitled to
any benefits to which City employees are entitled including but not limited to,
overtime, retirement benefits, worker's compensation benefits, injury leave or
other leave benefits.
2. Neither party shall assign any rights or obligations under this Agreement.
3. Each party covenants that it presently has no interests and shall not have
interests, direct or indirect, which would conflict in any manner with performance
of services specified under this Agreement.
Each party warrants that they have executed this Agreement knowingly, freely
and voluntarily and with full knowledge of its legal consequences. All parties
involved warrant and represent that, prior to executing this Agreement, each
party has had the opportunity to review and consider this matter with legal
counsel, and that the terms of this Agreement, and its consequences, are fully
understood by each party.
5. This Agreement represents the entire agreement and understanding between the
parties, and supersedes any and all prior agreements and understandings
between the parties, whether oral or written.
6, Each undersigned represents and warrants that its signature herein below has
the power, authority and right to bind their respective parties to each of the terms
of this Agreement, and shall Indemnify City fully, including reasonable costs and
25A -20
attorney's fees, for any injuries or damages to City in the event that such
authority or power is not, in fact, held by the signatory or is withdrawn.
25A -21
IN WITNESS WHEREOF, the parties - hereto haveex000* this Agreement the do, to
and year first ahove written,
ATTEST.
MARIA j), HuizAR
Clarkof the Council
�VEIJ AS TO FORM
R OARVA H 1 0
R6bohirnendod for Approval:
Byi,
Jorge Garcia
$r,. Manaomeni Assistant
city Managers Office
01TYOr :SANTA ANA
5ERAR00 MOUE-T
Ming city Manager
,SAUS0
ByF
m
25A-22
EXHIBIT A
SCHOOLS PARTICIPATING IN THE UTILITY BOX
PILOT ART PROJECT (PHASE THREE)
SCHOOL
SCHOOL ADDRESS
BOXLOCATION
PRINCIPAL
1) Advanced Learning Academy (ALA)
335 E. Walnut St
1sf & Downtown Plaza
Kim Garcia
2) ;Days Elementary School
1405 French St
Main & Washington
RobertAngulano
3): Greenville Fundamental
3600 S. Raiff St
Ralt &MacArthur
Felisa Gear
4) 'Lowell Elementary School
700$. Flower St
Flower St &Bishop
RefugioGrecian
5) :Jim Thorpe Fundamental
2450 W. Alton Ave.
Greenville &Alton
Teresa Steller
6) Wilson Elementary School
1317 K Baker St
Flower & Washington
Ligia Hallstrom
25A -23
EXHIBIT B
UTILITY BOX PILOT ART PROJECT (PHASE THREE)
RELEASE OF LIABILITY
25A -24
LOOM
RELEASE OF LIABILITY
Santa Ana Unifiod Sohodl D16triat,(SAUSD) / Schoot InformallorxtPleeae, print)
Authorized $AUSD [Sohool RepresohlatiVe Naffie.,
SAUSID I-School Address-,
Ern ftiancy'Contact;
WOlver and Usbilfty Release
This waiver and Lability release shall apply to any SAUSID and/or Schookstaff,, students,
volunteers,, executors or administrators,
25A-25
understand the-terms and
stab; students,; and
I have fully informed myself of the contents of this release by reading it before I signed it. I attest
that I am an authorized SAUSD and /or School representative. I realize that by signing this
document I am giving up legal rights to which the SAUSD and /or School staff, students, and
volunteers may be entitled.
Signature Printed Name
25A -26