HomeMy WebLinkAbout25F - AGMT - PARK CUSTODIAL SRVSREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
MAY 16, 2017
TITLE:
AGREEMENT WITH VALLEY
MAINTENANCECORPORATION FOR
CUSTODIAL SERVICES AT CITY PARKS
(STRATEGIC -PLAN. NO. 6, 1 B)
— - C TICMANA(�',ER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
❑ As Recommended
❑ As Amended
❑ Ordinance on 151 Reading
❑ Ordinance on 2ntl Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Authorize the City Manager and Clerk of the Council to execute an agreement with Valley
Maintenance Corporation to provide park restroom and park building custodial services at City
parks in an annual amount not to exceed $263,684, which includes a 10% contingency, for a two -
year term from June 1, 2017 through May 31, 2019, with two, one -year renewal options. In
addition, the contract will include a start-up cost of $6,278 in the first year of the contract, for a
total cost of $1,061,014 over the term of the contract, including renewals, subject to non -
substantive changes approved by the City Manager and City Attorney.
The Parks, Recreation and Community Services Agency (PRCSA) divides the city into four
maintenance districts. The PRCSA provides custodial services at park restrooms and at various
park buildings through a contractor. On March 8, 2017, PRCSA issued a Request for Proposal
(RFP) for custodial services, which was posted on PlanetBids. The Agency received two
proposals from interested companies.
An evaluation committee consisting of two representatives from PRCSA -Park Maintenance
reviewed and rated the proposals. The proposals were evaluated according to the criteria listed
in the RFP: references, fee and qualifications. The results of the RFP evaluation were as follows:
Company
Score
Valley Maintenance Corporation
200
Merchants Building Maintenance
175
City staff recommends entering into an agreement with Valley Maintenance Corporation. At the
start of the agreement the contractor will deploy additional resources to perform custodial
25F -1
Agreement with Valley Maintenance Corporation
May 16, 2017
Page 2
services above and beyond the routine services that will be performed. The cost startup service
will be $6,278.
STRATEGIC PLAN ALIGNMENT
Approval of this item allows the City to meet Goal #6 - Community Facilities & Infrastructure,
Objective #1 (Establish and maintain a Community Investment Plan for all City assets), Strategy
B (Equitably maintain existing streets and associated assets in a state of good repair so they are
clean, safe and aesthetically pleasing for all users).
FISCAL IMPACT
Funds are available in the following accounts for the specified years of the initial term:
Accounting Unit
PRCSA- Stadium
Total
FY 16/17 FY17/18 FY18/19 `
13210 - 62300) $ 3,514 $ 33,720
28,252 $263,684
$ 30,y10
$241,710
Funds are available in the following accounts for the specified years of the two, one -year renewal
terms:
Unit
FY 18/19 FY19/20 FY20/21
PRCSA- Stadium (no. 01113210 - 62300)
$ 2,810
$ 33,72U
$ 3u,ulu
PRCSA -Park Maintenance (no 01113250 - 62320)
$ 19,164
$229,964
$210,800
Total
$ 21,974
$263,684
$241,710
Gerardo Mouet
Executive Director
Parks, Recreation and Community Services
Agency
EXHIBIT: 1. Agreement
APPROVED AS TO FUNDS AND ACCOUNTS:
Francisco Gutierrez �yy
Executive Director
Finance and Management Services Agency
25F -2
AGREEMENT WITH VALLEY MAINTENANCE, CORP. FOR
JANITORIAL SERVICES AT PARK RESTROOMS & PARK BUILDINGS
THIS AGREEMENT is made and entered into this I" day of June, 2017 by and between Valley
Maintenance Corp. ( "Contractor "), and the City of Santa Ana, a charter city and municipal corporation
organized and existing under the Constitution and laws of the State of California ( "City").
RECITALS
A. On March 8, 2017, the City issued Request for Proposal No. 17 -031, by which it sought
proposals from qualified firms for high quality janitorial maintenance services at City park
restrooms and park buildings.
B. Contractor submitted a responsive proposal that was selected by the City. Contractor represents
that it is able and willing to provide the services described in the Scope of Work for park
restrooms and park buildings that were included in RFP No. 17 -031 that is attached to this
Agreement in its entirety, along with Addendum No. 1, as Exhibit A.
C. In undertaking the performance of this Agreement, Contractor represents that it is knowledgeable
in its field and that any services performed by Contractor under this Agreement will be
performed in compliance with such standards as may reasonably be expected from a professional
consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms
and conditions hereinafter set forth, the parties agree as follows:
1.
2.
SCOPE OF SERVICES
Contractor shall perform those services set forth in Exhibit A to this Agreement. Contractor's
proposal is incorporated herein by reference.
COMPENSATION
a. City agrees to pay, and Contractor agrees to accept as total payment for its services the
rates and charges identified in Exhibit B. The total sum to be expended under this
Agreement shall not exceed - $263,685 annually during the term of this Agreement,
including any renewal option periods. This annual amount includes a 10% contingency
for services as may be performed by Contractor at the sole discretion of City.
b. The Compensation for the first year of the Agreement shall include an additional start-up
cost of $6,278 which will cover additional clean -up work to bring the City park restrooms
and park buildings up to a standard level. Therefore, the Compensation for the first year
of said Agreement shall not exceed $269,962.
c. Payment by City shall be made within forty -five of days (45) days following receipt of
proper invoice evidencing work performed, subject to City accounting procedures.
Payment need not be made for work that fails to meet the standards of performance set
forth in the Recitals which may reasonably be expected by City.
25F -3
3. TERM
This Agreement shall commence on June 1, 2017 and terminate on May 31; 2019, unless
terminated earlier in accordance with Section 15, below. The term of this Agreement may be extended
for two (2) additional one -year option periods by a writing executed by the City Manager and the City
Attorney.
4. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an independent
contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to
create an employer- employee relationship, a joint venture relationship, or to allow the City to exercise
discretion or control over the professional manner in which Contractor performs the services which are
the subject matter of this Agreement; however, the services to be provided by Contractor shall be
provided in a manner consistent with all applicable standards and regulations governing such services.
Contractor shall pay all salaries and wages, employer's social security taxes, unemployment insurance
and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non - exclusive and perpetual license for City to copy, use, modify,
reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans,
specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any
tangible medium of expression, including but not limited to, physical drawings or data magnetically or
otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Contractor
under this Agreement ( "Documents & Data "). Contractor shall require all subcontractors to agree in
writing that City is granted a non - exclusive and perpetual license for any Documents & Data the
subcontractor prepares under this Agreement. Contractor represents and warrants that Contractor has the
legal right to license any and all Documents & Data. Contractor makes no such representation and
warranty in regard to Documents & Data which were provided to Contractor by the City. City shall not
be limited in any way in its use of the Documents and Data at any time, provided that any such use not
within the purposes intended by this Agreement shall be at City's sole risk.
6. BONDS
Contractor shall supply a payment bond in the amount of fifty percent (50 %) of the awarded total
annual contract amount of the proposal prior to execution of the Agreement. Upon receipt of the
payment bond, the proposal deposit will be returned. The proposal deposit is subject to be
forfeited if Contractor fails to execute the written Agreement and furnish the required payment
bond, or to satisfy any other conditions present within a reasonable time as determined by the
City. The payment bond is to be renewed annually and submitted by the Contractor in the
amount of 50% of the annual contract amount.
7. INSURANCE
Prior to undertaking performance of work under this Agreement, Contractor shall maintain and
shall require its subcontractors, if any, to obtain and maintain insurance as described below:
a. Commercial General Liability Insurance. Contractor shall maintain commercial general
liability insurance naming the City, its officers, employees, agents, volunteers and
representatives as additional insured(s) and shall include, but not be limited to protection
25F -4
against claims arising from bodily and personal injury, including death resulting
therefrom and damage to property, resulting from any act or occurrence arising out of
Contractor's operations in the performance of this Agreement, including, without
limitation, acts involving vehicles. The amounts of insurance shall be not less than the
following: single limit coverage applying to bodily and personal injury, including death
resulting therefrom, and property damage, in the total amount of $1,000,000 per
occurrence, with $2,000,000 in the aggregate. Such insurance shall (a) name the City, its
officers, employees, agents, volunteers and representatives as additional insured(s); (b) be
primary and not contributory with respect to insurance or self - insurance programs
maintained by the City; and (c) contain standard separation of insureds provisions.
b. Business automobile liability insurance, or equivalent form, with a combined single limit
of not less than $1,000,000 per occurrence. Such insurance shall include coverage for
owned, hired and non -owned automobiles.
c. Worker's Compensation Insurance. In accordance with the California Labor Code,
Contractor, if Contractor has any employees, is required to be insured against liability for
worker's compensation or to undertake self - insurance. Prior to commencing the
Performance of the work under this Agreement, Contractor agrees to obtain and maintain
any employer's liability insurance with limits not less than $1,000,000 per accident.
d. If Contractor is or employs a licensed professional such as an architect or engineer:
Professional liability (errors and omissions) insurance, with a combined single limit of
not less than $1,000,000 per claim with $2,000,000 in the aggregate.
e. The following requirements apply to the insurance to be provided by Contractor pursuant
to this section:
(i) Contractor shall maintain all insurance required above in full force and
effect for the entire period covered by this Agreement.
Certificates of insurance shall be furnished to the City upon execution of
this Agreement and shall be approved by the City.
Certificates and policies shall state that the policies shall not be canceled
or reduced in coverage or changed in any other material aspect without
thirty (30) days prior written notice to the City.
(iv) Contractor shall supply City with a fully executed additional insured
endorsement.
f. If Contractor fails or refuses to produce or maintain the insurance required by this section
or fails or refuses to furnish the City with required proof that insurance has been procured
and is in force and paid for, the City shall have the right, at the City's election, to
terminate this Agreement. Such termination shall not affect Contractor's right to be paid
for its time and materials expended prior to notification of termination. Contractor
waives the right to receive compensation and agrees to indemnify the City for any work
performed prior to approval of insurance by the City.
8. INDEMNIFICATION
Contractor agrees to and shall indemnify and hold harmless the City, its officers, agents,
25F -5
employees, consultants, special counsel, and representatives from liability: (1) for personal injury,
damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal
injury, including death, and claims for property damage, which may arise from the negligent operations
of the Contractor or its, subcontractors, agents, employees, or other persons acting on their behalf which
relates to the services described in section 1 of this Agreement; and (2) from any claim that personal
injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms
of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all
claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have
been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects,
arising from this Agreement. The Contractor further agrees to indemnify, hold harmless, and pay all
costs for the defense of the City, including fees and costs for special counsel to be selected by the City,
regarding any action by a third party challenging the validity of this Agreement, or asserting that personal
injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property
rights arises by reason of the terms of, or effects arising from this Agreement. City may make all
reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the
foregoing, to the extent Contractor Services are subject to Civil Code Section 2782.8, the above
indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out
of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.
9. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed under
this Agreement. Contractor shall maintain complete and accurate records with respect to the costs
incurred under this Agreement and any services, expenditures, and disbursements charged to the City for
a minimum period of three (3) years, or for any longer period required by law, from the date of final
payment to Contractor under this Agreement. All such records and invoices shall be clearly identifiable.
Contractor shall allow a representative of the City to examine, audit, and make transcripts or copies of
such records and any other documents created pursuant to this Agreement during regular business hours.
Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to this
Agreement for a period of three (3) years from the date of final payment to Contractor under this
Agreement.
10. CONFIDENTIALITY
If Contractor receives from the City information which due to the nature of such information is
reasonably understood to be confidential and/or proprietary, Contractor agrees that it shall not use or
disclose such information except in the performance of this Agreement, and further agrees to exercise
the same degree of care it uses to protect its own information of like importance, but in no event less
than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential
information includes not only written information, but also information transferred orally, visually,
electronically, or by other means. Confidential information disclosed to either party by any subsidiary
and /or agent of the other party is covered by this Agreement. The foregoing obligations of non -use and
nondisclosure shall not apply to any information that (a) has been disclosed in publicly available
sources; (b) is, through no fault of the Contractor disclosed in a publicly available source; (c) is in
rightful possession of the Contractor an obligation of confidentiality; (d) is required to be disclosed by
operation of law; or (e) is independently developed by the Contractor without reference to information
disclosed by the City.
11. CONFLICT OF INTEREST CLAUSE
Contractor covenants that it presently has no interests and shall not have interests, direct or
25F -6
indirect, which would conflict in any manner with performance of services specified under this
Agreement.
12. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall
be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or
certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner
provided in this Section, to the following persons:
To City: Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M -30)
P.O. Box 1988
Santa Ana, CA 92702 -1988
Fax 714- 647 -6956
Copies to:
To Contractor:
Gerardo Mouet
Executive Director
Parks, Recreation, and
Community Services Agency
City of Santa Ana
20 Civic Center Plaza M -23
P.O. Box 1988
Santa Ana, California 92702
Valley Maintenance Corp.
3660 Wilshire Blvd
Los Angeles, CA 90010
(213) 388 -3370
A party may change its address by giving notice in writing to the other party. Thereafter, any
communication shall be addressed and transmitted to the new address. If sent by mail, communication
shall be effective or deemed to have been given three (3) days after it has been deposited in the United
States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by
fax, communication shall be effective or deemed to have been given twenty -four (24) hours after the time
set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth
above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays
shall be excluded.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and
Contractor regarding the subject matter therein, and supersedes any and all other agreements, oral or
written, between the parties. In the event of a conflict between the terms of this Agreement and any
attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified
except by written instrument signed by the City and by an authorized representative of Contractor. The
parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent
25F -7
with, or in addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City.
Each party to this Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party,
which are not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor,
Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior written
consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior
written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit
the City's ability to have any of the services which are the subject to this Agreement performed by City
personnel or by other consultants retained by City.
15, TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of
termination. In such event, Contractor shall be entitled to receive and the City shall pay Consultant
compensation for all services performed by Contractor prior to receipt of such notice of termination,
subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Contractor to deliver
to the City all work product completed as of such date, and in such case such work
product shall be the property of the City unless prohibited by law, and Contractor
consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work that fails to meet the standard of performance
specified in the Recitals of this Agreement.
16. NONDISCRIMINATION
Contractor shall not discriminate because of race, color, creed, religion, sex, marital status,
sexual orientation, age, national origin, ancestry, or disability, as defined and prohibited by applicable
law, in the recruitment, selection, training, utilization, promotion, termination or other employment
related activities or in connection with any activities under this Agreement. Contractor affirms that it is
an equal opportunity employer and shall comply with all applicable federal, state and local laws and
regulations.
17. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity,
interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined
and governed by the laws of the State of California. Both parties further agree that Orange County,
California, shall be the venue for any action or proceeding that may be brought or arise out of, in
connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses, permits,
approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by
the laws and regulations of the United States, the State of California, the City of Santa Ana and all other
25F -8
governmental agencies. Contractor shall notify the City immediately and in writing of its inability to
obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be
cause for termination of this Agreement.
19. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power,
authority and right to bind their respective parties to each of the terms of this Agreement,
and shall indemnify City fully, including reasonable costs and attorney's fees, for any
injuries or damages to City in the event that such authority or power is not, in fact, held
by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set
forth in the body of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above
written.
ATTEST:
Maria D. Huizar
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By.
Lisa Storck
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
Gerardo Mouet
Executive Director
Parks, Recreation, and Community Services Agency
CITY OF SANTA ANA
Robert Cortez
Deputy City Manager
CONTRACTOR:
Name:
Title:
25F -9
EXHIBIT A-'
Appendix
ATTACHMENT 1
SCOPE OF WORK
CITY OF SANTA ANA
REQUEST FOR PROPOSALS
RFP NO.: 17 -031
Description of Work
It is the intent of this agreement to continually improve the quality of the facilities. The
Contractor shall provide all labor, training, materials, tools, equipment, transportation, hauling,
dumping, chemicals and other items needed to perform high quality park janitorial maintenance
pursuant to the terms defined herein. This RFP identifies facilities in to two groups, park
mstrooms and park buildings. Park buildings include community centers (including gymnasium,
if applicable) and other facilities that are not stand -alone restroom -only structures, which are
considered park restrooms.
The Contractor shall provide all park restroom janitorial maintenance at work sites listed herein,
including, but not limited to cleaning, scrubbing, polishing, toilets, urinals, doors, walls, floors,
ceilings, windows, partitions, dispensers, hand rails plumbing fixtures, and replacing burned out
lights, lens covers, removing foreign materials i.e. paper wads stuck to ceilings, walls, etc. In
addition, the Contractor shall clean the exterior of the building surfaces including the walls, roof,
windows, etc. and, other services required to maintain the work sites in a safe, attractive and
useable condition.
The Contractor shall provide all park building janitorial maintenance at work sites listed herein,
including, but not limited to cleaning, scrubbing, polishing of windows, desks, cabinets,
computers, phones, kitchen appliances, hanging amenities (clocks, pictures, Knox boxes,
etc.),toilets, urinals, doors, walls, floors, ceilings, windows, partitions, dispensers, hand rails
plumbing fixtures, and replacing burned out lights at the contractors expense, lens covers,
removing foreign materials i.e. paper wads stuck to ceilings, walls, etc. In addition, the
Contractor shall clean the exterior of the building surfaces required to maintain the work sites in
a safe, attractive and useable condition.
Contractor understands that it is assuming maintenance responsibility of the parks/locations "as
is" and is responsible for improving all aspects of the parks facilities to the quality described in
these specifications and interpreted by the City's Representative.
Proposers shall be responsible for monitoring the site to obtain information regarding this
solicitation.
EXHIBIT A
25F -10
1.0 DEFINITIONS
1.1 "City's Representative" shall mean the Executive Director of Parks, Recreation and
Community Services designated representative.
1.2 "Cleaning" shall mean the practice of thoroughly removing all stains, foreign materials,
mineral deposits, etc. to achieve a high quality "like new" appearance.
1.3 "Sanitizing" shall mean to disinfect (eradicate disease causing agents) by use of
germicidal or other approved disinfecting products.
1.4 "Polishing" shall mean, following cleaning, using products to enhance the "shine" of the
surface being polished.
2.0 AGREEMENT START -UP
See Addendum
3.0 PARK RESTROOM MAINTENANCE
Routine maintenance shall include but not be limited to the following services performed at the
Work Sites listed in Attachment 3 -6.
3.1 Daily Cleaning Schedule
3.1.1 Restock all supplies daily so dispensers are completely full. Replace vandalized
dispensers with approved manufacturer and model dispensers to Park
Maintenance specifications upon discovery. Dispensers will be provided by the
City.
3.1.2 Flush toilets and urinals prior to finishing and add approved products.
3.1.3 Check toilets and urinals for stoppages and use plunger and /or hand auger to
unplug. Note that the should the Contractor be unsuccessful in unplugging the
toilet or urinal causing the City to unclog the unit, and the clog is unplugged by
plunger and /or hand auger, the cost for this service will be deducted from the
Contractor's next monthly invoice.
3.1.4 If stoppages cannot be unplugged or if other plumbing problems are noticeable,
notify the City's Representative immediately. Contractor shall remove all waste
from the clogged urinal/commode, clean the urinal /commode and place a plastic
waste receptacle liner over the unit to protect it from use until a Plumber can clear
the clog.
3.1.5 Remove all stains, dust, litter, debris and otherwise foreign matter on all interior
surfaces including doors, sills, partitions, floors, walls, ceilings, etc. This
includes, but not limited to, wads of paper stuck on ceilings, tape, etc.
3.1.6 Empty, clean and sanitize receptacles inside and out.
25F -11
3.1.7 Sweep and mop entire floor with approved germicidal cleanser /solution. Hosing
out restrooms is not an acceptable practice.
3.1.8 Clean and sanitize all surfaces, including walls, doors, partitions, door /window
jambs, vents, light fixtures, ceilings, etc. Tile floors and walls shall be cleaned
and polished.
3.1.9 Clean, sanitize interior and exterior of washbasins and around all fixtures to
remove mineral deposits, water spots, dirt, grim, and any other unclean condition.
Polish all metal fixtures surfaces, inside and out, including but not limited to
toilets, urinals, plumbing, sinks, flush valves, mounting plates, dispensers, nuts,
screws, traps, hose bibs, water connections, handrails, mirrors, etc. using
approved products.
3.1.10 Clean and disinfect benches using approved germicidal cleanser.
3.1.11 Inspect and replace burned out lights at the Contractor's expense inside and
outside the building using approved products.
3.1.12 Clean and disinfect lockers (inside, outside and tops) using approved germicidal
cleanser. Throw away any trash found in unlocked lockers or on top of lockers.
3.1.13 Clean and sanitize shower walls, fixtures and curtains using approved germicidal
cleanser.
3.1.14 Pick -up, clean, sanitizes and removes trash and debris, including but not limited
to feces, urine, paper, within 10' feet of the building in each direction.
3.1.15 Clean exterior of the buildingtroof free of all stains, dirt, grime, sand, or other
foreign materials including paper wads, confetti, tape, slap tags, cob webs, dust,
etc. within 10' of the building.
3.1.16 Turn off lights once work is completed.
3.1.17 Clean and polish exterior of the building amenities (attached) including but not
limited to drinking fountains, lights, Knox boxes, plaques, windows (except
Stadium Press Box), etc. of dirt, grime, all foreign materials including paper
wads, confetti, tape, slap tags, cob webs, dust, etc.
3.1.18 Clean interior windows free of dirt, grime, tape, smudges, streaks, etc. to achieve
a clear glass condition. This includes Stadium Press Box.
3.2 Weekly Cleaning Schedule — Restrooms, Showers and Locker Rooms
3.2.1 Polish all tiles surfaces using approved product to achieve a high quality
appearance.
3.2.2 Inspect shower curtains. If curtains are worn, the Contractor shall replace them at
his own expense with a shower curtain product acceptable to the City's
Representative.
3.2.3 Clean light fixtures and protective coverings inside and out using approved
germicidal cleanser.
3.3 Monthly Cleaning Schedule — Restrooms, Showers and Locker Rooms
3.3.1 Clean and resurface floor surfaces using approved products per the
manufacturer's specifications.
3.3.2 Use pumice stone or other product/tool to remove mineral buildup from around
fixtures in the restroom.
3.3.3 Pressure wash all exterior wall and pavement surfaces to remove dirt, dust, debris,
stains, etc. to within 10' of the building.
25F -12
3.3.4 Scrub floors and base boards completely clean of dirt, grim, stains, etc. using a
power walk- behind floor scrubber and hand held power scrubber being careful not
to damage flooring.
3.4 Bi- Annual Cleaning Schedule
3.4.1 Pressure wash roofs to remove dirt, dust, debris, stains, etc.
4.0 PARK BUILDING MAINTENANCE- GENERAL
Routine maintenance shall include but not be limited to the following services performed at the
Work Sites listed in Attachment 3 -6.
SPECIAL NOTICES -All furniture moved by the Contractor's employees during the performance
of any services shall be returned to its appropriate location. All items such as trash receptacles or
desk chairs that are moved to enable cleaning underneath or around them shall be returned to
their appropriate location.
Work areas shall be secured and equipment placed to prevent passage by the general public and
City staff. All such work areas shall be denoted as such. Work areas and equipment shall
remain under this state /condition until all work is complete, equipment is vacated and passage is
safe for all. The proper quantity and type of safety warning signs, such as "Caution — Wet Floor"
shall be placed by the Contractor's employees each time such conditions exist that would warrant
placement of such signs. Signs are to be picked up and stored in the appropriate janitor room
once the condition no longer exists to warrant such signs.
4.1 Daily Cleaning Schedule
4.1.1 Restock all supplies daily so dispensers are completely full. Replace vandalized
dispensers with approved manufacturer and model dispensers to Park
Maintenance specifications upon discovery. Dispensers will be provided by the
City. All supplies shall be provided by the contractor
4.1.1 Flush toilets and urinals prior to finishing and add approved products. Replace
waterless urinal filters with approved urinal manufacturer's cartridges as often as
necessary to prevent foul odors and urine back -up. Waterless urinal filters shall be
provided by the Contractor and shall be per the waterless urinal manufacturer's
specified cartridge.
4.1.2 Check toilets and urinals for stoppages and use plunger and /or hand auger to
unplug. Note that the should the Contractor be unsuccessful in unplugging the
toilet or urinal causing the City to unclog the unit, and the clog is unplugged by
plunger and/or hand auger, the cost for this service will be deducted from the
Contractor's next monthly invoice.
4.1.3 If stoppages cannot be unplugged or if other plumbing problems are noticeable,
cover the urinal /commode with a trash liner then notify the City's Representative
immediately,
4.1.4 Remove all stains, dust, litter, debris and otherwise foreign matter on all interior
surfaces including doors, sills, partitions, floors, walls, ceilings, windows, etc.
This includes, but not limited to, wads of paper stuck on ceilings, tape, etc.
4.1.5 Empty, clean and sanitize receptacles inside and out. Replace plastic waste
receptacles liners so they are neat in appearance.
25F -13
4.1.6 Carpeting & Rugs- Vacuum all carpeted -rug areas wall -to -wall including areas
immediately adjacent walls and other obstacles. Contractor may elect to sweep
these areas out by hand first before vacuuming.
4.1.7 Tile and other resilient floors and walls shall be swept, mopped using approved
germicidal cleansers, and buffed/polished to a non - streaked consistent in
appearance luster.
4.1.8 Clean, dust and sanitize all surfaces inside and out, including walls, blinds,
drapes, book cases, books, doors, partitions, door /window jambs, vents, light
fixtures, ceilings, windows, window sills, mirrors, computers, telephones,
speakers, wall boards, pictures, etc.
4.1.9 Clean, sanitize interior and exterior of kitchen appliances, cabinets, washbasins,
floor drains, and around all fixtures to remove mineral deposits, water spots, dirt,
grim, and any other unclean condition. Polish all metal fixtures surfaces, inside
and out, including but not limited to toilets, drinking fountains, urinals, plumbing,
sinks, flush valves, kitchen vent hoods, mounting plates, dispensers, nuts, screws,
traps, hose bibs, water connections, handrails, mirrors, etc. using approved
products.
4.1.10 Kitchens & break rooms -Wash and dry dishes and put away. Clean and sanitize
counter tops, tables (surface and hardware, legs, etc.), vending machines, display
cases, etc.
4.1.11 Furniture - Clean, dust, vacuum, disinfect and polish furniture including but not
limited to chairs, tables, cabinets, computers, televisions, exterior of potted plant
pots, etc. using approved germicidal cleanser.
4.1.12 Lamps (lighting replacement) - Inspect and replace burned out interior and exterior
lights at the Contractor's expense using approved products.
4.1.13 Locker Room -Clean and disinfect lockers (inside, outside and tops) using
approved germicidal cleanser. Throw away any trash found in unlocked lockers
or on top of lockers. Clean, sanitize and polish wood benches and metal hardware.
4.1.14 Showers -Clean and sanitize shower walls, fixtures and curtains using approved
germicidal cleanser.
4.1.15 Exterior of Building Pick -up, clean, sanitizes and removes trash and debris,
including but not limited to feces, urine, paper, within 10' feet of the building in
each direction.
4.1.16 Exterior Building Service -Clean exterior of the building free of all foreign
materials including paper wads, confetti, tape, slap tags, cob webs, dust, etc.
4.1.17 Outside Patios, Balconies and Building Entryways- Remove cobwebs from
overhead surfaces, lights and other amenities affixed to the building entryway
areas. This would include cleaning the exterior of glass and metal doors, door
thresholds and hardware. Remove any litter, cigarette butts or bird droppings.
4.1.18 Entrance Glass, Mirrors and Workstation Glass- Thoroughly clean both sides of all
surrounding building entry door glass and entry doors for a uniform appearance
free of all smudges, fingerprints, stains, streaks, lint, etc. Remove any paper
and/or tape. Clean all mirrors in restrooms, locker rooms and fitness center in the
same manner as noted above. Spot clean workstation and /or partition glass daily
as needed.
4.1.19 Entrance Mats - Remove moisture, wet or dry soil, and any debris from carpeted,
rubber and /or other material mats. Ensure mats are properly positioned on the
floor.
25F -14
4.1.20 Stain Removal on Carpet, Upholstery, Partition Panels and Walls -Clean and/or
remove all stains as quickly as they are discovered so as not to allow them to set
into the fabric. If the stain is a coffee spill, use a contractor- supplied product
similar to Interface Coffee Breaker and follow the manufacturer's recommended
procedures. Do not blot or attempt to extract. Simply spray the affected area(s).
4.1.21 Remove slap tags, graffiti and any other materials used to deface the building and
it amenities.
4.1.22 Replace burned out lights (at the contractor's expense) Turn off lights once work
is completed.
4.1.23 "Offices, Stadium Press Box, Closets, Storage Rooms," Restrooms, Showers and
Locker Rooms
4.2 Weekly Cleaning Schedule
4.2.1 Spray and Buffing of Hard Floors -Clean and restore a uniform glass and
protective finish to resilient tile or terrazzo floors that are finished with a floor
finish. All chairs, trash receptacles, etc., shall be tilted or moved where necessary
to spray buff underneath. The entire floor shall have a uniform coating of floor
finish. All spray buff solution shall be removed from baseboards, furniture, trash
receptacles, etc.
4.2.2 Dusting of Ceiling, Atrium Ledges, Lunchroom Drywall Ledges and HVAC Wall
Vents -Clean all HAVAC vents and area immediately surround them. Dust all
atrium ledges at the glass /wood railing areas and at the atrium stairs. Dust
lunchroom drywall edges. Care shall be taken not to spread dust into the air.
4.2.3 High Dusting- Remove dust, cobwebs, oily film, etc., from all fixtures and
surfaces above 11 feet from the floor surface. This would include lights, grills,
light fixtures, pipes, sprinkler systems, cables, ledges, walls, atrium wood and
ledges, ceilings, vents, etc. Care shall be taken not to spread dust into the air.
4.2.4 Inspect shower curtains, If curtains are worn, the Contractor shall replace them at
his own expense with a shower curtain product acceptable to the City's
Representative.
4.2.5 Clean light fixtures and protective coverings inside and out using approved
germicidal cleanser.
4.3 Monthly Cleaning Schedule
4.3.1 Carpeted Floors -Pile lift carpet floors in all areas.
4.3.2 Carpeted Floors — Bi- Monthly* - Spin bonnet all carpeted floors every two (2)
months. *(calculate to monthly cost for bidding purposes). January; March; May;
July; September and November.
4.3.3 Tile Floors -Spray buff all tile floors. 'Clean and resurface floor surfaces using
approved products per the manufacturer's specifications.
4.3.4 Use pumice stone or other product/tool to remove mineral buildup from around
fixtures in the restroom.
4.3.5 Pressure -wash all exterior wall and pavement surfaces to remove dirt, gum, dust,
debris, stains, etc, to within 50' of the building.
4.4 Quarterly Cleaning Schedule
25F -15
4.4.1 Tile Floors — Strip and wax all tile floors quarterly. *(calculate to monthly cost for
bidding purposes)
4.5 Bi- Annual Cleaning Schedule
4.5.1 Clean roofs free of leaves and all other debris.
4.5.2 Pressure washes metal roofs to remove dirt, dust, debris, stains, etc.
4.5.3 Carpeted Floors — Semi - Annually* - Extract clean carpeted floors two (2) times
per year. *(calculate to monthly cost for bidding purposes) April and October
4.5.4 Scrub floors and base boards completely clean of dirt, grim, stains, etc. using a
power walk - behind floor scrubber and hand held power scrubber being careful not
to damage flooring.
5.0 PARK BUILDING MAINTENANCE - GYMNASIUM
A high level appearance and a safe surface underfoot require scheduled, daily preventive
maintenance.
5.1 Gymnasium General -Daily Maintenance
5.1.1 Clean walls and doors free of smudges, ball marks, and any other marks.
5.1.2 Clean any fixtures and/or appurtenances by wiping them free of marks, dust or
any other unclean material.
5.1.3 Clean bleachers of trash, spills, stains, dust, dirt etc. Wipe down bleachers
handrails.
5.1.4 Clean, sanitize and polish all steel surfaces including but not limited to metal
hardware, door handles /plates, etc.
5.1.5 Clean all interior and exterior door glass.
5.1.6 Polish all panic bars and kick rails.
5.2 Gymnasium General - Weekly Maintenance
5.2.1 Clean up and organize storage areas.
5.2.2 Dust off vents and other appurtenances up to 12' high.
5.2.3 Clean and disinfect wall coverings dust, marks, etc. up to 12' high
5.2.4 Clean up and organize the storage area.
5.2.5 Dust off vents and other appurtenance above 12' high.
5.2.6 Wipe down baseboards free of dust, marks, etc.
5.2.7 Clean walls above 12' high.
5.2.8 Clean basketball backboards free of smudges, ball marks, dust, etc.
5.3 Gymnasium General - Yearly Maintenance
5.3.1 Dust off and clean hanging ducts, score boards, etc. Note, that the Contractor shall
be responsible for the annual cleaning of the Salgado Gym duct work. Should the
Contractor elect to sub - contract this work, they shall notify the City and the City
shall instruct the sub- contractor on the process to become a City vendor. The sub-
contractor shall be approved by City Purchasing as a City vendor before
performing any work.
5.4 Gymnasium Floor Maintenance — Daily
25F -16
5.4.1 Matting- Contractor shall provide and replace as often as necessary U.S. Matt &
Rubber Corporation entrance guard mats (or approved equal) at each outside and
inside entry door directly leading into the gymnasium. The mats will be sized to
cover the entire width of all doors in order to protect the gymnasium floor from
dirt, moisture and other materials harmful to the gymnasium floor.
5.4.2 Dust Mopping -An essential element of preventive maintenance of wood sports
flooring is daily dust mopping.
The contractor shall use Algoma Mop Manufacturers "Mariner' mops (or
approved equal) that has been treated with Hillyard Super Hil- Tone®, Hil- Mist ®,
or Hil- Treat®, to remove dirt and grit that acts like sandpaper underfoot in
wearing away the gloss and protective coating on the flooring. The contractor
shall clean the entire gymnasium wood floor surface daily.
The contractor shall treat the dust mops by following the label directions. Never
treat a dust mop and immediately use it. The contractor shall rotate dust mops
daily. The contractor shall always brush out or vacuum the dust mops after each
daily use, retreat the mop, and hang overnight for the next use.
5.4.3 Spot Mopping and Damp Mopping -The contractor shall also provide daily
preventive maintenance of gymnasium wood sports flooring by removing spills
and soil that daily dust mopping does not remove. It is important to remove spills
as soon as possible to prevent slips and falls. For removal of blood, fecal matter,
urine, and other potentially infectious materials as outlined in OSHA Regulation
29 CFR 1910.1030, the contractor shall use the Hillyard Bodily Fluid Disposal
Kit (Item No. HIL0018204)
5.5 Gymnasium Floor Maintenance — Bi- Weekly
5.5.1 Mop the entire gym floor once every two weeks using a ratio of 1 gallon warm
water to 1 cup white vinegar to 1 cup of rubbing alcohol. Change water
frequently to avoid mopping with dirty water, thereby, spreading dirt and grime
around the gym floor.
5.6 Tools Required
5.6.1 "Wet Floor" signs
5.6.2 Mop bucket with wringer
5.6.3 Clean rayon mop with handle
5.6.4 Autoscrubber
5.6.5 Hillyard Super Shine -All®
5.7 Procedures
5.7.1 Set out "Wet Floor" signs.
5.7.2 Mix Super Shine -All at 2 oz. per gallon of water in a mop bucket, or I oz. per
gallon in an autoscrubber.
5.7.3 For spills, soak mop in the solution, wring out, and mop the floor area while
absorbing the spill.
25F -17
5.7.4 Re -soak the mop in the cleaning solution, wring out, and mop the area a second
time.
5.7.5 When damp mopping the entire floor, change the cleaning solution when it
becomes cloudy with dirt. NOTE: Do not mop heavy amounts of cleaning
solution onto the floor.
5.7.6 If autoscrubbing, use a new white pad.
5.7.7 Allow the floor to dry thoroughly before removing "Wet Floor" signs.
5.8 Spot Removal
5.8.1 Remove heel marks, gum, stains, etc. daily being careful to not damage the floor.
Areas affected by removal of marks, gum, stains, etc, shall be refinished
following Hillyard's refinishing specifications.
6.0 Approved Supplies
6.1 Restroom
6.1.1 Toilet Tissue - Acclaim White Singlefold Interfolded Bath Tissue # 10101— 00
6.1.2 Scott Bathroom Roll Tissue, item # 05102 20, 4.4 x4.5 inches.
6.2 Approved Cleaning Supplies
6.2.1 For cleaning urinals and commodes Colossus #1605
6.2.2 For cleaning polished and brushed chrome Sheila Shine
6.2.3 Metal/Chrome polish Sheila Shine
6.2.4 Disinfectant Versatile #180
7.0 BUILDING SECURITY
The Contractor's shall provide the City at the beginning of the agreement a matrix listing the
name of his/her custodians, what buildings they will service, what time the buildings will be
serviced, what vehicles they drive (make, model and license number). This information will be
copied to the Santa Ana Park Rangers and the Santa Ana Police Department for security
purposes.
The contractor shall keep all exterior doors locked during the performance of work or as
otherwise directed and shall ensure that all doors are locked at the end of the shift unless
otherwise noted. Offices with security systems shall have them activated immediately after work
is completed in that area. The Contractor shall be responsible for any lost keys, card keys and
any inherent damages (i.e., re- keying of whole facility). This cost shall be withheld from
contractor's payment(s). The decision to re -key the whole facility is solely that of the City's
Representative.
25F -18
8.0 EQUIPMENT USAGE
There shall be no usage of City equipment, telephones, or facilities by the contractor's staff. The
City may ask the contractor to remove staff from the site if they are found to be in violation of
this policy. Electrical power (110) volts will be furnished by the City at existing power outlets
for the contractor's use to operate such equipment as is necessary in the conduct of his work. The
Contractor shall be responsible for any damage caused to the electrical outlets and their covers
caused by the improper disconnection of equipment. Cold water will also be made available as
necessary for cleaning.
9.0 EXTRA WORK
It is the City's intent to keep parks and other public recreational sites in a beautiful and
exceptionally well maintained condition. This specification is designed to continuously improve
parks and public recreational sites. It is with this intent in mind that the City's Representative
may consider authorizing extra work. Extra work will not be initiated without written
authorization. In emergency situations, a not to exceed price may be submitted by contractor via
e -mail for review /approval by City.
The City's Representative may request that the Contractor submit proposals for extra work in
order to improve the grounds - landscape in the contract sites. The Contractor shall submit
proposals using the City's Proposal for Extra Work Spreadsheet. The Contractor shall complete
the spreadsheet in its entirety using his/her proposed extra work pricing (that is a part of this
agreement) in order for the proposal to be considered. City reserves the right to request
materials /equipment receipts with invoices. All labor shall be quoted on a "not to exceed" basis
and City will only pay for labor actually incurred. City will pay up to 15% mark -up on parts and
materials.
10.0 CITY INSPECTION
The Director's Representative shall regularly inspect City property subject to this Agreement. If
said inspection results in discovery of work that is not performed in the manner, and to the
professional degree set forth in the Specifications, The Contractor agrees that the City shall; 1)
withhold from Contractor's next monthly payment, the City's actual or estimated cost of
performing the work; or, 2) hire a contractor or City staff to perform the work not performed and
then withhold from the Contractor's next monthly payment the City's actual cost for performing
the work to bring the property into conformance with the specifications. Additionally, City shall
impose liquidated damages of up to $300.00 per inspection, per park, per item specified herein
not performed, per day not meeting the specifications during any such inspection.
Furthermore, it is not the Director's Representatives responsibility to inform the Contractor when
work specified in the specifications was not performed or that deficiencies exist. It is the
Director's Representatives responsibility to inspect the properties to verify that work was
performed to the specified level of quality and time frame followed by reporting that the work
was performed satisfactorily or not. It is the Contractor's responsibility to provide adequate
supervision and staffing to perform all aspects specified in this agreement. Should the Director's
Representative create Power Point punch lists, essentially performing the Contractor's
Supervisor's responsibilities /duties of determine what work needs to be performed in accordance
with the agreement specificaitons, the City shall deduct $300 per Power Point punch list from the
Contractor's monthly invoice.
25F -19
Consultant ResDOnsibilities'
1.0 GENERAL CONDITIONS
1.1 Local Office -The Contractor shall maintain a physical office within the 714 area code
(local office). The local office shall be open Monday through Friday 8:00 a.m. to 5:00
p.m, with a company representative present at all times. Answering services or mobile
telephones will not be considered a local office.
1.2 Outside the Scope of Work- Damage or malfunction to plant material or irrigation system
equipment (from valve to water meter), with the exception of irrigation heads and lateral
lines, by any of the following may be considered outside the scope of this Agreement:
-Acts of God
-Civil Disorder
- Vehicle Collision (excluding Contractor and its employees and subs)
- Excavation or re- surfacing of the street
-Power failures
- Underground wiring damage
Contractor will not be considered responsible for replacement. Contractor must prove to
the satisfaction of Director that one of the above occurred in order to be excused from
Performing under the Agreement.
1.3 Scheduling of Work
1.3.1 The Contractor shall provide park janitorial maintenance and be responsible for
locking up the restrooms at the designated park closing time Monday through
Sunday. The schedule may be modified at the City Representative's request.
1.3.2 The Contractor shall establish schedules of "routine work" to be followed in the
performance of this contract. Schedules listing the name and size of specific
crews performing daily, weekly, monthly, annual and periodic maintenance shall
be submitted to the City's Representative each month. A copy of these schedules
shall be provided to the City's Representative prior the performance, and any
changes in scheduling shall be reported in writing. The schedule shall include
days of the week and what person/crew will be performing specific work in
accordance with the specification. Each person/crew will be identified and list the
number of employees by job classification. Once the initial schedule of "routine
work" is completed the Contractor shall notify the City's Representative in
writing before any changes are made.
10 UNIFORMS AND VEHICLES IDENTIFICATION
2.1 The Contractor shall provide to all field personnel a standard uniform including but not
limited to uniform company hats, collared work shirts, pants, jackets, cold weather vests
and ANSI approved safety shoes. All uniforms will be marked by patch, silk screen or
embroidery with the company name and logo or other form of identification.
2.2 All equipment shall be clearly identified on both sides and rear of the vehicles as
belonging to the Contractor, well maintained, in excellent working condition, be clean in
appearance and without extensive visible damage, dirt graffiti etc. In addition, all
25F -20
vehicles shall have the company's name, contractor's license number and contact
information clearly identified on both sides and the rear of the vehicle.
2.3 The Director's Representative reserves the right to direct the Contractor to remove an
employee or piece of equipment for not meeting high maintenance and appearance
standards.
3.0 SAFETY REQUIREMENTS
3.1 All work performed under this contract shall be completed with maximum safety as the
priority above all other requirements. The Contractor shall be incompliance with his/her
companies City annual approved Illness and Injury Prevention Program.
3.2 All work performed under this contract shall be performed in strict compliance with all
federal, state and local safety laws, regulations or other authoritative mandates that
protect workers and the general public from, including but not limited to, blood home
pathogens, hazardous waste identification and transport and pesticide use and reporting
3.3 In the event unsafe work is observed by City staff or otherwise reported, the Director's
Representative may at his discretion order the Contractor to stop performing and pay all
costs and or damages resulting from the delay.
3.4 Each year the contractor shall submit for approval their updated Injury and Illness
Prevention Program (IIPP). As a part of this document the contractor shall include the
OSHA mandated annual safety training schedule and the certified trainers for the
calendar year. In addition, the contractor shall submit previous years OSHA safety
training certificates verifying each employee completed the mandated annual OSHA
safety training. For new employees, the contractor shall provide the employee, as a part
of their new employee orientation, mandated OSHA annual training courses and submit
their certificates of completion prior to the new employee being assigned to Santa Ana.
4.0 SAFETY NOTIFICATION
4.1 If Contractor identifies a potential safety issue, Contractor shall:
4.1.1 Notify the public that potentially unsafe conditions exist by installing yellow
"Caution Tape" and "A" frame barricades or equal substitute around the
condition.
4.1.2 Notify the Director's Representative of the condition first by phone and then in
writing (e -mail is acceptable) including digital photographs of the potential safety
concern. Once the Contractor has notified the City and the public of the
condition, as specified above, Contractor shall have no further responsibility
regarding the condition.
5.0 PROPERTY DAMAGE
Any damage to private property caused by Contractor shall be immediately reported to the
property owner. Contractors shall pay for any damage caused to private property in performing
this agreement.
25F -21
6.0 ACCESS TO PRIVATE PROPERTY
Prior to any work involving private property, the Contractor shall notify the City of the proposed
work and obtain all necessary permits and/or consent required from City and/or property owner
7.0 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS
The Contractor shall protect City and/or private property adjacent to work areas including
sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, walls,
sidewalks, street paving, etc., located on either public or private property. Contractor shall, at its
expense, replace any property that is removed or damaged, other than property pre- approved for
removal. Contractor shall abide by the City's "Policy for Driving on Park Property" (See
Attachment 4).
8.0 MONTHLY REPORTS
Prior to contract commencement, and by the first of every month thereafter, Contractor shall
submit to the City's Representative: 1) a detailed annual, monthly and weekly work schedule
consistent with task frequencies in Exhibit A -1; 2) time sheets of employees assigned to the
contract areas; 3) names and titles of all persons working on the project and their qualifications;
and 4) type and quantities of equipment, materials and/or chemicals to be used on the project.
The information contained in the above referenced documents shall be updated with any new
information as changes occur. The City's Representative shall be immediately notified of any
changes to the above information.
The information contained in the above referenced documents shall be updated with any new
information as changes occur. The Director's Representative shall be immediately notified of
any changes to the above information.
Failure to submit a report by the first of each month shall result in a fine of $100.00 per day for
each report submitted late.
9.0 WATER CONSERVATION
The City will pay for water used by Contractor pursuant to this agreement. Should the amount of
water used be considered excessive and the City Representative can quantify what is considered
normal water use from excessive then the Contractor shall pay the cost of the excess water.
10.0 SPECIFICATIONS INTERPRETATION
The intent of these specifications is known by the City of Santa Ana and SAPRF. Any questions
relating to the interpretation of these specifications must be addressed, in writing, prior to the
start of work. The Contractor agrees that interpretations of this contract after the start of work
are at the sole discretion of the Director's Representative, and the Contractor shall abide by all
such interpretations
11.0 PROTECTION OF EXISTING FACILITIES AND STRUCTURES
11.1 The Contractor shall exercise due care in protecting from damage all existing facilities,
structures, and utilities, both above surface and underground on the City's property. Any
damage to City, Santa Ana Park and Recreation Facilities (SAPRF), or private property
caused by the Contractor's neglect shall be corrected and paid for by the Contractor at no
cost to the City of Santa Ana or SAPRF. The City of Santa Ana and /or Director's
Representative shall make the determination of fault. The Director's Representative
25F -22
reserves the right to issue a Stop Work Notice if the Contractor does not promptly repair
any damage, within twenty -four (24) hours of the damage incurred.
11.2 If the Directors Representative requests or directs the Contractor to perform work in a
given area, it will be the Contractor's responsibility to verify and locate any underground
systems (i.e. utility lines) and take responsibility for taking reasonable precaution when
working in these areas.
11.3 Contractor shall call Underground Alert (800) 422 -4133) at least two working days prior
to digging for line locations. Any damage or problems shall be reported immediately to
the Director's Representative and the City of Santa Ana. If the Contractor discovers
something unexpected or a unique problem occurs, he should stop work and immediately
contact an authorized Director's Representative for a timely resolution of the problem.
12.0 SUBSTITUTIONS
Whenever a specific type of material is specified, no substitutions shall be allowed without
written consent of the SAPRF representative.
13.0 CERTIFICATION & APPLICATION OF MATERIALS
13.1 All materials shall be delivered on the site in original containers. Materials shall be
subject to inspection by the Director's Representative. The Director's Representative
will not approve materials not meeting the SAPRF standards, and Contractor shall return
any such non - satisfactory items at his/her cost.
13.2 No materials shall be applied prior to the Director's Representative verifying the
specified quantities of materials. Furthermore, should the Contractor apply materials
before the Director's Representative verifies correct materials and quantities, the
Contractor shall not receive credit for the applied materials. The Contractor shall then
reorder and deliver the materials, thereby not receiving credit for the applied materials.
14.0 CONTRACTOR NEGLECT
Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined
to be due to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa
Ana or the SAPRF.
15.0 CONSTRUCTION EQUIPMENT
The Contractor shall take all necessary precautions for safe operation of his equipment and the
protection of the public from injury and damage from such equipment.
16.0 SOUND CONTROL REQUIREMENTS
The Contractor shall comply with all local sound control and noise level rules, regulations and
ordinances that apply to any work performed pursuant to the Contract. Each internal combustion
engine used for any purpose on the job or related to the job shall be equipped with a muffler of a
type recommended by the manufacturer of such equipment. No internal combustion engine shalt
be operated on the project without said muffler. Full compensation for conforming to the
requirements of this section shall be considered as included in the prices paid for the various
contract items of work involved and no additional compensation will be allowed therefore.
Sounds, such as loud music, that are not related to the project, shall be kept at levels so as to not
disturb the general public.
25F -23
17.0 INQUIRIES AND COMPLAINTS
The Contractor shall maintain an office at some fixed place and shall maintain a telephone
thereat, listed in the telephone directory in his own name or in the firm name by which he is most
commonly known. Furthermore, the Contractor shall, at all times, have some responsible
person(s), employed by the Contractor, to take the necessary action regarding all inquiries and
complaints that may be received from the City of Santa Ana, Director's Representative, and/or
private citizens during normal working hours.
Whenever immediate action is required to prevent impending injury, death or property damage to
the facilities being maintained, the Director's Representative may, after reasonable attempt to
notify the Contractor cause such action to be taken by the SAPRF work force. All costs of any
such action shall be charged against the Contractor, or the Director's Representative may deduct
such cost from any amount due to Contractor.
All complaints shall be abated as soon as possible after notification, to the satisfaction of the City
of Santa Ana and/or Director's Representative. If any complaint is not abated within a
reasonable time, the Director's Representative shall be notified immediately of the reason for not
abating the complaint followed by a written report to the Director's Representative within five
(5) days. If the complaints are not abated within the time specified or to the satisfaction of the
Director's Representative, the Director's Representative may correct the specific complaint and
the total cost incurred by the SAPRF will be deducted and forfeit from the payments owing to
the Contractor from the SAPRF. Such cost shall include all SAPRF staff time required to
resolve the problem and appropriate overhead charges
18.0 NOTIFICATION OF LOCATIONS OF WORK
The Contractor shall notify the Director's Representative when the contractor's crews will be
working within the SAPRF. Said notifications will be made on a daily basis by telephone, cell
phone, fax, or by weekly written schedules which specify the entire weeks work locations.
19.0 WORK FORCE
The D'irector's Representative may evaluate each of the Contractor's staff and if he /she finds that
a Contractors employee or sub - contractor's employee is not performing or has not completed the
required OSHA mandated safety training to the satisfaction of the Director's Representative, the
Director's Representative shall require the Contractor to remove the employee from work sites at
his or her discretion within 24 hours of written notice.
20.0 MATERIALS
The Director's Representative shall approve or reject all materials delivered to the work site. In
addition, the Contractor shall not apply any materials until the Director's Representative inspects
the materials to confirm they are correct per specifications and, when required by the
Environmental Protection Agency, have the Safety Data Sheets that are placed on the premises
of the property where the materials shall be applied. Note that the Director's Representative may
stay at the work site to confirm that all materials are applied correctly and in the quantities
specified. Materials applied by the Contractor prior to the Director's Representative inspecting
the materials shall be considered not applied. Therefore, the Contractor shall not be given credit
towards the quantity of the specified material required to be applied by the specification. The
Contractor shall then be required to deliver the specified quantity of material to the work site
25F -24
and, following the Director's Representatives approval, apply the materials in the presence of the
Director's Representative:
Prior to the application or use of any materials the Contractor shall submit to the Director's
Representative a minimum 48 hours before delivery to the work site a list of all materials and/or
chemicals that may be used pursuant to the terms of this Agreement. The list shall include the
name of the product, the products specifications, and the quantity of materials, prescribed
method of use /application, Safety Data Sheets and chemical analysis where applicable,
recommended usage and any other manufacturer's data that may be pertinent. The list must be
submitted before any materials /chemicals are used pursuant to this Agreement.
Pesticides including but not limited to: Insecticides, fungicides, herbicides, algaecides, aviacides,
and rodenticides shall be of the best quality obtainable and available on the market, properly
labeled with guaranteed analysis, and brought to the job site in the manufacturer's original
container.
Materials shall as specified herein, matching those existing at the work site, or as specified by the
Director's Representative.
All materials delivered to the site shall be accompanied by a packing slip or other form from the
vendor indicating the specific commodity delivered and the quantity.
21.0 TRASH DISPOSAL AND RECYCLING
All organic waste (including leaves, grass clippings, brush, branches, and tree parts) resulting
from work performed under this contract shall be disposed of pursuant to the requirements of the
Santa Ana Municipal Code (SAMC) Chapter 16. Organic waste cannot be taken to a landfill.
Every month, the Contractor shall submit receipts from licensed composters /green waste
recycling facilities, to the Director listing the tons of organic waste recycled and the names and
addresses of the composting or processing companies.
As an alternative, the City may allow Contractor to dispose of green waste and trash in bins
provided by the City. The City will determine the amount of green waste and trash allowed to be
dumped in these bins based on historical amounts. Any additional disposal fees must be paid by
Contractor. At no time will the contractor be allowed to dispose of trash or green waste that was
not collected as part of this contract. If the City finds that the contractor is disposing of trash
from other contracts, the City will discontinue this service for the contractor and the contractor
will be required to pay for their own trash service.\
25F -25
Citv Responsibilities
1.0 CITY - DIRECTOR'S AUTHORITY
The Director's Representative is the only person authorized to direct changes in any of the
requirements under the Agreement and, not withstanding any provisions contained elsewhere in
the Agreement, and said authority remains solely in the Director's Representative. In the event
that the Contractor effects any such changes at the direction of any person other than the
Director's Representative, the changes will be considered to have been made without authority
and solely at the risk of the Contractor. In addition, the Director's Representative shall have the
authority to accept/reject materials, workmanship and to make changes in work or schedule,
when the City determines that no extra costs are involved. The Director's Representative shall
also have the authority to suspend portions of the specifications and withhold the cost of the
suspended portion of the agreement at his/her discretion.
The intent of these specifications is known by the City of Santa Ana. Any questions relating to
the interpretation of these specifications must be addressed, in writing, prior to the start of work.
When the performance of the work or completion per schedule is determined to be sub - standard
or not on schedule, the Director's Representative may recommend that all or a portion of
payment be withheld. In addition, the Director's Representative shall have the option to hire
another qualified contractor to perform any portion of the work specified and withhold payment
in the amount of the cost to hire the qualified contractor. Payment to be withheld shall be
deducted from the next or subsequent monthly payment due, or if the amount is insufficient to
cover payment, the Contractor shall be liable for said deficiency and will be billed accordingly.
The Director's Representative shall decide all questions and/or interpretations, which may arise
as to the interpretation of the quality of work, manner of performance, completion per schedule,
acceptable fulfillment of the Agreement by the Contractor, interpretation of the specifications,
and compensation, including completion of work by alternate sources.
Special Requirements
See - ATTACHMENT 4: ADDITIONAL PROVISIONS
25F -26
APPENDIX
ATTACHMENT 5: QUALITY STANDARDS
25F -27
! .^
| \
W
7�
Cl)
\ m
�
f
4.1 v
�& ƒd _
/
/
�
�
�
. }
�
�
. ..� .
-
El!
q �� }
iml Ono
� �.
25F -29
P
CUD
O
00
9D
ao
j W
co
4 �~
i Ct a
cz ��
r�
.' )'Z,,
3 " ��/� Qi C'V
cn
a { •fy V�yil -I�---+I
+�}p�b�'fux��. a.� - � g�'t U'Y`tiv �[4 4 D � x , `�'a fy{� t, °S E '� F € • Cy � �V.J} �
r
ro
rd
r i 4;
25F -30
:2
�
�
m
�
�
2
5t
/
i9
t2
\\
\)
\ 1
=4
}
n
k
//\
/
}
r4
:2
�
�
m
�
�
25F-32
of
ro
§
�
'ErT:$
§
k�2\
=
u
>
ƒ
\
'k
4
.ƒ
ƒ
7
- r4
Q
)
)
�
n
n
co
0
co
k2v
0
/k
§36
25F-32
j {) p'
f i
l
3
9(�
�i.
t F rr
Y
25F -33
s
25F -33
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Michele Martinez
COUNCILMEMBERS
P. David Benavides
Vicente Sanniento
Jose Sclorio
Sal Tinaiero
Juan Villegas
CITY OF SANTA ANA
20 Civic Center Plaza . P.O. Box 1968
Santa Ana, California 92702
714- 647 -6900
www Santa -ana o a
ACTING CITY MANAGER
Gerardo Mouet
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
March 27, 2017
Page 1 of 1
ADDENDUM NO.1
REQUEST FOR PROPOSAL
FOR
PARK RESTROOM AND PARK BUILDING CUSTODIAL SERVICES
RFP NO: 17 -031
DATE DUE: APRIL 5, 2017 AT 5:00 P.M.
Notice is hereby given that the City of Santa Ana, Parks, Recreation and Community Services Agency has made
certain modifications, additions and/or deletions, in the specifications to RFP NO: 17 -031 FOR PARK
RESTROOM AND PARK BUILDING CUSTODIAL SERVICES. This addendum shall become part of the original
Request for Proposal.
Attachment 1 -Scope of Work
Paragraph 2.0 AGREEMENT START -UP (page 11) shall be deleted and replaced with the following:
2.0 AGREEMENT START -UP
Beginning from the start date of the agreement and for a period corresponding to the Start -Up
Schedule (to be provided by the Proposer and Labeled Attachment 3 -8) the Contractor shall
visit each building and park restroom to provide a one -time start-up service. The Contractor
shall provide extra labor, equipment, materials, at a cost to the City identified in Attachment 3 -6
Fee Proposal, to raise the quality of janitorial maintenance to the level specified in the
agreement/specifications. Following the Contractor's start-up at each building /park restroom,
the City Representative will meet with the Contractor to inspect the facility and either approve
or cite the areas within the specifications where the Contractor shall provide further quality
janitorial maintenance. If at the end of the start-up period the Contractor has not completed
the start-up service to the satisfaction of the City's Representative, the City shall withhold the
City's estimated cost of performing this service from the Contractor's start-up cost invoice.
Specifically, the Contractor shall complete the following tasks, in addition to the routine
services identified in Attachment 1 -Scope of Work Paragraphs 3.0-5.0, to the satisfaction of
the Director's Representative:
SANTA ANA CITY COUNCIL
M,.d A. Pulido W6horr hvrr! z Vicenlasarnienlo Jas. Solana P. Davld Benavides Juan Vinegars Sal T.O.
Maya, Wybr Pro Tem, Ward 2 Ward Ward Ward
e,pWitlaolsanla- ane.om l,tlma ?naz o] Wards Wards v Ignlzp 32lmioosnrrana Ora deade (an - -ana em MI a=
sdna'er.misant aM
25F -34
Page 2 of 9
2.1 PARK RESTROOM, SHOWERS 8, LOCKERROOM MAINTENANCE
2.1.1 Remove all stains, dust, litter, debris and otherwise foreign matter on all interior
surfaces including doors, sills, partitions, floors, walls, ceilings, etc. This
includes, but not limited to, wads of paper stuck on ceilings, tape, etc.
2.1.2 Clean and sanitize receptacles inside and out.
2.1.3 Clean, sanitize and polish all surfaces, including walls, doors, partitions,
door /window jambs, vents, light fixtures, ceilings, etc. Tile surfaces and walls
shall be cleaned and polished.
2.1.4 Clean, sanitize interior and exterior of washbasins and around all fixtures to
remove mineral deposits, water spots, dirt, grim, and any other unclean
condition. Polish all metal fixtures surfaces, inside and out, including but not
limited to toilets, urinals, plumbing, sinks, flush valves, mounting plates,
dispensers, nuts, screws, traps, hose bibs, water connections, handrails, mirrors,
etc. using approved products.
2.1.5 Clean and disinfect benches using approved germicidal cleanser.
2.1.6 Inspect and replace burned out lights at the Contractor's expense inside and
outside the building using approved products.
2.1.7 Clean and disinfect lockers (inside, outside and tops) using approved germicidal
cleanser. Throw away any trash found in unlocked lockers or on top of lockers.
2.1.8 Clean, sanitize and polish shower walls, fixtures and curtains using approved
germicidal cleanser and products.
2.1.9 Clean exterior of the building /roof free of all stains, dirt, grime, sand, or other
foreign materials including paper wads, confetti, tape, slap tags, cob webs, dust,
etc. within 10' of the building.
2. 1.10 Clean and polish exterior of the building amenities (attached) including but not
limited to drinking fountains, lights, Knox boxes, plaques, windows (except
Stadium Press Box), etc. of dirt, grime, all foreign materials including paper
wads, confetti, tape, slap tags, cob webs, dust, etc.
2.1.11 Clean interior windows free of dirt, grime, tape, smudges, streaks, etc. to achieve
a clear glass condition. This includes Stadium Press Box.
2.1.12 Polish all tiles surfaces using approved product to achieve a high quality
appearance.
2.1.13 Inspect shower curtains. If curtains are worn, the Contractor shall replace them
at his own expense with a shower curtain product acceptable to the City's
Representative.
2.1.14 Clean light fixtures and protective coverings inside and out using approved
germicidal cleanser.
2.1.15 Clean and resurface floor surfaces using approved products per the
manufacturer's specifications.
2.1.16 Use pumice stone or other product/tool to remove mineral buildup from around
fixtures in the restroom.
2.1.17 Pressure wash all exterior wall and pavement surfaces to remove dirt, dust,
debris, stains, etc. to within 10' of the building.
2.1.18 Scrub floors and base boards completely clean of dirt, grim, stains, etc. using a
power walk- behind floor scrubber and hand held power scrubber being careful
not to damage flooring.
2.1.19 Pressure wash roofs to remove dirt, dust, debris, stains, etc.
25F -35
Page 3 of 9
2.2 PARK BUILDING & STADIUM MAINTENANCE
2.2.1 Remove all stains, dust, litter, debris and otherwise foreign matter on all interior
surfaces including doors, sills, partitions, floors, walls, ceilings, windows, etc.
This includes, but not limited to, wads of paper stuck on ceilings, tape, etc.
2.2.2 Empty, clean and sanitize receptacles inside and out. Replace plastic waste
receptacles liners so they are neat in appearance.
2.2.3 Clean, dust and sanitize all surfaces inside and out, including walls, blinds,
drapes, book cases, books, doors, partitions, door /window jambs, vents, light
fixtures, ceilings, windows, window sills, mirrors, computers, telephones,
speakers, wall boards, pictures, etc.
2.2.4 Clean, sanitize interior and exterior of kitchen appliances, cabinets, washbasins,
floor drains, and around all fixtures to remove mineral deposits, water spots, dirt,
grim, and any other unclean condition. Polish all metal fixtures surfaces, inside
and out, including but not limited to toilets, drinking fountains, urinals, plumbing,
sinks, flush valves, kitchen vent hoods, mounting plates, dispensers, nuts,
screws, traps, hose bibs, water connections, handrails, mirrors, etc. using
approved products.
2.2.5 Kitchens & break rooms -Wash and dry dishes and put away. Clean and sanitize
counter tops, tables (surface and hardware, legs, etc.), vending machines,
display cases, etc.
2.2.6 Furniture- Clean, dust, vacuum, disinfect and polish furniture including but not
limited to chairs, tables, cabinets, computers, televisions, exterior of potted plant
pots, etc. using approved germicidal cleanser.
2.2.7 Lamps (lighting replacement)- Inspect and replace burned out interior and exterior
lights at the Contractor's expense using approved products.
2.2.8 Locker Room - Clean and disinfect lockers (inside, outside and tops) using
approved germicidal cleanser. Throw away any trash found in unlocked lockers
or on top of lockers. Clean, sanitize and polish wood benches and metal
hardware.
2.2.9 Showers — Clean, sanitize and polish shower walls, fixtures and curtains using
approved germicidal cleanser.
2.2.10Outside Patios, Balconies and Building Entryways- Remove cobwebs from
overhead surfaces, lights and other amenities affixed to the building entryway
areas. This would include cleaning the exterior of glass and metal doors, door
thresholds and hardware. Remove any litter, cigarette butts or bird droppings.
2.2.11 Entrance Glass, Mirrors and Workstation Glass - Thoroughly clean both sides of
all surrounding building entry door glass and entry doors for a uniform
appearance free of all smudges, fingerprints, stains, streaks, lint, etc. Remove
any paper and /or tape. Clean all mirrors in restrooms, locker rooms and fitness
center in the same manner as noted above. Spot clean workstation and /or
partition glass daily as needed.
2.2.12 Entrance Mats - Remove moisture, wet or dry soil, and any debris from carpeted,
rubber and /or other material mats. Ensure mats are properly positioned on the
floor.
2.2.13 Stain Removal on Carpet, Upholstery, Partition Panels and Walls -Clean and /or
remove all stains as quickly as they are discovered so as not to allow them to set
into the fabric. If the stain is a coffee spill, use a contractor - supplied product
25F -36
Page 4 of 9
similar to Interface Coffee Breaker and follow the manufacturer's recommended
procedures. Do not blot or attempt to extract. Simply spray the affected area(s).
2.2.14 Remove slap tags, graffiti and any other materials used to deface the building
and it amenities.
2.2.15 Replace burned out lights (at the contractor's expense) Turn off lights once work
is completed.
2.2.16 Spray and Buffing of Hard Floors - Clean and restore a uniform glass and
protective finish to resilient tile or terrazzo floors that are finished with a floor
finish. All spray buff solution shall be removed from baseboards, furniture, trash
receptacles, etc.
2.2.17 Dusting of Ceiling, Atrium Ledges, Lunchroom Drywall Ledges and HVAC Wall
Vents -Clean all HAVAC vents and area immediately surround them. Dust all
atrium ledges at the glass /wood railing areas and at the atrium stairs. Dust
lunchroom drywall edges. Care shall be taken not to spread dust into the air.
2.2.18 High Dusting- Remove dust, cobwebs, oily film, etc., from all fixtures and surfaces
above 11 feet from the floor surface. This would include lights, grills, light
fixtures, pipes, sprinkler systems, cables, ledges, walls, atrium wood and ledges,
ceilings, vents, etc. Care shall be taken not to spread dust into the air.
2.2.19 Inspect shower curtains. If curtains are worn, the Contractor shall replace them
at his own expense with a shower curtain product acceptable to the City's
Representative.
2.2.20 Clean light fixtures and protective coverings inside and out using approved
germicidal cleanser.
2.2.21 Use pumice stone or other product/tool to remove mineral buildup from around
fixtures in the restroom.
2.2.22 Pressure -wash all exterior wall and pavement surfaces to remove dirt, gum,
dust, debris, stains, etc. to within 50' of the building.
2.2.23 Tile Floors — Strip and wax all tile floors
2.2.24 Clean roofs free of leaves and all other debris.
2.2.25 Pressure washes metal roofs to remove dirt, dust, debris, stains, etc.
2.2.26 Scrub floors and base boards completely clean of dirt, grim, stains, etc. using a
power walk- behind floor scrubber and hand held power scrubber being careful
not to damage flooring.
2.3 PARK BUILDING MAINTENANCE - GYMNASIUM
2.3.1 Clean walls and doors free of smudges, ball marks, and any other marks.
2.3.2 Clean any fixtures and /or appurtenances by wiping them free of marks, dust or
any other unclean material.
2.3.3 Clean bleachers of trash, spills, stains, dust, dirt etc. Wipe down bleachers
handrails.
2.3.4 Clean, sanitize and polish all steel surfaces including but not limited to metal
hardware, door handles /plates, etc.
2.3.5 Clean all interior and exterior door glass.
2.3.6 Polish all panic bars and kick rails.
2.3.7 Clean up and organize storage areas.
2.3.8 Dust off vents and other appurtenances up to 12' high.
2.3.9 Clean and disinfect wall coverings dust, marks, etc. up to 12' high
2.3.10 Clean up and organize the storage area.
25F -37
Page 5 of 9
2.3.11 Dust off vents and other appurtenance above 12' high.
2.3.12 Wipe down baseboards free of dust, marks, etc.
2.3.13 Clean walls above 12' high.
2.3.14 Clean basketball backboards free of smudges, ball marks, dust, etc.
2.3.15 Dust off and clean hanging ducts, score boards, etc. Note, that the Contractor
shall be responsible for the annual cleaning of the Salgado Gym duct work.
Should the Contractor elect to sub - contract this work, they shall notify the City
and the City shall instruct the sub - contractor on the process to become a City
vendor. The sub - contractor shall be approved by City Purchasing as a City
vendor before performing any work.
2.3.16 Gymnasium Floor Maintenance Matting- Contractor shall provide and replace as
often as necessary U.S. Matt & Rubber Corporation entrance guard mats (or
approved equal) at each outside and inside entry door directly leading into the
gymnasium. The mats will be sized to cover the entire width of all doors in
order to protect the gymnasium floor from dirt, moisture and other materials
harmful to the gymnasium floor.
2.3.17 Gymnasium Floor Maintenance -Mop the entire gym floor using a ratio of 1 gallon
warm water to 1 cup white vinegar to 1 cup of rubbing alcohol. Change water
frequently to avoid mopping with dirty water, thereby, spreading dirt and grime
around the gym floor.
25F -38
Page 6 of 9
Attachment 3 -6 shall be deleted and replaced with the following:
ATTACHMENT 3 -6: FEE PROPOSAL
REQUEST FOR PROPOSALS
RFP NO.: 17 -031
Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for
Proposals. I have examined the Scope of Services and am familiar with the scope of work locations. I am
familiar with all the existing conditions and limitation that may impact work requests. I understand and agree
that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the
submission of my proposal.
Proposal Item Price - Provide costs for Custodial Services. Fee must be inclusive of all costs, including but not
limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel. Start -Uo
�...._ .. ,� wmuames selecrea uhaer this RFP The proposer warrants that the prices, terms and
conditioned quoted will be valid for a period of 120 days from the date the proposal is due, in order to allow
time to award an agreement.
The City reserves the right to delete one or more sites from this contract with 30 days written notice. It is the
City's intent to award an agreement to two or more companies in order to divide up the districts among multiple
companies.
"`Round off Amounts to $5'' "'
A. PARK RESTROOM MAINTPNAMr -= eeovineo
1
Add
Address
Start -U Cost
CosUMonth.
Cam esino
3311 W. 5th St.
Edna
2140 W. Edna Dr.
El Salvador
1825 W. Civic Center Dr.
Riverview
1823 W 19th St.
Rosita
706 N. Newhope St.
District 2
Angels
914 W. 3rd St.
Cabrillo
1820 E. Fruit St.
Fisher Restroom
2501 N. Flower St.
Fisher Cabin
2501 N. Flower St.
Lo an/Che a's
1009 N. Custer St.
Portola
1750 E. Santa Clara Ave.
25F -39
Page 7 of 9
PARK BUILDING MAINTENANCE SERVICES
RR "A"
510 E. Memory Lan
Cost/Yr.
1
o RR "B„
fo
510 E. Memory Lane
NDistrict
Rosita- Salgado Center
706 N. Newhope St.
o Cabin
510 E. Memory Lane
osita - Salgado Pool
District 3
osita - Salgado Gym
Delhi
2314 S. Halladay St.
srct 2
Madison
1434S. Standard Ave.
1
Logan Center
1009 N. Custer St.
Memorial
2102 S. Flower St.
2
Santiago Nature Center
510 E. Memory Lane
Sand ointe
3700 S. Birch St.
3
Santiago Lawn Bowling Center-
Both Levels
District 4
Adams
2101 W Warner Ave.
Centennial "A„
3000 W. Edinger Ave.
Centennial "B„
3000 W. Edinger Ave.
Centennial "C"
3000 W. Edinger Ave.
Centennial HGHS
3000 W. Edinger Ave.
DYSC "A" includes locker room
3000 W. Edinger Ave.
and restrooms
DYSC "B"
3000 W Edinger Ave.
Herita a
4812 W Camille St.
Jerome
2101 W Mcfadden St.
Santa Anita
300 S. Figueroa St.
Thornton
1801 W Segerstrom Ave.
Windsor
2915 W. La Verne Ave.
Total
PARK BUILDING MAINTENANCE SERVICES
25F -40
Address
Start-Up Cost
Cost/Yr.
1
NDistrict
Rosita- Salgado Center
706 N. Newhope St.
osita - Salgado Pool
706 N. Newhope St.
osita - Salgado Gym
706 N. Newhope St.
srct 2
1
Logan Center
1009 N. Custer St.
2
Santiago Nature Center
510 E. Memory Lane
3
Santiago Lawn Bowling Center-
Both Levels
510 E. Memory Lane
25F -40
Page 8 of 9
4
Garfield Community Center
501 N. Lacy Avenue
1
Maintenance Supervisor
6
Stadium -Press Box/West &East
Restrooms/West & East
Concession Bld /Locker Rooms
602 N. Flower Street
$
3
7 Willard Intermediate
District 3
N. Parton StJ15 St.
4
Journeyman Electrician
1
Memorial Center
2102 S. Flower St.
$
6
2
Memorial Pool
2102 S. Flower St.
Apprentice Plumber
$
3
Sandpointe
3700 S. Birch St.
9
Apprentice Painter
4
Cypress Center
625 S. Cypress Ave.
District 4
1
Centennial Office - Offices,
Restrooms, Training Rooms
Centennial Road
Total
C. HOURLY SERVICES
A.
Labor
Hourly Wage
1
Maintenance Supervisor
$
2
Maintenance Service Leadworker
$
3
Maintenance Service Laborer
$
4
Journeyman Electrician
$
5
Apprentice Electrician
$
6
Journeyman Plumber
$
7
Apprentice Plumber
$
8
Journeyman Painter
$
9
Apprentice Painter
$
25F -41
Page 9 of 9
Printed Name of Authorized Agent Title
Signature of Authorized Agent Date
25F -42
n Services
Cost
By Square Foot Per Month —Park Restroom
enance
By Square Foot Per Month —Park Building
nance
V
By Square Foot Per Month — Gym Maintenance
By Square Foot Per Job — Pressure Wash Exterior
es i.e. Wails, Roofs, Entrances, Areas Around
s /Restrooms, Stadium Bleachers, Etc.
Printed Name of Authorized Agent Title
Signature of Authorized Agent Date
25F -42
PYHIRIT B '
Park Restroom Cuctnrlial
District 1
Address
Start-Up
CostlYear
Cost
Cam esino
3311 W. 5th St.
$ 88
$ 4,224
Edna
2140 W. Edna Dr.
$ 88
$ 4,224
El Salvador
1825 W. Civic Center Dr.
$ 88
$ 4,224
Riverview
1823 W. 19th St.
$ 88
$ 4,224
Rosita
706 N. Newho a St.
$ 88
$ 4,224
District
2
Angels
914 W. 3rd St.
$ 88
$ 4,224
Cabrillo
1820 E. Fruit St.
$ 88
$ 4,224
Fisher Restroom
2501 N. Flower St.
$ 88
$ 4,224
Fisher Cabin
2501 N. Flower St.
$ 88
$ 4,224
Logan /Che a's
1009 N. Custer St.
$ 88
$ 4,224
Portola
1750 E. Santa Clara Ave.
$ 88
$ 4,224
Santiago RR "A"
510 E. Memory Lane
$ 58
$ 2,760
Santiago RR "B"
510 E. Memory Lane
$ 58
$ 2,760
Santiago Cabin
510 E. Memory Lane
$ 50
$ 2,400
District
3
Delhi
2314 S. Halladay St.
$ 99
$ 5,184
Madison
1434 S. Standard Ave.
$ 99
$ 5,184
Memorial
2102 S. Flower St.
$ 99
$ 5,184
Sandpointe
3700 S. Birch St.
$ 99
$ 5,184
Di
District 4
Adams
2101 W. Warner Ave.
$
$ 5,184
Centennial "A"
3000 W. Edinger Ave.
$
$ 4,800
Centennial "B"
3000 W. Edinger Ave.
$
d94
$ 4,800
Centennial "C"
3000 W. Edinger Ave.
$
$ 4,800
Centennial HGHS
3000 W. Edinger Ave.
$
$ 5,184
DYSC "A" includes
locker room and
3000 W. Edinger Ave.
$ 124
$ 6,480
restrooms
DYSC'B"
3000 W. Edinger Ave.
$ 69
$ 3,600
Heritage
4812 W. Camille St.
$ 99
$ 5,184
Jerome
2101 W. Mcfadden St.
$ 99
$ 5,184
Santa Anita
300 S. Figueroa St.
$ 99
$ 5,184
Thornton 1801
W. Segerstrom Ave.
$ 99
$ 5,184
Windsor 12915
W. La Verne Ave.
$ 99
$ 5,184
Total
$ 2,698
$ 135,888
EXHIBIT B
25F -43
Park Building Custodial
25F -44
Address
Start-Up
Cost
Cost/Year
District 1
1
Rosita- Salgado Center
706 N. Newhope St.
$ 166
$ 7,944
2
Rosita - Salgado Pool
706 N. Newho a St.
$ 134
$ 1,620
3
Rosita - Salgado Gym
706 N. Newho a St.
$ 1,156
$ 7,500
District 2
1
Logan Center
1009 N. Custer St.
$ 109
$ 5,220
2
Santiago Nature Center
510 E. Memory Lane
$ 105
$ 5,040
3
Santiago Lawn Bowling Center -Both Levels
510 E. Memory Lane
$ 118
$ 5,640
4
Garfield Community
Center
501 N. Lac Avenue
Y
$ 170
$ 8,160
6
Stadium -Press
Box/West & East
Restrooms/West & East
Concession
81dg /Locker Rooms
602 N. Flower Street
$ 704
$ 33,720
7
Willard Intermediate
N. Parton St. 115th St.
$ 90
$ 4,620
District 3
1
Memorial Center
2102 S. Flower St.
$ 225
$ 7,200
2
Memorial Pool
2102 S. Flower St.
$ 320
$ 3,600
3
Sandpointe
3700 S. Birch St.
$ 50
$ 2,400
4
Cypress Center
625 S. Cypress Ave.
$ 45
$ 2,160
District 4
1
Centennial Office -
Offices, Restrooms,
Training Rooms
Centennial Road
$ 188
$ 9,000
Total
$ 3,580
$ 103,824
25F -44
C. HOURLY SERVICES
A
Labor
Hourly Wage
1
Maintenance Supervisor
$38
2
Maintenance Service Leadworker
$28
3
Maintenance Service Laborer
$24
4
Journeyman Electrician
$42
5
Apprentice Electrician
$42
6
Journeyman Plumber
$42
7
Apprentice Plumber
$42
8
Journeyman Painter
$36
9
Apprentice Painter
$36
B
Add -On Services
Cost
1
Price By Square Foot Per Month — Park Restroom Maintenance
$1.10
1
Price By Square Foot Per Month — Park Building Maintenance
$0.13
2
Price By Square Foot Per Month — Gym Maintenance
$0.05
3
Price By Square Foot Per Job — Pressure Wash Exterior Surfaces
i.e. Walls, Roofs, Entrances, Areas Around Buildings /Restrooms,
Stadium Bleachers, Etc.
$0.45
25F -45