HomeMy WebLinkAbout31A - CUP -3308 W WARNER AVEREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
JULY 5, 2017
TITLE:
RECEIVE AND FILE STAFF REPORT
APPROVING CONDITIONAL USE PERMIT
NO. 2017-16 TO ALLOW CONTINUED USE
OF A 60 -FOOT HIGH WIRELESS
COMMUNICATION FACILITY FOR T -MOBILE
WEST LOCATED AT 3308 WEST WARNER
AVENUE — SMARTLINK LLC., APPLICANT
(STRATEGIC PLAN NO. 3,2)
Z'7
CITY ANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
r�a7:Ti1TT4W
❑ As Recommended
❑ As Amended
❑ Ordinance on 15' Reading
❑ Ordinance on 2ntl Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Receive and file the staff report approving Conditional Use Permit No. 2017-16 as conditioned.
PLANNING COMMISSION ACTION
At its regular meeting on June 12, 2017, by a vote of 6:0, the Planning Commission adopted a
resolution approving Conditional Use Permit No. 2017-16 as conditioned to renew the
entitlements of an existing 60 -foot high mono -pole major wireless communication facility located
at 3308 West Warner Avenue located in the Light Manufacturing (M-1) zoning district. The
Planning Commission made no changes to the recommendation outlined in the attached staff
report (Exhibit A).
DISCUSSION
Smartlink, LLC. is proposing to renew the entitlements of an existing 60 -foot high wireless
communications facility. In addition, the applicant will remove and replace three antennas and the
radome from the mono -pole and install three new remote radio units (RRU's) within the existing
160 -square foot equipment building. The mono -pole and equipment enclosure are located within
a screened shelter on the southwest corner of the property, adjacent to the Union Pacific railroad
line and set back approximately 200 -feet from Warner Avenue. Aesthetically, the mono -pole will
continue to be stealthed as a light standard. The applicant will landscape an existing planter
along the Warner Avenue frontage, re -stripe and re -slurry the parking lot as needed, and re -paint
the wireless communications facility enclosure to ensure that the subject facility and site continue
to comply with all SAMC requirements.
31A-1
CUP No. 2017-16 –T -Mobile West Wireless Facility at 3308 West Warner Avenue
July 5, 2017
Page 2
In processing wireless communications facilities, the City of Santa Ana must consider provisions
contained within Section 6409(a) of the Middle Class Tax Relief Act [47 U.S.C. § 1455(a)], which
limits the ability of local agencies to impose additional conditions of approval when cell phone
tower permits are renewed. These limits include seismic retrofits, which, according to a study by
the City of Los Angeles, cost as much as constructing a new tower. However, the City will
condition all new communication facilities to comply with an Importance Factor of 1.5, which is
the building standard for public safety facilities. This will ensure telecommunication facilities are
functional and provide cell coverage in the event of a major natural disaster.
Full-sized site plans are available for public viewing in the Clerk of the Council Office.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #3 - Economic Development,
Objective #2 (create new opportunities for business/job growth and encourage private
development through new General Plan and Zoning Ordinance policies).
FISCAL IMPACT
There is no fiscal impact associated with this action.
Candida Neal, AICP —�
Planning Manager
Planning & Building Agency
JG:rb
S:PIanning Commission\02-12-17\CUP No. 2017-16.cc
Exhibit: A. Planning Commission Staff Report
31A-2
REQUEST FOR
Planning Commission Action
PLANNING COMMISSION MEETING DATE:
JUNE 12, 2017
TITLE:
PUBLIC HEARING - CONDITIONAL USE PERMIT
NO. 2017-16 TO ALLOW CONTINUED USE OF A 60 -
FOOT HIGH WIRELESS COMMUNICATION FACILITY
FOR T -MOBILE WEST LOCATED AT 3308 WEST
WARNER AVENUE — SMARTLINK LLC., APPLCIANT
{STRATEGIC PLAN NO. 3,2)
Prepared by Jerry C_Guevara
r��u � ecutiv irector
RECOMMENDED ACTION
PLANNING COMMISSION SECRETARY
APPROVED
❑ As Recommended
❑ As Amended
❑ Set Public Hearing For
DENIED
❑ Applicant's Request
❑ Staff Recommendation
CONTINUED TO
Planning nager
Adopt a resolution approving Conditional Use Permit No. 2017-16 as conditioned.
Executive Summary
Smartlink, LLC., representing T -Mobile West, LLC., is requesting approval of a conditional use
permit (CUP) to renew an existing 60 -foot high major wireless ("mono -pole") communication
facility located at 3308 West Warner Avenue. Major wireless communication facilities require
approval of a CUP pursuant to Section 41-198.3(b) of the Santa Ana Municipal Code (SAMC).
The subject site is currently developed with the subject mono -pole and a communication
equipment enclosure, as well as a 26,000-sqaure foot tilt up industrial building.
Table 1: Project and Location Information
Item
Information
Pro ect Address
3308 West Warner Avenue
Nearest Intersection
Warner Avenue and Susan Street
General Plan Designation
Industrial (IND)
Zoning Designation
Light Manufacturing (M-1)
Surrounding Land Uses
North Industrial
East Industrial
South Industrial
West Industrial
Property Size
1.5 acres
Existing Site Development
The site is developed with a t 26,000 -square foot concrete tilt up industrial
building.
Use Permissions
Allowed with a conditional useermit CUP
Zoning Code Sections Affected
Use
SAMC Section 41-198.3 b
Operational Standards
SAMC Section 41-198
Wireless Communication Facilities)
EXHIBIT A
31A-3
Conditional Use Permit No. 2017-16
June 12, 2017
Page 2
Project Description
Smartlink, Ll -C. is proposing to renew the entitlements of an existing 60 -foot high wireless
communications facility. In addition, the applicant is proposing to remove and replace three
antennas and the radome from the mono -pole and install three new remote radio units (RRU's)
within the existing 160 -square foot equipment building. The mono -pole and equipment enclosure
are located within a screened shelter on the southwest corner of the property, adjacent to the
Union Pacific railroad line and set back approximately 200 -feet from Warner Avenue.
Aesthetically, the mono -pole will continue to be stealthed as a light standard. The applicant will
landscape an existing planter along the front fagade of the main building that fronts Warner
Avenue, re -stripe and re -slurry the parking lot as needed, and re -paint the wireless
communications facility enclosure to ensure that the subject facility and site continue to comply
with all SAMC requirements.
Table 2: Development Standards
Standards
-1 by SAMC"
Provided-'
Stealth Design
Concealed Structure
Stealth as a Light Standard
Site Selection
Areas that will minimize aesthetic
The wireless facility is located at the
Intrusion
southwest corner of the property and
set back approximately 200 -feet from
Warner Avenue.
Maximum Facility Height
_
60 feet
60 feet
Landscaping
Groundcover at the base of the
Applicant will provide landscape at
facility and one 24 inch box tree
the front of the main building to
comply with this requirement.
Equipment Screening
Decorative fencing such as wrought
The wireless community facility is
iron or block around the wireless
currently screened by a six foot high
facility
CMU wall and the equipment is
housed within a 14 foot high building.
In January 2005, the Planning Commission approved CUP No. 2004-33 to allow the construction
of the subject mono -pole (stealth as a light standard) and equipment enclosure. Pursuant to
SAMC Section 41-198.3(3), a CUP is required for all major wireless communications facilities In
the City. Furthermore, Section 41-198.13 states that major wireless communications facilities
shall be approved for a period not to exceed five years. Since the adoption of the City's Wireless
Communication Facilities Ordinance, Federal actions have changed and now require that cities
approve wireless facilities for a period of not less than 10 years. Since the current facility is now
over 10 years old, the applicant is required to apply for a new CUP in order to maintain
entitlements for the wireless facility.
Proiect Analysis
In July of 1998, the City Council adopted Ordinance No. NS -2356, which established regulations
for wireless communication facilities throughout the City. Major wireless communication facilities
such as the T -Mobile West facility are required to have a stealth design and to be located in an
area that provide the greatest amount of visual screening. Further, these major facilities require
31A-4
Conditional Use Permit No. 2017-16
June 12, 2017
Page 3
the approval of a CUP. Staff has reviewed the applicant's request to continue operation of a
major wireless communication facility at this location and has determined that the following
analysis warrants staff's recommendation of approval for the CUP.
The existing mono -pole is compatible with the surrounding area and will not adversely affect the
economic viability in the area as the mono -pole has a stealth design that will maintain the
appearance of a light standard. In addition, due to its location at the rear of an industrial site and
surrounded by industrial uses, the facility will not have any negative visual impacts nor adverse
impacts to the surrounding properties. As part of the development review of the project, staff
worked closely with the applicant to identify improvements to enhance the overall appearance of
the site. As part of this application, the applicant will install additional landscape to an existing
planter along the front facade of the main building that fronts Warner Avenue, re -stripe the
parking lot to meet current parking standards, fill in pavement cracks with a layer of slurry seal as
needed, and re -paint the wireless communications facility enclosure. These improvements will
bring the site into compliance with Section 41-194.4 of the SAMC.
Pursuant to provisions contained within Section 6409(a) of the Middle Class Tax Relief Act [47
U.S.C. § 1455(a)], local agencies are preempted from requiring additional screening or stealthing
of the facility if such screening or stealthing was not required at the time of original construction.
Staff believes that the requested site improvements are in accordance with this the Middle Class
Tax Relief Act. In addition, the wireless facility will be maintained to comply with the California
Building Code Section 3108, which sets the standards for the construction of telecommunication
and broadcast towers.
Furthermore, this location is optimal to provide the coverage necessary for existing and
expanding service. The existing facility will continue to benefit the immediate community by
assisting in closing service gaps and providing additional calling capacity for T -Mobile in order to
Offer high quality coverage for residents and businesses In the City. The facility will be in
compliance with Federal law that governs health related issues for wireless facilities, including
safety regulations from the Federal Communications Commission (FCC) and Federal Aviation
Administration (FAA).
Finally, the use will continue to comply with all provisions pertaining to the construction and
installation of wireless facilities identified in Chapter 41 (Zoning Code) of the SAMC. The facility
will not adversely affect the General Plan as cellular facilities that are designed to be compatible
with the surrounding environment are consistent with the goals and objectives of the Land Use
Element.
Table 3• CEQA Strategic Plan Alignment and Public Notification & Community Outreach
CEQA Strategic Plan Alignment, and Public Notification & Community Outreach
CEQA
CEQA T e
General Rule Section 15061 (b) t3)1
Document T e
General Rule Exemption (ER No. 2015-85)
Reason(s) Exempt or
Analysis
This exemption applies to projects where it can be seen with certainty that there is no
possibility that the activity in question may have a significant effect on the environment.
This is an existing wireless communication facility and no alterations are being proposed
at this time. Furthermore, the facility wi11 comply with FAA and FCC re Mations.
31A-5
Conditional Use Permit No. 2017-16
June 12, 2017
Page 4
CE(�tegic Plan Alignment, and Public Notification & Communit Outreach
L
_
strategic Plan Alignment
Goal(s) and Policy(s)
Goal 3 (Economic Development), Objective 2 (create new opportunities for business/job
growth and encourage private development through new General Plan and Zoning
Ordinance policies)
Public Notification & Community Outreach ;
Required Measures
A ublic noticed was posted on the project site on June 1 2017
Notification by mail were mailed to all property owners and occupants within 500 feet of
the ro'ect site on June 1, 2017
News a er ostin was ublished in the Oran e Count Reporter on June 1, 2017
The sub'ect si#e is not located within the boundaries of a nei hborhood association
Conclusion
Based on the analysis provided within this report, staff recommends that the Planning
Commission approve CUP No. 2017-16 as conditioned.
Jerry C. Guevara
Assistant Planner I
JG:sb
MAConditlonal Use Per[TA2017CUP No, 2017-18 at 3308 W. Warner Ave=P No. 2017-16.pGAM
Exhibits: 1 — Resolution
2 — Vicinity Map
3 — Land Use Map
4 — Site Photo
5—Site Plan
6 — Enlarged Site Plan
31A-6
6.12.17 LS
RESOLUTION NO. 2017 -XX
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF SANTA ANA APPROVING CONDITIONAL
USE PERMIT NO. 2017-16, AS CONDITIONED, TO
ALLOW CONTINUED USE OF A 60 -FOOT HIGH
WIRELESS FACILITY ON THE PROPERTY LOCATED AT
3308 WEST WARNER AVENUE
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF
SANTA ANA AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Smartlink, LLC. ("Applicant"), representing T -Mobile West, LLC., is
requesting approval of Conditional Use Permit No. 2017-16 to renew the
entitlements of an existing 60 -foot high mono -pole major wireless
communications facility located at 3308 West Warner Avenue.
B. Pursuant to Santa Ana Municipal Code (SAMC) Section 41-198.10, a
conditional use permit (CUP) is required for major wireless communications
facilities established in the City of Santa Ana.
C. SAMC Section 41-198.13 states that major wireless communications
facilities shall be approved for a period not to exceed five (5) years, although
subsequent legislative acts have required that such facilities be approved for
a period of not less than ten (10) years.
D. On January 10, 2005, the Planning Commission held a duly noticed public
hearing on Conditional Use Permit No. 2004-33 to approve a new60-foot
mono -pole wireless communication facility. The applicant was approved at a
5-1 vote.
E. As the current facility's entitlements are now over its 10 year timeframe, the
Applicant is required to apply for a new CUP in order to maintain the
entitlements of the facility current.
F. On June 12, 2017, the Planning Commission held a duly noticed public
hearing on Conditional Use Permit No. 2017-16.
G. Santa Ana Municipal Code Section 41-638 authorizes the Planning
Commission to grant a conditional use permit upon making certain findings:
Resolution No. 2017-xx
Page 1 of 6
31A-7
1. The proposed use will provide a service or facility which will
contribute to the general well being of the neighborhood or the
community.
The existing 60 -foot high wireless communications facility
will continue to provide a service which will contribute to the
community. The facility will provide a service to Santa Ana
residents, businesses and motorists who subscribe to
Applicant's providers by providing cellular service and data
coverage for its users.
2. The proposed use under the circumstances of the particular case
will not be detrimental to the health, safety, or general welfare of
persons residing or working in the vicinity.
The issuance of a conditional use permit to re -entitle this
existing wireless communication facility located at 3308
West Warner Avenue will not be detrimental to persons
residing or working in the area as the facility will remain in
compliance with Federal Communications Commission
(FCC) and Federal Aviation Administration (FAA) safety
regulations. Furthermore, Federal law exempts local
jurisdictions from regulating health-related issues as these
issues are covered by Federal laws.
3. The proposed use will not adversely affect the present economic
stability or future economic development of properties surrounding
the area.
The existing mono -pole will be compatible with the
surrounding area and will not adversely affect the economic
viability in the area as the mono -pole has a stealth design
that will maintain the appearance of a light standard. In
addition, due to its location at the rear southwest corner of
an industrial site and setback approximately 200 -feet from
Warner Avenue, it is not expected to create any adverse
economic impacts for the surrounding properties.
4. The proposed use will comply with the regulations and conditions
specified in Chapter 41 for such use.
The use will continue to comply with all provisions pertaining
to the construction and installation of wireless facilities in
Chapter 41 (Zoning Code) of the SAMC. Additional on-site
improvements will bring the site into closer compliance with
SAMC standards.
Resolution No. 2017-xx
Page 2 of 6
31A-8
5. The proposed use will not adversely affect the General Plan or any
specific plan of the City.
The wireless facility will not adversely affect the intent of the
General Plan as cellular facilities that are designed to be
compatible with the surrounding environment are consistent
with the goals and objectives of the City's Land Use
Element. Goal 1 promotes a balance of land uses to address
community needs, which includes means of communication
that will be served by the mono -pole. In addition, Goals 3
and 5 require preservation of neighborhood character and
integrity as well as mitigation of development impacts. The
mono -pole's location minimizes visual impact on the area
and assists with the screening of the equipment. Further,
Policy 2.2 encourages land uses that accommodate the
City's needs for services. Enhancing a cell phone provider's
coverage in the area adds to the services that are readily
available for business owners, workers, and residents in the
immediate vicinity.
H. In accordance with the California Building Code Section 3108, the subject
telecommunication facility will be designed, constructed, and/or maintained
in accordance with the provisions of TIA-222, which is a set of nationally
recognized standards for the constructions of telecommunication and
broadcast towers.
Section 2. In accordance with the California Environmental Quality Act (CEQA)
the recommended action is exempt from CEQA per Section 15061(b)(3). This exemption
applies to projects where it can be seen with certainty that there is no possibility that the
activity in question may have a significant effect on the environment. The project proposes
to renew an existing major wireless facility through the issuance of a new CUP. No
expansion of square footage or physical land disturbances are proposed as part of the
project. Categorical Exemption Environmental Review No. 2015-85 will be filed for this
project.
Section 3. The applicant agrees to indemnify, hold harmless, and defend the
City of Santa Ana, its officials, officers, agents, and employees, from any and all liability,
claims, actions or proceedings that may be brought arising out of its approval of this
project, and any approvals associated with the project, including, without limitation, any
environmental review or approval, except to the extent caused by the sole negligence of
the City of Santa Ana.
Resolution No. 2017-xx
Page 3 of 6
31A-9
Section 4. The Planning Commission of the City of Santa Ana after conducting
the public hearing hereby approves Conditional Use Permit No. 2017-16 as conditioned
in Exhibit A, attached hereto and incorporated herein, for the project located at 3308
West Warner Avenue. This decision is based upon the evidence submitted at the above
said hearing, which includes, but is not limited to: the Request for Planning Commission
Action dated June 12, 2017, and exhibits attached thereto; and, the public testimony,
written and oral, all of which are incorporated herein by this reference.
ADOPTED this 12th day of June, 2017.
AYES: Commissioners:
NOES: Commissioners:
ABSENT: Commissioners:
ABSTENTIONS: Commissioners:
Lyn nette Verino
Chairperson
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
Lisa Storck
Assistant City Attorney
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, SARAH BERNAL, Commission Secretary, do hereby attest to and certify the attached
Resolution No. 2017-xx to be the original resolution adopted by the Planning
Commission of the City of Santa Ana on June 12, 2017.
Date:
Commission Secretary
City of Santa Ana
31A-10
Resolution No. 2017-xx
Page 4 of 6
EXHIBIT A
Conditions of Approval for Conditional Use Permit No. 2017-16
Conditional Use Permit No. 2017-16 is approved subject to compliance, to the
reasonable satisfaction of the Planning Manager, with all applicable sections of the
Santa Ana Municipal Code, the California Administrative Code, the California Building
Standards Code and all other applicable regulations.
The Applicant must comply in full with each and every condition listed below prior to
exercising the rights conferred by this conditional use permit.
The Applicant must remain in compliance with all conditions listed below throughout the
life of the conditional use permit. Failure to comply with each and every condition may
result in the revocation of the conditional use permit.
Planning Division
1. Any amendment to this conditional use permit must be submitted to the Planning
Division for review. At that time, staff will determine if administrative relief is
available or the conditional use permit must be amended.
2. The proposed facility shall be maintained as per approved plans and any existing
landscaping shall be protected in place while any required improvements are
installed for the 60 -foot wireless facility.
3. The permit Applicant shall provide a 24-hour phone number to which interference
problems may be reported. This condition will also apply to all existing facilities in
the City of Santa Ana.
4. The permit Applicant will provide a "single point of contact" in its Engineering and
Maintenance Departments to insure continuity on all interference issues. The name,
telephone number, fax number and e-mail address of that person shall be provided
to the City's designated representative upon activation of the facility.
5. The permit Applicant shall insure that lessee or other user(s) shall comply with the
terms and conditions of this permit, and shall be responsible for the failure of any
lessee or other users under the control of permit applicant to comply.
6. Applicant acknowledges and agrees that the permit is expressly conditioned on the
applicant maintaining the subject property in a well-maintained condition, including
the surrounding landscape.
7. Conditional Use Permit No. 2017-16 expires 10 years from the date of City Council
approval.
Resolution No. 2017-xx
Page 5 of 6
31A-1 1
8. The following on-site improvements shall be conducted prior to the release of this
resolution:
a. The parking lot shall be restriped in accordance to Sec. 41-1303 of the
SAMC. Parking stalls shall be double striped and shall not be less than
eight (8) feet six (6) inches wide and eighteen (18) feet long.
b. Fill in pavement cracks with a layer of slurry seal as needed.
C. Repaint equipment building and shelter.
d. Install landscape to the existing planter along the front fapade of the
main building that fronts Warner Avenue, as noted on the approved
plans.
Once the conditions and improvements have been addressed, contact the case
planner to schedule an inspection. The case planner will verify that all conditions
and improvements have been met and will release the resolution to the applicant.
9. In the event of graffiti markings, applicant shall eliminate all such graffiti within
twenty four (24) hours, with or without notice from the City, as a condition of the
permit.
Resolution No. 2017-xx
Page 6 of 6
31A-12
ml
he/ M Rl of z . R1
Mi Ml Mi RI
FORor.M 1 '�. Rl MOE�
F3 Al
Ml M1 Mi Ri
R3 Rl
M1 M1
M1 RR R1." kR1
°E Rl
PENDLE- AV M1 MI .Ml R1
�p j RI
Al =E- R4 l
M1 Mi e \ +
M1
do+..o C4
WARNER Au IITI R2-PRD
PRO ECTS[iE
M1
? / F
dRiap CE-
R4 J
M1 M1 "PR1
m Z
m R1 w
m M1 i l7
= I I
I I
SEGERSTROM AVE.
Al GEJ LAGRCULTURAL} CR CCMMFUALR 3DBAPAL Ri SNGLEFAMILYRBDEN7AL
-B PARKNGMODI9CAl10N �MEAT0BTER R2 TVVID AMILYFODIEN E
CSM OCMMHNOALSOUTH MAIN M1 LICNTINDUSFRAL m MULIAFLEDEASTYMULTIPLE
C1 COMMUNNYCOMME AL M2 HFAVYINDL Al_ FAMILYRE3DBdCE
Ci-MD COMM. CCMMFTTAAlJMU531M DISRACT MO MILITAR(OFB2ATTONS RA S. IEUREANAFARTMBNM
C2 G]NEALOCMNI SAL 0 OP SFAC RE FESDENTALRAATE
C3 GENTRALBASNESS P PRDFF90NAL YcOHCDE OPMENT
C1A CENTRAL BASNESSARBSTMLIAGE FCD PANN®COMMUNITYDEVO.O%NBAT S° SPEGBCP N
CA %ANND)SiOP%NGCSAIIIR PANNEDFE9DRNTALDE 0PMBJT
C5 AWMALOOMMDdCAL
CUP 2017-16
At- MONO -POLE WIRELESS FACILITY cw
3308 WEST WARNER AVENUE
— — = 500 FEET
1" = 1000 FEET
P L A N N I N G A N D B U I L D I N G A G E N C Y
\ EXHIBIT
p22
J MAYS � J
CUP 2017-16
>. MONO -POLE WIRELESS FACILITY
3308 WEST WARNER AVENUE �qy
P L A N N I N G A N D B U I L D I N G A G E N C Y
LAND USE MAP
EXHIBIT 3
31A-14
N�
Q
— RI L
N E
INDUS RIAL
Pv�NV
ER
�
Lu
INDUS
r
4 s.f
Q
w IND STRIAE
¢
CENTRAL AVE.
LL
v
CENTRAL AVE.
}
�
O
D
z Z
J
ADAMS ST.
�
INDUSTRIAL
J
a
~
w
F
v
>
z
lwi
Z
V
w
_
SEG ERSTRO M
AVENUE
CUP 2017-16
>. MONO -POLE WIRELESS FACILITY
3308 WEST WARNER AVENUE �qy
P L A N N I N G A N D B U I L D I N G A G E N C Y
LAND USE MAP
EXHIBIT 3
31A-14
e, ..
-
5A d \
EXI3DNr
PARKING LOr
;7
1 E -
Lt IT T_
IE ET,Il E,
IT IT-, I`, - � I
-[L 41tFILL.E I
E TF
WITH 4 LA�E` 'F
-
IIEEJZl.
I,E LI',F r
I T LLE �E 1,1,TE
'EE NEET
ATE -'I IE,
H - '-E CAB Aid? Ea
IDING
BUILDING
'El "A It,", L T,
" I I I tl.W, FILL, I
'Iffli LF
EIL
R;F
1101�
pil
0"
Awl: I IIII
j I
_EXISTING"P-MOBILE FACILIM AND
LOCATION Or PROPOSED MODIMATIQNS
4'r
CUP 2017-17
MONO -POLE WIRELESS FACILITY
3308 WEST WARNER AVENUE
EXHIBIT 5
SITE PLAN
31A-16
I
UD
'-L
I l' ILI I T I
CUP 2017-16
MONO -POLE WIRELESS FACILITY
3308 WEST WARNER AVENUE
EXHIBIT 6
ENLARGED SITE PLAN
31A-17
6.12.17 LS
RESOLUTION NO. 2017-23
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF SANTA ANA APPROVING CONDITIONAL
USE PERMIT NO. 2017-16, AS CONDITIONED, TO
ALLOW CONTINUED USE OF A 60 -FOOT HIGH
WIRELESS FACILITY ON THE PROPERTY LOCATED AT
3308 WEST WARNER AVENUE
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF
SANTA ANA AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. Smartlink, LLC. ("Applicant"), representing T -Mobile West, LLC., is
requesting approval of Conditional Use Permit No. 2017-16 to renew the
entitlements of an existing 60 -foot high mono -pole major wireless
communications facility located at 3308 West Warner Avenue.
B. Pursuant to Santa Ana Municipal Code (SAMC) Section 41-198.10, a
conditional use permit (CUP) is required for major wireless communications
facilities established in the City of Santa Ana.
C. SAMC Section 41-198.13 states that major wireless communications
facilities shall be approved for a period not to exceed five (5) years, although
subsequent legislative acts have required that such facilities be approved for
a period of not less than ten (10) years.
D. On January 10, 2005, the Planning Commission held a duly noticed public
hearing on Conditional Use Permit No. 2004-33 to approve a new 60 -foot
mono -pole wireless communication facility. The applicant was approved at a
5-1 vote.
E. As the current facility's entitlements 10 year timeframe, the Applicant is
required to apply for a new CUP in order to maintain the entitlements of the
facility current.
F. On June 12, 2017, the Planning Commission held a duly noticed public
hearing on Conditional Use Permit No. 2017-16.
G. Santa Ana Municipal Code Section 41-638 authorizes the Planning
Commission to grant a conditional use permit upon making certain findings:
Resolution No. 2017-23
Page 1 of 6
31A-18
1. The proposed use will provide a service or facility which will
contribute to the general well being of the neighborhood or the
community.
The existing 60 -foot high wireless communications facility
will continue to provide a service which will contribute to the
community. The facility will provide a service to Santa Ana
residents, businesses and motorists who subscribe to
Applicant's providers by providing cellular service and data
coverage for its users.
2. The proposed use under the circumstances of the particular case
will not be detrimental to the health, safety, or general welfare of
persons residing or working in the vicinity.
The issuance of a conditional use permit to re -entitle this
existing wireless communication facility located at 3308
West Warner Avenue will not be detrimental to persons
residing or working in the area as the facility will remain in
compliance with Federal Communications Commission
(FCC) and Federal Aviation Administration (FAA) safety
regulations. Furthermore, Federal law exempts local
jurisdictions from regulating health-related issues as these
issues are covered by Federal laws.
3. The proposed use will not adversely affect the present economic
stability or future economic development of properties surrounding
the area.
The existing mono -pole will be compatible with the
surrounding area and will not adversely affect the economic
viability in the area as the mono -pole has a stealth design
that will maintain the appearance of a light standard. In
addition, due to its location at the rear southwest corner of
an industrial site and setback approximately 200 -feet from
Warner Avenue, it is not expected to create any adverse
economic impacts for the surrounding properties.
4. The proposed use will comply with the regulations and conditions
specified in Chapter 41 for such use.
The use will continue to comply with all provisions pertaining
to the construction and installation of wireless facilities in
Chapter 41 (Zoning Code) of the SAMC. Additional on-site
improvements will bring the site into closer compliance with
SAMC standards.
Resolution No. 2017-23
Page 2 of 6
31A-19
5. The proposed use will not adversely affect the General Plan or any
specific plan of the City.
The wireless facility will not adversely affect the intent of the
General Plan as cellular facilities that are designed to be
compatible with the surrounding environment are consistent
with the goals and objectives of the City's Land Use
Element. Goal 1 promotes a balance of land uses to address
community needs, which includes means of communication
that will be served by the mono -pole. In addition, Goals 3
and 5 require preservation of neighborhood character and
integrity as well as mitigation of development impacts. The
mono -pole's location minimizes visual impact on the area
and assists with the screening of the equipment. Further,
Policy 2.2 encourages land uses that accommodate the
City's needs for services. Enhancing a cell phone provider's
coverage in the area adds to the services that are readily
available for business owners, workers, and residents in the
immediate vicinity.
H. In accordance with the California Building Code Section 3108, the subject
telecommunication facility will be designed, constructed, and/or maintained
in accordance with the provisions of TIA-222, which is a set of nationally
recognized standards for the construction of telecommunication and
broadcast towers.
Section 2. In accordance with the California Environmental Quality Act (CEQA)
the recommended action is exempt from CEQA per Section 15061(b)(3). This exemption
applies to projects where it can be seen with certainty that there is no possibility that the
activity in question may have a significant effect on the environment. The project proposes
to renew an existing major wireless facility through the issuance of a new CUP. No
expansion of square footage or physical land disturbances are proposed as part of the
project. Categorical Exemption Environmental Review No. 2015-85 will be filed for this
project.
Section 3. The applicant agrees to indemnify, hold harmless, and defend the
City of Santa Ana, its officials, officers, agents, and employees, from any and all liability,
claims, actions or proceedings that may be brought arising out of its approval of this
project, and any approvals associated with the project, including, without limitation, any
environmental review or approval, except to the extent caused by the sole negligence of
the City of Santa Ana.
Resolution No. 2017-23
Page 3 of 6
31A-20
Section 4. The Planning Commission of the City of Santa Ana after conducting
the public hearing hereby approves Conditional Use Permit No. 2017-16 as conditioned
in Exhibit A, attached hereto and incorporated herein, for the project located at 3308
West Warner Avenue. This decision is based upon the evidence submitted at the above
said hearing, which includes, but is not limited to: the Request for Planning Commission
Action dated June 12, 2017, and exhibits attached thereto; and, the public testimony,
written and oral, all of which are incorporated herein by this reference.
ADOPTED this 12th day of June, 2017,
AYES: Commissioners: Alderete, Bacerra, Contreras -Leo, McLoughlin, Mendoza,
Verino (6)
NOES: Commissioners: None (0)
ABSENT: Commissioners: Nguyen (1)
ABSTENTIONS: Commissioners: None (0)
Lynnette Verino
Chairperson
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
Lisa Storck
Assistant City Attorney
�Nairi��y_�rxQ y_l 11r.11 F_�li.�i.r_��iz.»r�rn_����
I, ROSA BARELA, Acting Recording Secretary, do hereby attest to and certify the
attached Resolution No. 2017-23 to be the original resolution adopted by the Planning
Commission of the City of Santa Ana on June 12, 2017.
Date:
Acting Recording Secretary
City of Santa Ana
31A-21
Resolution No. 2017-23
Page 4 of 6
Conditions of ADDroval for Conditional Use Permit No. 2017-16
Conditional Use Permit No. 2017-16 is approved subject to compliance, to the
reasonable satisfaction of the Planning Manager, with all applicable sections of the
Santa Ana Municipal Code, the California Administrative Code, the California Building
Standards Code and all other applicable regulations.
The Applicant must comply in full with each and every condition listed below prior to
exercising the rights conferred by this conditional use permit.
The Applicant must remain in compliance with all conditions listed below throughout the
life of the conditional use permit. Failure to comply with each and every condition may
result in the revocation of the conditional use permit.
Planning Division
1. Any amendment to this conditional use permit must be submitted to the Planning
Division for review. At that time, staff will determine if administrative relief is
available or the conditional use permit must be amended.
2. The proposed facility shall be maintained as per approved plans and any existing
landscaping shall be protected in place while any required improvements are
installed for the 60 -foot wireless facility.
3. The permit Applicant shall provide a 24-hour phone number to which interference
problems may be reported. This condition will also apply to all existing facilities in
the City of Santa Ana.
4. The permit Applicant will provide a "single point of contact" in its Engineering and
Maintenance Departments to insure continuity on all interference issues. The name,
telephone number, fax number and e-mail address of that person shall be provided
to the City's designated representative upon activation of the facility.
5. The permit Applicant shall insure that lessee or other user(s) shall comply with the
terms and conditions of this permit, and shall be responsible for the failure of any
lessee or other users under the control of permit applicant to comply.
6. Applicant acknowledges and agrees that the permit is expressly conditioned on the
applicant maintaining the subject property in a well-maintained condition, including
the surrounding landscape.
7. Conditional Use Permit No. 2017-16 expires 10 years from the date of City Council
approval.
Resolution No. 2017-23
Page 5 of 6
31A-22
8. The following on-site improvements shall be conducted prior to the release of this
resolution:
a. The parking lot shall be restriped in accordance to Sec. 41-1303 of the
SAMC. Parking stalls shall be double striped and shall not be less than
eight (8) feet six (6) inches wide and eighteen (18) feet long.
b. Fill in pavement cracks with a layer of slurry seal as needed.
C. Repaint equipment building and shelter.
d. Install landscape to the existing planter along the front fagade of the
main building that fronts Warner Avenue, as noted on the approved
plans.
Once the conditions and improvements have been addressed, contact the case
planner to schedule an inspection. The case planner will verify that all conditions
and improvements have been met and will release the resolution to the applicant.
9. In the event of graffiti markings, applicant shall eliminate all such graffiti within
twenty four (24) hours, with or without notice from the City, as a condition of the
permit.
Resolution No. 2017-23
Page 6 of 6
31A-23
31A-24