California WaterFix
65A
April 3, 2018
Recent Developments
DWRapproved CA WaterFixin July 2017
•
9000 cfs, two tunnels, and three intakes
–
October 2017 MWDBoard approved financing
•
options
February 2018 DWRannounced two-stage
•
construction option
Stage 1: two intake structures, one tunnel, 6000
•
cfspumps station
Stage 2: one intake structure, one tunnel, 3,000
•
cfspump station
Stage 1
Two intake stucture
•
Single tunnel
•
6,000 cfs
•
MWDshare will be 47% of SWP
•
MWDshare of total project 31.6% equals to
•
$5.3Billion
Monthly Household cost is $2.40
•