HomeMy WebLinkAbout31B - CUP - 2802 S FLOWERREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
JUNE 20, 2017
TITLE:
CONDITIONAL USE PERMIT NO. 2017-15
TO ALLOW CONTINUED USE OF A 60 -
FOOT TALL WIRELESS FACILITY FOR
AMERICAN TOWER LOCATED AT 2802
SOUTH FLOWER STREET - JOHN
BITTERLY, APPLICANT
{STRATEGIC PLAN NOS. 3, 2, 5}
h 2c
CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
❑ As Recommended
❑ As Amended
❑ Ordinance on 1" Reading
❑ Ordinance on 2 n Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Receive and file the staff report approving Conditional Use Permit No. 2017-15 as conditioned.
PLANNING COMMISSION ACTION
At its regular meeting on May 22, 2017, by a vote of 7:0, the Planning Commission adopted a
resolution approving Conditional Use Permit No. 2017-15 as conditioned to renew the
entitlements of an existing 60 -foot high major wireless communication facility disguised as a
mono -palm located at 2802 South Flower Street located in the Open Space (0) zoning district.
The Planning Commission made no changes to the recommendation outlined in the attached
staff report (Exhibit A).
DISCUSSION
John Bitterly, representing American Tower Corp., is requesting approval of a conditional use
permit (CUP) to renew the entitlements of an existing 60 -foot high major wireless communication
facility ("mono -palm") at 2802 South Flower Street, on the Saddleback High School campus.
Major wireless communication facilities require approval of a CUP pursuant to Section 41-
198.3(b) of the Santa Ana Municipal Code (SAMC). As the current facility has reached its 10 year
mark, the applicant is required to apply for a CUP to renew the city entitlements in order to maintain
the current facility. The CUP is conditioned to require the existing tower to provide a stealth
appearance.
As part of the development review of the project, staff worked closely with the applicant to identify
improvements to enhance the overall appearance of the site. These improvements include
upgrading existing landscaping to comply with SAMC standards. In addition, the applicant will be
replacing the existing fronds with new Mexican fan palm style fronds to the existing mono -palm to
31 B-1
CUP No. 2017-15 — American Tower Corp. Wireless Facility at 2802 South Flower Street
June 20, 2017
Page 2
enhance its appearance and to help conceal the tower and antennas; the antennas will be
painted to match the palm tree.
To process such re -entitlements in a timely manner, the City of Santa Ana considers the provisions
contained within Section 6409(a) of the Middle Class Tax Relief Act [47 U.S.C. § 1455(a)], which
limits local agencies abilities to impose additional conditions of approval when cell phone tower
permits are renewed. These limits include seismic retrofits, which, according to a study by the City
of Los Angeles, cost as much as constructing a brand new tower. However, the City will condition
all new communication facilities to comply with an Importance Factor of 1.5, which is the building
standard for public safety facilities. This will ensure telecommunication facilities are functional and
provide cell coverage in the event of a major natural disaster. Full-sized site plans are available
for public viewing in the Clerk of the Council Office.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #3 - Economic Development,
Objective #2 (create new opportunities for business/job growth and encourage private
development through new General Plan and Zoning Ordinance policies), and Objective #5
(leverage private investment that results in tax base expansion and job creation citywide).
FISCAL IMPACT
There is no fiscal impact associated with this action.
Hassan Haghani, AIC
Executive Director
Planning & Building Agency
IO:rb
M:\Planni ngCommission\28025 FLower\CU P2017-15-CEL2802SFIowerRenewal.m
Exhibit: A. Planning Commission Staff Report
31 B-2
REQUEST FOR
Planning Commission Action
PLANNING COMMISSION MEETING DATE:
MAY 22, 2017
TITLE:
PUBLIC HEARING - CONDITIONAL USE PERMIT NO.
2017.15 TO ALLOW CONTINUED USE OF A 60 -FOOT
TALL WIRELESS FACILITY FOR AMERICAN
TOWER LOCATED AT 2802 SOUTH FLOWER
STREET — JOHN BITTERLY, APPLICANT {STRATEGIC
PLAN NOS. 3, 2; 3, 5)
Prepared by Ivan Orozco
PLANNING COMMISSION SECRETARY
APPROVED
❑ As Recommended
❑ As Amended
❑ Set Public Hearing For
DENIED
❑ Applicant's Request
❑ Staff Recommendation
CONTINUED TO
4xec ' eDirectar Planning Manager
RECOMMENDED ACTION
Adopt a resolution approving Conditional Use Permit No. 2017-15 as conditioned.
Executive Summary
John Bitterly, representing American Tower Corp., is requesting approval of a conditional use
permit (CUP) to renew the entitlements of an existing 60 -foot high major wireless communication
facility ("mono -palm") at 2802 South Flower Street on the Saddleback High School campus.,
Major wireless communication facilities require approval of a CUP pursuant to § 41-198.3(b) of
the Santa Ana Municipal Code (SAMC). As part of this renewal application, the applicant will
install additional fronds to the existing mono -palm to enhance its appearance.
Table 1: Project and Location Information
Item <' ,
` Informs#eaci .
Project Address
2802 South Flower Street
Nearest Intersection
Se erstrom Avenue and Flower Street
General Plan Designation
Open Space (OS)
Zoning Designation
Open Space (0)
Surrounding Land Uses
North I Sinqle-Family Residential
East Industrial
South Raii Road Corridor
West Single -Family Residential
Property Size
36.19 acres
Existing Site Development
The site is developed with the Saddleback High School and the subject
mono -palm.
Use Permissions
Allowed with a conditional use permit (CUP),
Zoning Code Sections Affected
UseI
SAMC § 41-198.3 b
Operational Standards
SAMC § 41-198 (Wireless Communication
Facilities
EXHIBIT A
31 B-3
CUP No. 2016-26
March 27, 2017
Page 2
Project Description
In addition to the applicant's request for a new CUP, the existing tower will be refurbished to
enhance its stealth appearance. New fronds will be installed to conceal the tower and antennas,
and the antennas will be repainted to match the palm tree. Equipment for the wireless facility will
continue to be contained within an enclosure of approximately 484 square feet; no changes to this
component are proposed at this time. This enclosure is located to the south of the existing wireless
facility, while the mono -palm itself will remain in its current location within the wrought iron enclosure
and shrubbery. The facility is surrounded by two mature Mexican palm trees and three cedar trees
that provide additional screening to the enclosure and the pole structure. The existing trees
surrounding the cell site have been trimmed to fortify that the landscaping is regularly maintained
and all trash has been removed.
Table 2: Development Standards
Stari'Slards ..."
(rRQ. 4tr d $AMG; i.ROARCe
s.. y4_,�tt_, rra...._ ,1
Screening Criteria
A stealth facility
Mono -palm
The wireless facility is located at the
Areas that will minimize aesthetic
south of the property near the
Site Selection
intrusion
railroad and athletic fields. Not
visible from the public ri ht -of way.
=
_
Not to exceed 60 feet in height from
Height criteria
ground level as measured from the
60 feet
nearest street curb
Groundcover at the base of the
The site currently has five (5) mature
Landscaping,
facility and one twenty-four (24) inch
trees and shrubbery
box tree
_
Decorative fencing such as wrought
Complies; a 7 feet metal fence
Equipment Screening
iron or block around the wireless
provided on-site
facility
Project Background
In June 1999, the Planning Commission approved CUP No. 1999-10 to allow construction of the
subject mono -palm and equipment enclosure. Since its construction, the facility has provided
cellular coverage to the immediate area. SAMC § 41-198.13 states that major wireless
communication facilities shall be approved for a period not to exceed five years, although
subsequent State legislative acts have required that such facilities be approved for a period not to
exceed 10 years, As the current facility has reached its 10 year mark, the applicant is required to
apply for a new CIDP in order to maintain the current facility.
Project Analys
In July 1998, the City Council adopted Ordinance No. NS -2356, which established regulations for
wireless communication facilities throughout the City. Major wireless communication facilities such
as the American Tower facility are required to have a stealth design and be located in an area that
provides the greatest amount of visual screening. Further, these major facilities require the
approval of a CUP.
31 B-4
CUP No. 2016-26
March 27, 2017
Page 3
Staff has reviewed the applicant's request to continue operation of major wireless communication
facility at this location. In analyzing the CUP request, staff believes that the following analysis
warrants staff's recommendation of approval for the CUP.
As part of the development review of the project, staff worked closely with the applicant to identify
improvements to enhance the overall appearance of the site. These improvements include
maintenance of existing landscape to comply with SAMC standards. Pursuant to provisions
contained within § 6409(a) of the Middle Class Tax Relief Act [47 U.S.C. § 1455(a)], local agencies
are preempted from requiring additional screening or stealthing of the facility if such screening or
stealthing was not required at the time of original construction. However, the City will condition all
new communication facilities to comply with an Importance Factor of 1.5, which is the building
standard for public safety facilities. This will assure telecommunication facilities are functional and
provide cell coverage after a major natural disaster.
This location is optimal to provide the coverage necessary for existing and expanding service. The
proposed facility will provide a benefit to Santa Ana residents, businesses and motorists who
subscribe to American Tower services by expanding cellular and data coverage in the area. The
proposed facility will be in compliance with Federal law that governs health related issues for
wireless facilities, including safety regulations from the Federal Communications Commission
(FCC) and Federal Aviation Administration (FAA).
Finally, the use will continue to comply with all provisions pertaining to the construction and
Installation of wireless facilities identified in Chapter 41 (Zoning Code) of the SAMC. The facility will
not adversely affect the General Plan as cellular facilities that are designed to be compatible with
the surrounding environment are consistent with the goals and objectives of the Land Use Element,
Table 3: CEQA. Strategic Plan Alignment and Public Notification & Community Outreach
CEQA, Strati, °ic Plan Alignment, and Public Notificatidn & Comrriunit Outreach
CEQA
CEQA Tye
General Rule 15061 (b) (3)]
Document Type
General Rule Exemption ER No. 2016-53
This exemption applies to projects where it can be seen with certainty that there is no
Reason(s)
possibility that the activity in question may have a significant effect on the environment.
Exempt or Analysis
This Is an existing major wireless communication facility and no expansion of square
footage or physical land disturbances are proposed as part of the project.
Strate is Plan Alignment
Approval of this item supports the City's efforts to meet Goal #3 (Economic Development)
Objective #2 of creating new opportunities for business/job growth and encourage private
Goal(s) and Policy(s)
development through new General Plan and Zoning Ordinance policies. As well as
Objective #5 that leverage private investment that results in tax base expansion and job
creation citywide.
Public Notification &Community 9utreach
A public noticed was posted on the project site on May 12, 2017,
Required Measures
Notification by mall was mailed to all property owners and occupants within 500 feet of the
project site on Ma 12 2017.
Newspaper posting was published in the Orange County Reporter on May 12, 2017.
31 B-5
CUP No. 2016-26
March 27, 2017
Page 4
Conclusion
Based on the analysis provided within this report; staff recommends that the Planning Commission
approve Conditional Use Permit No, 2017-15 as conditioned.
Assistant
10:sb
MAPta nnfngQbm mis8lon12e USFLAwer1CUP2017.15-CEL2802S FlowerRenewal.pc
Exhibits: 1, Vicinity Map
2. Location Map
3. Site Photo
4. Site Plan
5. Elevation
6. Resolution
MEW
WARNER AVE.
=�*w L._.7 L_J 7J LJ I I LJ I l— IiL_J I 1
cl C7>
I I
C7 C2
M7 MI �
RI R1 Al RI Rt Al R1r M1 M1
I,. P1 -PPD
y
'4N✓i{ Mt I �7
Mt
C).
M1 Mt M1
C2 rye' nt-0 ni R7 L R7 - R1 � fit �fll d� _ i
� 4
M7
D-
Alm'
I / Rio t1
iii cs
1
C2 M7
w II I �iI iso- �^•II.....�.
-`' 0`. a R1i1 7r PI U C5 11
f
`
IICi
t _
1 R7 ccl �t tr ' ti R1 1
r.1 RI
R7 " R7 0 R7Ri e z
RIF: CR -
`a.
J R7 i lit Rl �_ I
Oh
m Ci nRi mQ Pti Hi
R1 > R7 �PiF C4
Al G34E2ALAWaJLTUR%Lt CR COMMEiMALROUD"AL RI 9NOYEFAM14YIM0EAIIA1-
.B FARgNGMbDIRCA7I0N CL GDAMMEOTC13im R2 WD FAMILY RESOWCE
CEA CCMMEi7ALM MMAIN M7 UGHTINDUSIRAL R7 MUDREOEdS7YMUUPLE
C7 CCMMUNINOaMME07AL M2 HFAWINDUS7WAL FAMILYRESOUNCE
07 MD OOMM. WMMUUAUMU8a1MSISIpCf MO MUTARiOFetAT10NS RA SMRMNAFARIMETS
C2 (YEJE2ALCOMMMElAL 0 OPEN FACIF W SMI)WAL25WE
G1 MYRALK)FIAM P TiUFMONAL GD smEOOEM ommT
C3iA CFNrAL8LGNMARnSTMUAGC FCA RANNmmMMUNI7YDEVHOFMEAT T 'SPELIRCIPAN
C4 RANNEOMM19OCEtlTE4 Rd] PLANNJRMOMALDEVELORdEIT
Cb ARIMALOOMMOROAL
CUP 2017 -15 -CEL
SADDLEBACK MONOPALM RENEWAL
I Al"I 2802 SOUTH FLOWER STREET - 500Fe7
v 1000 FEET—�
P L A N N I N G A N D B U I L D I N G A G E N C Y
VICINITY MAP
EXHIBIT 1
31 B-7
w c
y 1 4 Fo-1 a
�•p jr
q
EXHIBIT 4
31 B-10
�4pA�iP•�E�{: z � �� „(y�tikFAk sy/ ii><
Jill
low
�� & gfill
Yla
sr w
EXHIBIT 5
31 B-11
x'n
lin
tl
elk'
a
71
M
/
e
j
�8
ib
Ile
�.i
i�
r7.
j p; i
at�A
ti
EXHIBIT 5
31 B-11
LS 5.22 .17
RESOLUTION NO. 2017-21
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF SANTA ANA APPROVING CONDITIONAL USE PERMIT
NO. 2017-15 AS CONDITIONED TO ALLOW A 60 -FOOT TALL
WIRELESS FACILITY LOCATED AT 2802 SOUTH FLOWER
STREET
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA ANA
AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. American Tower Corp. (Applicant) is requesting approval of Conditional Use
Permit No. 2017-15 to renew the entitlements of an existing 60 -foot high major
wireless communications facility disguised as a palm tree (mono -palm) located at
2802 South Flower Street.
B. Pursuant to Santa Ana Municipal Code (SAMC) Section 41-198.10, a Conditional
Use Permit (CUP) is required for major wireless communications facilities
established in the City of Santa Ana.
C. SAMC Section 41-198.13 states that major wireless communications facilities
shall be approved for a period not to exceed five (5) years, although subsequent
State legislative acts have required that such facilities be approved for a period of
not less than ten (10) years.
D. As the current facility has reached the end of its 10 year mark, the Applicant is
required to apply for a CUP to renew the entitlements in order to maintain the
current facility.
E. In June 28, 1999, the Planning Commission held a duly noticed public hearing on
Conditional Use Permit No. 1999-10 to approve a new 60 -foot mono -pine
wireless facility. The application was approved at a 6-0 vote (Commissioner
Verino absent).
F. On May 22, 2017, the Planning Commission held a duly noticed public hearing
on Conditional Use Permit No. 2017-15.
Section 2. The Planning Commission determines that the following findings, which
must be established in order to grant this Conditional Use Permit pursuant to SAMC Section
41-638, have been established for Conditional Use Permit No. 2017-15 to allow a 60 -foot tall
wireless facility:
1. That the proposed use will provide a service or facility which will contribute
to the general well-being of the neighborhood or the community.
EXHIBIT 6
Resolution No. 2017-21
Page 1 of 5
M : I
The project will continue to provide a service which will contribute to
the community. The major wireless communication facility will
continue to provide a service to Santa Ana residents, businesses
and motorists who subscribe to American Tower Corp, services by
providing cellular service and data coverage for its users in the
center city sector of Santa Ana.
2. That the proposed use under the circumstances of the particular case will
not be detrimental to the health, safety, or general welfare of persons
residing or working in the vicinity.
The issuance of a new conditional use permit for the facility at this
location will not be detrimental to persons residing or working in the
area as the proposed facility will remain in compliance with Federal
law that governs health-related issues for wireless facilities, including
safety regulations from the Federal Communications Commission
(FCC) and Federal Aviation Administration (FAA).
3. That the proposed use will not adversely affect the present economic
stability or future economic development of properties surrounding the
area.
The facility, in conjunction with the onsite improvements, will be
compatible with the surrounding area and will not adversely affect
the economic viability in the area. The stealthing provided by the
facility's location at the rear of the site will not contribute to any
potential visual blight. Moreover, the facility will maintain and
increase the economic stability for this commercial and industrial
area by providing an additional service for business owners, workers,
and residents in the area.
4. That the proposed use shall comply with the regulations and conditions
specified in Chapter 41 for such use.
The use will continue to comply with all provisions pertaining to the
continuation of existing wireless facilities identified in Chapter 41
(Zoning Code) of the Santa Ana Municipal Code. The facility is
stealthed by its design and surrounding landscape and complies with
other standards outlined in the SAMC. Additional improvements to
the tower will screen the tower and antennas, bringing the facility
into closer compliance with SAMC standards.
5. That the proposed use will not adversely affect the General Plan or any
specific plan of the City.
The major wireless communication facility will not adversely affect
the General Plan as cellular facilities that are designed to be
compatible with the surrounding environment are consistent with the
goals and objectives of the Land Use Element. Goal 1 promotes a
balance of land uses to address community needs, which includes
means of communication that will be served by the facility. In
addition, Goals 3 and 5 require preservation of neighborhood
character and integrity as well as mitigation of developments'
impacts. The mono -palm's location minimizes visual impact on the
area and assists with the stealthing of the equipment. Further,
Resolution No. 2017-21
Page 2 of 5
31 B-13
Policy 2.2 encourages land uses that accommodate the City's
needs for services. Enhancing a cell phone provider's coverage in
the area adds to the services that are readily available for business
owners, workers, and residents in the immediate vicinity.
G. In accordance with the California Environmental Quality Act (CEQA) the
recommended action is exempt from CEQA per Section 15061(b)(3). This
exemption applies to projects where it can be seen with certainty that there is no
possibility that the activity in question may have a significant effect on the
environment. The project proposes to renew an existing major wireless facility
through the issuance of a new CUP. No expansion of square footage or physical
land disturbances are proposed as part of the project. Categorical Exemption
Environmental Review No. 2016-53 will be filed for this project.
Section 3. The Applicant agrees to indemnify, hold harmless, and defend the City of
Santa Ana, its officials, officers, agents, and employees, from any and all liability, claims,
actions or proceedings that may be brought arising out of its approval of this project, and any
approvals associated with the project, including, without limitation, any environmental review or
approval, except to the extent caused by the sole negligence of the City of Santa Ana.
Section 4. The Planning Commission of the City of Santa Ana after conducting the
public hearing hereby approves Conditional Use Permit No. 2017-15, as conditioned in Exhibit
A, attached hereto and incorporated herein. This decision is based upon the evidence
submitted at the abovesaid hearing, which includes, but is not limited to: the Request for
Planning Commission Action dated May 22, 2017, and exhibits attached thereto; and the
public testimony, all of which are incorporated herein by this reference.
ADOPTED this 22nd day of May, 2017 by the following vote:
AYES: Commissioners: ALDERETE, BACERRA, CONTRERAS-LEO,
MCLOUGHLIN, MENDOZA, NGUYEN, VERINO (7)
NOES: Commissioners:
ABSENT: Commissioners:
ABSTENTIONS: Commissioners:
Lynnette Verino
Chairperson
31B-14
Resolution No. 2017-21
Page 3 of 5
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
Lisa Storck
Assistant City Attorney
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, SARAH BERNAL, Commission Secretary, do hereby attest to and certify the attached
Resolution No. 2017-21 to be the original resolution adopted by the Planning Commission of
the City of Santa Ana on May 22, 2017.
Date:
Recording Secretary
City of Santa Ana
31 B-15
Resolution No. 2017-21
Page 4 of 5
EXHIBIT A
Conditions for Approval
Conditional Use Permit No. 2017-15 is approved subject to compliance, to the reasonable
satisfaction of the Planning Manager, with all applicable sections of the Santa Ana Municipal
Code, the California Administrative Code, the California Building Standards Code and all other
applicable regulations.
The Applicant must comply in full with each and every condition listed belowrip or to exercising
the rights conferred by this conditional use permit.
The Applicant must remain in compliance with all conditions listed below throughout the life of
the conditional use permit. Failure to comply with each and every condition may result in the
revocation of the conditional use permit.
1. The Applicant must comply with all conditions and requirements of the Development
Review Committee for the development project (DP No. 2016-18).
2. The Applicant shall replace all existing fronds with new stealth palm fronds similar in type
to the Mexican Fan palm to the existing tower within 180 days of the effective date of this
conditional use permit.
3. Any amendment to this conditional use permit must be submitted to the Planning
Division for review. At that time, staff will determine if administrative relief is available or
the conditional use permit must be amended.
4. The facility shall be maintained as per approved plans. Any damage to existing
structures, walls, parking areas, or landscaping must be repaired.
5. The permit Applicant shall provide a 24-hour phone number to which interference
problems may be reported. This condition will also apply to all existing facilities in the
City of Santa Ana.
6. The permit Applicant will provide a "single point of contact" in its Engineering and
Maintenance Departments to insure continuity on all interference issues. The name,
telephone number, fax number and e-mail address of that person shall be provided to
the City's designated representative upon activation of the facility.
7. The permit Applicant shall ensure that lessee or other user(s) shall comply with the
terms and conditions of this permit, and shall be responsible for the failure of any lessee
or other users under the control of permit Applicant to comply.
Resolution No. 2017-21
Page 5 of 5
31 B-16